[go: up one dir, main page]

CN105722154B - The optimization method and gateway and optimization system of resource processing - Google Patents

The optimization method and gateway and optimization system of resource processing Download PDF

Info

Publication number
CN105722154B
CN105722154B CN201410718617.7A CN201410718617A CN105722154B CN 105722154 B CN105722154 B CN 105722154B CN 201410718617 A CN201410718617 A CN 201410718617A CN 105722154 B CN105722154 B CN 105722154B
Authority
CN
China
Prior art keywords
resource
mme
target
processing
sgw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410718617.7A
Other languages
Chinese (zh)
Other versions
CN105722154A (en
Inventor
张庆武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing ZTE New Software Co Ltd
Original Assignee
Nanjing ZTE New Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing ZTE New Software Co Ltd filed Critical Nanjing ZTE New Software Co Ltd
Priority to CN201410718617.7A priority Critical patent/CN105722154B/en
Priority to PCT/CN2015/084945 priority patent/WO2016086673A1/en
Publication of CN105722154A publication Critical patent/CN105722154A/en
Application granted granted Critical
Publication of CN105722154B publication Critical patent/CN105722154B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W8/00Network data management

Landscapes

  • Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a kind of optimization methods of SGW resource processing, comprising the following steps: when the position of UE changes, the resource for receiving switching request message and Source MME response that Target MME is sent handles interim refuse information;Switching request message is handled, and is replied to Target MME and switches successfully response;When Source MME and Target MME complete UE resource switch, asset processing request message is sent to Target MME, and carry out Energy Resources Service's reason after the resource processing success message for receiving Target MME response.The present invention can make UE when MME switching occurs, and guarantee the creation of UE resource, update and delete successfully.

Description

The optimization method and gateway and optimization system of resource processing
Technical field
The present invention relates to optimization methods and clothes that field of communication technology more particularly to a kind of core network gateway resource are handled Business gateway and optimization system.
Background technique
EPS (Evolved Packet System, the grouping system of evolution) is by 3GPP (3rd Gene-ration Partnership Project, third generation partner program) tissue propose one kind be based on IP (I-nternet Protocol, Internet protocol) the network architecture, construct an open and flexible service environment, can support UE (User Equipment, user equipment) accesses IP network, and quick, stable access state is provided for user, can also be passed through Packet-switch technology is improved to meet the increased requirement of IP traffic amount.The existing rule for accessing IP network by EPS about UE The signaling and process description that model such as 3GPP TS 23.401 and 3GPP TS 29.274 etc. have had UE to switch in packet-based core networks. But when MME (Mobility Management Entity, mobile management entity) switching occurs, SG-W (Serving- GateWay, gateway) and PGW (Packet Data Network-GateWay, packet data network gateway) can be because of MME Switch and make creation, update and delete user resources failure, can not create, update and delete money so as to cause UE in the short time Source.
Above content is only used to facilitate the understanding of the technical scheme, and is not represented and is recognized that above content is existing skill Art.
Summary of the invention
The main purpose of the present invention is to provide a kind of optimization methods of core network gateway SGW resource processing, it is intended to occur When MME switches, guarantee the creation of UE resource, update and delete successfully, thus make customer service will not be due to the switching of MME in It is disconnected.
To achieve the above object, the optimization method of a kind of core network gateway SGW resource processing provided by the invention, the money Source processing optimization method the following steps are included:
When the position of user equipment (UE) changes, the switching that target mobile management entity Target MME is sent is received Request message and the resource of source mobile management entity Source MME response handle interim refuse information;
Received switching request message is handled, and is replied to Target MME and switches successfully response;
When the Source MME and Target MME completes UE resource switch, resource is sent to Target MME Request message is handled, and carries out the optimization processing of resource after the resource processing success message for receiving Target MME response.
Preferably, described when the position of user equipment (UE) changes, receive target mobile management entity Target Before the step of resource for switching request message and Source the MME response that MME is sent handles interim refuse information further include:
Receive the asset processing request message that packet data network gateway PGW is sent;
The asset processing request message is forwarded to give source mobile management entity Source MME.
Preferably, described when the Source MME and Target MME completes UE resource switch, to Target MME sends asset processing request message, and carries out resource after the resource processing success message for receiving Target MME response Optimization processing the step of before further include:
Switching request message and resource handle interim refuse information based on the received, judge Source MME and Target Whether MME completes UE resource switch.
Preferably, the message of switching request based on the received and resource handle interim refuse information, judge Source Whether MME and Target MME completed after the step of UE resource switch further include:
If the Source MME and the Target MME do not complete UE resource switch, at PGW resource response Manage failed message.
Preferably, if it is described when the Source MME and Target MME completes UE resource switch, to Target MME sends asset processing request message, and laggard in the resource processing success message for receiving Target MME response After the step of optimization processing of row resource further include:
Success message is handled to PGW resource response.
In addition, to achieve the above object, the present invention also provides a kind of core network gateway SGW, the SGW includes:
First receiving module, for receiving target mobile management entity when the position of user equipment (UE) changes The resource processing for MME switching request message and source mobile management entity Source the MME response that Target MME is sent temporarily is refused Exhausted message;
First processing module for handling received switching request message, and is replied to switch successfully and be rung to Target MME It answers;
Second processing module is used for when the Source MME and Target MM completes UE resource switch, to Target MME sends asset processing request message, and laggard in the resource processing success message for receiving Target MME response The optimization processing of row resource.
Preferably, the SGW further include:
Second receiving module, for receiving the asset processing request message of packet data network gateway PGW transmission;
Forwarding module, for forwarding the asset processing request message to give source mobile management entity Source MME.
Preferably, the SGW further include:
Judgment module handles interim refuse information, judgement for MME switching request message based on the received and resource Whether Source MME and Target MME complete UE resource switch.
Preferably, the SGW further include:
First respond module, if not completing UE resource switch for the Source MME and the Target MME, Then to PGW resource response processing failure message.
Preferably, the SGW further include:
Second respond module is used for when the Source MME and Target MME completes UE resource switch, to Target MME sends asset processing request message, and in the resource processing success message and complete for receiving Target MME response After the optimization processing of resource, success message is handled to PGW resource response.
In addition, to achieve the above object, the present invention also provides a kind of optimization system, the optimization system includes Source MME, Target MME, PGW and SGW as described above,
The Source MME includes:
Third receiving module, for receiving the asset processing request message of SGW forwarding;
Third respond module, for responding interim refuse information to SGW when the position of user equipment (UE) changes.
The Target MME includes:
First sending module, for sending MME switching request to SGW and disappearing when the position of user equipment (UE) changes Breath;
4th respond module, for receiving SGW and sending when Source MME and Target MM complete UE resource switch Asset processing request message, and after resource is handled successfully to SGW resource response handle success message.
The PGW includes:
Sending module, for sending asset processing request message to SGW.
Preferably, the PGW further include:
4th receiving module, for receiving SGW when Source MME and Target MME do not complete UE resource switch The resource of response handles failed message;
5th receiving module, for when Source MME and Target MME complete UE resource switch, SGW to be to Target MME sends asset processing request message, and receives the resource processing success message of Target MME response in SGW and complete money After the optimization processing in source, the resource for receiving SGW response handles success message.
The optimization method of core network gateway SGW resource processing provided by the invention, is disappeared by switching request based on the received Breath and interim refuse information, judge whether Source MME and Target MME complete UE resource switch, in Source MME and When Target MME completes UE resource switch, asset processing request message is retransmitted to Target MME, and receiving The optimization processing that resource is completed after the resource processing success message of Target MME response can when making UE that MME switching occur in this way To guarantee the creation of UE resource, update and delete successfully, so that customer service be made not interrupt because of the switching of MME.
Detailed description of the invention
Fig. 1 is the flow diagram of one embodiment of optimization method of core network gateway SGW resource of the present invention processing;
Fig. 2 is the flow diagram of another embodiment of optimization method of core network gateway SGW resource of the present invention processing;
Fig. 3 is the functional block diagram of mono- embodiment of core network gateway SGW of the present invention;
Fig. 4 is the functional block diagram of another embodiment of core network gateway SGW of the present invention;
Fig. 5 is the functional block diagram of one embodiment of optimization system of the present invention;
Fig. 6 is the functional block diagram of mono- embodiment of Source MME in optimization system of the present invention;
Fig. 7 is the functional block diagram of mono- embodiment of Target MME in optimization system of the present invention;
Fig. 8 is the functional block diagram of mono- embodiment of PGW in optimization system of the present invention;
Fig. 9 is the data flow diagram of optimization system of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The present invention provides a kind of optimization method of core network gateway SGW resource processing, referring to Fig.1, in one embodiment, institute State core network gateway SGW resource processing optimization method the following steps are included:
Step S101 receives target mobile management entity Target MME when the position of user equipment (UE) changes The resource of switching request message and Source the MME response of transmission handles interim refuse information;
In the present embodiment, when the position of UE changes, Target MME will send switching request message to SGW, lead to Know that the switching and other relevant UE information of Source MME and Target MME are occurring for SGW.
In the present embodiment, since Source MME and Target MME are handling the mobility switching of UE, according to 3GPP 29274-C50 protocol specification, it is 110 that Source MME, which replys cause value to SGW, is handling UE mobility switching flow and is facing When the response message refused.
Step S102 handles received switching request message, and replys to Target MME and switch successfully response;
In the present embodiment, SGW, can be to the switching request information when receiving the switching request message of Target MME transmission It is handled, if being successfully processed, is replied to Target MME and switch successfully response;If processing failure, to Target MME Reply handover failure response.
According to existing protocol specification (3GPP 23401-C50), handle as follows:
After SGW receives the creation, update or deletion failed message of Source MME response, itself related resource has been handled, The response replied creation to PGW, update or delete failure;
After PGW receives interim refuse information, after needing to wait the predetermined time, re-initiates creation, update or delete process.
It is lost it is therefore seen that existing protocol specification (3GPP 23401-C50) will cause creation, update or delete user resources It loses, and PGW needs to wait the predetermined time that could initiate creation again, update or delete business, so as to cause user in pre- timing It is interior to carry out new business process.
And the treatment process that the present invention takes is as follows:
Step S103, when the Source MME and Target MME completes UE resource switch, to Target MME3 sends asset processing request message, and carries out resource after the resource processing success message for receiving Target MME response Optimization processing.
In the present embodiment, if Source MME and Target MME complete UE resource switch, SGW is not returned first to PGW Multiple failure response, and creation, update or deletion request message are sent to Target MME, Target MME receives creation, updates Or deletion request message post-processes related resource, and after successfully creating, updating or delete related resource, creates to SGW reply, Successful response message is updated or deletes, SGW handles itself related resource after receiving success response message.
It should be understood that SGW is when receiving the interim refuse information of Source MME response, it is not limited to locate It manages UE mobility switching flow and temporarily refuses a kind of this cause value, if MME is not yet supported to protocol specification 3GPP 23401- C50 version, and other reasons value is replied in a step 101, such as cause value is 64, context is not found, and SGW1 can also be same Sample is handled according to step S103 and step 104.
In one embodiment, as shown in Fig. 2, on the basis of the embodiment of above-mentioned Fig. 1, in the present embodiment, the step Before 101 further include:
Step S104 receives the asset processing request message that packet data network gateway PGW is sent;
In the present embodiment, the asset processing request message includes: that asset creation, resource updates or resource removal request disappear It ceases, in other embodiments, however it is not limited to these asset processing request message.
Step S105 forwards the asset processing request message to give source mobile management entity Source MME.
In the present embodiment, SGW1 can be incited somebody to action after receiving the request to create of PGW4 transmission, updating request or deletion request message The request to create, update request or deletion request message are transmitted to source mobile management entity Source MME2.
In one embodiment, as shown in Fig. 2, on the basis of the embodiment of above-mentioned Fig. 1, in the present embodiment, the step Before S103 further include:
Step S106, switching request message and resource handle interim refuse information based on the received, judge Source MME UE resource switch whether is completed with Target MME.
In the present embodiment, SGW is in creation, the update for receiving Source MME processing UE mobility switching and temporarily refusing Or after deleting response message, SGW does not first delete UE related resource, but judges whether MME relevant information has changed, Source Whether MME and Target MME completes UE resource switch.
In one embodiment, as shown in Fig. 2, on the basis of the embodiment of above-mentioned Fig. 1, in the present embodiment, the step After S106 further include:
Step S107, if Source MME and Target MME do not complete UE resource switch, to PGW4 resource response Processing failure message.
In the present embodiment, if Source MME and Target MME do not complete UE resource switch, responds and provide to PGW4 Source processing failure message, at this point, the relevant resource of UE can be then deleted, creation, update or the deletion resource such as initiated.
In one embodiment, as shown in Fig. 2, on the basis of the embodiment of above-mentioned Fig. 1, in the present embodiment, the step After S103 further include:
Step S108 handles success message to PGW resource response.
In the present embodiment, after Target MME and SGW are successfully created, updated or delete related resource, SGW is to PGW Resource response handles success message.So far, creation, update or the deletion resource request success initiated by PGW, although MME occurs The switching of change, but user's new business is not interrupted, related resource is also successfully created, updates or is deleted.
The present invention also provides a kind of core network gateway SGW1, referring to Fig. 3, in one embodiment, in a preferred embodiment, The core network gateway SGW1 includes:
First receiving module 101, for receiving target mobile management entity when the position of user equipment (UE) changes The resource for MME switching request message and Source the MME response that Target MME is sent handles interim refuse information;
In the present embodiment, when the position of UE changes, Target MME will send handover information to SGW1, notice The information switching and other relevant UE information of Source MME and Target MME are occurring for SGW1.
In the present embodiment, since Source MME and Target MME are handling the mobility switching of UE, according to 3GPP 29274-C50 protocol specification, Source MME reply cause value such as 110 to SGW1, handling UE mobility switching flow and The response message temporarily refused.
First processing module 102 handles received switching request message, and replys to switch successfully to Target MME and ring It answers;
In the present embodiment, SGW1 can believe the switching request when receiving the switching request message of Target MME transmission Breath is handled, if being successfully processed, is replied to Target MME and is switched successfully response;If processing failure, to Target MME replys handover failure response.
According to existing protocol specification (3GPP 23401-C50), handle as follows:
After SGW1 receives the creation, update or deletion failed message of Source MME response, itself related resource has been handled, The response replied creation to PGW, update or delete failure.
After PGW receives interim refuse information, after needing to wait the predetermined time, re-initiates creation, update or delete process.
It is lost it is therefore seen that existing protocol specification (3GPP 23401-C50) will cause creation, update or delete user resources It loses, and PGW needs to wait the predetermined time that could initiate creation again, update or delete business, so as to cause user in pre- timing It is interior to carry out new business process.
And the treatment process that the present invention takes is as follows:
In the present embodiment, SGW1 is in the creation, more for receiving Source MME processing UE mobility switching and temporarily refusing After new or deletion response message, SGW1 does not first delete UE related resource, but judges whether MME relevant information has changed, Whether Source MME and Target MME complete UE resource switch.
Second processing module 103 is used for when the Source MME and Target MME completes UE resource switch, Asset processing request message is sent to Target MME, and after receiving the resource processing success message of Target MME response Carry out the optimization processing of resource.
In the present embodiment, if Source MME and Target MME complete UE resource switch, SGW1 is not returned first to PGW Multiple failure response, and creation, update or deletion request message are sent to Target MME, Target MME receives creation, updates Or deletion request message post-processes related resource, and after successfully creating, updating or delete related resource, replys and creates to SGW1 Successful response message is built, updates or deletes, SGW1 handles itself related resource after receiving success response message.
It should be understood that SGW1 is when receiving the interim refuse information of Source MME response, it is not limited to It handles UE mobility switching flow and temporarily refuses a kind of this cause value, if MME is not yet supported to protocol specification 3GPP 23401-C50 version, and other reasons value is replied in step 103, such as cause value is 64, context is not found, SGW1 It can be handled also according to step S103 and step 104.
In one embodiment, as shown in figure 4, on the basis of the embodiment of above-mentioned Fig. 3, in the present embodiment, the SGW1 Further include:
Second receiving module 105 receives the asset processing request message that packet data network gateway PGW is sent;
In the present embodiment, the asset processing request message includes: that asset creation, resource updates or resource removal request disappear It ceases, in other embodiments, however it is not limited to these asset processing request message.
Forwarding module 106 forwards the asset processing request message to give source mobile management entity Source MME.
In the present embodiment, SGW1 can be incited somebody to action after receiving the request to create of PGW transmission, updating request or deletion request message The request to create, update request or deletion request message are transmitted to source mobile management entity Source MME.
In one embodiment, as shown in figure 4, on the basis of the embodiment of above-mentioned Fig. 3, in the present embodiment, the SGW1 Further include:
Judgment module 103 handles interim refuse information, judgement for MME switching request message based on the received and resource Whether Source MME and Target MME complete UE resource switch.
In the present embodiment, SGW1 is in the creation, more for receiving Source MME processing UE mobility switching and temporarily refusing After new or deletion response message, SGW1 does not first delete UE related resource, but judges whether MME relevant information has changed, Whether Source MME and Target MME complete UE resource switch.
As shown in figure 4, on the basis of the embodiment of above-mentioned Fig. 3, the SGW1 further include:
First respond module 107 is cut if not completing UE resource for the Source MME and the Target MME It changes, then to PGW4 resource response processing failure message.
In the present embodiment, if Source MME and Target MME do not complete UE resource switch, to PGW resource response Processing failure message, at this point, the relevant resource of UE can be then deleted, creation, update or the deletion resource such as initiated.
In one embodiment, as shown in figure 4, on the basis of the embodiment of above-mentioned Fig. 3, in the present embodiment, the SGW1 Further include:
Second respond module 108 is used for when the Source MME and Target MME completes UE resource switch, To Target MME send asset processing request message, and receive Target MME response resource processing success message and After the optimization processing for completing resource, success message is handled to PGW resource response.
In the present embodiment, after Target MME and SGW1 are successfully created, updated or delete related resource, SGW is to PGW Resource response handles success message.So far, creation, update or the deletion resource request success initiated by PGW, although MME occurs The switching of change, but user's new business is not interrupted, related resource is also successfully created, updates or is deleted.
The present invention also provides a kind of optimization systems 100, referring to Fig. 5, in one embodiment, and in a preferred embodiment, institute It states optimization system 100 and includes Source MME2, Target MME3, PGW4 and SGW1 as described above,
Include: referring to Fig. 6, the Source MME2
Third receiving module 201, for receiving the asset processing request message of SGW1 forwarding;
In the present embodiment, the asset processing request message includes: that asset creation, resource updates or resource removal request disappear It ceases, in other embodiments, however it is not limited to these asset processing request message.
Third respond module 202, for being responded due to Source to SGW1 when the position of user equipment (UE) changes MME2 and Target MME3 is just in the interim refuse information of handover request.
In the present embodiment, since Source MME2 and Target MME3 are handling the mobility switching of UE, according to 3GPP 29274-C50 protocol specification, Source MME2 reply cause value such as 110 to SGW1, are handling the switching of UE mobility Process and temporarily refuse.
Include: referring to Fig. 7, the Target MME3
First sending module 301, for sending MME switching to SGW1 and asking when the position of user equipment (UE) changes Seek message;
In the present embodiment, when the position of UE changes, Target MME3 will send handover information to SGW1, notice The information switching and other relevant UE information of Source MME2 and Target MME3 are occurring for SGW1.
4th respond module 302, for receiving SGW1 when Source MME2 and Target MM complete UE resource switch The asset processing request message of transmission, and success message is handled to SGW1 resource response after resource is handled successfully.
In the present embodiment, if Source MME2 and Target MME3 complete UE resource switch, SGW1 first not to PGW4 replys failure response, and sends creation, update or deletion request message, Target MME3 to Target MME3 and receive wound It builds, update or deletion request message post-processing related resource, and after successfully creating, updating or delete related resource, to SGW1 It replys creation, update or delete successful response message, SGW1 creates itself related resource after receiving success response message.
Include: referring to Fig. 8, the PGW4
Second sending module 401, for sending asset processing request message to SGW1.
In the present embodiment, the asset processing request message includes: that asset creation, resource updates or resource removal request disappear It ceases, in other embodiments, however it is not limited to these asset processing request message.
In one embodiment, as shown in figure 8, the PGW4 further include:
4th receiving module 402, for connecing when Source MME2 and Target MME3 do not complete UE resource switch The resource for receiving SGW1 response handles failed message;
In the present embodiment, if Source MME2 and Target MME3 do not complete UE resource switch, responded to PGW4 Resource handles failed message, at this point, the relevant resource of UE can be then deleted, creation, update or the deletion resource such as initiated.
5th receiving module 403, for Source MME2 and Target MME3 complete UE resource switch when, SGW1 to Target MME3 sends asset processing request message, and handles in the resource that SGW1 receives Target MME3 response and successfully disappear After the optimization processing of breath and completion resource, the resource for receiving SGW1 response handles success message.
In the present embodiment, after Target MME3 and SGW1 are successfully created, are updated or delete related resource, SGW1 to PGW4 resource response handles success message.So far, creation, update or the deletion resource request success initiated by PGW4, although hair The switching that raw MME changes, but user's new business is not interrupted, related resource is also successfully created, updates or is deleted.
Referring to Fig. 9, in one embodiment, the data flow of the optimization system 100 is as follows:
Step S501:SGW1 receives creation, update or the deletion request message that PGW4 is sent;
This message is transmitted to Source MME2 by step S502:SGW1;
When the position step S503:UE sends variation, Source MME2 and Target MME3 carry out UE resource switch;
Step S504:Target MME3 sends switching request message to SGW1;
Step S505:Source MME2 handles interim refuse information to SGW1 resource response;
Step S506:SGW1 judges whether Source MME2 and Target MME3 complete UE resource switch, if Source MME2 and Target MM completes UE resource switch, then retransmits asset processing request message to Target MME3;
Step S507:Target MME3 receive creation, update or deletion request message post-processing related resource, and at Function creation after updating or deleting related resource, replys creation to SGW1, updates or delete successful response message;
Step S508:SGW1 creates, updates or deletes itself related resource after receiving success response message, and at Successful response message is replied to PGW4 after function process resource.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (12)

1. a kind of optimization method of core network gateway SGW resource processing, which is characterized in that core network gateway SGW Energy Resources Service The optimization method of reason the following steps are included:
When the position of user equipment (UE) changes, the switching request that target mobile management entity Target MME is sent is received Message, and source mobile management entity Source MME is received due to handling the mobility switching flow of the user equipment (UE) The response message temporarily refused sent;
Received switching request message is handled, and is replied to Target MME and switches successfully response;
When the Source MME and Target MME completes UE resource switch, resource processing is sent to Target MME Request message, and receive Target MME response resource processing success message after carry out resource optimization processing.
2. the optimization method of resource processing as described in claim 1, which is characterized in that send out the position in user equipment (UE) When changing, the money of switching request message and Source MME response that target mobile management entity Target MME is sent is received Source was handled before the step of interim refuse information further include:
Receive the asset processing request message that packet data network gateway PGW is sent;
The asset processing request message is forwarded to give source mobile management entity Source MME.
3. the optimization method of resource processing as described in claim 1, which is characterized in that described in the Source MME and institute When stating Target MME completion UE resource switch, asset processing request message is sent to Target MME, and receiving Before the step of carrying out the optimization processing of resource after the resource processing success message of Target MME response further include:
Switching request message and resource handle interim refuse information based on the received, judge that Source MME and Target MME are No completion UE resource switch.
4. the optimization method of resource processing as claimed in claim 3, which is characterized in that the switching request based on the received disappears Breath and resource handle interim refuse information, judge the step of whether Source MME and Target MME complete UE resource switch it Afterwards further include:
If the Source MME and the Target MME do not complete UE resource switch, lost to the processing of PGW resource response Lose message.
5. the optimization method of resource processing as described in claim 1, which is characterized in that described in the Source MME and institute When stating Target MME completion UE resource switch, asset processing request message is sent to Target MME, and receiving After the step of carrying out the optimization processing of resource after the resource processing success message of Target MME response further include:
Success message is handled to PGW resource response.
6. a kind of core network gateway SGW, which is characterized in that the SGW includes:
First receiving module, for receiving target mobile management entity Target when the position of user equipment (UE) changes The MME switching request message that MME is sent, and source mobile management entity Source MME is received because handling the user equipment The mobility switching flow of UE and the response message temporarily refused sent;
First processing module for handling received switching request message, and replys to Target MME and switches successfully response;
Second processing module is used for when the Source MME and Target MME completes UE resource switch, to Target MME sends asset processing request message, and laggard in the resource processing success message for receiving Target MME response The optimization processing of row resource.
7. SGW as claimed in claim 6, which is characterized in that the SGW further include:
Second receiving module, for receiving the asset processing request message of packet data network gateway PGW transmission;
Forwarding module, for forwarding the asset processing request message to give source mobile management entity Source MME.
8. SGW as claimed in claim 6, which is characterized in that the SGW further include:
Judgment module handles interim refuse information for switching request message based on the received and resource, judges Source MME UE resource switch whether is completed with Target MME.
9. SGW as claimed in claim 6, which is characterized in that the SGW further include:
First respond module, if not completing UE resource switch for the Source MME and the Target MME, to PGW resource response processing failure message.
10. SGW as claimed in claim 6, which is characterized in that the SGW further include:
Second respond module is used for when the Source MME and Target MME completes UE resource switch, to Target MME sends asset processing request message, and in the resource processing success message and complete for receiving Target MME response After the optimization processing of resource, success message is handled to PGW resource response.
11. a kind of optimization system, which is characterized in that the optimization system include Source MME, Target MME, PGW and SGW as described in any one of claim 6 to 10,
The Source MME includes:
Third receiving module, for receiving the asset processing request message of SGW forwarding;
Third respond module, for responding interim refuse information to SGW when the position of user equipment (UE) changes;
The Target MME includes:
First sending module, for sending MME switching request message to SGW when the position of user equipment (UE) changes;
4th respond module, for receiving the money that SGW is sent when Source MME and Target MM complete UE resource switch Source handles request message, and handles success message to SGW resource response after resource is handled successfully;
The PGW includes:
Sending module, for sending asset processing request message to SGW.
12. optimization system as claimed in claim 11, which is characterized in that the PGW further include:
4th receiving module, for when Source MME and Target MME do not complete UE resource switch, receiving SGW response Resource handle failed message;
5th receiving module, for when Source MME and Target MME complete UE resource switch, SGW to be to Target MME Asset processing request message is sent, and receives the resource processing success message of Target MME response in SGW and completes resource Optimization processing after, receive SGW response resource handle success message.
CN201410718617.7A 2014-12-01 2014-12-01 The optimization method and gateway and optimization system of resource processing Active CN105722154B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201410718617.7A CN105722154B (en) 2014-12-01 2014-12-01 The optimization method and gateway and optimization system of resource processing
PCT/CN2015/084945 WO2016086673A1 (en) 2014-12-01 2015-07-23 Resource processing optimization method, server gateway and optimization system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410718617.7A CN105722154B (en) 2014-12-01 2014-12-01 The optimization method and gateway and optimization system of resource processing

Publications (2)

Publication Number Publication Date
CN105722154A CN105722154A (en) 2016-06-29
CN105722154B true CN105722154B (en) 2019-09-27

Family

ID=56090949

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410718617.7A Active CN105722154B (en) 2014-12-01 2014-12-01 The optimization method and gateway and optimization system of resource processing

Country Status (2)

Country Link
CN (1) CN105722154B (en)
WO (1) WO2016086673A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101431780A (en) * 2007-11-09 2009-05-13 华为技术有限公司 Method, equipment and system for implementing network optimization switch
CN101605393A (en) * 2009-07-08 2009-12-16 中兴通讯股份有限公司 A kind of method and system that connects resource processing in the mobility management process
WO2010049573A1 (en) * 2008-10-29 2010-05-06 Nokia Corporation Cell change
CN102111745A (en) * 2010-10-15 2011-06-29 电信科学技术研究院 Method and device for reinitiating session management process of EPS system
CN102413584A (en) * 2010-09-20 2012-04-11 电信科学技术研究院 Method and equipment for managing PDN (public data network) connection
CN103249096A (en) * 2013-05-31 2013-08-14 大唐移动通信设备有限公司 Switching processing method, equipment and system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101610554B (en) * 2008-06-16 2012-04-25 华为技术有限公司 Method, system and equipment for switching between networks, updating location area and establishing ISR
US9197378B2 (en) * 2009-09-30 2015-11-24 Panasonic Intellectual Property Corporation Of America Packet restoration method, packet restoration system, and mobile terminal and intermediate device used in the method
JP5606603B1 (en) * 2013-05-20 2014-10-15 日本電気通信システム株式会社 Mobile communication system, SGW, terminal, communication method and control method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101431780A (en) * 2007-11-09 2009-05-13 华为技术有限公司 Method, equipment and system for implementing network optimization switch
WO2010049573A1 (en) * 2008-10-29 2010-05-06 Nokia Corporation Cell change
CN101605393A (en) * 2009-07-08 2009-12-16 中兴通讯股份有限公司 A kind of method and system that connects resource processing in the mobility management process
CN102413584A (en) * 2010-09-20 2012-04-11 电信科学技术研究院 Method and equipment for managing PDN (public data network) connection
CN102111745A (en) * 2010-10-15 2011-06-29 电信科学技术研究院 Method and device for reinitiating session management process of EPS system
CN103249096A (en) * 2013-05-31 2013-08-14 大唐移动通信设备有限公司 Switching processing method, equipment and system

Also Published As

Publication number Publication date
CN105722154A (en) 2016-06-29
WO2016086673A1 (en) 2016-06-09

Similar Documents

Publication Publication Date Title
CN108738086B (en) User plane reselection method and device
WO2017091960A1 (en) Method, device and system for switching between mobile edge computing platforms
CN109819485B (en) Communication method, device and system
CN102333386B (en) Terminal attachment method and equipment
CN104604269B (en) A joint location update processing method, device and system
CN105282803A (en) Communication interface and information transfer method and system based on the same
CN105307222B (en) Method, gateway entity and the network equipment of releasing source network resource
CN108123783A (en) Data transmission method, apparatus and system
CN102523573A (en) Method and device for updating tracking area position
EP3305008B1 (en) Controlling communication mode of a mobile terminal
CN109314725A (en) Local break-out in mobile IP network
CN105338511A (en) Network topology hiding method and equipment
US10440616B2 (en) Failure handling method, packet data network, mobility management entity, and network system
EP2890184A1 (en) Method, apparatus and system for processing data-field service
KR101541348B1 (en) METHOD AND APPARATUS FOR MANAGING SESSION BASED GPRS Tunneling Protocol NETWORK
CN106465446B (en) The method and apparatus of network insertion
CN104955136A (en) Terminal management apparatus, terminal, communication system, terminal management method, and program
CN108289306A (en) A kind of flow conflict processing method and device
CN105722154B (en) The optimization method and gateway and optimization system of resource processing
CN109392082A (en) Message method and device, terminal, access and mobility management entity
CN109804706A (en) For establishing the method and radio access network component of the connection of mobile terminal to mobile radio communication network
CN104995956B (en) A kind of method, apparatus and system that data channel is established
CN105325019B (en) A kind of information processing method and device of location area updating
CN111567084A (en) Switching method and device and computer storage medium
CN108702611A (en) The Centroid management of UE contexts

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190826

Address after: Yuhuatai District of Nanjing City, Jiangsu province 210012 Bauhinia Road No. 68

Applicant after: Nanjing Zhongxing New Software Co., Ltd.

Address before: 518057 Nanshan District Guangdong high tech Industrial Park, South Road, science and technology, ZTE building, Ministry of Justice

Applicant before: ZTE Corporation

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant