CN105672914B - The construction technology of continuous oil pipe operation sledge group - Google Patents
The construction technology of continuous oil pipe operation sledge group Download PDFInfo
- Publication number
- CN105672914B CN105672914B CN201610108602.8A CN201610108602A CN105672914B CN 105672914 B CN105672914 B CN 105672914B CN 201610108602 A CN201610108602 A CN 201610108602A CN 105672914 B CN105672914 B CN 105672914B
- Authority
- CN
- China
- Prior art keywords
- sledge
- roller
- coiled tubing
- oil pipe
- injection head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 238000005516 engineering process Methods 0.000 title claims abstract description 18
- 238000002347 injection Methods 0.000 claims abstract description 64
- 239000007924 injection Substances 0.000 claims abstract description 64
- 238000009434 installation Methods 0.000 claims abstract description 10
- 244000261422 Lysimachia clethroides Species 0.000 claims description 19
- 238000002513 implantation Methods 0.000 claims description 3
- 230000000630 rising effect Effects 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/22—Handling reeled pipe or rod units, e.g. flexible drilling pipes
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
A kind of construction technology of continuous oil pipe operation sledge group, construction technology step include:(1) operation sledge group is installed, and (2) coiled tubing injection, (3) coiled tubing is fixed, and (4) operation sledge group removes.The construction technology of this continuous oil pipe operation sledge group can carry out removing for coiled tubing, coiled tubing is not in the case where being truncated simultaneously, and operation sledge group is extensible to carry out operation to other well heads, and operating flexibility is strong, utilization rate of equipment and installations is high, operational reliability is strong, more meets the needs of operation field, and equipment usage quantity is few, operation cost is low, coiled tubing need not be destroyed, the consumption of coiled tubing is alleviated, further reduces cost.
Description
Technical field
The present invention relates to oil equipment field, is that a kind of continuous oil pipe operation sledge group carries out coiled tubing specifically
The construction technology of lower operation.
Background technology
Long working is carried out, it is necessary to which coiled tubing is put into well when carrying out the operations such as well logging and heavy crude heat extraction, together
When, there are multiple wells job requirements simultaneously again.Current operating type could be incited somebody to action, it is necessary to coiled tubing is all proposed from well
Equipment removes next well head and carries out operation, in order to meet that it is same that coiled tubing is placed on operation and multiple wells in well for a long time simultaneously
Shi Zuoye operating mode needs, it is necessary to removes equipment using more sets, cost is high, and utilization rate of equipment and installations is low.Such as coiled tubing is protected
Hold in well, and enable a device to remove, it is necessary to block coiled tubing, the coiled tubing being truncated is difficult to be applied to it
In his well, the consumption of resource is indirectly caused, adds operating cost.
The content of the invention
The present invention is directed to above-mentioned the shortcomings of the prior art, it is proposed that a kind of construction work of continuous oil pipe operation sledge group
Skill.
The construction technology of the continuous oil pipe operation sledge group of the present invention, the continuous oil pipe operation sledge group include oil pipe roller
Sledge, injection head sledge and well control device, the oil pipe roller sledge include roller sledge frame and roller, and the roller is removably mounted on
On roller sledge frame;The injection head sledge includes injection sledge frame, injects on sledge frame and installs the injection head main body and gooseneck of opening type;Apply
Work processing step is as follows:
1) operation sledge group is installed:Well control device is installed on wellhead assembly, and injection head sledge is installed to above wellhead assembly, will
The drive device of drive device and oil pipe roller sledge on injection head sledge is by controlling cable and hydraulic line online.
2) coiled tubing injects:Coiled tubing is removed from roller, then passes sequentially through gooseneck, injection head main body and well
Device is controlled, underground is sent to by wellhead assembly, the drive device Driver injection head main body on injection head sledge, carries out coiled tubing
Remove.
3) coiled tubing is fixed:After coiled tubing is put into underground setting position, between well control device and roller
Coiled tubing both ends installation oil pipe geometrical clamp, coiled tubing and well control device and roller are fixed.
4) operation sledge group removes:Injection head main body is opened, and injection head sledge is removed from wellhead assembly, takes roller sledge frame apart
Bindiny mechanism, roller sledge frame is removed.
Preferably, the drive device Driver injection head main body on injection head sledge, the process removed of coiled tubing is carried out
In, the drive device driving drum of oil pipe roller sledge provides opposition, and coiled tubing is tensioned.
Preferably, after operation sledge group removes, roller is placed on roller holder, the company between roller and well control device
Continuous oil pipe freely hangs placement.
Preferably, before coiled tubing injection, when carrying out operation sledge group installation steps, injection head sledge is installed to well
The side of mouth device, the gooseneck of injection head sledge are located above wellhead assembly;When carrying out coiled tubing implantation step, roller is left
Coiled tubing is directly conveyed towards well control device by gooseneck, and is sent into underground, the drive device of oil pipe roller sledge by wellhead assembly
Driving drum, carry out removing for coiled tubing.
Preferably, after the removal of operation sledge group, roller is installed onto on roller sledge frame, and injection head sledge is installed into well head
The side of device, the gooseneck of injection head sledge are located above wellhead assembly, and the coiled tubing between well control device and roller is placed into
On the gooseneck of injection head sledge, the oil pipe geometrical clamp on coiled tubing is pulled down, the drive device driving drum of oil pipe roller sledge, is carried out
Coiled tubing removes.
The beneficial effects of the invention are as follows:The construction technology of this continuous oil pipe operation sledge group can carry out rising for coiled tubing
Under, while coiled tubing, in the case where not being truncated, operation sledge group is extensible to carry out operation, operating flexibility to other well heads
By force, utilization rate of equipment and installations is high, and operational reliability is strong, more meets the needs of operation field, equipment usage quantity is few, operation cost
It is low, without coiled tubing is destroyed, the consumption of coiled tubing is alleviated, further reduces cost.
Before equipment is removed, coiled tubing is fixed above well control device using oil pipe geometrical clamp, avoids coiled tubing from falling
Well, coiled tubing is fixed above roller using oil pipe geometrical clamp, ensure that coiled tubing does not relax on roller, be easy to again
The rountrip that equipment carries out coiled tubing is installed.
The process removed of coiled tubing, the drawing of injection head main body and the acting in opposition of roller, make coiled tubing
Do not relax tightly, when ensureing coiled tubing rountrip, the fluency of operation.
Under the operating mode of oil equipment has been installed above without using injection head folding and unfolding oil pipe or wellhead assembly, oil pipe rolling
The roller of cylinder sledge can provide enough moments of torsion, overcome the deadweight of OIH pipe, can also carry out the rountrip of coiled tubing,
Realize the operation under various working, strong adaptability.
Brief description of the drawings
Accompanying drawing 1 is the schematic diagram one of this continuous oil pipe operation sledge group construction technology;
Accompanying drawing 2 is the schematic diagram two of this continuous oil pipe operation sledge group construction technology;
Accompanying drawing 3 is the schematic diagram three of this continuous oil pipe operation sledge group construction technology.
Embodiment
It is detailed in conjunction with appended preferred embodiment in order to further appreciate that structure, feature and the other purposes of the present invention
It is described as follows, illustrated preferred embodiment is merely to illustrate technical scheme, and the non-limiting present invention.
The embodiment of the present invention is as follows:
Embodiment one:
As shown in figure 1, continuous oil pipe operation sledge group includes oil pipe roller sledge 1, injection head sledge 2 and well control device 3.
Oil pipe roller sledge 1 is quick-changing type roller sledge, including roller sledge frame 1-1, roller holder 1-2 and roller 1-3.Roller
1-3 is removably mounted on roller sledge frame 1-1, and rotatable in roller sledge frame 1-1, and coiled tubing 7 is wrapped in roller 1-3
On.Drive device is installed, drive device is connected by transmission mechanism with roller 1-3 on oil pipe roller sledge 1.
Injection head sledge 2 is opening type injection head sledge, including injection sledge frame 2-1.Inject on sledge frame 2-1 and the note of opening type is installed
Enter a main body 2-2 and gooseneck 2-3.Gooseneck 2-3 is positioned at injection sledge frame 2-1 tops side, the guiding for coiled tubing 7.Injection
Head main body 2-2 includes mobile main body and the stationary body being oppositely arranged, and chain group assembly is installed in mobile main body and stationary body, and
Driven by drive device, mobile main body and stationary body can be driven by push-pull device at fixed such as the hydraulic jacks installed between the two into
Row opening and closing, drive during closure coiled tubing 7 to carry out rountrip, make coiled tubing 7 can be from injection head main body during opening
Removed in 2-2.Injection sledge frame 2-1 also can leave the breach that loads and draw off for coiled tubing 7 in correspondence position.
When continuous oil pipe operation sledge group is constructed, carry out as steps described below:
The installation of operation sledge group is carried out first:Well control device 3 is installed on wellhead assembly 4, injection head sledge 2 is installed to well head
The top of device 4, by the drive device on injection head sledge 2 and the drive device of oil pipe roller sledge 1 by controlling cable and hydraulic tube
Line 5 is online.
Then coiled tubing injection is carried out:Coiled tubing 7 is removed from roller 1-3, then pass sequentially through gooseneck 2-3,
Injection head main body 2-2 and well control device 3, underground is sent to by wellhead assembly 4, the drive device driving note on injection head sledge 2
Enter a main body 2-2, injection head main body 2-2 driving coiled tubings 7 move, and carry out removing for coiled tubing 7.On injection head sledge 2
During drive device Driver injection head main body 2-2 carries out the removing of coiled tubing 7, the drive device of oil pipe roller sledge 1 is driven
Dynamic roller 1-3 provides opposition, and coiled tubing 7 is tensioned.
Then coiled tubing is carried out to fix:After coiled tubing 7 is put into underground setting position, positioned at the He of well control device 3
The both ends of coiled tubing 7 installation oil pipe geometrical clamp 6 between roller 1-3, coiled tubing 7 and well control device 3 and roller 1-3 are consolidated
It is fixed.
Operation sledge group is finally carried out to remove:Injection head main body 2-2 is opened, and coiled tubing 7 moves from injection head main body 2-2
Go out, injection head sledge 2 is removed from wellhead assembly 4, takes roller sledge frame 1-1 bindiny mechanism, roller 1-3 and roller sledge frame 1-1 apart
Take apart, roller sledge frame 1-1 is removed, as shown in Figure 2.The equipment removed is sent to other well heads, carries out coiled tubing 7 and removes work
Industry.After operation sledge group removes, roller 1-3 is placed on roller holder 1-2, and roller 1-3 is fixed, positioned at roller 1-3 and well
The coiled tubing between device 3 is controlled, due to the removal of operation sledge group, the support of structure is lost and stretches drawing, freely hang placement
Onto ground.
Embodiment two:
The technical scheme of embodiment two and embodiment one is essentially identical, and difference is:
Before the progress of whole construction operation, if being mounted with oil pumper or other equipment above wellhead assembly, it is impossible to press
According to the advancing equipment of embodiment one.As shown in figure 3, when carrying out operation sledge group installation steps, injection head sledge 2 is installed to wellhead assembly
4 side, the gooseneck 2-3 of injection head sledge 2 are located at the top of wellhead assembly 4;When carrying out coiled tubing implantation step, roller 1- is left
3 coiled tubing 7 is directly conveyed towards well control device 3 by gooseneck 2-3, and is sent into underground, oil pipe roller sledge 1 by wellhead assembly 4
Drive device driving drum 1-3, there is provided enough moments of torsion, overcome the deadweight of OIH pipe 7, carry out removing for coiled tubing 7.
Embodiment three:
The technical scheme of embodiment three and embodiment one is essentially identical, and difference is:
After putting down oil pipe in well, because the needs of other operations, it is necessary to remove, now again to coiled tubing 7
Do not change at wellhead assembly, or oil pumper or other equipment have been mounted with above wellhead assembly.Under this operating mode, roller
1-3 is installed onto on roller sledge frame 1-1, and injection head sledge 2 is installed to the side of wellhead assembly 4, the gooseneck 2-3 positions of injection head sledge 2
Above wellhead assembly 4, the coiled tubing 7 between well control device 3 and roller 1-3 is placed on the gooseneck 2-3 of injection head sledge 2,
It need not again be put back into injection head main body, pull down the oil pipe geometrical clamp 6 on coiled tubing 7, the drive device of oil pipe roller sledge 1
Driving drum 1-3, there is provided moment of torsion overcomes OIH pipe 7 to conduct oneself with dignity, and carries out removing for coiled tubing 7, saves the activity duration.
Claims (5)
1. a kind of construction technology of continuous oil pipe operation sledge group, the continuous oil pipe operation sledge group includes oil pipe roller sledge, injection
Head sledge and well control device, the oil pipe roller sledge include roller sledge frame and roller, and the roller is removably mounted on roller sledge
On frame;The injection head sledge includes injection sledge frame, injects on sledge frame and installs the injection head main body and gooseneck of opening type;Its feature exists
In:Construction technology step is as follows:
1) operation sledge group is installed:Well control device is installed on wellhead assembly, and injection head sledge is installed to above wellhead assembly, will be injected
The drive device of drive device and oil pipe roller sledge on head sledge is by controlling cable and hydraulic line online;
2) coiled tubing injects:Coiled tubing is removed from roller, then passes sequentially through gooseneck, injection head main body and well control dress
Put, underground is sent to by wellhead assembly, the drive device Driver injection head main body on injection head sledge, carry out rising for coiled tubing
Under;
3) coiled tubing is fixed:After coiled tubing is put into underground setting position, in the company between well control device and roller
Continuous oil pipe both ends installation oil pipe geometrical clamp, coiled tubing and well control device and roller are fixed;
4) operation sledge group removes:Injection head main body is opened, and injection head sledge is removed from wellhead assembly, takes roller and roller sledge frame apart
Bindiny mechanism, roller sledge frame is removed.
2. the construction technology of continuous oil pipe operation sledge group according to claim 1, it is characterised in that the drive on injection head sledge
Dynamic device Driver injection head main body, during carrying out the removing of coiled tubing, the drive device driving drum of oil pipe roller sledge
Opposition is provided, coiled tubing is tensioned.
3. the construction technology of continuous oil pipe operation sledge group according to claim 1, it is characterised in that operation sledge group removes
Afterwards, roller is placed on roller holder, and the coiled tubing between roller and well control device freely hangs placement.
4. the construction technology of continuous oil pipe operation sledge group according to claim 1, it is characterised in that injected in coiled tubing
Before, when carrying out operation sledge group installation steps, injection head sledge is installed to the side of wellhead assembly, the gooseneck of injection head sledge is located at
Above wellhead assembly;When carrying out coiled tubing implantation step, the coiled tubing for leaving roller is directly conveyed towards well control dress by gooseneck
Put, and underground is sent into by wellhead assembly, the drive device driving drum of oil pipe roller sledge, carry out removing for coiled tubing.
5. the construction technology of continuous oil pipe operation sledge group according to claim 1, it is characterised in that removed in operation sledge group
Afterwards, roller is installed onto on roller sledge frame, and injection head sledge is installed to the side of wellhead assembly, and the gooseneck of injection head sledge is located at well
Above mouth device, the coiled tubing between well control device and roller is placed on the gooseneck of injection head sledge, pulled down on coiled tubing
Oil pipe geometrical clamp, the drive device driving drum of oil pipe roller sledge, carry out removing for coiled tubing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610108602.8A CN105672914B (en) | 2016-02-26 | 2016-02-26 | The construction technology of continuous oil pipe operation sledge group |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610108602.8A CN105672914B (en) | 2016-02-26 | 2016-02-26 | The construction technology of continuous oil pipe operation sledge group |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105672914A CN105672914A (en) | 2016-06-15 |
CN105672914B true CN105672914B (en) | 2018-01-09 |
Family
ID=56306184
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610108602.8A Active CN105672914B (en) | 2016-02-26 | 2016-02-26 | The construction technology of continuous oil pipe operation sledge group |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105672914B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115478796A (en) * | 2021-06-16 | 2022-12-16 | 中国石油天然气股份有限公司 | Coiled tubing injection head mobile device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2457307A1 (en) * | 2003-03-07 | 2004-05-15 | Leader Energy Services Corp. | Hybrid coiled tubing/fluid pumping unit |
GB2435875A (en) * | 2006-03-10 | 2007-09-12 | Schlumberger Holdings | Lifting a coiled tubing reel |
CN202100217U (en) * | 2011-06-24 | 2012-01-04 | 烟台杰瑞石油装备技术有限公司 | Skid-mounted combined type continuous oil pipe device |
CN203164004U (en) * | 2013-04-10 | 2013-08-28 | 烟台杰瑞石油装备技术有限公司 | Coiled tubing and coiled tubing equipment testing device |
CN204703800U (en) * | 2015-02-10 | 2015-10-14 | 烟台杰瑞石油装备技术有限公司 | A kind of power and control unit sledge and continuous oil pipe operation sledge group thereof |
CN204920855U (en) * | 2015-09-06 | 2015-12-30 | 烟台杰瑞石油装备技术有限公司 | A pour into first pylon into for coiled tubing operation |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1590550A2 (en) * | 2002-02-19 | 2005-11-02 | Varco I/P, Inc. | Subsea intervention system, method and components thereof |
US6763890B2 (en) * | 2002-06-04 | 2004-07-20 | Schlumberger Technology Corporation | Modular coiled tubing system for drilling and production platforms |
GB0803231D0 (en) * | 2008-02-22 | 2008-04-02 | Qserv Ltd | Apparatus and method |
-
2016
- 2016-02-26 CN CN201610108602.8A patent/CN105672914B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2457307A1 (en) * | 2003-03-07 | 2004-05-15 | Leader Energy Services Corp. | Hybrid coiled tubing/fluid pumping unit |
GB2435875A (en) * | 2006-03-10 | 2007-09-12 | Schlumberger Holdings | Lifting a coiled tubing reel |
CN202100217U (en) * | 2011-06-24 | 2012-01-04 | 烟台杰瑞石油装备技术有限公司 | Skid-mounted combined type continuous oil pipe device |
CN203164004U (en) * | 2013-04-10 | 2013-08-28 | 烟台杰瑞石油装备技术有限公司 | Coiled tubing and coiled tubing equipment testing device |
CN204703800U (en) * | 2015-02-10 | 2015-10-14 | 烟台杰瑞石油装备技术有限公司 | A kind of power and control unit sledge and continuous oil pipe operation sledge group thereof |
CN204920855U (en) * | 2015-09-06 | 2015-12-30 | 烟台杰瑞石油装备技术有限公司 | A pour into first pylon into for coiled tubing operation |
Also Published As
Publication number | Publication date |
---|---|
CN105672914A (en) | 2016-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203614062U (en) | Pipe penetrating device and pipe penetrating operation system | |
US4625796A (en) | Well pipe stabbing and back-up apparatus | |
CN105874151B (en) | Rig | |
WO2007081950B1 (en) | Top feed of control lines to a reciprocating spider | |
CN103437724B (en) | A kind of offshore boring island tubing string supporting device | |
CN103397894A (en) | Anchor mechanism and engineering machinery with same | |
CN105672914B (en) | The construction technology of continuous oil pipe operation sledge group | |
US20130126186A1 (en) | Wellbore tubular handling system | |
CN202832296U (en) | Drill rod lifting device on drilling equipment | |
CN104179465A (en) | Iron roughneck | |
CN104165032B (en) | A kind of open coiled tubing infusion appliance and using method thereof | |
CN103256048B (en) | Combine and adopt coal drilling machine group recovery method | |
CN201193525Y (en) | Vehicle-mounted temporary support device for development machine | |
CN102704477B (en) | Cable threading device and method of chain hoist traction anchor cable | |
CN102061883B (en) | Eccentric wheel clamp and method for running casing in drill hole of mine | |
CN106006237B (en) | Coal-winning machine with twisted and released of the cable function | |
CN204804722U (en) | Novel drilling rod power tong | |
CN204126573U (en) | A kind of open coiled tubing injector | |
CN205225104U (en) | Oil pipe sliding device is down played to borehole operation high efficiency in oil field | |
CN202346715U (en) | Integral fast translation device for electric drilling machine | |
CN102305024B (en) | Device for drilling machine for short-distance movement along rail and moving method thereof | |
CN204727131U (en) | Equipment moving control setup and belt feeder mobile control system | |
CN203978352U (en) | Hydraulic pressure sampling underground drill rig | |
CN205743772U (en) | A kind of three-dimensional drill stem conveying device | |
CN113464138B (en) | Coiled tubing water production equipment and technology for non-thin-layer-capable-of-production-protection coal bed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |