CN105672914B - The construction technology of continuous oil pipe operation sledge group - Google Patents

The construction technology of continuous oil pipe operation sledge group Download PDF

Info

Publication number
CN105672914B
CN105672914B CN201610108602.8A CN201610108602A CN105672914B CN 105672914 B CN105672914 B CN 105672914B CN 201610108602 A CN201610108602 A CN 201610108602A CN 105672914 B CN105672914 B CN 105672914B
Authority
CN
China
Prior art keywords
sledge
roller
coiled tubing
oil pipe
injection head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610108602.8A
Other languages
Chinese (zh)
Other versions
CN105672914A (en
Inventor
杨永磊
程龙
乔振亚
修宏宇
陈龙
张洪君
丁文桂
李树全
纪悦涛
张福兴
王吉华
戴明慧
杨显志
王建伟
王建骁
于继业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Jereh Petroleum Equipment and Technologies Co Ltd
Original Assignee
Yantai Jereh Petroleum Equipment and Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yantai Jereh Petroleum Equipment and Technologies Co Ltd filed Critical Yantai Jereh Petroleum Equipment and Technologies Co Ltd
Priority to CN201610108602.8A priority Critical patent/CN105672914B/en
Publication of CN105672914A publication Critical patent/CN105672914A/en
Application granted granted Critical
Publication of CN105672914B publication Critical patent/CN105672914B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/22Handling reeled pipe or rod units, e.g. flexible drilling pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

A kind of construction technology of continuous oil pipe operation sledge group, construction technology step include:(1) operation sledge group is installed, and (2) coiled tubing injection, (3) coiled tubing is fixed, and (4) operation sledge group removes.The construction technology of this continuous oil pipe operation sledge group can carry out removing for coiled tubing, coiled tubing is not in the case where being truncated simultaneously, and operation sledge group is extensible to carry out operation to other well heads, and operating flexibility is strong, utilization rate of equipment and installations is high, operational reliability is strong, more meets the needs of operation field, and equipment usage quantity is few, operation cost is low, coiled tubing need not be destroyed, the consumption of coiled tubing is alleviated, further reduces cost.

Description

The construction technology of continuous oil pipe operation sledge group
Technical field
The present invention relates to oil equipment field, is that a kind of continuous oil pipe operation sledge group carries out coiled tubing specifically The construction technology of lower operation.
Background technology
Long working is carried out, it is necessary to which coiled tubing is put into well when carrying out the operations such as well logging and heavy crude heat extraction, together When, there are multiple wells job requirements simultaneously again.Current operating type could be incited somebody to action, it is necessary to coiled tubing is all proposed from well Equipment removes next well head and carries out operation, in order to meet that it is same that coiled tubing is placed on operation and multiple wells in well for a long time simultaneously Shi Zuoye operating mode needs, it is necessary to removes equipment using more sets, cost is high, and utilization rate of equipment and installations is low.Such as coiled tubing is protected Hold in well, and enable a device to remove, it is necessary to block coiled tubing, the coiled tubing being truncated is difficult to be applied to it In his well, the consumption of resource is indirectly caused, adds operating cost.
The content of the invention
The present invention is directed to above-mentioned the shortcomings of the prior art, it is proposed that a kind of construction work of continuous oil pipe operation sledge group Skill.
The construction technology of the continuous oil pipe operation sledge group of the present invention, the continuous oil pipe operation sledge group include oil pipe roller Sledge, injection head sledge and well control device, the oil pipe roller sledge include roller sledge frame and roller, and the roller is removably mounted on On roller sledge frame;The injection head sledge includes injection sledge frame, injects on sledge frame and installs the injection head main body and gooseneck of opening type;Apply Work processing step is as follows:
1) operation sledge group is installed:Well control device is installed on wellhead assembly, and injection head sledge is installed to above wellhead assembly, will The drive device of drive device and oil pipe roller sledge on injection head sledge is by controlling cable and hydraulic line online.
2) coiled tubing injects:Coiled tubing is removed from roller, then passes sequentially through gooseneck, injection head main body and well Device is controlled, underground is sent to by wellhead assembly, the drive device Driver injection head main body on injection head sledge, carries out coiled tubing Remove.
3) coiled tubing is fixed:After coiled tubing is put into underground setting position, between well control device and roller Coiled tubing both ends installation oil pipe geometrical clamp, coiled tubing and well control device and roller are fixed.
4) operation sledge group removes:Injection head main body is opened, and injection head sledge is removed from wellhead assembly, takes roller sledge frame apart Bindiny mechanism, roller sledge frame is removed.
Preferably, the drive device Driver injection head main body on injection head sledge, the process removed of coiled tubing is carried out In, the drive device driving drum of oil pipe roller sledge provides opposition, and coiled tubing is tensioned.
Preferably, after operation sledge group removes, roller is placed on roller holder, the company between roller and well control device Continuous oil pipe freely hangs placement.
Preferably, before coiled tubing injection, when carrying out operation sledge group installation steps, injection head sledge is installed to well The side of mouth device, the gooseneck of injection head sledge are located above wellhead assembly;When carrying out coiled tubing implantation step, roller is left Coiled tubing is directly conveyed towards well control device by gooseneck, and is sent into underground, the drive device of oil pipe roller sledge by wellhead assembly Driving drum, carry out removing for coiled tubing.
Preferably, after the removal of operation sledge group, roller is installed onto on roller sledge frame, and injection head sledge is installed into well head The side of device, the gooseneck of injection head sledge are located above wellhead assembly, and the coiled tubing between well control device and roller is placed into On the gooseneck of injection head sledge, the oil pipe geometrical clamp on coiled tubing is pulled down, the drive device driving drum of oil pipe roller sledge, is carried out Coiled tubing removes.
The beneficial effects of the invention are as follows:The construction technology of this continuous oil pipe operation sledge group can carry out rising for coiled tubing Under, while coiled tubing, in the case where not being truncated, operation sledge group is extensible to carry out operation, operating flexibility to other well heads By force, utilization rate of equipment and installations is high, and operational reliability is strong, more meets the needs of operation field, equipment usage quantity is few, operation cost It is low, without coiled tubing is destroyed, the consumption of coiled tubing is alleviated, further reduces cost.
Before equipment is removed, coiled tubing is fixed above well control device using oil pipe geometrical clamp, avoids coiled tubing from falling Well, coiled tubing is fixed above roller using oil pipe geometrical clamp, ensure that coiled tubing does not relax on roller, be easy to again The rountrip that equipment carries out coiled tubing is installed.
The process removed of coiled tubing, the drawing of injection head main body and the acting in opposition of roller, make coiled tubing Do not relax tightly, when ensureing coiled tubing rountrip, the fluency of operation.
Under the operating mode of oil equipment has been installed above without using injection head folding and unfolding oil pipe or wellhead assembly, oil pipe rolling The roller of cylinder sledge can provide enough moments of torsion, overcome the deadweight of OIH pipe, can also carry out the rountrip of coiled tubing, Realize the operation under various working, strong adaptability.
Brief description of the drawings
Accompanying drawing 1 is the schematic diagram one of this continuous oil pipe operation sledge group construction technology;
Accompanying drawing 2 is the schematic diagram two of this continuous oil pipe operation sledge group construction technology;
Accompanying drawing 3 is the schematic diagram three of this continuous oil pipe operation sledge group construction technology.
Embodiment
It is detailed in conjunction with appended preferred embodiment in order to further appreciate that structure, feature and the other purposes of the present invention It is described as follows, illustrated preferred embodiment is merely to illustrate technical scheme, and the non-limiting present invention.
The embodiment of the present invention is as follows:
Embodiment one:
As shown in figure 1, continuous oil pipe operation sledge group includes oil pipe roller sledge 1, injection head sledge 2 and well control device 3.
Oil pipe roller sledge 1 is quick-changing type roller sledge, including roller sledge frame 1-1, roller holder 1-2 and roller 1-3.Roller 1-3 is removably mounted on roller sledge frame 1-1, and rotatable in roller sledge frame 1-1, and coiled tubing 7 is wrapped in roller 1-3 On.Drive device is installed, drive device is connected by transmission mechanism with roller 1-3 on oil pipe roller sledge 1.
Injection head sledge 2 is opening type injection head sledge, including injection sledge frame 2-1.Inject on sledge frame 2-1 and the note of opening type is installed Enter a main body 2-2 and gooseneck 2-3.Gooseneck 2-3 is positioned at injection sledge frame 2-1 tops side, the guiding for coiled tubing 7.Injection Head main body 2-2 includes mobile main body and the stationary body being oppositely arranged, and chain group assembly is installed in mobile main body and stationary body, and Driven by drive device, mobile main body and stationary body can be driven by push-pull device at fixed such as the hydraulic jacks installed between the two into Row opening and closing, drive during closure coiled tubing 7 to carry out rountrip, make coiled tubing 7 can be from injection head main body during opening Removed in 2-2.Injection sledge frame 2-1 also can leave the breach that loads and draw off for coiled tubing 7 in correspondence position.
When continuous oil pipe operation sledge group is constructed, carry out as steps described below:
The installation of operation sledge group is carried out first:Well control device 3 is installed on wellhead assembly 4, injection head sledge 2 is installed to well head The top of device 4, by the drive device on injection head sledge 2 and the drive device of oil pipe roller sledge 1 by controlling cable and hydraulic tube Line 5 is online.
Then coiled tubing injection is carried out:Coiled tubing 7 is removed from roller 1-3, then pass sequentially through gooseneck 2-3, Injection head main body 2-2 and well control device 3, underground is sent to by wellhead assembly 4, the drive device driving note on injection head sledge 2 Enter a main body 2-2, injection head main body 2-2 driving coiled tubings 7 move, and carry out removing for coiled tubing 7.On injection head sledge 2 During drive device Driver injection head main body 2-2 carries out the removing of coiled tubing 7, the drive device of oil pipe roller sledge 1 is driven Dynamic roller 1-3 provides opposition, and coiled tubing 7 is tensioned.
Then coiled tubing is carried out to fix:After coiled tubing 7 is put into underground setting position, positioned at the He of well control device 3 The both ends of coiled tubing 7 installation oil pipe geometrical clamp 6 between roller 1-3, coiled tubing 7 and well control device 3 and roller 1-3 are consolidated It is fixed.
Operation sledge group is finally carried out to remove:Injection head main body 2-2 is opened, and coiled tubing 7 moves from injection head main body 2-2 Go out, injection head sledge 2 is removed from wellhead assembly 4, takes roller sledge frame 1-1 bindiny mechanism, roller 1-3 and roller sledge frame 1-1 apart Take apart, roller sledge frame 1-1 is removed, as shown in Figure 2.The equipment removed is sent to other well heads, carries out coiled tubing 7 and removes work Industry.After operation sledge group removes, roller 1-3 is placed on roller holder 1-2, and roller 1-3 is fixed, positioned at roller 1-3 and well The coiled tubing between device 3 is controlled, due to the removal of operation sledge group, the support of structure is lost and stretches drawing, freely hang placement Onto ground.
Embodiment two:
The technical scheme of embodiment two and embodiment one is essentially identical, and difference is:
Before the progress of whole construction operation, if being mounted with oil pumper or other equipment above wellhead assembly, it is impossible to press According to the advancing equipment of embodiment one.As shown in figure 3, when carrying out operation sledge group installation steps, injection head sledge 2 is installed to wellhead assembly 4 side, the gooseneck 2-3 of injection head sledge 2 are located at the top of wellhead assembly 4;When carrying out coiled tubing implantation step, roller 1- is left 3 coiled tubing 7 is directly conveyed towards well control device 3 by gooseneck 2-3, and is sent into underground, oil pipe roller sledge 1 by wellhead assembly 4 Drive device driving drum 1-3, there is provided enough moments of torsion, overcome the deadweight of OIH pipe 7, carry out removing for coiled tubing 7.
Embodiment three:
The technical scheme of embodiment three and embodiment one is essentially identical, and difference is:
After putting down oil pipe in well, because the needs of other operations, it is necessary to remove, now again to coiled tubing 7 Do not change at wellhead assembly, or oil pumper or other equipment have been mounted with above wellhead assembly.Under this operating mode, roller 1-3 is installed onto on roller sledge frame 1-1, and injection head sledge 2 is installed to the side of wellhead assembly 4, the gooseneck 2-3 positions of injection head sledge 2 Above wellhead assembly 4, the coiled tubing 7 between well control device 3 and roller 1-3 is placed on the gooseneck 2-3 of injection head sledge 2, It need not again be put back into injection head main body, pull down the oil pipe geometrical clamp 6 on coiled tubing 7, the drive device of oil pipe roller sledge 1 Driving drum 1-3, there is provided moment of torsion overcomes OIH pipe 7 to conduct oneself with dignity, and carries out removing for coiled tubing 7, saves the activity duration.

Claims (5)

1. a kind of construction technology of continuous oil pipe operation sledge group, the continuous oil pipe operation sledge group includes oil pipe roller sledge, injection Head sledge and well control device, the oil pipe roller sledge include roller sledge frame and roller, and the roller is removably mounted on roller sledge On frame;The injection head sledge includes injection sledge frame, injects on sledge frame and installs the injection head main body and gooseneck of opening type;Its feature exists In:Construction technology step is as follows:
1) operation sledge group is installed:Well control device is installed on wellhead assembly, and injection head sledge is installed to above wellhead assembly, will be injected The drive device of drive device and oil pipe roller sledge on head sledge is by controlling cable and hydraulic line online;
2) coiled tubing injects:Coiled tubing is removed from roller, then passes sequentially through gooseneck, injection head main body and well control dress Put, underground is sent to by wellhead assembly, the drive device Driver injection head main body on injection head sledge, carry out rising for coiled tubing Under;
3) coiled tubing is fixed:After coiled tubing is put into underground setting position, in the company between well control device and roller Continuous oil pipe both ends installation oil pipe geometrical clamp, coiled tubing and well control device and roller are fixed;
4) operation sledge group removes:Injection head main body is opened, and injection head sledge is removed from wellhead assembly, takes roller and roller sledge frame apart Bindiny mechanism, roller sledge frame is removed.
2. the construction technology of continuous oil pipe operation sledge group according to claim 1, it is characterised in that the drive on injection head sledge Dynamic device Driver injection head main body, during carrying out the removing of coiled tubing, the drive device driving drum of oil pipe roller sledge Opposition is provided, coiled tubing is tensioned.
3. the construction technology of continuous oil pipe operation sledge group according to claim 1, it is characterised in that operation sledge group removes Afterwards, roller is placed on roller holder, and the coiled tubing between roller and well control device freely hangs placement.
4. the construction technology of continuous oil pipe operation sledge group according to claim 1, it is characterised in that injected in coiled tubing Before, when carrying out operation sledge group installation steps, injection head sledge is installed to the side of wellhead assembly, the gooseneck of injection head sledge is located at Above wellhead assembly;When carrying out coiled tubing implantation step, the coiled tubing for leaving roller is directly conveyed towards well control dress by gooseneck Put, and underground is sent into by wellhead assembly, the drive device driving drum of oil pipe roller sledge, carry out removing for coiled tubing.
5. the construction technology of continuous oil pipe operation sledge group according to claim 1, it is characterised in that removed in operation sledge group Afterwards, roller is installed onto on roller sledge frame, and injection head sledge is installed to the side of wellhead assembly, and the gooseneck of injection head sledge is located at well Above mouth device, the coiled tubing between well control device and roller is placed on the gooseneck of injection head sledge, pulled down on coiled tubing Oil pipe geometrical clamp, the drive device driving drum of oil pipe roller sledge, carry out removing for coiled tubing.
CN201610108602.8A 2016-02-26 2016-02-26 The construction technology of continuous oil pipe operation sledge group Active CN105672914B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610108602.8A CN105672914B (en) 2016-02-26 2016-02-26 The construction technology of continuous oil pipe operation sledge group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610108602.8A CN105672914B (en) 2016-02-26 2016-02-26 The construction technology of continuous oil pipe operation sledge group

Publications (2)

Publication Number Publication Date
CN105672914A CN105672914A (en) 2016-06-15
CN105672914B true CN105672914B (en) 2018-01-09

Family

ID=56306184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610108602.8A Active CN105672914B (en) 2016-02-26 2016-02-26 The construction technology of continuous oil pipe operation sledge group

Country Status (1)

Country Link
CN (1) CN105672914B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115478796A (en) * 2021-06-16 2022-12-16 中国石油天然气股份有限公司 Coiled tubing injection head mobile device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2457307A1 (en) * 2003-03-07 2004-05-15 Leader Energy Services Corp. Hybrid coiled tubing/fluid pumping unit
GB2435875A (en) * 2006-03-10 2007-09-12 Schlumberger Holdings Lifting a coiled tubing reel
CN202100217U (en) * 2011-06-24 2012-01-04 烟台杰瑞石油装备技术有限公司 Skid-mounted combined type continuous oil pipe device
CN203164004U (en) * 2013-04-10 2013-08-28 烟台杰瑞石油装备技术有限公司 Coiled tubing and coiled tubing equipment testing device
CN204703800U (en) * 2015-02-10 2015-10-14 烟台杰瑞石油装备技术有限公司 A kind of power and control unit sledge and continuous oil pipe operation sledge group thereof
CN204920855U (en) * 2015-09-06 2015-12-30 烟台杰瑞石油装备技术有限公司 A pour into first pylon into for coiled tubing operation

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1590550A2 (en) * 2002-02-19 2005-11-02 Varco I/P, Inc. Subsea intervention system, method and components thereof
US6763890B2 (en) * 2002-06-04 2004-07-20 Schlumberger Technology Corporation Modular coiled tubing system for drilling and production platforms
GB0803231D0 (en) * 2008-02-22 2008-04-02 Qserv Ltd Apparatus and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2457307A1 (en) * 2003-03-07 2004-05-15 Leader Energy Services Corp. Hybrid coiled tubing/fluid pumping unit
GB2435875A (en) * 2006-03-10 2007-09-12 Schlumberger Holdings Lifting a coiled tubing reel
CN202100217U (en) * 2011-06-24 2012-01-04 烟台杰瑞石油装备技术有限公司 Skid-mounted combined type continuous oil pipe device
CN203164004U (en) * 2013-04-10 2013-08-28 烟台杰瑞石油装备技术有限公司 Coiled tubing and coiled tubing equipment testing device
CN204703800U (en) * 2015-02-10 2015-10-14 烟台杰瑞石油装备技术有限公司 A kind of power and control unit sledge and continuous oil pipe operation sledge group thereof
CN204920855U (en) * 2015-09-06 2015-12-30 烟台杰瑞石油装备技术有限公司 A pour into first pylon into for coiled tubing operation

Also Published As

Publication number Publication date
CN105672914A (en) 2016-06-15

Similar Documents

Publication Publication Date Title
CN203614062U (en) Pipe penetrating device and pipe penetrating operation system
US4625796A (en) Well pipe stabbing and back-up apparatus
CN105874151B (en) Rig
WO2007081950B1 (en) Top feed of control lines to a reciprocating spider
CN103437724B (en) A kind of offshore boring island tubing string supporting device
CN103397894A (en) Anchor mechanism and engineering machinery with same
CN105672914B (en) The construction technology of continuous oil pipe operation sledge group
US20130126186A1 (en) Wellbore tubular handling system
CN202832296U (en) Drill rod lifting device on drilling equipment
CN104179465A (en) Iron roughneck
CN104165032B (en) A kind of open coiled tubing infusion appliance and using method thereof
CN103256048B (en) Combine and adopt coal drilling machine group recovery method
CN201193525Y (en) Vehicle-mounted temporary support device for development machine
CN102704477B (en) Cable threading device and method of chain hoist traction anchor cable
CN102061883B (en) Eccentric wheel clamp and method for running casing in drill hole of mine
CN106006237B (en) Coal-winning machine with twisted and released of the cable function
CN204804722U (en) Novel drilling rod power tong
CN204126573U (en) A kind of open coiled tubing injector
CN205225104U (en) Oil pipe sliding device is down played to borehole operation high efficiency in oil field
CN202346715U (en) Integral fast translation device for electric drilling machine
CN102305024B (en) Device for drilling machine for short-distance movement along rail and moving method thereof
CN204727131U (en) Equipment moving control setup and belt feeder mobile control system
CN203978352U (en) Hydraulic pressure sampling underground drill rig
CN205743772U (en) A kind of three-dimensional drill stem conveying device
CN113464138B (en) Coiled tubing water production equipment and technology for non-thin-layer-capable-of-production-protection coal bed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant