CN105429181A - Automatic photovoltaic power station active power control method - Google Patents
Automatic photovoltaic power station active power control method Download PDFInfo
- Publication number
- CN105429181A CN105429181A CN201511017256.4A CN201511017256A CN105429181A CN 105429181 A CN105429181 A CN 105429181A CN 201511017256 A CN201511017256 A CN 201511017256A CN 105429181 A CN105429181 A CN 105429181A
- Authority
- CN
- China
- Prior art keywords
- inverter
- meritorious
- increment
- active power
- photovoltaic plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 230000001105 regulatory effect Effects 0.000 claims description 17
- 230000005611 electricity Effects 0.000 description 1
Classifications
-
- H02J3/383—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Landscapes
- Inverter Devices (AREA)
Abstract
The invention discloses an automatic photovoltaic power station active power control method. The method comprises the following steps: S1, the priority of each inverter in the photovoltaic power station is set; and S2, according to the priority, the inverters are grouped to acquire multiple inverter sets, wherein the inverters with the same priority are induced to one inverter set. According to the active power output general objective P objective issued by a main station and the current active power output value P outlet for the photovoltaic power station, an active power P increment value in need of adjustment is calculated. According to a judgment result of whether the active power P increment value is a positive value or a negative value, a different inverter adjustment mode is adopted. If the active power P increment value is the positive value, the inverter sets are traversed according to the priorities from high to low, and active power of the inverters is adjusted; and if the active power P increment value is the negative value, the inverter sets are traversed according to the priorities from low to high, and active power of the inverters is adjusted.
Description
Technical field
The present invention relates to photovoltaic plant technical field, particularly relate to and the present invention proposes a kind of photovoltaic plant active power autocontrol method.
Background technology
Photovoltaic plant installed capacity at home has in recent years had fulminant growth, and according to " photovoltaic plant access electric power network technique regulation " requirement, photovoltaic plant should have active power regulation ability, and can control the output of its active power according to dispatching of power netwoks departmental instruction.The power adjustments of current photovoltaic plant can be divided into two classes substantially, and a class is manual adjustment, and a class is automatic adjustment.Send instructions to photovoltaic plant under the mode of manual adjustment and scheduling station, then by start and stop inverter manually; Send instructions to the active power controller device of photovoltaic plant under the mode of automatic adjustment and scheduling station, then exerted oneself by the meritorious of each inverter in active power automatic control equipment control photovoltaic plant.
Existing two class active power controller modes all have shortcoming, and manual adjustment mode needs artificial frequent operation, and labour intensity is large, and the response time is long, and cost of labor is high; Automatic regulative mode response is fast, save cost of labor, but the nargin modes such as the general mode that automatically regulates and distributes is, each inverter in photovoltaic plant is equal, the each inverter active distributed is exerted oneself substantially equal, and in fact in photovoltaic plant the economic benefit of each inverter be different, can not ensure that the economic benefit of photovoltaic plant is maximum etc. the method for salary distribution of nargin.
Summary of the invention
Based on the technical problem that background technology exists, the present invention proposes a kind of photovoltaic plant active power autocontrol method.
A kind of photovoltaic plant active power autocontrol method that the present invention proposes, comprises the following steps:
S1, the priority of each inverter in photovoltaic plant is set;
S2, according to priority to inverter carry out grouping obtain multiple inverter set, the inverter that priority is equal is concluded in an inverter set;
S3, the real-time electric quantity information of acquisition booster stations, and calculate the current force value P that gains merit of photovoltaic plant
outlet;
The meritorious general objective P that exerts oneself of S4, acquisition main website dispatching down distributing
target;
S5, calculating photovoltaic plant need the meritorious increment size P regulated
increment=P
target-P
outlet;
S6, will gain merit increment size P
incrementabsolute value and the meritorious adjustment dead band value P of photovoltaic plant
regulate dead bandcontrast;
If S7 | P
increment| >P
regulate dead band, then meritorious increment size P is judged
incrementfor on the occasion of or be negative value;
The increment size P if S8 gains merit
incrementfor on the occasion of, then travel through inverter set from high to low according to priority, and regulate inverter to send out meritorious;
The increment size P if S9 gains merit
incrementfor negative value, then travel through inverter from low to high according to priority and combine, and regulate inverter to send out meritorious.
Preferably, step S2 is specially: carry out grouping according to priority to inverter and obtain multiple inverter set, and the inverter that priority is equal concludes one and only in an inverter set.
Preferably, also step S10 is comprised: obtain each inverter real time data and running state information in photovoltaic plant.
Preferably, step S8 is divided into following steps:
S81, according to priority from high to low, the set of traversal inverter, as the controlled and current meritorious P of inverter
currentbe less than and maximumly send out P meritorious
can send outtime, gain merit for target regulates this inverter with maximum sending out, the P and real-time accumulated rise is gained merit
raise, P
raise=P
can send out-P
current;
S82, as the meritorious aggregate-value ∑ P of rise
raisebe more than or equal to meritorious increment size P
incrementtime, stop regulating.
Preferably, step S8 also comprises S80 step by step: calculate it according to each inverter real time data and running state information and maximumly send out P meritorious
can send outwith current meritorious P
current.
Preferably, step S9 is divided into following steps:
S91, according to priority from low to high, the set of traversal inverter, as the controlled and current meritorious P of inverter
currentbe greater than most I and send out P meritorious
minimumtime, send out with most I and gain merit for target regulates this inverter, the P and real-time accumulated downward is gained merit
lower, P
lower=P
minimum-P
current;
S92, as the meritorious aggregate-value ∑ P of downward
lowerbe less than or equal to meritorious increment size P
incrementtime, stop regulating.
Preferably, step S9 also comprises S90 step by step: calculate its most I according to each inverter real time data and running state information and send out P meritorious
minimumwith current meritorious P
current.
Photovoltaic plant active power autocontrol method provided by the invention, first can arrange the priority of each inverter in photovoltaic plant, then according to the meritorious general objective P that exerts oneself that main website issues according to economic benefit or other principles
targetgain merit force value P current with photovoltaic plant
outletcalculate the meritorious increment size P needing to regulate
increment.And according to meritorious increment size P
incrementfor on the occasion of or be the judged result of negative value, adopt different inverter regulative modes.If meritorious increment size P
incrementfor on the occasion of, then travel through inverter set from high to low according to priority, and regulate inverter to send out meritorious; If meritorious increment size P
incrementfor negative value, then travel through inverter from low to high according to priority and combine, and regulate inverter to send out meritorious.
In the present invention, by the different situations according to meritorious increment size P increment, adopt different photovoltaic plant regulative modes, allow the high inverter of priority preferentially generate electricity when load up, first turn down priority low inverter active when load down, the economic benefit of photovoltaic plant can be made to reach optimum.
In the present invention, by inverter equal for priority is concluded in same inverter set, be conducive to the speed improving traversal inverter, thus improve the adjustment efficiency of photovoltaic plant.
Accompanying drawing explanation
Fig. 1 is a kind of photovoltaic plant active power autocontrol method flow chart that the present invention proposes.
Embodiment
With reference to Fig. 1, a kind of photovoltaic plant active power autocontrol method that the present invention proposes, comprises the following steps.
S1, the priority of each inverter in photovoltaic plant is set.
Each inverter priority can be arranged as required, such as, according to the economic benefit of inverter each in photovoltaic plant, to ensure that the economic benefit of photovoltaic plant is target to the maximum and carries out priority setting.
S2, carry out grouping obtain multiple inverter set according to priority to inverter, the inverter that priority is equal concludes one and only in an inverter set.
In present embodiment, the inverter equal to priority by inverter set is gathered, and is conducive to improving the follow-up efficiency regulated inverter, thus the efficiency that raising active power controls automatically.
S3, the real-time electric quantity information of acquisition booster stations, and calculate the current force value P that gains merit of photovoltaic plant
outlet.The meritorious general objective P that exerts oneself of S4, acquisition main website dispatching down distributing
target.
S5, calculating photovoltaic plant need the meritorious increment size P regulated
increment=P
target-P
outlet.
S6, will gain merit increment size P
incrementabsolute value and the meritorious adjustment dead band value P of photovoltaic plant
regulate dead bandcontrast.
If S7 | P
increment| >P
regulate dead band, then meritorious increment size P is judged further
incrementfor on the occasion of or be negative value.If | P
increment| <P
regulate dead band, then illustrate that photovoltaic plant is working properly, does not need to regulate, so can terminate to regulate.
In present embodiment, when | P
increment| >P
regulate dead band, regardless of P
incrementfor on the occasion of or be negative value, all need to carry out real power control to photovoltaic plant, especially by the meritorious realization of exerting oneself regulating each inverter, so, this method also comprises step S10: obtain each inverter real time data and running state information in photovoltaic plant, to grasp the real-time status of each inverter.
If meritorious increment size P
incrementfor on the occasion of, then illustrate, need meritorious the exerting oneself of each inverter to heighten.In order to realize higher economic benefit, in present embodiment, according to priority order from high to low, each inverter being regulated, specifically can refer to step S80-S82.
S80: calculate it according to each inverter real time data and running state information and maximumly send out P meritorious
can send outwith current meritorious P
current.
S81, according to priority from high to low, the set of traversal inverter, as the controlled and current meritorious P of inverter
currentbe less than and maximumly send out P meritorious
can send outtime, gain merit for target regulates this inverter with maximum sending out, the P and real-time accumulated rise is gained merit
raise, P
raise=P
can send out-P
current.
S82, as the meritorious aggregate-value ∑ P of rise
raisebe more than or equal to meritorious increment size P
incrementtime, stop regulating.
In this step, first the highest to priority inverter set regulates, and the rise after the part or all of controlled inverter in inverter set regulates is gained merit P
raisetotal value can meet meritorious increment size P
incrementtime, then stop regulating; The P if the rise after controlled inverters all in current inverter set regulates is gained merit
raisetotal value still do not reach meritorious increment size P
incrementtime, then further the inverter in the inverter set of the low one-level of priority is regulated, until reach meritorious increment size P
increment.
If meritorious increment size P
incrementfor negative value, then illustrate, need meritorious the exerting oneself of each inverter to turn down.In order to realize higher economic benefit, in present embodiment, according to priority order from low to high, each inverter being regulated, specifically can refer to step S90-S92.。
Step S90, to calculate the most I of each inverter according to each inverter real time data and running state information and send out P meritorious
minimumwith current meritorious P
current.
S91, according to priority from low to high, the set of traversal inverter, as the controlled and current meritorious P of inverter
currentbe greater than most I and send out P meritorious
minimumtime, send out with most I and gain merit for target regulates this inverter, the P and real-time accumulated downward is gained merit
lower, P
lower=P
minimum-P
current.
S92, as the meritorious aggregate-value ∑ P of downward
lowerbe less than or equal to meritorious increment size P
incrementtime, stop regulating.
In this step, first regulate the inverter set that priority is minimum, the downward after the part or all of controlled inverter in inverter set regulates is gained merit P
lowertotal value can meet meritorious increment size P
incrementtime, then stop regulating; The P if the downward after controlled inverters all in current inverter set regulates is gained merit
lowertotal value still do not reach meritorious increment size P
incrementtime, then further the inverter in the higher leveled inverter set of priority is regulated, until reach meritorious increment size P
increment.
The above; be only the present invention's preferably embodiment; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to according to technical scheme of the present invention and inventive concept thereof and replace or change, all should be encompassed within protection scope of the present invention.
Claims (7)
1. a photovoltaic plant active power autocontrol method, is characterized in that, comprises the following steps:
S1, the priority of each inverter in photovoltaic plant is set;
S2, according to priority to inverter carry out grouping obtain multiple inverter set, the inverter that priority is equal is concluded in an inverter set;
S3, the real-time electric quantity information of acquisition booster stations, and calculate the current force value P that gains merit of photovoltaic plant
outlet;
The meritorious general objective P that exerts oneself of S4, acquisition main website dispatching down distributing
target;
S5, calculating photovoltaic plant need the meritorious increment size P regulated
increment=P
target-P
outlet;
S6, will gain merit increment size P
incrementabsolute value and the meritorious adjustment dead band value P of photovoltaic plant
regulate dead bandcontrast;
If S7 | P
increment| >P
regulate dead band, then meritorious increment size P is judged
incrementfor on the occasion of or be negative value;
The increment size P if S8 gains merit
incrementfor on the occasion of, then travel through inverter set from high to low according to priority, and regulate inverter to send out meritorious;
The increment size P if S9 gains merit
incrementfor negative value, then travel through inverter from low to high according to priority and combine, and regulate inverter to send out meritorious.
2. photovoltaic plant active power autocontrol method as claimed in claim 1, it is characterized in that, step S2 is specially: carry out grouping according to priority to inverter and obtain multiple inverter set, and the inverter that priority is equal concludes one and only in an inverter set.
3. photovoltaic plant active power autocontrol method as claimed in claim 1, is characterized in that, also comprise step S10: obtain each inverter real time data and running state information in photovoltaic plant.
4. photovoltaic plant active power autocontrol method as claimed in claim 3, it is characterized in that, step S8 is divided into following steps:
S81, according to priority from high to low, the set of traversal inverter, as the controlled and current meritorious P of inverter
currentbe less than and maximumly send out P meritorious
can send outtime, gain merit for target regulates this inverter with maximum sending out, the P and real-time accumulated rise is gained merit
raise, P
raise=P
can send out-P
current;
S82, as the meritorious aggregate-value ∑ P of rise
raisebe more than or equal to meritorious increment size P
incrementtime, stop regulating.
5. photovoltaic plant active power autocontrol method as claimed in claim 4, it is characterized in that, step S8 also comprises S80 step by step: calculate it according to each inverter real time data and running state information and maximumly send out P meritorious
can send outwith current meritorious P
current.
6. photovoltaic plant active power autocontrol method as claimed in claim 3, it is characterized in that, step S9 is divided into following steps:
S91, according to priority from low to high, the set of traversal inverter, as the controlled and current meritorious P of inverter
currentbe greater than most I and send out P meritorious
minimumtime, send out with most I and gain merit for target regulates this inverter, the P and real-time accumulated downward is gained merit
lower, P
lower=P
minimum-P
current;
S92, as the meritorious aggregate-value ∑ P of downward
lowerbe less than or equal to meritorious increment size P
incrementtime, stop regulating.
7. photovoltaic plant active power autocontrol method as claimed in claim 6, it is characterized in that, step S9 also comprises S90 step by step: calculate its most I according to each inverter real time data and running state information and send out P meritorious
minimumwith current meritorious P
current.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511017256.4A CN105429181A (en) | 2015-12-29 | 2015-12-29 | Automatic photovoltaic power station active power control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511017256.4A CN105429181A (en) | 2015-12-29 | 2015-12-29 | Automatic photovoltaic power station active power control method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105429181A true CN105429181A (en) | 2016-03-23 |
Family
ID=55507198
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511017256.4A Pending CN105429181A (en) | 2015-12-29 | 2015-12-29 | Automatic photovoltaic power station active power control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105429181A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107994618A (en) * | 2017-12-15 | 2018-05-04 | 北京交通大学 | The active power dispatching method and power distribution network measuring and controlling equipment of power distribution network level light accumulation |
CN116231632A (en) * | 2023-01-10 | 2023-06-06 | 北京市腾河电子技术有限公司 | Power regulation and control method and system for photovoltaic power station, electronic equipment and storage medium |
CN116526587A (en) * | 2023-06-16 | 2023-08-01 | 国网山东省电力公司泰安供电公司 | Photovoltaic grid-connected configuration-free system and method |
CN116565942A (en) * | 2023-04-17 | 2023-08-08 | 国网山东省电力公司泰安供电公司 | A 5G network-based AGC scheduling method for photovoltaic inverters |
CN119582328A (en) * | 2025-02-08 | 2025-03-07 | 国网冀北电力有限公司张家口供电公司 | Inverter control method, system, power system and inverter scheduling method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011076242A1 (en) * | 2009-12-21 | 2011-06-30 | Siemens Aktiengesellschaft | Expanded power automation system |
CN103268136A (en) * | 2013-05-10 | 2013-08-28 | 国电南瑞南京控制系统有限公司 | Active power control method of photovoltaic power station |
-
2015
- 2015-12-29 CN CN201511017256.4A patent/CN105429181A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011076242A1 (en) * | 2009-12-21 | 2011-06-30 | Siemens Aktiengesellschaft | Expanded power automation system |
CN103268136A (en) * | 2013-05-10 | 2013-08-28 | 国电南瑞南京控制系统有限公司 | Active power control method of photovoltaic power station |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107994618A (en) * | 2017-12-15 | 2018-05-04 | 北京交通大学 | The active power dispatching method and power distribution network measuring and controlling equipment of power distribution network level light accumulation |
CN116231632A (en) * | 2023-01-10 | 2023-06-06 | 北京市腾河电子技术有限公司 | Power regulation and control method and system for photovoltaic power station, electronic equipment and storage medium |
CN116231632B (en) * | 2023-01-10 | 2024-04-16 | 北京市腾河电子技术有限公司 | Power regulation and control method and system for photovoltaic power station, electronic equipment and storage medium |
CN116565942A (en) * | 2023-04-17 | 2023-08-08 | 国网山东省电力公司泰安供电公司 | A 5G network-based AGC scheduling method for photovoltaic inverters |
CN116526587A (en) * | 2023-06-16 | 2023-08-01 | 国网山东省电力公司泰安供电公司 | Photovoltaic grid-connected configuration-free system and method |
CN119582328A (en) * | 2025-02-08 | 2025-03-07 | 国网冀北电力有限公司张家口供电公司 | Inverter control method, system, power system and inverter scheduling method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102400855B (en) | Power adjusting method and device in wind farm | |
CN102709939B (en) | Active power control method of wind power station for improving power generation efficiency of wind power station | |
CN105429181A (en) | Automatic photovoltaic power station active power control method | |
CN105720585B (en) | The reactive power control method and system of wind power plant cluster | |
CN105978043B (en) | Photovoltaic plant multi-inverter active power controller method | |
CN105633949B (en) | Economic operation real-time power generation scheduling and control method | |
US9898018B2 (en) | Power clipping method and system | |
CN103928940A (en) | A distributed photovoltaic power plant active power control device and control method | |
CN102361330A (en) | Active power optimizing and distributing method for wind generator unit of wind power station | |
RU2012143401A (en) | REGULATION OF THE CONTRIBUTION OF SECONDARY ENERGY SOURCES TO THE ELECTRIC DISTRIBUTION NETWORK | |
CN103259267A (en) | Mold splitting type voltage control method for wind power plant cluster | |
CN103226735B (en) | A kind of power system optimal dispatch method based on wind-powered electricity generation segmentation | |
CN102931662B (en) | Distributive load dynamic regulation-based microgrid monitoring system and control method | |
CN104269855B (en) | Rapid site reactive voltage adjusting method adaptable to multiple energy accesses | |
CN204615404U (en) | Ventilation air gas/photovoltaic generating system that automatic power factor regulates | |
CN103001292A (en) | Charger energy-saving control method | |
CN110635521A (en) | A fair coordination control method and system based on power and reserve capacity | |
CN105656027B (en) | The control method and device of wind storing cogeneration system active power and reactive voltage | |
US10097001B2 (en) | Power control system for energy storage devices, and control device and control method thereof | |
CN104333049B (en) | A kind of active power for wind power controls distribution method and system | |
CN106340893B (en) | A distributed photovoltaic power generation power control method based on virtual power plant | |
CN105978031A (en) | Method and system for conducting active and reactive coordinated control on photovoltaic device | |
CN105743134B (en) | It is adaptive quickly to adjust photovoltaic AVC control methods | |
CN109830992B (en) | Self-adaptive adjustment energy scheduling control method, device and system | |
CN104253443B (en) | A kind of active quickly regulating method of virtual small hydropower system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160323 |