CN105234062B - A kind of inner circle corrosion-proof steel pipe fitting connecting process - Google Patents

A kind of inner circle corrosion-proof steel pipe fitting connecting process Download PDF

Info

Publication number
CN105234062B
CN105234062B CN201510682028.2A CN201510682028A CN105234062B CN 105234062 B CN105234062 B CN 105234062B CN 201510682028 A CN201510682028 A CN 201510682028A CN 105234062 B CN105234062 B CN 105234062B
Authority
CN
China
Prior art keywords
pipe fitting
pipe
inner circle
surfacing
spraying area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510682028.2A
Other languages
Chinese (zh)
Other versions
CN105234062A (en
Inventor
卢艺雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZIGONG JUGUANG HARD-SURFACE TECHNOLOGY Co Ltd
Original Assignee
ZIGONG JUGUANG HARD-SURFACE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZIGONG JUGUANG HARD-SURFACE TECHNOLOGY Co Ltd filed Critical ZIGONG JUGUANG HARD-SURFACE TECHNOLOGY Co Ltd
Priority to CN201510682028.2A priority Critical patent/CN105234062B/en
Publication of CN105234062A publication Critical patent/CN105234062A/en
Application granted granted Critical
Publication of CN105234062B publication Critical patent/CN105234062B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention discloses a kind of inner circle corrosion-proof steel pipe fitting connecting process, including step:A)The circle oil removing of pipe fitting;B)Pipe fitting inner circle sandblasting;C)Mouth of pipe surfacing:Surfacing area and surfacing alloy anticorrosive coat are delineated in the union end mouth of pipe inner circle of all pipe fittings;D)Sprayed in pipe:It is spraying area that each pipe fitting inner circle beyond surfacing area, which is delineated,;Each pipe fitting is longitudinally disposed, each pipe fitting is transferred along straight line and makes rotation, load coil is powered simultaneously, each spraying area first passes through load coil heating, engineering plastic powder is sprayed in spraying area by the spray gun of lower section again, so that engineering plastic powder is adhered in heated whole spraying area, stop decentralization pipe fitting;Each pipe fitting is above carried and makes its rotation, while load coil is powered, and first passes through heated pipe fitting and melting temperature is heated to engineering plastic powder, then control two arc pressuring plates to be contacted with whole spraying area, extruding is carried out to melting engineering plastics, obtain sprayed coating;E) weld.The uniformity of spray layer thickness and consistency is effectively ensured in the present invention, and improves surface smoothness, greatly improves coating quality, reduces product cost, and ensures that the antiseptic property of whole pipeline inner circle meets needs.

Description

A kind of inner circle corrosion-proof steel pipe fitting connecting process
Technical field
The present invention relates to a kind of inner circle corrosion-proof steel pipe fitting connecting process.
Background technology
The steel pipe of the industries such as oil, chemical industry, electric power is presently used for, to change its inner surface characteristic, meets that anti-corrosion will Ask, generally using engineering plastics such as polyphenylene sulfide, polyether-ether-ketone, polyimides and liquid crystal polymer, its each pipe fitting inner circle is entered Row thermal spraying;The hot-spraying technique of existing pipe fitting inner circle use pipe heating, centrifugal gunite work plastic powders, stove more The mode of room temperature is melted, be cooled to interior heat again, is the shortcomings that the technique:1)It is different from spraying alloy powder, engineering plastic powder It is relatively light, during spraying and workpiece adhesive force it is poor, cause the thickness of sprayed coating, consistency not to control accurately, plus heating weight Sprayed coating has certain mobility when melting, and this is resulted in, and the thickness of sprayed coating, consistency are uneven, and surface roughness can not also be controlled System, has a strong impact on coating quality, even results in substantial amounts of waste product, adds product cost, and the process-cycle is grown, production efficiency compared with It is low;Last each pipe fitting, which need to weld, to be connected to form pipeline, and above-mentioned each pipe fitting, because weld zone temperature is higher, can cause to spray in connection Layer melting comes off, and anti-corrosive properties are affected or scrapped.
The content of the invention
The purpose of the present invention is to be directed to deficiencies of the prior art, there is provided a kind of inner circle corrosion-proof steel pipe fitting connection Technique, the uniformity of spray layer thickness and consistency can be effectively ensured in it, and improves surface smoothness, greatly improve spraying matter Amount, product cost is reduced, and ensure that the antiseptic property of whole pipeline inner circle meets needs.
To reach above-mentioned purpose, a kind of inner circle corrosion-proof steel pipe fitting connecting process of the invention, comprise the following steps:A)It is right The inner circle oil removing of all pipe fittings of more than two;B)Inner circle sandblasting to all pipe fittings;C)Mouth of pipe surfacing:In the connection of all pipe fittings Connect the intraoral circle of end pipe and delineate surfacing area, in the region surfacing alloy anticorrosive coat;Characterized by further comprising:D)Sprayed in pipe:Will It is spraying area that each pipe fitting inner circle beyond surfacing area, which delineates,;Each pipe fitting is longitudinally disposed, and load coil and several spray guns are indulged To each arranged at inner side of pipe fitting is fixedly arranged on, moveable two arc pressuring plate is set in load coil upper horizontal;By each pipe fitting along directly Line is transferred and it is rotated around own axes, while load coil is powered, and each spraying area first passes through load coil and added Heat, engineering plastic powder is sprayed in spraying area by the spray gun of lower section again so that engineering plastic powder is adhered to heated whole In spraying area, stop decentralization pipe fitting;Each pipe fitting is above carried and it is rotated around own axes, while load coil is powered, First pass through heated pipe fitting and melting temperature is heated to engineering plastic powder, then control two arc pressuring plates to be connect with whole spraying area Touch, extruding is carried out to melting engineering plastics, obtain sprayed coating;E) weld:It is after each sprayed coating cooling and shaping, each pipe fitting is adjacent The union end mouth of pipe welding be connected, obtain complete duct coupling;
The present invention implements engineering by implementing surfacing alloy anticorrosive coat in the surfacing area of union end mouth of pipe inner circle, in spraying area The thermal spraying of plastics, the high temperature of weld zone can be avoided in welding influences sprayed coating, it is ensured that the anti-corrosive properties of whole pipeline inner circle Needs can be met;In spraying, by driving pipe fitting rotation to ensure the uniformity for heating, spraying and extruding;Pass through control two The radial clearance of arc pressuring plate and pipe fitting, the thickness of coating, consistency are inconsistent when spraying, can be to melting in extruding Engineering plastics it is again moulding, the uniformity of spray layer thickness and consistency is effectively ensured, and improve consistency, can not only eliminate Influence of the mobility of engineering plastics to coating quality is melted, and improves surface smoothness, greatly improves coating quality, is reduced useless Product rate, reduce product cost;And pipe fitting completes processing during up-downgoing is once reciprocal, for heating, natural cooling immediately, adds The work cycle is short, and production efficiency is higher;
As a further improvement on the present invention, in welding:The adjacent union end mouth of pipe of each pipe fitting is set in axial gap Put, the adjacent union end mouth of pipe is connected by built-up welding internal layer wlding, internal layer wlding is and alloy anticorrosive coat identical material, reality The welding of existing dissimilar steel, then the built-up welding carbon steel layer outside internal layer wlding;Influence of the welding to sprayed coating can further be reduced, protected simultaneously Demonstrate,prove pipeline strength;
As a further improvement on the present invention, each pipe fitting upper end is connected with one section of transition tool;During spraying, transition Frock and the position correspondence of load coil and two arc pressuring plates, it is easy to implement thermal spraying to the whole spraying area of pipe fitting inner circle;
As a further improvement on the present invention, guide sleeve is fixedly installed outside each pipe fitting, is prevented when pipe fitting moves up and down It swings;
In summary, the uniformity of spray layer thickness and consistency can be effectively ensured in the present invention, and improves surface smoothness, Coating quality is greatly improved, reduces product cost, and ensures that the antiseptic property of whole pipeline inner circle meets needs.
Brief description of the drawings
Fig. 1 is the front view of the hot spray apparatus used in the present invention.
Fig. 2 is the enlarged drawing of control cylinder in Fig. 1.
Fig. 3 is the front view for the complete duct coupling that the present invention obtains.
Fig. 4 is Fig. 3 A-A profiles.
Fig. 5 is the sectional view of complete duct coupling end pipe fitting.
Fig. 6 is the sectional view of complete duct coupling intermediate pipe piece.
Embodiment
The invention will now be described in further detail with reference to the accompanying drawings.
As shown in Figure 1 and Figure 2, the hot spray apparatus that uses in the present invention, including support 1, support 1 is located at by guideway 2 On installing plate 3, the reducing motor 4 that is fixedly arranged on installing plate 3, reducing motor 4 is connected with shaft coupling 5, on pipe fitting 6 to be sprayed End is connected by one section of transition tool 7 with shaft coupling 5, and the internal diameter of transition tool 7 is more than the internal diameter of pipe fitting 6 and welded with pipe fitting 6, The outside of pipe fitting 6 is provided with recovery tube 19, and recovery tube 19 is connected with collecting box 20;Guide sleeve 21 is installed with outside pipe fitting 6;In pipe A fixed pillar 8 for the medial gap of part 6, pillar 8 are connected with recovery tube 19, and load coil 9 is installed with pillar 8, Several spray guns 10 are installed with the pillar 8 of the lower section of load coil 9, pass through insulating support 11 above load coil 9 Control cylinder 12 is installed with, control cylinder 12 includes passing through cylinder barrel 13, two work in cylinder barrel 13 that insulating support 11 is fixed Plug 14, the stretching hydraulic fluid port 15 located at the middle part of cylinder barrel 13 and the two retraction hydraulic fluid ports 16 positioned at cylinder barrel both ends, two-piston 14 are associated with respectively From piston rod 17, two-piston bar 17 connects firmly respective arc pressuring plate 18, and two arc pressuring plates 18 are symmetrically positioned in the interior of pipe fitting 6 Side;The height of transition tool 7 is more than the height of load coil 9 plus control cylinder 12;
A kind of inner circle corrosion-proof steel pipe fitting connecting process of the present invention, comprises the following steps:A)To the inner circle of several pipe fittings Oil removing;B)Inner circle sandblasting to all pipe fittings;C)Mouth of pipe surfacing:As shown in Figure 5, Figure 6, by the one of pipe ends portion pipe fitting 22 The inner circle delineating for connecing the certain axial length of end pipe mouth is surfacing area 24, by the two union end mouths of pipe one of remaining all intermediate pipe piece 23 Determining the inner circle of axial length, to delineate be surfacing area 25, and in all surfacing areas, surfacing is Ni-based or chromium base or ferrous alloy anticorrosive coat;D) Sprayed in pipe:It is spraying area that each pipe fitting inner circle beyond surfacing area, which is delineated,;As shown in Figure 1 and Figure 2, each longitudinal direction of pipe fitting 6 is set Put, load coil 9 and the longitudinal direction of several spray guns 10 are fixedly arranged on each inner side of pipe fitting 6, and the moveable level of two arc pressuring plate 18 is set It is placed in the top of load coil 9;Pass through boom hoisting(Such as driving, it is not shown)Reducing motor 4 is transferred, reducing motor 4 and Installing plate 3 is descending along guideway 2, while reducing motor 4 rotates, and each pipe fitting 6 is transferred along straight line and it is revolved around own axes Turn, while load coil 9 is powered, and each spraying area first passes through load coil 9 and heated, again by the spray gun 10 of lower section by work Engineering plastics powder(Such as polyphenylene sulfide, polyether-ether-ketone, polyimides)It is sprayed in spraying area so that engineering plastic powder is adhered to In heated whole spraying area, stop decentralization pipe fitting 6;Each pipe fitting 6 is above carried and it is rotated around own axes, is sensed simultaneously Heating coil 9 is powered, and first passes through heated pipe fitting 6 and melting temperature is heated to engineering plastic powder, then to control cylinder 12 Stretching hydraulic fluid port 15 fuel feeding, two-piston bar 17 stretch out, and two arc pressuring plates 18 of control contact with whole spraying area, to melting engineering plastics Extruding is carried out, obtains sprayed coating;E) weld:After each sprayed coating cooling and shaping, as shown in Figure 3, Figure 4, by each pipe fitting 22 or 23 The adjacent union end mouth of pipe is set in axial gap, and the adjacent union end mouth of pipe is connected by built-up welding internal layer wlding 26, internal layer Wlding 26 be with alloy anticorrosive coat identical material, realize the welding of dissimilar steel, then in the outer built-up welding carbon steel layer 27 of internal layer wlding 26, Obtain complete duct coupling 28;
The union end mouth of pipe of each pipe fitting is equipped with pass with it in the complete middle position of duct coupling 28, such as pipe ends portion pipe fitting 22 There is a union end mouth of pipe, intermediate pipe piece 23 has two union end mouths of pipe;The present invention passes through the spray in union end mouth of pipe inner circle Welding zone 24 or 25 implements surfacing alloy anticorrosive coat, implements the thermal spraying of engineering plastics in spraying area, surfacing area 24 and 25 is in axial direction Length determined by welding temperature, be defined by the combination for not influenceing follow-up sprayed coating and pipe fitting, welding when can avoid welding The high temperature in area causes sprayed coating to melt or come off;Heating-up temperature during thermal spraying is far below the fusion temperature of spray-welding coating(800 More than DEG C), avoid previous spray-welding coating from being damaged, it is ensured that the antiseptic property of the whole inner circle of pipeline 28 meets needs;The present invention Pipe fitting 6 is driven to rotate the uniformity that can ensure to heat, spray and extrude by reducing motor 4, and can be quick by sensing heating Reach the temperature of thermal spraying(It is below 300 DEG C);Control it to reach precalculated position by the range of two-piston bar 17, make Obtaining two arc pressuring plates 18 and keep identical radial clearance with pipe fitting 6, the thickness of coating, consistency are inconsistent when spraying, Can be again moulding to the engineering plastics of melting in extruding, the uniformity of spray layer thickness and consistency is effectively ensured, and improve Consistency, influence of the mobility of melting engineering plastics to coating quality can be not only eliminated, and improve surface smoothness, significantly carried High coating quality, percent defective is reduced, reduce product cost;And pipe fitting 6 completes processing during up-downgoing is once reciprocal, for i.e. Shi Jiare, natural cooling, the process-cycle is short, and production efficiency is higher.

Claims (4)

1. a kind of inner circle corrosion-proof steel pipe fitting connecting process, comprises the following steps:A)To the inner circle of all pipe fittings of more than two Oil removing;B)Inner circle sandblasting to all pipe fittings;C)Mouth of pipe surfacing:Surfacing area is delineated in the union end mouth of pipe inner circle of all pipe fittings, In the region surfacing alloy anticorrosive coat;Characterized by further comprising:D)Sprayed in pipe:Each pipe fitting inner circle beyond surfacing area is drawn It is set to spraying area;Each pipe fitting is longitudinally disposed, and load coil and several spray guns are longitudinally fixedly arranged on each arranged at inner side of pipe fitting, are sensing Heating coil upper horizontal sets moveable two arc pressuring plate;Each pipe fitting is transferred along straight line and it is revolved around own axes Turn, while load coil is powered, each spraying area first passes through load coil heating, again by the spray gun of lower section by engineering plastic Feed powder end is sprayed in spraying area so that engineering plastic powder is adhered in heated whole spraying area, stops decentralization pipe fitting;Will Each pipe fitting above carries and it is rotated around own axes, while load coil is powered, and first passes through heated pipe fitting to engineering plastic Feed powder end is heated to melting temperature, then controls two arc pressuring plates to be contacted with whole spraying area, carries out extruding to melting engineering plastics, Obtain sprayed coating;E) weld:After each sprayed coating cooling and shaping, the adjacent union end mouth of pipe welding of each pipe fitting is connected, obtained Complete duct coupling.
2. a kind of inner circle corrosion-proof steel pipe fitting connecting process as claimed in claim 1, it is characterised in that in welding:By each pipe The adjacent union end mouth of pipe of part is set in axial gap, and the adjacent union end mouth of pipe is connected by built-up welding internal layer wlding, internal layer Wlding be with alloy anticorrosive coat identical material, realize the welding of dissimilar steel, then the built-up welding carbon steel layer outside internal layer wlding.
3. a kind of inner circle corrosion-proof steel pipe fitting connecting process as claimed in claim 1 or 2, it is characterised in that by each pipe fitting Upper end is connected with one section of transition tool.
4. a kind of inner circle corrosion-proof steel pipe fitting connecting process as claimed in claim 3, it is characterised in that fixed outside each pipe fitting Guide sleeve is set, its swing is prevented when pipe fitting moves up and down.
CN201510682028.2A 2015-10-21 2015-10-21 A kind of inner circle corrosion-proof steel pipe fitting connecting process Active CN105234062B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510682028.2A CN105234062B (en) 2015-10-21 2015-10-21 A kind of inner circle corrosion-proof steel pipe fitting connecting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510682028.2A CN105234062B (en) 2015-10-21 2015-10-21 A kind of inner circle corrosion-proof steel pipe fitting connecting process

Publications (2)

Publication Number Publication Date
CN105234062A CN105234062A (en) 2016-01-13
CN105234062B true CN105234062B (en) 2017-12-19

Family

ID=55032025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510682028.2A Active CN105234062B (en) 2015-10-21 2015-10-21 A kind of inner circle corrosion-proof steel pipe fitting connecting process

Country Status (1)

Country Link
CN (1) CN105234062B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108006328B (en) * 2017-12-08 2020-06-16 自贡市巨光硬面材料科技有限公司 Manufacturing process of inner circle full-corrosion-proof pipe fitting
CN117778937B (en) * 2024-01-19 2024-12-20 永康市珏灵电器股份有限公司 Manufacturing equipment and manufacturing method of plasma non-stick pan

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ATE503147T1 (en) * 2007-04-25 2011-04-15 Kwh Pipe Ab Oy METHOD AND DEVICE FOR COATING PIPES
CN103170445A (en) * 2013-02-22 2013-06-26 北钢管业(营口)有限公司 One-step shaping technology for coating epoxy powder on inner wall and outer wall of steel pipe

Also Published As

Publication number Publication date
CN105234062A (en) 2016-01-13

Similar Documents

Publication Publication Date Title
CN104943155B (en) Composite pipe flanging molding device and molding method
KR101261020B1 (en) Method and device for coating metallic pipes or other long components which have a restricted cross section
CN105234062B (en) A kind of inner circle corrosion-proof steel pipe fitting connecting process
CN212092919U (en) Automatic hot spraying mechanism for inner wall surface of pipe
CN205097539U (en) Portable handheld plastics extrusion welder
CN104959263A (en) De-rusting and spraying intelligent robot in pipeline
CN104175066A (en) Axial pushing-in gathering and upsetting composite process of ultralong pipe head flange
CN108296136A (en) The full powder forming units of steel pipe 3PE and moulding process
CN113441959A (en) Full-automatic spiral steel pipe anticorrosion integrated production line and production process
CN106111458B (en) A kind of full-automatic inside and outside operating method for applying coating line of steel conduit
CN105363653B (en) A kind of device and technique of pipe fitting inner circle thermal spraying engineering plastics
CN105221850A (en) A kind of anticorrosive steel rib strengthens Spiral Steel Pipe and preparation method thereof
CN204308386U (en) A kind of moveable welding adapter inside surfacing device
CN209229163U (en) A kind of outer plastic-coated lining plastic metal composite pipe
CN107031029A (en) A kind of glass reinforced plastic pipe pipeline joint production equipment
CN107116803A (en) A kind of polyethylene plastic steel wound drain pipe composite joint construction technology
CN205393346U (en) Spinning equipment of compound water pipe of heavy -calibre
CN201530123U (en) Metal pipeline polyethylene anticorrosive coating joint coating construction machine
CN106564181B (en) A kind of method and apparatus of plastic packaging composite metal plastic pipe end face
CN110722279A (en) Steel pipe butt welding process
CN109849313A (en) High-voltage flexible PE steel wire composite pipe fast connecting joint processing method and system
CN205767494U (en) Mouth of pipe Full-automatic welding machine
CN203282042U (en) Mobile friction stir welding device
CN101524678B (en) Special equipment for plastic lining process of profiled tank
CN100349686C (en) Friction welding method for making short tie-in oil pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Connecting technology of steel pipes with anti-corrosion inner circles

Effective date of registration: 20180228

Granted publication date: 20171219

Pledgee: Bank of Zigong Limited by Share Ltd

Pledgor: ZIGONG JUGUANG HARD-SURFACE TECHNOLOGY CO., LTD.

Registration number: 2018510000027

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20181123

Granted publication date: 20171219

Pledgee: Bank of Zigong Limited by Share Ltd

Pledgor: ZIGONG JUGUANG HARD-SURFACE TECHNOLOGY CO., LTD.

Registration number: 2018510000027

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Connecting technology of steel pipes with anti-corrosion inner circles

Effective date of registration: 20181127

Granted publication date: 20171219

Pledgee: Bank of Zigong Limited by Share Ltd

Pledgor: ZIGONG JUGUANG HARD-SURFACE TECHNOLOGY CO., LTD.

Registration number: 2018510000128

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20191122

Granted publication date: 20171219

Pledgee: Bank of Zigong Limited by Share Ltd

Pledgor: ZIGONG JUGUANG HARD-SURFACE TECHNOLOGY CO., LTD.

Registration number: 2018510000128

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Connecting technology of steel pipes with anti-corrosion inner circles

Effective date of registration: 20191127

Granted publication date: 20171219

Pledgee: Bank of Zigong Limited by Share Ltd

Pledgor: ZIGONG JUGUANG HARD-SURFACE TECHNOLOGY CO., LTD.

Registration number: Y2019510000055

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20201124

Granted publication date: 20171219

Pledgee: Bank of Zigong Limited by Share Ltd.

Pledgor: ZIGONG JUGUANG HARD-SURFACE TECHNOLOGY Co.,Ltd.

Registration number: Y2019510000055

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A connection technology of inner circle anti-corrosion steel pipe fittings

Effective date of registration: 20201126

Granted publication date: 20171219

Pledgee: Bank of Zigong Limited by Share Ltd.

Pledgor: ZIGONG JUGUANG HARD-SURFACE TECHNOLOGY Co.,Ltd.

Registration number: Y2020510000106

PE01 Entry into force of the registration of the contract for pledge of patent right