[go: up one dir, main page]

CN105804200B - A kind of fragment shuts off online processing exhaust system - Google Patents

A kind of fragment shuts off online processing exhaust system Download PDF

Info

Publication number
CN105804200B
CN105804200B CN201610242365.4A CN201610242365A CN105804200B CN 105804200 B CN105804200 B CN 105804200B CN 201610242365 A CN201610242365 A CN 201610242365A CN 105804200 B CN105804200 B CN 105804200B
Authority
CN
China
Prior art keywords
online processing
vatch basin
water
rainwater
initial rainwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610242365.4A
Other languages
Chinese (zh)
Other versions
CN105804200A (en
Inventor
李习洪
周超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Shengyu Smart Ecological Environmental Protection Co ltd
Original Assignee
Wuhan Shengyu Drainage Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Shengyu Drainage Systems Co Ltd filed Critical Wuhan Shengyu Drainage Systems Co Ltd
Priority to CN201610242365.4A priority Critical patent/CN105804200B/en
Publication of CN105804200A publication Critical patent/CN105804200A/en
Application granted granted Critical
Publication of CN105804200B publication Critical patent/CN105804200B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • E03F1/001Methods, systems, or installations for draining-off sewage or storm water into a body of water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/042Arrangements of means against overflow of water, backing-up from the drain

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

The present invention relates to municipal water treatment systems field, shut off online processing exhaust system in particular to a kind of fragment.It receives water area and is divided into multiple sections according to latticed, the area of each section is 0.2~4 square kilometre;At least one branch drain, at least one Vatch basin and at least one online processing pond are provided in the section;The water inlet of Vatch basin is connected with the port of export of branch drain, and initial rainwater discharge outlet is connected with trunk sewer, and later stage rain-water drainage mouth is connected with online processing pond, and the discharge end in online processing pond is connected with natural water.Pass through the delay issue during solving prior art initial rainwater long-distance sand transport in the independent Vatch basin of section setting, online processing pond is set to be capable of being handled the later stage rainwater in section accordingly of efficient quick, the processing pressure for both having alleviated sewage treatment plant in turn avoids initial rainwater pollution natural water.

Description

A kind of fragment shuts off online processing exhaust system
Technical field
The present invention relates to municipal water treatment systems field, shut off online processing exhaust system in particular to a kind of fragment.
Background technology
For separate system storm sewer, each floss hole is no any River Closure Measures at present, is directly discharged to nature First rain when water body, sewage during such fine day and rainy day has all been discharged to natural water, natural water is caused seriously Pollution.
For collaborating tubing giving sufficient strength, many regions are all to be discharged into sewage by a Vatch basin of the trunk sewer through end at present Factory is managed, when the rainy day, rainwater and sanitary sewage are discharged to natural water through Vatch basin.During actual motion, in order to save space and Project cost will generally collaborate the receipts water area area that exhaust system is responsible for and set big as far as possible, then done in sewage The end of pipe sets a discharge outlet to concentrate discharge of shutting off.There is the problem of very big in this drainage system, Sometimes When It Rains receive water The first rain and later stage rainwater in region mix, and are not carried out the separation of clear water and sewage, finally in end initial rainwater tune The first rain pollutant concentration that reservoir is regulated and stored is very low, containing the rainwater that a large amount of later stage is clean, and is discharged to the rainwater in natural water Also containing a large amount of just rain, serious runoff pollution is generated to natural water.Since the area that receipts water area covers is too big, do not have Delay time of the rainwater on pipeline or rainwash is fully taken into account, otherwise first rain is to be directly discharged to natural water initiation Serious contamination accident or be to mix to be flowed in sewage treatment plant with a large amount of later stage clean rainwater seriously to increase at sewage The processing pressure of factory is managed, the regulation and control for initial rainwater and later stage rainwater are simultaneously unreasonable, it is impossible to are totally separated from.For example, Storage pond has been built in certain city in the area close to urban sewage treatment system, it is assumed that M areas are apart from the storage pond 1Km, M area Interior urban rainwater is directly discharged to storage pond by pipe network, the city initial rainwater in M areas be fully discharged into storage pond when Between be T1.For exceeding the area apart from storage pond farther out in the region, it is assumed that air line distance of the N areas apart from storage pond is The time that the city initial rainwater in 10km, N area is fully discharged into storage pond is T2, and from the point of view of time length, T2 is obviously remote Much larger than T1.And after initial rainwater has been expired in storage pond collection, the rainwater exceeded begins to be automatically discharged into natural water, adjusts Since reservoir be T3 to the time that natural water discharges start to collect rainwater to.During actual motion, if only taking M areas into account Rainwater emission behaviour, i.e. the initial rainwater in M areas can enter the cleaning of sewage disposal system intermediary and later stages by storage pond Rainwater can be discharged into natural water, and T3 is needed to be more than T1, once beyond T3, storage pond is immediately discharged to natural water, and N areas flow to the rainwater of storage pond and still pollute very serious initial rainwater at this time, i.e. T3 is less than T2, and nothing is discharged to natural water It is doubtful to cause very serious pollution.
If only in view of the rainwater emission behaviour in N areas, i.e. T3 is more than T2, and the initial rainwater in that N areas can lead to It crosses storage pond to enter in urban sewage treatment system, be handled well.But for M areas, M areas have largely Later stage clean rainwater be also discharged into urban sewage treatment system within the time of the initial rainwater in storage pond discharge N areas In, such emission behaviour can cause very big processing pressure to urban sewage system.In addition, M areas and N during actual motion The pipe network in area is generally connection situation, and due to the difference of distance, the delay on road acts on, and the initial rainwater in N areas may The later stage clean rainwater in serious pollution M areas, also results in the unreasonable of rainwater emission behaviour.
Invention content
Present invention aim to solve the deficiency of above-mentioned background technology, provide a kind of fragment shut off online processing discharge System.
The technical scheme is that:A kind of fragment shuts off online processing exhaust system, in the receipts water area of the system It is provided with trunk sewer and branch drain;The branch drain is connected with trunk sewer, it is characterised in that:The receipts pool Domain is divided into multiple sections according to latticed, and the area of each section is 0.2~4 square kilometre;It is provided in the section At least one branch drain and at least one Vatch basin;The Vatch basin includes water inlet, initial rainwater discharge outlet and later stage Rain-water drainage mouth, the water inlet of Vatch basin are connected with the port of export of branch drain, and initial rainwater discharge outlet is connected with trunk sewer, Later stage rain-water drainage mouth is connected with online processing pond, and the discharge end in online processing pond is connected with natural water.
The area of further each section is 0.5~2 square kilometre.
Online processing pond or several sections to be used in conjunction with one there are one settings in further each section Online processing pond.
The further online processing pond is cyclone, settling pit, waterpower particle separator, aeration tank, ultraviolet light One group or several of combination of the devices such as sterilization pool.
Fixed weir is provided in the further Vatch basin, initial rainwater floss hole is arranged in the water inlet of Vatch basin On Vatch basin side wall between fixed weir, cut-off equipment is provided at initial rainwater floss hole;The initial rainwater floss hole Retaining device is provided between the fixed weir;It is provided in Vatch basin between the fixed weir and later stage rain-water drainage mouth Backward flowing preventing device.
The further backward flowing preventing device is set on the fixed weir;The backward flowing preventing device includes being set to described Guide rail on fixed weir side wall;Door-plate is slidably connected on the guide rail;Buoyancy tank is connected on the door-plate.
The further cut-off equipment includes the swivel plate being arranged on the Vatch basin side wall;In the middle part of the swivel plate It is hinged on by the initial rainwater floss hole side;One end of the swivel plate is equipped with floating ball, and the other end is to be discharged with initial rainwater The keying plate of mouth cooperation;Vatch basin side wall above swivel plate is equipped with the first gag lever post and the second gag lever post, works as keying When plate fully opens, the keying plate is contacted with first gag lever post, completely covers initial rainwater floss hole when opening and closing plate When, the keying plate is contacted with second gag lever post.
Described in when height at the top of further fixed weir completely covers initial rainwater floss hole higher than the keying plate The height of floating ball bottom.
The further retaining device is the side wall with Vatch basin for the bottom of pond upper surface for being vertically fixed on Vatch basin In the platy structure at an inclination angle, retaining device is sharp with being equipped with the angle that a side walls of cut-off equipment are formed on Vatch basin Angle.
The further retaining device is floating type baffle or waterpower grid.
The further branch drain is the drainpipe in separate system, combined system or mixed flow system
Sewage treatment plant further is further included, the discharge outlet of the trunk sewer is connected with sewage treatment plant.
Beneficial effects of the present invention have:
1st, entire water area of receiving is divided into latticed small section, Vatch basin is set inside each independent section, in this way Structure can avoid in delay of the initial rainwater in road convey far from Vatch basin, can effectively by initial rainwater with Later stage clean rainwater is detached, and the pressure for both having alleviated sewage treatment plant in turn avoids initial rainwater pollution natural water, if It puts online processing pond to collect later stage rainwater and handled accordingly, treated to be directly discharged in natural water, does not return Flow to sewage treatment plant, first, the pollution to natural water can be effectively reduced, second is that can high degree alleviate at sewage Manage the processing capacity of factory;
2nd, water area will be received and is divided into area 0.2-4 square kilometres of section, each section sets up individually small-sized section Well is flowed, each Vatch basin handles the rainwater in each section.Since section area is smaller, distance is shut off in each section The time difference of the rainwater conflux of well far point and near point to Vatch basin water inlet is smaller, and the online processing pond of setting is completely by each piece First rain and later stage rainwater in area separate, and the phenomenon that being mutually mixed, the place of rainwater is not present in initial rainwater and later stage rainwater Significant effect is managed to improve.In addition, each section is handled the rainwater in section by respective Vatch basin, various zones rain The processing procedure of water can be carried out at the same time, and greatly improve the efficiency of rainwater treatment;
3rd, rain is made with the use of the independent rainwater treatment mini system for forming each section by Vatch basin and branch drain Water process more in time, seriously polluted initial rainwater can be made to enter sewage treatment plant, later stage cleaning rain to the greatest extent Water is automatically discharged into online processing pond, is drained into natural water, will not be polluted again by the sedimentation of regulating and storing in online processing pond Natural water, in addition the sewage in online processing pond do not flow back into trunk sewer, the processing pressure of sewage treatment plant will not be caused, The water process of the complete independently part in section more efficiently, avoids the pressure for increasing sewage treatment plant;
4th, be divided into the smaller section of area by the way that water area entire will be received, then set in section independent Vatch basin and Online processing pond is regulated and stored the mesh of processing with reaching first rain, compared to building total large-scale rainwater storage system in whole region System, absolute construction more economy in section of the invention save a large amount of man power and material;
5th, by setting Vatch basin, then Vatch basin is connected with online processing pond in receipts water area, multistage water is formed Processing system improves the separative efficiency of first rain and later stage rainwater, reduces the pollution to natural water, enhances the effect of water process Rate;
6th, first rain can be carried out abandoned stream by Vatch basin, really set abandoned stream amount according to the first rainfall for receiving water area, passed through this Device can then be directly discharged to initial rainwater discharge to sewage treatment plant, later stage rainwater in online processing pond.
Each section size is 0.2~4 square kilometre, it is assumed that the initial rainwater apart from Vatch basin distalmost end enters The time of Vatch basin is T4, and Vatch basin is T from the time after the completion of the time to abandoned stream for the abandoned stream that begins to rain.In actual use, T can directly be set to be equal to or more than T4, because section area is smaller, T4 values are also relatively small, only after small part Phase clean rainwater, which is mingled in initial rainwater, enters sewage treatment plant, and the rainwater of such fraction can't increase sewage disposal The pressure of factory, most later stage clean rainwaters are directly discharged in online processing pond, effectively raise just rain and later stage The separative efficiency of rainwater.
Municipal water treatment systems are divided independent section by the configuration of the present invention is simple, by setting independent cut in section Stream well solves the delay issue during prior art initial rainwater long-distance sand transport, sets online processing pond efficiently fast Prompt is handled the later stage rainwater in section accordingly, and the processing pressure for both having alleviated sewage treatment plant in turn avoids initial stage Rainwater pollution Natural Water, it is more reasonable efficient to the emission treatment of rainwater, there is great promotional value.
Description of the drawings
Fig. 1:The structure diagram of the receipts water area of the present invention;
Fig. 2:The structural front view of the Vatch basin of the present invention;
Fig. 3:The structure top view of the Vatch basin of the present invention;
Fig. 4:The cut-off equipment structure diagram of the Vatch basin of the present invention;
Fig. 5:The fine day working state schematic representation of the Vatch basin of the present invention;
Fig. 6:The rainfall preliminary work status diagram of the Vatch basin of the present invention;
Fig. 7:The anti-backflow status diagram of the Vatch basin of the present invention;
Wherein:1- Vatch basins;2- branch drains;3- fixed weirs;4- initial rainwater discharge outlet;5- cut-off equipments;6- debris retainings Device;7- backward flowing preventing devices;71- guide rails;72- door-plates;73- buoyancy tanks;51- swivel plates;52- floating balls;53- opens and closes plate;54- is cut with scissors Axis;The first gag lever posts of 55-;The second gag lever posts of 56-;57- supporting rods;8- trunk sewers;9- sewage treatment plants;10- sections;11- Online processing pond;12- natural waters.
Specific embodiment
The present invention is described in further detail in the following with reference to the drawings and specific embodiments.
Such as Fig. 1~7, the receipts water area of the present embodiment exhaust system is divided into multiple sections 10, each piece according to latticed The area in area 10 is 0.2~4 square kilometre, and best water area of receiving is 0.5~2 square kilometre, and each section 10 is according to local ground Shape is built, and multiple branch drains 2 are provided in section 10.The branch drain 2 of the present embodiment can be that rainwater branch pipe can also be Branch sewer or the branch pipe for being collected simultaneously rainwater and sewage.Wastewater quality form in section 10 can be shunting tubulation Net, combined system pipe network or mixed flow tubulation net, the drainage pattern in section 10 in system can be the same or differ Sample, it is arranged according to local terrain generalization.
The branch drain 2 set in section 10 collects rainwater, sanitary sewage or the industrial wastewater in section, branch drain 2 port of export is connected with Vatch basin 1.When the rainwater form of export in section 10 is separate system, Vatch basin 1 is located at each section The floss hole of rainwater branch pipe in 10 is used to separate seriously polluted initial rainwater and clean later stage rainwater.And for interflow Tubulation net and mixed flow tubulation net, since the amount of sanitary sewage is seldom, for the rainwater that rainfall generates, proportion very little, Therefore it in combined system or mixed flow tubulation net, is detached after sanitary sewage and rainwater mixing by Vatch basin 1.
For the Vatch basin of the present embodiment as shown in Fig. 2~7, the Vatch basin 1 of the present embodiment is concrete component, on Vatch basin 1 There are water inlet, initial rainwater floss hole 4 and later stage rainwater discharge outlet.Fixed weir 3, initial rainwater discharge are provided in Vatch basin 1 Mouth 4 is arranged on 1 side wall of Vatch basin between the water inlet of Vatch basin 1 and fixed weir 3, and initial rainwater is discharged into from water inlet and cuts After flowing well 1, it is discharged on trunk sewer 8 by initial rainwater floss hole 4 and enters the progress comprehensive treatment of sewage treatment plant 9.
The present embodiment is provided with cut-off equipment 5 in rainwater discharge outlet 4 in the early stage, as shown in figure 4, cut-off equipment 5 includes setting The swivel plate 51 on 1 side wall of Vatch basin is put, 51 middle part of swivel plate is hinged on by 4 side of initial rainwater floss hole, swivel plate 51 One end is equipped with floating ball 52, and the other end is the keying plate 53 coordinated with initial rainwater floss hole 4.Open and close effect of the plate 53 in floating ball 52 Lower rotation, in actual use, the weight and buoyancy of floating ball 52 can be adjusted, and according to 10 size of section, be calculated in section 10 First rain rainfall, design floating ball 52 weight and buoyancy, after first rain automatically rotation block initial rainwater floss hole 4 it is complete The abandoned stream of Cheng Chuyu.
Swivel plate 51 excessively rotates in order to prevent, can be maintained at initial rainwater floss hole 4 always.The present embodiment is set County Party committee's structure, including the first gag lever post 55 and the second limiting being located on Vatch basin 1 on initial rainwater floss hole 4 top side wall Bar 56 when keying plate 53 fully opens, opens and closes plate 53 and is contacted with the first gag lever post 55, when keying plate 53 is completely by initial rainwater When floss hole 4 covers, open and close plate 53 and contacted with the second gag lever post 56.Supporting rod 57 is provided with, and pass through between two gag lever posts Supporting rod 57 is fixed on the side wall of Vatch basin 1.The height at 3 top of fixed weir completely discharges initial rainwater higher than plate 53 is opened and closed The height of 52 bottom of floating ball when mouth 4 covers.
Pour in down a chimney in order to prevent, the present embodiment is provided with anti-in the Vatch basin 1 between fixed weir 3 and later stage rain-water drainage mouth Flowing backward device 7.As shown in Fig. 5~7, backward flowing preventing device 7 is set on fixed weir 3, and backward flowing preventing device 7 includes being set to fixed weir Guide rail 71 on 3 side walls is slidably connected with door-plate 72 on guide rail 71, buoyancy tank 73 is connected on door-plate 72.Door-plate 72 is floating It is moved up and down under the action of case 73 along guide rail 71, when the water level in natural water 12 is higher than the drain height in Vatch basin 1, this When Vatch basin 1 face the danger poured in down a chimney, buoyancy tank 73 is pushed door-plate 72 to rise by hydraulic action, prevent water in natural water 12 into Enter into Vatch basin 1.
Often containing a large amount of scum silica frost in urban rainwater or sanitary sewage, if these scum silica frost are directly arranged without processing It is put into natural water 12, very big pollution can be caused to natural water 12, seriously affects ecological environment.The present embodiment is in the early stage Retaining device 6 is provided between rainwater discharge outlet 4 and the fixed weir 3.
Retaining device 6 is floating type baffle or waterpower grid.When retaining device 6 is floating type baffle, Vatch basin 1 Guide rail is provided in side walls, the both ends of baffle can slide up and down to connection respectively and on guide rail, baffle is hollow or installs Floating box structure, under flow action, baffle is as water flow fluctuation rises or declines.The lower edge of baffle is on the water surface always, Baffle intercepts the scum silica frost of water float.By by scum silica frost centralized collection or be transported to sewage treatment plant carry out integrated treatment.For Convenient for collecting, the baffle of the present embodiment has angle, and the angle is sharp with the side walls that are equipped with initial rainwater floss hole 4 Angle, in this way under water impact, scum silica frost can be pooled to 4 front end of initial rainwater floss hole, finally be pooled to sewage treatment plant.
When retaining device 6 be water conservancy grid when, the both ends of grid are separately fixed in the side walls of Vatch basin 1, not with Water flow fluctuation moves, and scum silica frost is rested on after the interception of grid between water inlet and grid.It is cut in addition, grid is vertically fixed on The bottom of pond upper surface of well is flowed, grid has angle, and the angle is acute angle with the side walls for being equipped with initial rainwater floss hole 4, Grid is in tilted layout, and under water impact, scum silica frost can be pooled to 4 front end of initial rainwater floss hole, finally be pooled to sewage disposal Factory.It is focused on convenient for collecting.
The flow flowed out in branch drain 2 passes through the separation of Vatch basin 1, is divided into initial rainwater and later stage rainwater, shuts off Well 1 is initial rainwater floss hole 4 and later stage rainwater discharge outlet respectively there are two exporting, the initial stage that initial rainwater passes through Vatch basin 1 Rainwater discharge outlet 4 is directly discharged to trunk sewer 8 and enters the progress integrated treatment of sewage treatment plant 9.Later stage is relatively clean Rainwater be discharged into online processing pond 11 by the later stage rainwater discharge outlet of Vatch basin 1 and carry out online processing, it is clean that treated Water purification body is directly discharged in natural water 12.Online processing pond 11 carries out simple process for later stage relatively clean rainwater, The waste water flowed back into trunk sewer 8 is not generated, therefore, does not increase the processing pressure of sewage treatment plant 9, the alleviation of high degree The pressure of the sewage disposal at peak period of sewage treatment plant 9.
The online processing pond 11 of the present embodiment is cyclone, settling pit, waterpower particle separator, aeration tank, ultraviolet light disappear One group or several of combination of the devices such as malicious pond.Later stage rainwater pollution is lighter, the impurity such as silt more easily settled, Sedimentation separation is carried out with regard to that can get rid of by some water conservancy cyclones or separator, it is simple and convenient.
It the section 10 of the present embodiment can each one online processing pond 11 of setting or multiple sections in section 10 10 are used in conjunction with an online processing pond 11.
In use, during fine day, sewage is directly discharged by the initial rainwater floss hole 4 on Vatch basin 1 in trunk sewer 8 Sewage treatment plant 9 is entered, as shown in Figure 5.
At rainfall initial stage, rainfall is little at this time, initial rainwater mixed with sanitary sewage after by the initial rainwater on Vatch basin 1 Floss hole 4, which is discharged into trunk sewer 8, enters sewage treatment plant 9.When the initial rainwater in Vatch basin 1 substantially discharges completion Afterwards, cut-off equipment 4 starts to shut off, and later stage rainwater starts to accumulate in Vatch basin 1, as shown in fig. 6, the rainwater of accumulation is more than to fix During the height on weir 3, start to discharge into online processing pond 11.
It is higher than between fixed weir 3 and water inlet when there is the water level between 1 later stage of Vatch basin rainwater discharge outlet and fixed weir 3 Height of water level when, face the risk poured in down a chimney in Vatch basin 1 at this time, as shown in fig. 7, at this point, backward flowing preventing device 7 is started to work, Blocking water pours in down a chimney into Vatch basin 1.
For the rain-water drainage mouth of separate system, 1 facility of Vatch basin is built in the discharge outlet of branch drain 2, in 1 row of Vatch basin Online processing pond 11 is built to the port of export of natural water 12, and sanitary sewage shuts off to sewage treatment plant 9 during fine day, at the beginning of during rainfall Rain and sanitary sewage shut off to sewage treatment plant 9, and later stage rainwater is discharged into 11 online processing of online processing pond, and treated rainwater is again It is discharged to natural water 13.
For collaborating tubing giving sufficient strength, if receiving water area is more than 2 square kilometres, need to increase on the interflow main pipe along river Add several discharge outlet, the receipts water area area that each discharge outlet is responsible for is probably in 1Km2Left and right is cut in the setting of each floss hole Well 1 is flowed, 11 facility of online processing pond is built to the port of export of natural water 12 in 1 row of Vatch basin, sanitary sewage shuts off during fine day To sewage treatment plant 9, rain and sanitary sewage at the beginning of during rainfall shut off to sewage treatment plant 9, and later stage rainwater is discharged into online processing pond 11 Online processing, treated, and rainwater is discharged to natural water 13 again.
Basic principle, main feature and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent defines.

Claims (9)

  1. The online processing exhaust system 1. a kind of fragment shuts off is provided with trunk sewer (8) and row in the receipts water area of the system Water branch pipe (2);The branch drain (2) is connected with trunk sewer (8), it is characterised in that:The receipts water area is according to net Trellis is divided into multiple sections (10), and the area of each section (10) is 0.2~4 square kilometre;It is set in the section (10) It is equipped at least one branch drain (2) and at least one Vatch basin (1);The Vatch basin (1) includes water inlet, initial rainwater Discharge outlet (4) and later stage rain-water drainage mouth, the water inlet of Vatch basin (1) are connected with the port of export of branch drain (2), initial rainwater Discharge outlet (4) is connected with trunk sewer (8), and later stage rain-water drainage mouth is connected with online processing pond (11), the row in online processing pond End is put to connect with natural water (12);
    Fixed weir (3) is provided in the Vatch basin (1);Shutting off between the fixed weir (3) and later stage rain-water drainage mouth Backward flowing preventing device (7) is provided in well (1);The backward flowing preventing device (7) is set on the fixed weir (3);The reverse-filling Device (7) includes the guide rail (71) that is set on the fixed weir (3) side wall;Door-plate is slidably connected on the guide rail (72);Buoyancy tank (73) is connected on the door-plate.
  2. The online processing exhaust system 2. a kind of fragment as described in claim 1 shuts off, it is characterised in that:Each section (10) area is 0.5~2 square kilometre.
  3. The online processing exhaust system 3. a kind of fragment as described in claim 1 shuts off, it is characterised in that:Each section (10) online processing pond (11) or several sections (10) to be used in conjunction with an online processing pond (11) there are one settings in.
  4. The online processing exhaust system 4. a kind of fragment as claimed in claim 3 shuts off, it is characterised in that:The online processing Pond (11) is one group or several of the devices such as cyclone, settling pit, waterpower particle separator, aeration tank, disinfection by ultraviolet light pond Combination.
  5. The online processing exhaust system 5. a kind of fragment as described in claim 1 shuts off, it is characterised in that:The initial rainwater Floss hole (4) is arranged on Vatch basin (1) side wall between the water inlet of Vatch basin (1) and fixed weir (3), initial rainwater discharge Cut-off equipment (5) is provided at mouth (4);Debris retaining dress is provided between the initial rainwater floss hole (4) and the fixed weir (3) It puts (6).
  6. The online processing exhaust system 6. a kind of fragment as claimed in claim 5 shuts off, it is characterised in that:The cut-off equipment (5) swivel plate (51) including being arranged on the Vatch basin (1) side wall;The initial stage is hinged in the middle part of the swivel plate (51) By rainwater discharge outlet (4) side;One end of the swivel plate (51) is equipped with floating ball (52), and the other end is and initial rainwater floss hole (4) the keying plate (53) of cooperation;Vatch basin (1) side wall above swivel plate (51) is equipped with the first gag lever post (55) and the Two gag lever posts (56), when keying plate (53) fully opens, the keying plate (53) contacts with first gag lever post (55), when When keying plate (53) completely covers initial rainwater floss hole (4), the keying plate (53) connects with second gag lever post (56) It touches.
  7. The online processing exhaust system 7. a kind of fragment as claimed in claim 6 shuts off, it is characterised in that:At the top of fixed weir (3) Height higher than it is described keying plate (53) initial rainwater floss hole (4) is covered completely when floating ball (52) bottom height.
  8. The online processing exhaust system 8. a kind of fragment as claimed in claim 5 shuts off, it is characterised in that:The retaining device (6) be vertically fixed on Vatch basin (1) bottom of pond upper surface be in the side wall of Vatch basin (1) inclination angle platy structure, block The angle that the side walls formation of cut-off equipment (5) is equipped on slag device (6) and Vatch basin (1) is acute angle.
  9. The online processing exhaust system 9. a kind of fragment as claimed in claim 7 shuts off, it is characterised in that:The retaining device (6) it is floating type baffle or waterpower grid.
CN201610242365.4A 2016-04-19 2016-04-19 A kind of fragment shuts off online processing exhaust system Active CN105804200B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610242365.4A CN105804200B (en) 2016-04-19 2016-04-19 A kind of fragment shuts off online processing exhaust system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610242365.4A CN105804200B (en) 2016-04-19 2016-04-19 A kind of fragment shuts off online processing exhaust system

Publications (2)

Publication Number Publication Date
CN105804200A CN105804200A (en) 2016-07-27
CN105804200B true CN105804200B (en) 2018-07-03

Family

ID=56458234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610242365.4A Active CN105804200B (en) 2016-04-19 2016-04-19 A kind of fragment shuts off online processing exhaust system

Country Status (1)

Country Link
CN (1) CN105804200B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106480966A (en) * 2016-12-06 2017-03-08 同济大学 A kind of rain sewage dams and auto purification type sand-catching apparatus
CN107761896B (en) * 2017-05-10 2024-03-26 武汉圣禹排水系统有限公司 Surface pollution control system and method for diversion drainage pipe network system
CN109162342B (en) * 2018-07-20 2023-11-14 浙江绿维环境股份有限公司 Intelligent multi-grid rain and sewage intercepting well
CN111364578A (en) * 2018-12-25 2020-07-03 武汉圣禹排水系统有限公司 Method for modifying sewage disposal and distribution system based on existing pipe network
CN110040867B (en) * 2019-03-20 2021-10-29 中铁四局集团有限公司 Engineering site sewage treatment method
CN116474435B (en) * 2023-04-24 2025-05-13 三峡生态环境有限公司 Urban sewage treatment system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202324152U (en) * 2011-10-28 2012-07-11 安徽汉威智能科技有限公司 Rain-sewage diversion device
CN102776949A (en) * 2012-08-14 2012-11-14 上海市城市建设设计研究总院 Separately-built type rainwater storage system
JP2013159925A (en) * 2012-02-02 2013-08-19 Toshiba Corp Sewage treatment system
CN205637031U (en) * 2016-04-19 2016-10-12 武汉圣禹排水系统有限公司 Burst online processing discharge system that dams

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202324152U (en) * 2011-10-28 2012-07-11 安徽汉威智能科技有限公司 Rain-sewage diversion device
JP2013159925A (en) * 2012-02-02 2013-08-19 Toshiba Corp Sewage treatment system
CN102776949A (en) * 2012-08-14 2012-11-14 上海市城市建设设计研究总院 Separately-built type rainwater storage system
CN205637031U (en) * 2016-04-19 2016-10-12 武汉圣禹排水系统有限公司 Burst online processing discharge system that dams

Also Published As

Publication number Publication date
CN105804200A (en) 2016-07-27

Similar Documents

Publication Publication Date Title
CN105863021B (en) A kind of fragment shuts off exhaust system of regulating and storing
CN105804200B (en) A kind of fragment shuts off online processing exhaust system
CN105544698B (en) A kind of region fragment rain water drainage processing system based on separate system pipe network
CN104174191B (en) Integrated grit chamber for treating rainwater and treatment method
CN105625545B (en) A kind of region fragment rain processing system based on separate system pipe network
CN102102392B (en) Integrated initial rainwater draining well and method for draining rainwater
CN105714913B (en) A kind of region fragment rainwater shunting processing system based on separate system pipe network
CN103046632A (en) Municipal administration rainwater regulation system
CN206233333U (en) Initial rainwater filtering, precipitating, discarding and collecting treatment system
CN203878648U (en) Multifunctional rainwater collecting system
CN107965031A (en) A kind of system for collecting, handle, putting aside, utilizing for initial rainwater runoff
CN204607764U (en) Buried efficient early-stage rainwater treatment unit
CN209353440U (en) Road rainwater storage and drainage system for sponge city
CN205637032U (en) Burst regulation discharge system that dams
CN203989972U (en) Integrated grit chamber for treating rainwater
CN204753798U (en) Confluence system underground initial stage rainwater regulation pond
CN103951136B (en) A balcony wastewater, initial rainwater purifier and purification method applied to rainwater pipe network
CN111535416B (en) Sponge urban rainwater source control system and process based on delay adjustment technology
CN205475587U (en) Regional burst rainwater reposition of redundant personnel processing system based on reposition of redundant personnel tubulation net
CN205637031U (en) Burst online processing discharge system that dams
CN210887511U (en) An initial rainwater diversion and pollution control system
CN205662974U (en) Environmental rainwater branch matter collection in hillock district holds system
CN111255042A (en) Ecological tree pool with floater for automatically controlling initial rainwater drainage and working method
CN207436183U (en) A kind of carry cuts dirty pipe, a drainage system for regulate and store facility and online treatment facility
CN106746349A (en) Contaminative early-stage rainwater treatment facility

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 509 Weihu Road, Shamao Street, Hannan District, Wuhan City, Hubei Province, 430090

Patentee after: Wuhan Shengyu Smart Ecological Environmental Protection Co.,Ltd.

Address before: No. 189, Quanli North Road, Wuhan Economic and Technological Development Zone, Wuhan City, Hubei Province, 430056

Patentee before: WUHAN SHENGYU DRAINAGE SYSTEM Co.,Ltd.

CP03 Change of name, title or address