CN105625742A - 砖墙加固结构 - Google Patents
砖墙加固结构 Download PDFInfo
- Publication number
- CN105625742A CN105625742A CN201610127817.4A CN201610127817A CN105625742A CN 105625742 A CN105625742 A CN 105625742A CN 201610127817 A CN201610127817 A CN 201610127817A CN 105625742 A CN105625742 A CN 105625742A
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- brick wall
- horizontal
- cuff
- anchor rib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 98
- 239000011449 brick Substances 0.000 title claims abstract description 53
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 15
- 239000002344 surface layer Substances 0.000 claims abstract description 9
- 239000002002 slurry Substances 0.000 claims description 26
- 235000019353 potassium silicate Nutrition 0.000 claims description 24
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 claims description 24
- 239000004568 cement Substances 0.000 claims description 23
- 230000002787 reinforcement Effects 0.000 claims description 14
- CTQNGGLPUBDAKN-UHFFFAOYSA-N O-Xylene Chemical compound CC1=CC=CC=C1C CTQNGGLPUBDAKN-UHFFFAOYSA-N 0.000 claims description 12
- 210000002966 serum Anatomy 0.000 claims description 12
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 claims description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 238000000034 method Methods 0.000 claims description 7
- 238000010276 construction Methods 0.000 claims description 6
- 238000010790 dilution Methods 0.000 claims description 6
- 239000012895 dilution Substances 0.000 claims description 6
- 239000000428 dust Substances 0.000 claims description 6
- 230000011218 segmentation Effects 0.000 claims description 6
- 238000013022 venting Methods 0.000 claims description 6
- 208000003044 Closed Fractures Diseases 0.000 claims description 3
- 230000001680 brushing effect Effects 0.000 claims description 3
- 239000004567 concrete Substances 0.000 claims description 3
- 239000003822 epoxy resin Substances 0.000 claims description 3
- 238000003973 irrigation Methods 0.000 claims description 3
- 230000002262 irrigation Effects 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 3
- 239000011505 plaster Substances 0.000 claims description 3
- 229920000647 polyepoxide Polymers 0.000 claims description 3
- 239000011241 protective layer Substances 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 239000000377 silicon dioxide Substances 0.000 claims description 3
- 239000002699 waste material Substances 0.000 claims description 3
- 238000004873 anchoring Methods 0.000 abstract 4
- 239000011083 cement mortar Substances 0.000 abstract 1
- 239000010410 layer Substances 0.000 abstract 1
- 238000005260 corrosion Methods 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- OFCNXPDARWKPPY-UHFFFAOYSA-N allopurinol Chemical compound OC1=NC=NC2=C1C=NN2 OFCNXPDARWKPPY-UHFFFAOYSA-N 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
本发明公开了一种砖墙加固结构,其特征是砖墙在灰缝部位设置钢筋套箍,不同排钢筋套箍错位布置,钢筋套箍的钢筋穿过砖墙水平灰缝形成闭合套箍,砖墙表面设置水平钢筋,水平钢筋受锚固筋固定完毕后进行采用分段预应力张拉,分段预应力张拉长度单元为同排相邻钢筋套箍的距离,水平钢筋经张拉后变成折线钢筋,相邻排张拉长度最大处的折线钢筋采用钢筋拉条焊接固定,钢筋拉条与预留在砖墙内的锚固筋焊接,锚固筋直径采用8~10mm,锚固筋伸入砖墙预留孔,预应力张拉完毕后水泥砂浆抹面作为保护层,水泥砂浆面层厚度采用25~30mm,折线钢筋外侧挂设钢筋网。
Description
技术领域
本发明涉及一种加固结构,特别涉及一种砖墙加固结构。
背景技术
砖墙出现承载力不够时要进行加固,单纯采用钢筋加固效果并不好,由于后加的加固钢筋在承载时难以与原有的砖墙形成整体,即原有的砖墙在承载时先发挥作用,而后加的加固钢筋后发挥作用,甚至要在原有的砖墙达到极限时才参与承载,这样加固构件会处于不安全状态,在较大的承载力下会出现脆性破坏,如何使后加的加固钢筋和砖墙协同受力是工程技术人员要面对的课题。
发明内容
本发明是提供一种砖墙加固结构,解决加固钢筋和砖墙不能协同受力的问题。
本发明中砖墙在灰缝部位每隔2.5~3m设置钢筋套箍,钢筋套箍直径采用8~10mm,不同排钢筋套箍错位布置,钢筋套箍的钢筋穿过砖墙水平灰缝形成闭合套箍,砖墙表面设置水平钢筋,水平钢筋竖向间距为150~300mm,水平钢筋直径采用8~10mm,水平钢筋受水平钢筋锚固筋固定完毕后进行采用分段预应力张拉,分段预应力张拉长度单元为同排相邻钢筋套箍的距离,水平钢筋经张拉后变成折线钢筋,相邻排张拉长度最大处的折线钢筋采用钢筋拉条焊接固定,钢筋拉条与预留在砖墙内的锚固筋焊接,锚固筋直径采用8~10mm,锚固筋伸入砖墙预留孔,预应力张拉完毕后水泥砂浆抹面作为保护层,以防钢筋腐蚀和徐变。水泥砂浆面层厚度采用25~30mm,为了使水泥砂浆面层和砖墙表面的钢筋形成整体,折线钢筋外侧挂设钢筋网,钢筋网所采用的钢筋直径为6mm,间距为200m。
施工步骤包括:
(1)清理墙体裂缝
由于墙体如果存在裂缝,会使裂缝在预应力张拉时产生压缩变形,造成预应力损失,达不到卸荷加固的目的,因此对墙体裂缝必须进行加固。
采用水玻璃混合浆液灌缝,水玻璃混合浆液制作如下:先用二甲苯将水玻璃稀释,二甲苯与水玻璃重量比为0.3,再将稀释后的水玻璃浆液与水泥混合,稀释后的水玻璃浆液与水泥的重量比为0.5,形成水玻璃混合浆液。
操作时先用钢丝刷将裂缝两侧各100mm宽混凝土表面的灰尘、浮渣清除干净,再用水玻璃混合浆液封闭裂缝。每隔700mm将针头固定在裂缝较宽处,并在两针头中间留2mm空间不封闭作排气孔,用高压灌浆泵逐个套接针头,将浆液压入裂缝内,直至与针头相邻的排气孔流出浆液为止。第一次灌浆完毕后停30min再进行二次补灌。经2d养护方可进入预应力施张作业。
(2)设置锚固筋和钢筋套箍
砖墙钻设预留孔,预留孔直径比锚固筋大2~3mm,钻孔完毕后送风吹净孔眼内的粉尘,再将锚固筋放入预留孔,锚固筋和预留孔之间空隙填塞环氧树脂砂浆。
钢筋套箍穿过砖墙水平灰缝焊接成闭合套箍。
(3)安装水平钢筋
水平钢筋与钢筋套箍焊接。
(4)水平钢筋预应力张拉
预应力张拉采用杠杆式夹紧工具,杠杆式夹紧工具的阻力臂与动力臂的比值为0.1~0.015。
由于在预应力张拉过程中会涉及杠杆式夹紧工具多次夹拢造成的应力损失,钢筋拉条与锚固筋焊接的应力损失,钢筋松弛的应力损失,故水平钢筋预应力采用超张拉,表1为不同张拉长度的预应力损失系数情况,根据大量试验结果,采用控制应力超张拉9%。
表1不同张拉长度的预应力损失系数
张拉长度 | 2.5m | 2.6m | 2.7m | 2.8m | 2.9m | 3m |
1次 | 0.091 | 0.089 | 0.089 | 0.090 | 0.091 | 0.088 |
2次 | 0.089 | 0.091 | 0.090 | 0.091 | 0.090 | 0.090 |
3次 | 0.088 | 0.090 | 0.092 | 0.090 | 0.089 | 0.089 |
4次 | 0.090 | 0.092 | 0.090 | 0.088 | 0.090 | 0.091 |
5次 | 0.092 | 0.090 | 0.091 | 0.090 | 0.088 | 0.090 |
6次 | 0.091 | 0.088 | 0.088 | 0.092 | 0.090 | 0.092 |
(5)水泥砂浆面层施工
安装钢筋网的对拉钢筋,对拉钢筋直径采用10mm,挂设后钢筋网后涂刷水泥砂浆,水泥砂浆面层分三次成活,每次抹灰厚度为8~10mm。完成后喷水养护不得少于7天。
本发明所采用的钢筋套箍、钢筋拉条、锚固筋均可以采用钢筋废料进行加工,所以成本较低。
本发明通过预应力钢筋与砖墙成为整体,对降低砖墙的应力水平和发挥预应力钢筋的承载能力起了很大的作用,所以力学性能较好。本发明施工操作方便,可靠性强。
附图说明
图1为砖墙加固结构示意图。
各附图中:1、钢筋套箍,2、折线钢筋,3、钢筋拉条,4、锚固筋,5、砖墙,6、水平钢筋。
具体实施方式
实施例中砖墙5在灰缝部位每隔2.5~3m设置钢筋套箍1,钢筋套箍1直径采用8~10mm,不同排钢筋套箍1错位布置,钢筋套箍1的钢筋穿过砖墙5水平灰缝形成闭合套箍,砖墙5表面设置水平钢筋6,水平钢筋6竖向间距为150~300mm,水平钢筋6直径采用8~10mm,水平钢筋6受锚固筋4固定完毕后进行采用分段预应力张拉,分段预应力张拉长度单元为同排相邻钢筋套箍1的距离,水平钢筋6经张拉后变成折线钢筋2,相邻排张拉长度最大处的折线钢筋2采用钢筋拉条3焊接固定,钢筋拉条3与预留在砖墙5内的锚固筋4焊接,锚固筋4直径采用8~10mm,锚固筋4伸入砖墙5预留孔,预应力张拉完毕后水泥砂浆抹面作为保护层,以防钢筋腐蚀和徐变。水泥砂浆面层厚度采用25~30mm,为了使水泥砂浆面层和砖墙5表面的钢筋形成整体,折线钢筋2外侧挂设钢筋网,钢筋网所采用的钢筋直径为6mm,间距为200m。
施工步骤包括:
(1)清理墙体裂缝
采用水玻璃混合浆液灌缝,水玻璃混合浆液制作如下:先用二甲苯将水玻璃稀释,二甲苯与水玻璃重量比为0.3,再将稀释后的水玻璃浆液与水泥混合,稀释后的水玻璃浆液与水泥的重量比为0.5,形成水玻璃混合浆液。
操作时先用钢丝刷将裂缝两侧各100mm宽混凝土表面的灰尘、浮渣清除干净,再用水玻璃混合浆液封闭裂缝。每隔700mm将针头固定在裂缝较宽处,并在两针头中间留2mm空间不封闭作排气孔,用高压灌浆泵逐个套接针头,将浆液压入裂缝内,直至与针头相邻的排气孔流出浆液为止。第一次灌浆完毕后停30min再进行二次补灌。经2d养护方可进入预应力施张作业。
(2)设置锚固筋4和钢筋套箍1
砖墙5钻设预留孔,预留孔直径比锚固筋4大2~3mm,钻孔完毕后送风吹净孔眼内的粉尘,再将锚固筋4放入预留孔,锚固筋4和预留孔之间空隙填塞环氧树脂砂浆。
钢筋套箍1穿过砖墙5水平灰缝焊接成闭合套箍。
(3)安装水平钢筋6
水平钢筋6与钢筋套箍1焊接。
(4)水平钢筋6预应力张拉
预应力张拉采用杠杆式夹紧工具,杠杆式夹紧工具的阻力臂与动力臂的比值为0.1~0.015。
水平钢筋6预应力采用超张拉,采用控制应力超张拉9%。
(5)水泥砂浆面层施工
安装钢筋网的对拉钢筋,对拉钢筋直径采用10mm,挂设后钢筋网后涂刷水泥砂浆,水泥砂浆面层分三次成活,每次抹灰厚度为8~10mm。完成后喷水养护不得少于7天。
实施例所采用的钢筋套箍1、钢筋拉条3、锚固筋4采用钢筋废料进行加工。
Claims (8)
1.一种砖墙加固结构,其特征是砖墙在灰缝部位设置钢筋套箍,不同排钢筋套箍错位布置,钢筋套箍的钢筋穿过砖墙水平灰缝形成闭合套箍,砖墙表面设置水平钢筋,水平钢筋受锚固筋固定完毕后进行采用分段预应力张拉,分段预应力张拉长度单元为同排相邻钢筋套箍的距离,水平钢筋经张拉后变成折线钢筋,相邻排张拉长度最大处的折线钢筋采用钢筋拉条焊接固定,钢筋拉条与预留在砖墙内的锚固筋焊接,锚固筋直径采用8~10mm,锚固筋伸入砖墙预留孔,预应力张拉完毕后水泥砂浆抹面作为保护层,水泥砂浆面层厚度采用25~30mm,折线钢筋外侧挂设钢筋网。
2.根据权利要求1所述的砖墙加固结构,其特征是施工步骤包括:
(1)清理墙体裂缝
采用水玻璃混合浆液灌缝,水玻璃混合浆液制作如下:先用二甲苯将水玻璃稀释,二甲苯与水玻璃重量比为0.3,再将稀释后的水玻璃浆液与水泥混合,稀释后的水玻璃浆液与水泥的重量比为0.5,形成水玻璃混合浆液;
操作时先用钢丝刷将裂缝两侧各100mm宽混凝土表面的灰尘、浮渣清除干净,再用水玻璃混合浆液封闭裂缝;每隔700mm将针头固定在裂缝较宽处,并在两针头中间留2mm空间不封闭作排气孔,用高压灌浆泵逐个套接针头,将浆液压入裂缝内,直至与针头相邻的排气孔流出浆液为止;第一次灌浆完毕后停30min再进行二次补灌;经2d养护方可进入预应力施张作业;
(2)设置锚固筋和钢筋套箍
砖墙钻设预留孔,预留孔直径比锚固筋大2~3mm,钻孔完毕后送风吹净孔眼内的粉尘,再将锚固筋放入预留孔,锚固筋和预留孔之间空隙填塞环氧树脂砂浆;
钢筋套箍穿过砖墙水平灰缝焊接成闭合套箍;
(3)安装水平钢筋
水平钢筋与钢筋套箍焊接;
(4)水平钢筋预应力张拉
预应力张拉采用杠杆式夹紧工具,杠杆式夹紧工具的阻力臂与动力臂的比值为0.1~0.015;
(5)水泥砂浆面层施工
安装钢筋网的对拉钢筋,对拉钢筋直径采用10mm,挂设后钢筋网后涂刷水泥砂浆,完成后喷水养护不得少于7天。
3.根据权利要求1所述的砖墙加固结构,其特征是砖墙在灰缝部位每隔2.5~3m设置钢筋套箍,钢筋套箍直径采用8~10mm。
4.根据权利要求4所述的砖墙加固结构,其特征是水平钢筋竖向间距为150~300mm,水平钢筋直径采用8~10mm。
5.根据权利要求1所述的砖墙加固结构,其特征是钢筋网所采用的钢筋直径为6mm,间距为200m。
6.根据权利要求1所述的砖墙加固结构,其特征是水平钢筋预应力采用超张拉,采用控制应力超张拉9%。
7.根据权利要求4所述的砖墙加固结构,其特征是水泥砂浆面层分三次成活,每次抹灰厚度为8~10mm。
8.根据权利要求4所述的砖墙加固结构,其特征是钢筋套箍、钢筋拉条、锚固筋采用钢筋废料进行加工。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610127817.4A CN105625742B (zh) | 2016-02-17 | 2016-02-17 | 砖墙加固结构 |
CN201710555532.5A CN107227860B (zh) | 2016-02-17 | 2016-02-17 | 砖墙预应力加固结构 |
CN201710558577.8A CN107165436B (zh) | 2016-02-17 | 2016-02-17 | 砖墙加固构造 |
CN201710555531.0A CN107386676B (zh) | 2016-02-17 | 2016-02-17 | 砖墙加固施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610127817.4A CN105625742B (zh) | 2016-02-17 | 2016-02-17 | 砖墙加固结构 |
Related Child Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710558577.8A Division CN107165436B (zh) | 2016-02-17 | 2016-02-17 | 砖墙加固构造 |
CN201710555531.0A Division CN107386676B (zh) | 2016-02-17 | 2016-02-17 | 砖墙加固施工方法 |
CN201710555532.5A Division CN107227860B (zh) | 2016-02-17 | 2016-02-17 | 砖墙预应力加固结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105625742A true CN105625742A (zh) | 2016-06-01 |
CN105625742B CN105625742B (zh) | 2017-12-15 |
Family
ID=56041047
Family Applications (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710555531.0A Active CN107386676B (zh) | 2016-02-17 | 2016-02-17 | 砖墙加固施工方法 |
CN201710555532.5A Expired - Fee Related CN107227860B (zh) | 2016-02-17 | 2016-02-17 | 砖墙预应力加固结构 |
CN201710558577.8A Expired - Fee Related CN107165436B (zh) | 2016-02-17 | 2016-02-17 | 砖墙加固构造 |
CN201610127817.4A Expired - Fee Related CN105625742B (zh) | 2016-02-17 | 2016-02-17 | 砖墙加固结构 |
Family Applications Before (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710555531.0A Active CN107386676B (zh) | 2016-02-17 | 2016-02-17 | 砖墙加固施工方法 |
CN201710555532.5A Expired - Fee Related CN107227860B (zh) | 2016-02-17 | 2016-02-17 | 砖墙预应力加固结构 |
CN201710558577.8A Expired - Fee Related CN107165436B (zh) | 2016-02-17 | 2016-02-17 | 砖墙加固构造 |
Country Status (1)
Country | Link |
---|---|
CN (4) | CN107386676B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108505553A (zh) * | 2017-01-21 | 2018-09-07 | 叶长青 | 条形基础砖混建筑物的纠偏方法 |
CN108560949A (zh) * | 2018-06-28 | 2018-09-21 | 中冶建工集团有限公司 | 土坯墙外立面加固结构及土坯墙外立面加固方法 |
JP2018178646A (ja) * | 2017-04-20 | 2018-11-15 | 清水建設株式会社 | 組積造の補強構造及び補強方法 |
CN113417222A (zh) * | 2021-08-02 | 2021-09-21 | 杨伟涛 | 一种道路桥梁裂缝处理装置 |
CN116335432A (zh) * | 2023-03-31 | 2023-06-27 | 江苏海洋大学 | 一种嵌入式t型钢-砂浆钢筋网片加固毛石墙体的方法 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112049461B (zh) * | 2020-07-27 | 2022-05-17 | 成龙建设集团有限公司 | 一种古建筑砖墙的加固方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010281033A (ja) * | 2009-06-02 | 2010-12-16 | Takenaka Komuten Co Ltd | 組積造壁の補強工法及び組積造構造物。 |
CN202925925U (zh) * | 2012-11-04 | 2013-05-08 | 西安建筑科技大学 | 一种砖砌体墙加固装置 |
CN202925922U (zh) * | 2012-11-04 | 2013-05-08 | 西安建筑科技大学 | 一种砖砌体墙的组合加固装置 |
CN103835521A (zh) * | 2012-11-20 | 2014-06-04 | 贵阳铝镁设计研究院有限公司 | 一种砖墙的加固方法及结构 |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100654781B1 (ko) * | 2006-02-20 | 2006-12-08 | 이완섭 | 조적벽체 보강 공법 |
JP2010242393A (ja) * | 2009-04-07 | 2010-10-28 | Shimizu Corp | 耐震補強構造 |
RU2431727C1 (ru) * | 2010-02-01 | 2011-10-20 | Федеральное государственное учреждение высшего профессионального образования "Орловский государственный аграрный университет" (ФГОУ ВПО ОрелГАУ) | Способ усиления изгибаемых монолитных железобетонных конструкций и устройство для его осуществления |
CN201943212U (zh) * | 2010-12-22 | 2011-08-24 | 上海维固工程实业有限公司 | 砖墙加固结构 |
CN202431015U (zh) * | 2011-12-20 | 2012-09-12 | 陕西省建筑科学研究院 | 一种建筑用砌体墙加固装置 |
DE102012109950A1 (de) * | 2012-10-18 | 2014-05-08 | Hering Bau Gmbh & Co. Kg | Verbundsystem zur Verstärkung von Bauteilen |
CN103352581B (zh) * | 2013-07-09 | 2015-12-09 | 北京筑福国际工程技术有限责任公司 | 采用内部预应力钢筋锚杆加固烧结粘土砖砌体结构的方法 |
CN103912133B (zh) * | 2014-03-19 | 2016-01-13 | 华北水利水电大学 | 框架梁横向张拉预应力碳纤维片材加固方法 |
CN203905526U (zh) * | 2014-05-06 | 2014-10-29 | 北京筑福建筑事务有限责任公司 | 砌体灰缝加固结构 |
CN104405139B (zh) * | 2014-12-03 | 2017-01-11 | 西南科技大学 | 石砌墙体加固方法 |
CN204703545U (zh) * | 2015-05-05 | 2015-10-14 | 北京中建建筑设计院有限公司 | 一种用于砖混板墙的加固生根结构 |
-
2016
- 2016-02-17 CN CN201710555531.0A patent/CN107386676B/zh active Active
- 2016-02-17 CN CN201710555532.5A patent/CN107227860B/zh not_active Expired - Fee Related
- 2016-02-17 CN CN201710558577.8A patent/CN107165436B/zh not_active Expired - Fee Related
- 2016-02-17 CN CN201610127817.4A patent/CN105625742B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010281033A (ja) * | 2009-06-02 | 2010-12-16 | Takenaka Komuten Co Ltd | 組積造壁の補強工法及び組積造構造物。 |
CN202925925U (zh) * | 2012-11-04 | 2013-05-08 | 西安建筑科技大学 | 一种砖砌体墙加固装置 |
CN202925922U (zh) * | 2012-11-04 | 2013-05-08 | 西安建筑科技大学 | 一种砖砌体墙的组合加固装置 |
CN103835521A (zh) * | 2012-11-20 | 2014-06-04 | 贵阳铝镁设计研究院有限公司 | 一种砖墙的加固方法及结构 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108505553A (zh) * | 2017-01-21 | 2018-09-07 | 叶长青 | 条形基础砖混建筑物的纠偏方法 |
CN108532655A (zh) * | 2017-01-21 | 2018-09-14 | 叶长青 | 砖混建筑物的纠偏施工方法 |
JP2018178646A (ja) * | 2017-04-20 | 2018-11-15 | 清水建設株式会社 | 組積造の補強構造及び補強方法 |
CN108560949A (zh) * | 2018-06-28 | 2018-09-21 | 中冶建工集团有限公司 | 土坯墙外立面加固结构及土坯墙外立面加固方法 |
CN108560949B (zh) * | 2018-06-28 | 2024-06-04 | 中冶建工集团有限公司 | 土坯墙外立面加固结构及土坯墙外立面加固方法 |
CN113417222A (zh) * | 2021-08-02 | 2021-09-21 | 杨伟涛 | 一种道路桥梁裂缝处理装置 |
CN113417222B (zh) * | 2021-08-02 | 2022-07-29 | 杨伟涛 | 一种道路桥梁裂缝处理装置 |
CN116335432A (zh) * | 2023-03-31 | 2023-06-27 | 江苏海洋大学 | 一种嵌入式t型钢-砂浆钢筋网片加固毛石墙体的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107386676B (zh) | 2019-03-08 |
CN107227860B (zh) | 2019-06-11 |
CN107227860A (zh) | 2017-10-03 |
CN107386676A (zh) | 2017-11-24 |
CN105625742B (zh) | 2017-12-15 |
CN107165436A (zh) | 2017-09-15 |
CN107165436B (zh) | 2020-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105625742A (zh) | 砖墙加固结构 | |
CN204326567U (zh) | 一种钢筋混凝土墙体贯穿大裂缝修补结构 | |
CN112324475A (zh) | 一种加固盾构隧道衬砌结构的方法 | |
CN101949135B (zh) | 空心板桥体外横向锚固体系及其施工工艺 | |
CN111648787A (zh) | 一种采用超高性能混凝土加固盾构隧道衬砌结构的方法 | |
CN105464002A (zh) | 一种钢筋混凝土薄壁桥台加固施工工法 | |
JP5823009B1 (ja) | モルタル吹付による擁壁の構築工法 | |
CN105604340A (zh) | 一种能提高抗震能力和安全寿命的旧房屋加楼层改造方法 | |
CN110792200A (zh) | 一种无需后期剔打的砌体施工方法及其包管结构 | |
CN106567554A (zh) | 砌体结构建筑物的加固施工方法 | |
CN108560944A (zh) | 一种加强古城墙整体性的加固结构及其施工方法 | |
CN114592688B (zh) | 基于等效杆件模型的斜向配筋钢筋混凝土剪力墙施工方法 | |
CN111502721A (zh) | 一种联巷混凝土联合支护结构及其施工方法 | |
CN206487167U (zh) | 一种楼板加固装置 | |
CN107916797B (zh) | 一种提升旧建筑物承载性能的构造方法 | |
CN104675138B (zh) | 一种用于隔声降噪改造的板式阳台加固方法 | |
KR101126483B1 (ko) | 섬유시트를 이용한 수중 구조물의 수중 보강방법 | |
CN108035457A (zh) | 一种装配式高延性混凝土剪力墙连接结构及连接方法 | |
CN208122041U (zh) | 一种ips现浇砼剪力墙自保温体系结构系统 | |
CN207920144U (zh) | 一种无圈梁砌体结构的滑移隔震装置 | |
CN207920139U (zh) | 一种具有加固结构的钢筋混凝土轴心受压柱 | |
CN104947948A (zh) | 一种夯土墙体的加固方法 | |
CN113718703B (zh) | 一种装配式变形自适应挡浪墙组合结构及其施工方法 | |
CN114718605A (zh) | 用于加固盾构隧道衬砌结构的超高性能混凝土-钢拱架组合结构及方法 | |
CN209742151U (zh) | 纤维筋配筋砌体结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201112 Address after: Residence of huangduiji township government, yuncheng county, Heze City, Shandong Province Patentee after: Yuncheng Yundong new building materials Co., Ltd Address before: Ouhai District of Zhejiang city in Wenzhou province 325000 Rong Road No. 39 Patentee before: Zhu Kui |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171215 Termination date: 20210217 |
|
CF01 | Termination of patent right due to non-payment of annual fee |