CN105463986B - Construction method of bridge expansion joint - Google Patents
Construction method of bridge expansion joint Download PDFInfo
- Publication number
- CN105463986B CN105463986B CN201510863484.7A CN201510863484A CN105463986B CN 105463986 B CN105463986 B CN 105463986B CN 201510863484 A CN201510863484 A CN 201510863484A CN 105463986 B CN105463986 B CN 105463986B
- Authority
- CN
- China
- Prior art keywords
- expansion joint
- template assembly
- bridge
- construction method
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/06—Arrangement, construction or bridging of expansion joints
- E01D19/067—Flat continuous joints cast in situ
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention relates to a construction method of a bridge expansion joint. The construction method of the bridge expansion joint comprises the following steps that firstly, longitudinal or transverse embedded bars of the bridge expansion joint are embedded in the top end of a bridge abutment; secondly, a formwork assembly is manufactured; thirdly, the formwork assembly is placed on the embedded bars in the expansion joint, and the lower end face of the formwork assembly is supported on the bridge end and the bridge abutment; fourthly, asphalt concrete is laid on a basic pavement and the top of the formwork assembly; fifthly, the asphalt concrete is cut along the left side edge and the right side edge of the formwork assembly, and the formwork assembly is taken out; sixthly, other steel bars in the expansion joint are tied and expansion joint profile steel is welded; and seventhly, foam boards are inserted, concrete is poured, and construction of the expansion joint is completed. According to the construction method of the bridge expansion joint, the formwork assembly is manufactured through existing construction materials, so that the cost is low, and the formwork assembly can be used repeatedly after being detached; it can be guaranteed that the expansion joint is not filled with sand soil impurities in the construction process, and the connection flatness between the constructed expansion joint and the laid asphalt concrete pavement can also be guaranteed.
Description
Technical field
The present invention relates to bridge construction engineering field, especially a kind of construction method of bridge expanssion joint.
Background technology
With the development of urban construction, medium and small bridges get more and more, and the expansion joint construction being related to is more and more.Bridge
Expansion joint refers to the requirement for meeting bridge floor deformation, generally between two beam-ends, between beam-ends and abutment or bridge handing-over position
Put setting expansion joint.A kind of main mode adopting is sandbag filling at present, and sandbag filling needs artificial measuring greatly;Work progress
Middle cracky causes sandy soil or debris to leak in expansion joint, is not easily cleaned;And sandbag filling is unreal, be susceptible to displacement, causes
Expansion joint both sides asphalt compaction degree and flatness are unsatisfactory for design requirement.
Through retrieval, find a patent document related to present patent application: a kind of shallow groove anchorage bridge stretches
Seam construction method, notification number: cn1341791, first setting both sides at seam in bridge has step surface for it, then this two step surface is carried out
Surface treatment;Make a call to one group by the anchoring hole site of retractor device both sides beam body to be arranged is each to two step surface relevant positions
Hole, each swivel nut of two groups of expansion bolts and screw rod are placed in each corresponding aperture of step surface, and pour into epoxy cement slurry, and two
The uniform brushing in step surface surface adhesive;The each anchor hole of both sides beam body of retractor device is penetrated each corresponding expansion bolt one by one
Screw rod on, then close-fitting is connected with packing ring and nut thereon;Between retractor device both sides beam body and corresponding step surface side
Cavity in fill up High Strength Concrete, retractor device beam body is connected by it with bridge structure thing, simultaneously will be equal for two groups of expansion bolts
Effectively it is locked in inside it.
Contrasted by technical characteristic, the bridge expanssion joint construction process disclosed in above-mentioned document and present patent application are in technology
Relatively big difference is existed on scheme.
Content of the invention
It is an object of the invention to overcoming the deficiencies in the prior art, provide a kind of construction method of bridge expanssion joint, the party
Method using plank sheathing readily removable remove, feature that is capable of circulation, being difficult displacement and surfacing;Customize plank sheathing, peace using live material
It is filled to expansion joint position, compactness and the flatness of expansion joint both sides bituminous concrete not only can be ensured, and do not result in
Sandy soil, debris etc. leak in expansion joint, be a kind of efficiently, reliability, energy-conservation, the construction method of low cost.
The solution of the present invention is achieved in that
A kind of construction method of bridge expanssion joint, step is as follows:
Step one, before science of bridge building abutment concreting, in longitudinal direction or the horizontal stroke of the pre-buried bridge expanssion joint in abutment top
To embedded ribs;
Step 2, make template assembly, the width of this template assembly is wide with expansion joint, the height of template assembly with substantially
Road surface is contour;
Step 3, template assembly is placed on the embedded ribs in expansion joint, template assembly lower surface be supported on beam-ends and
On abutment, the upper surface of template assembly is flushed with basic road surface, and assembly tightly consolidates;
Step 4, in basic road surface and template assembly top asphalt concrete grinding compacting;
Step 5, along template assembly arranged on left and right sides side cutting bituminous concrete and counter open, taking-up template assembly;
Other reinforcing bars in step 6, colligation expansion joint, and welding expansion joint shaped steel on reinforcing bar;
Plug-in mounting cystosepiment in step 7, the gap being formed between the shaped steel of expansion joint, then pours coagulation into expansion joint
Soil, completes expansion joint and all constructs.
And, described template assembly includes template and the lumps of wood of rectangular configuration, parallel longitudinal of the lower surface of described template
Every the multiple lumps of wood of installation.
And, the template size of described template assembly is 75cm × 100cm.
And, in step 4, before asphalt concrete, smear one layer of oils and fats in template assembly top surface.
Advantages of the present invention and good effect are:
The present invention utilizes existing construction material, draw materials easily, construction cost low, and process is simple, speed of application are fast,
Bad utilization can be followed after template assembly dismounting;This method easy construction, quick, not only can ensure expansion joint in work progress
Do not filled by sandy soil debris, and it is flat to can ensure that expansion joint is connected with the asphalt concrete pavement of laying after the completion of constructing
Whole degree, the present invention suitably promotes, and has a extensive future.
Brief description
Fig. 1 is present situation front view before the construction of expansion joint of the present invention;
Fig. 2 is the a-a of Fig. 1 to sectional view;
Fig. 3 is the front view of template assembly in the present invention;
Fig. 4 is the top view of Fig. 3;
Fig. 5 is the schematic diagram of installation form assembly of the present invention;
Fig. 6 is the schematic diagram of asphalt concrete of the present invention;
Fig. 7 is the schematic diagram that the present invention takes out template assembly;
Fig. 8 is the schematic diagram after the completion of the construction of expansion joint of the present invention.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings and by specific embodiment.
A kind of construction method of bridge expanssion joint, comprises the following steps:
Step one, before bridge abutment concreting, stretching between beam-ends 1 and abutment 3 or between beam-ends and beam-ends
Pre-buried parallel longitudinal spaced embedded ribs 2 are stitched in contracting, as shown in Figure 1 and Figure 2, in the present embodiment accompanying drawing be beam-ends and abutment it
Between expansion joint;
Step 2, make template assembly 4, the structure of this template assembly as shown in Figure 3, Figure 4, including template 5 and the lumps of wood 6,
Multiple lumps of wood are installed at the parallel longitudinal interval of lower surface of described template, and the lumps of wood in the present embodiment is right for two;
Step 3, template assembly is placed on the embedded ribs in expansion joint, in template assembly the width of template with flexible
Seam is wide, and the height of template assembly is contour with basic road surface, and in template assembly, the lumps of wood is installed in two sides of embedded ribs simultaneously respectively
It is supported on beam-ends and abutment, the upper surface of template assembly is flushed with basic road surface.Vertical in expansion joint in the present embodiment accompanying drawing
To assembled two template assemblies, as shown in Figure 5, Figure 6, and assembly tightly consolidates;
Step 4, in basic road surface and template assembly top asphalt concrete seven grinding compacting, bituminous concrete
Surface is concordant with bridge deck pavement and roadbase, to ensure the flatness of asphalt paving;
Step 5, by snap the line mode bituminous concrete surface eject template assembly arranged on left and right sides side position, and
Along template assembly two sides cutting counter open, take out template assembly, as shown in Figure 7;
Other reinforcing bars in step 6, colligation expansion joint, and welding expansion joint shaped steel on reinforcing bar;
Plug-in mounting cystosepiment 8 in step 7, the gap being formed between the shaped steel of expansion joint, then pours coagulation into expansion joint
Soil, completes expansion joint and all constructs, as shown in Figure 8.
In the present embodiment, in step 4, in order to prevent template assembly from bonding together with bituminous concrete, asphalt
One layer of oils and fats are smeared in template assembly top surface before concrete.
The template size of described template assembly is 75cm × 100cm.
Compared with prior art, the beneficial effects of the present invention is:
The present invention utilizes existing construction material, draw materials easily, construction cost low, and process is simple, speed of application are fast,
Bad utilization can be followed after template assembly dismounting;This method easy construction, quick, not only can ensure expansion joint in work progress
Do not filled by sandy soil debris, and it is flat to can ensure that expansion joint is connected with the asphalt concrete pavement of laying after the completion of constructing
Whole degree, the present invention suitably promotes, and has a extensive future.
It is emphasized that embodiment of the present invention is illustrative rather than determinate, bag therefore of the present invention
Include the embodiment being not limited to described in specific embodiment, every by those skilled in the art's technology according to the present invention scheme
The other embodiment drawing, also belongs to the scope of protection of the invention.
Claims (4)
1. a kind of construction method of bridge expanssion joint it is characterised in that: step is as follows:
Step one, before science of bridge building abutment concreting, vertical or horizontal in the pre-buried bridge expanssion joint in abutment top
Embedded ribs;
Step 2, make template assembly, the width of this template assembly is wide with expansion joint, the height of template assembly and basic road surface
Contour;
Step 3, template assembly is placed on the embedded ribs in expansion joint, template assembly lower surface is supported on beam-ends and abutment
On, the upper surface of template assembly is flushed with basic road surface, and assembly tightly consolidates;
Step 4, in basic road surface and template assembly top asphalt concrete grinding compacting;
Step 5, along template assembly arranged on left and right sides side cutting bituminous concrete and counter open, taking-up template assembly;
Other reinforcing bars in step 6, colligation expansion joint, and welding expansion joint shaped steel on reinforcing bar;
Plug-in mounting cystosepiment in step 7, the gap being formed between the shaped steel of expansion joint, then to casting concrete in expansion joint, complete
Expansion joint is become all to construct.
2. bridge expanssion joint according to claim 1 construction method it is characterised in that: described template assembly includes rectangle
The template of structure and the lumps of wood, multiple lumps of wood are installed at the parallel longitudinal interval in lower surface of described template.
3. bridge expanssion joint according to claim 2 construction method it is characterised in that: the Pattern plate ruler of described template assembly
Very little it is multiplied by 100cm for 75cm.
4. bridge expanssion joint according to claim 1 and 2 construction method it is characterised in that: in step 4, asphalt
One layer of oils and fats are smeared in template assembly top surface before concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510863484.7A CN105463986B (en) | 2015-12-01 | 2015-12-01 | Construction method of bridge expansion joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510863484.7A CN105463986B (en) | 2015-12-01 | 2015-12-01 | Construction method of bridge expansion joint |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105463986A CN105463986A (en) | 2016-04-06 |
CN105463986B true CN105463986B (en) | 2017-01-25 |
Family
ID=55602107
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510863484.7A Expired - Fee Related CN105463986B (en) | 2015-12-01 | 2015-12-01 | Construction method of bridge expansion joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105463986B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108487055A (en) * | 2018-04-28 | 2018-09-04 | 王涛 | A kind of expansion joint dust collect plant and its construction method |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108221715A (en) * | 2018-01-08 | 2018-06-29 | 深圳市东进技术服务有限公司 | A kind of renovation technique of bridge pavement |
CN111549652B (en) * | 2020-05-25 | 2022-08-23 | 河南省第一建筑工程集团有限责任公司 | Construction method for preventing expansion joint vehicle jumping of prefabricated section beam |
CN111809512A (en) * | 2020-07-15 | 2020-10-23 | 中国二十冶集团有限公司 | Method for temporarily plugging expansion joint of simply supported girder bridge |
CN114108455A (en) * | 2021-11-26 | 2022-03-01 | 中铁十局集团青岛工程有限公司 | Construction structure and construction method for expansion joint |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008215024A (en) * | 2007-03-07 | 2008-09-18 | Motonosuke Arai | Construction method for highway bridge joint pavement |
DE102010037873A1 (en) * | 2009-10-02 | 2011-04-07 | Josef Engelbert Fuchs | Method for producing a supporting element for installation in concrete or asphalt pavements of roadway or bridge crossings and thus equipped roadway or bridge crossing |
CN102518036A (en) * | 2011-10-31 | 2012-06-27 | 中交一航局第四工程有限公司 | Construction method for installing bridge expansion joint |
CN102966037A (en) * | 2012-12-14 | 2013-03-13 | 黑龙江省交通科学研究所 | Installation and construction process of bridge expansion joints |
CN103215891A (en) * | 2013-04-22 | 2013-07-24 | 中铁四局集团有限公司 | Manufacturing process for reserved expansion joint and deformation joint of anti-collision guardrail |
CN104631311A (en) * | 2015-01-26 | 2015-05-20 | 上海颖川加固工程技术有限公司 | Bridge expansion joint structure and construction method |
-
2015
- 2015-12-01 CN CN201510863484.7A patent/CN105463986B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008215024A (en) * | 2007-03-07 | 2008-09-18 | Motonosuke Arai | Construction method for highway bridge joint pavement |
DE102010037873A1 (en) * | 2009-10-02 | 2011-04-07 | Josef Engelbert Fuchs | Method for producing a supporting element for installation in concrete or asphalt pavements of roadway or bridge crossings and thus equipped roadway or bridge crossing |
CN102518036A (en) * | 2011-10-31 | 2012-06-27 | 中交一航局第四工程有限公司 | Construction method for installing bridge expansion joint |
CN102966037A (en) * | 2012-12-14 | 2013-03-13 | 黑龙江省交通科学研究所 | Installation and construction process of bridge expansion joints |
CN103215891A (en) * | 2013-04-22 | 2013-07-24 | 中铁四局集团有限公司 | Manufacturing process for reserved expansion joint and deformation joint of anti-collision guardrail |
CN104631311A (en) * | 2015-01-26 | 2015-05-20 | 上海颖川加固工程技术有限公司 | Bridge expansion joint structure and construction method |
Non-Patent Citations (1)
Title |
---|
桥梁伸缩缝的施工;宋德俊 等;《辽宁交通科技》;20041030(第10期);第109、132页 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108487055A (en) * | 2018-04-28 | 2018-09-04 | 王涛 | A kind of expansion joint dust collect plant and its construction method |
Also Published As
Publication number | Publication date |
---|---|
CN105463986A (en) | 2016-04-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105463986B (en) | Construction method of bridge expansion joint | |
CN105134009A (en) | Sill coping concrete structure of frame structure infilled wall and construction method | |
CN201089875Y (en) | Pavement structure of concrete new-old pavement anastomosis part for broadening road | |
CN106351239A (en) | Cement modified soil strengthened geogrid reinforced soil structure and construction method thereof | |
CN108797636A (en) | A kind of upper font retaining wall structure and its construction method | |
CN206245730U (en) | A kind of cast-in-place pitched roof double template structure | |
CN108193572A (en) | A kind of method recycled to precast beam precasting yard hardened layer | |
CN109236322A (en) | It a kind of artificial bottom plate preventing soft-rock tunnel pucking and its constructs and method for maintaining | |
CN103437353A (en) | Cast-in-situ light foam concrete reinforcing method based on anchor bolt support | |
CN210262555U (en) | Light soil road structure | |
CN208395602U (en) | Steel joint structure of assembled road surface | |
CN110820455A (en) | Construction process for lapping and expanding roadbed of asphalt concrete highway | |
CN108385612A (en) | A kind of construction method of the good concrete protecting face plate of stability | |
CN109252434A (en) | A kind of asphalt pavement structure and its construction method | |
CN108589769A (en) | A kind of embedding rock T shapes combined type column plate high gear wall construction method of overlength | |
CN115450250B (en) | Reinforced cement stabilized macadam retaining wall structure and construction method | |
CN216712592U (en) | Novel roadbed applying foamed light soil | |
CN105672350A (en) | Construction method for repairing lateral displacement of retaining wall | |
CN104947565A (en) | Construction technology for forming railway crossing by pouring of concrete | |
CN105839504B (en) | Assembled cement pavement construction method | |
CN211734909U (en) | Continuous reinforced concrete pavement | |
CN114658045B (en) | Active retaining wall repairing construction method | |
CN207484194U (en) | A kind of seamless road surface of assembling beam and slab type | |
CN111577330A (en) | A construction method for large-section inclined shaft open channel section and its high-strength composite formwork | |
CN205617175U (en) | Be applied to temporary support structure of widening fast in place |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170125 Termination date: 20171201 |