CN105178194A - Continuous beam type rail construction method - Google Patents
Continuous beam type rail construction method Download PDFInfo
- Publication number
- CN105178194A CN105178194A CN201510572673.9A CN201510572673A CN105178194A CN 105178194 A CN105178194 A CN 105178194A CN 201510572673 A CN201510572673 A CN 201510572673A CN 105178194 A CN105178194 A CN 105178194A
- Authority
- CN
- China
- Prior art keywords
- rail beam
- rail
- stiffening rib
- blocking plate
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510572673.9A CN105178194B (en) | 2015-09-10 | 2015-09-10 | Continuous beam type rail construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510572673.9A CN105178194B (en) | 2015-09-10 | 2015-09-10 | Continuous beam type rail construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105178194A true CN105178194A (en) | 2015-12-23 |
CN105178194B CN105178194B (en) | 2017-05-10 |
Family
ID=54900584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510572673.9A Active CN105178194B (en) | 2015-09-10 | 2015-09-10 | Continuous beam type rail construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105178194B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107513906A (en) * | 2017-09-14 | 2017-12-26 | 中铁第四勘察设计院集团有限公司 | A kind of transition apparatus suitable for straddle type monorail rail tracks installation |
CN109468946A (en) * | 2018-04-12 | 2019-03-15 | 上海公路投资建设发展有限公司 | A kind of steel construction temporary fastening device and technique for large-scale bent cap free cantilever erection |
CN109629350A (en) * | 2019-02-27 | 2019-04-16 | 成都建工第六建筑工程有限公司 | The concrete track beam and its construction method that empty iron stressed seamless connects |
CN109989330A (en) * | 2017-12-29 | 2019-07-09 | 比亚迪股份有限公司 | Continous way track and its erection method |
CN110820596A (en) * | 2019-12-09 | 2020-02-21 | 南京林业大学 | Temporary limiting device for linear adjustment of PC track beam and using method |
CN110886221A (en) * | 2019-10-31 | 2020-03-17 | 柳州市轨道交通工程有限责任公司 | Simply-supported system track beam erecting method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09203011A (en) * | 1996-01-25 | 1997-08-05 | East Japan Railway Co | Construction method for short span overpasses or overpasses with long spans |
CN2426489Y (en) * | 2000-06-07 | 2001-04-11 | 国营重庆重型铸锻厂 | Single-track traffic PC rail beam cast steel supporter |
CN102704355A (en) * | 2012-06-13 | 2012-10-03 | 北京交通大学 | Realization method of seamless rail for straddle-type monorail transportation |
CN103161101A (en) * | 2013-04-12 | 2013-06-19 | 北京交通大学 | Straddle type monorail transportation rigid framework system |
CN103437294A (en) * | 2013-08-19 | 2013-12-11 | 北京交通大学 | Implementation method for multiple stress systems of beam bridge in straddle type monorail transport line |
CN104746395A (en) * | 2013-12-30 | 2015-07-01 | 中铁工程设计咨询集团有限公司 | PC track beam and manufacturing method thereof |
-
2015
- 2015-09-10 CN CN201510572673.9A patent/CN105178194B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09203011A (en) * | 1996-01-25 | 1997-08-05 | East Japan Railway Co | Construction method for short span overpasses or overpasses with long spans |
CN2426489Y (en) * | 2000-06-07 | 2001-04-11 | 国营重庆重型铸锻厂 | Single-track traffic PC rail beam cast steel supporter |
CN102704355A (en) * | 2012-06-13 | 2012-10-03 | 北京交通大学 | Realization method of seamless rail for straddle-type monorail transportation |
CN103161101A (en) * | 2013-04-12 | 2013-06-19 | 北京交通大学 | Straddle type monorail transportation rigid framework system |
CN103437294A (en) * | 2013-08-19 | 2013-12-11 | 北京交通大学 | Implementation method for multiple stress systems of beam bridge in straddle type monorail transport line |
CN104746395A (en) * | 2013-12-30 | 2015-07-01 | 中铁工程设计咨询集团有限公司 | PC track beam and manufacturing method thereof |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107513906A (en) * | 2017-09-14 | 2017-12-26 | 中铁第四勘察设计院集团有限公司 | A kind of transition apparatus suitable for straddle type monorail rail tracks installation |
CN107513906B (en) * | 2017-09-14 | 2023-06-02 | 中铁第四勘察设计院集团有限公司 | Transition device suitable for installation of straddle type single track rail beam |
CN109989330A (en) * | 2017-12-29 | 2019-07-09 | 比亚迪股份有限公司 | Continous way track and its erection method |
CN109989330B (en) * | 2017-12-29 | 2021-02-23 | 比亚迪股份有限公司 | Continuous track and erection method thereof |
CN109468946A (en) * | 2018-04-12 | 2019-03-15 | 上海公路投资建设发展有限公司 | A kind of steel construction temporary fastening device and technique for large-scale bent cap free cantilever erection |
CN109468946B (en) * | 2018-04-12 | 2024-04-12 | 上海公路投资建设发展有限公司 | Steel structure temporary fixing device and process for large-scale bent cap cantilever assembly |
CN109629350A (en) * | 2019-02-27 | 2019-04-16 | 成都建工第六建筑工程有限公司 | The concrete track beam and its construction method that empty iron stressed seamless connects |
CN109629350B (en) * | 2019-02-27 | 2024-02-13 | 成都建工第六建筑工程有限公司 | Prestressed seamless connection concrete track beam for empty iron and construction method thereof |
CN110886221A (en) * | 2019-10-31 | 2020-03-17 | 柳州市轨道交通工程有限责任公司 | Simply-supported system track beam erecting method |
CN110820596A (en) * | 2019-12-09 | 2020-02-21 | 南京林业大学 | Temporary limiting device for linear adjustment of PC track beam and using method |
Also Published As
Publication number | Publication date |
---|---|
CN105178194B (en) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105178194A (en) | Continuous beam type rail construction method | |
CN105178163A (en) | Novel continuous beam type rail | |
CN102605717A (en) | Pier-top longitudinal support scaffolding method | |
CN115977407B (en) | Prestressed large-span truss string slipping construction system and construction method thereof | |
KR101109665B1 (en) | Mixed Truss Bridge Combining Plate Girder with Truss | |
CN104195946B (en) | The time phasing method of the dual-purpose suspension bridge of multilayer deck public affairs rail | |
CN101806220A (en) | Structure extending open tunnel for existing rapid transit railway tunnel | |
CN105088969A (en) | Closure method for multi-tower single-cable-plane cable-stayed bridge | |
CN103711067A (en) | Transversely assembled corrugated steel web combined box girder with small number of supports and construction method thereof | |
CN103590324A (en) | Transverse shear resisting section type self-resetting pier and construction method thereof | |
CN106285035A (en) | A kind of method of prefabricated assembled reorganization and expansion building structure node and structure node thereof | |
CN102953337B (en) | Bridge construction method | |
CN111893895B (en) | Construction method for changing single-width frame beam into double-width frame beam on bent cap | |
CN105274939B (en) | Connecting device for PC track beam | |
CN113638304A (en) | Concrete beam type bridge hidden cover beam structure system and construction method thereof | |
CN204959578U (en) | PC track roof beam | |
CN209039975U (en) | One kind can temporarily turn permanent superstructure | |
CN107558351A (en) | Abdomen bag bottom is trapezoidal(Waveform)Steel plate combination box beam and its construction method | |
CN204919297U (en) | Novel continuous beam type track | |
CN115262637B (en) | Subway station platform board assembled structure system | |
CN204959614U (en) | PC track roof beam connecting device | |
CN217840517U (en) | Section steel concrete floor | |
CN203684102U (en) | Prefabricated girder support system erected at the junction span of the ramp bridge and the main line bridge | |
CN216108007U (en) | Concrete beam type bridge and cast-in-situ hidden cover beam thereof | |
CN109083007A (en) | Steel girder bridge assembling support system and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Bo Inventor after: Tu Hai Inventor after: Zeng Wubing Inventor after: Lai Li Inventor after: Wu Tian Inventor after: Zhao Xiaobo Inventor after: Li Yanqing Inventor after: Zhang Fugui Inventor after: Guo Hongfei Inventor after: Zhou Shengyi Inventor after: Wang Bo Inventor after: Zhang Jiong Inventor before: Chen Bo Inventor before: Wang Bo Inventor before: Tu Hai Inventor before: Lai Li Inventor before: Wu Huanjun Inventor before: Wu Tian Inventor before: Zhao Xiaobo Inventor before: Li Yanqing Inventor before: Zhang Fugui Inventor before: Guo Hongfei Inventor before: Zhou Shengyi Inventor before: Zhang Jiong |
|
GR01 | Patent grant | ||
GR01 | Patent grant |