[go: up one dir, main page]

CN105780732A - Flood draining side channel - Google Patents

Flood draining side channel Download PDF

Info

Publication number
CN105780732A
CN105780732A CN201610130499.7A CN201610130499A CN105780732A CN 105780732 A CN105780732 A CN 105780732A CN 201610130499 A CN201610130499 A CN 201610130499A CN 105780732 A CN105780732 A CN 105780732A
Authority
CN
China
Prior art keywords
flood
river
facility
pass
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610130499.7A
Other languages
Chinese (zh)
Other versions
CN105780732B (en
Inventor
邱学尧
罗琼
邱光稳
高美芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610130499.7A priority Critical patent/CN105780732B/en
Publication of CN105780732A publication Critical patent/CN105780732A/en
Application granted granted Critical
Publication of CN105780732B publication Critical patent/CN105780732B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/08Details, e.g. gates, screens

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)
  • Biological Treatment Of Waste Water (AREA)

Abstract

The invention provides a flood draining side channel in order to treat river water by directly building and mounting river channel treatment facilities, such as aeration facilities, sedimentation facilities and filtering facilities on a river channel without affecting river channel flood draining capability and prevent the river channel treatment facilities from being flushed by too-large river water flow. The main structures of the flood draining side channel comprise a side channel body, a flood draining opening, a flood return opening, a flood guide wall and a retaining wall. Flood beyond a certain height is guided into the side channel body through the facilities, so that one part of the river channel is not affected by flood. The river channel treatment facilities can also be arranged to treat the river channel. The river channel treatment facilities in the original river channel can keep running depending on river water flow and can continuously and stably run for a long term, so that an economical and efficient treatment mode is provided for river channel treatment.

Description

Flood passage by-pass
Technical field
The invention belongs to flood control and field for the treatment of of water pollution, particularly to a kind of river course flood by-pass.
Background technology
The pollution of river mainly includes artificial pollution and natural pollution;Wherein natural pollution is through commonly overlooked problem, mainly includes river course dry branches and fallen leaves along the line etc. and enters river course, the animals and plants etc. rotted in river course;Artificial pollution is mainly industrial or agricultural sewage, city domestic sewage etc., is current management the best part.Pollutant in river mainly include solid contaminant and fluid contaminants, and wherein solid contaminant is easier to be separated by measures such as filtration, precipitations, and the degraded of fluid contaminants can consume oxygen in water, and dissolved oxygen is too low can produce foul gas.
Current river regulation measure mainly has section dirt, desilting, the restoration of the ecosystem etc. in river course.Wherein river channel sewage intercepting belongs to the collection work of sewage, and due to sewage collecting limited efficacy, some sewage enters in river course;Channel cleanout is the important channel eliminating river course endogenous pollution, but is belonging to short-term surprise measure, it is difficult to long-term, continuous, stable removal pollutant;Restoration of the ecosystem is breeding plant in river course mainly, and these plants are low to the contaminant removal efficiency in river course, rot also to increase the pollution of river in river course.
Administering owing to being drawn by river, its investment and operating cost are higher;The treatment facility directly arranging the water pollutions such as aeration facility, deposition facility, filtration facility in river course may affect river course flood;Additionally river is variant in wet season and dry season, and these facilities are difficult in adapt to the requirement under various flow condition.The present invention is by building by-pass and affiliated facility thereof, and excessive water when by flood imports by-pass so that directly builds on former river course and installs water pollution control facility and do not reduce flood discharge capacity, avoids that flow is excessive affects water pollution control facility operation simultaneously.
Summary of the invention
Administering river for directly building river regulation facilities such as installing aeration facility, deposition facility, filtration facility on river course, and do not reduce flood carrying capacity, avoid river discharge to cross large impact water river regulation facility simultaneously, the present invention proposes flood passage by-pass.Its main units includes by-pass, goes out Hong Kou, Hui Hongkou, lead flood wall, choking wall etc., and the flood that will be exceeded certain altitude by these facilities imports by-pass so that a part of section, by flood influence, can arrange river regulation facility and administer river course.
Choking wall is arranged on out Hong Kou, its top higher than river course ordinary water level and lower than river flood water level.
Lead flood wall stand sky be arranged on former river course, its bottom higher than river course ordinary water level and lower than river flood water level.
The present invention administers the method in river course and includes following two situation:
(1) when there is not flood
River is provided with the section of river regulation facility all along former river course from leading entrance under flood wall, flows to downstream after river regulation facility processes;
(2) when there is flood
River water level is intercepted in former river course by choking wall lower than the part of choking wall, enters, under flood wall, the section installing river regulation facility from leading, flows to downstream after river regulation facility processes;
River water level is led flood wall higher than the part of choking wall and is stopped, enters by-pass through working as the flood mouth that goes out on stream wall, and passes through go back to the former river course of flood mouth return in downstream.
The river regulation facilities such as aeration facility, deposition facility, filtration facility are set in the section that former river flood is exported, are used for pollutant, the increase river dissolved oxygen content etc. of removing in river.
Return flood mouth and be opened in the downstream being provided with river regulation facility, select, in the strong section of flood discharge capacity, to prevent flood from pouring in down a chimney or river is trapped in the section arranging river regulation facility and floods facility therein.
The downstream arranging the river regulation facilities such as aeration facility, deposition facility, filtration facility in former river course arranges accident pool and railing, the water pollution control facility guaranteed under abnormal condition in by-pass destroyed by rush of water after under sink in accident pool, it is prevented that enter downstream influences river course, former river course safety.
The present invention administers the pollution of river, provides the benefit that compared with prior art:
1, when flood, by leading flood wall and going out Hong Kou, the flood exceeding certain altitude is diverted to by-pass;
2, owing to flood is divided to by-pass, part section, former river course is not by flood influence;
3, the river regulation facilities such as aeration facility, deposition facility, filtration facility can be set by the section of flood influence in former river course;
4, the river regulation facility on former river course can run by river flow, and its investment and operating cost are relatively low;
5, Hui Hongkou is opened in the section that the downstream flood discharge capacity being provided with river regulation facility is strong, can prevent flood from pouring in down a chimney or river is trapped in the section being provided with river regulation facility;
6, the downstream arranging the river regulation facilities such as aeration facility, deposition facility, filtration facility in former river course arranges accident pool and railing, the water pollution control facility guaranteed under abnormal condition in by-pass destroyed by rush of water after under sink in accident pool, it is prevented that enter downstream influences river course, former river course safety.
Accompanying drawing explanation
Fig. 1 is the horizontal layout schematic diagram of the present invention.
Fig. 2 is the A-A profile of the present invention.
Fig. 3 is the B-B profile of the present invention.
Fig. 4 is the C-C profile of the present invention.
Wherein, riverbank 1, former river course 2, by-pass 3, go out flood mouth 4, return flood mouth 5, lead flood wall 6, choking wall 7, railing 8, accident pool 9, accident pool pool wall 10.
Detailed description of the invention
Flood passage by-pass, its main units includes by-pass 3, goes out flood mouth 4, returns flood mouth 5, leads flood wall 6, choking wall 7 etc., by these facilities, the flood exceeding certain altitude is imported by-pass 3 so that a part of section, not by flood influence, can arrange river regulation facility and administer river course.
The present invention administers the method in river course and includes following two situation:
(1) when there is not flood
River is provided with the section of river regulation facility all along former river course 2 from leading entrance under flood wall 6, flows to downstream after river regulation facility processes;
(2) when there is flood
River water level is intercepted lower than the part of choking wall 7 in former river course 2 by choking wall 7, enters, under flood wall 6, the section installing river regulation facility from leading, flows to downstream after river regulation facility processes;
River water level is led flood wall 6 higher than the part of choking wall 7 and is stopped, enters by-pass 3 through the flood mouth 4 that goes out on stream wall 7, and pass through back big vast mouth 5 in downstream and return to former river course 2.

Claims (7)

1. flood passage by-pass, it is characterised in that include by-pass (3), go out Hong Kou (4), Hui Hongkou (5), lead the facilities such as flood wall (6), choking wall (7).
2. flood passage by-pass as claimed in claim 1, it is characterised in that choking wall (7) is arranged on out Hong Kou (4), its top higher than river course ordinary water level lower than river flood water level.
3. flood passage by-pass as claimed in claim 1, it is characterised in that lead that flood wall (6) is built on stilts to be arranged on former river course (2), its bottom higher than river course ordinary water level lower than river flood water level.
4. flood passage by-pass as claimed in claim 1, it is characterised in that the river regulation facilities such as aeration facility, deposition facility, filtration facility are set on former river course 2.
5. flood passage by-pass as claimed in claim 1, it is characterised in that Hui Hongkou (5) is opened in the downstream being provided with river regulation facility, selects in the strong section of flood discharge capacity.
6. river regulation by-pass as claimed in claim 1, it is characterised in that the downstream arranging the river regulation facilities such as aeration facility, deposition facility, filtration facility in former river course (2) arranges accident pool (9) and railing (8).
7. the flood passage by-pass as described in claim 1,2,3,4,5,6, it is characterised in that specific works mode is as follows:
(1) when there is not flood
River is provided with the section of river regulation facility all along former river course (2) from leading entrance under flood wall (6), flows to downstream after river regulation facility processes;
(2) when there is flood
River water level is intercepted in former river course (2) by choking wall (7) lower than the part of choking wall (7), enters, from leading, the section installing river regulation facility under flood wall (6), flows to downstream after river regulation facility processes;
River water level is led flood wall (6) higher than the part of choking wall (7) and is stopped, enters by-pass (3) through the Hong Kou (4) that goes out on stream wall (7), and pass through back big vast mouth (5) in downstream and return to former river course (2).
CN201610130499.7A 2016-03-08 2016-03-08 Flood passage by-pass Expired - Fee Related CN105780732B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610130499.7A CN105780732B (en) 2016-03-08 2016-03-08 Flood passage by-pass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610130499.7A CN105780732B (en) 2016-03-08 2016-03-08 Flood passage by-pass

Publications (2)

Publication Number Publication Date
CN105780732A true CN105780732A (en) 2016-07-20
CN105780732B CN105780732B (en) 2018-05-01

Family

ID=56388271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610130499.7A Expired - Fee Related CN105780732B (en) 2016-03-08 2016-03-08 Flood passage by-pass

Country Status (1)

Country Link
CN (1) CN105780732B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110372107A (en) * 2019-08-27 2019-10-25 上海市城市建设设计研究总院(集团)有限公司 River baffle guiding device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06299530A (en) * 1993-04-12 1994-10-25 Randesu Kk Water channel block
CN101591899A (en) * 2009-06-26 2009-12-02 甄建伟 The river course utilization system
CN201386269Y (en) * 2009-04-03 2010-01-20 云南省环境科学研究院 River channel bypass trash blocking device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06299530A (en) * 1993-04-12 1994-10-25 Randesu Kk Water channel block
CN201386269Y (en) * 2009-04-03 2010-01-20 云南省环境科学研究院 River channel bypass trash blocking device
CN101591899A (en) * 2009-06-26 2009-12-02 甄建伟 The river course utilization system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110372107A (en) * 2019-08-27 2019-10-25 上海市城市建设设计研究总院(集团)有限公司 River baffle guiding device
CN110372107B (en) * 2019-08-27 2024-05-03 上海市城市建设设计研究总院(集团)有限公司 River channel blocking and guiding device

Also Published As

Publication number Publication date
CN105780732B (en) 2018-05-01

Similar Documents

Publication Publication Date Title
CN107190842A (en) A kind of control method for shunting of accurately being removed contamination for rainwater
CN205776702U (en) Storage pond floating debris retaining system
CN202324064U (en) Turbidity type rainwater flow-discarding device
KR101327526B1 (en) Water treatment structure
CN104975648A (en) Combined system underground initial rainwater storage tank
CN205637032U (en) Burst regulation discharge system that dams
CN208267068U (en) A kind of initial rainwater collection device
CN204753798U (en) Confluence system underground initial stage rainwater regulation pond
CN105568925B (en) River regulation by-pass
CN105780732A (en) Flood draining side channel
CN207260283U (en) A kind of road and bridge siphon drainge system
KR100762981B1 (en) Nonpoint Pollution Reduction Device
CN202730707U (en) Initial-stage rainwater intercepting and shunting as well as later-stage rainwater separating system for flood drainage river channel
CN206512820U (en) A kind of combined system or the rainy just unconspicuous burst of feature of mixed flow system handle exhaust system online
CN203639250U (en) Intelligent integrated oil removal lifting device
CN207760985U (en) A kind of band surges the drainage system of bottom-open type weir gate and pump row
CN113429017B (en) River channel treatment system
CN205637031U (en) Burst online processing discharge system that dams
CN205637082U (en) Take horizontal grid intercepting device's vatch basin
CN204959950U (en) Rainwater automatic collection emptying devices
CN106638889A (en) Un-obvious initial rain characteristic online fragment treatment discharge system under combined system or mixed system and control method of discharge system
CN207436177U (en) A kind of drainage system with pump row
CN206607652U (en) The first unconspicuous separate system of rain feature handles exhaust system online
CN209260856U (en) A kind of automatic diverter of rain leader downspout initial rainwater
CN207633478U (en) A kind of sewage closure works system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180501