CN105088962B - A kind of integral hoisting method of Wavelike steel webplate part - Google Patents

A kind of integral hoisting method of Wavelike steel webplate part Download PDF

Info

Publication number
CN105088962B
CN105088962B CN201510569110.4A CN201510569110A CN105088962B CN 105088962 B CN105088962 B CN 105088962B CN 201510569110 A CN201510569110 A CN 201510569110A CN 105088962 B CN105088962 B CN 105088962B
Authority
CN
China
Prior art keywords
wavelike steel
sections
steel webplate
wavelike
webplate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510569110.4A
Other languages
Chinese (zh)
Other versions
CN105088962A (en
Inventor
王兵
叶智勇
陈立生
黄焰
赵国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Original Assignee
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Municipal Engineering Group Co Ltd filed Critical Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority to CN201510569110.4A priority Critical patent/CN105088962B/en
Publication of CN105088962A publication Critical patent/CN105088962A/en
Application granted granted Critical
Publication of CN105088962B publication Critical patent/CN105088962B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of integral hoisting method of Wavelike steel webplate part, comprises the steps:It is hanging basket advancing is in place on No. 1 Wavelike steel webplate sections of N of Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs, the bottom of the Hanging Basket is fixed on No. 1 Wavelike steel webplate sections of N, top protrudes from the leading section of No. 1 Wavelike steel webplate sections of N;The precast assembly of N Wavelike steel webplate sections is completed in factory, N Wavelike steel webplates sections is made up of some pieces of vertical bridges to the Wavelike steel webplate of arrangement, and the gooseneck and temporary support bracing means that Jing direction across bridge is arranged between each Wavelike steel webplate is connected;N Wavelike steel webplate sections is transported to immediately below its design attitude using flat top barge;It is in place using the tackling system integral lifting N Wavelike steel webplate sections at the top of the Hanging Basket, and complete the connection of N Wavelike steel webplates sections and No. 1 Wavelike steel webplate sections of N.It is an advantage of the invention that effectively shortening the construction period, improve construction quality and reduce the work high above the ground time.

Description

A kind of integral hoisting method of Wavelike steel webplate part
Technical field
The invention belongs to technical field of bridge engineering, and in particular to a kind of integral hoisting method of Wavelike steel webplate part.
Background technology
Wavelike steel webplate PC combined box beams are a kind of economic, efficient, novel bridge forms of easy construction, and which passes through to adopt Replace the concrete web of prestressed concrete box girder as web with Wavelike steel webplate, web is reduced to concrete flange plate Constraint, improve structural behaviour, improve material efficiency.Research of the China to Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs is started late, More than 30 seat Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs have been built up, it is in the majority with beam bridge.In recent years, as theoretical research reaches its maturity and real Trample experience constantly to accumulate, Wavelike steel webplate PC box beams start to apply to large span single-box multi-cell continuous bridge and cable-stayed bridge.Waveform Wavelike steel webplate lifting operation, this piecemeal hanging method are completed using piecemeal lift-on/lift-off system generally in steel web PC box girder bridge construction The duration is substantially prolongs, the work high above the ground time is increased and the welding quality of Wavelike steel webplate is difficult to ensure that, for large span The inferior position of ultra-wide single-box multi-cell Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs is particularly highlighted.
Therefore, it is how in the case where the precondition of safety and construction quality is ensured, economical, rapidly realize Wavelike steel webplate portion Part is lifted, and becomes those skilled in the art's technical problem urgently to be resolved hurrily.
The content of the invention
The purpose of the present invention be according to above-mentioned the deficiencies in the prior art in place of, there is provided a kind of entirety of Wavelike steel webplate part Hanging method, if dry tablet Wavelike steel webplate sections is passed through the integral hoisting method gooseneck and temporary support bracing means is assembled Into N Wavelike steel webplate sections, and realized to its integral hoisting by the Hanging Basket being set up on N-1 Wavelike steel webplate sections.
The object of the invention is realized being completed by technical scheme below:
A kind of integral hoisting method of Wavelike steel webplate part, it is characterised in that the integral hoisting method includes following step Suddenly:It is hanging basket advancing is in place on the N-1 Wavelike steel webplate sections of Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs, make the bottom of the Hanging Basket It is fixed on N-1 Wavelike steel webplate sections, top protrudes from the leading section of the N-1 Wavelike steel webplates sections;In factory The integral prefabricated assembly of N Wavelike steel webplate sections is completed inside, the N Wavelike steel webplates sections is from some pieces of vertical bridges to arrangement Wavelike steel webplate composition, between each Wavelike steel webplate Jing direction across bridge arrange gooseneck and temporary support bracing means It is connected;The N Wavelike steel webplates sections is transported to immediately below its design attitude using flat top barge;Using positioned at described Described in tackling system integral lifting at the top of Hanging Basket, N Wavelike steel webplate sections is in place, is completed by welding and high-strength bolt The connection of the N Wavelike steel webplates sections and the N-1 Wavelike steel webplates sections.
If the Hanging Basket is formed by connecting by horizontal-associate from the vertical bridge of dry tablet to the main couple of arrangement, each main couple difference Correspondence is arranged in directly over the Wavelike steel webplate of the N-1 Wavelike steel webplates sections.
The tackling system includes two cranes being symmetrically arranged at the top of the Hanging Basket, and below the crane, Jing wireropes hang The distribution beam of dress direction across bridge arrangement, distribution beam lower flange interval be laid with some vertical bridges to shoulder pole girder, each is described flat Spreader beam Jing suspension rods are connected respectively each Wavelike steel webplate on the N Wavelike steel webplates sections.
The distribution beam is in same perpendicular with the center of gravity of the N Wavelike steel webplates sections.
Two suspension centres are disposed with the top flange of every piece of Wavelike steel webplate on the N Wavelike steel webplates sections, wherein One suspension centre is arranged at the junction point with the gooseneck, and another suspension centre is arranged in the temporary support bracing means At junction point.
It is an advantage of the invention that(1)Using " distribution beam+shoulder pole girder " scheme arrangement Wavelike steel webplate part suspension centre, suspension centre It is arranged in Wavelike steel webplate and gooseneck, the junction of temporary support bracing means so that waveform steel web portion in hoisting process Part stress is more reasonable;(2)It is prefabricated in the factory and completes Wavelike steel webplate part, has both reduced cost and in turn ensure that welding quality; (3)Job site need only complete longitudinally connected between Wavelike steel webplate sections by welding and high-strength bolt, reduce height The idle job time, reduce construction risk;(4)Prefabrication Wavelike steel webplate sections is carried out simultaneously with site operation, is contracted significantly The short duration;(5)The components such as suspension rod, distribution beam, shoulder pole girder, inverted U-shaped connector and temporary support are reusable, save Steel.
Description of the drawings
Fig. 1 is the integral hoisting schematic diagram of Wavelike steel webplate sections in the present invention;
Fig. 2 is the integral hoisting elevation of Wavelike steel webplate sections in the present invention;
Fig. 3 is Wavelike steel webplate sections and suspension centre horizontal layout schematic diagram in the present invention.
Specific embodiment
The feature and other correlated characteristics of the present invention is described in further detail by embodiment below in conjunction with accompanying drawing, with It is easy to the understanding of technical staff of the same trade:
Such as Fig. 1-3, in figure, labelling 1-16 is respectively:Main couple 1, crane 2, horizontal-associate 3, N-1 Wavelike steel webplates sections 4, It is distribution beam 5, shoulder pole girder 6, suspension rod 7, N Wavelike steel webplates sections 8, top board 9, steel anchor box 10, suspension centre 11, gooseneck 12, interim Bracing reinforcement device 13, bearing pin 14, wirerope 15, Wavelike steel webplate 16.
Embodiment:As Figure 1-3, the present embodiment is specifically related to a kind of integral hoisting method of Wavelike steel webplate part, Suitable for single-box multi-cell, the Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs of many case multicells, following steps are specifically included:
(1)The prefabricated N Wavelike steel webplates sections 8 to be lifted in factory, i.e. by some pieces on direction across bridge it is uniform between It is linked to be one by the welding of gooseneck 12, temporary support bracing means 13 and steel anchor box 10 every longitudinal Wavelike steel webplate 16 of arrangement Individual entirety, wherein, the top flange of each piece of Wavelike steel webplate 16 is disposed with two suspension centres 11 and lifts for loop wheel machine system, and corresponding Weld at 11 position of suspension centre for lifting by crane the interim otic placode for connecting, it is horizontal with steel that one of suspension centre 11 is located at Wavelike steel webplate 16 The junction of beam 12, another suspension centre 11 are located at the junction of Wavelike steel webplate 16 and temporary support bracing means 13;And per block 11 position of suspension centre on Wavelike steel webplate 16 arranges identical;
(2)At the same time, on the N-1 Wavelike steel webplates sections 4 of Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs assembled Hanging Basket and before Move, if Hanging Basket is made up of dry tablet main couple 1, horizontal-associate 3 and loop wheel machine system, spaced apart each longitudinal main couple along direction across bridge 1 connects and composes Hanging Basket entirety by horizontal-associate 3, and each correspondence of main couple 1 is arranged in each ripple in N-1 Wavelike steel webplates sections 4 Directly over shape steel web, and it is anchored on the box beam top board 9 on N-1 Wavelike steel webplates sections 4 by bearing pin 14;Wherein, respectively Piece main couple 1 is spliced to form inclined parallelogram like by two triangular trusses, i.e. one of triangular truss anchor It is fixed on top board 9, another triangular truss protrudes from the leading section of N-1 Wavelike steel webplates sections 4 to constitute loop wheel machine system Mounting platform;
Aforesaid loop wheel machine system is installed on the top that Hanging Basket protrudes from 4 part of N-1 Wavelike steel webplates sections, including two Symmetrically arranged crane 2, is placed with about 2 for lifting by crane the wirerope 15 for lifting, 15 lower end of the wirerope correspondence of every crane 2 in crane The distribution beam 5 of one direction across bridge arrangement is hung with, if the lower flange Jing bolt connections of each road distribution beam 5 have arterial highway spaced apart Vertical bridge is to shoulder pole girder 6;Wherein, distribution beam 5 is steel construction, is formed by the welding edge of a wing and ribbed stiffener on one block of steel plate;It is flat Spreader beam 6 is then steel I-beam, and ribbed stiffener is welded on steel I-beam;
It should be noted that the center of gravity of each road distribution beam 5 is in the center of gravity of N Wavelike steel webplates sections 8 to be lifted In same perpendicular, to guarantee that lifting is steady;Additionally, the position of each road shoulder pole girder 6 corresponds to be lifted No. N in lower section 16 position of each Wavelike steel webplate in Wavelike steel webplate sections 8, so that each road shoulder pole girder 6 can be with each Wavelike steel webplate when the time comes 16 correspondingly can connect, and the stress point of N Wavelike steel webplates sections 8 is respectively positioned on Wavelike steel webplate position, it is to avoid to be hung at Malformation when at other positions;
(3)N Wavelike steel webplates sections 8 is transported to using flat top barge for the underface of its design attitude;
(4)Crane 2 on Hanging Basket will be put on flat top barge under distribution beam 5 and shoulder pole girder 6 by wirerope 15, is led to The position of toning screed barge is so that each piece of Wavelike steel webplate 16 on N Wavelike steel webplates sections 8 is with each road shoulder pole girder 6 Position corresponds;Afterwards using inverted U-shaped connector by the interim otic placode at each suspension centre 11 on Wavelike steel webplate 16 be anchored in The suspension rod 7 of 6 lower flange of shoulder pole girder is connected;
(5)After being connected with N Wavelike steel webplates sections 8 and finishing, by 2 integral lifting N Wavelike steel webplate section of crane Section 8 it is in place and with 4 end part aligning of N-1 Wavelike steel webplates sections, afterwards by welding and high-strength bolt complete N waveform steel 8 end of web sections is with the connection between 4 end of N-1 Wavelike steel webplates sections;
(6)After completing the connection between sections, shoulder pole girder 6 is released with the connection between N Wavelike steel webplates sections 8, torn open Except the components such as suspension rod 7, distribution beam 5, shoulder pole girder 6, inverted U-shaped connector and temporary support bracing means 13, No. N+1 section to be lifted Recycling is repeated during section.
Integral hoisting method in the present embodiment greatly reduces compared with the method for traditional piecemeal lifting Wavelike steel webplate The Site Welding operation of Wavelike steel webplate part, simplifies the temperature pier measure of Wavelike steel webplate, reduces and set up, remove The work high above the ground carried out by temporary support, each sections reduce the activity duration 20 for each person every day, and full-bridge can reduce work high above the ground altogether Time 960 for each person every day, is total to 96 days reductions of erection time.Additionally, by adopting " distribution beam+shoulder pole girder " scheme arrangement Wavelike steel webplate Part suspension centre, suspension centre are arranged in Wavelike steel webplate and gooseneck, the junction of temporary support so that waveform steel abdomen in hoisting process Plate member stress is more reasonable, and lifting is steady, it is to avoid sections unbalance stress in hoisting process causes deformation.

Claims (4)

1. a kind of integral hoisting method of Wavelike steel webplate part, it is characterised in that the integral hoisting method includes following step Suddenly:It is hanging basket advancing is in place on the N-1 Wavelike steel webplate sections of Prestressed Concrete Box-Girder Bridges with Corrugated Steel Webs, make the bottom of the Hanging Basket It is fixed on N-1 Wavelike steel webplate sections, top protrudes from the leading section of the N-1 Wavelike steel webplates sections;In factory The integral prefabricated assembly of N Wavelike steel webplate sections is completed inside, the N Wavelike steel webplates sections is from some pieces of vertical bridges to arrangement Wavelike steel webplate composition, between each Wavelike steel webplate Jing direction across bridge arrange gooseneck and temporary support bracing means It is connected;The N Wavelike steel webplates sections is transported to immediately below its design attitude using flat top barge;Using positioned at described Described in tackling system integral lifting at the top of Hanging Basket, N Wavelike steel webplate sections is in place, is completed by welding and high-strength bolt The connection of the N Wavelike steel webplates sections and the N-1 Wavelike steel webplates sections;The tackling system includes two symmetrically The crane being installed at the top of the Hanging Basket, the distribution beam of Jing wireropes lifting direction across bridge arrangement, the distribution beam below the crane Lower flange interval be laid with some vertical bridges to shoulder pole girder, each shoulder pole girder Jing suspension rod be connected respectively the N ripples Each Wavelike steel webplate on shape steel web sections.
2. a kind of integral hoisting method of Wavelike steel webplate part according to claim 1, it is characterised in that the Hanging Basket If being formed by connecting by horizontal-associate from the vertical bridge of dry tablet to the main couple of arrangement, each main couple is corresponded to respectively and is arranged in the N- Directly over the Wavelike steel webplate of No. 1 Wavelike steel webplate sections.
3. a kind of integral hoisting method of Wavelike steel webplate part according to claim 1, it is characterised in that the distribution Beam is in same perpendicular with the center of gravity of the N Wavelike steel webplates sections.
4. a kind of integral hoisting method of Wavelike steel webplate part according to claim 1, it is characterised in that the N ripples Two suspension centres are disposed with the top flange of every piece of Wavelike steel webplate on shape steel web sections, one of suspension centre is arranged in same institute State at the junction point of gooseneck, another suspension centre is arranged at the junction point with the temporary support bracing means.
CN201510569110.4A 2015-09-09 2015-09-09 A kind of integral hoisting method of Wavelike steel webplate part Active CN105088962B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510569110.4A CN105088962B (en) 2015-09-09 2015-09-09 A kind of integral hoisting method of Wavelike steel webplate part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510569110.4A CN105088962B (en) 2015-09-09 2015-09-09 A kind of integral hoisting method of Wavelike steel webplate part

Publications (2)

Publication Number Publication Date
CN105088962A CN105088962A (en) 2015-11-25
CN105088962B true CN105088962B (en) 2017-03-29

Family

ID=54570222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510569110.4A Active CN105088962B (en) 2015-09-09 2015-09-09 A kind of integral hoisting method of Wavelike steel webplate part

Country Status (1)

Country Link
CN (1) CN105088962B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761165B (en) * 2019-10-24 2021-03-30 安徽省路港工程有限责任公司 Steel web box girder installation system and construction method thereof
CN113637488A (en) * 2021-07-12 2021-11-12 五冶集团上海有限公司 Integral installation method of sectional type protection plate of coke oven
CN117236892B (en) * 2023-09-27 2024-09-13 广西路建工程集团有限公司 Digital twin-based bridge steel web water transportation hoisting system and control method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102154992B (en) * 2011-04-28 2012-08-22 中交第二公路工程局有限公司 Dislocation installation method of corrugated steel web
CN202936737U (en) * 2012-10-23 2013-05-15 中铁十八局集团第一工程有限公司 Continuous beam cradle hoisting structure for corrugated steel webs
CN104047234B (en) * 2014-04-02 2016-05-11 中铁二院工程集团有限责任公司 Wavelike steel webplate continuous rigid frame bridge self-supporting end bay closure construction method

Also Published As

Publication number Publication date
CN105088962A (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN104988844B (en) Two times tensioning prestressing force assembled Wavelike steel webplate combination beam
CN101586330B (en) Receding construction method of cradle of continuous girder bridge made of prestressing concrete
CN108547223A (en) The hybrid beam bridge construction method of steel reinforced concrete overlapping
CN105256713B (en) Semi-assembly type steel concrete composite beam and construction method thereof
CN104652242B (en) Derrick connecting structure used for reinforcing PSC (Pre-stressed Concrete) continuous box girder bridge and construction method
CN104727227B (en) A kind of whole segmental erection method of uncovered lattice girder steel of half-through steel box tied arch bridge
CN102704406B (en) Roadbed slab non-tensile stress construction method based on combined channel girder
CN205100082U (en) Prefabricated assembled steel-concrete composite beam bridge
CN104631343A (en) Self-travelling diamond-shaped pin-connected truss-type form traveler structure and form traveler travelling and constructing method
CN108060636B (en) The construction method of overall assembled composite beam bridge
CN101781878A (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN207244447U (en) Movable hanging basket for steel-concrete composite bridge
CN105088969B (en) A kind of closure method of multitower single plane cable stayed bridge
CN106087711B (en) Antinode work beam-steel concrete top plate-external prestressing combines T-shaped simply supported beam
CN104060542B (en) Compound beam cable stayed bridge direction across bridge prestress application device and applying method thereof
CN102322025A (en) Pre-stressing reinforced and widened bridge structure
CN110700103B (en) Construction method of continuous composite beam
CN105064200A (en) Prestressed ferroconcrete combined simply-supported beam bridge with preprocessed assembled fish-bellied truss frame and construction method of prestressed ferroconcrete combined simply-supported beam bridge
CN107905083A (en) A kind of the inversion type clod wash U-shaped steel combination beam bridge and construction method of lacing connection
CN105088962B (en) A kind of integral hoisting method of Wavelike steel webplate part
CN107401125B (en) Traveling device of mobile trolley and using method
CN109098094A (en) Construction method without bracket horizontal splicing corrugated steel web plate combined box girder
CN105735099B (en) Construction time uses the simple supported-to-continuous girder bridge and its construction method of external prestressing
CN207749417U (en) Concrete tower post centre form strength nature skeleton
CN106320192A (en) Beam section replacement reinforcement method for large-span concrete continuous beam bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant