CN105364426A - Method for preparing thick-wall high-frequency welded steel tube - Google Patents

Method for preparing thick-wall high-frequency welded steel tube Download PDF

Info

Publication number
CN105364426A
CN105364426A CN201510948023.XA CN201510948023A CN105364426A CN 105364426 A CN105364426 A CN 105364426A CN 201510948023 A CN201510948023 A CN 201510948023A CN 105364426 A CN105364426 A CN 105364426A
Authority
CN
China
Prior art keywords
welded
welding
temperature
frequency
preparation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510948023.XA
Other languages
Chinese (zh)
Inventor
范建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU CHANGSHU HUANTONG INDUSTRIAL CO LTD
Original Assignee
JIANGSU CHANGSHU HUANTONG INDUSTRIAL CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU CHANGSHU HUANTONG INDUSTRIAL CO LTD filed Critical JIANGSU CHANGSHU HUANTONG INDUSTRIAL CO LTD
Priority to CN201510948023.XA priority Critical patent/CN105364426A/en
Publication of CN105364426A publication Critical patent/CN105364426A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a method for preparing a thick-wall high-frequency welded steel tube. The thickness of the steel tube is 28 mm. The preparation method includes the following steps that 1, a hot-rolled coil plate is unreeled and cut; 2, row rollers are formed; 3, seams are pre-welded; 4, welding forming is conducted; 5, the welded seams are treated and cooled; 6, the welded seams are subjected to heat treatment; 7, finishing, inspecting and putting in storage are carried out. By means of the method for preparing the thick-wall high-frequency welded steel tube, the overall strength and low-temperature-resistant toughness of the thick-wall welded tube are improved by forming the row rollers, pre-welding the seams and conducting postweld heat treatment, the existence of welded seam cracking or welded seam tension is avoided, and the overall performance of the thick-wall steel tube is guaranteed.

Description

A kind of preparation method of heavy wall high-frequency welded steel pipe
Technical field
The present invention relates to welded still pipe field, particularly relate to a kind of preparation method of heavy wall high-frequency welded steel pipe.
Background technology
Thick walled steel tube typically refers to the steel pipe of pipe thickness at more than 20mm, be for the 20mm wall thickness of domestic production within steel pipe.Thick walled steel tube is mainly used in transportation pipe spool, slurry pipeline steel pipe, petroleum casing pipe and structure pipe, square and rectangular pipe.
The impact of welding parameter and intermediate frequency simulation normalizing parameter when the performance of thick walled steel tube is mainly subject to the mouldability of shaping load, edges of boards and welds, its timber intensity is high, resilience is just very large, so the little prerequisite being impact and welding rear steel pipe stability of socket opening after being shaped, otherwise the steel pipe after welding is easy to weld seam to tear.
Summary of the invention
The technical problem that the present invention mainly solves is to provide a kind of preparation method of heavy wall high-frequency welded steel pipe, can effectively reduce steel pipe base shaping after mouth of pipe size, ensure thick walled steel tube welding after overall performance.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: the preparation method providing a kind of heavy wall high-frequency welded steel pipe, the thickness of described steel pipe is 28mm, and described preparation method comprises the steps:
(1) hot-rolled coil unreels shearing: according to the dimensional requirement of welded pipe, carries out slitting, obtain single welded pipe blank after being unreeled by hot-rolled coil by the coiled sheet width of thick walled steel tube, milling limit width requirement;
(2) row-roll forming process: adopt minor diameter row roller forming machine to adopt 6 methods to be bent into radial misalignment opening socket the sheet material after shearing in step (1), then adjust size rolls and correct roll location, making opening socket joint close;
(3) prewelding joint close: adopt Prewelding machine prewelding joint close;
(4) welding fabrication: utilize the High Frequency Solid State source of welding current that the pipe of postwelding pre-in step (3) is welded into socket;
(5) weld seam process and cooling: remove the weld seam burr inside and outside welding socket, then carry out with low temperature compressed air process of jetting and lower the temperature;
(6) weld seam heat treatment: carry out normalized treatment with welding socket cooled in induction heater step (5);
(7) repair, check, put in storage.
In a preferred embodiment of the present invention, in described step (4), the process conditions of described welding fabrication are: bonding power 1500 ~ 2000kW, bonding speed 12 ~ 15m/min, welding temperature 1500 ~ 1550 DEG C, extruding allowance 16 ~ 18mm, welding current 15 ~ 18A.
In a preferred embodiment of the present invention, in described step (5), described compressed-air actuated pressure is 10 ~ 20Kpa, and temperature is 5 ~ 10 DEG C.
In a preferred embodiment of the present invention, in described step (6), the condition of described normalized treatment is: heating frequency 50 ~ 60kHz, heating-up temperature 950 ~ 1050 DEG C, constant temperature keeps 5 ~ 15min, then cools to 300 DEG C with the furnace, Air flow 10 ~ 15min again, last water-cooled is to room temperature.
The invention has the beneficial effects as follows: the preparation method of a kind of heavy wall high-frequency welded steel pipe of the present invention, adopt row-roll forming process, prewelding joint close and post weld heat treatment, improve the bulk strength of heavy wall welded pipe and low temperature resistant toughness, avoid the existence of weld cracking or weld seam tension force, ensure the overall performance of thick walled steel tube.
Detailed description of the invention
Below preferred embodiment of the present invention is described in detail, can be easier to make advantages and features of the invention be readily appreciated by one skilled in the art, thus more explicit defining is made to protection scope of the present invention.
The embodiment of the present invention comprises:
Embodiment 1
Present invention is disclosed a kind of preparation method of heavy wall high-frequency welded steel pipe, the specification of described steel pipe is: diameter 35mm, pipe thickness 28mm, and described preparation method comprises the steps:
(1) hot-rolled coil unreels shearing: according to the dimensional requirement of welded pipe, slitting is carried out by the coiled sheet width of thick walled steel tube, milling limit width requirement after being unreeled by hot-rolled coil, obtain single welded pipe blank, and ensure that steel billet has enough shaping surpluses, welding surplus, amount of compression and edge milling amount;
(2) row-roll forming process: adopt minor diameter row roller forming machine to adopt 6 methods to be bent into radial misalignment opening socket the sheet material after shearing in step (1), then adjust size rolls and correct roll location, making opening socket joint close;
(3) prewelding joint close: adopt Prewelding machine welding at prewelding power 500kW, weldering pre speed 15min/min, prewelding temperature 1400 DEG C, make the opening joint close of steel billet;
(4) welding fabrication: utilize the High Frequency Solid State source of welding current that the pipe of postwelding pre-in step (3) is welded into socket; The process conditions of described welding fabrication are: bonding power 1500kW, bonding speed 12m/min, welding temperature 1550 DEG C, extruding allowance 16mm, welding current 15A;
(5) weld seam process and cooling: remove the weld seam burr inside and outside welding socket, wherein, inner burr push rod ejects, and be then 10Kpa with pressure, temperature is that the compressed air of 5 DEG C is jetted, to remove burr, butt welded seam carries out cooling and processes simultaneously;
(6) weld seam heat treatment: adopt medium frequency induction heater butt welded seam to carry out simulation normalized treatment, to eliminate the internal stress and rolled hardening that produce because weld seam cools rapidly in welding process, improve weld metal zone plasticity, improve or eliminate the inequality of composition and tissue in welding; The condition of described normalized treatment is: heating frequency 50kHz, heating-up temperature 950 DEG C, and constant temperature keeps 5min, then cools to 300 DEG C with the furnace, then Air flow 10 ~ 15min, and last water-cooled is to room temperature;
(7) repair, check, put in storage.
Embodiment 2
Present invention is disclosed a kind of preparation method of heavy wall high-frequency welded steel pipe, the specification of described steel pipe is: diameter 35mm, pipe thickness 28mm, and described preparation method comprises the steps:
(1) hot-rolled coil unreels shearing: according to the dimensional requirement of welded pipe, slitting is carried out by the coiled sheet width of thick walled steel tube, milling limit width requirement after being unreeled by hot-rolled coil, obtain single welded pipe blank, and ensure that steel billet has enough shaping surpluses, welding surplus, amount of compression and edge milling amount;
(2) row-roll forming process: adopt minor diameter row roller forming machine to adopt 6 methods to be bent into radial misalignment opening socket the sheet material after shearing in step (1), then adjust size rolls and correct roll location, making opening socket joint close;
(3) prewelding joint close: adopt Prewelding machine welding at prewelding power 800kW, weldering pre speed 20min/min, prewelding temperature 1400 DEG C, make the opening joint close of steel billet;
(4) welding fabrication: utilize the High Frequency Solid State source of welding current that the pipe of postwelding pre-in step (3) is welded into socket; The process conditions of described welding fabrication are: bonding power 2000kW, bonding speed 15m/min, welding temperature 1500 DEG C, extruding allowance 18mm, welding current 15A;
(5) weld seam process and cooling: remove the weld seam burr inside and outside welding socket, wherein, inner burr push rod ejects, and be then 20Kpa with pressure, temperature is that the compressed air of 10 DEG C is jetted, to remove burr, butt welded seam carries out cooling and processes simultaneously;
(6) weld seam heat treatment: adopt medium frequency induction heater butt welded seam to carry out simulation normalized treatment, to eliminate the internal stress and rolled hardening that produce because weld seam cools rapidly in welding process, improve weld metal zone plasticity, improve or eliminate the inequality of composition and tissue in welding; The condition of described normalized treatment is: heating frequency 60kHz, heating-up temperature 1050 DEG C, and constant temperature keeps 5min, then cools to 300 DEG C with the furnace, then Air flow 10 ~ 15min, and last water-cooled is to room temperature;
(7) repair, check, put in storage.
The foregoing is only embodiments of the invention; not thereby the scope of the claims of the present invention is limited; every utilize description of the present invention to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.

Claims (4)

1. a preparation method for heavy wall high-frequency welded steel pipe, is characterized in that, the thickness of described steel pipe is 28mm, and described preparation method comprises the steps:
(1) hot-rolled coil unreels shearing: according to the dimensional requirement of welded pipe, carries out slitting, obtain single welded pipe blank after being unreeled by hot-rolled coil by the coiled sheet width of thick walled steel tube, milling limit width requirement;
(2) row-roll forming process: adopt minor diameter row roller forming machine to adopt 6 methods to be bent into radial misalignment opening socket the sheet material after shearing in step (1), then adjust size rolls and correct roll location, making opening socket joint close;
(3) prewelding joint close: adopt Prewelding machine prewelding joint close;
(4) welding fabrication: utilize the High Frequency Solid State source of welding current that the pipe of postwelding pre-in step (3) is welded into socket;
(5) weld seam process and cooling: remove the weld seam burr inside and outside welding socket, then carry out with low temperature compressed air process of jetting and lower the temperature;
(6) weld seam heat treatment: carry out normalized treatment with welding socket cooled in induction heater step (5);
(7) repair, check, put in storage.
2. the preparation method of heavy wall high-frequency welded steel pipe according to claim 1, it is characterized in that, in described step (4), the process conditions of described welding fabrication are: bonding power 1500 ~ 2000kW, bonding speed 12 ~ 15m/min, welding temperature 1500 ~ 1550 DEG C, extruding allowance 16 ~ 18mm, welding current 15 ~ 18A.
3. the preparation method of heavy wall high-frequency welded steel pipe according to claim 1, is characterized in that, in described step (5), described compressed-air actuated pressure is 10 ~ 20Kpa, and temperature is 5 ~ 10 DEG C.
4. the preparation method of heavy wall high-frequency welded steel pipe according to claim 1, it is characterized in that, in described step (6), the condition of described normalized treatment is: heating frequency 50 ~ 60kHz, heating-up temperature 950 ~ 1050 DEG C, constant temperature keeps 5 ~ 15min, then cools to 300 DEG C with the furnace, Air flow 10 ~ 15min again, last water-cooled is to room temperature.
CN201510948023.XA 2015-12-17 2015-12-17 Method for preparing thick-wall high-frequency welded steel tube Pending CN105364426A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510948023.XA CN105364426A (en) 2015-12-17 2015-12-17 Method for preparing thick-wall high-frequency welded steel tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510948023.XA CN105364426A (en) 2015-12-17 2015-12-17 Method for preparing thick-wall high-frequency welded steel tube

Publications (1)

Publication Number Publication Date
CN105364426A true CN105364426A (en) 2016-03-02

Family

ID=55367316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510948023.XA Pending CN105364426A (en) 2015-12-17 2015-12-17 Method for preparing thick-wall high-frequency welded steel tube

Country Status (1)

Country Link
CN (1) CN105364426A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106271432A (en) * 2016-08-30 2017-01-04 天津鑫凯建业科技有限公司 A kind of steel pipes with straight manufacturing process and the reel hold down gag for this technique
CN110142310A (en) * 2019-05-31 2019-08-20 常熟市盈博钢管有限公司 A kind of production technology of steel pipes with straight
CN112570472A (en) * 2020-12-02 2021-03-30 中冶南方(武汉)热工有限公司 Hot-rolled stainless steel annealing and pickling line
CN113020315A (en) * 2021-03-08 2021-06-25 常熟市盈博钢管有限公司 Method for manufacturing thin-wall chilled special pipe

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100651774B1 (en) * 2005-12-26 2006-12-01 주식회사 포스코 Manufacturing method of electric resistance welded steel pipe
CN102312075A (en) * 2010-06-29 2012-01-11 攀钢集团钢铁钒钛股份有限公司 Method for improving low-temperature impact toughness of weld joint of weld pipe welded in manner of high-frequency straight welding
CN104646931A (en) * 2013-11-16 2015-05-27 无锡大金高精度冷拔钢管有限公司 Manufacturing method of cold drawn welded pipe for precision oil cylinder
CN104842128A (en) * 2015-06-08 2015-08-19 武汉钢铁(集团)公司 Ultrahigh radius-thickness ratio high-frequency longitudinal-seam welded pipe manufacturing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100651774B1 (en) * 2005-12-26 2006-12-01 주식회사 포스코 Manufacturing method of electric resistance welded steel pipe
CN102312075A (en) * 2010-06-29 2012-01-11 攀钢集团钢铁钒钛股份有限公司 Method for improving low-temperature impact toughness of weld joint of weld pipe welded in manner of high-frequency straight welding
CN104646931A (en) * 2013-11-16 2015-05-27 无锡大金高精度冷拔钢管有限公司 Manufacturing method of cold drawn welded pipe for precision oil cylinder
CN104842128A (en) * 2015-06-08 2015-08-19 武汉钢铁(集团)公司 Ultrahigh radius-thickness ratio high-frequency longitudinal-seam welded pipe manufacturing method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106271432A (en) * 2016-08-30 2017-01-04 天津鑫凯建业科技有限公司 A kind of steel pipes with straight manufacturing process and the reel hold down gag for this technique
CN110142310A (en) * 2019-05-31 2019-08-20 常熟市盈博钢管有限公司 A kind of production technology of steel pipes with straight
CN112570472A (en) * 2020-12-02 2021-03-30 中冶南方(武汉)热工有限公司 Hot-rolled stainless steel annealing and pickling line
CN113020315A (en) * 2021-03-08 2021-06-25 常熟市盈博钢管有限公司 Method for manufacturing thin-wall chilled special pipe

Similar Documents

Publication Publication Date Title
CN102699107B (en) Cold roll forming method of thin-walled and high-strength square steel tube
CN104816076B (en) A kind of pipe pipe butt weld technologies for steel method of continuous pipe
CN103341522B (en) The production method of thick-walled titanium welded tube and forming machine
CN105364426A (en) Method for preparing thick-wall high-frequency welded steel tube
CN104175062B (en) All-fiber-texture large-size double-flange fan main shaft forging method
CN105478524B (en) A kind of manufacturing method of duplex stainless steel coiled tubing
CN105478525B (en) A kind of manufacture method for the coiled tubing for including logging cable
WO2008037145A1 (en) A manufacture method of high precision seamless steel pipes
CN105458633B (en) A kind of manufacture method of mild steel coiled tubing
CN103643025B (en) Method of improving toughness of novel martensite heat-resistant steel A355P91 welding seam
CN102642123B (en) A kind of manufacturing process of Ultra-low carbon X42 grade of steel high-frequency straight seam welded pipe
CN105414878A (en) High-heat-resistance alloy steel casting defect repair method
CN105234200A (en) On-line tube-expanding production process of large-diameter seamless steel tubes
CN102873462A (en) Process for welding swing check valve and matching pipe
CN103966505A (en) Manufacturing process for large-wall thickness X70M steel-grade HFM pipeline tube
CN108705197A (en) Chrome ferritic stainless steel welding and post-weld annealed technique in a kind of cold continuous rolling production line
CN104493436B (en) A kind of manufacturing method having the both ends in-flanges titanium alloy cylindrical part for forcing feed supplement
CN103878542A (en) Manufacturing technology of tower crane jib pulling plate
CN102312075A (en) Method for improving low-temperature impact toughness of weld joint of weld pipe welded in manner of high-frequency straight welding
CN105537875A (en) Production method of ferritic stainless steel welded tube
CN103470873A (en) Special steel pipe for CO2 (carbon dioxide) air conditioner compressor casing and processing process of special steel pipe
CN204602909U (en) A kind of device correcting C type steel-casting
CN105171344B (en) A kind of preparation method of square steel tube
CN103286468B (en) The technique of the welding of non-return door pipe arrangement dissimilar steel
CN110666320A (en) 300-series stainless steel Taylor double-welding-wheel resistance seam welding process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160302