CN105805414B - A kind of heavy caliber flexibility socket joint concrete pipe stirs mill take-up device and tenses construction method - Google Patents

A kind of heavy caliber flexibility socket joint concrete pipe stirs mill take-up device and tenses construction method Download PDF

Info

Publication number
CN105805414B
CN105805414B CN201610313552.7A CN201610313552A CN105805414B CN 105805414 B CN105805414 B CN 105805414B CN 201610313552 A CN201610313552 A CN 201610313552A CN 105805414 B CN105805414 B CN 105805414B
Authority
CN
China
Prior art keywords
pipe
cushion rubber
socket
bellmouth
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610313552.7A
Other languages
Chinese (zh)
Other versions
CN105805414A (en
Inventor
孙伟
耿学宽
孙守岗
秦雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG ZAOJIAN CONSTRUCTION GROUP Co Ltd
Original Assignee
SHANDONG ZAOJIAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG ZAOJIAN CONSTRUCTION GROUP Co Ltd filed Critical SHANDONG ZAOJIAN CONSTRUCTION GROUP Co Ltd
Priority to CN201610313552.7A priority Critical patent/CN105805414B/en
Publication of CN105805414A publication Critical patent/CN105805414A/en
Application granted granted Critical
Publication of CN105805414B publication Critical patent/CN105805414B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors
    • F16L1/09Accessories therefor, e.g. anchors for bringing two tubular members closer to each other

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Sewage (AREA)

Abstract

The field test of comb-- pipe and repairing-- down tube-- dig interfaces hole-- cleaning barrel of pipe, cushion rubber-- top is covered on the mouth of pipe-- cleaning rubber gasket-- socket, socket mouth-- inspection center line, elevation-- with stock rod check cushion rubber position-- lock tube, accelerate project progress, it is simple with " manually stirring grain immediately mouth method " technical operation, only needing two people that drawknot crossbeam is put into tube end can drawknot, jack efficiency manually back and forth need not be carried and bundled in groove improve 1/3rd than traditional " jack tension method ", shorten the installation period of pipeline, accelerate project progress.

Description

A kind of heavy caliber flexibility socket joint concrete pipe stirs mill take-up device and tenses construction method
Technical field
It the utility model is related to the take-up device of heavy caliber flexibility cushion rubber concrete pipe bell socket and its use installation side Method.It can guarantee that engineering construction quality and improve the installation rate of concrete pipe, improve mechanization of building operation degree, reduce artificial work Intensity.
Background technology
Pipe of concrete is used to convey the fluids such as water, oil, gas.Pipe of concrete is divided into plain concrete pipe, ordinary reinforced concrete Pipe, seif-citing rate concrete reinforced pipe and the class of prestressed concrete pipe four.By the difference of pipe of concrete internal diameter, minor diameter pipe can be divided into (Below 400 millimeters of internal diameter), middle diameter tube (400~1400 millimeters) and large diameter pipe (more than 1400 millimeters).Born by pipe The difference of hydraulic pressure ability, can be divided into low-voltage tube and pressure pipe, and the operating pressure of pressure pipe typically has 0.4,0.6,0.8,1.0,1.2 MPa etc..Pipe of concrete, by the difference of joint for pipe pattern, can be divided into flat pipe, spigot-and-socket pipe and enterprise again compared with steel pipe Mouth formula pipe.Its interface shape has cement mortar to smear band interface, ferro-cement smears band interface, cement mortar socket joint and rubber Cushion rubber socket joint etc..
Socket joint method referred in pipeline engineering construction, a kind of technological means for being used when being continued between pore and pore.
In pipeline engineering construction, there are two kinds of unicellular plastics pipe and porous plastics pipe respectively using socket joint method, it is used When socket joint method continues, unicellular plastics pipe requires that the bellmouth internal diameter of bell-and-spigot pipe coincide with socket external diameter;Porous plastics pipe external diameter is with connecing The internal diameter matches mutually of head casing tube.
Socket type pipeline is formed by connecting by many pipeline sections, and one end of pipeline section is socket, and the other end is bellmouth, bellmouth port Footpath partial enlargement, its internal diameter are also bigger than the external diameter of socket end, and installation connection is that the socket of pipeline section is inserted holding for another pipeline section Intraoral, annular space is tamped with interface material between two mouthfuls, and interface material is generally available rubber ring, dilatancy or asbestos cement, It in particular cases can also use blue or green lead joint mouth.
With the development of the social economy, the shortage of water resource, Heavy-calibre Prestressed Concrete pipeline is impervious, anti-with its Folding endurance can be good, it is anticorrosive pollution-free, cheap the advantages that replace metal pipe material in Long-distance Water Transmission Pipeline water engineering To extensive use, traditional portal frame jack tenses concrete pipe installation method, and mechanization degree is low, efficiency is low, hand labor intensity Greatly, the needs of the construction of modern project can not be met.
The content of the invention
In order to solve traditional portal frame jack tense concrete pipe installation method mechanization degree is low, efficiency is low, artificial labor The problem of fatigue resistance is big.The utility model provides a kind of efficient, quick, civilization installation heavy caliber concrete pipe installation method, from And improve engineering good economic benefit and social benefit;According to " jack tenses interface method " principle, reference is manually turned a millstone and rolled up The working forms of machine are raised, the artificial form for stirring mill is formed by simple modifications(It is attached to stir mill machining sketch chart).By artificial push-jump Mill is stirred to pull concrete pipe to install concrete pipe with steel wire rope.
To achieve these goals, the technical scheme is that:
Heavy caliber flexibility socket joint concrete pipe stirs mill take-up device, including support, it is characterized in that:Being provided with support to rotate Wiring bar, wiring bar upper end is provided with rotating bar, and wiring bar bottom is provided with gag lever post, rope is carried on gag lever post.
Heavy caliber flexibility socket joint concrete pipe according to claim 1 stirs mill take-up device, it is characterized in that:Described wiring Bar is movably mounted in rotation support, is rotated support and is fixedly installed at frame bottom, and described support is positive prismatic table shape, on support Quadrangle be less than lower quadrangle, connected between upper quadrangle and lower quadrangle by four fix bars, frame bottom is provided with Rectangle collet, rectangle collet are connected with the side of bottom four.
Heavy caliber flexibility socket joint concrete pipe stirs mill take-up device and tenses construction method, it is characterized in that:Comprise the following steps
(1)Comb:The field test and repairing of pipe;
(2)Dig interfaces hole:
Before Pipe installing, working pit is dug installed in interface in pipeline, is more than or equal to 300mm before bellmouth, after bellmouth Grown more than bell of pipe inclined-plane, both sides are more than caliber, and depth is more than or equal to 200mm, makes the operational phase bell of pipe hanging;
Lifting pipes should then put chock, or the heap loose materials on lumps of wood position if desired for stacking below bottom, upper strata with Lower floor's bell and spigot should be inverted, and the elastic materials such as twice straw mattress are padded between two layers of tubing, two layers of pipeline is separated and does not contact with each other, put The position of straw mattress should be with the chock consistency from top to bottom under bottom pipe.Tubing stacks the number of plies such as following table:
(3)Down tube
Using special high-strength nylon hanging belt, in order to avoid injuring pipe shaft concrete, body center of gravity should be found out before lifting, does bid Will should be such that tube coupling bellmouth meets to current direction to meet body lifting requirements, during down tube;
(4)Mounting interface
The bellmouth and socket of tubing to be cleaned out before installation, cushion rubber is also checked and cleared up, and then slings pipe, The cushion rubber on socket end set, cushion rubber should be enclosed on the end of socket, answer even thickness along pipe ring and must not have twisted phenomena,
After work before installation is ready, so that it may sling tubing with single rope using suspender, by bell and spigot centering such as socket joint Mouth centering;Cushion rubber is in the initial position of installation, then tenses the chain block that both sides obtain, the socket of tubing is slowly inserted and hold Mouthful, now cushion rubber then rolls along the outer working face direction of bellmouth inner working face and socket, until tubing is installed in place, at cushion rubber Yu Cheng, socket working face position such as cushion rubber, first three section concrete pipe is installed with jack tension method when starting point starts tubulature, After three-joint pipe installation is in place, middle node pipe shaft section groove position backfill is to pipe shaft above 400mm and tamps, and the present apparatus is put Put in tube hub line position, being fixed on rear side of the present apparatus with steel wire rope on mounted pipe, so stir mill and just install in place, Jack can be replaced to carry out drawknot Pipe installing with this;
(5)Installation
Present apparatus overhanging cable crossbeam is caught on to the bellmouth of pipe to be installed, the fixture block side between crossbeam and concrete pipe Wood, prevent crossbeam from destroying concrete pipe, manually push rotation rotating bar, slowly pull in tube socket in bellmouth, and at any time Check that whether uniformly cushion rubber rolls into, adjust at any time,
During installation, top, pulling rate degree uniformly slowly, and should should have special messenger to check that cushion rubber rolls into situation, as found to roll into inequality It is even, it should stop pushing up, draw, tap adjustment cushion rubber position with chisel, be further continued for pushing up after uniform, draw, cushion rubber is reached the pre- of bell and spigot Positioning is put,
In installation process, pipe is sling when inserting with crane parallel groove, so that socket cushion rubber is accurately to entering in bellmouth, Slightly from bottom land when slinging,
Its bellmouth inner working face of the installing pipe period of the day from 11 p.m. to 1 a.m, the outer working face of socket clean up, and the cushion rubber being enclosed on socket is straight, nothing Distort flop phenomenon.
The beneficial effects of the utility model are:
1 accelerates project progress
It is simple with " manually stirring grain immediately mouth method " technical operation, it is only necessary to which that drawknot crossbeam is put into tube end by two people Can drawknot, it is not necessary to manually back and forth carry and bundle jack efficiency in groove and improve three than traditional " jack tension method " / mono-, the installation period of pipeline is shortened, accelerates project progress.
2 save recruitment
With " manually stirring grain immediately mouth method " crane lifting drawknot, machine is improved than traditional " portal frame jack tension method " Tool degree, drawknot only need 3-4 people to promote to stir that grain is tight, so as to reduce the reciprocal operation for carrying jack and portal frame Recruitment, and reduce labor intensity, that is, improve civilized construction degree reduces recruitment again.
3 improve construction quality
Compared with " manually stirring grain immediately mouth method " than traditional " portal frame jack tension method ", the layback of concrete duct two When tight, stress and uniform force, both sides cushion rubber roll uniformity, substantially increase interface installation quality simultaneously for both sides, ensure The total quality of Pipe installing.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the operation principle structural representation of the present invention;
Fig. 3 is the structural representation of pipe canal digging of the present invention;
Fig. 4 is the structural representation that pipe lifts in the present invention;
Fig. 5 is the structural representation of bell and spigot centering in the present invention;
Fig. 6 is the structural representation that bell and spigot is installed in place in the present invention;
Fig. 7 is the structural representation of pipeline installation in the present invention.
In accompanying drawing
1st, wiring bar;2nd, rotating bar;3rd, rope;4th, support;5th, gag lever post;6th, support is rotated;7th, base.
Embodiment
1st, installation procedure
The field test of comb-- pipe and repairing-- down tube-- dig interfaces hole-- cleaning barrel of pipe, pipe Cushion rubber-- is covered on mouth-- cleaning rubber gasket-- socket and pushes up, socket mouth-- and check center line, elevation that-- with stock rod checks glue Enclose position-- lock tube
2nd, the inspection repairing of the mixed mud pipe before down tube
2.1st, live tubing must carry out appearance test and have its quality of product certificate, quality certificate to meet enterprise And the technical requirements of relevant national standard.
2.2nd, the inside and outside wall of body should be smooth, and outward appearance no significant defect is that 250g gently hammers check protection layer hollowing situation into shape with weight.
2.3 bell and spigots should not have that crackle and its working face of breach are smooth, and local camber is no more than with dipstick metering 2mm。
2.4 discovery defects will ask supplier to be repaired in time, and method for repairing and mending determines according to actual conditions.
The inspection of 3 rubber rings
3.1 all cushion rubbers should meet national standard, and cushion rubber should prevent direct sunlight, drench with rain snow during transport preserves Lid, forbid to contact with grease type, acid-base class chemicals and other materials for being harmful to cushion rubber.
3.2 cushion rubbers should be wiped clean before, must not use the cushion rubber of adfreezing, cushion rubber typically preserves more than 5 DEG C, such as 5 When being preserved below DEG C, to avoid cushion rubber from being turned round, cushion rubber should be warming up to more than 15 DEG C before use.
3.3 cushion rubbers must be checked before by root specification and whether isolate, breakage, bubble, elephant skin, big overlap etc. it is scarce Fall into.
3.4 storehouses are deposited, and should not be extruded.
4 channel excavation inspections
The width that 4.1 pipeline groove bottoms are excavated typically is calculated as follows:
B=D+2b
B, D, b are shown in bottom land furrow width table
Trough furrow width table(Unit mm)
Ips Pipe is outer through D Operating surface width b Excavate groove width B
400 500 400 1300
500 600 500 1600
600 710 500 1710
800 920 500 1920
1000 1140 600 2340
1200 1360 600 2560
1400 1580 800 3180
The ground of 4.2 grooves should be straight, when bottom land is rock or hard ground, should be constructed by design code, designs nothing During regulation construction, it is 200mm that the pipe lower part of the body, which should lay sand bedding course its thickness,
Never rigid foundation, stone is allowed directly to be contacted with pipe shaft.
5 dig joint working pit
Before 5.1 Pipe installings, with pipeline installation promptly and accurately dig working pit in interface, be more than before bellmouth etc. Exceed bell of pipe inclined-plane after 300mm, bellmouth to grow, both sides are more than caliber, and depth is more than or equal to 200mm, ensures the operational phase The bell of pipe is hanging.
5.2 lifting pipes should put chock, or the heap loose materials on lumps of wood position if desired for stacking, then bottom lower section, on Layer should be inverted with lower floor bell and spigot, and the elastic material such as pad twice straw mattress, makes two layers of pipeline separate not phase mutual connection between two layers of tubing Touch, the position for putting straw mattress should be with the chock consistency from top to bottom under bottom pipe.Tubing stacks the number of plies such as following table:
Tubing specification(mm) 400-600 700-800 900-1200 1400
At most stack the number of plies 5 4 3 2
6th, down tube
6.1st, using special high-strength nylon hanging belt, in order to avoid injure pipe shaft concrete.Body center of gravity should be found out before lifting, is done Go out mark to meet body lifting requirements.During down tube tube coupling bellmouth should be made to meet to current direction.Such as pipe lifting schematic diagram Fig. 4 institutes Show;
6.2 lifting pipes should put chock, or the heap loose materials on lumps of wood position if desired for stacking, then bottom lower section, on Layer should be inverted with lower floor bell and spigot, and the elastic material such as pad twice straw mattress, makes two layers of pipeline separate not phase mutual connection between two layers of tubing Touch, the position for putting straw mattress should be with the chock consistency from top to bottom under bottom pipe.Tubing stacks the number of plies such as following table:
Tubing specification(mm) 400-600 700-800 900-1200 1400
At most stack the number of plies 5 4 3 2
7 mounting interfaces
The bellmouth and socket of tubing are cleaned out before 7.1 installations, cushion rubber is also checked and cleared up, and then hangs pipe Rise, the cushion rubber on socket end set, cushion rubber should be enclosed on the end of socket, answer even thickness along pipe ring and there must not be distortion existing As.
7.2 installation before work it is ready after, so that it may tubing is sling with single rope using suspender, by bell and spigot centering;
7.3 cushion rubbers are in the initial position of installation, then tense the chain block that both sides obtain, the socket of tubing is slowly inserted Enter bellmouth, now cushion rubber then rolls along the outer working face direction of bellmouth inner working face and socket, until tubing is installed in place, glue Circle in hold, socket working face position;
First three section concrete pipe is installed with jack tension method when 7.4 starting points start tubulature, the installation of three-joint pipe is just Behind position, middle node pipe shaft section groove position backfill is to pipe shaft above 400mm and tamps, and " will stir mill " and be placed on tube hub line position Put, being fixed on rear side of " stirring mill " with steel wire rope on mounted pipe, so stir mill and just install in place, can be replaced down with this Chain carries out drawknot Pipe installing.
The 7.5 overhanging cable crossbeams that " will stir mill " catch on the bellmouth of pipe to be installed, are pressed from both sides between crossbeam and concrete pipe The block lumps of wood, prevent crossbeam destruction concrete pipe from manually push rotation " stirring mill " and slowly pulling in tube socket in bellmouth, and with When check cushion rubber roll into whether uniformly, adjust at any time.
When the 7.6th, installing, top, pulling rate degree uniformly slowly, and should should have special messenger to check that cushion rubber rolls into situation, as found to roll into It is uneven, it should stop pushing up, draw, tap adjustment cushion rubber position with chisel, be further continued for pushing up after uniform, draw, cushion rubber is reached bell and spigot Precalculated position.
7.7th, in installation process, pipe is sling when inserting with crane parallel groove, so that socket cushion rubber is accurately to entering to hold It is intraoral, slightly from bottom land when slinging.
7.8th, its bellmouth inner working face during installing pipe, the outer working face of socket clean up, the cushion rubber being enclosed on socket is straight, Distortionless flop phenomenon.
8 check center line, elevation
8.1st, after each tube coupling installation, elevation and center line are controlled using spirit level and theodolite, after the installation of new pipe, The installation quality of adjacent tubes is examined simultaneously, after meeting design requirement, you can carry out body axial lock and both sides are fixed.
Pipe shaft bottom after 8.2 installations should uniformly contact with basis, close with husky or earthen backfill in the range of 120 ° of duct bottom Prevent stress concentration phenomenon below figure in fact.9th, cushion rubber position is checked with stock rod
9.1st, check whether the position of socket push-in bellmouth meets the requirements, stretched into stock rod in bell and spigot gap and check cushion rubber Whether position is correct, and whether reviewer enters in pipe checks cushion rubber on bell and spigot working face.
10th, lock tube
10.1st, can be locked in after pipe laying to prevent the mouth of pipe movement of former section pipes of starting point installation with steel wire rope and jack On pipe below.
Embodiment
The estimated gross investment of certain engineering (first phase) is 54,400,000 yuan.Engineering from certain eservoir diversion to certain city's indusqtrial water supply, if The m3 of day water supply scale 70,000 is counted, the prestressed concrete pipe road that design caliber is DN1000, to ensure that engineering is smoothly implemented, is passed through Repeatedly repeatedly practise and sum up this engineering method, and shown by engineer applied, the technology accelerates project progress, it is ensured that construction peace Entirely, construction quality is improved, compared with traditional " portal frame jack tension method ", shortens 35 days installation periods, suppresses and once lead to Cross, save fund input 13.5%, achieve obvious Technological Economy and social benefit.
Certain reservoir is to East Lake water supply project, more than 6,000 ten thousand yuan of Budgetary Estimates gross investment, 20.12 kilometers of pipeline installation, and day supplies The side of outlet capacity 4.4 ten thousand, design caliber are DN1500, DN1200 reinforced concrete pipeline, by applying " manually stirring grain immediately mouth method " Accelerate project progress, it is ensured that construction safety, construction quality is improved, compared with traditional " portal frame jack tension method ", Shorten 30 days installation periods, suppress once by saving fund input 16.5%, achieving obvious Technological Economy and society imitates Benefit.

Claims (1)

1. a kind of heavy caliber flexibility socket joint concrete pipe stirs mill take-up device and tenses construction method, including heavy caliber flexibility socket joint concrete pipe stirs Take-up device is ground, it is characterized in that:Support(4)Inside it is provided with rotary wiring bar(1), wiring bar(1)Upper end, which is provided with, to be turned Lever(2), wiring bar(1)Bottom is provided with gag lever post(5), gag lever post(5)It is upper to carry rope(3), described wiring bar(1)Can Dynamic being arranged on rotates support(6)It is interior, rotate support(6)It is fixedly installed at support(4)Bottom, described support(4)For positive terrace with edge Shape, support(4)On quadrangle be less than lower quadrangle, pass through four fix bars between upper quadrangle and lower quadrangle and connect, branch Frame(4)Bottom is provided with rectangle collet, and rectangle collet is connected with the side of bottom four;
Construction method comprises the following steps:
(1)Comb:The field test and repairing of pipe;
(2)Dig interfaces hole:
Before Pipe installing, working pit is dug installed in interface in pipeline, 300mm is more than or equal to before bellmouth, is exceeded after bellmouth Bell of pipe inclined-plane is grown, and both sides are more than caliber, and depth is more than or equal to 200mm, makes the operational phase bell of pipe hanging;
Lifting pipes then should put chock, or the heap loose materials on lumps of wood position, upper strata and lower floor if desired for stacking below bottom Bell and spigot should be inverted, and the elastic materials such as twice straw mattress are padded between two layers of tubing, two layers of pipeline is separated and does not contact with each other, put straw mattress Position should be with the chock consistency from top to bottom under bottom pipe;
(3)Down tube
Using special high-strength nylon hanging belt, in order to avoid injuring pipe shaft concrete, body center of gravity should be found out before lifting, make mark with Meet body lifting requirements, tube coupling bellmouth should be made to meet to current direction during down tube;
(4)Mounting interface
The bellmouth and socket of tubing are cleaned out before installation, cushion rubber is also checked and cleared up, and then slings pipe, is being inserted Mouth end puts cushion rubber, and cushion rubber should be enclosed on the end of socket, answer even thickness along pipe ring and must not have twisted phenomena,
After work before installation is ready, so that it may sling tubing with single rope using suspender, by bell and spigot centering such as bell and spigot pair In;Cushion rubber is in the initial position of installation, then tenses the chain block that both sides obtain, the socket of tubing is slowly inserted bellmouth, Now cushion rubber is then rolled along the outer working face direction of bellmouth inner working face and socket, and until tubing is installed in place, cushion rubber is in Hold, socket working face position such as cushion rubber, when starting point starts tubulature with jack tension method install first three section concrete pipe, three After saving pipe installation in place, middle node pipe shaft section groove position backfill is to pipe shaft above 400mm and tamps, and heavy caliber is flexible Socket joint concrete pipe stirs mill take-up device and is placed on tube hub line position, and rear side is fixed on mounted pipe with steel wire rope On, such heavy caliber flexibility socket joint concrete pipe stirs the installation of mill take-up device in place, and jack can be replaced to carry out drawknot pipeline peace with this Fill;
(5)Installation
Present apparatus overhanging cable crossbeam is caught on to the bellmouth of pipe to be installed, the fixture block lumps of wood between crossbeam and concrete pipe, Prevent crossbeam from destroying concrete pipe, manually push rotation rotating bar, slowly pull in tube socket in bellmouth, and check at any time Uniformly whether cushion rubber roll into, and adjusts at any time,
During installation, top, pulling rate degree should uniformly slowly, and should have special messenger check cushion rubber roll into situation, as find roll into it is uneven, should Stopping top, draw, tap adjustment cushion rubber position with chisel, be further continued for pushing up after uniform, draw, cushion rubber is reached the pre-determined bit of bell and spigot Put,
In installation process, pipe is sling when inserting with crane parallel groove, so that socket cushion rubber is sling accurately to entering in bellmouth When slightly from bottom land,
Its bellmouth inner working face of the installing pipe period of the day from 11 p.m. to 1 a.m, the outer working face of socket clean up, and the cushion rubber being enclosed on socket is straight, distortionless Flop phenomenon.
CN201610313552.7A 2016-05-12 2016-05-12 A kind of heavy caliber flexibility socket joint concrete pipe stirs mill take-up device and tenses construction method Active CN105805414B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610313552.7A CN105805414B (en) 2016-05-12 2016-05-12 A kind of heavy caliber flexibility socket joint concrete pipe stirs mill take-up device and tenses construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610313552.7A CN105805414B (en) 2016-05-12 2016-05-12 A kind of heavy caliber flexibility socket joint concrete pipe stirs mill take-up device and tenses construction method

Publications (2)

Publication Number Publication Date
CN105805414A CN105805414A (en) 2016-07-27
CN105805414B true CN105805414B (en) 2017-12-29

Family

ID=56455933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610313552.7A Active CN105805414B (en) 2016-05-12 2016-05-12 A kind of heavy caliber flexibility socket joint concrete pipe stirs mill take-up device and tenses construction method

Country Status (1)

Country Link
CN (1) CN105805414B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107781550A (en) * 2016-08-31 2018-03-09 天津市宝坻区新颐达模具厂 Steel pipe socket joint disconnecting prevention structure
CN107035918A (en) * 2017-06-07 2017-08-11 天津市源泉市政工程有限公司 One kind feedwater pipe fitting engineering construction method
CN109027491A (en) * 2017-06-12 2018-12-18 五冶集团上海有限公司 A kind of glass reinforced plastic pipe pipe fitting connecting method
CN108612910B (en) * 2018-07-23 2020-04-10 重庆建工市政交通工程有限责任公司 Construction method for installing T-shaped nodular cast iron pipe
CN110242793B (en) * 2019-04-25 2021-01-12 北京碧鑫水务有限公司 Method for installing reinforced concrete pipeline
CN110285261B (en) * 2019-07-23 2020-12-15 福建磊鑫(集团)有限公司 Sewage pipeline laying process
CN117345945B (en) * 2023-08-30 2025-01-17 中国化学工程第十四建设有限公司 Onshore socket and spigot installation method for large diameter GRP seawater pipes

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117203A (en) * 2007-08-29 2008-02-06 泰安市泰山工程机械集团有限公司 Novel pipe hanger equipped with auxiliary boom
CN203272790U (en) * 2013-04-20 2013-11-06 大唐国际发电股份有限公司张家口发电厂 Shroud ring tensioning device
CN203384489U (en) * 2013-07-30 2014-01-08 中国人民解放军总后勤部油料研究所 Pipeline wall pulley
JP6294627B2 (en) * 2013-10-09 2018-03-14 株式会社クボタ Pipe joint structure, seal member, joint state management method for pipe joint, and joint state management apparatus for pipe joint
CA2850647A1 (en) * 2014-04-30 2015-10-30 Kevin Adams Apparatus for adjusting relative spacing of sections of pipe arranged in end to end relation
CN104100784A (en) * 2014-05-20 2014-10-15 江苏柏诚工程股份有限公司 Method of docking bonding of large-caliber UPVC (Ultra-high-density Polyvinyl Chloride) tubes
CN204569267U (en) * 2015-04-10 2015-08-19 青岛港国际股份有限公司 Equipment unit dismounting is with hanging pull tool
CN204750654U (en) * 2015-06-05 2015-11-11 陕西北元化工集团有限公司 Multi -functional device of binding
CN204749260U (en) * 2015-06-30 2015-11-11 广船国际有限公司 Interfacing apparatus for pipeline
CN205716008U (en) * 2016-05-12 2016-11-23 山东枣建建设集团有限公司 Heavy caliber flexibility socket joint concrete pipe stirs mill take-up device

Also Published As

Publication number Publication date
CN105805414A (en) 2016-07-27

Similar Documents

Publication Publication Date Title
CN105805414B (en) A kind of heavy caliber flexibility socket joint concrete pipe stirs mill take-up device and tenses construction method
CN110409510B (en) Water stopping structure at joint of engagement pile and ground continuous wall
CN108194703B (en) Correction construction system and correction method for construction jacking pipe
CN110864162B (en) Construction technology of argillaceous sandstone geological pipe jacking
CN104776268B (en) Mechanized construction method for installing large-diameter reinforced concrete drainage pipeline
CN110409511B (en) Water-stopping method at joint between occlusal pile and ground connecting wall
CN103485410B (en) Installation and construction method for super-large-diameter reinforced concrete rebated pipe
CN109458194B (en) A staged grouting treatment method for remediating tunnel cross-section deformation
CN110468950A (en) A kind of iron and steel enterprise's free-draining pipeline silt cleaning device and method
CN110206071B (en) Method and device for reinforcing joints of underground continuous wall
CN106402492A (en) Method and device for pipeline laying
CN205716008U (en) Heavy caliber flexibility socket joint concrete pipe stirs mill take-up device
CN111173528A (en) Large-diameter long-interval tunnel shield construction method for water-rich sandy gravel stratum
CN208058113U (en) A kind of amendment construction system of construction push pipe
CN116538348B (en) Water diversion engineering jacking pipe internally-penetrating steel pipe and self-compacting concrete pouring construction method
CN211341803U (en) Tower crane hopper with telescopic string barrel
CN110043713A (en) Major diameter K2 type ductile iron pipe machinery jacking coupling tube and its installation method
CN105135054A (en) Jacking pipe construction method for ultra-long pipeline
CN205224019U (en) Stake of reinforcing bar fiber cement soil
CN109538823A (en) Construction method for double-pipe staggered alternative jacking
CN202530553U (en) Inspection well
CN107061865A (en) A kind of new and old pipeline of sewage treatment plant's heavy caliber does not stop production the method for meeting and discussing
CN215105438U (en) Precipitation well block structure
CN107778029B (en) Concrete curing method for buried pipe in structure
CN107916674B (en) Shallow foundation pit dewatering device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A tensioning construction method of mixing and grinding tensioning device for large diameter flexible socket concrete pipe

Effective date of registration: 20210929

Granted publication date: 20171229

Pledgee: Zaozhuang rural commercial bank, Limited by Share Ltd.

Pledgor: SHANDONG ZAOJIAN CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2021980010203

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20171229

Pledgee: Zaozhuang rural commercial bank, Limited by Share Ltd.

Pledgor: SHANDONG ZAOJIAN CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2021980010203