A kind of steel pipe automatic chamfering mantle fiber process equipment and its application method
Technical field
The invention belongs to a kind of steel pipe process equipment and its application method, a kind of steel pipe automatic chamfering mantle fiber is especially belonged to
Process equipment and its application method.
Background technology
Current straight seam welded steel pipe chamfering mantle fiber processing uses manual equipment, because the general length of straight seam welded steel pipe is
6 meters, worker has bad luck offline straight seam welded steel pipe to steel tube chamfering mantle fiber machining area, it is necessary to by transport, broken bundle etc.
Process, then manually operated steel tube chamfering equipment and mantle fiber equipment progress steel tube chamfering mantle fiber, because straight seam welded steel pipe is longer, leads
Cause that execute-in-place is dangerous big, having bad luck difficulty, big, operating difficulties degree is big, worker's labor intensity is big, have a strong impact on steel tube chamfering
Mantle fiber production efficiency.How automatic transport, the automatic chamfering mantle fiber processing of steel pipe of steel tube chamfering mantle fiber is realized, reduction steel pipe falls
Work difficulty is transported, the operation difficulty and labor intensity and danger of operator is reduced, steel tube chamfering mantle fiber production efficiency is improved
It is the technical issues that need to address.
The content of the invention
The technical problems to be solved by the invention are:A kind of steel pipe automatic chamfering mantle fiber process equipment is provided.Institute of the present invention
Another to be solved technical problem is:A kind of application method of steel pipe automatic chamfering mantle fiber process equipment is provided.Use the steel
Pipe automatic chamfering mantle fiber process equipment can not only realize steel tube chamfering mantle fiber automatic transport, the processing of steel pipe automatic chamfering mantle fiber, and
And steel pipe can also be reduced have bad luck work difficulty, reduce the operation difficulty and labor intensity and danger of operator, moreover it is possible to improve
Steel tube chamfering mantle fiber production efficiency.
The present invention solve above-mentioned technical problem technical scheme be:A kind of steel pipe automatic chamfering mantle fiber process equipment, including
Chassis, the top surface on the chassis is rectangle, it is characterized in that:Also include steel pipe stepping transmission system and the bottom installed on chassis
The steel tube chamfering mantle fiber system of processing that the mistake contraposition of disk two ends is installed, in addition to electrical equipment control and hydraulic control system;
The steel pipe stepping transmission system includes the steel pipe transverse movement support being installed on the chassis, steel pipe transverse movement
The steel pipe that the steel pipe installed in support is moved along chassis longitudinal direction vertically moves power set and steel pipe vertically move jacking and
The steel pipe transverse mobile device moved along chassis horizontal direction installed in tourelle, steel pipe transverse movement support, in addition to
Steel pipe storage bracket with sloped top face and chamfering mantle fiber tube product that steel pipe transverse movement support both sides are respectively mounted
Receive support;
The steel pipe transverse movement support is parallel by two parallel terraced facade supports, a parallel terraced support in bottom surface and one
Ladder top face support encloses and is provided with least 14 crossbeams on composition, the parallel ladder top face support;The steel pipe vertically moves dynamic
Power apparatus longitudinally rotates roller group unit by least five steel pipe and constituted, and the steel pipe longitudinally rotates roller group unit on base, base
V-type roller group composition of 2 installed on the support frame and support frame of installation with reducing motor;The steel pipe vertically move jacking and
Tourelle vertically moves jacking by least six steel pipe and rolling unit is constituted, and the steel pipe vertically moves jacking and rolled single
Activity is installed with the branch of 2 rollers successively respectively for the both sides installed on the support frame and support frame that member is installed on base, base
Fagging is constituted, and is disposed with 4 V-shaped grooves in the supporting plate, 4 rollers are movably arranged on support successively using rotary shaft respectively
The both sides of 4 V-shaped grooves set on plate;The steel pipe vertically moves jacking and at least six steel pipe of tourelle is vertically moved
At least five steel pipe that jacking and rolling unit vertically move power set with the steel pipe longitudinally rotates the base point of roller group unit
The adjacent beams for not being sequentially arranged at the parallel ladder top face support are projected on remote steel pipe storage bracket on the chassis face
Side, the steel pipe vertically moves jacking and rolling unit and steel pipe and longitudinally rotates the lateral length of roller group unit to be described parallel
Ladder top face support adjacent beams are projected on 4/5 of lateral length on the chassis face, wherein wrong respectively close to the chassis two ends
2 steel pipes of the steel tube chamfering mantle fiber system of processing that contraposition is installed longitudinally rotate the parallel ladder top face support of roller group unit inside
Adjacent beams, which are projected on the top surface on the chassis, is also respectively mounted steel pipe transverse mobile device, and the steel pipe longitudinally rotates roller
2 V-type roller groups with reducing motor of group unit are vertically moved with the steel pipe sets 4 in the supporting plate of jacking and rolling unit
It is straight line that V-shaped groove is mutually corresponded respectively;The steel pipe transverse mobile device includes steel pipe jack-up bracket, steel pipe jack-up oil
Cylinder, steel pipe jack-up axis of guide, steel pipe transverse Shift cylinder, the bottom surface of the parallel terraced support in bottom surface of the steel pipe transverse movement support
On be at least arranged on respectively using 3 steel pipe transverse shifting rollers at least 3 guide rails that correspondence is laterally set on the chassis, extremely
Few 3 steel pipe transverse Shift cylinders correspond to steel pipe transverse movement support and are sequentially arranged on the chassis, steel pipe transverse movement oil
The parallel terraced support in bottom surface that the lever of cylinder moves support with steel pipe transverse is fixedly connected;The steel pipe jack-up bracket is using being arranged on
Steel pipe jack-up axis of guide on steel pipe transverse movement support is arranged on steel pipe transverse movement support, installed in steel pipe transverse movement
The lever of steel pipe jack-up oil cylinder on support is fixedly connected with the steel pipe jack-up bracket;The both sides tool of the steel pipe jack-up bracket
Have and stretch out the part that steel pipe transverse moves support, 5 V-arrangements are disposed with the supporting plate installed on the steel pipe jack-up bracket
The distance between the V-shaped groove two-by-two set in the supporting plate installed on groove, the steel pipe jack-up bracket is vertically moved with the steel pipe
The distance between the V-shaped groove two-by-two set in the supporting plate of jacking and rolling unit is consistent, when steel pipe jack-up oil cylinder jack-up steel
When tube top plays bracket, one V-shaped groove of outermost set on steel pipe jack-up bracket support plate can be received and arranged in steel pipe storage bracket
It is listed in an outermost steel pipe;
The steel tube chamfering mantle fiber system of processing includes lathe bed and steel tube chamfering power set and steel on lathe bed
Pipe sleeve silk power set and steel pipe clamping device, in addition to it is separately mounted to steel tube chamfering power set and steel pipe mantle fiber power dress
Put the steel pipe positioner on the lathe bed of front side;
The steel tube chamfering power set include steel tube chamfering unit head, and the steel tube chamfering unit head falls installed in steel pipe
In corner power head mounting seat, the steel tube chamfering unit head in steel tube chamfering unit head mounting seat uses line slideway
On the lathe bed, the steel tube chamfering unit head includes rose reamer, the rose reamer extension adjustment device for installing rose reamer, electricity
The transmission device of machine and transmission electrical machine power to rose reamer;
The steel pipe mantle fiber power set include the main spindle box for being installed with mantle fiber screw die, the main spindle box backing plate of main spindle box bottom
The upper fixed straight-line guide rail slide block that can be slided on line slideway, is fixed on the oil cylinder mounting bracket on lathe bed and main spindle box is housed
Equipped with motor and decelerator by sprocket wheel and chain drive main axis at the top of traveling oil cylinder, the main spindle box, on the main spindle box
It is also equipped with the mantle fiber screw die folding control device that cylinder is power;
The steel pipe clamping device includes the well subrack being arranged on lathe bed, steel pipe clamping promotion oil cylinder, steel pipe clamping bottom
2 steel pipe clampings are installed on seat, former and later two crossbeams of the well subrack and promote oil cylinder mounting bracket, 2 steel pipe clampings are pushed away
The axis and steel pipe mantle fiber power set main shaft of the facade of dynamic oil cylinder mounting bracket respectively with the steel tube chamfering power set unit head
Axis on 2 vertical planes, two steel pipe clampings, which are promoted, to be respectively mounted steel pipe clamping and promotes oil on oil cylinder mounting brackets
Cylinder, 2 steel pipe clampings promote the lever of oil cylinder to be installed with the steel pipe briquetting that bottom surface is arc surface using connector respectively, should
Bottom surface is also is respectively mounted steel pipe clamping base on the corresponding lathe bed of 2 steel pipe briquettings of arc surface, the steel pipe clamping base
Top surface be the arc surface that is engaged with the steel pipe briquetting that bottom surface is arc surface;
The steel pipe positioner includes steel pipe positional cylinder and steel pipe positioning slide plate, 2 pieces of steel pipe positioning slide plate difference
The steel pipe set on front side of steel tube chamfering power set and steel pipe mantle fiber power set on lathe bed is arranged on using pulley and positions slide plate
In mounting groove, the levers of 2 steel pipe positional cylinders on lathe bed on the outside of 2 steel pipes positioning slide plate mounting grooves respectively with
2 pieces of steel pipe positioning slide plates are fixedly connected;
The hydraulic pressure, electric apparatus control apparatus are controlled using PLC program, using prior art;The mantle fiber screw die folding control
Device processed uses prior art.
The present invention the course of work be:
A, the steel pipe that need to be processed is arranged in steel pipe storage bracket;
B, steel pipe jack-up oil cylinder jack-up steel pipe jack-up bracket, steel pipe jack-up bracket is close to steel pipe storage bracket outermost number
1 V groove receives first steel pipe to be processed;
C, the lever of steel pipe transverse Shift cylinder, which stretch out, to be promoted on steel pipe transverse movement support and steel pipe transverse movement support
The steel pipe jack-up bracket transverse shifting of installation, the lever of steel pipe jack-up oil cylinder is retracted, and steel pipe to be processed falls into steel pipe and longitudinally rotated
The 1st V-type roller of roller group unit outermost number and steel pipe, which are vertically moved, sets outermost number in the supporting plate of jacking and rolling unit
On the roller that 1st V-shaped groove side is installed, the lever of steel pipe transverse Shift cylinder, which is retracted, pulls steel pipe transverse movement support and steel
The steel pipe jack-up bracket installed on pipe transverse moving support sets back;
D, startup steel pipe vertically move the reducing motor of the V-type roller with reducing motor of power set, steel pipe edge to be processed
The V-type roller and steel pipe that steel pipe longitudinally rotates roller group unit vertically move V-shaped groove side installation in jacking and rolling unit supporting plate
Roller be transported to steel tube chamfering power set complete steel tube chamfering processing;
E, steel tube chamfering are machined, and the reducing motor of the V-type roller with reducing motor is rotated backward, and are completed steel tube chamfering and are added
The steel pipe counter motion of work, while receiving the 2nd V-shaped groove of outermost number of the steel pipe jack-up bracket of the 2nd steel pipe to be processed again
The steel pipe for completing steel tube chamfering processing is simultaneously sent into steel pipe longitudinal direction turn by secondary jack-up under the lever pushing of steel pipe transverse Shift cylinder
Dynamic the 2nd V-type roller of roller group unit outermost number and steel pipe vertically move the outermost set in the supporting plate of jacking and rolling unit
Steel pipe mantle fiber power set are transported on the roller that number the 2nd V-shaped groove side in side is installed and complete the processing of steel pipe mantle fiber;
F, steel pipe mantle fiber are machined, and the reducing motor of the V-type roller with reducing motor is rotated backward again, while receiving the
The 3rd V-shaped groove of outermost number of the steel pipe jack-up bracket of 3 steel pipes to be processed jack-up and in steel pipe transverse Shift cylinder again
The steel pipe feeding steel pipe that the mantle fiber processing of steel pipe will be completed under lever pushing longitudinally rotates the 3rd V-type of roller group unit outermost number
Roller and steel pipe vertically move the roller for setting the 3rd V-shaped groove side of outermost number to install in the supporting plate of jacking and rolling unit
On be transported to the other end chamfer machining that the steel tube chamfering power set that chassis opposite side installs complete steel pipe;
G, the other end chamfer machining of steel pipe are completed, and the reducing motor of the V-type roller with reducing motor is rotated backward, and is completed
The steel pipe counter motion of the other end chamfer machining of steel pipe, while receiving the steel pipe jack-up bracket of the 4th steel pipe to be processed most
The 4th V-shaped groove of outside number again jack-up and under the lever pushing of steel pipe transverse Shift cylinder by complete steel pipe the other end fall
The steel pipe feeding steel pipe of angle processing longitudinally rotates the 4th V-type roller of roller group unit outermost number and steel pipe vertically moves jacking and rolling
The chassis opposite side is transported on the roller for setting the 4th V-shaped groove side installation of outermost number in the supporting plate of moving cell to install
Steel pipe mantle fiber power set complete steel pipe the other end mantle fiber processing;
H, steel pipe other end mantle fiber are machined, and the reducing motor of the V-type roller with reducing motor is rotated backward again, simultaneously
Receive the 5th steel pipe to be processed steel pipe jack-up bracket the 5th V-shaped groove of outermost number again jack-up and steel pipe transverse movement
The steel pipe for completing the processing of steel pipe other end mantle fiber is sent into the chamfering mantle fiber tube product under the lever pushing of oil cylinder and receives support
On, the chamfering mantle fiber at the 1st steel pipe two ends to be processed is machined;2nd, the 3rd, nth root steel tube chamfering mantle fiber to be processed
Work repeats above-mentioned conveying and chamfering mantle fiber procedure of processing.
The beneficial effects of the invention are as follows:Due to the present invention there is provided steel pipe stepping transmission system and steel tube chamfering mantle fiber add
Work system.Automatic transport, the processing of steel pipe automatic chamfering mantle fiber of steel tube chamfering mantle fiber are realized, steel pipe is also reduced and has bad luck work
Difficulty, reduces the operation difficulty and labor intensity and danger of operator, improves steel tube chamfering mantle fiber production efficiency.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples;
Fig. 1 is the steel tube chamfering mantle fiber processing system that steel pipe stepping transmission system of the present invention and the mistake contraposition of chassis two ends are installed
The combining structure schematic diagram of system;
Fig. 2 is the steel tube chamfering mantle fiber that invention steel pipe stepping transmission system and the mistake contraposition of chassis two ends are installed
The top view of the combining structure of system of processing;
Fig. 3 is steel tube chamfering mantle fiber system of processing structural representation of the present invention;
Fig. 4 is steel tube chamfering mantle fiber system of processing right view of the present invention;
Fig. 5 is steel tube chamfering mantle fiber system of processing top view of the present invention;
Fig. 6 is the structural representation of steel pipe transverse mobile device of the present invention;
Fig. 7 is the structural representation that steel pipe of the present invention longitudinally rotates roller group unit;
Fig. 8 is the left view that steel pipe of the present invention longitudinally rotates roller group unit;
Fig. 9 is the top view that steel pipe of the present invention longitudinally rotates roller group unit;
In accompanying drawing:1. chassis, 3. steel pipe storage brackets, 4. chamfering mantle fiber tube products receive support, 5. parallel ladder top faces
Support, 6. steel pipes longitudinally rotate the V-type roller group of roller group unit, 61. bases, 62. support frames, 63. with reducing motor, 7. steel pipes and indulged
To mobile jacking and rolling unit, 71. rollers, 72. supporting plates, 8. steel pipe jack-up brackets, 9. steel pipe jack-up oil cylinders, 10. steel pipes
Jack-up axis of guide, 11. steel pipe transverse Shift cylinders, 12. steel pipe transverse shifting rollers, 13. lathe beds, 14. chamfering unit heads, 15.
Rose reamer, 16. mantle fiber screw die, 17. main spindle boxes, 18. well subracks, 19. steel pipe clampings promote oil cylinder, 20. steel pipe clamping bases,
21. steel pipe clamping promotes oil cylinder mounting bracket, 22. bottom surfaces to determine for the steel pipe briquetting, 23. steel pipe positional cylinders, 24. steel pipes of arc surface
Position slide plate.
Embodiment
Below by specific embodiment, the present invention is described in further detail.
Embodiment 1
As shown in Figures 1 to 9, a kind of steel pipe automatic chamfering mantle fiber process equipment, including chassis 1, the top surface on the chassis 1
For rectangle, it is characterized in that:Also include steel pipe stepping transmission system and the mistake contraposition installation of the two ends of chassis 1 installed on chassis 1
Steel tube chamfering mantle fiber system of processing, in addition to electrical equipment control and hydraulic control system;
The steel pipe stepping transmission system includes being installed on the One On The Chassis steel pipe transverse movement support, and steel pipe transverse is moved
The steel pipe that the steel pipe installed in dynamic support is moved along the longitudinal direction of chassis 1 vertically moves power set and steel pipe vertically moves jacking
And tourelle, the interior steel pipe transverse mobile device moved along the horizontal direction of chassis 1 installed of steel pipe transverse movement support, also wrap
The steel pipe storage bracket 3 with sloped top face and chamfering mantle fiber steel pipe for including that steel pipe transverse movement support both sides are respectively mounted are produced
Product receive support 4;
The steel pipe transverse movement support is parallel by two parallel terraced facade supports, a parallel terraced support in bottom surface and one
Ladder top face support 5 encloses and is provided with 14 crossbeams on composition, the parallel ladder top face support 5;The steel pipe vertically moves power
Device longitudinally rotates roller group unit 6 by 5 steel pipes and constituted, and the steel pipe longitudinally rotates roller group unit 6 on base 61, base 61
The 2 V-type roller groups 63 with reducing motor installed on the support frame 62 and support frame 62 of installation are constituted;The steel pipe is vertically moved
Jacking and tourelle vertically moves jacking by 6 steel pipes and rolling unit 7 is constituted, the steel pipe vertically moves jacking and rolling
Activity is installed with 2 rollers 71 successively respectively for the both sides installed on the support frame and support frame that unit 7 is installed on base, base
Supporting plate 72 constitute, be disposed with 4 V-shaped grooves in the supporting plate 72,4 rollers 71 are movable successively using rotary shaft respectively
The both sides of 4 V-shaped grooves set in supporting plate 72;The steel pipe vertically moves 6 steel pipes of jacking and tourelle
Vertically move 5 steel pipes that jacking and rolling unit 7 vertically move power set with the steel pipe and longitudinally rotate roller group unit 6
Base is sequentially arranged at the adjacent beams of the parallel ladder top face support 5 and is projected on the top surface on the chassis 1 away from steel pipe respectively
The side of storage bracket 3, the transverse direction that the steel pipe vertically moves jacking and rolling unit 7 with steel pipe longitudinally rotates roller group unit 6 is long
Spend and be projected on 4/5 of lateral length on the top surface on the chassis 1 for the adjacent beams of parallel ladder top face support 5, wherein distinguishing
2 steel pipes of the steel tube chamfering mantle fiber system of processing installed close to the two ends of chassis 1 mistake contraposition longitudinally rotate the inner side of roller group unit 6
Parallel ladder top face support 5 adjacent beams be projected on the top surface on the chassis 1 be also respectively mounted steel pipe transverse movement dress
Put, the steel pipe longitudinally rotates 2 V-type roller groups 63 with reducing motor of roller group unit 6 and the steel pipe vertically move jacking and
It is straight line to set 4 V-shaped grooves mutually to correspond respectively in the supporting plate 72 of rolling unit 7;The steel pipe transverse movement dress
Put including steel pipe jack-up bracket 8, steel pipe jack-up oil cylinder 9, steel pipe jack-up axis of guide 10, steel pipe transverse Shift cylinder 11, the steel
The bottom is arranged on the bottom surface of the parallel terraced support in bottom surface of pipe transverse moving support using 3 steel pipe transverse shifting rollers 12 respectively
On 3 guide rails that correspondence is laterally set on disk 1,3 steel pipe transverse Shift cylinders 11 correspond to steel pipe transverse movement support successively
On the chassis 1, the parallel terraced support in bottom surface of lever and steel pipe transverse the movement support of steel pipe transverse Shift cylinder 11 is consolidated
Fixed connection;The steel pipe jack-up bracket 8 uses the activity peace of steel pipe jack-up axis of guide 10 being arranged on steel pipe transverse movement support
On steel pipe transverse movement support, the lever and the steel of the steel pipe jack-up oil cylinder 9 on support are moved installed in steel pipe transverse
Tube top plays bracket 8 and is fixedly connected;The both sides of the steel pipe jack-up bracket 8, which have, stretches out the part that steel pipe transverse moves support, should
The support installed on 5 V-shaped grooves, the steel pipe jack-up bracket 8 is disposed with the supporting plate installed on steel pipe jack-up bracket 8
The distance between the V-shaped groove two-by-two set on plate is vertically moved with the steel pipe and set in the supporting plate 72 of jacking and rolling unit 7
The distance between V-shaped groove two-by-two it is consistent, when the 9 steel pipe jack-up brackets 8 in steel pipe jack-up oil cylinder top, steel pipe jack-up bracket 8
One V-shaped groove of the outermost set in the supporting plate of installation, which can be received, is arranged in an outermost steel in steel pipe storage bracket 3
Pipe;
The steel tube chamfering mantle fiber system of processing includes lathe bed 13 and the steel tube chamfering power set on lathe bed 13
With steel pipe mantle fiber power set and steel pipe clamping device, in addition to be separately mounted to steel tube chamfering power set and steel pipe mantle fiber dynamic
Steel pipe positioner on front side of power apparatus on lathe bed 13;
The steel tube chamfering power set include steel tube chamfering unit head 14, and the steel tube chamfering unit head 14 is arranged on steel
In pipe chamfering unit head mounting seat, the steel tube chamfering unit head 14 in steel tube chamfering unit head mounting seat uses straight
Line guide rail is arranged on the lathe bed 13, and the steel tube chamfering unit head 14 includes rose reamer 15, installs the rose reamer of rose reamer 15
The transmission device of extension adjustment device, motor and transmission electrical machine power to rose reamer 15;
The steel pipe mantle fiber power set include the main spindle box 17 for being installed with mantle fiber screw die 16, the main shaft of the bottom of main spindle box 17
The fixed straight-line guide rail slide block that can be slided on line slideway on case backing plate, is fixed on the oil cylinder mounting bracket on lathe bed 13 and fills
Have at the top of main spindle box traveling oil cylinder, the main spindle box equipped with motor and decelerator by sprocket wheel and chain drive main axis, should
The folding control device of mantle fiber screw die 16 that cylinder is power is also equipped with main spindle box 17;
The steel pipe clamping device includes the well subrack 18 being arranged on lathe bed 13, steel pipe clamping promotion oil cylinder 19, steel pipe
2 steel pipe clampings are installed on Holding seat 20, former and later two crossbeams of the well subrack 18 and promote oil cylinder mounting bracket 21, described 2
Individual steel pipe clamping promotes the axis and steel pipe of the facade of oil cylinder mounting bracket 21 respectively with the steel tube chamfering power set unit head 14
The axis of mantle fiber power set main shaft is on 2 vertical planes, and two steel pipe clampings are promoted pacifies respectively on oil cylinder mounting bracket 21
It is filled with steel pipe clamping and promotes oil cylinder 19,2 steel pipe clampings promotes the lever of oil cylinder 19 to be installed with bottom using connector respectively
Face is the steel pipe briquetting 22 of arc surface, and the bottom surface is also to be respectively mounted on the corresponding lathe bed 13 of 2 steel pipe briquettings 22 of arc surface
Steel pipe clamping base 20, the top surface of the steel pipe clamping base 20 is the circle being engaged with the steel pipe briquetting 22 that bottom surface is arc surface
Cambered surface.
A kind of application method of the steel pipe automatic chamfering mantle fiber process equipment, it is characterized in that:Comprise the steps:
A, the steel pipe that need to be processed is arranged in steel pipe storage bracket 3;
B, the jack-up steel pipe jack-up bracket 8 of steel pipe jack-up oil cylinder 9, steel pipe jack-up bracket 8 is close to the outermost of steel pipe storage bracket 3
The 1st V groove of number receives first steel pipe to be processed;
C, the lever of steel pipe transverse Shift cylinder 11, which stretch out, promotes steel pipe transverse movement support and steel pipe transverse movement support
The transverse shifting of steel pipe jack-up bracket 8 of upper installation, the lever of steel pipe jack-up oil cylinder 9 is retracted, and steel pipe to be processed falls into steel pipe longitudinal direction
Rotate roller group the 1st V-type roller of 6 outermost number of unit and steel pipe is vertically moved and set in the supporting plate 72 of jacking and rolling unit 7
The roller 71 installed of the 1st V-shaped groove side of outermost number on, the lever of steel pipe transverse Shift cylinder 11, which is retracted, pulls steel pipe horizontal
The steel pipe jack-up bracket 8 installed on to mobile support and steel pipe transverse movement support sets back;
D, start steel pipe and vertically move the reducing motor of V-type roller of the power set with reducing motor, steel pipe to be processed is along steel
The V-type roller and steel pipe that pipe longitudinally rotates roller group unit 6 vertically move V-shaped groove side peace in jacking and the supporting plate 72 of rolling unit 7
The roller 71 of dress is transported to steel tube chamfering power set and completes steel tube chamfering processing;
E, steel tube chamfering are machined, and the reducing motor of the V-type roller with reducing motor is rotated backward, and are completed steel tube chamfering and are added
The steel pipe counter motion of work, while receiving the 2nd V-shaped groove of outermost number of the steel pipe jack-up bracket 8 of the 2nd steel pipe to be processed again
The steel pipe for completing steel tube chamfering processing is simultaneously sent into steel pipe longitudinal direction by secondary jack-up under the lever pushing of steel pipe transverse Shift cylinder 11
Rotate roller group the 2nd V-type roller of 6 outermost number of unit and steel pipe is vertically moved and set in the supporting plate 72 of jacking and rolling unit 7
The roller 71 installed of the 2nd V-shaped groove side of outermost number on be transported to steel pipe mantle fiber power set and complete the processing of steel pipe mantle fiber;
F, steel pipe mantle fiber are machined, and the reducing motor of the V-type roller with reducing motor is rotated backward again, while receiving the
The 3rd V-shaped groove of outermost number of the steel pipe jack-up bracket 8 of 3 steel pipes to be processed jack-up and in steel pipe transverse Shift cylinder again
The steel pipe feeding steel pipe that the mantle fiber processing of steel pipe will be completed under 11 lever pushing longitudinally rotates the outermost number the 3rd of roller group unit 6
Individual V-type roller and steel pipe, which are vertically moved, sets the 3rd V-shaped groove side peace of outermost number in the supporting plate 72 of jacking and rolling unit 7
The other end chamfer machining for the steel tube chamfering power set completion steel pipe that the chassis opposite side is installed is transported on the roller 71 of dress;
G, the other end chamfer machining of steel pipe are completed, and the reducing motor of the V-type roller with reducing motor is rotated backward, and is completed
The steel pipe counter motion of the other end chamfer machining of steel pipe, while receiving the steel pipe jack-up bracket 8 of the 4th steel pipe to be processed most
The 4th V-shaped groove of outside number again jack-up and under the lever pushing of steel pipe transverse Shift cylinder 11 will complete steel pipe the other end
The steel pipe feeding steel pipe of chamfer machining longitudinally rotates the 4th V-type roller of 6 outermost number of roller group unit and steel pipe vertically move jacking and
It is another that the chassis is transported on the roller 71 that the 4th V-shaped groove side installation of outermost number is set in the supporting plate 72 of rolling unit 7
The steel pipe mantle fiber power set that side is installed complete the other end mantle fiber processing of steel pipe;
H, steel pipe other end mantle fiber are machined, and the reducing motor of the V-type roller with reducing motor is rotated backward again, simultaneously
Receive the 5th steel pipe to be processed steel pipe jack-up bracket 8 the 5th V-shaped groove of outermost number again jack-up and steel pipe transverse move
The steel pipe for completing the processing of steel pipe other end mantle fiber is sent into the chamfering mantle fiber tube product under the lever pushing of dynamic oil cylinder 11 to receive
On support 4, the chamfering mantle fiber at the 1st steel pipe two ends to be processed is machined;2nd, the 3rd, nth root steel tube chamfering to be processed
Mantle fiber work repeats above-mentioned conveying and chamfering mantle fiber procedure of processing.
Embodiment 2
As shown in Figures 1 to 9, a kind of steel pipe automatic chamfering mantle fiber process equipment, including chassis 1, the top surface on the chassis 1
For rectangle, it is characterized in that:Also include steel pipe stepping transmission system and the mistake contraposition installation of the two ends of chassis 1 installed on chassis 1
Steel tube chamfering mantle fiber system of processing, in addition to electrical equipment control and hydraulic control system;
The steel pipe stepping transmission system includes being installed on the One On The Chassis steel pipe transverse movement support, and steel pipe transverse is moved
The steel pipe that the steel pipe installed in dynamic support is moved along the longitudinal direction of chassis 1 vertically moves power set and steel pipe vertically moves jacking
And tourelle, the interior steel pipe transverse mobile device moved along the horizontal direction of chassis 1 installed of steel pipe transverse movement support, also wrap
The steel pipe storage bracket 3 with sloped top face and chamfering mantle fiber steel pipe for including that steel pipe transverse movement support both sides are respectively mounted are produced
Product receive support 4;
The steel pipe transverse movement support is parallel by two parallel terraced facade supports, a parallel terraced support in bottom surface and one
Ladder top face support 5 encloses and is provided with 14 crossbeams on composition, the parallel ladder top face support 5;The steel pipe vertically moves power
Device longitudinally rotates roller group unit 6 by 5 steel pipes and constituted, and the steel pipe longitudinally rotates roller group unit 6 on base 61, base 61
The 2 V-type roller groups 63 with reducing motor installed on the support frame 62 and support frame 62 of installation are constituted;The steel pipe is vertically moved
Jacking and tourelle vertically moves jacking by 6 steel pipes and rolling unit 7 is constituted, the steel pipe vertically moves jacking and rolling
Activity is installed with 2 rollers 71 successively respectively for the both sides installed on the support frame and support frame that unit 7 is installed on base, base
Supporting plate 72 constitute, be disposed with 4 V-shaped grooves in the supporting plate 72,4 rollers 71 are movable successively using rotary shaft respectively
The both sides of 4 V-shaped grooves set in supporting plate 72;The steel pipe vertically moves 6 steel pipes of jacking and tourelle
Vertically move 5 steel pipes that jacking and rolling unit 7 vertically move power set with the steel pipe and longitudinally rotate roller group unit 6
Base is sequentially arranged at the adjacent beams of the parallel ladder top face support 5 and is projected on the top surface of chassis 1 respectively to be deposited away from steel pipe
The side of support 3 is put, the steel pipe vertically moves the lateral length that jacking and rolling unit 7 longitudinally rotate roller group unit 6 with steel pipe
4/5 of lateral length on the top surface on the chassis 1 is projected on for the adjacent beams of parallel ladder top face support 5, wherein leaning on respectively
2 steel pipes of the steel tube chamfering mantle fiber system of processing that the nearly two ends of chassis 1 mistake contraposition is installed longitudinally rotate the inner side of roller group unit 6
The adjacent beams of parallel ladder top face support 5 are projected on the top surface on the chassis 1 and are also respectively mounted steel pipe transverse mobile device,
The steel pipe longitudinally rotates 2 V-type roller groups 63 with reducing motor of roller group unit 6 and the steel pipe vertically moves jacking and rolling
It is straight line to set 4 V-shaped grooves mutually to correspond respectively in the supporting plate 72 of unit 7;The steel pipe transverse mobile device bag
Steel pipe jack-up bracket 8, steel pipe jack-up oil cylinder 9, steel pipe jack-up axis of guide 10, steel pipe transverse Shift cylinder 11 are included, the steel pipe is horizontal
The chassis 1 is arranged on to the bottom surface of the parallel terraced support in bottom surface of mobile support using 3 steel pipe transverse shifting rollers 12 respectively
On 3 guide rails that upper correspondence is laterally set, 3 steel pipe transverse Shift cylinders 11 correspond to steel pipe transverse movement support and installed successively
On the chassis 1, the lever and steel pipe transverse of steel pipe transverse Shift cylinder 11 move the parallel terraced support in bottom surface fixation company of support
Connect;The steel pipe jack-up bracket 8 is movably arranged on using the steel pipe jack-up axis of guide 10 being arranged on steel pipe transverse movement support
On steel pipe transverse movement support, the lever and the steel pipe top of the steel pipe jack-up oil cylinder 9 on support are moved installed in steel pipe transverse
Bracket 8 is played to be fixedly connected;The both sides of the steel pipe jack-up bracket 8, which have, stretches out the part that steel pipe transverse moves support, the steel pipe
It is disposed with the supporting plate installed on jack-up bracket 8 in the supporting plate installed on 5 V-shaped grooves, the steel pipe jack-up bracket 8
The distance between the V-shaped groove two-by-two set vertically moves set in the supporting plate 72 of jacking and rolling unit 7 two with the steel pipe
The distance between two V-shaped grooves are consistent, and when the 9 steel pipe jack-up brackets 8 in steel pipe jack-up oil cylinder top, steel pipe jack-up bracket 8 is installed
Supporting plate on one V-shaped groove of outermost for setting can receive an outermost steel pipe is arranged in steel pipe storage bracket 3;
The steel tube chamfering mantle fiber system of processing includes lathe bed 13 and the steel tube chamfering power set on lathe bed 13
With steel pipe mantle fiber power set and steel pipe clamping device, in addition to be separately mounted to steel tube chamfering power set and steel pipe mantle fiber dynamic
Steel pipe positioner on front side of power apparatus on lathe bed 13;
The steel tube chamfering power set include steel tube chamfering unit head 14, and the steel tube chamfering unit head 14 is arranged on steel
In pipe chamfering unit head mounting seat, the steel tube chamfering unit head 14 in steel tube chamfering unit head mounting seat uses straight
Line guide rail is arranged on the lathe bed 13, and the steel tube chamfering unit head 14 includes rose reamer 15, installs the rose reamer of rose reamer 15
The transmission device of extension adjustment device, motor and transmission electrical machine power to rose reamer 15;
The steel pipe mantle fiber power set include the main spindle box 17 for being installed with mantle fiber screw die 16, the main shaft of the bottom of main spindle box 17
The fixed straight-line guide rail slide block that can be slided on line slideway on case backing plate, is fixed on the oil cylinder mounting bracket on lathe bed 13 and fills
Have at the top of main spindle box traveling oil cylinder, the main spindle box equipped with motor and decelerator by sprocket wheel and chain drive main axis, should
The folding control device of mantle fiber screw die 16 that cylinder is power is also equipped with main spindle box 17;
The steel pipe clamping device includes the well subrack 18 being arranged on lathe bed 13, steel pipe clamping promotion oil cylinder 19, steel pipe
2 steel pipe clampings are installed on Holding seat 20, former and later two crossbeams of the well subrack 18 and promote oil cylinder mounting bracket 21, described 2
Individual steel pipe clamping promotes the axis and steel pipe of the facade of oil cylinder mounting bracket 21 respectively with the steel tube chamfering power set unit head 14
The axis of mantle fiber power set main shaft is on 2 vertical planes, and two steel pipe clampings are promoted pacifies respectively on oil cylinder mounting bracket 21
It is filled with steel pipe clamping and promotes oil cylinder 19,2 steel pipe clampings promotes the lever of oil cylinder 19 to be installed with bottom using connector respectively
Face is the steel pipe briquetting 22 of arc surface, and the bottom surface is also to be respectively mounted on the corresponding lathe bed 13 of 2 steel pipe briquettings 22 of arc surface
Steel pipe clamping base 20, the top surface of the steel pipe clamping base 20 is the circle being engaged with the steel pipe briquetting 22 that bottom surface is arc surface
Cambered surface;
The steel pipe positioner includes 24,2 pieces of steel pipe positioning slide plates of steel pipe positional cylinder 23 and steel pipe positioning slide plate
24 are arranged on the steel pipe set on front side of steel tube chamfering power set and steel pipe mantle fiber power set on lathe bed 13 using pulley respectively
Position in slide plate mounting groove, 2 steel pipe positional cylinders 23 on lathe bed 13 on the outside of 2 steel pipe positioning slide plate mounting grooves
Lever be fixedly connected respectively with 2 pieces of steel pipes positioning slide plates 24.
A kind of application method of the steel pipe automatic chamfering mantle fiber process equipment, it is characterized in that:Comprise the steps:
A, the steel pipe that need to be processed is arranged in steel pipe storage bracket 3;
B, the jack-up steel pipe jack-up bracket 8 of steel pipe jack-up oil cylinder 9, steel pipe jack-up bracket 8 is close to the outermost of steel pipe storage bracket 3
The 1st V groove of number receives first steel pipe to be processed;
C, the lever of steel pipe transverse Shift cylinder 11, which stretch out, promotes steel pipe transverse movement support and steel pipe transverse movement support
The transverse shifting of steel pipe jack-up bracket 8 of upper installation, the lever of steel pipe jack-up oil cylinder 9 is retracted, and steel pipe to be processed falls into steel pipe longitudinal direction
Rotate roller group the 1st V-type roller of 6 outermost number of unit and steel pipe is vertically moved and set in the supporting plate 72 of jacking and rolling unit 7
The roller 71 installed of the 1st V-shaped groove side of outermost number on, the lever of steel pipe transverse Shift cylinder 11, which is retracted, pulls steel pipe horizontal
The steel pipe jack-up bracket 8 installed on to mobile support and steel pipe transverse movement support sets back;
D, start steel pipe and vertically move the reducing motor of V-type roller of the power set with reducing motor, steel pipe to be processed is along steel
The V-type roller and steel pipe that pipe longitudinally rotates roller group unit 6 vertically move V-shaped groove side peace in jacking and the supporting plate 72 of rolling unit 7
The roller 71 of dress is transported to steel tube chamfering power set and completes steel tube chamfering processing;
E, steel tube chamfering are machined, and the reducing motor of the V-type roller with reducing motor is rotated backward, and are completed steel tube chamfering and are added
The steel pipe counter motion of work, while receiving the 2nd V-shaped groove of outermost number of the steel pipe jack-up bracket 8 of the 2nd steel pipe to be processed again
The steel pipe for completing steel tube chamfering processing is simultaneously sent into steel pipe longitudinal direction by secondary jack-up under the lever pushing of steel pipe transverse Shift cylinder 11
Rotate roller group the 2nd V-type roller of 6 outermost number of unit and steel pipe is vertically moved and set in the supporting plate 72 of jacking and rolling unit 7
The roller 71 installed of the 2nd V-shaped groove side of outermost number on be transported to steel pipe mantle fiber power set and complete the processing of steel pipe mantle fiber;
F, steel pipe mantle fiber are machined, and the reducing motor of the V-type roller with reducing motor is rotated backward again, while receiving the
The 3rd V-shaped groove of outermost number of the steel pipe jack-up bracket 8 of 3 steel pipes to be processed jack-up and in steel pipe transverse Shift cylinder again
The steel pipe feeding steel pipe that the mantle fiber processing of steel pipe will be completed under 11 lever pushing longitudinally rotates the outermost number the 3rd of roller group unit 6
Individual V-type roller and steel pipe, which are vertically moved, sets the 3rd V-shaped groove side peace of outermost number in the supporting plate 72 of jacking and rolling unit 7
The other end chamfer machining for the steel tube chamfering power set completion steel pipe that the chassis opposite side is installed is transported on the roller 71 of dress;
G, the other end chamfer machining of steel pipe are completed, and the reducing motor of the V-type roller with reducing motor is rotated backward, and is completed
The steel pipe counter motion of the other end chamfer machining of steel pipe, while receiving the steel pipe jack-up bracket 8 of the 4th steel pipe to be processed most
The 4th V-shaped groove of outside number again jack-up and under the lever pushing of steel pipe transverse Shift cylinder 11 will complete steel pipe the other end
The steel pipe feeding steel pipe of chamfer machining longitudinally rotates the 4th V-type roller of 6 outermost number of roller group unit and steel pipe vertically move jacking and
It is another that the chassis is transported on the roller 71 that the 4th V-shaped groove side installation of outermost number is set in the supporting plate 72 of rolling unit 7
The steel pipe mantle fiber power set that side is installed complete the other end mantle fiber processing of steel pipe;
H, steel pipe other end mantle fiber are machined, and the reducing motor of the V-type roller with reducing motor is rotated backward again, simultaneously
Receive the 5th steel pipe to be processed steel pipe jack-up bracket 8 the 5th V-shaped groove of outermost number again jack-up and steel pipe transverse move
The steel pipe for completing the processing of steel pipe other end mantle fiber is sent into the chamfering mantle fiber tube product under the lever pushing of dynamic oil cylinder 11 to receive
On support 4, the chamfering mantle fiber at the 1st steel pipe two ends to be processed is machined;2nd, the 3rd, nth root steel tube chamfering to be processed
Mantle fiber work repeats above-mentioned conveying and chamfering mantle fiber procedure of processing.
By above-mentioned description, those skilled in the art completely can be in the model without departing from this invention technological thought
In enclosing, various changes and amendments are carried out all within protection scope of the present invention.The unaccomplished matter of the present invention, belongs to ability
The common knowledge of field technique personnel.