CN105714935B - AP1000 superposed type dome spelling technique - Google Patents

AP1000 superposed type dome spelling technique Download PDF

Info

Publication number
CN105714935B
CN105714935B CN201410725710.0A CN201410725710A CN105714935B CN 105714935 B CN105714935 B CN 105714935B CN 201410725710 A CN201410725710 A CN 201410725710A CN 105714935 B CN105714935 B CN 105714935B
Authority
CN
China
Prior art keywords
monomer
ring
dome
welding
horizontal connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410725710.0A
Other languages
Chinese (zh)
Other versions
CN105714935A (en
Inventor
张芳芳
暴海民
刘兆瑞
张仕兵
高飞
赵景发
刘召辉
时亮
张欣亮
苏洪委
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry 24 Construction Co Ltd
Original Assignee
China Nuclear Industry 24 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 24 Construction Co Ltd filed Critical China Nuclear Industry 24 Construction Co Ltd
Priority to CN201410725710.0A priority Critical patent/CN105714935B/en
Publication of CN105714935A publication Critical patent/CN105714935A/en
Application granted granted Critical
Publication of CN105714935B publication Critical patent/CN105714935B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention belongs to nuclear power technical field of building construction, and in particular to a kind of AP1000 superposed type dome spelling technique.AP1000 superposed type dome uses modularization construction process, dome element precast is become monomer structure in processing workshop, transport to scene is carried out integral assembling, construction operation is finally completed by the way of integral hoisting;When on-site consolidation, ring beam monomer is lifted first, hereafter symmetrically lifts 16 Pin radial girders monomers, then 32 Pin horizontal connection beams are installed, weld job can be started after being adjusted in place, after 8 Pin radial girders monomers are in place, ring beam can be installed, the lifting and group weldering of cladding boards 15 are then carried out;It is in place in ring beam monomer, radial girders monomer and horizontal connection beam and after forming robust structure, separately introduce structures, protective plate & wire mesh & diffusor entry module between upper, annular stair & hoistable platform, Passive containment cooling system valve.Present invention can ensure that the smooth assembly of AP1000 nuclear power steel dome.

Description

AP1000 superposed type dome spelling technique
Technical field
The invention belongs to nuclear power technical field of building construction, and in particular to a kind of AP1000 superposed type dome spelling technique.
Background technique
AP1000 nuclear power technology is most safe, state-of-the-art business nuclear power technology in current global nuclear power market, while It is Chinese generation Ⅲ nuclear power proprietary technology.AP1000 steel dome is by dome ontology, upper, annular stair/hoistable platform, passive Between containment cooling system valve structures, protective plate/wire mesh/four part of diffusor entry module be assembled into one it is whole Body, project amount about 746.6T.Important component of the steel dome as passive system forms superposition mode with CVTH, And as the carrier for preventing big aircraft impact in nuclear power heap-type, these technologies are all not available for other nuclear power heap-type.Vault Top component is various, and structure is complicated, and reasonable spelling technique is the guarantee of entire project progress and construction quality.
Summary of the invention
The purpose of the present invention is to provide a kind of AP1000 superposed type dome spelling techniques, to guarantee AP1000 nuclear power steel vault The smooth assembly on top, improves splicing accuracy, construction speed and the economic benefit of dome.
The technical solution used in the present invention is:
A kind of AP1000 superposed type dome spelling technique, AP1000 superposed type dome use modularization construction process, are adding Dome element precast is become monomer structure by work workshop, and transport to scene carries out integral assembling, finally uses the side of integral hoisting Formula completes construction operation;When on-site consolidation, ring beam monomer is lifted first, is hereafter symmetrically lifted 16 Pin radial girders monomers, is then pacified 32 Pin horizontal connection beams are filled, weld job can be started after being adjusted in place, it, can mounting ring after 8 Pin radial girders monomers are in place Then beam carries out the lifting and group weldering of cladding boards 15;It in place and is formed in ring beam monomer, radial girders monomer and horizontal connection beam After robust structure, separately introduce upper, annular stair/hoistable platform, structures between Passive containment cooling system valve, Protective plate/wire mesh/diffusor entry module;Protective plate/wire mesh/diffusor entry modular structure is by ring beam sky suitable for reading Between introduce, the structures of upper, annular stair/between hoistable platform and Passive containment cooling system valve pass through dome ontology diameter It is introduced to beam monomer or the reserved space of cladding boards.
The specific steps of the technique include:After ring beam monomer module assembly is completed, in integral hoisting to assembled moulding bed;Ring Beam monomer is made of ring beam and reinforcing beam, rood beam, 3 sections of prefabricated factory of ring beam point, on-site assembly;Reinforcing beam, rood beam workshop Loose mail factory, on-site assembly after prefabricated;Ring beam monomer assembling flow path:Ring beam splicing welding joint group to, spot welding --- reinforcing beam, cross --- ring beam splices seam welding --- high-strength bolt fastening --- anchor studs repair welding --- for the bolt connection of beam, grill support Live touch-up paint;The reinforcing beam and rood beam of three sections of ring beams and centre are first combined into an entirety on the ground, and then integral hoisting is arrived On moulding bed;Use 12 concrete foundations as the assembled moulding bed of ring beam when assembled, basis is the periphery of dome integral assembling 32 concrete buttress;The lifting of ring beam monomer uses truck crane.
The specific steps of the technique include:According to ring beam monomer seated position and positioning scenarios, radial girders monomer is whole On lifting to assembled moulding bed;Radial girders monomer totally 16 Pin, including radial girders, ring secondary beam, back rib channel steel, cladding boards;Monomer lifting Symmetrically circumferential placement, the truck crane or crawler crane of radial girders monomer lifted using suitable tonnage are needed when in place.
The specific steps of the technique include:According to the seated position of ring beam monomer and radial girders monomer, horizontal connection is installed Beam completes the connection of two polymeric monomer modules;Horizontal connection beam construction process:Horizontal connection beam-ends edge polishing --- horizontal connection beam Installation is in place, and --- horizontal connection beam and ring beam and radial girders weld --- non-destructive testing --- stiffening plate welding --- lossless inspection Survey --- touch-up paint;
Polishing:First the distance between live ring beam monomer and radial girders monomer are surveyed, then according to measured data Cutting grinding process is carried out to the both ends of horizontal connection beam, is welded again after the leveling of scene;
Installation:Horizontal connection beam installs and uses tower crane or truck crane, and Current Collector Sleave is the hanging belt of suitable tonnage and unloads Button;
Welding:Weld seam during this is full penetration weld;Unilateral double V-groove is opened in upper lower flange, and web opens K-type slope Mouthful, before welding, first the spot welding gusset on the outside of flange plate above and below horizontal connection beam both ends, prevents welding deformation;Electricity adds before weldering Heat preheating after reaching preheating temperature, is carried out by 2 welders successively to the flange plate butt weld of 4, horizontal connection beam both ends first Then diagonal line bottoming is staggeredly filled capping again, capping carries out back chipping in back of weld after the completion, and repair welding back chipping welds Seam;
By 2 two end webs of welder's weld horizontal attachment beam after 4 flange plate butt weld dehydrogenations, first to K-type Groove carries out bottom welding, opposite uniform thickness is soldered in back chipping side after weld seam other side back chipping, back chipping after bottoming, then in K Type groove two sides carry out alternately being soldered to capping completion, carry out dehydrogenation using electric heating immediately after the completion of capping;
Non-destructive testing:After dehydrogenation, horizontal connection beam and radial web coupling part weld seam are polished, and according to setting Meter requires to do relevant detection:100%+100% Magnetic testing of visual detection /+100% ultrasound examination of liquid penetration examination;
Horizontal connection beam and radial girders monomer welding after the completion of, face of weld is polishing to it is concordant with H profile steel, according to NDE It is required that being detected, the welding of stiffener is then carried out again;
Connector between two Pin radial girders monomers has ring secondary beam and 3 blocks of steel linear plates;The adjustment of radial girders monomer is in place good Later can installation connecting element, sequence of construction is:Ring secondary beam is in place, and --- ring secondary beam welds --- lossless commission --- circumferential surface Plate is in place, and --- --- channel steel welding in end --- it is high to connect circumferential panel welding --- lossless commission --- for bolt connection Strength bolt fastening;
When ring secondary beam assembly, positioned using double plate;
Ring secondary beam and cladding boards use truck crane or 1# tower crane.
The specific steps of the technique include:Moulding bed superstructure is removed, protective plate/wire mesh/diffusor entry is assembled Module platform for lining;Remove moulding bed when, first tear the crossbeam and fashioned iron diagonal brace between the steel column of outer ring open, after tear open between Internal and external cycle steel column Then diagonal brace removes the upper semisection of outer ring steel column, crossbeam and fashioned iron diagonal brace between inner ring steel column are then removed, finally in dismounting Enclose the upper semisection of steel column;After finishing to the dismounting of all components, bracket is installed on the lower semisection of Internal and external cycle steel column, and successively pacify Two ring beams are filled, protective plate/wire mesh/diffusor entry module platform for lining is formed.
The specific steps of the technique include:After dome ontology assembly is completed, protective plate/wire mesh/diffuser is completed The introducing and installment work of inlet module;Protective plate/wire mesh/diffusor entry module monomer is by dome ring beam monomer Side space introduces, and introducing work equipment is jack and hanging belt;Introducing sequence is external octagonal monomer --- the removable steel in inside Diagonal brace of the plate --- steel column --- between steel column.
The specific steps of the technique include:After dome ontology assembly is completed, it is flat to be completed at the same time upper, annular stair/lifting The introducing and installment work of structures between platform and Passive containment cooling system valve;Upper, annular stair/hoistable platform and The introducing selection monomer of structures introduces between Passive containment cooling system valve or loose mail introduces;It introduces, needs if monomer Reserve last Pin radial girders monomer;If loose mail introduces, last Pin panel need to be reserved;The mode no matter introduced be loose mail or Monomer introduces hanging belt and jack that work equipment is suitable tonnage.
It is obtained by the present invention to have the beneficial effect that:
The present invention is optimized for the assembled sequence of dome, maximum under the premise of ensuring safety construction The raising project progress and benefit of degree.By effectively protecting to the well-planned of dome steel structure assembly sequence and continuing to optimize Construction quality and progress and site operation order are demonstrate,proved:Dome ontology, upper, annular stair/hoistable platform, passive containment Structures and protective plate/wire mesh/diffusor entry module take modularization assemble theory between cooling system valve, significantly Reduce subsequent installation exercise and task difficulty;Symmetric mode is taken during assembled, so that total uniform force, surely Gu beautiful, Deformation control is accurate;Modular construction theory is taken in dome spelling operation, forms parallel construction and continuous productive process, Greatly improve the progress of entire engineering.The smooth scientific and technological progress for implementing effectively to promote company of dome spelling technique.
Detailed description of the invention
Fig. 1 is AP1000 superposed type dome spelling process flow chart of the present invention;
Fig. 2 is dome ring beam monomer with regard to bitmap;
Fig. 3 is dome radial girders monomer with regard to bitmap;
Fig. 4 is dome horizontal connection beam with regard to bitmap;
Fig. 5 is protective plate/wire mesh/diffusor entry module platform for lining schematic diagram;
Fig. 6 is protective plate/wire mesh/diffusor entry module with regard to bitmap;
Fig. 7 is the structures of upper, annular stair/between hoistable platform and Passive containment cooling system valve with regard to bitmap;
Fig. 8 is ring beam monomer construction diagrams;
Fig. 9 (a) is radial girders composition figure;
Fig. 9 (b) is the A-A view of Fig. 9 (a);
Figure 10 is radial girders monomer construction diagrams;
Figure 11 (a) is horizontal connection beam welding figure;
Figure 11 (b) is the B-B view of Figure 11 (a);
Figure 12 (a) is panel tooling drawing;
Figure 12 (b) is the C-C view of Figure 12 (a);
In figure:1, moulding bed steel column supports;2, ring beam monomer;3, radial girders monomer;4, horizontal connection beam;5, protective plate/gold Belong to silk screen/diffusor entry module;6, upper, annular stair/hoistable platform;7, structure between Passive containment cooling system valve Build object;8, ring beam;9, reinforcing beam;10, rood beam;11, concrete foundation;12, radial girders;13, ring secondary beam;14, back rib channel steel; 15, cladding boards;16, angle cleat;17, stiffener;18, angle steel supports.
Specific embodiment
The present invention is described further with reference to the accompanying drawings and examples.
AP1000 superposed type dome uses modularization construction process, and dome element precast is become monomer knot in processing workshop Structure, transport to scene are carried out integral assembling, construction operation are finally completed by the way of integral hoisting.When on-site consolidation, first Ring beam monomer 2 is lifted, 16 Pin radial girders monomers 3 is hereafter symmetrically lifted, then 32 Pin horizontal connection beams 4 is installed, after being adjusted in place Weld job can be started, after 8 Pin radial girders monomers 3 are in place, ring beam 8 can be installed, the lifting of cladding boards 15 is then carried out With a group weldering.
It is in place in ring beam monomer 2, radial girders monomer 3 and horizontal connection beam 4 and after forming robust structure, separately introduce Structures 7, protective plate/wire mesh/diffusion between upper, annular stair/hoistable platform 6, Passive containment cooling system valve Device inlet module 5.The installation of accessory module also uses modular mode, and piecemeal sub-unit introduces assembled, reduction field operation work It measures.Wherein, protective plate/wire mesh/5 component of diffusor entry module is introduced by ring beam space suitable for reading, and upper, annular stair/ Between hoistable platform 6 and Passive containment cooling system valve 7 component of structures can by dome ontology radial girders monomer 3 or The reserved space of cladding boards 15 introduces.
As shown in Figure 1, AP1000 superposed type dome spelling technique of the present invention includes the following steps:
The first step:As shown in Fig. 2, 2 module spliced of ring beam monomer is installed into later, in integral hoisting to assembled moulding bed;
Ring beam monomer 2 is made of ring beam 8 and reinforcing beam 9, rood beam 10, and ring beam 8 divides 3 sections of prefabricated factory, on-site assembly;Add Loose mail dispatches from the factory after brutal 9,10 shop-fabricated of rood beam, on-site assembly.
2 assembling flow path of ring beam monomer:8 splicing welding joint group of ring beam to, spot welding --- reinforcing beam 9, rood beam 10, grill support Bolt connection --- ring beam 8 splice seam welding --- high-strength bolt fastening --- anchor studs repair welding --- live touch-up paint.
The reinforcing beam 9 and rood beam 10 of three sections of ring beams 8 and centre is first combined into an entirety, then integral hoisting on the ground Onto moulding bed.Use 12 concrete foundations 11 as the assembled moulding bed of ring beam 8 when assembled, basis arrangement and foundation outline are as schemed Shown in 8, basis is the concrete buttress of periphery 32 of dome integral assembling.The lifting of ring beam monomer 2 uses truck crane.
Second step:As shown in figure 3, radial girders monomer 3 is whole to be hung according to 2 seated position of ring beam monomer and positioning scenarios It is filled on assembled moulding bed;
Totally 16 Pin, including radial girders 12 (W36*395) of radial girders monomer 3, ring secondary beam 13 (W36*135), back rib channel steel 14 (MC8*20), cladding boards 15 (PL 1/2 "), channel steel connecting plate, the composition such as angle cleat.
Symmetrically circumferential placement is needed when monomer lifting is in place, as shown in Figure 10.Suitable ton can be used in the lifting of radial girders monomer 3 The truck crane or crawler crane of position.
Third step:As shown in figure 4, the seated position according to ring beam monomer 2 and radial girders monomer 3, installs horizontal connection beam 4 Complete the connection of two polymeric monomer modules;
4 construction process of horizontal connection beam:4 ora terminalis of horizontal connection beam polishing --- horizontal connection beam 4 is installed in place --- water Flushconnection beam 4 and ring beam 8 and radial girders 12 weld --- non-destructive testing --- stiffening plate welding --- non-destructive testing --- touch-up paint.
Polishing:First the distance between live ring beam monomer 2 and radial girders monomer 3 are surveyed, then according to actual measurement number Cutting grinding process is carried out according to the both ends to horizontal connection beam 4, is welded again after the leveling of scene.
Installation:The installation of horizontal connection beam 4 can be used tower crane or truck crane, Current Collector Sleave be suitable tonnage hanging belt and Shackle.
Welding:Weld seam during this is full penetration weld.Unilateral double V-groove is opened in upper lower flange, and web opens K-type slope Mouthful, before welding, first the spot welding gusset on the outside of flange plate above and below 4 both ends of horizontal connection beam, prevents welding deformation.Electricity adds before weldering Heat preheating after reaching preheating temperature, is carried out by 2 welders successively to the flange plate butt weld of 4, horizontal connection beam both ends first Then diagonal line bottoming is staggeredly filled capping again, capping carries out back chipping in back of weld after the completion, and repair welding back chipping welds Seam.
By 2 welder's weld horizontal attachment beams, 4 liang of end webs after 4 flange plate butt weld dehydrogenations, first to K-type Groove carries out bottom welding, opposite uniform thickness is soldered in back chipping side after weld seam other side back chipping, back chipping after bottoming, then in K Type groove two sides carry out alternately being soldered to capping completion, immediately using electric heating progress dehydrogenation after the completion of capping, at the hydrogen that disappears Reason parameter is same as above.
Non-destructive testing:After dehydrogenation, horizontal connection beam 4 and radial web coupling part weld seam are polished, and according to Design requirement does relevant detection:100%+100% Magnetic testing of visual detection /+100% ultrasonic wave of liquid penetration examination inspection It surveys.
After the completion of horizontal connection beam 4 and radial girders monomer 3 weld, face of weld is polishing to it is concordant with H profile steel, according to NDE requires to be detected, and then carries out the welding of stiffener 17 again.
Connector between two Pin radial girders monomers 3 has ring secondary beam 13 (W36*135) and 3 blocks of steel linear plates 15 (with back Rib MC8*20).Radial girders monomer 3 adjust it is good in place after can installation connecting element, sequence of construction is:Ring secondary beam 13 is in place --- Ring secondary beam 13 welds --- lossless commission --- circumferential panel --- bolt connection --- welding of end channel steel --- in place Connect circumferential panel welding --- lossless commission --- high-strength bolt fastening.
When ring secondary beam 13 is assembled, for the correct placement for guaranteeing secondary beam, positioned when assembled using double plate.
Branch before two pieces of biggish panels are in place, in 3 support angle steels 18 of panel upper surface spot welding, as suspension panel Support, while also as the distortion-free tooling of welding.
Ring secondary beam 13 and cladding boards 15 use truck crane or 1# tower crane.
4th step:As shown in figure 5, removing moulding bed superstructure, protective plate/wire mesh/diffusor entry module 5 is assembled Platform for lining;
When removing moulding bed, first tear the crossbeam and fashioned iron diagonal brace between the steel column of outer ring open, after tear diagonal brace between Internal and external cycle steel column open, Then the upper semisection of outer ring steel column is removed, crossbeam and fashioned iron diagonal brace between inner ring steel column is then removed, finally removes inner ring steel The upper semisection of column.After finishing to the dismounting of all components, bracket is installed on the lower semisection of Internal and external cycle steel column, and successively install two Ring beam, to form protective plate/wire mesh/diffusor entry module 5 platform for lining.
5th step:As shown in fig. 6, completing protective plate/wire mesh/diffusor entry after dome ontology assembly is completed The introducing and installment work of module 5;
Protective plate/wire mesh/diffusor entry module 5 monomer is introduced by 2 upper space of dome ring beam monomer, is introduced Work equipment is jack and hanging belt.Introducing sequence is external octagonal monomer --- removable steel plate --- steel column --- steel column in inside Between diagonal brace.
6th step:As shown in fig. 7, being completed at the same time upper, annular stair/hoistable platform 6 after dome ontology assembly is completed The introducing and installment work of structures 7 between Passive containment cooling system valve;
Upper, annular stair/introducing of structures 7 can basis between hoistable platform 6 and Passive containment cooling system valve Live practice of construction progress selection monomer introduces or loose mail introduces.It is introduced if monomer, last Pin radial girders list need to be reserved Body;If loose mail introduces, last Pin panel need to be reserved.The mode no matter introduced is loose mail or monomer, and introducing work equipment is The hanging belt and jack of suitable tonnage.

Claims (7)

1. a kind of AP1000 superposed type dome spelling technique, it is characterised in that:AP1000 superposed type dome uses modular construction Dome element precast is become monomer structure in processing workshop by technique, and transport to scene carries out integral assembling, finally using whole The mode of lifting completes construction operation;When on-site consolidation, hereafter lifting ring beam monomer (2) first symmetrically lifts 16 Pin radial girders Monomer (3) then installs 32 Pin horizontal connection beams (4), can start weld job after being adjusted in place, to 8 Pin radial girders monomers (3) after in place, ring beam (8) can be installed, then carry out the lifting and group weldering of cladding boards (15);In ring beam monomer (2), radial girders Monomer (3) and horizontal connection beam (4) in place and are formed after robust structure, and upper, annular stair/hoistable platform is separately introduced (6), structures (7), protective plate/wire mesh/diffusor entry module (5) between Passive containment cooling system valve;It is anti- Backplate/wire mesh/diffusor entry module (5) component is introduced by ring beam space suitable for reading, upper, annular stair/hoistable platform (6) structures (7) pass through dome ontology radial girders monomer (3) or cladding boards between Passive containment cooling system valve (15) reserved space introduces.
2. AP1000 superposed type dome spelling technique according to claim 1, it is characterised in that:The specific steps of the technique Including:Ring beam monomer (2) module spliced is installed into later, in integral hoisting to assembled moulding bed;Ring beam monomer (2) by ring beam (8) and Reinforcing beam (9), rood beam (10) composition, 3 sections of prefabricated factory of ring beam (8) point, on-site assembly;Reinforcing beam (9), rood beam (10) vehicle Between it is prefabricated after loose mail factory, on-site assembly;Ring beam monomer (2) assembling flow path:Ring beam (8) splicing welding joint group is to, spot welding --- adds High-strength bolt is tight for the bolt connection --- ring beam (8) splices seam welding --- of brutal (9), rood beam (10), grill support --- Gu anchor studs repair welding --- live touch-up paint;The reinforcing beam (9) and rood beam (10) of three sections of ring beams (8) and centre are first on ground On be combined into an entirety, then in integral hoisting to moulding bed;Use 12 concrete foundations (11) as ring beam (8) when assembled Assembled moulding bed, basis are the concrete buttress of periphery 32 of dome integral assembling;The lifting of ring beam monomer (2) uses automobile It hangs.
3. AP1000 superposed type dome spelling technique according to claim 1, it is characterised in that:The specific steps of the technique Including:According to ring beam monomer (2) seated position and positioning scenarios, in (3) integral hoisting to assembled moulding bed of radial girders monomer;Diameter To beam monomer (3) totally 16 Pin, including radial girders (12), ring secondary beam (13), back rib channel steel (14), cladding boards (15);Monomer lifting Symmetrically circumferential placement, the truck crane or crawler crane of radial girders monomer (3) lifted using suitable tonnage are needed when in place.
4. AP1000 superposed type dome spelling technique according to claim 1, it is characterised in that:The specific steps of the technique Including:According to the seated position of ring beam monomer (2) and radial girders monomer (3), two polymeric monomer moulds are completed in installation horizontal connection beam (4) The connection of block;Horizontal connection beam (4) construction process:The polishing of horizontal connection beam (4) ora terminalis --- horizontal connection beam (4) is installed just --- horizontal connection beam (4) and ring beam (8) and radial girders (12) weld --- non-destructive testing --- stiffening plate welding --- nothing for position Damage detection --- touch-up paint;
Polishing:First the distance between live ring beam monomer (2) and radial girders monomer (3) are surveyed, then according to actual measurement number Cutting grinding process is carried out according to the both ends to horizontal connection beam (4), is welded again after the leveling of scene;
Installation:Horizontal connection beam (4) installs and uses tower crane or truck crane, and Current Collector Sleave is the hanging belt of suitable tonnage and unloads Button;
Welding:Weld seam during this is full penetration weld;Unilateral double V-groove is opened in upper lower flange, and web opens K-type groove, weldering Before connecing, first the spot welding gusset on the outside of horizontal connection beam (4) both ends up and down flange plate, prevents welding deformation;Electric heating before welding Preheating after reaching preheating temperature, first by 2 welders successively to the flange plate butt weld of 4, horizontal connection beam both ends, carries out pair Linea angulata bottoming, is then staggeredly filled capping again, and capping carries out back chipping, and repair welding back chipping weld seam in back of weld after the completion;
By 2 (4) two end webs of welder's weld horizontal attachment beam after 4 flange plate butt weld dehydrogenations, first to K-type slope Mouth carries out bottom welding, opposite uniform thickness is soldered in back chipping side after weld seam other side back chipping, back chipping after bottoming, then in K-type Groove two sides carry out alternately being soldered to capping completion, carry out dehydrogenation using electric heating immediately after the completion of capping;
Non-destructive testing:After dehydrogenation, horizontal connection beam (4) and radial web coupling part weld seam are polished, and according to setting Meter requires to do relevant detection:100%+100% Magnetic testing of visual detection /+100% ultrasound examination of liquid penetration examination;
Horizontal connection beam (4) and radial girders monomer (3) welding after the completion of, face of weld is polishing to it is concordant with H profile steel, according to NDE requires to be detected, and then carries out the welding of stiffener (17) again;
Connector between two Pin radial girders monomers (3) has ring secondary beam (13) and 3 pieces of steel linear plates (15);Radial girders monomer (3) After adjustment is in place good can installation connecting element, sequence of construction is:Ring secondary beam (13) is --- ring secondary beam (13) welding --- in place --- circumferential panel is in place, and --- bolt connection --- welding of end channel steel --- connects circumferential panel weldering for lossless commission Connect the fastening of --- lossless commission --- high-strength bolt;
When ring secondary beam (13) is assembled, positioned using double plate;Ring secondary beam (13) and cladding boards (15) use truck crane or 1# tower It hangs.
5. AP1000 superposed type dome spelling technique according to claim 1, it is characterised in that:The specific steps of the technique Including:Moulding bed superstructure is removed, protective plate/wire mesh/diffusor entry module (5) platform for lining is assembled;Remove moulding bed When, first tear the crossbeam and fashioned iron diagonal brace between the steel column of outer ring open, after tear diagonal brace between Internal and external cycle steel column open, then remove outer ring steel column Upper semisection, then remove inner ring steel column between crossbeam and fashioned iron diagonal brace, finally remove inner ring steel column upper semisection;To all After component dismounting finishes, bracket is installed, and two ring beams (8) are successively installed on the lower semisection of Internal and external cycle steel column, is formed anti- Backplate/wire mesh/diffusor entry module (5) platform for lining.
6. AP1000 superposed type dome spelling technique according to claim 1, it is characterised in that:The specific steps of the technique Including:After dome ontology assembly is completed, the introducing of protective plate/wire mesh/diffusor entry module (5) and erector are completed Make;Protective plate/wire mesh/diffusor entry module (5) monomer is introduced by dome ring beam monomer (2) upper space, is introduced Work equipment is jack and hanging belt;Introducing sequence is external octagonal monomer --- removable steel plate --- steel column --- steel column in inside Between diagonal brace.
7. AP1000 superposed type dome spelling technique according to claim 1, it is characterised in that:The specific steps of the technique Including:After dome ontology assembly is completed, it is completed at the same time upper, annular stair/hoistable platform (6) and passive containment is cooling The introducing and installment work of structures (7) between system valve;Upper, annular stair/hoistable platform (6) and passive containment are cold But the introducing selection monomer of structures (7) introduces between system valve or loose mail introduces;It is introduced if monomer, last Pin need to be reserved Radial girders monomer (3);If loose mail introduces, last Pin panel need to be reserved;The mode no matter introduced is loose mail or monomer, is introduced Work equipment is the hanging belt and jack of suitable tonnage.
CN201410725710.0A 2014-12-03 2014-12-03 AP1000 superposed type dome spelling technique Active CN105714935B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410725710.0A CN105714935B (en) 2014-12-03 2014-12-03 AP1000 superposed type dome spelling technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410725710.0A CN105714935B (en) 2014-12-03 2014-12-03 AP1000 superposed type dome spelling technique

Publications (2)

Publication Number Publication Date
CN105714935A CN105714935A (en) 2016-06-29
CN105714935B true CN105714935B (en) 2018-11-27

Family

ID=56142905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410725710.0A Active CN105714935B (en) 2014-12-03 2014-12-03 AP1000 superposed type dome spelling technique

Country Status (1)

Country Link
CN (1) CN105714935B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605532A (en) * 2021-07-27 2021-11-05 中国核工业华兴建设有限公司 Method for manufacturing ellipsoidal curved surface net rack steel template
CN114759357B (en) * 2022-04-24 2023-02-28 西安电子科技大学 Expandable mesh antenna based on dome type tensioning integrity
CN114986445B (en) * 2022-06-09 2023-12-01 浙江东南网架股份有限公司 Factory assembling method for spherical reticulated shell dome structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5361550A (en) * 1993-12-08 1994-11-08 The United States Of America As Represented By The Secretary Of The Army Movable hardened air form dome-shaped structure for containing hazardous, toxic, or radioactive airborne releases
JP2003057379A (en) * 2001-08-09 2003-02-26 Mitsubishi Heavy Ind Ltd Nuclear reactor containment assembling construction method
CN102184747A (en) * 2011-03-18 2011-09-14 山东核电设备制造有限公司 Modular steel containment vessel annular hanging beam and assembling method thereof
CN203284883U (en) * 2013-05-07 2013-11-13 中国核工业二四建设有限公司 AP1000 nuclear power dome assembly jig frame
CN103903663A (en) * 2012-12-28 2014-07-02 国家核电技术有限公司 Method for manufacturing large vessel, especially steel containment vessel in nuclear power plant

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5361550A (en) * 1993-12-08 1994-11-08 The United States Of America As Represented By The Secretary Of The Army Movable hardened air form dome-shaped structure for containing hazardous, toxic, or radioactive airborne releases
JP2003057379A (en) * 2001-08-09 2003-02-26 Mitsubishi Heavy Ind Ltd Nuclear reactor containment assembling construction method
CN102184747A (en) * 2011-03-18 2011-09-14 山东核电设备制造有限公司 Modular steel containment vessel annular hanging beam and assembling method thereof
CN103903663A (en) * 2012-12-28 2014-07-02 国家核电技术有限公司 Method for manufacturing large vessel, especially steel containment vessel in nuclear power plant
CN203284883U (en) * 2013-05-07 2013-11-13 中国核工业二四建设有限公司 AP1000 nuclear power dome assembly jig frame

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《AP1000 叠合式穹顶车间预制胎架及防变形施工技术》;张欣亮等;《建筑论坛》;20140430;519-521 *

Also Published As

Publication number Publication date
CN105714935A (en) 2016-06-29

Similar Documents

Publication Publication Date Title
CN101967886B (en) Assembly and installation methods of steel containment vessel of nuclear power station
CN105345288B (en) A kind of method that use motor-driven chain hoist unit equipment installs desulfurizing tower
CN105649332A (en) Building beam and slab construction method
CN106141476B (en) A kind of assemble method of super-large diameter without ribbed stiffener thin-wall semi top seal closure
CN107545937A (en) Nuclear power plant containment shell Leak-tight liner integral type link block structure and its installation method
CN101956457A (en) Method for constructing rectangular steel pipe concrete column
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN105714935B (en) AP1000 superposed type dome spelling technique
CN101347703B (en) Installation technique of metallurgical gas desulfuration absorbing tower
CN103806669A (en) Construction method for H-type steel stiff column with cross fracture surface
CN104743056B (en) The hanging method of ship aluminium alloy segmentation
CN110306782A (en) Reactor building shell dome template and its assembling and construction method
CN106400675A (en) Steel anchor box and mounting method thereof
CN105448366B (en) A kind of installation method of Nuclear Power Station Condensers
CN102226497B (en) Manufacturing method of large rubber rolling curtain sealed dry-type gas holder
CN105803154B (en) Make steel oxygen rifle and fix set of rails assembly/installation method
CN111156011A (en) An improved device for preventing deformation of shield steel sleeve
CN107419907A (en) A kind of steel-making tower steel structure platform is staggered installation of welding method
CN107934778A (en) The lifting erecting device and method of AP1000 nuclear island super large shield doors
CN203486787U (en) Integral lifting device for cabinet top of Wiggins coal gas cabinet
CN112374344A (en) Method for mounting top of large-scale gas tank in steel mill
CN109967975A (en) The method of construction of large-scale floating ship service machine
CN213871393U (en) Protection structure that portal bracing beam lifted
CN103510712A (en) Right-angled-Z-shaped aerial butt-joint construction method of multi-layer H-shaped steel columns
CN117661852A (en) Group holding pole type electric lifting device and installation method of storage tank barrel plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant