[go: up one dir, main page]

CN105373092B - A kind of water factory's special intelligent networked control systems and its control method - Google Patents

A kind of water factory's special intelligent networked control systems and its control method Download PDF

Info

Publication number
CN105373092B
CN105373092B CN201510662945.4A CN201510662945A CN105373092B CN 105373092 B CN105373092 B CN 105373092B CN 201510662945 A CN201510662945 A CN 201510662945A CN 105373092 B CN105373092 B CN 105373092B
Authority
CN
China
Prior art keywords
water
pump
unit
flow
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510662945.4A
Other languages
Chinese (zh)
Other versions
CN105373092A (en
Inventor
范青如
张振华
冯金荣
秦爱冬
达云祥
杨志宏
贾伯林
乔春光
季周荣
周圆圆
万冲
徐春峰
卢建波
汤建林
朱兆祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIPINGYANG WATER TREATMENT ENGINEERING Co Ltd
Original Assignee
TAIPINGYANG WATER TREATMENT ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIPINGYANG WATER TREATMENT ENGINEERING Co Ltd filed Critical TAIPINGYANG WATER TREATMENT ENGINEERING Co Ltd
Priority to CN201510662945.4A priority Critical patent/CN105373092B/en
Publication of CN105373092A publication Critical patent/CN105373092A/en
Application granted granted Critical
Publication of CN105373092B publication Critical patent/CN105373092B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/4184Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by fault tolerance, reliability of production system

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Separation Of Suspended Particles By Flocculating Agents (AREA)
  • Treatment Of Water By Oxidation Or Reduction (AREA)

Abstract

The invention discloses a kind of water factory's special intelligent networked control systems, including the raw water pipeline equipped with flow of inlet water display record and valve control system, equipped with raw water water distribution and the distribution reservoir of valving system, equipped with the flocculation sedimentation tank of automatic medicament feeding system, equipped with the filter tank of automation control system, equipped with the clear water reserviors and the water supply pump installation equipped with confession constant pressure water supply regulating system of chlorination and residual chlorine monitoring system, pipeline alarm and alignment system are further equipped with raw water pipeline, distribution reservoir is further equipped with the micro-tensioning system of raw water water distribution, flocculation sedimentation tank is further equipped with kinetic parameter on-line monitoring and feedback optimized system, clear water reserviors are further equipped with disinfection reactions parameter real time monitoring and feedback optimized system, water supply pump installation is further equipped with water supply pump installation with pump optimization system.It is of the invention to add more intelligent elements with original water factory, meet the demand of modern development in science and technology.

Description

A kind of water factory's special intelligent networked control systems and its control method
Technical field
The invention is related to a kind of water factory's special intelligent networked control systems, and the invention further relates to a kind of water factory's Special intelligent control The control method of system processed, it is related to Automated condtrol and water treatment field, more particularly to the full factory's production monitoring in water treatment plant and pipe Reason field.
Background technology
The world today faces serious water crisis, and water resource, which lacks to turn into, is related to poor, sustainable development or even generation The significant problem of boundary's peace and safety.China is the country of a shortage of water resources, and the more water of people are few, water resource spatial and temporal distributions are uneven It is the fundamental realities of the country and regimen in China, strengthens water demand and water utilizing process management, by perfects system, fulfilling one's duties, improve Ability, strengthen supervision, strictly control water total amount, improve water-use efficiency comprehensively.Strengthen water affairs management, using water wisely, reduce and give up Water discharge has important and far-reaching meaning.
Daily production and maintenance using Automated condtrol progress water factory are the notable spies of water supply industry development in recent years Point.From in the 1980s, after the development of nearly 30 years, the automation of water factory is just progressively ripe, has been directed to include filter tank automatic Almost full water factory's production links such as change, adding-reagent automation, water quality detection automation.The automatic management of water factory makes in day-to-day operation Human cost be greatly lowered, the efficiency of water factory is improved significantly.
Such as the A of Chinese patent CN 104156900 disclose a kind of water works management information intelligent monitoring system, its feature exists In:Including information gathering, Transmission system and Database Administration Server;Described information gathers, for gathering in predeterminable area Water works management information;The Transmission system, for by water works management information transfer to Database Administration Server;The database Management server, for storing the data of processing Transmission system transmission;Wherein described Database Administration Server takes including data Be engaged in layer, using supporting layer, application layer and using alternation of bed;The data service layer, for storing the water obtained from information gathering Factory's management information;It is described to apply supporting layer, for the data in processing data service layer and it is transported to application layer;The application Layer, for establishing water works management information processing data platform;It is described to apply alternation of bed, for realizing that application layer and user exchange letter Breath.But as the further development of automatic technology and vigorously advocating for energy-saving policy, water works management personnel have got over To get over the single AutoPlay function that can not be satisfied with current automatic technology and be only capable of providing, they need to assign water plant automation More intensions are controlled, are changed from automation to intellectuality.
Main flow control system is mainly included with lower part used by current water factory:Flow of inlet water display record and valve control System, raw water water distribution and valve regulated, flocculate link Automatic Dosing, the Automated condtrol in filter tank, clear water reserviors chlorination and residual chlorine monitoring, Water supply pump house carries out constant pressure water supply regulation.Main flow control system is with data acquisition, display, automatic feeding and simple collection feedback Regulation is characterized.
New Automated condtrol not only needs to enter the technological parameters such as full plant operating mode, instrument and other field datas Row monitoring, it also can interpolate that the quality of current data index and carry out auto-control.Water factory's automatic control production under the new situation is flat Platform should be able to also be when water factory's production occurs abnormal to operating personnel's alert, and can provide corresponding emergent management journey Sequence, the capability in handling accident and rate of straining of administrative staff are improved, accident is contained in the budding stage as far as possible or drops loss To continuity that is minimum, ensureing the security reliability of Water Works and produce.
By summarizing above mentioned problem, we understand, to the Automated condtrol platform of current water factory, how to include water factory's operation Automatic Optimal adjusting function it is most important.
The content of the invention
It is an object of the invention to for deficiency of the prior art, there is provided a kind of water factory's special intelligent networked control systems and Its control method, the Automatic Optimal adjusting function of water factory's operation is incorporated, more intelligence is effective.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of water factory's special intelligent networked control systems, Including the raw water pipeline equipped with flow of inlet water display record and valve control system, equipped with raw water water distribution and valve regulated system The distribution reservoir of system, the flocculation sedimentation tank equipped with automatic medicament feeding system, the filter tank equipped with automation control system, equipped with adding The clear water reserviors and the water supply pump installation equipped with confession constant pressure water supply regulating system of chlorine and residual chlorine monitoring system, its innovative point are: Pipeline alarm is further equipped with the raw water pipeline and alignment system, distribution reservoir are further equipped with the micro-tensioning system of raw water water distribution, is wadded a quilt with cotton Solidifying sedimentation basin is further equipped with kinetic parameter on-line monitoring and feedback optimized system, and clear water reserviors are further equipped with disinfection reactions parameter reality When monitoring and feedback optimized system, water supply pump installation be further equipped with water supply pump installation with pump optimization system.
Further, the pipeline alarm and alignment system include the pressure gauge P that pipeline front end is set1, set electromagnetism Flow regulating valve and the middle pressure gauge P set2, the pressure gauge P of terminal setting3, reservoir liquid level and house steward's flow automated collection systems and Booster siren, the automatic reservoir liquid level determines acquisition time with house steward's flow collection system induction pressure meter pressure, and controls Booster siren.
Further, the micro-tensioning system of the raw water water distribution realizes the fine setting of raw water sendout, mainly by raw water sendout Control element, unit for treating water and interval censored data evaluation unit composition, the interval censored data evaluation unit are controlled by control element Unit for treating water.
Further, the kinetic parameter on-line monitoring and feedback optimized system control including flocculation kinetics parameter GT Element, online acquisition flow of inlet water Q unit, online acquisition water inlet water temperature twUnit and gate valve number n open and close unit, the online acquisition Flow of inlet water Q unit, online acquisition water inlet water temperature twUnit result feeds back flocculation kinetics parameter GT control elements, Flocculation Kinetics Learn parameter GT control element control gate valve numbers n and open and close unit.
Further, the disinfection reactions parameter real time monitoring and feedback optimized system are controlled including disinfection reactions parameter CT values Element, feed water flow gauge, clear water reserviors liquid level gauge and alarm processed, the feed water flow gauge and clear water reserviors liquid level gauge gathered data feedback Give disinfection reactions parameter CT value control elements, disinfection reactions parameter CT values control element control alarm.
Further, the water supply pump installation is with performance curve fitting unit of the pump optimization system including pump and pipeline and oneself Dynamic combine matches somebody with somebody pump unit, and the performance curve fitting unit control Automatic Combined of the pump and pipeline matches somebody with somebody pump unit.
It is a further object to provide a kind of control method of water factory's special intelligent networked control systems, including raw water Pipeline, distribution reservoir, flocculation sediment, filter tank, clear water reserviors and water supply pump installation controlling unit, its innovative point are:The distribution reservoir The control method of link is:In distribution reservoir, when flow of inlet water is 7000m3/h<Q<10000m3During/h, the tax of distribution ratio of liquid flow Value presses Q firstA:QB:QC=1.0:2.0:2.0 are set, and after running a period of time, pass through the area in the micro-tensioning system of raw water water distribution Between data evaluation unit overall merit is carried out to the water distribution quantity of each water dispensing unit, by water quality by good to the other assignment n of differencei, water quality The processing water of poor processing unit can cut down 1%Q, and the best processing unit of corresponding water quality can increase 1%Q, and be in The processing unit of middle water quality, which is not done, to be changed;
The control method of the flocculation sedimentation tank link is:By in kinetic parameter on-line monitoring and feedback optimized system The flow of inlet water Q unit of online acquisition and the water inlet water temperature t of online acquisitionwUnit, the Flocculation Kinetics of Real time displaying course of reaction Parameter GT values are learned, by accumulating GT- filter tanks crushing and GT- water quality index characteristic curve data, are obtained more excellent under specific inflow GT values, open and close unit so as to feeding back corresponding closing gate valve number n and valve opening and closing number be adjusted;
Control method is in the clear water reserviors link:Using feed water flow gauge and clear water reserviors liquid level gauge gathered data, this enters Water ga(u)ge and clear water reserviors liquid level gauge gathered data feed back to disinfection reactions parameter CT value control elements, realize monitoring in real time, together When the flocculation kinetics parameter CT values that collect enter data collecting system;If residence time T is less than less than 30min or CT values 30mg/L/min, flocculation kinetics parameter CT control element control alarm equipment alarm, and flocculation kinetics parameter CT values at this moment Data collecting system will not be entered;
The supply-water pump device link control method is:System provides the confession of current water factory according to Historical Data System first Water Q, the H values provided with reference to needed for the determination of pipeline H-Q curves enters water supply network, pump pressure header value H is then provided needed for pumpi、 Liquid level difference △ Z of water pump outlet pipe road and clear water reserviors, pipeline loss of flood peak hf, i.e., under output Q, what is provided needed for every pump is total Pressure head Hi is H+ △ Z+hf;Then by gained HiValue substitutes into the H-Q curves of every pump, tries to achieve Qi, then by QiSubstitute into the P- of the pump Q curves, obtain the operation power P of the pumpi, the like, by pump and the performance curve fitting unit of pipeline, obtain all pumps QiAnd PiValue, each pump is then optionally combined with pump unit control by Automatic Combined, obtains following two groups of data:Sundstrand pump stream AmountWith combination pump powerF (i) is assignment function, takes 0 and 1, represents the off and on of the pump respectively, full Foot combination pump dischargeUnder the conditions of suitable with needing output Q, water supply unit consumptionMinimum gained As a result;
The control method of the raw water pipeline link is:After electromagnetism flow regulating valve valve event on raw water pipeline terminates, water Storehouse liquid level starts to gather first group of data with house steward's flow automated collection systems, by the reservoir liquid level collected and house steward's flow knot Close history data curve and pressure gauge theory show value is calculated, then by the pressure data collected compared with theoretical value Compared with if the pressure gauge P that pipeline front end is set1, the middle pressure gauge P set2, terminal set pressure gauge P3Three pressure gauges Real-time collection value is below theoretical value below 20%, then automatic reservoir liquid level and the control booster alarm of house steward's flow collection system Device, send booster alarm and localization of bursted pipe is carried out by suction wave finder;If collection value is in normal fluctuation with theoretical value In the range of, then continue gathered data, when gather second pressure data be only need to compared with first pressure data, if Fluctuated in normal range (NR), still return to automatic data acquisition scheme, if exceeding normal fluctuation range, start collection value and theoretical value Alignment programs come judge whether occur booster;If valve acts, data acquisition restarts from after pressure stability.
Beneficial effects of the present invention are as follows:
(1) present invention has following characteristic compared with the presently used robot control system(RCS) in waterworks:On raw water pipeline Add pipeline alarm and alignment system;Water distribution system can also be according to each structures except the water distribution between realizing more phase structures Processing state be finely adjusted;The flocculation reaction stage can accomplish flocculation basin kinetic parameter on the basis of Automatic Dosing is realized The on-line monitoring of (GT values) with it is feedback optimized;In addition to can be to the display control of clear water pit level and residual chlorine concentration, moreover it is possible to online Monitor disinfection reactions parameter (CT) and feedback optimized regulation;On the basis of traditional automatic program stable water supply, according to output And pressure of supply water, suitable pump group can be selected to carry out energy saving optimizing water supply.
(2) in the link such as water distribution of the present invention suitable for water treatment procedure, coagulating, sterilization operational factor monitoring And optimization, be advantageous to improve producing water water quality, reduce operating cost.Advantage of the invention is that:1st, raw water is carried out to multiple water factories Distribute and can be adjusted according to water factory's operation conditions, be improved overall effluent quality;2nd, Real time displaying and regulation and control GT values, Optimize the operational effect of flocculation tank;3rd, Real time displaying CT values make the control of chlorine dosage more effective, reduce and are processed into The yield of sheet and DBPs;4th, water supply pump installation can optimize the combination of water supply pump group with pumping system, reduce water-supplying unit's electricity Consumption, reduce production cost;5th, the alarm of raw water pipeline booster and alignment system can make a response and carry out to booster rapidly Position judgment, reduce water loss and emergency repair time.
(3) present invention carries out raw water distribution according to each phase treating capacity, and can be according to the real-time disposition amount of being allocated Fine setting;Solve the problems, such as that traditional coagulation unit can not artificially adjust coagulation GT values by controlling flow passage gate valve to open and close quantity, will The GT values operation that can effectively instruct the coagulating stage associated with water treatmenting performance data of real-time display;Merely with feed water flow Gauge and clear water reserviors liquid level gauge solve the sterilization dwell time problems lacked in existing conventional water factory's on-line monitoring, are advantageous to subtract Few on-line monitoring equipment cost, while online CT values can effectively control chlorine dosage, reduce the production of processing cost and DBPs It is raw;It can be changed according to output and automatically generated with pump scheme, reduce unit water supply power consumption;Booster can be carried out to raw water pipeline in time Alarm and positioning, reduce water loss and emergency repair time.
Brief description of the drawings
It is further detailed with reference to the accompanying drawings and detailed description.
Fig. 1 is that the water-supply plant automation control method of the present embodiment forms.
Fig. 2 is the raw water water distribution and fine setting robot control system(RCS) of the present embodiment.
Fig. 3 is that the node flow change threshold of the present embodiment sets schematic diagram.
Fig. 4 is the GT values on-line monitoring of the present embodiment and feedback optimized system.
Fig. 5 shows for the CT on-line monitorings of the present embodiment and feedback optimized system.
Fig. 6 is that the water supply pump house of the present embodiment optimizes system with pump.
Fig. 7 is the pipeline burst alarm and alignment system of the present embodiment.
Embodiment
Technical scheme is elaborated with reference to specific embodiment.
In order to thoroughly understand the present invention, detailed structure will be proposed in following description.Obviously, execution of the invention is simultaneously It is not limited to the specific details that those skilled in the art is familiar with.Presently preferred embodiments of the present invention is described in detail as follows, but In addition to these detailed descriptions, the present invention can also have other embodiment.
The present invention is illustrated with reference to certain city's water-supply plant engineering project, the total water supply capacity 250000m of the water-supply plant3/ d, by The item design of three phases, treating capacity are respectively 50000m3/d(A)、100000m3/ d (B) and 100000m3/ d (C), plant area's raw water by Piece house steward's supply.The present embodiment main composition part includes raw water water distribution and micro-tensioning system, and flocculation basin kinetic parameter is online Monitoring and feedback optimized system, disinfection reactions parameter real time monitoring and feedback optimized system, water supply pump house with pump optimization system and Pipeline burst is alarmed and alignment system.
1. raw water water distribution and micro-tensioning system
A, in B, C the third stage of the project, the treating capacity of the phase of B, C two is identical with using technique, high treating effect.The A phases are due to operation Time is grown, and handling process is unstable, and effluent quality is poor.Therefore, the disposal ability that should be tried one's best during water distribution using the phase of B, C two, subtracts The treating capacity of few A phases.
Specific decreasing water distribution method reference picture 2, according to practical operating experiences, is divided into three flow sections by house steward's inflow.Water inlet Flow Q<7000m3/ h is low processing capacity, now three the phase water factory disposal ability it is greatly more than needed, effluent quality is fully able to obtain Ensure, it is necessary to prevent flow of inlet water is too small from causing pipeline to draw the generation of empty phenomenon, therefore the minimum treating capacity of A phases need to be ensured 1000m3/ h, remaining flow of inlet water can be divided equally by the phase of B, C two.Work as Q>10000m3During/h, processing water close to limit process amount, this When should play the maximum capacity (2000m of A phases3/ h) while the part more than maximum throughput is shared by the phase of B, C two.Work as water inlet Flow 7000m3/h<Q<10000m3/ h, water treatment building are in a higher load range, now commented by interval censored data Valency system, which carries out adjustment and optimization in time to each phase water distribution quantity, to be helped to improve effluent water quality on the whole.As shown in Fig. 2 stream The assignment of amount distribution ratio presses Q firstA:QB:QC=1.0:2.0:2.0 set.After running a period of time, the water outlet to the phase of A, B, C tri- Water quality carries out overall merit, by water quality by good to the other assignment (n of differencei) it is 1,2,3.Therefore, water quality poor processing unit Processing water can cut down 1%Q, and the best processing unit of corresponding water quality can increase 1%Q, and be in the processing list of middle water quality Member, which is not done, to be changed.To prevent valve from frequently opening and closing, control at node is not adjusted in ± 2%Q fluctuation ranges.To ensure valve Aperture requirement, valve minimum aperture is set to 30 °.
2. flocculation basin kinetic parameter is monitored on-line and feedback optimized system
The GT values of flocculation tank are adjusted by the keying quantity of gate valve at robot control system(RCS) control reaction tank tunnel inlets, So as to solve the problems, such as that traditional flocculation basin can not artificially change flocculation GT values.It is further characterized in that reaction tank in robot control system(RCS) GT value real-time displays, it is associated with filter tank performance crushing curve and effluent quality by GT values, obtain preferably operating GT value models Enclose with corresponding operating mode, course of reaction can be better controled over.Because design load is generally preferable hybrid reaction condition, adjust GT values in whole reaction tank level off to design load be the system basic design principle, as shown in table 1, adjusted according to flow of inlet water Valve number provide.
Table 1 closes the regulation of quantity to electric gate valve
Flow QC(m3/h) Close valve quantity Close valve numbering
QC>3990 0 0
3990<QC≤3570 2 1,8
3570<QC≤3150 4 1,2,7,8
3150<QC≤2730 6 1,2,3,6,7,8
QC≤2730 8 1,2,3,4,5,6,7,8
Remarks:1- is uniform in order to fluid, and gate is symmetrically closed.2- gate valves are numbered depending on live actual number.
In order to prevent that gate valve caused by flow of inlet water fluctuation frequently opens and closes problem at node, to corresponding valve at node flow Door keying problem provide, for example, 3990m3/ h is the node flow for closing valve number 0 and 2, if not entering to the flow Professional etiquette is determined, then flow is in 3989-3991m3When being fluctuated between/h, gate valve, which closes number, to easily cause gate valve frequently in 0 and 2 changes Damage.
Node flow changes into range flow (for example, node flow ± 100m3/ h) can effectively it solve the above problems: When flow is 3991m3/ h, valve closes quantity and is changed into 2 from 0, if flowed fluctuation is 3989m3/ h, valve are failure to actuate, until flow Change turns to 4090m3/ h, it is 0 that valve, which can be readjusted to close number,.
Node flow and corresponding range threshold can be adjusted according to water factory's service data, make the operation of reaction tank not Disconnected optimization.As shown in figure 4, the flow of inlet water Q and water temperature t that pass through online acquisitionw, can be online with reference to corresponding closing gate valve number n Show the GT values of course of reaction.By accumulating GT- filter tanks crushing and GT- water quality index characteristic curve data, can obtain it is specific enter Preferably GT values under water, so as to feedback regulation valve number, obtain the flocculation reaction dynamic conditions more optimized.
3. disinfection reactions parameter real time monitoring and feedback optimized system
The system is characterised by that disinfection reactions parameter CT values can be monitored on-line, as shown in figure 5, merely with feed water flow gauge QinSolves the problems, such as the disinfecting time lacked in existing conventional water factory's on-line monitoring with clear water reserviors liquid level gauge (z-t), so also Advantageously reduce the equipment cost of on-line monitoring.Using the CT values collected and water quality bacterium colony achievement data storehouse, can instruct to add Chlorine, superchlorination is effectively avoided, while Disinfection Effect is ensured, on the one hand can save disinfection cost, it is on the other hand favourable In the generation for reducing DBPs.Once residence time T is less than 30mg/L*min less than 30min or CT values, system can be automatic Warning reminding operating personnel take corresponding measure.Related data will not also enter data collecting system, avoid to analyze data Accuracy impacts.
4. water supply pump house is with pump optimization system
After being fitted using least square method to the performance curve of pump and pipeline, use Automatic Combined by optimum results with It is easily operated as the foundation with pump, objective interface that the form of list is presented to water works management personnel.Embodiment is as schemed Shown in 6:System provides the output Q of current water factory according to Historical Data System first, after operating personnel confirm, with reference to pipeline H-Q curves determine the H values for entering offer needed for water supply network, and pump pressure header value Hi is then provided needed for pump to be needed to consider water pump outlet pipe The liquid level difference of road and clear water reserviors (△ Z), the pipeline loss of flood peak (hf), i.e., under output Q, the total head of offer needed for every pump Hi is (H+ △ Z+hf).Then gained Hi values are substituted into the H-Q curves of every pump, try to achieve Qi, then by QiSubstitute into the P-Q of the pump Curve, obtain the operation power P of the pumpi, the like, obtain the Q of all pumpsiAnd PiValue, is then optionally combined each pump, obtains Two groups of data below:Combine pump dischargeWith combination pump powerF (i) is assignment function, takes 0 He 1, the off and on of the pump is represented respectively.It is required to meet combination pump dischargeUnder the conditions of suitable with needing output Q, supply Water unit consumptionMinimum is optimal conditions.
5. pipeline burst is alarmed and alignment system
Field condition explanation:Water inlet manifold about 16km, pressure gauge P is mounted with successively at away from starting point 6.5km1, electromagnetism adjust Flow valve and pressure gauge P2, terminal is mounted with into factory pressure gauge P3.This embodiment is characterized in that lacking the premise of starting point pressure gauge The lower completion that automatic booster alarm and positioning are realized using negative pressure wave method.
Specific implementation method is as shown in Figure 7:After valve event, data collecting system starts to gather first group of data, will adopt Pressure gauge theory show value is calculated with house steward's flow combination history data curve in the reservoir liquid level collected, then will adopt The pressure data collected compared with theoretical value, if the real-time collection value of three pressure gauges be below theoretical value 20% (preliminary design value, Can be optimized according to commissioning test situation) below, then send booster alarm and localization of bursted pipe is carried out by suction wave finder.If Collection value and theoretical value be in normal fluctuation range, then continue gathered data, when gather second pressure data be need to be with First pressure data is compared, if in normal range (NR) (program preliminary design value is 10% the first normal sample data) interior ripple It is dynamic, automatic data acquisition scheme is still returned, if exceeding normal fluctuation range, starts collection value with theoretical value alignment programs to sentence It is disconnected whether booster to occur.If valve acts, data acquisition restarts from after pressure stability.
The present invention has following feature in the design of water factory's production self-controlled platform:(1) raw water is carried out according to each phase treating capacity Distribution, and can be according to the fine setting of the real-time disposition amount of being allocated;(2) solves biography by controlling flow passage gate valve to open and close quantity The problem of system coagulation unit can not artificially adjust coagulation GT values, by the GT values of real-time display energy associated with water treatmenting performance data Effectively instruct the operation in coagulating stage;(3) solves existing conventional water merely with feed water flow gauge and clear water reserviors liquid level gauge The sterilization dwell time problems lacked in factory's on-line monitoring, advantageously reduce on-line monitoring equipment cost, while online CT value energy Effectively control chlorine dosage, reduces the generation of processing cost and DBPs;(4) it can be changed according to output and automatically generated with pump Scheme, reduce unit water supply power consumption;(5) booster alarm and positioning can be carried out to raw water pipeline in time, reduces water and be lost in and rob Repair the time.
The general principle and principal character and advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (7)

1. a kind of water factory's special intelligent networked control systems, including the original equipped with flow of inlet water display record and valve control system Water lines, the distribution reservoir equipped with raw water water distribution and valving system, the flocculation sedimentation tank equipped with automatic medicament feeding system, match somebody with somebody Have the filter tank of automation control system, adjusted equipped with the clear water reserviors of chlorination and residual chlorine monitoring system and equipped with for constant pressure water supply The water supply pump installation of section system, it is characterised in that:Pipeline alarm and alignment system, distribution reservoir are further equipped with the raw water pipeline The micro-tensioning system of raw water water distribution is further equipped with, flocculation sedimentation tank is further equipped with kinetic parameter on-line monitoring and feedback optimized system System, clear water reserviors are further equipped with disinfection reactions parameter real time monitoring and feedback optimized system, and water supply pump installation is further equipped with supply-water pump Device is with pump optimization system.
2. water factory's special intelligent networked control systems according to claim 1, it is characterised in that:The pipeline alarm and positioning System includes the pressure gauge P that pipeline front end is set1, the electromagnetism flow regulating valve that sets and the middle pressure gauge P set2, what terminal was set Pressure gauge P3, reservoir liquid level and house steward's flow automated collection systems and booster siren, the reservoir liquid level and house steward's flow it is automatic Acquisition system induction pressure meter pressure determines acquisition time, and controls booster siren.
3. water factory's special intelligent networked control systems according to claim 1, it is characterised in that:The fine setting of the raw water water distribution System realizes the fine setting of raw water sendout, is mainly evaluated by raw water sendout control element, unit for treating water and interval censored data single Member composition, the interval censored data evaluation unit control unit for treating water by control element.
4. water factory's special intelligent networked control systems according to claim 1, it is characterised in that:The kinetic parameter is online Monitoring and feedback optimized system include flocculation kinetics parameter GT control elements, online acquisition flow of inlet water Q unit, online acquisition Water temperature of intaking twUnit and gate valve number n open and close unit, the online acquisition flow of inlet water Q unit, online acquisition water inlet water temperature twUnit As a result flocculation kinetics parameter GT control elements are fed back, flocculation kinetics parameter GT control element control gate valve numbers n opens and closes unit.
5. water factory's special intelligent networked control systems according to claim 1, it is characterised in that:The disinfection reactions parameter is real When monitoring and feedback optimized system include disinfection reactions parameter CT values control element, feed water flow gauge, clear water reserviors liquid level gauge and report Alert device, the feed water flow gauge and clear water reserviors liquid level gauge gathered data feed back to disinfection reactions parameter CT value control elements, and sterilization is anti- Parameter CT values control element is answered to control alarm.
6. water factory's special intelligent networked control systems according to claim 1, it is characterised in that:The water supply pump installation matches somebody with somebody pump Performance curve fitting unit and Automatic Combined of the optimization system including pump and pipeline match somebody with somebody the performance curve of pump unit, the pump and pipeline Fitting unit control Automatic Combined matches somebody with somebody pump unit.
7. a kind of control method of water factory's special intelligent networked control systems described in claim 1, including raw water pipeline, water distribution Pond, flocculation sedimentation tank, filter tank, clear water reserviors and water supply pump installation controlling unit, it is characterised in that:The control of the distribution reservoir link Method is:In distribution reservoir, when flow of inlet water is 7000m3/h<Q<10000m3During/h, the assignment of distribution ratio of liquid flow presses Q firstA: QB:QC=1.0:2.0:2.0 are set, and after running a period of time, are evaluated by the interval censored data in the micro-tensioning system of raw water water distribution single Member carries out overall merit to the water distribution quantity of each water dispensing unit, by water quality by good to the other assignment n of differencei, the poor processing list of water quality The processing water of member can cut down 1%Q, and the best processing unit of corresponding water quality can increase 1%Q, and be in the place of middle water quality Reason unit, which is not done, to be changed;
The control method of the flocculation sedimentation tank link is:By online in kinetic parameter on-line monitoring and feedback optimized system The flow of inlet water Q unit of collection and the water inlet water temperature t of online acquisitionwUnit, the flocculation kinetics ginseng of Real time displaying course of reaction Number GT values, by accumulating GT- filter tanks crushing and GT- water quality index characteristic curve data, obtain preferably GT under specific inflow Value, valve opening and closing number is adjusted so as to feed back corresponding closing gate valve number n keyings unit;
Control method is in the clear water reserviors link:Utilize feed water flow gauge and clear water reserviors liquid level gauge gathered data, the feed water flow Gauge and clear water reserviors liquid level gauge gathered data feed back to disinfection reactions parameter CT value control elements, realize monitoring in real time, adopt simultaneously The disinfection reactions parameter CT values collected enter data collecting system;If residence time T is less than 30mg/L/ less than 30min or CT values Min, disinfection reactions parameter CT control element control alarm equipment alarm, and disinfection reactions parameter CT values at this moment will not enter data Acquisition system;
The supply-water pump device link control method is:System provides the output of current water factory according to Historical Data System first Q, the H values provided with reference to needed for the determination of pipeline H-Q curves enters water supply network, pump pressure header value H is then provided needed for pumpi, pump out Liquid level difference △ Z of water lines and clear water reserviors, pipeline loss of flood peak hf, i.e., under output Q, the total head of offer needed for every pump Hi is H+ △ Z+hf;Then gained Hi values are substituted into the H-Q curves of every pump, try to achieve Qi, then by QiThe P-Q for substituting into the pump is bent Line, obtain the operation power P of the pumpi, the like, by pump and the performance curve fitting unit of pipeline, obtain the Q of all pumpsi And PiValue, each pump is then optionally combined with pump unit control by Automatic Combined, obtains following two groups of data:Combine pump dischargeWith combination pump powerF (i) is assignment function, takes 0 and 1, represents the off and on of the pump respectively, is being met Combine pump dischargeUnder the conditions of suitable with needing output Q, water supply unit consumptionMinimum gained knot Fruit;
The control method of the raw water pipeline is:After electromagnetism flow regulating valve valve event on raw water pipeline terminates, reservoir liquid level with House steward's flow automated collection systems start to gather first group of data, and the reservoir liquid level collected is transported with house steward's flow combination history Pressure gauge theory show value is calculated in row data and curves, and then the pressure data collected compares with theoretical value, if pipe The pressure gauge P that road front end is set1, the middle pressure gauge P set2, terminal set pressure gauge P3The real-time collection of three pressure gauges Value is below theoretical value below 20%, then automatic reservoir liquid level and house steward's flow collection system control booster siren, send quick-fried Pipe is alarmed and carries out localization of bursted pipe by suction wave finder;If collection value is in normal fluctuation range with theoretical value, Continue gathered data, only need to be compared with first pressure data, if in normal range (NR) when gathering second pressure data Interior fluctuation, automatic data acquisition scheme is still returned to, if exceeding normal fluctuation range, start collection value and theoretical value alignment programs To judge whether that booster occurs;If valve acts, data acquisition restarts from after pressure stability.
CN201510662945.4A 2015-01-28 2015-10-14 A kind of water factory's special intelligent networked control systems and its control method Active CN105373092B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510662945.4A CN105373092B (en) 2015-01-28 2015-10-14 A kind of water factory's special intelligent networked control systems and its control method

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201510042964 2015-01-28
CN2015100429647 2015-01-28
CN201510662945.4A CN105373092B (en) 2015-01-28 2015-10-14 A kind of water factory's special intelligent networked control systems and its control method

Publications (2)

Publication Number Publication Date
CN105373092A CN105373092A (en) 2016-03-02
CN105373092B true CN105373092B (en) 2017-12-22

Family

ID=55375375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510662945.4A Active CN105373092B (en) 2015-01-28 2015-10-14 A kind of water factory's special intelligent networked control systems and its control method

Country Status (1)

Country Link
CN (1) CN105373092B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106340170A (en) * 2016-08-31 2017-01-18 江苏江华水处理设备有限公司 Wireless transmission based water treatment expert system
CN106338950A (en) * 2016-11-02 2017-01-18 铜仁学院 Intelligent pipe network control system and control method for water treatment
CN109725120A (en) * 2018-12-25 2019-05-07 华南智能机器人创新研究院 An intelligent data monitoring method and system based on tap water production
CN110258721B (en) * 2019-06-18 2020-01-31 重庆昕晟环保科技有限公司 Water supply method for combined secondary water supply and storage equipment
CN111764460A (en) * 2020-06-22 2020-10-13 菏泽城建工程发展集团有限公司 Municipal water supply system for solving problem of too low local water pressure and water supply method thereof
CN112303328A (en) * 2020-10-29 2021-02-02 中水三立数据技术股份有限公司 Scheduling method, system and equipment for pipeline valve of water storage equipment
CN112964418B (en) * 2021-01-28 2022-11-22 深圳市水务科技有限公司 Method, device, equipment and medium for monitoring negative pressure state of pretreatment workshop of sewage plant
CN114971330B (en) * 2022-06-06 2024-12-31 上海西派埃智能化系统有限公司 A method for automatically dispatching water balance in a waterworks
CN116557792B (en) * 2023-07-07 2023-10-10 杭州智缤科技有限公司 Low-cost water supply network pipe explosion detection method, device and application

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1760141A (en) * 2005-09-16 2006-04-19 哈尔滨工业大学 Two stage disinfection system for drinking water, and method for sanitizing drinking water by using the system
CN103007625A (en) * 2012-12-15 2013-04-03 华北水利水电学院 Integrated water purification device and water purification method
CN202898167U (en) * 2012-10-20 2013-04-24 中国石油化工股份有限公司 Petrochemical sewage biological treatment device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1760141A (en) * 2005-09-16 2006-04-19 哈尔滨工业大学 Two stage disinfection system for drinking water, and method for sanitizing drinking water by using the system
CN202898167U (en) * 2012-10-20 2013-04-24 中国石油化工股份有限公司 Petrochemical sewage biological treatment device
CN103007625A (en) * 2012-12-15 2013-04-03 华北水利水电学院 Integrated water purification device and water purification method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《苏中某污水厂自控仪表系统调试运行方案的介绍》;徐尔东;《科技传播》;20121031;第76-77页 *
污水处理中自控系统的应用;朱忠华;《机电信息》;20120630(第6期);第93-94页 *

Also Published As

Publication number Publication date
CN105373092A (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN105373092B (en) A kind of water factory&#39;s special intelligent networked control systems and its control method
CN201321631Y (en) Secondary water supply safe intelligent management system
CN1239466A (en) Method and appts. for generating oxygenated water
CN105988378A (en) Circulating cooling water control system and drug adding control device and drug adding control method thereof
CN107152057B (en) Intelligent direct drinking water supply and selling system and water supply method thereof
CN109324583B (en) Three-dimensional display-based thermal power plant water supply and drainage network management method and system
CN104355453A (en) Full-automatic control system and method for water purification plant
CN214623362U (en) Sewage pipe network dispatching system
CN207973549U (en) A kind of fully automatic sterilizing equipment based on Internet of Things
CN110264067A (en) A kind of calculation method of secondary water-supply water storage apparatus inlet flow rate
CN104846952A (en) Dual-mode intelligent secondary water supply equipment
CN206039234U (en) Once -through boiler condensate water ammonifying personalizes and patrols and examines formula intelligence control system
CN207211265U (en) A kind of intelligent water supply system of frequency-changing pressure stabilizing
CN107942969A (en) A kind of water plant automation monitoring system
CN108468363B (en) Secondary water supply safety guarantee device
CN113822541A (en) Sewage plant station network scheduling method and system
CN105781493B (en) Metering room concentrates chemicals dosing plant
CN204759162U (en) Sewage treatment plant teledetection and control management device
CN110902729B (en) Control device and method for replacing raw water of water purifying and drinking machine and water purifying and drinking machine
CN207786336U (en) Flue gas shower water adds alkali regulating device
CN115126041A (en) Intelligent water supply system and method
CN204063219U (en) A kind of boiler heating system
CN208667313U (en) A kind of intelligent water purifier of camera monitoring leak
CN206580576U (en) A kind of centralized water cleaning systems
CN208814780U (en) A kind of intelligent water purifier of leak visualizing monitor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20191008

Granted publication date: 20171222

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20221008

Granted publication date: 20171222

PD01 Discharge of preservation of patent
PP01 Preservation of patent right

Effective date of registration: 20221008

Granted publication date: 20171222

PP01 Preservation of patent right