[go: up one dir, main page]

CN105127010B - Bauxite forward flotation refuse filter press feeding combines the unit - Google Patents

Bauxite forward flotation refuse filter press feeding combines the unit Download PDF

Info

Publication number
CN105127010B
CN105127010B CN201510634914.8A CN201510634914A CN105127010B CN 105127010 B CN105127010 B CN 105127010B CN 201510634914 A CN201510634914 A CN 201510634914A CN 105127010 B CN105127010 B CN 105127010B
Authority
CN
China
Prior art keywords
tailings
filter press
outlet
pump
cyclone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510634914.8A
Other languages
Chinese (zh)
Other versions
CN105127010A (en
Inventor
王秀峰
李民菁
李少帅
张松茂
李新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Liheng Environmental Technology Co ltd
Original Assignee
HENAN DONGDA MINING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN DONGDA MINING CO Ltd filed Critical HENAN DONGDA MINING CO Ltd
Priority to CN201510634914.8A priority Critical patent/CN105127010B/en
Publication of CN105127010A publication Critical patent/CN105127010A/en
Application granted granted Critical
Publication of CN105127010B publication Critical patent/CN105127010B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)
  • Cyclones (AREA)

Abstract

本发明涉及铝土矿正浮选尾矿压滤机上料组合装置,有效解决尾矿底流进入尾矿压滤机上料时间长、滤饼较薄、尾矿压滤机的进料泵过流件寿命短的问题,扫选尾流的上料泵出料口连通旋流器的进料口,旋流器的溢流出口连通尾矿的沉降槽进口,旋流器的底流出口连通锥形槽的上口部,锥形槽的出口和中间泵相连,中间泵和尾矿的沉降槽底流管连通,尾矿的沉降槽底流管出口接通尾矿压滤机的进料泵进口,尾矿压滤机的进料泵的出口连通尾矿压滤机,本发明结构简单,安装使用方便,效果好,解决了尾矿底流进入尾矿压滤机上料时间长、成饼效果差、尾矿压滤机的进料泵过流件寿命短的问题,提高了工作效率。

The invention relates to a material loading combination device for a bauxite positive flotation tailings filter press, which effectively solves the problem of long loading time for tailings underflow entering the tailings filter press, thin filter cake, and the flow-through parts of the feed pump of the tailings filter press. The problem of short service life is that the outlet of the feeding pump of the scavenging wake is connected to the inlet of the cyclone, the overflow outlet of the cyclone is connected to the inlet of the sedimentation tank of the tailings, and the underflow outlet of the cyclone is connected to the conical tank The outlet of the conical tank is connected to the middle pump, the middle pump is connected to the bottom flow pipe of the tailings settlement tank, the outlet of the tailings settlement tank bottom flow pipe is connected to the inlet of the feed pump of the tailings filter press, and the tailings The outlet of the feeding pump of the filter press is connected to the tailings filter press. The present invention has simple structure, convenient installation and use, and good effect, and solves the problem of long feeding time for tailings underflow entering the tailings filter press, poor cake forming effect, and tailings The short service life of the feed pump of the filter press improves the work efficiency.

Description

铝土矿正浮选尾矿压滤机上料组合装置Bauxite positive flotation tailings filter press feeding combination device

技术领域technical field

本发明涉及一种铝土矿正浮选尾矿压滤机上料组合装置。The invention relates to a material loading combination device for a bauxite positive flotation tailings filter press.

背景技术Background technique

当生产铝土矿精矿是以处理低品位铝土矿废渣作为原料时,铝土矿废渣氧化铝含量在52~58%,铝硅比在2.2~2.8,所生产的精矿产品铝硅比在5.0~6.5。尾矿产品铝硅比在1.2~1.5,生产中使用的是高效自循环充气矿化浮选槽,合格的原矿浆经浮选进料泵打入三阶梯布置的高效自循环充气矿化浮选槽中,经过充气搅拌,达到固-液-气三相平衡,进行一次粗选、一次扫选、一次精选的流程作业,实现快速浮选。所得的产品为精矿浆和扫选尾流(意同尾矿浆,以下称扫选尾流),目前扫选尾流后续作业为:扫选尾流经扫选尾流的上料泵输送至尾矿的沉降槽加入絮凝剂进行沉降作业,由于扫选尾流本身存在的特性,粒度较细,经检测扫选尾流粒度:+100目占5%左右,-100目至+200目为15%左右,-200目占80%左右,在絮凝剂絮凝过程中扫选尾流中的+100目由于粒度及比重较大,所需絮凝沉降时间较短,后续的-100目至+200目、-200目物料所需沉降时间相比+100目较长,+100目物料经絮凝剂絮凝沉降后优先沉入尾矿的沉降槽底部,尾矿的沉降槽内形成粒度分层,+100目物料经尾矿压滤机的进料泵输送至尾矿压滤机,上满尾矿压滤机时间较短,后续物料上满尾矿压滤机时间较长,平均单车上满尾矿压滤机时间达到40分钟,由于尾矿压滤机的进料泵长时间运行造成尾矿压滤机的进料泵过流件寿命较短,单套泵过流件使用寿命大约为1200小时,尾矿压滤机运行尤其是成尾矿滤饼效果较差,厚度仅为20mm-25mm 。When the production of bauxite concentrate is to process low-grade bauxite waste residue as raw material, the alumina content of bauxite waste residue is 52-58%, the aluminum-silicon ratio is 2.2-2.8, and the aluminum-silicon ratio of the produced concentrate product is Between 5.0 and 6.5. The aluminum-silicon ratio of the tailings product is 1.2 to 1.5. The high-efficiency self-circulation aerated mineralization flotation tank is used in the production. The qualified raw ore pulp is pumped into the three-step arrangement of the high-efficiency self-circulation aerated mineralization flotation through the flotation feed pump. In the tank, after aeration and stirring, the three-phase balance of solid-liquid-gas is achieved, and a process of roughing, sweeping and fine selection is carried out to realize rapid flotation. The resulting products are concentrate pulp and scavenging tails (meaning tailings pulp, hereinafter referred to as scavenging tails), the current follow-up operation of scavenging tails is: the scavenging tails are transported to the Add flocculants to the settlement tank of the tailings for settling operations. Due to the characteristics of the scavenging wake itself, the particle size is relatively fine. After testing, the particle size of the scavenging tail flow: +100 mesh accounts for about 5%, and -100 mesh to +200 mesh is About 15%, -200 mesh accounts for about 80%. In the process of flocculant flocculation, the +100 mesh in the wake of the scavenger has a relatively large particle size and specific gravity, and the required flocculation and settlement time is relatively short. The subsequent -100 mesh to +200 mesh The settling time required for materials of -200 mesh and +100 mesh is longer than that of +100 mesh, and the +100 mesh material preferentially sinks into the bottom of the tailings settling tank after being flocculated and settled by the flocculant, and particle size stratification is formed in the tailings settling tank, + The 100-mesh material is transported to the tailings filter press through the feed pump of the tailings filter press. The time for filling the tailings filter press is relatively short, and the time for subsequent materials to fill the tailings filter press is longer. On average, a single vehicle is full of tailings The time of the mine filter press reaches 40 minutes. Due to the long-term operation of the feed pump of the tailings filter press, the service life of the feed pump of the tailings filter press is relatively short, and the service life of a single set of pump flow parts is about 1200 Hours, the operation of the tailings filter press is poor, especially the effect of forming a tailings filter cake, with a thickness of only 20mm-25mm.

发明内容Contents of the invention

为克服现有技术缺陷,本发明之目的就是提供一种铝土矿正浮选尾矿压滤机上料组合装置,可有效解决尾矿底流进入尾矿压滤机上料时间长、滤饼较薄、尾矿压滤机的进料泵过流件寿命短的问题。In order to overcome the defects of the existing technology, the purpose of the present invention is to provide a bauxite positive flotation tailings filter press feeding combination device, which can effectively solve the problem of long feeding time and thin filter cake when tailings underflow enters the tailings filter press. 1. The service life of the feed pump of the tailings filter press is short.

本发明解决的技术方案是,包括扫选尾流的上料泵、尾矿的沉降槽、尾矿压滤机的进料泵和尾矿压滤机,扫选尾流的上料泵出料口连通旋流器的进料口,旋流器的溢流出口连通尾矿的沉降槽进口,旋流器的底流出口连通锥形槽的上口部,锥形槽的出口和中间泵相连,中间泵和尾矿的沉降槽底流管连通,尾矿的沉降槽底流管出口接通尾矿压滤机的进料泵进口,尾矿压滤机的进料泵的出口连通尾矿压滤机。The technical scheme solved by the present invention is to include the feeding pump for scavenging the tail flow, the settling tank for the tailings, the feed pump for the tailings filter press and the tailings filter press, and the discharge pump for the scavenging tail flow The outlet of the cyclone is connected to the feed port of the cyclone, the overflow outlet of the cyclone is connected to the tailings sedimentation tank inlet, the underflow outlet of the cyclone is connected to the upper mouth of the conical tank, and the outlet of the conical tank is connected to the intermediate pump. The middle pump is connected with the bottom flow pipe of the settlement tank of the tailings, the outlet of the bottom flow pipe of the settlement tank of the tailings is connected with the inlet of the feed pump of the tailings filter press, and the outlet of the feed pump of the tailings filter press is connected with the tailings filter press .

本发明结构简单,安装使用方便,效果好,有效解决了尾矿底流进入尾矿压滤机上料时间长、成饼效果差、尾矿压滤机的进料泵过流件寿命短的问题,大大提高了尾矿压滤机工作效率。The invention has the advantages of simple structure, convenient installation and use, good effect, and effectively solves the problems of long loading time for tailings underflow entering the tailings filter press, poor cake forming effect, and short service life of the feed pump flow parts of the tailings filter press. The working efficiency of the tailings filter press is greatly improved.

附图说明Description of drawings

图1为改造前的铝土矿正浮选尾矿压滤机上料装置。Figure 1 shows the feeding device of the bauxite positive flotation tailings filter press before transformation.

图2为本发明的结构主视图。Fig. 2 is a structural front view of the present invention.

具体实施方式detailed description

以下结合附图对本发明的具体实施方式作详细说明。The specific implementation manners of the present invention will be described in detail below in conjunction with the accompanying drawings.

由图1-图2给出,本发明包括扫选尾流的上料泵、尾矿的沉降槽、尾矿压滤机的进料泵和尾矿压滤机,扫选尾流的上料泵1出料口连通旋流器2的进料口,旋流器的溢流出口连通尾矿的沉降槽3进口,旋流器的底流出口连通锥形槽4的上口部,锥形槽的出口和中间泵5相连,中间泵和尾矿的沉降槽3底流管连通,尾矿的沉降槽底流管出口接通尾矿压滤机的进料泵6进口,尾矿压滤机的进料泵的出口连通尾矿压滤机7。Given by Fig. 1-Fig. 2, the present invention comprises the feeding pump of scavenging tail flow, the settling tank of tailings, the feeding pump of tailings filter press and tailings filter press, the feeding pump of scavenging tail flow The discharge port of the pump 1 is connected to the feed port of the cyclone 2, the overflow outlet of the cyclone is connected to the inlet of the tailings settlement tank 3, the underflow outlet of the cyclone is connected to the upper mouth of the conical tank 4, and the conical tank The outlet of the tailings is connected to the middle pump 5, the middle pump is connected to the bottom flow pipe of the tailings settlement tank 3, the outlet of the tailings settlement tank bottom flow pipe is connected to the inlet of the feed pump 6 of the tailings filter press, and the inlet of the tailings filter press The outlet of the feed pump is connected to the tailings filter press 7.

所述的旋流器2装在尾矿的沉降槽的平台上,工作压力为0.06Mpa-0.08Mpa,旋流器溢流口口径为75mm-85mm,底流沉沙嘴口径为35mm-50mm。Said cyclone 2 is installed on the platform of the tailings settlement tank, the working pressure is 0.06Mpa-0.08Mpa, the diameter of the overflow port of the cyclone is 75mm-85mm, and the diameter of the bottom flow sedimentation nozzle is 35mm-50mm.

所述的锥形槽4装在地平面上,长4000mm-5000mm,宽3500m-4500mm,高5000mm-6000mm,锥角为45º-50º。The tapered groove 4 is installed on the ground plane, with a length of 4000mm-5000mm, a width of 3500m-4500mm, a height of 5000mm-6000mm, and a cone angle of 45º-50º.

所述的尾矿压滤机为HZMGF500/2000-U压滤机。The tailings filter press is HZMGF500/2000-U filter press.

所述的中间泵5为ZJ系列渣浆泵,如河北石家庄开发区石泵泵业有限公司生产的型号150ZJ-A57的渣浆泵。The intermediate pump 5 is a ZJ series slurry pump, such as the model 150ZJ-A57 slurry pump produced by Shijiazhuang Development Zone Stone Pump Industry Co., Ltd., Hebei.

所述的锥形槽4为现有技术,为专利号ZL201420368038X,专利名称为一种无搅拌式出料槽组合装置。The tapered tank 4 is a prior art, patent number ZL201420368038X, and the patent name is a non-stirring type discharge tank combination device.

需要指出的是,本发明并不仅限于上述举例,本技术领域的技术人员在本发明的实质范围内所做出的等同或等效的变化、改型、添加、替换,均属于本发明的保护范围。It should be pointed out that the present invention is not limited to the above-mentioned examples, and equivalent or equivalent changes, modifications, additions, and replacements made by those skilled in the art within the essential scope of the present invention all belong to the protection of the present invention. scope.

本发明的使用情况是:在尾矿的沉降槽3上架设旋流器2,开启扫选尾流的上料泵1,经管道输送浮选后的扫选尾流矿浆进入旋流器2,工作压力控制在0.06Mpa-0.08Mpa,经旋流器旋流分级后,旋流器的溢流进入尾矿的沉降槽3加入絮凝剂后进行沉降作业,旋流器的底流进入锥形槽4,锥形槽的底部出料口出来的物料经中间泵5输入至尾矿的沉降槽底流管内与尾矿的沉降槽的底流混合后经尾矿压滤机的进料泵6进入尾矿压滤机7进行压榨作业。The usage of the present invention is as follows: a cyclone 2 is erected on the settling tank 3 of the tailings, the feeding pump 1 of the scavenging tail is turned on, and the scavenging tail slurry after flotation is transported through the pipeline into the cyclone 2, The working pressure is controlled at 0.06Mpa-0.08Mpa. After being graded by the cyclone, the overflow of the cyclone enters the tailings settlement tank 3 and adds flocculant to carry out the settlement operation, and the underflow of the cyclone enters the conical tank 4 The material from the outlet at the bottom of the tapered tank is input into the bottom flow pipe of the tailings settlement tank through the middle pump 5, mixed with the bottom flow of the tailings settlement tank, and then enters the tailings pressure filter through the feed pump 6 of the tailings filter press. Filter machine 7 carries out pressing operation.

本发明将铝土矿正浮选扫选尾流的上料泵出来的物料,用旋流器分为粗粒细粒两部分,细粒经尾矿的沉降槽絮凝沉降分离、粗粒经锥形槽自然重力分离,然后再合并进行压榨作业,和未使用本发明之前相比,使用本发明絮凝剂用量减少8-9%、由于絮凝剂用量的变化,导致物料的性质发生变化,压缩性能发生变化,从而减少上料时间,增加滤饼厚度。In the present invention, the material pumped out of the bauxite forward flotation sweeping tail flow is divided into two parts, coarse and fine, by a cyclone. Shaped grooves are naturally separated by gravity, and then combined for pressing operations. Compared with before using the present invention, the amount of flocculant used in the present invention is reduced by 8-9%. Due to the change in the amount of flocculant, the properties of the material change, and the compression performance changes, thereby reducing the feeding time and increasing the thickness of the filter cake.

本发明与改造前的设备结构相比,具有以下的主要有益效果:在尾矿压滤机运行过程中,单台尾矿压滤机上料时间由原来的40分钟缩短为20分钟、尾矿滤饼厚度由10mm左右提高到28-32mm、尾矿压滤机的进料泵过流件使用寿命由原来的1200小时提升至1800小时,使用寿命提升50%。Compared with the equipment structure before transformation, the present invention has the following main beneficial effects: during the operation of the tailings filter press, the feeding time of a single tailings filter press is shortened from the original 40 minutes to 20 minutes, and the tailings filter The thickness of the cake is increased from about 10mm to 28-32mm, and the service life of the feed pump flow parts of the tailings filter press is increased from the original 1200 hours to 1800 hours, and the service life is increased by 50%.

Claims (3)

1.一种铝土矿正浮选尾矿压滤机上料组合装置,包括扫选尾流的上料泵、尾矿的沉降槽、尾矿压滤机的进料泵和尾矿压滤机,其特征在于,扫选尾流的上料泵(1)出料口连通旋流器(2)的进料口,旋流器的溢流出口连通尾矿的沉降槽(3)进口,旋流器的底流出口连通锥形槽(4)的上口部,锥形槽的出口和中间泵(5)相连,中间泵和尾矿的沉降槽(3)底流管连通,尾矿的沉降槽底流管出口接通尾矿压滤机的进料泵(6)进口,尾矿压滤机的进料泵的出口连通尾矿压滤机(7)。1. A bauxite positive flotation tailings filter press feeding combination device, including a feeding pump for scavenging tails, a settling tank for tailings, a feed pump for tailings filter presses, and a tailings filter press , which is characterized in that the discharge port of the feeding pump (1) for the scavenging wake is connected to the feed port of the cyclone (2), the overflow outlet of the cyclone is connected to the inlet of the settlement tank (3) for the tailings, and the cyclone The bottom outlet of the flow device is connected to the upper mouth of the conical tank (4), the outlet of the conical tank is connected to the middle pump (5), the middle pump is connected to the bottom flow pipe of the tailings settlement tank (3), and the tailings settlement tank The outlet of the underflow pipe is connected to the inlet of the feed pump (6) of the tailings filter press, and the outlet of the feed pump of the tailings filter press is connected to the tailings filter press (7). 2.根据权利要求1所述的铝土矿正浮选尾矿压滤机上料组合装置,其特征在于,所述的旋流器(2)装在尾矿的沉降槽的平台上,旋流器溢流口口径为75mm-85mm,底流沉沙嘴口径为35mm-50mm。2. The bauxite positive flotation tailings filter press feeding combination device according to claim 1, characterized in that the cyclone (2) is installed on the platform of the tailings settlement tank, and the cyclone The caliber of the overflow port of the device is 75mm-85mm, and the caliber of the bottom flow sedimentation nozzle is 35mm-50mm. 3.根据权利要求1所述的铝土矿正浮选尾矿压滤机上料组合装置,其特征在于,所述的锥形槽(4)装在地平面上,长4000mm-5000mm,宽3500m-4500mm,高5000mm-6000mm,锥角为45º-50º。3. The bauxite positive flotation tailings filter press feeding combination device according to claim 1, characterized in that the tapered groove (4) is installed on the ground plane, with a length of 4000mm-5000mm and a width of 3500m -4500mm, height 5000mm-6000mm, cone angle 45º-50º.
CN201510634914.8A 2015-09-30 2015-09-30 Bauxite forward flotation refuse filter press feeding combines the unit Active CN105127010B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510634914.8A CN105127010B (en) 2015-09-30 2015-09-30 Bauxite forward flotation refuse filter press feeding combines the unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510634914.8A CN105127010B (en) 2015-09-30 2015-09-30 Bauxite forward flotation refuse filter press feeding combines the unit

Publications (2)

Publication Number Publication Date
CN105127010A CN105127010A (en) 2015-12-09
CN105127010B true CN105127010B (en) 2018-01-09

Family

ID=54712773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510634914.8A Active CN105127010B (en) 2015-09-30 2015-09-30 Bauxite forward flotation refuse filter press feeding combines the unit

Country Status (1)

Country Link
CN (1) CN105127010B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1628910A (en) * 2003-12-15 2005-06-22 湘潭钢铁集团有限公司 Process for ball milling and water washing of waste iron and steel slag, slag slurry treatment process, and apparatus therefor
CN102744146A (en) * 2012-07-10 2012-10-24 河南东大矿业股份有限公司 Ore-dressing method for low-grade bauxite
CN103657840A (en) * 2013-07-10 2014-03-26 中蓝连海设计研究院 Dry type discharge method of phosphorus ore tailings
CN104162479A (en) * 2014-06-12 2014-11-26 煤炭工业济南设计研究院有限公司 Movable sieve waste rock discharge system slime water treatment process and device
CN204319842U (en) * 2014-12-06 2015-05-13 中国铝业股份有限公司 A kind of subsider
CN104722395A (en) * 2015-02-13 2015-06-24 湖北鑫鹰环保科技股份有限公司 Mixed flocculating agent capable of accelerating settling of superfine grain tailing flocculation and application thereof
CN104741212A (en) * 2015-04-07 2015-07-01 马钢(集团)控股有限公司 Full-scale comprehensive tailing utilization method
CN205084888U (en) * 2015-09-30 2016-03-16 河南东大矿业股份有限公司 Positive flotation tailings pressure filter material loading composite set of bauxite

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5143712B2 (en) * 1973-10-09 1976-11-24

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1628910A (en) * 2003-12-15 2005-06-22 湘潭钢铁集团有限公司 Process for ball milling and water washing of waste iron and steel slag, slag slurry treatment process, and apparatus therefor
CN102744146A (en) * 2012-07-10 2012-10-24 河南东大矿业股份有限公司 Ore-dressing method for low-grade bauxite
CN103657840A (en) * 2013-07-10 2014-03-26 中蓝连海设计研究院 Dry type discharge method of phosphorus ore tailings
CN104162479A (en) * 2014-06-12 2014-11-26 煤炭工业济南设计研究院有限公司 Movable sieve waste rock discharge system slime water treatment process and device
CN204319842U (en) * 2014-12-06 2015-05-13 中国铝业股份有限公司 A kind of subsider
CN104722395A (en) * 2015-02-13 2015-06-24 湖北鑫鹰环保科技股份有限公司 Mixed flocculating agent capable of accelerating settling of superfine grain tailing flocculation and application thereof
CN104741212A (en) * 2015-04-07 2015-07-01 马钢(集团)控股有限公司 Full-scale comprehensive tailing utilization method
CN205084888U (en) * 2015-09-30 2016-03-16 河南东大矿业股份有限公司 Positive flotation tailings pressure filter material loading composite set of bauxite

Also Published As

Publication number Publication date
CN105127010A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN104722389B (en) Coal dissociation-is independently sized mixing-bulk flotation technique in a kind of particulate
CN207385669U (en) A kind of device for improving ball mill grinding efficiency
CN102228762A (en) Dehydration method and device of tailings
CN104815748B (en) The broken mill floatation process of two sections of coal in a kind of coking
CN104549710A (en) Three-stage opening compounding separation process and three-stage opening compounding separation system for coarse slime
CN105084786B (en) A kind of lime slaking dosing feed device
CN108816483A (en) A kind of Machine-made Sand production system
CN105772212A (en) Method of producing special type coal for white cement by using medium caking coal
CN104001370A (en) Dry discharge technology of tailings
CN105665133B (en) A kind of comprehensive reutilization method of stone material tailing resource
CN204396203U (en) Ore dressing rotational-flow high-efficient divides bucket
CN210965495U (en) Hierarchical tailings production system
CN104772210A (en) Ore dressing process for tungsten dressing tailing comprehensive utilization
CN105170310A (en) Large crystalline flake graphite separation system and method for flotation of crystalline flake graphite by large crystalline flake graphite separation system
CN203874891U (en) Backwater feed device with fractional concentration function
CN201052478Y (en) Bauxite pole type short flow path separation equipment
CN114308375A (en) A kind of gold tailings resource utilization and harmless disposal method
CN204933663U (en) A kind of tailings disposal plant
CN202460212U (en) Settling tank with feeding device
CN105127010B (en) Bauxite forward flotation refuse filter press feeding combines the unit
CN204620179U (en) A kind of mineral processing circuit system of tungsten milltailings
CN106635208B (en) The technique that a kind of coal preparation plant's thickener underflow directly prepares water-coal-slurry
CN205084888U (en) Positive flotation tailings pressure filter material loading composite set of bauxite
CN104958949A (en) Multi-distribution system of tailings dry discharge belt filtering machine
CN204261797U (en) Ore dressing high-effective classifying deslimer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Dengfeng City, Henan province 452470 city of Zhengzhou Tang Zhuang Xiang Tang Dong Cun Bei River

Patentee after: HENAN DONGDA TECHNOLOGY CO.,LTD.

Address before: Dengfeng City, Henan province 452470 city of Zhengzhou Tang Zhuang Xiang Tang Dong Cun Bei River

Patentee before: HENAN DONGDA MINING Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20241115

Address after: Room 204, Building H, No. 30 Qixin Road, Wulian Community, Longgang Street, Longgang District, Shenzhen City, Guangdong Province 518100

Patentee after: Shenzhen Liheng Environmental Technology Co.,Ltd.

Country or region after: China

Address before: 452470 North River, Tangdong Village, Tangzhuang Township, Dengfeng City, Zhengzhou City, Henan Province

Patentee before: HENAN DONGDA TECHNOLOGY CO.,LTD.

Country or region before: China

TR01 Transfer of patent right