CN105771518A - Dust treatment device used in ore processing - Google Patents

Dust treatment device used in ore processing Download PDF

Info

Publication number
CN105771518A
CN105771518A CN201610281265.2A CN201610281265A CN105771518A CN 105771518 A CN105771518 A CN 105771518A CN 201610281265 A CN201610281265 A CN 201610281265A CN 105771518 A CN105771518 A CN 105771518A
Authority
CN
China
Prior art keywords
framework
support
fixing
pipeline
drainage screen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610281265.2A
Other languages
Chinese (zh)
Other versions
CN105771518B (en
Inventor
张哲瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610281265.2A priority Critical patent/CN105771518B/en
Priority to CN201710651655.9A priority patent/CN107376561B/en
Publication of CN105771518A publication Critical patent/CN105771518A/en
Application granted granted Critical
Publication of CN105771518B publication Critical patent/CN105771518B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D50/00Combinations of methods or devices for separating particles from gases or vapours
    • B01D50/60Combinations of devices covered by groups B01D46/00 and B01D47/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D50/00Combinations of methods or devices for separating particles from gases or vapours
    • B01D50/10Combinations of devices covered by groups B01D45/00, B01D46/00 and B01D47/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2258/00Sources of waste gases
    • B01D2258/02Other waste gases
    • B01D2258/025Other waste gases from metallurgy plants

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Filtering Of Dispersed Particles In Gases (AREA)
  • Sewage (AREA)

Abstract

A dust treatment device used in ore processing comprises an air suction device, a pipeline device, a first filtering device, a second filtering device, a connecting device and a purifying device. The air suction device comprises a first frame, a first pipeline, an air incoming hopper, a first support, a second pipeline, a first roller, a first filtering net, a second support, a second filtering net and a third pipeline, the pipeline device comprises a fourth pipeline, a third support, a second fan, a first cross rod, a first inclined rod, a first bent rod and a fourth support, the first filtering device comprises a second frame, a third filtering net, a fourth filtering net, a first spring and a first cushion block, the second filtering device comprises a third frame and a first retaining plate, the connecting device comprises a fifth pipeline, a seventh support, an eighth support, a ninth support, a tenth support, a six pipeline and an eleventh support, and the purifying device comprises a purifying box, a sixth filtering net and a fourth frame. The dust treatment device can suck dust in for thorough purifying and filtering and has remarkable purifying effect.

Description

Dust treatment plant in a kind of ore processing
Technical field
The present invention relates to dust disposal technical field, particularly relate to dust treatment plant in a kind of ore processing.
Background technology
Dust is in commercial production, and especially common in mineral products processing a kind of product, dust not only brings the loss of mineral, and brings serious environmental pollution.Making the soil of periphery and air be subject to serious pollution in mining and the course of processing, by atmospheric air circulation, dust enters in water body, causes the pollution of water body simultaneously, causes the destruction of whole ecological environment.Produce substantial amounts of dust and fly away in atmosphere, cause that the vile weathers such as dense fog occur, cause the diseases such as human respiratory system.On-the-spot in processings such as exploitation, broken, screening, conveyings, first the healthy of workman is caused serious infringement by dust, and secondly the production environment of plant area derives is airborne dust and fall ash.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
Summary of the invention
It is an object of the invention to provide dust treatment plant in a kind of ore processing that can effectively solve above-mentioned technical problem.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
nullDust treatment plant in a kind of ore processing,In described ore processing, dust treatment plant includes air extractor、It is positioned at the plumbing installation on the right side of described air extractor、It is positioned at the first defecator below described plumbing installation、It is positioned at the second defecator below described first defecator、It is positioned at the connecting device below described second defecator and is positioned at the purifier below described connecting device,Described air extractor includes the first framework、It is arranged at the first pipeline in described first framework、It is positioned at the air inlet bucket on the left of described first pipeline、It is positioned at the first support above described first pipeline、It is positioned at the second pipe above described first framework、It is contained in the first roller in described first framework、It is positioned at the first drainage screen on the left of described first roller、It is positioned at the second support on the right side of described first drainage screen、It is positioned at the second drainage screen on the right side of described second support and is positioned at the 3rd pipeline below described first framework,Described plumbing installation includes the 4th pipeline、It is positioned at the 3rd support above described 4th pipeline、It is arranged at the second blower fan on described 4th pipeline、It is positioned at the first cross bar on the left of described 4th pipeline、It is positioned at the first brace below described first cross bar、It is positioned at the first bent stick above described first brace、It is positioned at the 4th support below described first brace、It is positioned at the 5th support on the right side of described 4th pipeline and is positioned at the 6th support on the left of described 4th pipeline,Described first defecator includes the second framework、It is contained in described second framework the 3rd drainage screen of the left and right sides、The 4th drainage screen between described 3rd drainage screen、It is positioned at the first spring below described 4th drainage screen、It is positioned at the first cushion block below described first spring,Described second defecator includes the 3rd framework、It is contained in the first baffle plate in described 3rd framework、It is positioned at first bracer below described first baffle plate and is positioned at the 5th drainage screen below described first bracer,Described connecting device includes the 5th pipeline、It is positioned at the 7th support on the right side of described 5th pipeline、It is positioned at the 8th support on the left of described 5th pipeline、It is positioned at the 9th support on the left of described 8th support、It is positioned at the tenth support below described 9th support、It is positioned at the 6th pipeline below described 5th pipeline and is positioned at the 11st support below described 5th pipeline,Described purifier includes purifying box、It is contained in the 6th drainage screen in described purifying box、It is positioned at the 4th framework below described 6th drainage screen、It is positioned at the second bent stick below described 4th framework and is positioned at the second spring above described 4th framework.
nullDescribed first framework is hollow cuboid,Described first framework horizontal positioned,Described first framework is provided with first through hole on its right surface、It is positioned at the second through hole of its lower surface and is located thereon the third through-hole on surface,Described first pipeline is horizontal,The right-hand member of described first pipeline runs through the surfaces externally and internally of described first framework and extends to inside described first framework,Described first pipeline is fixing with described first framework to be connected,Described first pipeline is provided with the first blower fan,The left end of described first pipeline is fixing with the right surface of described air inlet bucket to be connected,Described air inlet bucket is hollow round table-like,Described first support is L-shaped,One end of described first support is fixing with described first blower fan to be connected,The other end of described first support is fixing with the left surface of described first framework to be connected,One end of described second pipe is directed at described third through-hole and fixing with the upper surface of described first framework is connected,Described second pipe is provided with the second water pump,Described second water pump is provided with the first montant,Described first montant is vertical shape,The lower end of described first montant is fixing with described first framework to be connected,The upper end of described first montant is fixing with described first water pump to be connected.
nullThe cross section ovalize of described first roller,Described first roller turns with described first framework axle and is connected,Described first roller is provided with the bristle at its two ends,Described bristle is provided with several and fixing with described first roller is connected,Described first drainage screen is in the shape of the letter V,The upper end of described first drainage screen is vertical shape,The inclined shape in lower end of described first drainage screen,The right-hand member of described first pipeline is fixing with the left surface of described first drainage screen to be connected,Described second support is L-shaped,One end of described second support is fixing with the inner surface of described first framework to be connected,The other end of described second support is fixing with described first drainage screen to be connected,Described second drainage screen is bending,The two ends up and down of described second drainage screen are fixing with the inner surface of described first framework to be connected,Described second drainage screen is positioned at the left side of described first through hole,Described 3rd pipeline is vertical shape,The upper end of described 3rd pipeline is directed at described second through hole and fixing with the lower surface of described first framework is connected,Described 3rd pipeline is provided with the first valve.
nullThe upper end of described 4th pipeline is directed at described first through hole and fixing with the right surface of described first framework is connected,The lower end of described 4th pipeline is vertical shape,Described 3rd support is concave shape,One end of described 3rd support is fixing with described first framework to be connected,The other end of described 3rd support is fixing with described 4th pipeline to be connected,Described first cross bar is horizontal,The left end of described first cross bar is fixing with the right surface of described first framework to be connected,The right-hand member of described first cross bar is fixing with described first bent stick to be connected,The described first inclined shape of brace,The upper end of described first brace is fixing with the right surface of described first framework to be connected,The lower end of described first brace is fixing with described second blower fan to be connected,Described first bent stick is bending,The lower end of described first twisted plate is fixing with described first brace to be connected,Described 4th pipeline runs through the upper and lower surface of described first bent stick and is secured to connect,Described 4th support is L-shaped,One end of described 4th support is fixing with described first brace to be connected,The other end of described 4th support is fixing with described 4th pipeline to be connected,Described 5th support is L-shaped,One end of described 5th support is fixing with described 4th pipeline to be connected,The other end of described 5th support is vertical shape,Described 6th support is L-shaped,The upper end of described 6th support is fixing with described 4th support to be connected,The lower end of described 6th support is vertical shape.
Described second framework is cross section is the cylinder of isosceles trapezoid, described second framework horizontal positioned, described second framework is provided with the fourth hole of its upper surface, fourth hole described in the lower end aligned of described 4th pipeline and fixing with the upper surface of described second framework be connected, the lower end of described 5th support and the 6th support is fixing with described second framework to be connected, described 3rd drainage screen is provided with two and lays respectively at the left and right sides in described second framework, described 3rd drainage screen is cuboid, described 3rd drainage screen is vertically placed, the upper surface of described 3rd drainage screen is fixing with the inner surface of described second framework to be connected.
Described 4th drainage screen is cuboid, described 4th drainage screen horizontal positioned, described 4th drainage screen is between described 3rd drainage screen, the side of described 4th drainage screen is connected with the side slip of described 3rd drainage screen, described first spring is vertical shape, the upper end of described first spring is fixing with described 4th drainage screen to be connected, the lower end of described first spring is fixing with the upper surface of described first cushion block to be connected, described first cushion block is cuboid, described first cushion block is between described 3rd drainage screen, described first cushion block horizontal positioned, the side of described first cushion block is fixing with the side of described 3rd drainage screen to be connected, described first cushion block, the lower surface of the 3rd drainage screen and the second framework is in same plane.
nullDescribed 3rd framework is cross section is the cylinder of isosceles trapezoid,Described 3rd framework horizontal positioned,The upper surface of described 3rd framework is fixing with the lower surface of described second framework to be connected,The lower surface of described 3rd framework is provided with fifth hole,Described first baffle plate is horizontal,The side of described first baffle plate is fixing with the inner surface of described 3rd framework to be connected,The upper surface of the upper surface of described first baffle plate and described 3rd framework is in same plane,The lower surface of described 3rd drainage screen and the first cushion block is fixing with the upper surface of described first baffle plate to be connected,Described first baffle plate is provided with clematis stem hole,Described first bracer is cuboid,Described first bracer horizontal positioned,The upper surface of described first bracer is fixing with the lower surface of described first baffle plate to be connected,Described 5th drainage screen is bending,The two ends of described 5th drainage screen are fixing with the lower surface of described first bracer to be connected,Described 5th drainage screen is positioned at the top of described fifth hole,Described 5th drainage screen acts against on the inner surface of described 3rd framework.
nullOne end of described 5th pipeline is directed at described fifth hole and fixing with the lower surface of described 3rd framework is connected,The other end of described 5th pipeline is fixing with the upper end of described 6th pipeline to be connected,Described 7th support is L-shaped,One end of described 7th support is fixing with the lower surface of described 3rd framework to be connected,The other end of described 7th support is fixing with described 5th pipeline to be connected,Described 8th support is L-shaped,One end of described 8th support is fixing with described 3rd framework to be connected,The other end of described 8th support is fixing with described 5th pipeline to be connected,Described 9th support is L-shaped,One end of described 9th support is fixing with described 8th support to be connected,The other end of described 9th support is fixing with described tenth support to be connected,Described tenth support is concave shape,One end of described tenth support is fixing with described 5th pipeline to be connected,The other end of described tenth support is fixing with described 11st pipeline to be connected,Described 11st support is L-shaped,One end of described 11st support is fixing with described 5th pipeline to be connected,The other end of described 11st support is horizontal.
nullDescribed purifying box is hollow cuboid,The cross section of described purifying box is concave shape,Described 11st support is fixing with the right surface of described purifying box to be connected,Described 6th drainage screen is cuboid,Described 6th drainage screen horizontal positioned,The side of described 6th drainage screen is fixing with the inner surface of described purifying box to be connected,The described upper surface of the 6th drainage screen and the upper surface of described purifying box are in same plane,Described 6th pipeline runs through the upper and lower surface of described 6th drainage screen and is secured to connect,The lower end of described 6th pipeline is contained in described 4th framework,Described 4th framework is cross section is U-shaped cylinder,Described 4th framework horizontal positioned,Described second bent stick is provided with two and lays respectively at the left and right sides of described 4th framework,Described second bent stick is bending,The lower end of described second bent stick is fixing with the inner surface of described purifying box to be connected,The upper end of described second bent stick is fixing with described 4th framework to be connected,Described second spring is provided with two,Described second spring is vertical shape,The lower end of described second spring is fixing with described 4th framework to be connected,The upper end of described second spring is fixing with the lower surface of described 6th drainage screen to be connected.
After adopting technique scheme, present invention have the advantage that
Dust treatment plant simple in construction in ore processing of the present invention, easy to use, can dust be drawn into wherein, then it is carried out purification filtering thoroughly, clean-up effect is notable, and purification efficiency is high, it is possible to the dust produced in effective removing commercial production, purify the environment produced, ensure the healthy of workman and the safety produced.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the detailed description of the invention of dust treatment plant in ore processing of the present invention is described further:
Fig. 1 is the structural representation of dust treatment plant in ore processing of the present invention;
Detailed description of the invention
As it is shown in figure 1, dust treatment plant includes air extractor 1, is positioned at the plumbing installation 2 on the right side of described air extractor 1, is positioned at the first defecator 3 below described plumbing installation 2, is positioned at the second defecator 4 below described first defecator 3, is positioned at the connecting device 5 below described second defecator 4 and is positioned at the purifier 6 below described connecting device 5 in ore processing of the present invention.
As shown in Figure 1, described air extractor 1 includes the first framework 11, it is arranged at the first pipeline 12 in described first framework 11, it is positioned at the air inlet bucket 14 on the left of described first pipeline 12, it is positioned at the first support 15 above described first pipeline 12, it is positioned at the second pipe 16 above described first framework 11, it is contained in the first roller 17 in described first framework 11, it is positioned at the first drainage screen 18 on the left of described first roller 17, it is positioned at the second support 19 on the right side of described first drainage screen 18, it is positioned at the second drainage screen 10 on the right side of described second support 19 and is positioned at the 3rd pipeline 13 below described first framework 11.Described first framework 11 is in hollow cuboid, described first framework 11 horizontal positioned, the first through hole 111 being provided with its right surface in described first framework 11, the second through hole 112 being positioned at its lower surface and be located thereon the third through-hole 113 on surface, described first through hole the 111, second through hole 112 and third through-hole 113 is rounded and communicates with the inside of described first framework 11.Described first pipeline 12 is horizontal, the right-hand member of described first pipeline 12 runs through the surfaces externally and internally of described first framework 11 and extends to described first framework 11 inside, described first pipeline 12 is fixing with described first framework 11 to be connected, and described first pipeline 12 is provided with the first blower fan 121.The left end of described first pipeline 12 and the right surface of described air inlet bucket 14 are fixing to be connected, and described air inlet bucket 14 is hollow round table-like.Described first support 15 is L-shaped, and one end of described first support 15 is fixing with described first blower fan 121 to be connected, and the other end of described first support 15 is fixing with the left surface of described first framework 11 to be connected.One end of described second pipe 16 is directed at described third through-hole 113 and fixing with the upper surface of described first framework 11 is connected, the inside of described second pipe 16 is communicated with the inside of described first framework 11, the other end of described second pipe 16 is placed in pond, described second pipe 16 is provided with the second water pump 161, described second water pump 161 is provided with the first montant, described first montant is vertical shape, the lower end of described first montant is fixing with described first framework 11 to be connected, and the upper end of described first montant is fixing with described first water pump 161 to be connected.The cross section ovalize of described first roller 17, described first roller 17 turns with described first framework 11 axle and is connected, described first roller 17 is connected with motor, described first roller 17 can be rotated in described first framework 11, being provided with the bristle 171 at two ends on described first roller 17, described bristle 171 is provided with several and fixing with described first roller 17 is connected.Described first drainage screen 18 is in the shape of the letter V, and the upper end of described first drainage screen 18 is vertical shape, the inclined shape in lower end of described first drainage screen 18, and the right-hand member of described first pipeline 12 is fixing with the left surface of described first drainage screen 18 to be connected.Described second support 19 is L-shaped, and one end of described second support 19 is fixing with the inner surface of described first framework 11 to be connected, and the other end of described second support 19 is fixing with described first drainage screen 18 to be connected.Described second drainage screen 10 is in bending, and the two ends up and down of described second drainage screen 10 are fixing with the inner surface of described first framework 11 to be connected, and described second drainage screen 10 is positioned at the left side of described first through hole 111.Described 3rd pipeline 13 is in vertical shape, the upper end of described 3rd pipeline 13 is directed at described second through hole 112 and fixing with the lower surface of described first framework 11 is connected, the inside of described 3rd pipeline 13 is communicated with the inside of described first framework 11, described 3rd pipeline 13 is provided with the first valve 131, for controlling the flow of water in described 3rd pipeline 13.
As it is shown in figure 1, described plumbing installation 2 includes the 4th pipeline 21, is positioned at the 3rd support 22, the second blower fan 23 being arranged on described 4th pipeline 21 above described 4th pipeline 21, is positioned at the first cross bar 24 on the left of described 4th pipeline 21, is positioned at the first brace 25 below described first cross bar 24, is positioned at the first bent stick 26 above described first brace 25, is positioned at the 4th support 27 below described first brace 25, is positioned at the 5th support 28 on the right side of described 4th pipeline 21 and is positioned at the 6th support 29 on the left of described 4th pipeline 21.The upper end of described 4th pipeline 21 is directed at described first through hole 111 and fixing with the right surface of described first framework 11 is connected so that the inside of described 4th pipeline 21 communicates with the inside of described first framework 11, and the lower end of described 4th pipeline 21 is vertical shape.Described 3rd support 22 is in concave shape, and one end of described 3rd support 22 is fixing with described first framework 11 to be connected, and the other end of described 3rd support 22 is fixing with described 4th pipeline 21 to be connected.Described second blower fan 23 is for being pumped into the gas in described first framework 11 in described 4th pipeline 21.Described first cross bar 24 is horizontal, and the left end of described first cross bar 24 is fixing with the right surface of described first framework 11 to be connected, and the right-hand member of described first cross bar 24 is fixing with described first bent stick 26 to be connected.The described first inclined shape of brace 25, the upper end of described first brace 25 is fixing with the right surface of described first framework 11 to be connected, and the lower end of described first brace 25 is fixing with described second blower fan 23 to be connected.Described first bent stick 26 is in bending, the lower end of described first twisted plate 26 is fixing with described first brace 25 to be connected, described 4th pipeline 21 runs through the upper and lower surface of described first bent stick 26 and is secured to connect, thus described 4th pipeline 21 is played a supporting role.Described 4th support 27 is L-shaped, and one end of described 4th support 27 is fixing with described first brace 25 to be connected, and the other end of described 4th support 27 is fixing with described 4th pipeline 21 to be connected.Described 5th support 28 is L-shaped, and one end of described 5th support 28 is fixing with described 4th pipeline 21 to be connected, and the other end of described 5th support 28 is vertical shape.Described 6th support 29 is L-shaped, and the upper end of described 6th support 29 is fixing with described 4th support 27 to be connected, and the lower end of described 6th support 29 is vertical shape.
As it is shown in figure 1, described first defecator 3 includes the second framework 31, is contained in described second framework 31 the 3rd drainage screen 32 of the left and right sides, the 4th drainage screen 33 between described 3rd drainage screen 32, be positioned at the first spring 34 below described 4th drainage screen 33, be positioned at the first cushion block 35 below described first spring 34.Described second framework 31 is the cylinder of isosceles trapezoid for cross section, described second framework 31 horizontal positioned, described second framework 31 horizontal positioned, described second framework 31 is provided with the fourth hole 311 of its upper surface, rounded and with described second framework 31 the inside of described fourth hole 311 communicates, fourth hole 311 described in the lower end aligned of described 4th pipeline 21 and fixing with the upper surface of described second framework 31 be connected, the inside of described 4th pipeline 21 is communicated with the inside of described second framework 31, the lower end of described 5th support 28 and the 6th support 29 is fixing with described second framework 31 to be connected, described second framework 31 is in hollow shape.Described 3rd drainage screen 32 is provided with two and lays respectively at the left and right sides in described second framework 31, described 3rd drainage screen 32 is in cuboid, described 3rd drainage screen 32 is vertically placed, and the upper surface of described 3rd drainage screen 32 is fixing with the inner surface of described second framework 31 to be connected.Described 4th drainage screen 33 is in cuboid, described 4th drainage screen 33 horizontal positioned, described 4th drainage screen 33 is between described 3rd drainage screen 32, and the side of described 4th drainage screen 33 is connected with the side slip of described 3rd drainage screen 32 so that described 4th drainage screen 33 can move up and down.Described first spring 34 is provided with two, and described first spring 34 is in vertical shape, and the upper end of described first spring 34 is fixing with described 4th drainage screen 33 to be connected, and the lower end of described first spring 34 is fixing with the upper surface of described first cushion block 35 to be connected.Described first cushion block 35 is in cuboid, described first cushion block 35 is between described 3rd drainage screen 32, described first cushion block 35 horizontal positioned, the side of described first cushion block 35 is fixing with the side of described 3rd drainage screen 32 to be connected, and the lower surface of described first cushion block the 35, the 3rd drainage screen 32 and the second framework 31 is in same plane.
As it is shown in figure 1, described second defecator 4 includes the 3rd framework 41, the first baffle plate 42 of being contained in described 3rd framework 41, be positioned at first bracer 43 below described first baffle plate 42 and be positioned at the 5th drainage screen 44 below described first bracer 43.Described 3rd framework 41 is the cylinder of isosceles trapezoid in cross section, described 3rd framework 41 horizontal positioned, described 3rd framework 41 is in hollow shape, the upper surface of described 3rd framework 41 is fixing with the lower surface of described second framework 31 to be connected, the inside making described 3rd framework 41 and the second framework 31 communicates, the lower surface of described 3rd framework 41 is provided with fifth hole 411, and rounded and with described 3rd framework 41 the inside of described fifth hole 411 communicates.Described first baffle plate 42 is horizontal, the side of described first baffle plate 42 is fixing with the inner surface of described 3rd framework 41 to be connected, the upper surface of described first baffle plate 42 and the upper surface of described 3rd framework 41 are in same plane, the lower surface of described 3rd drainage screen 32 and the first cushion block 35 is fixing with the upper surface of described first baffle plate 42 to be connected, described first baffle plate 42 is provided with clematis stem hole 421, and described clematis stem hole 421 is provided with two and runs through the upper and lower surface of described first baffle plate 42.Described first bracer 43 is in cuboid, and described first bracer 43 horizontal positioned, the upper surface of described first bracer 43 is fixing with the lower surface of described first baffle plate 42 to be connected.Described 5th drainage screen 44 is in bending, the two ends of described 5th drainage screen 44 are fixing with the lower surface of described first bracer 43 to be connected, described 5th drainage screen 44 is positioned at the top of described fifth hole 411, and described 5th drainage screen 44 acts against on the inner surface of described 3rd framework 41.
As it is shown in figure 1, described connecting device 5 includes the 5th pipeline 51, is positioned at the 7th support 52 on the right side of described 5th pipeline 51, is positioned at the 8th support 53 on the left of described 5th pipeline 51, is positioned at the 9th support 54 on the left of described 8th support 53, is positioned at the tenth support 55 below described 9th support 54, is positioned at the 6th pipeline 56 below described 5th pipeline 51 and is positioned at the 11st support 57 below described 5th pipeline 51.One end of described 5th pipeline 51 is directed at described fifth hole 411 and fixing with the lower surface of described 3rd framework 41 is connected, the inside of described 5th pipeline 51 is communicated with the inside of described 3rd framework 41, the other end of described 5th pipeline 51 is fixing with the upper end of described 6th pipeline 56 to be connected so that the inside of described 5th pipeline 51 communicates with the inside of described 6th pipeline 56.Described 7th support 52 is L-shaped, and one end of described 7th support 52 is fixing with the lower surface of described 3rd framework 41 to be connected, and the other end of described 7th support 52 is fixing with described 5th pipeline 51 to be connected.Described 8th support 53 is L-shaped, and one end of described 8th support 53 is fixing with described 3rd framework 41 to be connected, and the other end of described 8th support 53 is fixing with described 5th pipeline 51 to be connected.Described 9th support 54 is L-shaped, and one end of described 9th support 54 is fixing with described 8th support 53 to be connected, and the other end of described 9th support 54 is fixing with described tenth support 55 to be connected.Described tenth support 55 is in concave shape, and one end of described tenth support 55 is fixing with described 5th pipeline 51 to be connected, and the other end of described tenth support 55 is fixing with described 11st pipeline 56 to be connected.Described 11st support 57 is L-shaped, and one end of described 11st support 57 is fixing with described 5th pipeline 51 to be connected, and the other end of described 11st support 57 is horizontal.
As it is shown in figure 1, described purifier 6 includes purifying box 61, the 6th drainage screen 62 that is contained in described purifying box 61, be positioned at the 4th framework 63 below described 6th drainage screen 62, be positioned at the second bent stick 64 below described 4th framework 63 and be positioned at the second spring 65 above described 4th framework 63.Described purifying box 61 is in hollow cuboid, and the cross section of described purifying box 61 is concave shape, and described 11st support 57 is fixing with the right surface of described purifying box 61 to be connected.Described 6th drainage screen 62 is in cuboid, described 6th drainage screen 62 horizontal positioned, the side of described 6th drainage screen 62 is fixing with the inner surface of described purifying box 61 to be connected, the upper surface of described 6th drainage screen 62 and the upper surface of described purifying box 61 are in same plane, described 6th pipeline 56 runs through the upper and lower surface of described 6th drainage screen 62 and is secured to connect, and the lower end of described 6th pipeline 56 is contained in described 4th framework 63.Described 4th framework 63 is U-shaped cylinder in cross section, and described 4th framework 63 horizontal positioned is placed with water in described 4th framework 63, in order to the gas from the 6th pipeline 56 ejection is purified.Described second bent stick 64 is provided with two and lays respectively at the left and right sides of described 4th framework 63, described second bent stick 64 is in bending, the lower end of described second bent stick 64 is fixing with the inner surface of described purifying box 61 to be connected, the upper end of described second bent stick 64 is fixing with described 4th framework 63 to be connected, thus described 4th framework 63 is played a supporting role.Described second spring 65 is provided with two, and described second spring 65 is in vertical shape, and the lower end of described second spring 65 is fixing with described 4th framework 63 to be connected, and the upper end of described second spring 65 is fixing with the lower surface of described 6th drainage screen 62 to be connected.
As shown in Figure 1, when in described ore processing of the present invention, dust treatment plant uses, first place it under the environment that in ore processing process, dust is bigger, then the first blower fan 121 is started, dust is made to enter in air inlet bucket 14, then in the first pipeline 12, then spray from the right-hand member of the first pipeline 12, then the right side of the first drainage screen 18 is partly entered into through the filtration of the first drainage screen 18, part is through the lower section of the first drainage screen 18, then pass around the right side entering below the first drainage screen 18 of the first drainage screen 18, thus the effect of shunting can be played when air pressure is bigger, prevent from the first drainage screen 18 is caused damage.Start the first water pump 161 simultaneously, the water in pond is made to enter in second pipe 16, then in the first framework 11, then soak the first drainage screen 18 and focus on the lower section within the first framework 11, such that it is able to most dust in air is fallen in absorption, and start the motor being connected with the first roller 17, first roller 17 is rotated, and then drive described bristle 171 to rotate with, when described bristle 171 rotates along with described first roller 17, water within first framework 11 constantly can be splash, water is made constantly to be splashed on the first drainage screen 18 and the second drainage screen 10, it is possible not only to soak the first drainage screen 18 and the second drainage screen 19, impurity thereon can also be rinsed out, the impurity in air can be purified simultaneously.Enter into the air on the right side of the first drainage screen 18 to enter into after the filtration of the second drainage screen 10 in the 4th pipeline 21, then the second blower fan 23 is started, making the air being cleaned in the first framework 11 constantly be drawn in the 4th pipeline 21, now in air, most dust is cleaned.Entering into the gas in the 4th pipeline 21 and enter in the second framework 31, the filtration backward both sides flowing through the 4th drainage screen 33, when air pressure is bigger, described 4th drainage screen 33 moves down, it is prevented that the 4th drainage screen 33 is caused damage.Then air enters into the lower section of the first baffle plate 42 after the filtration of the 3rd drainage screen 32 and through clematis stem hole 421, enter into after being then passed through the filtration of the 5th drainage screen 44 in the 5th pipeline 51, then in the 6th pipeline 56, then it is fully contacted with the water in the 4th framework 63, to dispose remaining dust in air, then air is discharged after the filtration of the 6th drainage screen 62, and the dust in air content now discharged is very low.When the water in described first framework 11 is more, open the first valve 131 so that the water in the first framework 11 is discharged through the 3rd pipeline 13.So far, in ore processing of the present invention, dust treatment plant use procedure is described.
The above; being only the specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, any those skilled in the art are in the technical scope that the invention discloses; change can be readily occurred in or replace, all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with described scope of the claims.

Claims (9)

  1. null1. dust treatment plant in an ore processing,It is characterized in that: in described ore processing, dust treatment plant includes air extractor、It is positioned at the plumbing installation on the right side of described air extractor、It is positioned at the first defecator below described plumbing installation、It is positioned at the second defecator below described first defecator、It is positioned at the connecting device below described second defecator and is positioned at the purifier below described connecting device,Described air extractor includes the first framework、It is arranged at the first pipeline in described first framework、It is positioned at the air inlet bucket on the left of described first pipeline、It is positioned at the first support above described first pipeline、It is positioned at the second pipe above described first framework、It is contained in the first roller in described first framework、It is positioned at the first drainage screen on the left of described first roller、It is positioned at the second support on the right side of described first drainage screen、It is positioned at the second drainage screen on the right side of described second support and is positioned at the 3rd pipeline below described first framework,Described plumbing installation includes the 4th pipeline、It is positioned at the 3rd support above described 4th pipeline、It is arranged at the second blower fan on described 4th pipeline、It is positioned at the first cross bar on the left of described 4th pipeline、It is positioned at the first brace below described first cross bar、It is positioned at the first bent stick above described first brace、It is positioned at the 4th support below described first brace、It is positioned at the 5th support on the right side of described 4th pipeline and is positioned at the 6th support on the left of described 4th pipeline,Described first defecator includes the second framework、It is contained in described second framework the 3rd drainage screen of the left and right sides、The 4th drainage screen between described 3rd drainage screen、It is positioned at the first spring below described 4th drainage screen、It is positioned at the first cushion block below described first spring,Described second defecator includes the 3rd framework、It is contained in the first baffle plate in described 3rd framework、It is positioned at first bracer below described first baffle plate and is positioned at the 5th drainage screen below described first bracer,Described connecting device includes the 5th pipeline、It is positioned at the 7th support on the right side of described 5th pipeline、It is positioned at the 8th support on the left of described 5th pipeline、It is positioned at the 9th support on the left of described 8th support、It is positioned at the tenth support below described 9th support、It is positioned at the 6th pipeline below described 5th pipeline and is positioned at the 11st support below described 5th pipeline,Described purifier includes purifying box、It is contained in the 6th drainage screen in described purifying box、It is positioned at the 4th framework below described 6th drainage screen、It is positioned at the second bent stick below described 4th framework and is positioned at the second spring above described 4th framework.
  2. null2. dust treatment plant in ore processing according to claim 1,It is characterized in that: described first framework is hollow cuboid,Described first framework horizontal positioned,Described first framework is provided with first through hole on its right surface、It is positioned at the second through hole of its lower surface and is located thereon the third through-hole on surface,Described first pipeline is horizontal,The right-hand member of described first pipeline runs through the surfaces externally and internally of described first framework and extends to inside described first framework,Described first pipeline is fixing with described first framework to be connected,Described first pipeline is provided with the first blower fan,The left end of described first pipeline is fixing with the right surface of described air inlet bucket to be connected,Described air inlet bucket is hollow round table-like,Described first support is L-shaped,One end of described first support is fixing with described first blower fan to be connected,The other end of described first support is fixing with the left surface of described first framework to be connected,One end of described second pipe is directed at described third through-hole and fixing with the upper surface of described first framework is connected,Described second pipe is provided with the second water pump,Described second water pump is provided with the first montant,Described first montant is vertical shape,The lower end of described first montant is fixing with described first framework to be connected,The upper end of described first montant is fixing with described first water pump to be connected.
  3. null3. dust treatment plant in ore processing according to claim 2,It is characterized in that: the cross section ovalize of described first roller,Described first roller turns with described first framework axle and is connected,Described first roller is provided with the bristle at its two ends,Described bristle is provided with several and fixing with described first roller is connected,Described first drainage screen is in the shape of the letter V,The upper end of described first drainage screen is vertical shape,The inclined shape in lower end of described first drainage screen,The right-hand member of described first pipeline is fixing with the left surface of described first drainage screen to be connected,Described second support is L-shaped,One end of described second support is fixing with the inner surface of described first framework to be connected,The other end of described second support is fixing with described first drainage screen to be connected,Described second drainage screen is bending,The two ends up and down of described second drainage screen are fixing with the inner surface of described first framework to be connected,Described second drainage screen is positioned at the left side of described first through hole,Described 3rd pipeline is vertical shape,The upper end of described 3rd pipeline is directed at described second through hole and fixing with the lower surface of described first framework is connected,Described 3rd pipeline is provided with the first valve.
  4. null4. dust treatment plant in ore processing according to claim 3,It is characterized in that: the upper end of described 4th pipeline is directed at described first through hole and fixing with the right surface of described first framework is connected,The lower end of described 4th pipeline is vertical shape,Described 3rd support is concave shape,One end of described 3rd support is fixing with described first framework to be connected,The other end of described 3rd support is fixing with described 4th pipeline to be connected,Described first cross bar is horizontal,The left end of described first cross bar is fixing with the right surface of described first framework to be connected,The right-hand member of described first cross bar is fixing with described first bent stick to be connected,The described first inclined shape of brace,The upper end of described first brace is fixing with the right surface of described first framework to be connected,The lower end of described first brace is fixing with described second blower fan to be connected,Described first bent stick is bending,The lower end of described first twisted plate is fixing with described first brace to be connected,Described 4th pipeline runs through the upper and lower surface of described first bent stick and is secured to connect,Described 4th support is L-shaped,One end of described 4th support is fixing with described first brace to be connected,The other end of described 4th support is fixing with described 4th pipeline to be connected,Described 5th support is L-shaped,One end of described 5th support is fixing with described 4th pipeline to be connected,The other end of described 5th support is vertical shape,Described 6th support is L-shaped,The upper end of described 6th support is fixing with described 4th support to be connected,The lower end of described 6th support is vertical shape.
  5. 5. dust treatment plant in ore processing according to claim 4, it is characterized in that: described second framework is cross section is the cylinder of isosceles trapezoid, described second framework horizontal positioned, described second framework is provided with the fourth hole of its upper surface, fourth hole described in the lower end aligned of described 4th pipeline and fixing with the upper surface of described second framework be connected, the lower end of described 5th support and the 6th support is fixing with described second framework to be connected, described 3rd drainage screen is provided with two and lays respectively at the left and right sides in described second framework, described 3rd drainage screen is cuboid, described 3rd drainage screen is vertically placed, the upper surface of described 3rd drainage screen is fixing with the inner surface of described second framework to be connected.
  6. 6. dust treatment plant in ore processing according to claim 5, it is characterized in that: described 4th drainage screen is cuboid, described 4th drainage screen horizontal positioned, described 4th drainage screen is between described 3rd drainage screen, the side of described 4th drainage screen is connected with the side slip of described 3rd drainage screen, described first spring is vertical shape, the upper end of described first spring is fixing with described 4th drainage screen to be connected, the lower end of described first spring is fixing with the upper surface of described first cushion block to be connected, described first cushion block is cuboid, described first cushion block is between described 3rd drainage screen, described first cushion block horizontal positioned, the side of described first cushion block is fixing with the side of described 3rd drainage screen to be connected, described first cushion block, the lower surface of the 3rd drainage screen and the second framework is in same plane.
  7. null7. dust treatment plant in ore processing according to claim 6,It is characterized in that: described 3rd framework is cross section is the cylinder of isosceles trapezoid,Described 3rd framework horizontal positioned,The upper surface of described 3rd framework is fixing with the lower surface of described second framework to be connected,The lower surface of described 3rd framework is provided with fifth hole,Described first baffle plate is horizontal,The side of described first baffle plate is fixing with the inner surface of described 3rd framework to be connected,The upper surface of the upper surface of described first baffle plate and described 3rd framework is in same plane,The lower surface of described 3rd drainage screen and the first cushion block is fixing with the upper surface of described first baffle plate to be connected,Described first baffle plate is provided with clematis stem hole,Described first bracer is cuboid,Described first bracer horizontal positioned,The upper surface of described first bracer is fixing with the lower surface of described first baffle plate to be connected,Described 5th drainage screen is bending,The two ends of described 5th drainage screen are fixing with the lower surface of described first bracer to be connected,Described 5th drainage screen is positioned at the top of described fifth hole,Described 5th drainage screen acts against on the inner surface of described 3rd framework.
  8. null8. dust treatment plant in ore processing according to claim 7,It is characterized in that: one end of described 5th pipeline is directed at described fifth hole and fixing with the lower surface of described 3rd framework is connected,The other end of described 5th pipeline is fixing with the upper end of described 6th pipeline to be connected,Described 7th support is L-shaped,One end of described 7th support is fixing with the lower surface of described 3rd framework to be connected,The other end of described 7th support is fixing with described 5th pipeline to be connected,Described 8th support is L-shaped,One end of described 8th support is fixing with described 3rd framework to be connected,The other end of described 8th support is fixing with described 5th pipeline to be connected,Described 9th support is L-shaped,One end of described 9th support is fixing with described 8th support to be connected,The other end of described 9th support is fixing with described tenth support to be connected,Described tenth support is concave shape,One end of described tenth support is fixing with described 5th pipeline to be connected,The other end of described tenth support is fixing with described 11st pipeline to be connected,Described 11st support is L-shaped,One end of described 11st support is fixing with described 5th pipeline to be connected,The other end of described 11st support is horizontal.
  9. null9. dust treatment plant in ore processing according to claim 8,It is characterized in that: described purifying box is hollow cuboid,The cross section of described purifying box is concave shape,Described 11st support is fixing with the right surface of described purifying box to be connected,Described 6th drainage screen is cuboid,Described 6th drainage screen horizontal positioned,The side of described 6th drainage screen is fixing with the inner surface of described purifying box to be connected,The described upper surface of the 6th drainage screen and the upper surface of described purifying box are in same plane,Described 6th pipeline runs through the upper and lower surface of described 6th drainage screen and is secured to connect,The lower end of described 6th pipeline is contained in described 4th framework,Described 4th framework is cross section is U-shaped cylinder,Described 4th framework horizontal positioned,Described second bent stick is provided with two and lays respectively at the left and right sides of described 4th framework,Described second bent stick is bending,The lower end of described second bent stick is fixing with the inner surface of described purifying box to be connected,The upper end of described second bent stick is fixing with described 4th framework to be connected,Described second spring is provided with two,Described second spring is vertical shape,The lower end of described second spring is fixing with described 4th framework to be connected,The upper end of described second spring is fixing with the lower surface of described 6th drainage screen to be connected.
CN201610281265.2A 2016-04-29 2016-04-29 Dust treatment plant in a kind of ore processing Expired - Fee Related CN105771518B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610281265.2A CN105771518B (en) 2016-04-29 2016-04-29 Dust treatment plant in a kind of ore processing
CN201710651655.9A CN107376561B (en) 2016-04-29 2016-04-29 The working method of dust treatment device in a kind of ore processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610281265.2A CN105771518B (en) 2016-04-29 2016-04-29 Dust treatment plant in a kind of ore processing

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201710651655.9A Division CN107376561B (en) 2016-04-29 2016-04-29 The working method of dust treatment device in a kind of ore processing

Publications (2)

Publication Number Publication Date
CN105771518A true CN105771518A (en) 2016-07-20
CN105771518B CN105771518B (en) 2017-10-27

Family

ID=56399182

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610281265.2A Expired - Fee Related CN105771518B (en) 2016-04-29 2016-04-29 Dust treatment plant in a kind of ore processing
CN201710651655.9A Active CN107376561B (en) 2016-04-29 2016-04-29 The working method of dust treatment device in a kind of ore processing

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201710651655.9A Active CN107376561B (en) 2016-04-29 2016-04-29 The working method of dust treatment device in a kind of ore processing

Country Status (1)

Country Link
CN (2) CN105771518B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106237734A (en) * 2016-09-09 2016-12-21 成都菲斯普科技有限公司 A kind of efficient dedusting and purifying air system
CN106237777A (en) * 2016-09-29 2016-12-21 成都恒力达科技有限公司 A kind of boiler waste gas purification device that can carry out multi-filtering
CN106268147A (en) * 2016-09-29 2017-01-04 成都恒力达科技有限公司 A kind of energy filtering dust and the air purifier of fine particle
CN106268146A (en) * 2016-09-29 2017-01-04 成都恒力达科技有限公司 A kind of waste gas cleaning system being applicable to Industrial Boiler
CN106362509A (en) * 2016-08-31 2017-02-01 廖淑梅 Novel efficient dust remover for agricultural machinery
CN106606912A (en) * 2016-12-07 2017-05-03 长泰惠龙新材料科技有限公司 Concrete asphalt mixing and dedusting device for building

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6739085B2 (en) * 2017-12-11 2020-08-12 クリーン・テクノロジー株式会社 Dust-containing gas treatment device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2377656B (en) * 2001-07-19 2003-10-29 Samsung Kwangju Electronics Co Grill assembly of cyclone dust collecting apparatus for vacuum cleaner
JP2011067740A (en) * 2009-09-25 2011-04-07 Anlet Co Ltd Mist and dust collector
CN102698548A (en) * 2012-03-22 2012-10-03 梁嘉麟 Air purifying device for adsorbing by taking water as main body
CN104958980A (en) * 2015-06-30 2015-10-07 江苏双盈纺织科技有限公司 Printing and dyeing waste gas filtering and dust removing device
CN105311919A (en) * 2015-12-01 2016-02-10 张萍 Electric wire burning gas purification treatment device
CN105521678A (en) * 2015-12-27 2016-04-27 刘汉佑 An air cleaning device for a pharmaceutical workshop

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5509946A (en) * 1995-01-27 1996-04-23 Chu; Kung-Ming Indoor air filter
CN104815513B (en) * 2015-05-27 2016-08-17 国润生物科技(深圳)有限公司 A kind of Household air purifier
CN204816092U (en) * 2015-06-01 2015-12-02 王杨 Exhaust treatment device sprays paint
CN105311910B (en) * 2015-11-08 2017-02-01 衢州学院 Industrial gas purification dust-removal equipment
CN105507366A (en) * 2015-12-29 2016-04-20 张萍 Air-into-water drinking water system
CN105477944B (en) * 2016-01-21 2017-08-29 六安同辉智能科技有限公司 It is a kind of can conveniently treating deposited dust air cleaning unit

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2377656B (en) * 2001-07-19 2003-10-29 Samsung Kwangju Electronics Co Grill assembly of cyclone dust collecting apparatus for vacuum cleaner
JP2011067740A (en) * 2009-09-25 2011-04-07 Anlet Co Ltd Mist and dust collector
CN102698548A (en) * 2012-03-22 2012-10-03 梁嘉麟 Air purifying device for adsorbing by taking water as main body
CN104958980A (en) * 2015-06-30 2015-10-07 江苏双盈纺织科技有限公司 Printing and dyeing waste gas filtering and dust removing device
CN105311919A (en) * 2015-12-01 2016-02-10 张萍 Electric wire burning gas purification treatment device
CN105521678A (en) * 2015-12-27 2016-04-27 刘汉佑 An air cleaning device for a pharmaceutical workshop

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106362509A (en) * 2016-08-31 2017-02-01 廖淑梅 Novel efficient dust remover for agricultural machinery
CN106237734A (en) * 2016-09-09 2016-12-21 成都菲斯普科技有限公司 A kind of efficient dedusting and purifying air system
CN106237734B (en) * 2016-09-09 2018-06-26 盐城市吉盛达环保工程有限公司 A kind of efficient dedusting and purifying air system
CN106237777A (en) * 2016-09-29 2016-12-21 成都恒力达科技有限公司 A kind of boiler waste gas purification device that can carry out multi-filtering
CN106268147A (en) * 2016-09-29 2017-01-04 成都恒力达科技有限公司 A kind of energy filtering dust and the air purifier of fine particle
CN106268146A (en) * 2016-09-29 2017-01-04 成都恒力达科技有限公司 A kind of waste gas cleaning system being applicable to Industrial Boiler
CN106606912A (en) * 2016-12-07 2017-05-03 长泰惠龙新材料科技有限公司 Concrete asphalt mixing and dedusting device for building

Also Published As

Publication number Publication date
CN107376561A (en) 2017-11-24
CN107376561B (en) 2019-10-08
CN105771518B (en) 2017-10-27

Similar Documents

Publication Publication Date Title
CN105771518A (en) Dust treatment device used in ore processing
CN105749682A (en) Environment-friendly efficient dust suction device for textile spinning
CN103877804A (en) Water tank for filtering tail gas dust
CN105771530A (en) Dust removal system for mineral production workshop
CN105107333A (en) Dust treatment device
CN206325351U (en) A kind of smoke dust filter in petrochemical industry process
CN103949125B (en) A kind of smoke and dust purifier
CN105498416A (en) Exhaust gas dedusting purification device and dedusting method
CN103816763A (en) Haze sweeper
CN208320302U (en) A kind of environment-friendly type spraying dedusting device
CN203777867U (en) Waste gas purification device
CN109692538A (en) Purification device for diesel engine vent gas processing
CN104275060A (en) Atomizing type dust-removing system
CN206008330U (en) A kind of dust arrester
CN203876069U (en) Open type rubber mixing mill tail gas purification system convenient to clean
CN203790768U (en) Tail gas dust filter water tank
CN204469463U (en) A kind of spraying dedusting device
CN209501146U (en) Washing wet scrubber side by side
CN202122893U (en) Oil smoke-removing and dust-removing dual-purpose machine
CN202478764U (en) Flue purification dust catcher
CN209034060U (en) Flue dust and dirty gas cleaning plant
CN202129008U (en) Dust removal device
CN207738553U (en) Sewage treatment device for machining
CN205216494U (en) Paint dust treatment device
CN104436964A (en) Flue gas cleaner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171027

Termination date: 20200429

CF01 Termination of patent right due to non-payment of annual fee