CN105717383B - The hot operating test device of the big component change current valve module of direct current transportation and its test method - Google Patents
The hot operating test device of the big component change current valve module of direct current transportation and its test method Download PDFInfo
- Publication number
- CN105717383B CN105717383B CN201410738019.6A CN201410738019A CN105717383B CN 105717383 B CN105717383 B CN 105717383B CN 201410738019 A CN201410738019 A CN 201410738019A CN 105717383 B CN105717383 B CN 105717383B
- Authority
- CN
- China
- Prior art keywords
- thyristor
- test
- converter valve
- valve module
- group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 85
- 238000010998 test method Methods 0.000 title claims abstract description 24
- 230000008859 change Effects 0.000 title description 5
- 230000005540 biological transmission Effects 0.000 claims abstract description 17
- 229920006395 saturated elastomer Polymers 0.000 claims abstract description 13
- 238000000034 method Methods 0.000 claims description 11
- 230000000712 assembly Effects 0.000 claims description 8
- 238000000429 assembly Methods 0.000 claims description 8
- 238000009429 electrical wiring Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 9
- 230000008569 process Effects 0.000 description 5
- 238000010438 heat treatment Methods 0.000 description 3
- 230000009466 transformation Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000001960 triggered effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
Landscapes
- Testing Of Individual Semiconductor Devices (AREA)
- Inverter Devices (AREA)
Abstract
本发明涉及一种直流输电大组件换流阀模块热运行试验装置及其试验方法,该装置包括换流阀模块以及连接在换流阀模块两端的饱和电抗器;所述换流阀模块包括A、B两组阀组件;每组阀组件由饱和电抗器和15级晶闸管串联构成;每级晶闸管均设有散热器;所述饱和电抗器的两端并联续流有二极管;所述晶闸管触发方式为采用小阻值电阻将每个晶闸管的阳极与门极短接。试验方法对整台大组件换流阀进行整体热运行试验,不改变阀模块的整体结构,仅需对被试换流阀模块电气接线稍加改变,替换少量晶闸管散热器并加装试验母排。本发明解决由于大组件换流阀模块串联晶闸管级过多所造成的试验耐压高、试验用交流电源容量大、试验场地及设备受限等问题。
The invention relates to a test device for thermal operation of a converter valve module of a large direct current transmission component and a test method thereof. The device includes a converter valve module and saturated reactors connected to both ends of the converter valve module; the converter valve module includes A , B two groups of valve components; each group of valve components is composed of a saturated reactor and 15 grades of thyristors connected in series; each grade of thyristors is provided with a radiator; both ends of the saturated reactor are connected in parallel with diodes; the thyristor trigger mode The anode and gate of each thyristor are short-circuited with a small resistance resistor. The test method conducts the overall thermal operation test on the entire large-component converter valve, without changing the overall structure of the valve module, only slightly changing the electrical wiring of the tested converter valve module, replacing a small number of thyristor radiators and installing test busbars. The invention solves the problems of high test withstand voltage, large capacity of test AC power supply, limited test site and equipment caused by too many thyristor stages connected in series of large component converter valve modules.
Description
技术领域technical field
本发明涉及一种特高压直流输电技术领域的试验装置及其试验方法,具体讲涉及一种直流输电大组件换流阀模块热运行试验装置及其试验方法。The invention relates to a test device and a test method thereof in the technical field of ultra-high voltage direct current transmission, in particular to a test device for thermal operation of a converter valve module of a large component of direct current transmission and a test method thereof.
背景技术Background technique
当代特高压直流输电系统的换流阀是基于晶闸管换相的原理设计建造的,作为国家重要电力装备和昂贵资产,直流输电工程一经建成后,要求稳定运行数十年以上,作为直流输电系统核心设备的换流阀,其出厂时的可靠性试验是必须环节,其中针对单一换流阀模块的热运行试验就是给模块的晶闸管通过额定电流,通过测量各晶闸管的发热温度来对模块的散热结构、晶闸管的可靠性进行评价的试验,该试验可以直接反映换流阀在热力学方面的特性,同时试验结果除了可以直接决定产品是否合格之外,试验过程中对所有晶闸管的温度记录还可以形成每台换流阀独有的“热力学指纹”,为其投运后的在线监测、运行维修提供原始依据。The converter valve of the contemporary UHV DC transmission system is designed and constructed based on the principle of thyristor commutation. As an important power equipment and expensive asset in the country, once the DC transmission project is completed, it requires stable operation for more than decades. As the core of the DC transmission system The reliability test of the converter valve of the equipment is a necessary link when it leaves the factory. The thermal operation test for a single converter valve module is to pass the rated current to the thyristor of the module and measure the heating temperature of each thyristor to measure the cooling structure of the module. , Thyristor reliability evaluation test, this test can directly reflect the thermodynamic characteristics of the converter valve, and the test results can not only directly determine whether the product is qualified, but also can form the temperature records of all thyristors during the test. The unique "thermodynamic fingerprint" of Taiwan's converter valve provides the original basis for its online monitoring, operation and maintenance after it is put into operation.
换流阀由若干台阀模块组成,而每台阀模块包括十几到几十只晶闸管,本文所称的大组件换流阀是专指每台包括几十只及以上晶闸管的阀模块。目前国内尚未提出针对这种大组件换流阀模块的热运行试验方案,原有的热运行试验方案是晶闸管生产厂家在进行晶闸管型式试验时所进行的热循环试验:该试验方法如附图1所示,将6只晶闸管串接后作为被试品,每只晶闸管的阳极和门极短接,通过直流电源在晶闸管两端施加直流电压,试验开始时晶闸管被触发一次后立即导通,在导通后不再关断,通过调节直流电源令晶闸管电流变化,此试验方法可对少量晶闸管进行热运行试验,但对数十级晶闸管串联构成的大组件换流阀模块则需要容量和试验电压较高的直流电源,同时被试晶闸管没有反复触发换相过程,从发热原理看,由于缺少恢复电荷和开关损耗环节,因此其热力学特性与直流输电工程的实际情况不相符合。The converter valve is composed of several valve modules, and each valve module includes a dozen to dozens of thyristors. The large-component converter valve referred to in this article refers to each valve module including dozens or more thyristors. At present, there is no thermal operation test scheme for this kind of large-component converter valve module in China. The original thermal operation test scheme is the thermal cycle test carried out by thyristor manufacturers when they conduct thyristor type tests: the test method is shown in Figure 1 As shown, 6 thyristors are connected in series as the tested product. The anode and gate of each thyristor are short-circuited, and a DC voltage is applied to both ends of the thyristor through a DC power supply. At the beginning of the test, the thyristor is triggered once and immediately conducts. After it is turned on, it will not be turned off, and the thyristor current will be changed by adjusting the DC power supply. This test method can conduct thermal running tests on a small number of thyristors, but for large-scale converter valve modules composed of dozens of thyristors connected in series, capacity and test voltage are required. Higher DC power supply, and the thyristors under test did not repeatedly trigger the commutation process. From the perspective of heating principle, due to the lack of recovery charge and switching loss links, its thermodynamic characteristics are not consistent with the actual situation of DC transmission projects.
发明内容Contents of the invention
针对现有技术的不足,本发明的目的是提供一种直流输电大组件换流阀模块热运行试验装置及其试验方法,本发明解决由于大组件换流阀模块串联晶闸管级过多所造成的试验耐压高、试验用交流电源容量大、试验场地及设备受限等问题,并确保大组件换流阀模块的热运行试验发热原理与实际工程吻合,令阀模块在试验过程中有工频换相过程。Aiming at the deficiencies of the prior art, the purpose of the present invention is to provide a thermal operation test device and test method for large component converter valve modules of DC power transmission. There are problems such as high test withstand voltage, large capacity of test AC power supply, limited test site and equipment, etc., and ensure that the heating principle of the large component converter valve module in the thermal operation test is consistent with the actual project, so that the valve module has power frequency during the test process. commutation process.
本发明的目的是采用下述技术方案实现的:The object of the present invention is to adopt following technical scheme to realize:
本发明提供一种直流输电大组件换流阀模块热运行试验装置,其改进之处在于,所述装置包括换流阀模块以及连接在换流阀模块两端的饱和电抗器;所述换流阀模块包括A、B两组阀组件;每组阀组件由饱和电抗器和15级晶闸管串联构成;每级晶闸管均设有散热器;所述饱和电抗器的两端并联有续流二极管;所述晶闸管触发方式为采用小阻值电阻将每个晶闸管的阳极与门极短接。The invention provides a test device for thermal operation of a converter valve module of a large direct current transmission component. The improvement is that the device includes a converter valve module and saturable reactors connected to both ends of the converter valve module; the converter valve The module includes two groups of valve components A and B; each group of valve components is composed of a saturated reactor and 15 levels of thyristors in series; each level of thyristor is equipped with a radiator; the two ends of the saturated reactor are connected in parallel with freewheeling diodes; The thyristor is triggered by short-circuiting the anode and gate of each thyristor with a small resistance resistor.
本发明还提供一种直流输电大组件换流阀模块热运行试验装置的试验方法,其改进之处在于,所述热运行试验方法包括:①使换流阀模块中的两组8级晶闸管反并联;或②使换流阀模块中的两组7级晶闸管反并联,以实现降低试验电源容量的需求;所述小阻值电阻阻值范围为0.5~20欧姆。The present invention also provides a test method for the thermal operation test device of the converter valve module of the DC transmission large component. The improvement is that the thermal operation test method includes: parallel connection; or (2) anti-parallel connection of two groups of 7-level thyristors in the converter valve module to realize the requirement of reducing the test power supply capacity; the resistance range of the small resistance resistor is 0.5-20 ohms.
进一步地,在热运行试验之前:将每组阀组件的15级晶闸管分成1、2两组,并在两组晶闸管分界处的散热器上焊接母排;其中:临近饱和电抗器含7级晶闸管为第一组,分别为A-1组晶闸管串和B-1组晶闸管串;含8级晶闸管为第二组,分别为A-2组晶闸管串和B-2组晶闸管串。Further, before the thermal running test: Divide the 15-level thyristors of each group of valve components into two groups of 1 and 2, and weld the busbar on the radiator at the boundary of the two groups of thyristors; where: the adjacent saturated reactor contains 7-level thyristors The first group consists of A-1 group thyristor strings and B-1 group thyristor strings; the second group including 8-level thyristors consists of A-2 group thyristor strings and B-2 group thyristor strings.
进一步地,所述①中,将每个阀组件散热器上焊接的母排与饱和电抗器的母排用电缆连接,将A-1组晶闸管串和B-1组晶闸管串短接;将A、B两组阀组件的饱和电抗器连接,并在换流阀模块的中点之间施加大电流低电压的交流电源,此时换流阀模块的A-2组晶闸管串和B-2组晶闸管串两组8级晶闸管反并联,进行热运行试验;当电压处于正半周期时A-2组晶闸管串导通,当电压处于负半周期时B-2组晶闸管串导通;Further, in the above ①, the busbar welded on the radiator of each valve assembly is connected with the busbar of the saturable reactor with a cable, and the A-1 thyristor string and the B-1 thyristor string are short-circuited; the A The saturated reactors of the two groups of valve assemblies in B and B are connected, and a high-current and low-voltage AC power supply is applied between the midpoints of the converter valve modules. At this time, the thyristor strings of the A-2 group and the B-2 group Thyristor string Two groups of 8-level thyristors are connected in anti-parallel for thermal operation test; when the voltage is in the positive half cycle, group A-2 thyristor strings are turned on, and when the voltage is in the negative half cycle, group B-2 thyristor strings are turned on;
进一步地,所述②中,将A、B两组阀组件散热器上焊接的母排用电缆连接,将A-2组晶闸管串和B-2组晶闸管串短接;将A、B两组阀组件的饱和电抗器连接,并在换流阀模块的中点之间施加大电流低电压(大电流范围为:500-5000安培;低电压范围:5-100伏特)的交流电源,此时换流阀模块的A-1组晶闸管串和B-1组晶闸管串两组7级晶闸管反并联,进行热运行试验;当电压处于正半周期时A-1组晶闸管串导通;当电压处于负半周期时B-1组晶闸管串导通。Further, in the above ②, connect the busbars welded on the radiators of the A and B groups of valve assemblies with cables, and short-circuit the thyristor strings of the A-2 group and the B-2 group of thyristor strings; connect the A and B groups The saturable reactor of the valve assembly is connected, and an AC power supply with high current and low voltage (high current range: 500-5000 amperes; low voltage range: 5-100 volts) is applied between the midpoints of the converter valve module, at this time The A-1 thyristor string of the converter valve module and the B-1 thyristor string two groups of 7-level thyristors are connected in antiparallel for thermal operation test; when the voltage is in the positive half cycle, the A-1 thyristor string conducts; when the voltage is in During the negative half cycle, the thyristor strings of group B-1 are turned on.
进一步地,所述热运行试验包括下述步骤:(1)在晶闸管阳极和门极间用小阻值电阻短接;(2)调节交流电源电压;(3)晶闸管触发,电流达到预期值;Further, the thermal running test includes the following steps: (1) short-circuiting the thyristor anode and gate with a small resistance resistor; (2) adjusting the AC power supply voltage; (3) triggering the thyristor, and the current reaches the expected value;
所述大电流范围为500-5000安培;所述低电压范围为5-100伏特。The high current range is 500-5000 amperes; the low voltage range is 5-100 volts.
与最接近的现有技术相比,本发明具有的有益效果是:Compared with the closest prior art, the beneficial effects that the present invention has are:
1)本发明提供的直流输电大组件换流阀模块热运行试验装置及其试验方法,可解决在试验场地及供电电源容量受限的情况下,由于换流阀模块晶闸管数量过多所带来的试验困难问题:本试验方法无需将换流阀模块拆分,仅需对设备接线稍加处理,更改极少量散热器并加装试验母排,就可对整个大组件换流阀模块进行整体热运行试验。1) The thermal operation test device and test method of the converter valve module of the DC power transmission large component and the test method can solve the problem caused by the excessive number of thyristors of the converter valve module under the condition that the test site and the capacity of the power supply are limited. Difficulties in the test: This test method does not need to disassemble the converter valve module, only needs to slightly handle the equipment wiring, change a small number of radiators and install test busbars, and then the entire large-component converter valve module can be integrated. Hot running test.
2)本发明提供的直流输电大组件换流阀模块热运行试验装置及其试验方法,令阀模块在热运行试验时具备晶闸管工频换相过程,晶闸管所发出的热量组成中不仅有通态损耗,还有开关损耗,更接近实际工程中运行工况,试验数据更可靠。2) The thermal operation test device and test method of the converter valve module of the DC power transmission large component provided by the present invention enable the valve module to have a thyristor power frequency commutation process during the thermal operation test, and the heat emitted by the thyristor is composed of not only the on-state The loss, as well as the switching loss, are closer to the actual engineering operating conditions, and the test data is more reliable.
3)针对整台大组件换流阀模块进行整体热运行试验时,无需改变换流阀模块的整体结构,而仅改变被试模块的少量电气接线和散热器并加装试验母排的试验方法;3) When conducting the overall thermal operation test for the entire large-component converter valve module, it is not necessary to change the overall structure of the converter valve module, but only change a small amount of electrical wiring and radiators of the tested module and install the test method of the busbar;
4)正反两组反并联晶闸管串以提高交流电源利用率、使得交流电压的正负半周期均可对两组反并联的晶闸管串同时试验、令串联晶闸管级具备工频换相过程的试验方法;4) Two groups of positive and negative anti-parallel thyristor strings are used to improve the utilization rate of AC power supply, so that the positive and negative half cycles of the AC voltage can be tested simultaneously on two sets of anti-parallel thyristor strings, and the test of making the series thyristor stage have a power frequency commutation process method;
5)在阀模块的饱和电抗器上加装并联二极管的试验方法:为换流阀模块电流提供续流通路,抑制因饱和电抗器电流突然中断造成的电感两端电压突升,避免对试验设备及试验人员造成伤害。5) The test method of installing a parallel diode on the saturable reactor of the valve module: provide a continuous flow path for the current of the converter valve module, suppress the sudden rise of the voltage at both ends of the inductance caused by the sudden interruption of the saturated reactor current, and avoid damage to the test equipment. and test personnel.
附图说明Description of drawings
图1是6级晶闸管串联热循环试验原理图;Figure 1 is a schematic diagram of a 6-stage thyristor series thermal cycle test;
图2是本发明提供的30级晶闸管串联换流阀模块热运行试验电气原理图,其中(a)味A-2组晶闸管串和B-2组晶闸管串两组8级晶闸管反并联接线图;(b)为的A-1组晶闸管串和B-1组晶闸管串两组7级晶闸管串反并联接线图;Fig. 2 is the electrical principle diagram of the thermal operation test of the 30-stage thyristor series converter valve module provided by the present invention, wherein (a) is a wiring diagram of A-2 group thyristor strings and B-2 group thyristor strings and two groups of 8-stage thyristor anti-parallel connections; (b) A-1 group of thyristor strings and B-1 group of thyristor strings are the anti-parallel connection diagrams of two groups of 7-level thyristor strings;
图3是本发明提供的热运行试验方法下进行试验时其中1只晶闸管的伏安特性图。Fig. 3 is a volt-ampere characteristic diagram of one of the thyristors during the test under the thermal running test method provided by the present invention.
具体实施方式Detailed ways
下面结合附图对本发明的具体实施方式作进一步的详细说明。The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings.
本发明提供一种专为几十级晶闸管串联的特高压直流输电大组件换流阀模块热运行试验方案。本发明可对整台大组件换流阀进行整体热运行试验,不改变阀模块的整体结构,仅需对被试换流阀模块电气接线稍加改变,替换少量晶闸管散热器并加装试验母排,整个试验方案原理简单,易于实现。试验结束后,将被试换流阀接线及更改的元器件恢复即可。The invention provides a test scheme for thermal operation of a converter valve module of a UHV direct current transmission large component specially designed for tens of levels of thyristors connected in series. The invention can carry out the overall thermal operation test on the entire large component converter valve without changing the overall structure of the valve module, only needing to slightly change the electrical wiring of the tested converter valve module, replace a small number of thyristor radiators and install a test busbar , the whole test scheme is simple in principle and easy to implement. After the test is over, it is enough to restore the wiring of the tested converter valve and the changed components.
本发明提供一种直流输电大组件换流阀模块热运行试验装置,该装置包括换流阀模块以及连接在换流阀模块两端的饱和电抗器;所述换流阀模块由两组阀组件A、B构成,每组阀组件由15只晶闸管级串联,每组组件内串有一个饱和电抗器,故每台阀模块共由30级晶闸管级及两个饱和电抗器串联构成。每级晶闸管均设有散热器;考虑到饱和电抗器的续流效应,为避免产生高电压危害设备及人身安全,试验过程中需在饱和电抗器两端并联续流二极管,试验后将二极管拆除。晶闸管触发方式为采用小阻值电阻将每个晶闸管的阳极与门极直接短接。此法晶闸管分压均匀,晶闸管导通关断一致性好,接线简便,易于实现。The invention provides a test device for thermal operation of a converter valve module of a large direct current transmission component. The device includes a converter valve module and saturable reactors connected to both ends of the converter valve module; , B, each group of valve components is composed of 15 thyristor stages in series, and each group of components is connected in series with a saturable reactor, so each valve module is composed of 30 thyristor stages and two saturable reactors in series. Each level of thyristor is equipped with a radiator; considering the freewheeling effect of the saturable reactor, in order to avoid high voltage hazards to equipment and personal safety, a freewheeling diode should be connected in parallel at both ends of the saturable reactor during the test, and the diode should be removed after the test . The triggering method of the thyristor is to directly short-circuit the anode and gate of each thyristor with a small resistance resistor. In this method, the voltage division of the thyristor is uniform, the turn-on and turn-off consistency of the thyristor is good, the wiring is simple, and it is easy to realize.
本发明还提供一种直流输电大组件换流阀模块热运行试验装置的试验方法,在试验前,进行热运行试验分组:将每组阀组件的15级晶闸管分成1、2两组,在两组晶闸管分界处的散热器上焊接母排,临近饱和电抗器含7级晶闸管为第一组,分别为A-1组晶闸管串和B-1组晶闸管串;含8级晶闸管为第二组,分别为A-2组晶闸管串和B-2组晶闸管串。做试验之前用带有母排的散热器替换原有的散热器,试验做完后卸下带有母排的散热器,换回原有的散热器。The present invention also provides a test method for the thermal operation test device of the converter valve module of the DC transmission large component. The busbar is welded on the radiator at the boundary of the group of thyristors, and the first group containing 7-level thyristors near the saturated reactor is the first group, which are respectively A-1 group thyristor strings and B-1 group thyristor strings; the second group contains 8-level thyristors, They are A-2 groups of thyristor strings and B-2 groups of thyristor strings. Before the test, replace the original radiator with the radiator with the busbar. After the test, remove the radiator with the busbar and replace it with the original radiator.
两组组件的试验方法如下:The test methods for the two groups of components are as follows:
1)第一组试验时,试验接线图如图2(a)所示:将每个阀组件中间部分散热器上焊接的母排与饱和电抗器的母排用电缆连接,可将A-1、B-1两组晶闸管短接掉。将两个阀组件的饱和电抗器接在一起,并在这点和整个阀模块的中点之间施加大电流低电压的交流电源,此时阀模块中间的A-2、B-2两个8级晶闸管串反并联,进行热运行试验。由于试验时采用交流电源,当电压处于正半周期时A-2组晶闸管导通,当电压处于负半周期时B-2组晶闸管导通。1) In the first group of tests, the test wiring diagram is shown in Figure 2(a): Connect the busbar welded on the radiator in the middle part of each valve assembly to the busbar of the saturated reactor with a cable, and A-1 , B-1 two groups of thyristors are short-circuited. Connect the saturable reactors of the two valve assemblies together, and apply a high-current and low-voltage AC power supply between this point and the midpoint of the entire valve module. At this time, two valves A-2 and B-2 in the middle of the valve module 8-level thyristors are connected in series and anti-parallel for thermal operation test. Since the AC power supply is used in the test, when the voltage is in the positive half cycle, the thyristors of group A-2 are turned on, and when the voltage is in the negative half cycle, the thyristors of group B-2 are turned on.
2)第二组试验时,试验接线图如图2(b)所示:将两个阀组件中间部分散热器上焊接的母排用电缆连接,可将A-2、B-2两组晶闸管短接掉。同样将两个阀组件的饱和电抗器连接,并在这两点之间施加大电流低电压的交流电源,此时阀模块靠近饱和电抗器的A-1、B-1两个7级晶闸管串反并联,进行热运行试验。当电压处于正半周期时A-1组晶闸管导通;当电压处于负半周期时B-1组晶闸管导通。2) In the second group of tests, the test wiring diagram is shown in Figure 2(b): connect the bus bars welded on the radiators in the middle of the two valve assemblies with cables, and connect the two groups of thyristors A-2 and B-2 Short it out. Also connect the saturable reactors of the two valve components, and apply a high-current and low-voltage AC power supply between these two points. At this time, the valve module is close to the two 7-stage thyristor strings A-1 and B-1 of the saturable reactor. Anti-parallel connection, thermal running test. When the voltage is in the positive half cycle, the thyristors of group A-1 are turned on; when the voltage is in the negative half cycle, the thyristors of group B-1 are turned on.
所述热运行试验包括下述步骤:(1)在晶闸管阳极和门极间用小阻值电阻短接;(2)调节交流电源电压;(3)晶闸管触发,电流达到预期值;The thermal running test comprises the following steps: (1) short-circuiting the thyristor anode and the gate with a small resistance resistor; (2) adjusting the AC power supply voltage; (3) triggering the thyristor, and the current reaches the expected value;
所述大电流范围为500-5000安培;所述低电压范围为5-100伏特。The high current range is 500-5000 amperes; the low voltage range is 5-100 volts.
如图3所示为在本发明所提出的热运行试验方法下进行试验时其中1只晶闸管的伏安特性图,如虚线所示为流过该晶闸管的电流波形IVT,如实线所示为晶闸管的端电压UVT,其中t1区间是晶闸管的开通损耗区间、t2区间是晶闸管的关断损耗区间、t3区间是晶闸管的导通损耗区间。As shown in Figure 3, it is the volt-ampere characteristic diagram of one of the thyristors when the test is carried out under the thermal running test method proposed by the present invention. The current waveform IVT flowing through the thyristor is shown by the dashed line, and the thyristor is shown by the solid line. The terminal voltage UVT of the thyristor, where the t1 interval is the turn-on loss interval of the thyristor, the t2 interval is the turn-off loss interval of the thyristor, and the t3 interval is the conduction loss interval of the thyristor.
晶闸管在试验时实际工作在自整流状态:被试品晶闸管组件既是半波整流桥,又是负载。这样一来,相对于附图1所涉及的热运行试验方案,系统相当于把直流电源和被试品整合到被试品自身上了,因此系统效能可以提高1倍,对试验电源的容量需求可以降低50%。The thyristor actually works in the self-rectification state during the test: the thyristor component of the tested product is not only a half-wave rectifier bridge, but also a load. In this way, compared with the thermal operation test scheme involved in Figure 1, the system is equivalent to integrating the DC power supply and the tested product into the tested product itself, so the system performance can be doubled, and the capacity requirements for the test power supply Can be reduced by 50%.
本发明所涉及到的热运行试验方法已经在工程实际中获得了的应用,在本单位所实施的直流换流阀技改工程中,根据用户要求,为其提供了更换阀模块晶闸管级部分组件的服务,用户原换流阀为大组件换流阀模块,每台模块包括30级晶闸管,如附图2所示的晶闸管串联部分为其简化的示意图。经过技术改造后,需要进行热运行试验,本单位结合实际提出本发明所阐述的试验方法,并对技改完成的阀模块进行了试验,经用户反馈本试验方案对换流阀的热运行能力进行了充分验证,试验效果理想。The thermal operation test method involved in the present invention has already been applied in engineering practice. In the DC converter valve technical transformation project implemented by the unit, according to the user's requirements, some components of the thyristor level of the replacement valve module were provided. service, the user’s original converter valve is a large component converter valve module, each module includes 30-level thyristors, as shown in Figure 2 is a simplified schematic diagram of the thyristor series connection. After technical transformation, it is necessary to carry out thermal operation test. The unit proposes the test method described in the present invention in combination with the actual situation, and conducts a test on the valve module after technical transformation. According to the feedback from the user, this test scheme has a great impact on the thermal operation capacity of the converter valve. Fully verified, the test effect is ideal.
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,尽管参照上述实施例对本发明进行了详细的说明,所属领域的普通技术人员依然可以对本发明的具体实施方式进行修改或者等同替换,这些未脱离本发明精神和范围的任何修改或者等同替换,均在申请待批的本发明的权利要求保护范围之内。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to the above embodiments, those of ordinary skill in the art can still implement the present invention Any modification or equivalent replacement that does not deviate from the spirit and scope of the present invention is within the protection scope of the claims of the pending application of the present invention.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410738019.6A CN105717383B (en) | 2014-12-04 | 2014-12-04 | The hot operating test device of the big component change current valve module of direct current transportation and its test method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410738019.6A CN105717383B (en) | 2014-12-04 | 2014-12-04 | The hot operating test device of the big component change current valve module of direct current transportation and its test method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105717383A CN105717383A (en) | 2016-06-29 |
CN105717383B true CN105717383B (en) | 2018-10-23 |
Family
ID=56144001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410738019.6A Active CN105717383B (en) | 2014-12-04 | 2014-12-04 | The hot operating test device of the big component change current valve module of direct current transportation and its test method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105717383B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108896895B (en) * | 2018-03-30 | 2024-01-16 | 全球能源互联网研究院有限公司 | A high-power thyristor electric and thermal combined aging test method and system |
CN112039107A (en) * | 2020-08-28 | 2020-12-04 | 西安西电电力系统有限公司 | Flexible direct current transmission debugging system and flexible direct current transmission debugging live method |
CN114509654A (en) * | 2021-11-19 | 2022-05-17 | 西安热工研究院有限公司 | A compact self-cooling thyristor valve temperature rise test system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01202155A (en) * | 1988-02-04 | 1989-08-15 | Toshiba Corp | Thyristor valve |
CN101719719A (en) * | 2009-12-14 | 2010-06-02 | 中国电力科学研究院 | Novel thyristor converter valve module |
CN102487192A (en) * | 2010-12-01 | 2012-06-06 | 中国电力科学研究院 | A large current protection exit device for synthesis test of DC converter valve |
CN103036210A (en) * | 2012-12-12 | 2013-04-10 | 国网智能电网研究院 | Layering sectional type capacitive balance control method based on look-up table |
CN103197241A (en) * | 2013-03-20 | 2013-07-10 | 许继集团有限公司 | Testing device and testing method of flexible direct-current transmission modular multilevel converter (MMC) converter valve operating |
CN103457504A (en) * | 2013-09-18 | 2013-12-18 | 国家电网公司 | Circuit capable of reducing current conversion valve commutation failure |
CN103487680A (en) * | 2013-09-11 | 2014-01-01 | 国家电网公司 | Converter valve commutation failure distinguishing method |
-
2014
- 2014-12-04 CN CN201410738019.6A patent/CN105717383B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01202155A (en) * | 1988-02-04 | 1989-08-15 | Toshiba Corp | Thyristor valve |
CN101719719A (en) * | 2009-12-14 | 2010-06-02 | 中国电力科学研究院 | Novel thyristor converter valve module |
CN102487192A (en) * | 2010-12-01 | 2012-06-06 | 中国电力科学研究院 | A large current protection exit device for synthesis test of DC converter valve |
CN103036210A (en) * | 2012-12-12 | 2013-04-10 | 国网智能电网研究院 | Layering sectional type capacitive balance control method based on look-up table |
CN103197241A (en) * | 2013-03-20 | 2013-07-10 | 许继集团有限公司 | Testing device and testing method of flexible direct-current transmission modular multilevel converter (MMC) converter valve operating |
CN103487680A (en) * | 2013-09-11 | 2014-01-01 | 国家电网公司 | Converter valve commutation failure distinguishing method |
CN103457504A (en) * | 2013-09-18 | 2013-12-18 | 国家电网公司 | Circuit capable of reducing current conversion valve commutation failure |
Non-Patent Citations (1)
Title |
---|
《士100 kV特高压直流输电工程换流阀研发产品运行试验》;胡治龙 等;《高压电器》;20130430;第49卷(第4期);第25-30页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105717383A (en) | 2016-06-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109444705B (en) | A power cycle experimental device for multi-junction temperature difference control of automotive-grade IGBT | |
CN101187690B (en) | Method of instantaneous forward voltage test during DC converter valve recovery | |
CN103176117B (en) | A kind of high-power thyristor turn-off characteristic test device based on half-wave method | |
CN103278758B (en) | A kind of high-power thyristor turn-off characteristic test method and proving installation thereof | |
CN103176124B (en) | A kind of high-power thyristor turn-off characteristic test method based on half-wave method | |
CN102522882B (en) | Protection circuit of converter power component | |
CN103645399B (en) | A kind of converter valve submodule Auto-Test System and thyristor test circuit thereof | |
CN102662145A (en) | Detection method for modular multi-level converter (MMC) steady state operation tester | |
CN104914340B (en) | Flexible direct current transmission converter valve wholly-controled device overcurrent turn-off function pilot system and method | |
CN105717383B (en) | The hot operating test device of the big component change current valve module of direct current transportation and its test method | |
CN101149421A (en) | The Method of Low-Voltage Parameter Operation Test of DC Converter Valve | |
CN104122499A (en) | Multi-level converter valve operation testing system composed of H-bridge submodules | |
CN201138362Y (en) | Fault current test device for HVDC converter valve | |
CN104977480B (en) | A kind of failure current test apparatus for high voltage DC transmission converter valve and its test method | |
CN106655819B (en) | Protector for short-circuit current rectifier of bidirectional converter | |
CN103580054B (en) | A kind of converter valve AC system 1s fault tolerance property analytical method | |
CN109143046B (en) | A flexible DC converter valve overcurrent shutdown test system and method suitable for overhead lines | |
CN203894367U (en) | Thyristor shunting detection circuit for voltage source transverter | |
CN107478957B (en) | Full-bridge module topology for direct-current transmission fault current test and test method | |
CN103457504B (en) | A kind of circuit reducing converter valve commutation failure | |
CN204479717U (en) | Extra-high voltage ice-melt disconnector heavy current tester | |
CN105203938A (en) | High-power thyristor forward recovery characteristic detection device and detection method | |
CN107179498A (en) | A kind of inspection circuit and method for flexible DC power transmission MMC valve | |
CN106329512A (en) | According to the technical scheme provided by the present invention, the black-start speed and stability of the power grid are improved. | |
CN108445329A (en) | A kind of temperature-rise test device of extra-high voltage large capacity combined electrical apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170607 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant after: State Grid Corporation of China Applicant after: China-EPRI Electric Power Engineering Co., Ltd. Applicant after: Electric Power Research Institute of State Grid Shandong Electric Power Company Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant before: State Grid Corporation of China Applicant before: State Grid Smart Grid Institute Applicant before: China-EPRI Electric Power Engineering Co., Ltd. Applicant before: Electric Power Research Institute of State Grid Shandong Electric Power Company |
|
GR01 | Patent grant | ||
GR01 | Patent grant |