CN105350578A - Compatible plastic inspection well and connecting structure of compatible plastic inspection well and pipeline - Google Patents

Compatible plastic inspection well and connecting structure of compatible plastic inspection well and pipeline Download PDF

Info

Publication number
CN105350578A
CN105350578A CN201510831771.XA CN201510831771A CN105350578A CN 105350578 A CN105350578 A CN 105350578A CN 201510831771 A CN201510831771 A CN 201510831771A CN 105350578 A CN105350578 A CN 105350578A
Authority
CN
China
Prior art keywords
pipeline
manhole
inspection well
wall
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510831771.XA
Other languages
Chinese (zh)
Inventor
孙海英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HAILI PIPELINE TECHNOLOGY Co Ltd
Original Assignee
SHANDONG HAILI PIPELINE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HAILI PIPELINE TECHNOLOGY Co Ltd filed Critical SHANDONG HAILI PIPELINE TECHNOLOGY Co Ltd
Priority to CN201510831771.XA priority Critical patent/CN105350578A/en
Publication of CN105350578A publication Critical patent/CN105350578A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/121Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the connection between shaft elements, e.g. of rings forming said shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/124Shaft entirely made of synthetic material
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/021Connection of sewer pipes to manhole shaft
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/024Manhole shafts or other inspection chambers; Snow-filling openings; accessories made of plastic material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a compatible plastic inspection well which comprises two identical V-shaped shells. Each shell comprises two symmetric side faces, a bottom face and a top face with an opening. A flange is arranged on the edge of each shell, and a plurality of through holes are formed in the flanges. The two shells are connected through a threaded fastener to form the inspection well with one open end. The inspection well can be compatible with pipelines of multiple specifications and calibers, multiple connecting modes are combined, mold investment cost is greatly reduced, and the product production period is shortened. The inspection well is formed by assembling the two shells, centralized split manufacturing, batch transportation and on-site combining and assembling can be achieved, and the beneficial effects of being light, high in strength and easy to assemble are achieved. In addition, the inspection well and a pipeline connecting hole are connected through a flange, and the beneficial effects that the inspection well and the pipeline are connected conveniently and fast, and connector sealing is reliable are achieved.

Description

A kind of compatibility plastic inspection well and the syndeton with pipeline thereof
Technical field
The present invention relates to a kind of compatibility plastic inspection well and the syndeton with pipeline thereof, belong to manhole technical field.
Background technology
In recent years, the requirement to construction field energy-saving and emission-reduction along with socio-economic development and country, plastic inspection well has because of it advantage that traditional manhole cannot compare, and in the engineering constructions such as municipal administration discharge, rain dirt shunting, pipe network inspection, be used widely in field.Plastic inspection well adopts once injection moulding, builds shaping or rotation molding.For once through moulding technology, the size of manhole and pipeline junction perforate is determined by the size of mould own, a kind of mould can only produce the manhole of certain connecting hole, and in actual conditions, manhole and pipeline are connected with yi word pattern, tee T, cross etc. many [1] plants mode, manufacturer is in order to meet above customer demand, many molds are dropped into adapt to the pipeline of plurality of specifications bore and multiple connected mode, this not only considerably increases the input of mould, cause the idle of enterprise's part assets, too increase the production cycle of product, store in a warehouse in the manhole later stage, also extra-pay is created in transportation, also there are problems in work progress, sometimes need extra with the use of accessories such as reducing joints, manhole and pipeline connected mode mostly are bayonet joint or plastic melting Welding in addition, and on-site construction operations is complicated, difficulty is comparatively large, and the sealing of connecting portion and reliability are also not easy to ensure.
Summary of the invention
The present invention is in order to overcome the deficiency of above technology, provide a kind of compatibility plastic inspection well and the syndeton with pipeline thereof, this manhole can compatible many kinds of specification bore pipeline and realize the combination of multiple connected mode, greatly save mould Meteorological, and shorten life cycle of the product.
the present invention overcomes the technical scheme that its technical problem adopts:
A kind of compatibility plastic inspection well, comprise two identical " V " font housings, each housing comprises two symmetrical sides, bottom surfaces and is provided with the end face of opening, the edge of each housing is provided with bead, bead is provided with several through holes, being connected by threaded fastener between two housings forms the manhole of one end open.
Preferred according to the present invention, " V " font intersection of each housing is provided with angle muscle, the outer wall of housing is provided with some longitudinal ribs, some horizontal bars and some annular muscle, described angle muscle, longitudinal rib and horizontal bar and annular muscle are interweaved, both raw material usage had been saved, reduce the overall weight of manhole, the bulk strength of manhole can also be strengthened.
Preferred according to the present invention, the mouth of different size and position, for facing the wall and meditating, can be offered, with the pipeline of compatible many kinds of specification in the region on described side and in annular muscle on facing the wall and meditating.
Preferred according to the present invention, it is the groove of 0.5-1.5mm that the inner surface of described bead is provided with a degree of depth, smears fluid sealant, to increase the overall tightness of manhole during two housing assemblings by groove.
Preferred according to the present invention, the angle between described two sides is 90 °.
Preferred according to the present invention, described manhole is connected with pipeline by flange, offer the port corresponding with the pipeline needing to connect and several flange holes on facing the wall and meditating, manhole is connected with pipeline with the flange hole one_to_one corresponding on facing the wall and meditating with the port of facing the wall and meditating by the mouth of pipe of pipeline and the flange hole on flange respectively.
the invention has the beneficial effects as follows:
1, manhole of the present invention can compatible many kinds of specification bore pipeline and realize the combination of multiple connected mode, greatly saved mould Meteorological, and shortened life cycle of the product.
2, manhole of the present invention is assembled by two housings, can realize concentrated split manufacture, bulk transport and on-the-spot fit assembling, have lightweight, intensity is high and assemble simple advantage.
3, manhole of the present invention and pipeline connecting hole adopt Flange joint, have, sealing joint reliable advantage convenient and fast connection with pipeline.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present invention.
Fig. 2 is the structural representation I of inventive shell.
Fig. 3 is the structural representation II of inventive shell.
Fig. 4 is structural representation when respectively facing the wall and meditating perforate state after manhole of the present invention assembling.
Fig. 5 is the structural representation I after manhole of the present invention is connected with pipeline.
Fig. 6 is the structural representation II after manhole of the present invention is connected with pipeline.
In figure, 1, manhole, 2, housing, 2.1, side, 2.2, bottom surface, 2.3, end face, 3, longitudinal rib, 4, horizontal bar, 5, annular muscle, 6, angle muscle, 7, bead, 8, through hole, 9, groove, 10, bolt, 11, nut, 12, A faces the wall and meditates, 13, B faces the wall and meditates, and 14, small-bore pipeline, 15, large aperture pipeline, 16, pipeline, 17, flange hole, 18, face the wall and meditate, 19, flange, 20, port.
Detailed description of the invention
Better understand the present invention for the ease of those skilled in the art, be described in further details below in conjunction with the drawings and specific embodiments to the present invention, following is only exemplary do not limit protection scope of the present invention.
As Figure 1-3, compatibility plastic inspection well of the present invention, comprise two identical " V " font housings 2, housing 2 is fiberglass reinforced SMC or BMC material, divides body formed manufacture by mold pressing; Each housing 2 comprises two symmetrical sides 2.1, bottom surfaces 2.2 and is provided with the end face 2.3 of opening, and the angle preferably between two sides 2.1 is 90 °, is assembled into a square manhole.
" V " font intersection of each housing 2 is provided with angle muscle 6, the outer wall of housing is provided with some longitudinal ribs 3, some horizontal bars 4 and some annular muscle 5, described angle muscle 6, longitudinal rib 3 and horizontal bar 4 and annular muscle 6 are interweaved, both raw material usage had been saved, reduce the overall weight of manhole, the bulk strength of manhole can also be strengthened; , for facing the wall and meditating 18, face the wall and meditate and can offer the mouth of different size and position on 18, with the pipeline of compatible many kinds of specification in region on side 2.1 and in annular muscle; The edge of each housing 2 is provided with bead 7, bead 7 is provided with several through holes 8, the inner surface of bead 7 is provided with the groove 9 that a degree of depth is 0.5-1.5mm, fluid sealant is smeared by groove 9 when two housings 2 are assembled, make two housings 2 bonded to each other, then utilize bolt 10 through the manhole 1 of through hole 8 with the fastening formation one end open of nut 11.
As illustrated in figures 4-5, described manhole 1 is connected with pipeline 16 by flange 19, face the wall and meditate on 18 and offer the port 20 corresponding with the pipeline needing to connect and several flange holes 17, the mouth of pipe of pipeline 16 and the flange hole on flange 19 respectively with face the wall and meditate 18 port 20 with the flange hole one_to_one corresponding of facing the wall and meditating on 18, manhole 1 is connected with pipeline 16.
The assemble method of manhole of the present invention is as follows: job site is placed in same level by symmetrical for two housings 2, fluid sealant is filled respectively in the groove 9 of two housings 2, then the surface in alignment of the bead 7 of two housings 2 is fitted, successively multiple bolt 10 is passed through hole 8, fastening nut 11, make two housing 2 compact siro spinning technology integral, be assembled into manhole 1, it is lightweight, assembling is simple.
Due to the pipeline of manhole energy compatible many kinds of specification of the present invention, the connected mode of itself and pipeline is as follows:
(1) as illustrated in figures 4-5, at the construction field (site), different from the concrete connected mode of pipeline 16 with manhole 1 according to pipeline 16 caliber size, determine perforate size and position, as need to two of single housing 2 face the wall and meditate 18 carry out opening manipulation respectively time, first on facing the wall and meditating, hold port and flange hole successfully according to the correspondence position of the flange hole 17 on the pipeline 16 needing separately to connect.A faces the wall and meditates and 12 needs to connect small-bore pipeline 14, then A faces the wall and meditates on 12 and offers the port corresponding with small-bore pipeline 14 and flange hole 17; B faces the wall and meditates and 13 needs to connect large aperture pipeline 15, then B faces the wall and meditates on 13 and offers the port corresponding with large aperture pipeline 15 and flange hole 17; If housing 2 certain face the wall and meditate on do not need connecting pipe, then this faces the wall and meditates just without perforate, the mfg. moulding die of the housing 2 of such manhole 1 only needs little kind, just can compatible many kinds of specification pipeline and realize the combination of multiple connected mode, greatly save mould Meteorological, and shorten life cycle of the product.
(2) respectively the flange hole 17 of small-bore pipeline 14 is aimed at the flange hole 17 that A faces the wall and meditates on 12, the flange hole 17 of large aperture pipeline 15 aims at the flange hole 17 that B faces the wall and meditates on 13, then multiple bolt 10 is rear fastening with nut 11 through each flange hole 17, such manhole 1 just and pipeline linked into an integrated entity, as shown in Figure 6, this connected mode is convenient to operation, sealing joint is reliable.
Above only describes general principle of the present invention and preferred embodiment, those skilled in the art can make many changes and improvements according to foregoing description, and these changes and improvements should belong to protection scope of the present invention.

Claims (6)

1. a compatibility plastic inspection well, it is characterized in that: comprise two identical " V " fonts housing (2), each housing (2) comprises two symmetrical sides (2.1), bottom surface (2.2) and is provided with the end face (2.3) of opening, the edge of each housing is provided with bead (7), bead (7) is provided with several through holes (8), being connected by threaded fastener between two housings forms the manhole (1) of one end open.
2. manhole according to claim 1, it is characterized in that: " V " font intersection of each housing is provided with angle muscle (6), the outer wall of housing is provided with some longitudinal ribs (3), some horizontal bars (4) and some annular muscle (5), described angle muscle (6), longitudinal rib (3) and horizontal bar (4) and annular muscle (6) are interweaved.
3. manhole according to claim 2, is characterized in that: described side (2.1) are upper and region in annular muscle is face the wall and meditate (18), can offer the mouth of different size and position on facing the wall and meditating.
4. manhole according to claim 1, is characterized in that: the inner surface of described bead (7) is provided with the groove (9) that a degree of depth is 0.5-1.5mm.
5. manhole according to claim 1, is characterized in that: the angle between described two sides (2.1) is 90 °.
6. the syndeton of a manhole as claimed in claim 3 and pipeline, it is characterized in that: described manhole (1) is connected with pipeline (16) by flange (19), face the wall and meditate on (18) and offer the port (20) corresponding with the pipeline needing to connect and several flange holes (17), manhole (1) is connected with pipeline (16) with the flange hole one_to_one corresponding of facing the wall and meditating on (18) with the port of facing the wall and meditating on (18) (20) with the flange hole on flange (19) by the mouth of pipe of pipeline (16) respectively.
CN201510831771.XA 2015-11-25 2015-11-25 Compatible plastic inspection well and connecting structure of compatible plastic inspection well and pipeline Pending CN105350578A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510831771.XA CN105350578A (en) 2015-11-25 2015-11-25 Compatible plastic inspection well and connecting structure of compatible plastic inspection well and pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510831771.XA CN105350578A (en) 2015-11-25 2015-11-25 Compatible plastic inspection well and connecting structure of compatible plastic inspection well and pipeline

Publications (1)

Publication Number Publication Date
CN105350578A true CN105350578A (en) 2016-02-24

Family

ID=55326630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510831771.XA Pending CN105350578A (en) 2015-11-25 2015-11-25 Compatible plastic inspection well and connecting structure of compatible plastic inspection well and pipeline

Country Status (1)

Country Link
CN (1) CN105350578A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284600A (en) * 2016-08-29 2017-01-04 山东国舜建设集团有限公司 A kind of gully of repeatable utilization
CN110053274A (en) * 2019-05-09 2019-07-26 常州信息职业技术学院 Large-scale spliced plastic inspection well well room, contour machining equipment and forming method
CN110173034A (en) * 2019-05-09 2019-08-27 山东海丽管道科技有限公司 A kind of compatibility plastic inspection well and its connection structure with pipeline
CN110565682A (en) * 2019-09-16 2019-12-13 南京电力设计研究院有限公司 ring main unit prefabricated foundation module segmentation method and installation connection method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0672799A2 (en) * 1994-03-15 1995-09-20 Josef Dipl.-Ing. Enichlmayr Plastic branching unit for canals
CN201972169U (en) * 2011-02-15 2011-09-14 四川国丰管业有限公司 Integrated reinforced plastic inspection well
CN202157341U (en) * 2011-07-25 2012-03-07 四川亚塑新材料有限公司 Enhanced reinforcing rib plastic inspection well
CN202745188U (en) * 2012-07-24 2013-02-20 江阴市宇龙橡塑有限公司 High-strength inspection well
CN103912018A (en) * 2014-04-01 2014-07-09 武汉亿美特机械有限公司 Composite-structure combined-type plastic inspection well seat
CN203716186U (en) * 2014-02-18 2014-07-16 孙海英 Inspection well
CN204298851U (en) * 2014-12-04 2015-04-29 康泰塑胶科技集团有限公司 Plastic inspection well
CN205205862U (en) * 2015-11-25 2016-05-04 山东海丽管道科技有限公司 Can compatible plastic check well and connection structure with pipeline thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0672799A2 (en) * 1994-03-15 1995-09-20 Josef Dipl.-Ing. Enichlmayr Plastic branching unit for canals
EP0672799A3 (en) * 1994-03-15 1997-01-15 Enichlmayr Josef Dipl Ing Plastic branching unit for canals.
CN201972169U (en) * 2011-02-15 2011-09-14 四川国丰管业有限公司 Integrated reinforced plastic inspection well
CN202157341U (en) * 2011-07-25 2012-03-07 四川亚塑新材料有限公司 Enhanced reinforcing rib plastic inspection well
CN202745188U (en) * 2012-07-24 2013-02-20 江阴市宇龙橡塑有限公司 High-strength inspection well
CN203716186U (en) * 2014-02-18 2014-07-16 孙海英 Inspection well
CN103912018A (en) * 2014-04-01 2014-07-09 武汉亿美特机械有限公司 Composite-structure combined-type plastic inspection well seat
CN204298851U (en) * 2014-12-04 2015-04-29 康泰塑胶科技集团有限公司 Plastic inspection well
CN205205862U (en) * 2015-11-25 2016-05-04 山东海丽管道科技有限公司 Can compatible plastic check well and connection structure with pipeline thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284600A (en) * 2016-08-29 2017-01-04 山东国舜建设集团有限公司 A kind of gully of repeatable utilization
CN110053274A (en) * 2019-05-09 2019-07-26 常州信息职业技术学院 Large-scale spliced plastic inspection well well room, contour machining equipment and forming method
CN110173034A (en) * 2019-05-09 2019-08-27 山东海丽管道科技有限公司 A kind of compatibility plastic inspection well and its connection structure with pipeline
CN110565682A (en) * 2019-09-16 2019-12-13 南京电力设计研究院有限公司 ring main unit prefabricated foundation module segmentation method and installation connection method thereof
CN110565682B (en) * 2019-09-16 2021-05-18 南京电力设计研究院有限公司 Ring main unit prefabricated foundation module segmentation method and installation connection method thereof

Similar Documents

Publication Publication Date Title
CN105350578A (en) Compatible plastic inspection well and connecting structure of compatible plastic inspection well and pipeline
CN204805240U (en) High strength side pipe fittings
CN203878615U (en) Light combined type set-shaped steel formwork for inspection well
CN105113790A (en) Bare-concrete corner floating window steel formwork structure body device
CN205205862U (en) Can compatible plastic check well and connection structure with pipeline thereof
CN103953163A (en) Reinforced connector formed by low alloy steel in casting and machining manners
CN204554135U (en) A kind of pipeline clamp
CN201738430U (en) Assembled plastic inspection well
CN210597382U (en) Shaping standard component of stagnant water section under electric power piping lane tube coupling
CN110173034A (en) A kind of compatibility plastic inspection well and its connection structure with pipeline
CN203836461U (en) Stainless steel liner cross pipe fitting
CN211114132U (en) Joint
CN203783123U (en) High-strength plastic steel moulding plate convenient to manufacture
CN208763412U (en) Template is auxiliarily fixed in a kind of easy-to-dismount concrete setting
CN102218510A (en) Portable method for fixing core
CN201697396U (en) A double U-shaped buried heat exchanger
CN204097123U (en) The exterior wall unit of piecing assembly sewage disposal device
CN109203457A (en) A method of in building tenon structure on hollow material
CN2933806Y (en) Methane tank detachable steel-wood mould
CN2585006Y (en) Plastic reducing three-way pipe fitting
CN214925437U (en) PC component drawing die through hole positioning tool
CN222701048U (en) A height-adjustable docking well neck
CN205357314U (en) A continuous type flowerpot for three -dimensional greening
CN211315463U (en) Flange type glass fiber reinforced plastic pipeline
CN212612349U (en) Universal regulation modularization quick combination installation abnormal shape template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160224

WD01 Invention patent application deemed withdrawn after publication