CN105463986B - Construction method of bridge expansion joint - Google Patents

Construction method of bridge expansion joint Download PDF

Info

Publication number
CN105463986B
CN105463986B CN201510863484.7A CN201510863484A CN105463986B CN 105463986 B CN105463986 B CN 105463986B CN 201510863484 A CN201510863484 A CN 201510863484A CN 105463986 B CN105463986 B CN 105463986B
Authority
CN
China
Prior art keywords
expansion joint
template assembly
bridge
construction method
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510863484.7A
Other languages
Chinese (zh)
Other versions
CN105463986A (en
Inventor
杨贤贵
王贤春
秦林
张奎
万中正
高正强
刘杨
杨志国
赵全东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of CTCE Group
Original Assignee
Third Construction Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of CTCE Group filed Critical Third Construction Co Ltd of CTCE Group
Priority to CN201510863484.7A priority Critical patent/CN105463986B/en
Publication of CN105463986A publication Critical patent/CN105463986A/en
Application granted granted Critical
Publication of CN105463986B publication Critical patent/CN105463986B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • E01D19/067Flat continuous joints cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a construction method of a bridge expansion joint. The construction method of the bridge expansion joint comprises the following steps that firstly, longitudinal or transverse embedded bars of the bridge expansion joint are embedded in the top end of a bridge abutment; secondly, a formwork assembly is manufactured; thirdly, the formwork assembly is placed on the embedded bars in the expansion joint, and the lower end face of the formwork assembly is supported on the bridge end and the bridge abutment; fourthly, asphalt concrete is laid on a basic pavement and the top of the formwork assembly; fifthly, the asphalt concrete is cut along the left side edge and the right side edge of the formwork assembly, and the formwork assembly is taken out; sixthly, other steel bars in the expansion joint are tied and expansion joint profile steel is welded; and seventhly, foam boards are inserted, concrete is poured, and construction of the expansion joint is completed. According to the construction method of the bridge expansion joint, the formwork assembly is manufactured through existing construction materials, so that the cost is low, and the formwork assembly can be used repeatedly after being detached; it can be guaranteed that the expansion joint is not filled with sand soil impurities in the construction process, and the connection flatness between the constructed expansion joint and the laid asphalt concrete pavement can also be guaranteed.

Description

A kind of construction method of bridge expanssion joint
Technical field
The present invention relates to bridge construction engineering field, especially a kind of construction method of bridge expanssion joint.
Background technology
With the development of urban construction, medium and small bridges get more and more, and the expansion joint construction being related to is more and more.Bridge Expansion joint refers to the requirement for meeting bridge floor deformation, generally between two beam-ends, between beam-ends and abutment or bridge handing-over position Put setting expansion joint.A kind of main mode adopting is sandbag filling at present, and sandbag filling needs artificial measuring greatly;Work progress Middle cracky causes sandy soil or debris to leak in expansion joint, is not easily cleaned;And sandbag filling is unreal, be susceptible to displacement, causes Expansion joint both sides asphalt compaction degree and flatness are unsatisfactory for design requirement.
Through retrieval, find a patent document related to present patent application: a kind of shallow groove anchorage bridge stretches Seam construction method, notification number: cn1341791, first setting both sides at seam in bridge has step surface for it, then this two step surface is carried out Surface treatment;Make a call to one group by the anchoring hole site of retractor device both sides beam body to be arranged is each to two step surface relevant positions Hole, each swivel nut of two groups of expansion bolts and screw rod are placed in each corresponding aperture of step surface, and pour into epoxy cement slurry, and two The uniform brushing in step surface surface adhesive;The each anchor hole of both sides beam body of retractor device is penetrated each corresponding expansion bolt one by one Screw rod on, then close-fitting is connected with packing ring and nut thereon;Between retractor device both sides beam body and corresponding step surface side Cavity in fill up High Strength Concrete, retractor device beam body is connected by it with bridge structure thing, simultaneously will be equal for two groups of expansion bolts Effectively it is locked in inside it.
Contrasted by technical characteristic, the bridge expanssion joint construction process disclosed in above-mentioned document and present patent application are in technology Relatively big difference is existed on scheme.
Content of the invention
It is an object of the invention to overcoming the deficiencies in the prior art, provide a kind of construction method of bridge expanssion joint, the party Method using plank sheathing readily removable remove, feature that is capable of circulation, being difficult displacement and surfacing;Customize plank sheathing, peace using live material It is filled to expansion joint position, compactness and the flatness of expansion joint both sides bituminous concrete not only can be ensured, and do not result in Sandy soil, debris etc. leak in expansion joint, be a kind of efficiently, reliability, energy-conservation, the construction method of low cost.
The solution of the present invention is achieved in that
A kind of construction method of bridge expanssion joint, step is as follows:
Step one, before science of bridge building abutment concreting, in longitudinal direction or the horizontal stroke of the pre-buried bridge expanssion joint in abutment top To embedded ribs;
Step 2, make template assembly, the width of this template assembly is wide with expansion joint, the height of template assembly with substantially Road surface is contour;
Step 3, template assembly is placed on the embedded ribs in expansion joint, template assembly lower surface be supported on beam-ends and On abutment, the upper surface of template assembly is flushed with basic road surface, and assembly tightly consolidates;
Step 4, in basic road surface and template assembly top asphalt concrete grinding compacting;
Step 5, along template assembly arranged on left and right sides side cutting bituminous concrete and counter open, taking-up template assembly;
Other reinforcing bars in step 6, colligation expansion joint, and welding expansion joint shaped steel on reinforcing bar;
Plug-in mounting cystosepiment in step 7, the gap being formed between the shaped steel of expansion joint, then pours coagulation into expansion joint Soil, completes expansion joint and all constructs.
And, described template assembly includes template and the lumps of wood of rectangular configuration, parallel longitudinal of the lower surface of described template Every the multiple lumps of wood of installation.
And, the template size of described template assembly is 75cm × 100cm.
And, in step 4, before asphalt concrete, smear one layer of oils and fats in template assembly top surface.
Advantages of the present invention and good effect are:
The present invention utilizes existing construction material, draw materials easily, construction cost low, and process is simple, speed of application are fast, Bad utilization can be followed after template assembly dismounting;This method easy construction, quick, not only can ensure expansion joint in work progress Do not filled by sandy soil debris, and it is flat to can ensure that expansion joint is connected with the asphalt concrete pavement of laying after the completion of constructing Whole degree, the present invention suitably promotes, and has a extensive future.
Brief description
Fig. 1 is present situation front view before the construction of expansion joint of the present invention;
Fig. 2 is the a-a of Fig. 1 to sectional view;
Fig. 3 is the front view of template assembly in the present invention;
Fig. 4 is the top view of Fig. 3;
Fig. 5 is the schematic diagram of installation form assembly of the present invention;
Fig. 6 is the schematic diagram of asphalt concrete of the present invention;
Fig. 7 is the schematic diagram that the present invention takes out template assembly;
Fig. 8 is the schematic diagram after the completion of the construction of expansion joint of the present invention.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings and by specific embodiment.
A kind of construction method of bridge expanssion joint, comprises the following steps:
Step one, before bridge abutment concreting, stretching between beam-ends 1 and abutment 3 or between beam-ends and beam-ends Pre-buried parallel longitudinal spaced embedded ribs 2 are stitched in contracting, as shown in Figure 1 and Figure 2, in the present embodiment accompanying drawing be beam-ends and abutment it Between expansion joint;
Step 2, make template assembly 4, the structure of this template assembly as shown in Figure 3, Figure 4, including template 5 and the lumps of wood 6, Multiple lumps of wood are installed at the parallel longitudinal interval of lower surface of described template, and the lumps of wood in the present embodiment is right for two;
Step 3, template assembly is placed on the embedded ribs in expansion joint, in template assembly the width of template with flexible Seam is wide, and the height of template assembly is contour with basic road surface, and in template assembly, the lumps of wood is installed in two sides of embedded ribs simultaneously respectively It is supported on beam-ends and abutment, the upper surface of template assembly is flushed with basic road surface.Vertical in expansion joint in the present embodiment accompanying drawing To assembled two template assemblies, as shown in Figure 5, Figure 6, and assembly tightly consolidates;
Step 4, in basic road surface and template assembly top asphalt concrete seven grinding compacting, bituminous concrete Surface is concordant with bridge deck pavement and roadbase, to ensure the flatness of asphalt paving;
Step 5, by snap the line mode bituminous concrete surface eject template assembly arranged on left and right sides side position, and Along template assembly two sides cutting counter open, take out template assembly, as shown in Figure 7;
Other reinforcing bars in step 6, colligation expansion joint, and welding expansion joint shaped steel on reinforcing bar;
Plug-in mounting cystosepiment 8 in step 7, the gap being formed between the shaped steel of expansion joint, then pours coagulation into expansion joint Soil, completes expansion joint and all constructs, as shown in Figure 8.
In the present embodiment, in step 4, in order to prevent template assembly from bonding together with bituminous concrete, asphalt One layer of oils and fats are smeared in template assembly top surface before concrete.
The template size of described template assembly is 75cm × 100cm.
Compared with prior art, the beneficial effects of the present invention is:
The present invention utilizes existing construction material, draw materials easily, construction cost low, and process is simple, speed of application are fast, Bad utilization can be followed after template assembly dismounting;This method easy construction, quick, not only can ensure expansion joint in work progress Do not filled by sandy soil debris, and it is flat to can ensure that expansion joint is connected with the asphalt concrete pavement of laying after the completion of constructing Whole degree, the present invention suitably promotes, and has a extensive future.
It is emphasized that embodiment of the present invention is illustrative rather than determinate, bag therefore of the present invention Include the embodiment being not limited to described in specific embodiment, every by those skilled in the art's technology according to the present invention scheme The other embodiment drawing, also belongs to the scope of protection of the invention.

Claims (4)

1. a kind of construction method of bridge expanssion joint it is characterised in that: step is as follows:
Step one, before science of bridge building abutment concreting, vertical or horizontal in the pre-buried bridge expanssion joint in abutment top Embedded ribs;
Step 2, make template assembly, the width of this template assembly is wide with expansion joint, the height of template assembly and basic road surface Contour;
Step 3, template assembly is placed on the embedded ribs in expansion joint, template assembly lower surface is supported on beam-ends and abutment On, the upper surface of template assembly is flushed with basic road surface, and assembly tightly consolidates;
Step 4, in basic road surface and template assembly top asphalt concrete grinding compacting;
Step 5, along template assembly arranged on left and right sides side cutting bituminous concrete and counter open, taking-up template assembly;
Other reinforcing bars in step 6, colligation expansion joint, and welding expansion joint shaped steel on reinforcing bar;
Plug-in mounting cystosepiment in step 7, the gap being formed between the shaped steel of expansion joint, then to casting concrete in expansion joint, complete Expansion joint is become all to construct.
2. bridge expanssion joint according to claim 1 construction method it is characterised in that: described template assembly includes rectangle The template of structure and the lumps of wood, multiple lumps of wood are installed at the parallel longitudinal interval in lower surface of described template.
3. bridge expanssion joint according to claim 2 construction method it is characterised in that: the Pattern plate ruler of described template assembly Very little it is multiplied by 100cm for 75cm.
4. bridge expanssion joint according to claim 1 and 2 construction method it is characterised in that: in step 4, asphalt One layer of oils and fats are smeared in template assembly top surface before concrete.
CN201510863484.7A 2015-12-01 2015-12-01 Construction method of bridge expansion joint Expired - Fee Related CN105463986B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510863484.7A CN105463986B (en) 2015-12-01 2015-12-01 Construction method of bridge expansion joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510863484.7A CN105463986B (en) 2015-12-01 2015-12-01 Construction method of bridge expansion joint

Publications (2)

Publication Number Publication Date
CN105463986A CN105463986A (en) 2016-04-06
CN105463986B true CN105463986B (en) 2017-01-25

Family

ID=55602107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510863484.7A Expired - Fee Related CN105463986B (en) 2015-12-01 2015-12-01 Construction method of bridge expansion joint

Country Status (1)

Country Link
CN (1) CN105463986B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487055A (en) * 2018-04-28 2018-09-04 王涛 A kind of expansion joint dust collect plant and its construction method

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221715A (en) * 2018-01-08 2018-06-29 深圳市东进技术服务有限公司 A kind of renovation technique of bridge pavement
CN111549652B (en) * 2020-05-25 2022-08-23 河南省第一建筑工程集团有限责任公司 Construction method for preventing expansion joint vehicle jumping of prefabricated section beam
CN111809512A (en) * 2020-07-15 2020-10-23 中国二十冶集团有限公司 Method for temporarily plugging expansion joint of simply supported girder bridge
CN114108455A (en) * 2021-11-26 2022-03-01 中铁十局集团青岛工程有限公司 Construction structure and construction method for expansion joint

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008215024A (en) * 2007-03-07 2008-09-18 Motonosuke Arai Construction method for highway bridge joint pavement
DE102010037873A1 (en) * 2009-10-02 2011-04-07 Josef Engelbert Fuchs Method for producing a supporting element for installation in concrete or asphalt pavements of roadway or bridge crossings and thus equipped roadway or bridge crossing
CN102518036A (en) * 2011-10-31 2012-06-27 中交一航局第四工程有限公司 Construction method for installing bridge expansion joint
CN102966037A (en) * 2012-12-14 2013-03-13 黑龙江省交通科学研究所 Installation and construction process of bridge expansion joints
CN103215891A (en) * 2013-04-22 2013-07-24 中铁四局集团有限公司 Manufacturing process for reserved expansion joint and deformation joint of anti-collision guardrail
CN104631311A (en) * 2015-01-26 2015-05-20 上海颖川加固工程技术有限公司 Bridge expansion joint structure and construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008215024A (en) * 2007-03-07 2008-09-18 Motonosuke Arai Construction method for highway bridge joint pavement
DE102010037873A1 (en) * 2009-10-02 2011-04-07 Josef Engelbert Fuchs Method for producing a supporting element for installation in concrete or asphalt pavements of roadway or bridge crossings and thus equipped roadway or bridge crossing
CN102518036A (en) * 2011-10-31 2012-06-27 中交一航局第四工程有限公司 Construction method for installing bridge expansion joint
CN102966037A (en) * 2012-12-14 2013-03-13 黑龙江省交通科学研究所 Installation and construction process of bridge expansion joints
CN103215891A (en) * 2013-04-22 2013-07-24 中铁四局集团有限公司 Manufacturing process for reserved expansion joint and deformation joint of anti-collision guardrail
CN104631311A (en) * 2015-01-26 2015-05-20 上海颖川加固工程技术有限公司 Bridge expansion joint structure and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
桥梁伸缩缝的施工;宋德俊 等;《辽宁交通科技》;20041030(第10期);第109、132页 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487055A (en) * 2018-04-28 2018-09-04 王涛 A kind of expansion joint dust collect plant and its construction method

Also Published As

Publication number Publication date
CN105463986A (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN105463986B (en) Construction method of bridge expansion joint
CN105134009A (en) Sill coping concrete structure of frame structure infilled wall and construction method
CN201089875Y (en) Pavement structure of concrete new-old pavement anastomosis part for broadening road
CN106351239A (en) Cement modified soil strengthened geogrid reinforced soil structure and construction method thereof
CN108797636A (en) A kind of upper font retaining wall structure and its construction method
CN206245730U (en) A kind of cast-in-place pitched roof double template structure
CN108193572A (en) A kind of method recycled to precast beam precasting yard hardened layer
CN109236322A (en) It a kind of artificial bottom plate preventing soft-rock tunnel pucking and its constructs and method for maintaining
CN103437353A (en) Cast-in-situ light foam concrete reinforcing method based on anchor bolt support
CN210262555U (en) Light soil road structure
CN208395602U (en) Steel joint structure of assembled road surface
CN110820455A (en) Construction process for lapping and expanding roadbed of asphalt concrete highway
CN108385612A (en) A kind of construction method of the good concrete protecting face plate of stability
CN109252434A (en) A kind of asphalt pavement structure and its construction method
CN108589769A (en) A kind of embedding rock T shapes combined type column plate high gear wall construction method of overlength
CN115450250B (en) Reinforced cement stabilized macadam retaining wall structure and construction method
CN216712592U (en) Novel roadbed applying foamed light soil
CN105672350A (en) Construction method for repairing lateral displacement of retaining wall
CN104947565A (en) Construction technology for forming railway crossing by pouring of concrete
CN105839504B (en) Assembled cement pavement construction method
CN211734909U (en) Continuous reinforced concrete pavement
CN114658045B (en) Active retaining wall repairing construction method
CN207484194U (en) A kind of seamless road surface of assembling beam and slab type
CN111577330A (en) A construction method for large-section inclined shaft open channel section and its high-strength composite formwork
CN205617175U (en) Be applied to temporary support structure of widening fast in place

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170125

Termination date: 20171201