[go: up one dir, main page]

CN105429181A - Automatic photovoltaic power station active power control method - Google Patents

Automatic photovoltaic power station active power control method Download PDF

Info

Publication number
CN105429181A
CN105429181A CN201511017256.4A CN201511017256A CN105429181A CN 105429181 A CN105429181 A CN 105429181A CN 201511017256 A CN201511017256 A CN 201511017256A CN 105429181 A CN105429181 A CN 105429181A
Authority
CN
China
Prior art keywords
inverter
meritorious
increment
active power
photovoltaic plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201511017256.4A
Other languages
Chinese (zh)
Inventor
温全
殷骏
程琦
谢芝东
计圣凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd
Original Assignee
ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd filed Critical ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd
Priority to CN201511017256.4A priority Critical patent/CN105429181A/en
Publication of CN105429181A publication Critical patent/CN105429181A/en
Pending legal-status Critical Current

Links

Classifications

    • H02J3/383
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Landscapes

  • Inverter Devices (AREA)

Abstract

The invention discloses an automatic photovoltaic power station active power control method. The method comprises the following steps: S1, the priority of each inverter in the photovoltaic power station is set; and S2, according to the priority, the inverters are grouped to acquire multiple inverter sets, wherein the inverters with the same priority are induced to one inverter set. According to the active power output general objective P objective issued by a main station and the current active power output value P outlet for the photovoltaic power station, an active power P increment value in need of adjustment is calculated. According to a judgment result of whether the active power P increment value is a positive value or a negative value, a different inverter adjustment mode is adopted. If the active power P increment value is the positive value, the inverter sets are traversed according to the priorities from high to low, and active power of the inverters is adjusted; and if the active power P increment value is the negative value, the inverter sets are traversed according to the priorities from low to high, and active power of the inverters is adjusted.

Description

A kind of photovoltaic plant active power autocontrol method
Technical field
The present invention relates to photovoltaic plant technical field, particularly relate to and the present invention proposes a kind of photovoltaic plant active power autocontrol method.
Background technology
Photovoltaic plant installed capacity at home has in recent years had fulminant growth, and according to " photovoltaic plant access electric power network technique regulation " requirement, photovoltaic plant should have active power regulation ability, and can control the output of its active power according to dispatching of power netwoks departmental instruction.The power adjustments of current photovoltaic plant can be divided into two classes substantially, and a class is manual adjustment, and a class is automatic adjustment.Send instructions to photovoltaic plant under the mode of manual adjustment and scheduling station, then by start and stop inverter manually; Send instructions to the active power controller device of photovoltaic plant under the mode of automatic adjustment and scheduling station, then exerted oneself by the meritorious of each inverter in active power automatic control equipment control photovoltaic plant.
Existing two class active power controller modes all have shortcoming, and manual adjustment mode needs artificial frequent operation, and labour intensity is large, and the response time is long, and cost of labor is high; Automatic regulative mode response is fast, save cost of labor, but the nargin modes such as the general mode that automatically regulates and distributes is, each inverter in photovoltaic plant is equal, the each inverter active distributed is exerted oneself substantially equal, and in fact in photovoltaic plant the economic benefit of each inverter be different, can not ensure that the economic benefit of photovoltaic plant is maximum etc. the method for salary distribution of nargin.
Summary of the invention
Based on the technical problem that background technology exists, the present invention proposes a kind of photovoltaic plant active power autocontrol method.
A kind of photovoltaic plant active power autocontrol method that the present invention proposes, comprises the following steps:
S1, the priority of each inverter in photovoltaic plant is set;
S2, according to priority to inverter carry out grouping obtain multiple inverter set, the inverter that priority is equal is concluded in an inverter set;
S3, the real-time electric quantity information of acquisition booster stations, and calculate the current force value P that gains merit of photovoltaic plant outlet;
The meritorious general objective P that exerts oneself of S4, acquisition main website dispatching down distributing target;
S5, calculating photovoltaic plant need the meritorious increment size P regulated increment=P target-P outlet;
S6, will gain merit increment size P incrementabsolute value and the meritorious adjustment dead band value P of photovoltaic plant regulate dead bandcontrast;
If S7 | P increment| >P regulate dead band, then meritorious increment size P is judged incrementfor on the occasion of or be negative value;
The increment size P if S8 gains merit incrementfor on the occasion of, then travel through inverter set from high to low according to priority, and regulate inverter to send out meritorious;
The increment size P if S9 gains merit incrementfor negative value, then travel through inverter from low to high according to priority and combine, and regulate inverter to send out meritorious.
Preferably, step S2 is specially: carry out grouping according to priority to inverter and obtain multiple inverter set, and the inverter that priority is equal concludes one and only in an inverter set.
Preferably, also step S10 is comprised: obtain each inverter real time data and running state information in photovoltaic plant.
Preferably, step S8 is divided into following steps:
S81, according to priority from high to low, the set of traversal inverter, as the controlled and current meritorious P of inverter currentbe less than and maximumly send out P meritorious can send outtime, gain merit for target regulates this inverter with maximum sending out, the P and real-time accumulated rise is gained merit raise, P raise=P can send out-P current;
S82, as the meritorious aggregate-value ∑ P of rise raisebe more than or equal to meritorious increment size P incrementtime, stop regulating.
Preferably, step S8 also comprises S80 step by step: calculate it according to each inverter real time data and running state information and maximumly send out P meritorious can send outwith current meritorious P current.
Preferably, step S9 is divided into following steps:
S91, according to priority from low to high, the set of traversal inverter, as the controlled and current meritorious P of inverter currentbe greater than most I and send out P meritorious minimumtime, send out with most I and gain merit for target regulates this inverter, the P and real-time accumulated downward is gained merit lower, P lower=P minimum-P current;
S92, as the meritorious aggregate-value ∑ P of downward lowerbe less than or equal to meritorious increment size P incrementtime, stop regulating.
Preferably, step S9 also comprises S90 step by step: calculate its most I according to each inverter real time data and running state information and send out P meritorious minimumwith current meritorious P current.
Photovoltaic plant active power autocontrol method provided by the invention, first can arrange the priority of each inverter in photovoltaic plant, then according to the meritorious general objective P that exerts oneself that main website issues according to economic benefit or other principles targetgain merit force value P current with photovoltaic plant outletcalculate the meritorious increment size P needing to regulate increment.And according to meritorious increment size P incrementfor on the occasion of or be the judged result of negative value, adopt different inverter regulative modes.If meritorious increment size P incrementfor on the occasion of, then travel through inverter set from high to low according to priority, and regulate inverter to send out meritorious; If meritorious increment size P incrementfor negative value, then travel through inverter from low to high according to priority and combine, and regulate inverter to send out meritorious.
In the present invention, by the different situations according to meritorious increment size P increment, adopt different photovoltaic plant regulative modes, allow the high inverter of priority preferentially generate electricity when load up, first turn down priority low inverter active when load down, the economic benefit of photovoltaic plant can be made to reach optimum.
In the present invention, by inverter equal for priority is concluded in same inverter set, be conducive to the speed improving traversal inverter, thus improve the adjustment efficiency of photovoltaic plant.
Accompanying drawing explanation
Fig. 1 is a kind of photovoltaic plant active power autocontrol method flow chart that the present invention proposes.
Embodiment
With reference to Fig. 1, a kind of photovoltaic plant active power autocontrol method that the present invention proposes, comprises the following steps.
S1, the priority of each inverter in photovoltaic plant is set.
Each inverter priority can be arranged as required, such as, according to the economic benefit of inverter each in photovoltaic plant, to ensure that the economic benefit of photovoltaic plant is target to the maximum and carries out priority setting.
S2, carry out grouping obtain multiple inverter set according to priority to inverter, the inverter that priority is equal concludes one and only in an inverter set.
In present embodiment, the inverter equal to priority by inverter set is gathered, and is conducive to improving the follow-up efficiency regulated inverter, thus the efficiency that raising active power controls automatically.
S3, the real-time electric quantity information of acquisition booster stations, and calculate the current force value P that gains merit of photovoltaic plant outlet.The meritorious general objective P that exerts oneself of S4, acquisition main website dispatching down distributing target.
S5, calculating photovoltaic plant need the meritorious increment size P regulated increment=P target-P outlet.
S6, will gain merit increment size P incrementabsolute value and the meritorious adjustment dead band value P of photovoltaic plant regulate dead bandcontrast.
If S7 | P increment| >P regulate dead band, then meritorious increment size P is judged further incrementfor on the occasion of or be negative value.If | P increment| <P regulate dead band, then illustrate that photovoltaic plant is working properly, does not need to regulate, so can terminate to regulate.
In present embodiment, when | P increment| >P regulate dead band, regardless of P incrementfor on the occasion of or be negative value, all need to carry out real power control to photovoltaic plant, especially by the meritorious realization of exerting oneself regulating each inverter, so, this method also comprises step S10: obtain each inverter real time data and running state information in photovoltaic plant, to grasp the real-time status of each inverter.
If meritorious increment size P incrementfor on the occasion of, then illustrate, need meritorious the exerting oneself of each inverter to heighten.In order to realize higher economic benefit, in present embodiment, according to priority order from high to low, each inverter being regulated, specifically can refer to step S80-S82.
S80: calculate it according to each inverter real time data and running state information and maximumly send out P meritorious can send outwith current meritorious P current.
S81, according to priority from high to low, the set of traversal inverter, as the controlled and current meritorious P of inverter currentbe less than and maximumly send out P meritorious can send outtime, gain merit for target regulates this inverter with maximum sending out, the P and real-time accumulated rise is gained merit raise, P raise=P can send out-P current.
S82, as the meritorious aggregate-value ∑ P of rise raisebe more than or equal to meritorious increment size P incrementtime, stop regulating.
In this step, first the highest to priority inverter set regulates, and the rise after the part or all of controlled inverter in inverter set regulates is gained merit P raisetotal value can meet meritorious increment size P incrementtime, then stop regulating; The P if the rise after controlled inverters all in current inverter set regulates is gained merit raisetotal value still do not reach meritorious increment size P incrementtime, then further the inverter in the inverter set of the low one-level of priority is regulated, until reach meritorious increment size P increment.
If meritorious increment size P incrementfor negative value, then illustrate, need meritorious the exerting oneself of each inverter to turn down.In order to realize higher economic benefit, in present embodiment, according to priority order from low to high, each inverter being regulated, specifically can refer to step S90-S92.。
Step S90, to calculate the most I of each inverter according to each inverter real time data and running state information and send out P meritorious minimumwith current meritorious P current.
S91, according to priority from low to high, the set of traversal inverter, as the controlled and current meritorious P of inverter currentbe greater than most I and send out P meritorious minimumtime, send out with most I and gain merit for target regulates this inverter, the P and real-time accumulated downward is gained merit lower, P lower=P minimum-P current.
S92, as the meritorious aggregate-value ∑ P of downward lowerbe less than or equal to meritorious increment size P incrementtime, stop regulating.
In this step, first regulate the inverter set that priority is minimum, the downward after the part or all of controlled inverter in inverter set regulates is gained merit P lowertotal value can meet meritorious increment size P incrementtime, then stop regulating; The P if the downward after controlled inverters all in current inverter set regulates is gained merit lowertotal value still do not reach meritorious increment size P incrementtime, then further the inverter in the higher leveled inverter set of priority is regulated, until reach meritorious increment size P increment.
The above; be only the present invention's preferably embodiment; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to according to technical scheme of the present invention and inventive concept thereof and replace or change, all should be encompassed within protection scope of the present invention.

Claims (7)

1. a photovoltaic plant active power autocontrol method, is characterized in that, comprises the following steps:
S1, the priority of each inverter in photovoltaic plant is set;
S2, according to priority to inverter carry out grouping obtain multiple inverter set, the inverter that priority is equal is concluded in an inverter set;
S3, the real-time electric quantity information of acquisition booster stations, and calculate the current force value P that gains merit of photovoltaic plant outlet;
The meritorious general objective P that exerts oneself of S4, acquisition main website dispatching down distributing target;
S5, calculating photovoltaic plant need the meritorious increment size P regulated increment=P target-P outlet;
S6, will gain merit increment size P incrementabsolute value and the meritorious adjustment dead band value P of photovoltaic plant regulate dead bandcontrast;
If S7 | P increment| >P regulate dead band, then meritorious increment size P is judged incrementfor on the occasion of or be negative value;
The increment size P if S8 gains merit incrementfor on the occasion of, then travel through inverter set from high to low according to priority, and regulate inverter to send out meritorious;
The increment size P if S9 gains merit incrementfor negative value, then travel through inverter from low to high according to priority and combine, and regulate inverter to send out meritorious.
2. photovoltaic plant active power autocontrol method as claimed in claim 1, it is characterized in that, step S2 is specially: carry out grouping according to priority to inverter and obtain multiple inverter set, and the inverter that priority is equal concludes one and only in an inverter set.
3. photovoltaic plant active power autocontrol method as claimed in claim 1, is characterized in that, also comprise step S10: obtain each inverter real time data and running state information in photovoltaic plant.
4. photovoltaic plant active power autocontrol method as claimed in claim 3, it is characterized in that, step S8 is divided into following steps:
S81, according to priority from high to low, the set of traversal inverter, as the controlled and current meritorious P of inverter currentbe less than and maximumly send out P meritorious can send outtime, gain merit for target regulates this inverter with maximum sending out, the P and real-time accumulated rise is gained merit raise, P raise=P can send out-P current;
S82, as the meritorious aggregate-value ∑ P of rise raisebe more than or equal to meritorious increment size P incrementtime, stop regulating.
5. photovoltaic plant active power autocontrol method as claimed in claim 4, it is characterized in that, step S8 also comprises S80 step by step: calculate it according to each inverter real time data and running state information and maximumly send out P meritorious can send outwith current meritorious P current.
6. photovoltaic plant active power autocontrol method as claimed in claim 3, it is characterized in that, step S9 is divided into following steps:
S91, according to priority from low to high, the set of traversal inverter, as the controlled and current meritorious P of inverter currentbe greater than most I and send out P meritorious minimumtime, send out with most I and gain merit for target regulates this inverter, the P and real-time accumulated downward is gained merit lower, P lower=P minimum-P current;
S92, as the meritorious aggregate-value ∑ P of downward lowerbe less than or equal to meritorious increment size P incrementtime, stop regulating.
7. photovoltaic plant active power autocontrol method as claimed in claim 6, it is characterized in that, step S9 also comprises S90 step by step: calculate its most I according to each inverter real time data and running state information and send out P meritorious minimumwith current meritorious P current.
CN201511017256.4A 2015-12-29 2015-12-29 Automatic photovoltaic power station active power control method Pending CN105429181A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511017256.4A CN105429181A (en) 2015-12-29 2015-12-29 Automatic photovoltaic power station active power control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511017256.4A CN105429181A (en) 2015-12-29 2015-12-29 Automatic photovoltaic power station active power control method

Publications (1)

Publication Number Publication Date
CN105429181A true CN105429181A (en) 2016-03-23

Family

ID=55507198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511017256.4A Pending CN105429181A (en) 2015-12-29 2015-12-29 Automatic photovoltaic power station active power control method

Country Status (1)

Country Link
CN (1) CN105429181A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107994618A (en) * 2017-12-15 2018-05-04 北京交通大学 The active power dispatching method and power distribution network measuring and controlling equipment of power distribution network level light accumulation
CN116231632A (en) * 2023-01-10 2023-06-06 北京市腾河电子技术有限公司 Power regulation and control method and system for photovoltaic power station, electronic equipment and storage medium
CN116526587A (en) * 2023-06-16 2023-08-01 国网山东省电力公司泰安供电公司 Photovoltaic grid-connected configuration-free system and method
CN116565942A (en) * 2023-04-17 2023-08-08 国网山东省电力公司泰安供电公司 A 5G network-based AGC scheduling method for photovoltaic inverters
CN119582328A (en) * 2025-02-08 2025-03-07 国网冀北电力有限公司张家口供电公司 Inverter control method, system, power system and inverter scheduling method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011076242A1 (en) * 2009-12-21 2011-06-30 Siemens Aktiengesellschaft Expanded power automation system
CN103268136A (en) * 2013-05-10 2013-08-28 国电南瑞南京控制系统有限公司 Active power control method of photovoltaic power station

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011076242A1 (en) * 2009-12-21 2011-06-30 Siemens Aktiengesellschaft Expanded power automation system
CN103268136A (en) * 2013-05-10 2013-08-28 国电南瑞南京控制系统有限公司 Active power control method of photovoltaic power station

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107994618A (en) * 2017-12-15 2018-05-04 北京交通大学 The active power dispatching method and power distribution network measuring and controlling equipment of power distribution network level light accumulation
CN116231632A (en) * 2023-01-10 2023-06-06 北京市腾河电子技术有限公司 Power regulation and control method and system for photovoltaic power station, electronic equipment and storage medium
CN116231632B (en) * 2023-01-10 2024-04-16 北京市腾河电子技术有限公司 Power regulation and control method and system for photovoltaic power station, electronic equipment and storage medium
CN116565942A (en) * 2023-04-17 2023-08-08 国网山东省电力公司泰安供电公司 A 5G network-based AGC scheduling method for photovoltaic inverters
CN116526587A (en) * 2023-06-16 2023-08-01 国网山东省电力公司泰安供电公司 Photovoltaic grid-connected configuration-free system and method
CN119582328A (en) * 2025-02-08 2025-03-07 国网冀北电力有限公司张家口供电公司 Inverter control method, system, power system and inverter scheduling method

Similar Documents

Publication Publication Date Title
CN102400855B (en) Power adjusting method and device in wind farm
CN102709939B (en) Active power control method of wind power station for improving power generation efficiency of wind power station
CN105429181A (en) Automatic photovoltaic power station active power control method
CN105720585B (en) The reactive power control method and system of wind power plant cluster
CN105978043B (en) Photovoltaic plant multi-inverter active power controller method
CN105633949B (en) Economic operation real-time power generation scheduling and control method
US9898018B2 (en) Power clipping method and system
CN103928940A (en) A distributed photovoltaic power plant active power control device and control method
CN102361330A (en) Active power optimizing and distributing method for wind generator unit of wind power station
RU2012143401A (en) REGULATION OF THE CONTRIBUTION OF SECONDARY ENERGY SOURCES TO THE ELECTRIC DISTRIBUTION NETWORK
CN103259267A (en) Mold splitting type voltage control method for wind power plant cluster
CN103226735B (en) A kind of power system optimal dispatch method based on wind-powered electricity generation segmentation
CN102931662B (en) Distributive load dynamic regulation-based microgrid monitoring system and control method
CN104269855B (en) Rapid site reactive voltage adjusting method adaptable to multiple energy accesses
CN204615404U (en) Ventilation air gas/photovoltaic generating system that automatic power factor regulates
CN103001292A (en) Charger energy-saving control method
CN110635521A (en) A fair coordination control method and system based on power and reserve capacity
CN105656027B (en) The control method and device of wind storing cogeneration system active power and reactive voltage
US10097001B2 (en) Power control system for energy storage devices, and control device and control method thereof
CN104333049B (en) A kind of active power for wind power controls distribution method and system
CN106340893B (en) A distributed photovoltaic power generation power control method based on virtual power plant
CN105978031A (en) Method and system for conducting active and reactive coordinated control on photovoltaic device
CN105743134B (en) It is adaptive quickly to adjust photovoltaic AVC control methods
CN109830992B (en) Self-adaptive adjustment energy scheduling control method, device and system
CN104253443B (en) A kind of active quickly regulating method of virtual small hydropower system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160323