CN105071539B - Monitoring method and device for power distribution network - Google Patents

Monitoring method and device for power distribution network Download PDF

Info

Publication number
CN105071539B
CN105071539B CN201510528623.0A CN201510528623A CN105071539B CN 105071539 B CN105071539 B CN 105071539B CN 201510528623 A CN201510528623 A CN 201510528623A CN 105071539 B CN105071539 B CN 105071539B
Authority
CN
China
Prior art keywords
concentrator
equipment
optical network
network unit
faulty
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510528623.0A
Other languages
Chinese (zh)
Other versions
CN105071539A (en
Inventor
付军美
尚博
宁燃
张绍峰
陈媛媛
刘保全
徐田刚
吴雁南
吕斌
周密
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510528623.0A priority Critical patent/CN105071539B/en
Publication of CN105071539A publication Critical patent/CN105071539A/en
Application granted granted Critical
Publication of CN105071539B publication Critical patent/CN105071539B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本发明公开了一种用于配电网的监控方法和装置。其中,该方法包括:建立配电网的多层拓扑模型,其中,多层拓扑模型用于表征配电网中各个设备之间的拓扑结构;从数据源中采集配电网的状态信息;根据多层拓扑模型和状态信息对设备进行分析,以判断配电网中是否存在故障设备;若判断出配电网中存在故障设备,则输出故障结果,其中,故障结果包括电网故障和/或通信故障。本发明解决了现有技术中无法及时发现配电网中存在的故障的技术问题。

The invention discloses a monitoring method and device for distribution network. Among them, the method includes: establishing a multi-layer topology model of the distribution network, wherein the multi-layer topology model is used to characterize the topology structure between various devices in the distribution network; collecting state information of the distribution network from a data source; according to The multi-layer topology model and state information analyze the equipment to determine whether there is a faulty device in the distribution network; if it is judged that there is a faulty device in the distribution network, then output the fault result, where the fault result includes the power grid fault and/or communication Fault. The invention solves the technical problem that the faults in the distribution network cannot be found in time in the prior art.

Description

用于配电网的监控方法和装置Monitoring method and device for distribution network

技术领域technical field

本发明涉及电网领域,具体而言,涉及一种用于配电网的监控方法和装置。The invention relates to the field of power grids, in particular to a monitoring method and device for distribution networks.

背景技术Background technique

在电力系统中,随着配电自动化系统建设,配电网的运行范围在逐渐扩大,配电网发生故障,将直接导致用户用电受到严重的影响。因此,及时发现并处理配电网的故障,能够缩短因上述故障导致用户用电受到影响的时间,提高配电网的故障维修效率。然而,目前,还没有对配电网进行故障监控的方案,只能依靠用户报修的“被动”方式获取故障信息,再启动故障处理流程解决处理。In the power system, with the construction of the distribution automation system, the operating range of the distribution network is gradually expanding, and the failure of the distribution network will directly lead to a serious impact on the user's electricity consumption. Therefore, discovering and handling the faults of the distribution network in time can shorten the time when the user's electricity consumption is affected due to the above faults, and improve the fault maintenance efficiency of the distribution network. However, at present, there is no solution for fault monitoring of the distribution network. We can only rely on the "passive" way of user repairs to obtain fault information, and then start the fault processing process to solve the problem.

此外,相关技术中,也无法分辨电网故障和传输电网信号的通信设备故障。In addition, in the related art, it is also impossible to distinguish the failure of the power grid from the failure of the communication equipment transmitting the grid signal.

针对上述的问题,目前尚未提出有效的解决方案。For the above problems, no effective solution has been proposed yet.

发明内容Contents of the invention

本发明实施例提供了一种用于配电网的监控方法和装置,以至少解决现有技术中无法及时发现配电网中存在的故障的技术问题。Embodiments of the present invention provide a monitoring method and device for a distribution network, so as to at least solve the technical problem in the prior art that faults in the distribution network cannot be found in time.

根据本发明实施例的一个方面,提供了一种用于配电网的监控方法,包括:建立配电网的多层拓扑模型,其中,所述多层拓扑模型用于表征所述配电网中各个设备之间的拓扑结构;从数据源中采集所述配电网的状态信息;根据所述多层拓扑模型和所述状态信息对所述设备进行分析,以判断所述配电网中是否存在故障设备;若判断出所述配电网中存在所述故障设备,则输出故障结果,其中,所述故障结果包括电网故障和/或通信故障。According to an aspect of an embodiment of the present invention, a method for monitoring a distribution network is provided, including: establishing a multi-layer topology model of the distribution network, wherein the multi-layer topology model is used to characterize the distribution network The topological structure between each device in the distribution network; collect the status information of the distribution network from the data source; analyze the device according to the multi-layer topology model and the status information to judge the status information of the distribution network Whether there is a faulty device; if it is judged that the faulty device exists in the distribution network, output a fault result, wherein the fault result includes a grid fault and/or a communication fault.

进一步地,所述设备包括配电设备和用于传输所述配电网的状态信息的通信设备。Further, the device includes a power distribution device and a communication device for transmitting status information of the distribution network.

进一步地,所述电网故障包括以下任意一种:低压出线开关跳闸、配变低压主开关跳闸、配电变压器故障和开闭站出线开关跳闸;所述通信故障包括以下任意一种:光网络单元故障、光纤故障、集中器故障和集中器下联端口故障。Further, the power grid failure includes any of the following: tripping of the low-voltage outlet switch, tripping of the low-voltage main switch of the distribution transformer, distribution transformer failure, and tripping of the outlet switch of the switch station; the communication failure includes any of the following: optical network unit failure, fiber failure, concentrator failure, and downlink port failure of the concentrator.

进一步地,所述数据源包括以下至少之一:用户用电采集系统、调度EMS系统、配电自动化系统、OMS系统和配电网通信系统。Further, the data source includes at least one of the following: user electricity collection system, dispatch EMS system, distribution automation system, OMS system and distribution network communication system.

进一步地,根据所述多层拓扑模型和所述状态信息对所述设备进行分析,以判断所述配电网中是否存在故障设备包括:在接收到第一设备的异常信号的情况下,获取所述拓扑结构中至少一个与所述第一设备具有相同父节点的第二设备的工作状态;判断所述第二设备的工作状态是否正常;在判断出所述第二设备的工作状态为异常的情况下,确定所述故障设备为所述父节点对应的设备;在判断出所述第二设备的工作状态为正常的情况下,确定所述故障设备为所述第一设备。Further, analyzing the device according to the multi-layer topology model and the state information to determine whether there is a faulty device in the power distribution network includes: in the case of receiving an abnormal signal from the first device, obtaining The working status of at least one second device that has the same parent node as the first device in the topology; judging whether the working status of the second device is normal; after judging that the working status of the second device is abnormal In the case of , determine that the faulty device is the device corresponding to the parent node; in the case of judging that the working state of the second device is normal, determine that the faulty device is the first device.

进一步地,所述设备包括集中器,根据所述多层拓扑模型和所述状态信息对所述设备进行分析,以判断所述配电网中是否存在故障设备包括:根据所述多层拓扑模型和所述状态信息对所述集中器进行分析,以判断所述配电网中所述集中器是否为所述故障设备或非所述集中器的设备是否为所述故障设备。Further, the device includes a concentrator, and analyzing the device according to the multi-layer topology model and the status information to determine whether there is a faulty device in the distribution network includes: according to the multi-layer topology model and analyzing the concentrator with the status information to determine whether the concentrator in the distribution network is the faulty device or whether a device other than the concentrator is the faulty device.

进一步地,根据所述多层拓扑模型和所述状态信息对所述集中器进行分析,以判断所述配电网中所述集中器是否为所述故障设备或非所述集中器的设备是否为所述故障设备包括:在接收到第一集中器的掉线信号、以及未接收到所述第一集中器对应的第一光网络单元的掉线信号的情况下,获取第二集中器的工作状态,其中,所述第二集中器和所述第一集中器均由第一低压出线开关供电;判断所述第二集中器的工作状态是否正常;在判断出所述第二集中器的工作状态正常的情况下,确定所述故障设备为所述第一集中器;在判断出所述第二集中器的工作状态异常的情况下,确定所述故障设备为所述第一低压出线开关。Further, the concentrator is analyzed according to the multi-layer topology model and the status information to determine whether the concentrator in the distribution network is the faulty device or whether the device other than the concentrator is The faulty device includes: when the offline signal of the first concentrator is received and the offline signal of the first optical network unit corresponding to the first concentrator is not received, obtaining the second concentrator’s Working state, wherein both the second concentrator and the first concentrator are powered by the first low-voltage outlet switch; judge whether the working state of the second concentrator is normal; When the working state is normal, determine that the faulty device is the first concentrator; when it is judged that the working state of the second concentrator is abnormal, determine that the faulty device is the first low-voltage outlet switch .

进一步地,根据所述多层拓扑模型和所述状态信息对所述集中器进行分析,以判断所述配电网中所述集中器是否为所述故障设备或非所述集中器的设备是否为所述故障设备包括:在接收到第三集中器的掉线信号、以及未接收到所述第三集中器对应的第二光网络单元的掉线信号的情况下,获取第一目标用户的表计电压,其中,所述第一目标用户的表计电压通过第四集中器采集,第二目标用户的表计电压通过所述第三集中器采集,所述第三集中器、所述第一目标用户和所述第二目标用户均由第二低压出线开关供电;判断所述第一目标用户的表计电压是否正常;在判断出所述第一目标用户的表计电压正常的情况下,确定所述故障设备为所述第三集中器。Further, the concentrator is analyzed according to the multi-layer topology model and the status information to determine whether the concentrator in the distribution network is the faulty device or whether the device other than the concentrator is The faulty device includes: in the case of receiving the disconnection signal of the third concentrator and not receiving the disconnection signal of the second optical network unit corresponding to the third concentrator, obtaining the first target user’s Meter voltage, wherein the meter voltage of the first target user is collected by the fourth concentrator, the meter voltage of the second target user is collected by the third concentrator, the third concentrator, the second concentrator Both the first target user and the second target user are powered by the second low-voltage outlet switch; judging whether the meter voltage of the first target user is normal; if it is judged that the meter voltage of the first target user is normal , determining that the faulty device is the third concentrator.

进一步地,在判断判断所述第一目标用户的表计电压是否正常之后,根据所述多层拓扑模型和所述状态信息对所述集中器进行分析,以判断所述配电网中所述集中器是否为所述故障设备或非所述集中器的设备是否为所述故障设备还包括:在判断出所述第一目标用户的表计电压异常的情况下,则获取预设数量的第三目标用户的表计电压,其中,所述第三目标用户的表计电压通过所述第四集中器采集,所述第三目标用户由所述第二低压出线开关供电,所述预设数量大于或等于一;判断所述第三目标用户的表计电压是否正常;在判断出所述第三目标用户的表计电压正常的情况下,确定所述故障设备为所述第三集中器;在判断出所述第三目标用户的表计电压异常的情况下,确定所述故障设备为所述第二低压出线开关。Further, after judging whether the meter voltage of the first target user is normal, the concentrator is analyzed according to the multi-layer topology model and the state information, so as to judge the Whether the concentrator is the faulty device or whether the device other than the concentrator is the faulty device also includes: if it is judged that the meter voltage of the first target user is abnormal, obtaining a preset number of second The meter voltage of three target users, wherein, the meter voltage of the third target user is collected through the fourth concentrator, the third target user is powered by the second low-voltage outlet switch, and the preset number greater than or equal to one; judging whether the meter voltage of the third target user is normal; in the case of judging that the meter voltage of the third target user is normal, determining that the faulty device is the third concentrator; If it is determined that the meter voltage of the third target user is abnormal, it is determined that the faulty device is the second low-voltage outlet switch.

进一步地,根据所述多层拓扑模型和所述状态信息对所述集中器进行分析,以判断所述配电网中所述集中器是否为所述故障设备或非所述集中器的设备是否为所述故障设备包括:在接收到第五集中器的掉线信号、以及未接收到所述第五集中器对应的第三光网络单元的掉线信号的情况下,判断第一预设时间内是否接收到第四目标用户的停电报修消息,其中,所述第四目标用户和所述第五集中器均由第三低压出线开关供电;在判断出所述第一预设时间内接收到所述第四目标用户的所述停电报修消息的情况下,确定所述故障设备为所述第三低压出线开关;在判断出所述第一预设时间内未接收到所述第四目标用户的所述停电报修消息的情况下,确定所述故障设备为所述第三低压出线开关或者所述第五集中器。Further, the concentrator is analyzed according to the multi-layer topology model and the status information to determine whether the concentrator in the distribution network is the faulty device or whether the device other than the concentrator is The faulty device includes: judging the first preset time when receiving the offline signal of the fifth concentrator and not receiving the offline signal of the third optical network unit corresponding to the fifth concentrator whether to receive a power outage report message from the fourth target user, wherein both the fourth target user and the fifth concentrator are powered by the third low-voltage outlet switch; In the case of the power failure report message of the fourth target user, it is determined that the faulty device is the third low-voltage outlet switch; the fourth target user is not received within the first preset time after judging In the case of the power outage repair report message, it is determined that the faulty device is the third low-voltage outlet switch or the fifth concentrator.

进一步地,在确定所述故障设备为所述第三低压出线开关或者所述第五集中器之后,根据所述多层拓扑模型和所述状态信息对所述集中器进行分析,以判断所述配电网中所述集中器是否为所述故障设备或非所述集中器的设备是否为所述故障设备还包括:判断第二预设时间内是否接收到所述第四目标用户的所述停电报修消息,其中,所述第二预设时间的起始时间为所述第一预设时间的结束时间;在判断出所述第二预设时间内接收到所述第四目标用户的所述停电报修消息的情况下,确定所述故障设备为所述第三低压出线开关。Further, after determining that the faulty device is the third low-voltage outgoing line switch or the fifth concentrator, analyze the concentrator according to the multi-layer topology model and the state information to determine whether the Whether the concentrator in the power distribution network is the faulty device or whether the device other than the concentrator is the faulty device also includes: judging whether the fourth target user’s information is received within a second preset time. A power outage report message, wherein, the start time of the second preset time is the end time of the first preset time; the message of the fourth target user is received within the second preset time In the case of the power outage report message, it is determined that the faulty device is the third low-voltage outlet switch.

进一步地,所述设备包括光网络单元,根据所述多层拓扑模型和所述状态信息对所述设备进行分析,以判断所述配电网中是否存在故障设备包括:根据所述多层拓扑模型和所述状态信息对所述光网络单元进行分析,以判断所述配电网中所述光网络单元是否为所述故障设备或非所述光网络单元的设备是否为所述故障设备。Further, the device includes an optical network unit, and analyzing the device according to the multi-layer topology model and the state information to determine whether there is a faulty device in the distribution network includes: according to the multi-layer topology The model and the status information analyze the optical network unit to determine whether the optical network unit in the distribution network is the faulty device or whether a device other than the optical network unit is the faulty device.

进一步地,根据所述多层拓扑模型和所述状态信息对所述光网络单元进行分析,以判断所述配电网中所述光网络单元是否为所述故障设备或非所述光网络单元的设备是否为所述故障设备包括:接收到第四光网络单元的掉线信号;获取与目标配电变压器对应的10KV进线开关的状态,其中,所述目标配电变压器为与所述第四光网络单元对应的配电变压器;根据所述10KV进线开关的状态,判断所述故障设备是否为所述第四光网络单元。Further, analyzing the optical network unit according to the multi-layer topology model and the state information to determine whether the optical network unit in the distribution network is the faulty device or not the optical network unit Whether the device is the faulty device includes: receiving the offline signal of the fourth optical network unit; obtaining the state of the 10KV incoming line switch corresponding to the target distribution transformer, wherein the target distribution transformer is the same as the first The distribution transformer corresponding to the four optical network units; according to the state of the 10KV incoming line switch, it is judged whether the faulty device is the fourth optical network unit.

进一步地,根据所述10KV进线开关的状态,判断所述故障设备是否为所述第四光网络单元包括:若所述10KV进线开关满足预设条件,则确定所述故障设备为所述第四光网络单元,其中,所述预设条件为闭合、存在电流、且有功值。Further, according to the state of the 10KV incoming line switch, judging whether the faulty device is the fourth optical network unit includes: if the 10KV incoming line switch satisfies a preset condition, determining that the faulty device is the The fourth optical network unit, wherein the preset condition is closed, current exists, and active power value.

进一步地,根据所述多层拓扑模型和所述状态信息对所述光网络单元进行分析,以判断所述配电网中所述光网络单元是否为所述故障设备或非所述光网络单元的设备是否为所述故障设备包括:在接收到第五光网络单元的掉线信号的情况下,获取通信检修计划和通信光缆故障信息,其中,所述第五光网络单元为与第六集中器具有关联关系的光网络单元;根据所述通信检修计划和通信光缆故障信息判断所述第五光网络单元是否已存在通信故障;在根据所述通信检修计划和通信光缆故障信息判断出所述第五光网络单元不存在所述通信故障的情况下,获取第五目标用户的表计电压,其中,所述第五目标用户的表计电压通过第七集中器所采集,所述第六集中器用户采集第六目标用户的表计电压,所述第五目标用户和所述第六目标用户均由第一配变低压主开关供电;判断所述第五目标用户的表计电压是否正常;在判断出所述第五目标用户的表计电压正常的情况下,确定所述故障设备为所述第五光网络单元;在判断出所述第五目标用户的表计电压异常的情况下,确定所述故障设备为所述第一配变低压主开关。Further, analyzing the optical network unit according to the multi-layer topology model and the state information to determine whether the optical network unit in the distribution network is the faulty device or not the optical network unit Whether the device is the faulty device includes: obtaining the communication maintenance plan and the fault information of the communication optical cable in the case of receiving the disconnection signal of the fifth optical network unit, wherein the fifth optical network unit is the same as the sixth set optical network unit with an associated relationship; judge whether the fifth optical network unit has a communication fault according to the communication maintenance plan and communication optical cable fault information; When the fifth optical network unit does not have the communication failure, acquire the meter voltage of the fifth target user, wherein the meter voltage of the fifth target user is collected by the seventh concentrator, and the sixth concentrator The meter user collects the meter voltage of the sixth target user, and both the fifth target user and the sixth target user are powered by the first low-voltage main switch of the distribution transformer; it is judged whether the meter voltage of the fifth target user is normal; When it is judged that the meter voltage of the fifth target user is normal, determining that the faulty device is the fifth optical network unit; when it is judged that the meter voltage of the fifth target user is abnormal, It is determined that the faulty device is the low-voltage main switch of the first distribution transformer.

进一步地,根据所述多层拓扑模型和所述状态信息对所述光网络单元进行分析,以判断所述配电网中所述光网络单元是否为所述故障设备或非所述光网络单元的设备是否为所述故障设备包括:在接收到第六光网络单元的掉线信号的情况下,获取通信检修计划和通信光缆故障信息;根据所述通信检修计划和通信光缆故障信息判断所述第六光网络单元是否已存在通信故障;在根据所述通信检修计划和通信光缆故障信息判断出所述第六光网络单元不存在所述通信故障的情况下,判断第三预设时间内是否接收到第七目标用户的停电报修消息,其中,所述第七目标用户与所述第六光网络单元均由第二配变低压主开关供电;在判断出所述第三预设时间内接收到所述第七目标用户的所述停电报修消息的情况下,确定所述故障设备为所述第二配变低压主开关;在判断出所述第三预设时间内未接收到所述第七目标用户的所述停电报修消息的情况下,确定所述故障设备为所述第二配变低压主开关或者所述第六光网络单元。Further, analyzing the optical network unit according to the multi-layer topology model and the state information to determine whether the optical network unit in the distribution network is the faulty device or not the optical network unit Whether the device is the faulty device includes: in the case of receiving the disconnection signal of the sixth optical network unit, obtaining the communication maintenance plan and communication optical cable fault information; judging the communication maintenance plan and communication optical cable fault information according to the Whether the sixth optical network unit has a communication fault; if it is determined that the sixth optical network unit does not have the communication fault according to the communication maintenance plan and the communication cable fault information, determine whether the sixth optical network unit has a communication fault within the third preset time Receive a power outage report message from the seventh target user, wherein both the seventh target user and the sixth optical network unit are powered by the second low-voltage main switch of the distribution transformer; receive within the third preset time In the case of receiving the power outage report message from the seventh target user, it is determined that the faulty device is the low-voltage main switch of the second distribution transformer; In the case of the power outage report message of the target user, it is determined that the faulty device is the second distribution transformer low-voltage main switch or the sixth optical network unit.

进一步地,在确定所述故障设备为所述第二配变低压主开关或者所述第六光网络单元之后,其中,根据所述多层拓扑模型和所述状态信息对所述光网络单元进行分析,以判断所述配电网中所述光网络单元是否为所述故障设备或非所述光网络单元的设备是否为所述故障设备还包括:判断第四预设时间内是否接收到所述第七目标用户的所述停电报修消息,其中,所述第四预设时间的起始时间为所述第三预设时间的结束时间;在判断出所述第四预设时间内接收到所述停电报修消息的情况下,确定所述故障设备为所述第二配变低压主开关。Further, after determining that the faulty device is the second distribution transformer low-voltage main switch or the sixth optical network unit, wherein the optical network unit is performed according to the multi-layer topology model and the state information Analyzing to determine whether the optical network unit in the distribution network is the faulty device or whether the device other than the optical network unit is the faulty device also includes: judging whether the The power outage report message of the seventh target user, wherein the start time of the fourth preset time is the end time of the third preset time; In the case of the power outage report message, it is determined that the faulty device is the low-voltage main switch of the second distribution transformer.

进一步地,所述设备还包括辅助电源,所述辅助电源用于在第七光网络单元的主电源断电时,在第一预设时间段内向所述第七光网络单元供电,其中,根据所述多层拓扑模型和所述状态信息对所述光网络单元进行分析,以判断所述配电网中所述光网络单元是否为所述故障设备或非所述光网络单元的设备是否为所述故障设备包括:在接收到所述第七光网络单元的掉线信号的情况下,判断接收到所述掉线信号之前的所述第一预设时间段内是否接收到所述第七光网络单元的网口丢失信号,其中,所述网口丢失信号与向所述第七光网络单元供电的配电变压器对应;在判断出接收到所述网口丢失信号的情况下,确定所述故障设备为向所述第七光网络单元供电的配电变压器;在判断出未接收到所述网口丢失信号的情况下,确定所述故障设备为所述第七光网络单元。Further, the device further includes an auxiliary power supply, the auxiliary power supply is used to supply power to the seventh optical network unit within a first preset time period when the main power supply of the seventh optical network unit is powered off, wherein, according to The multi-layer topology model and the state information analyze the optical network unit to determine whether the optical network unit in the distribution network is the faulty device or whether a device other than the optical network unit is The faulty device includes: in the case of receiving the offline signal of the seventh optical network unit, judging whether the seventh optical network unit has received the seventh ONU within the first preset time period before receiving the offline signal. The network port loss signal of the optical network unit, wherein the network port loss signal corresponds to the distribution transformer that supplies power to the seventh optical network unit; when it is judged that the network port loss signal is received, determine the The faulty device is a distribution transformer that supplies power to the seventh optical network unit; if it is determined that the network port loss signal is not received, determine that the faulty device is the seventh optical network unit.

进一步地,所述设备还包括辅助电源,所述辅助电源用于在第八光网络单元的主电源断电时,在第二预设时间段内向所述第八光网络单元供电,其中,根据所述多层拓扑模型和所述状态信息对所述光网络单元进行分析,以判断所述配电网中所述光网络单元是否为所述故障设备或非所述光网络单元的设备是否为所述故障设备包括:在接收到所述第八光网络单元的网口丢失信号的情况下,判断在接收到所述网口丢失信号之后的所述第二预设时间段内,是否接收到所述第八光网络单元的掉线信号;在判断出接收到所述掉线信号的情况下,确定所述故障设备为向所述第八光网络单元供电的配电变压器;在判断出未接收到所述掉线信号的情况下,确定所述故障设备为与所述网口丢失信号对应的配电变压器。Further, the device further includes an auxiliary power supply, the auxiliary power supply is used to supply power to the eighth optical network unit within a second preset time period when the main power supply of the eighth optical network unit is powered off, wherein, according to The multi-layer topology model and the state information analyze the optical network unit to determine whether the optical network unit in the distribution network is the faulty device or whether a device other than the optical network unit is The faulty device includes: in the case of receiving the network port loss signal of the eighth optical network unit, judging whether to receive the network port loss signal within the second preset time period after receiving the network port loss signal The offline signal of the eighth optical network unit; when it is determined that the offline signal is received, determine that the faulty device is a distribution transformer that supplies power to the eighth optical network unit; When the disconnection signal is received, it is determined that the faulty device is a distribution transformer corresponding to the network port loss signal.

根据本发明实施例的另一方面,还提供了一种用于配电网的监控装置,包括:建立单元,用于建立配电网的多层拓扑模型,其中,所述多层拓扑模型用于表征所述配电网中各个设备之间的拓扑结构;采集单元,用于从数据源中采集所述配电网的状态信息;判断单元,用于根据所述多层拓扑模型和状态信息对所述设备进行分析,以判断所述配电网中是否存在故障设备;输出单元,用于在判断出所述配电网中存在所述故障设备的情况下,输出故障结果,其中,所述故障结果包括电网故障和/或通信故障。According to another aspect of the embodiments of the present invention, there is also provided a monitoring device for a distribution network, including: an establishment unit for establishing a multi-layer topology model of the distribution network, wherein the multi-layer topology model uses To characterize the topology structure among the various devices in the distribution network; the acquisition unit is used to collect the state information of the distribution network from the data source; the judgment unit is used to collect the state information according to the multi-layer topology model and the state Analyzing the device to determine whether there is a faulty device in the distribution network; an output unit configured to output a fault result when it is determined that the faulty device exists in the distribution network, wherein the The above failure results include grid failure and/or communication failure.

进一步地,所述设备包括配电设备和用于传输所述配电网的状态信息的通信设备。Further, the device includes a power distribution device and a communication device for transmitting status information of the distribution network.

进一步地,所述电网故障包括以下任意一种:低压出线开关跳闸、配变低压主开关跳闸、配电变压器故障和开闭站出线开关跳闸;所述通信故障包括以下任意一种:光网络单元故障、光纤故障、集中器故障和集中器下联端口故障。Further, the power grid failure includes any of the following: tripping of the low-voltage outlet switch, tripping of the low-voltage main switch of the distribution transformer, distribution transformer failure, and tripping of the outlet switch of the switch station; the communication failure includes any of the following: optical network unit failure, fiber failure, concentrator failure, and downlink port failure of the concentrator.

进一步地,所述数据源包括以下至少之一:用户用电采集系统、调度EMS系统、配电自动化系统、OMS系统和配电网通信系统。Further, the data source includes at least one of the following: user electricity collection system, dispatch EMS system, distribution automation system, OMS system and distribution network communication system.

进一步地,所述判断单元包括:获取模块,用于在接收到第一设备的异常信号的情况下,获取所述拓扑结构中至少一个与所述第一设备具有相同父节点的第二设备的工作状态;第一判断模块,用于判断所述第二设备的工作状态是否正常;第一确定模块,用于在判断出所述第二设备的工作状态为异常的情况下,确定所述故障设备为所述父节点对应的设备;第二确定模块,用于在判断出所述第二设备的工作状态为正常的情况下,确定所述故障设备为所述第一设备。Further, the judging unit includes: an obtaining module, configured to obtain, in the case of receiving an abnormal signal from the first device, the information of at least one second device having the same parent node as the first device in the topology Working state; a first judging module, used to judge whether the working state of the second device is normal; a first determining module, used to determine the fault when it is judged that the working state of the second device is abnormal The device is the device corresponding to the parent node; the second determination module is configured to determine that the faulty device is the first device when it is determined that the working state of the second device is normal.

进一步地,所述设备包括集中器,其中,所述判断单元包括:第二判断模块,用于根据所述多层拓扑模型和所述状态信息对所述集中器进行分析,以判断所述配电网中所述集中器是否为所述故障设备或非所述集中器的设备是否为所述故障设备。Further, the device includes a concentrator, wherein the judging unit includes: a second judging module, configured to analyze the concentrator according to the multi-layer topology model and the state information, to judge whether the configuration Whether the concentrator in the power grid is the faulty device or whether a device other than the concentrator is the faulty device.

进一步地,所述设备包括光网络单元,其中,所述判断单元包括:第三判断模块,用于根据所述多层拓扑模型和状态信息对所述光网络单元进行分析,以判断所述配电网中所述光网络单元是否为所述故障设备或非所述光网络单元的设备是否为所述故障设备。Further, the device includes an optical network unit, wherein the judging unit includes: a third judging module, configured to analyze the optical network unit according to the multi-layer topology model and state information, so as to judge whether the configuration Whether the optical network unit in the power grid is the faulty device or whether a device other than the optical network unit is the faulty device.

在本发明实施例中,采用建立配电网的多层拓扑模型,其中,所述多层拓扑模型用于表征所述配电网中各个设备之间的拓扑结构;从数据源中采集所述配电网的状态信息;根据所述多层拓扑模型和状态信息对所述设备进行分析,以判断所述配电网中是否存在故障设备;若判断出所述配电网中存在所述故障设备,则输出故障结果,其中,所述故障结果包括电网故障和/或通信故障。通过建立配电网的拓扑模型,采集配电网的状态信息,进而根据上述拓扑模型和状态信息对配电网中设备进行分析,实现了对配电网中设备的运行情况进行监控,从而能够及时主动的发现配电网中出现故障的设备(即,故障设备),并且能够进一步地确定上述出现故障的设备所属的故障类型,与相关技术中,只能依靠用户报修的被动方式来确定出现故障相比,达到了不依靠用户报修,就能够及时主动发现配电网中存在的故障的目的,从而实现了提高工作人员解决故障的时效性的技术效果,进而解决了现有技术中无法及时发现配电网中存在的故障的技术问题。In the embodiment of the present invention, a multi-layer topology model of the distribution network is established, wherein the multi-layer topology model is used to characterize the topology structure among the various devices in the distribution network; State information of the distribution network; analyze the device according to the multi-layer topology model and state information to determine whether there is a faulty device in the distribution network; if it is determined that the fault exists in the distribution network The device outputs a fault result, where the fault result includes a power grid fault and/or a communication fault. By establishing the topology model of the distribution network, collecting the status information of the distribution network, and then analyzing the equipment in the distribution network according to the above topology model and status information, it is possible to monitor the operation of the equipment in the distribution network, so as to be able to Timely and active detection of faulty equipment in the distribution network (that is, faulty equipment), and can further determine the type of fault to which the above-mentioned faulty equipment belongs. In related technologies, only relying on the passive way of user repair Compared with faults, it achieves the purpose of timely and proactively discovering the faults in the distribution network without relying on the user's repair report, thereby achieving the technical effect of improving the timeliness of the staff to solve the faults, and further solving the problem that the existing technology cannot The technical problem of discovering the faults existing in the distribution network.

附图说明Description of drawings

此处所说明的附图用来提供对本发明的进一步理解,构成本申请的一部分,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:The accompanying drawings described here are used to provide a further understanding of the present invention and constitute a part of the application. The schematic embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations to the present invention. In the attached picture:

图1是根据本发明实施例的一种可选的用于配电网的监控方法的流程图;Fig. 1 is a flow chart of an optional monitoring method for a distribution network according to an embodiment of the present invention;

图2是根据本发明实施例的另一种可选的用于配电网的监控方法中一个低压出线开关给多个集中器供电的示意图;2 is a schematic diagram of a low-voltage outlet switch supplying power to multiple concentrators in another optional monitoring method for a distribution network according to an embodiment of the present invention;

图3是根据本发明实施例的另一种可选的用于配电网的监控方法中一次电网与通信网存在交叉的示意图;Fig. 3 is a schematic diagram of another optional method for monitoring a distribution network according to an embodiment of the present invention, where there is a crossover between the primary power grid and the communication network;

图4是根据本发明实施例的另一种可选的用于配电网的监控方法中一次电网与通信网不存在交叉的示意图;Fig. 4 is a schematic diagram showing that there is no intersection between the primary power grid and the communication network in another optional monitoring method for distribution network according to an embodiment of the present invention;

图5是根据本发明实施例的又一种可选的用于配电网的监控方法中一次电网与通信网不存在交叉的示意图;Fig. 5 is a schematic diagram showing that there is no intersection between the primary power grid and the communication network in another optional monitoring method for distribution network according to an embodiment of the present invention;

图6是根据本发明实施例的另一种可选的用于配电网的监控方法中低压出线开关跳闸的示意图;6 is a schematic diagram of tripping of a low-voltage outlet switch in another optional monitoring method for a distribution network according to an embodiment of the present invention;

图7是根据本发明实施例的另一种可选的用于配电网的监控方法中配变低压主开关跳闸的示意图;Fig. 7 is a schematic diagram of a low-voltage main switch of a distribution transformer tripping in another optional monitoring method for a distribution network according to an embodiment of the present invention;

图8是根据本发明实施例的另一种可选的用于配电网的监控方法中开闭站开关跳闸的示意图;以及Fig. 8 is a schematic diagram of another optional monitoring method for a distribution network according to an embodiment of the present invention;

图9是根据本发明实施例的一种用于配电网的监控装置的示意图。Fig. 9 is a schematic diagram of a monitoring device for a power distribution network according to an embodiment of the present invention.

具体实施方式detailed description

为了使本技术领域的人员更好地理解本发明方案,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分的实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都应当属于本发明保护的范围。In order to enable those skilled in the art to better understand the solutions of the present invention, the following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only It is an embodiment of a part of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts shall fall within the protection scope of the present invention.

需要说明的是,本发明的说明书和权利要求书及上述附图中的术语“第一”、“第二”等是用于区别类似的对象,而不必用于描述特定的顺序或先后次序。应该理解这样使用的数据在适当情况下可以互换,以便这里描述的本发明的实施例能够以除了在这里图示或描述的那些以外的顺序实施。此外,术语“包括”和“具有”以及他们的任何变形,意图在于覆盖不排他的包含,例如,包含了一系列步骤或单元的过程、方法、系统、产品或设备不必限于清楚地列出的那些步骤或单元,而是可包括没有清楚地列出的或对于这些过程、方法、产品或设备固有的其它步骤或单元。It should be noted that the terms "first" and "second" in the description and claims of the present invention and the above drawings are used to distinguish similar objects, but not necessarily used to describe a specific sequence or sequence. It is to be understood that the data so used are interchangeable under appropriate circumstances such that the embodiments of the invention described herein can be practiced in sequences other than those illustrated or described herein. Furthermore, the terms "comprising" and "having", as well as any variations thereof, are intended to cover a non-exclusive inclusion, for example, a process, method, system, product or device comprising a sequence of steps or elements is not necessarily limited to the expressly listed instead, may include other steps or elements not explicitly listed or inherent to the process, method, product or apparatus.

根据本发明实施例,提供了一种用于配电网的监控方法的方法实施例,需要说明的是,在附图的流程图示出的步骤可以在诸如一组计算机可执行指令的计算机系统中执行,并且,虽然在流程图中示出了逻辑顺序,但是在某些情况下,可以以不同于此处的顺序执行所示出或描述的步骤。According to an embodiment of the present invention, a method embodiment of a method for monitoring a power distribution network is provided. It should be noted that the steps shown in the flow chart of the accompanying drawings can be implemented in a computer system such as a set of computer-executable instructions and, although a logical order is shown in the flowcharts, in some cases the steps shown or described may be performed in an order different from that shown or described herein.

图1是根据本发明实施例的一种可选的用于配电网的监控方法的流程图,如图1所示,该方法包括如下步骤:Fig. 1 is a flow chart of an optional monitoring method for a distribution network according to an embodiment of the present invention. As shown in Fig. 1, the method includes the following steps:

步骤S102,建立配电网的多层拓扑模型,其中,多层拓扑模型用于表征配电网中各个设备之间的拓扑结构。Step S102, establishing a multi-layer topology model of the distribution network, wherein the multi-layer topology model is used to characterize the topology structure among various devices in the distribution network.

具体地,多层拓扑模型可以为三层,每层分别是10KV配网、10KV变压器台区以及低压设备和用户智能表。Specifically, the multi-layer topology model can be three layers, and each layer is a 10KV distribution network, a 10KV transformer station area, low-voltage equipment, and user smart meters.

步骤S104,从数据源中采集配电网的状态信息。Step S104, collecting state information of the distribution network from a data source.

具体地,配电网的状态信息包括集中器电源信息、集中器心跳数据、光网络单元(Optical Network Unit,简称ONU)数据、检修计划数据、电网拓扑数据、EMS实时数据等。Specifically, the status information of the distribution network includes concentrator power information, concentrator heartbeat data, optical network unit (Optical Network Unit, ONU for short) data, maintenance plan data, grid topology data, EMS real-time data, etc.

具体地,配电网的状态信息主要包括从用电采集系统、营销系统、调度EMS(能量管理)系统、配电自动化系统、配电网通信系统、OMS(调度运行管理)系统、PMS2.0系统中获取的数据。其中,用电采集系统中包含配变、低压用户表计数据,营销系统中包含95598工单数据、客户台账数据和表计关系数据,调度EMS系统中包含变电站10KV开关遥信遥测数据,配电自动化系统中包含配电线路数据和站房遥信遥测数据,配电通信系统中包含ONU不在线数据,OMS系统中包含计划停电数据,PMS2.0系统中包含GIS设备台账和电网拓扑数据。Specifically, the status information of the distribution network mainly includes information from the electricity collection system, marketing system, dispatch EMS (energy management) system, distribution automation system, distribution network communication system, OMS (dispatch operation management) system, PMS2.0 data obtained from the system. Among them, the power collection system includes distribution transformer and low-voltage user meter data, the marketing system includes 95598 work order data, customer ledger data, and meter relationship data, and the dispatching EMS system includes substation 10KV switch remote signaling and telemetry data. The electrical automation system includes distribution line data and station telemetry data, the distribution communication system includes ONU offline data, the OMS system includes planned power outage data, and the PMS2.0 system includes GIS equipment account and grid topology data .

步骤S106,根据多层拓扑模型和状态信息对设备进行分析,以判断配电网中是否存在故障设备。Step S106, analyzing the equipment according to the multi-layer topology model and status information to determine whether there is a faulty equipment in the distribution network.

步骤S108,若判断出配电网中存在故障设备,则输出故障结果,其中,故障结果包括电网故障和/或通信故障。In step S108, if it is determined that there is a faulty device in the power distribution network, a fault result is output, wherein the fault result includes a grid fault and/or a communication fault.

在本发明实施例中,通过建立配电网的拓扑模型,采集配电网的状态信息,进而根据上述拓扑模型和状态信息对配电网中设备进行分析,实现了对配电网中设备的运行情况进行监控,从而能够及时主动的发现配电网中出现故障的设备(即,故障设备),并且能够进一步地确定上述出现故障的设备所属的故障类型,与相关技术中,只能依靠用户报修的被动方式来确定出现故障相比,达到了不依靠用户报修,就能够及时主动发现配电网中存在的故障的目的,从而实现了提高工作人员解决故障的时效性的技术效果,进而解决了现有技术中无法及时发现配电网中存在的故障的技术问题。In the embodiment of the present invention, by establishing the topology model of the distribution network, collecting the state information of the distribution network, and then analyzing the equipment in the distribution network according to the above topology model and state information, the equipment in the distribution network is realized. The operating conditions are monitored, so that it is possible to promptly and proactively discover the faulty equipment (that is, the faulty equipment) in the distribution network, and to further determine the type of fault to which the above-mentioned faulty equipment belongs. In related technologies, only the user can rely on Compared with the passive method of reporting for repairs to determine the occurrence of faults, it achieves the purpose of actively discovering the faults in the distribution network in a timely manner without relying on the user's repairs, thereby achieving the technical effect of improving the timeliness of the staff to solve the faults, and then solving the problem. It solves the technical problem that the faults in the distribution network cannot be found in time in the prior art.

此外,在本发明实施例还实现了分辨电网设备故障和通信设备故障的效果。In addition, the embodiment of the present invention also achieves the effect of distinguishing the failure of the grid equipment and the failure of the communication equipment.

可选地,上述实施例中的设备包括配电设备和用于传输配电网的状态信息的通信设备。Optionally, the device in the foregoing embodiment includes a power distribution device and a communication device for transmitting status information of the power distribution network.

可选地,电网故障包括以下任意一种:低压出线开关跳闸、配变低压主开关跳闸、配电变压器故障和开闭站出线开关跳闸;通信故障包括以下任意一种:光网络单元故障、光纤故障、集中器故障和集中器下联端口故障。Optionally, the power grid failure includes any of the following: tripping of the low-voltage outlet switch, tripping of the low-voltage main switch of the distribution transformer, distribution transformer failure, and tripping of the outlet switch of the switching station; communication failure includes any of the following: failure of the optical network unit, optical fiber failure, concentrator failure, and concentrator downlink port failure.

可选地,数据源包括以下至少之一:用户用电采集系统、调度EMS系统、配电自动化系统、OMS系统和配电网通信系统。Optionally, the data source includes at least one of the following: user electricity collection system, dispatch EMS system, distribution automation system, OMS system and distribution network communication system.

可选地,在本发明实施例中,根据多层拓扑模型和状态信息对设备进行分析,以判断配电网中是否存在故障设备包括步骤S1061至步骤S1067:Optionally, in the embodiment of the present invention, analyzing the equipment according to the multi-layer topology model and state information to determine whether there is a faulty equipment in the distribution network includes steps S1061 to S1067:

步骤S1061,在接收到第一设备的异常信号的情况下,获取拓扑结构中至少一个与第一设备具有相同父节点的第二设备的工作状态。具体地,异常信号可以是掉线信号,第一设备可以是通信设备,也可以是配电设备。Step S1061, in the case of receiving the abnormal signal of the first device, acquire the working status of at least one second device having the same parent node as the first device in the topology structure. Specifically, the abnormal signal may be a disconnection signal, and the first device may be a communication device or a power distribution device.

在拓扑结构中,与第一设备属于同一父节点的第二设备可能有一个,也可能有多个。对于有多个第二设备的情况,可以只获取一个第二设备的工作状态,也可以获取n个第二设备的工作状态,其中,n大于1,且小于或者等于多个第二设备的数量。In the topology structure, there may be one or more second devices belonging to the same parent node as the first device. For the case of multiple second devices, the working status of only one second device can be obtained, or the working status of n second devices can be obtained, where n is greater than 1 and less than or equal to the number of multiple second devices .

步骤S1063,判断第二设备的工作状态是否正常。Step S1063, judging whether the working state of the second device is normal.

具体地,如果上述步骤S1061中获取了一个第二设备的工作状态,则只需判断上述一个第二设备的工作状态是否正常;如果上述步骤S1061中获取了n个第二设备的工作状态,则需要判断n个第二设备中每个第二设备的工作状态是否正常。Specifically, if the working status of one second device is obtained in the above step S1061, it is only necessary to judge whether the working status of the one second device is normal; if the working status of n second devices is obtained in the above step S1061, then It is necessary to determine whether the working state of each second device among the n second devices is normal.

步骤S1065,在判断出第二设备的工作状态为异常的情况下,确定故障设备为父节点对应的设备。Step S1065, if it is determined that the working state of the second device is abnormal, determine that the faulty device is the device corresponding to the parent node.

如果上述步骤S1061中只获取一个第二设备的工作状态,那么,若判断出上述一个第二设备的工作状态为异常,则确定在拓扑结构中第一设备和第二设备的父节点所对应的设备为故障设备。如果上述步骤S1061中获取了n个第二设备的工作状态,那么,若判断出上述n个第二设备的工作状态都为异常,则确定在拓扑结构中第一设备和第二设备的父节点所对应的设备为故障设备。If only the working state of one second device is acquired in the above step S1061, then, if it is judged that the working state of the above-mentioned one second device is abnormal, then determine the parent node corresponding to the first device and the second device in the topology structure The device is a faulty device. If the working states of n second devices are acquired in the above step S1061, then, if it is judged that the working states of the above n second devices are all abnormal, then determine the parent node of the first device and the second device in the topology The corresponding device is a faulty device.

步骤S1067,在判断出第二设备的工作状态为正常的情况下,确定故障设备为第一设备。Step S1067, if it is determined that the working state of the second device is normal, determine that the faulty device is the first device.

同样的,如果上述步骤S1061中只获取一个第二设备的工作状态,那么,若判断出上述一个第二设备的工作状态为正常,则确定第一设备为故障设备。如果上述步骤S1061中获取n个第二设备的工作状态,那么,若判断出上述n个第二设备的工作状态都为正常,则确定第一设备为故障设备。Similarly, if only the working state of one second device is acquired in the above step S1061, then if it is judged that the working state of the one second device is normal, then it is determined that the first device is a faulty device. If the working states of the n second devices are obtained in the above step S1061, then if it is determined that the working states of the n second devices are all normal, then it is determined that the first device is a faulty device.

在本发明实施例中,根据各个设备在拓扑结构中的结构关系,当任意一个设备产生异常信号时,通过纵向追源、横向验证、一层一层向上推导的方式对拓扑结构中与该设备相关联的其它设备进行分析,能够准确的确定出故障设备,达到了提高确定故障设备的准确性的效果。In the embodiment of the present invention, according to the structural relationship of each device in the topology, when any device generates an abnormal signal, the device in the topology is analyzed by means of vertical tracing, horizontal verification, and layer-by-layer upward derivation. Analyzing other associated devices can accurately determine the faulty device, achieving the effect of improving the accuracy of determining the faulty device.

可选地,在本发明实施例中,设备包括集中器,根据多层拓扑模型和状态信息对设备进行分析,以判断配电网中是否存在故障设备包括:根据多层拓扑模型和状态信息对集中器进行分析,以判断配电网中集中器是否为故障设备或非集中器的设备是否为故障设备。Optionally, in this embodiment of the present invention, the device includes a concentrator, and analyzing the device according to the multi-layer topology model and status information to determine whether there is a faulty device in the distribution network includes: according to the multi-layer topology model and status information The concentrator conducts analysis to determine whether the concentrator is a faulty device or whether the non-concentrator is a faulty device in the distribution network.

对于对集中器进行分析的情形,配电网的状态信息包括集中器电源信息和集中器的心跳数据,其中,集中器电源信息需对应到低压出线开关,集中器心跳数据是指集中器五分钟心跳数据。对于该情形,根据多层拓扑模型和状态信息对集中器进行分析,以判断配电网中集中器是否为故障设备或非集中器的设备是否为故障设备可以分为以下两种场景:For the analysis of the concentrator, the state information of the distribution network includes the power supply information of the concentrator and the heartbeat data of the concentrator. heartbeat data. For this situation, the concentrator is analyzed according to the multi-layer topology model and state information to determine whether the concentrator in the distribution network is a faulty device or whether the non-concentrator device is a faulty device. It can be divided into the following two scenarios:

场景一:一个低压出线开关给多个集中器供电,即,一个低压出线开关带多个集中器。Scenario 1: One low-voltage outlet switch supplies power to multiple concentrators, that is, one low-voltage outlet switch has multiple concentrators.

可选地,根据多层拓扑模型和状态信息对集中器进行分析,以判断配电网中集中器是否为故障设备或非集中器的设备是否为故障设备包括步骤S1至步骤S7,具体如下:Optionally, analyzing the concentrator according to the multi-layer topology model and status information to determine whether the concentrator in the distribution network is a faulty device or whether a non-concentrator device is a faulty device includes steps S1 to S7, specifically as follows:

步骤S1,在接收到第一集中器的掉线信号、以及未接收到第一集中器对应的第一光网络单元的掉线信号的情况下,获取第二集中器的工作状态,其中,第二集中器和第一集中器均由第一低压出线开关供电。Step S1, when the disconnection signal of the first concentrator is received and the disconnection signal of the first optical network unit corresponding to the first concentrator is not received, the working status of the second concentrator is obtained, wherein, the first concentrator Both the second concentrator and the first concentrator are powered by the first low-voltage outlet switch.

具体地,第二集中器的数量可能是一个,也可能是多个。Specifically, there may be one or more second concentrators.

步骤S3,判断第二集中器的工作状态是否正常。Step S3, judging whether the working state of the second concentrator is normal.

如果第二集中器的数量为多个,则需判断每个第二集中器的工作状态是否都正常。If there are multiple second concentrators, it is necessary to determine whether the working status of each second concentrator is normal.

步骤S5,在判断出第二集中器的工作状态正常的情况下,确定故障设备为第一集中器。Step S5, if it is determined that the working state of the second concentrator is normal, determine that the faulty device is the first concentrator.

具体地,对于存在多个第二集中器的情况,在判断出每个第二集中器的工作状态都正常的情况下,才确定故障设备为第一集中器。Specifically, in the case where there are multiple second concentrators, it is determined that the faulty device is the first concentrator only when it is determined that the working status of each second concentrator is normal.

当故障设备为第一集中器时,输出的故障结果为集中器故障。When the faulty device is the first concentrator, the output fault result is concentrator fault.

步骤S7,在判断出第二集中器的工作状态异常的情况下,确定故障设备为第一低压出线开关。Step S7, if it is determined that the working state of the second concentrator is abnormal, determine that the faulty device is the first low-voltage outlet switch.

具体地,需要在判断出每个第二集中器的工作状态都异常的情况下,才确定故障设备为第一低压出线开关。Specifically, it is necessary to determine that the faulty device is the first low-voltage outlet switch only when it is determined that the working state of each second concentrator is abnormal.

当故障设备为第一低压出线开关时,输出的故障结果为低压出线开关跳闸。When the faulty device is the first low-voltage outlet switch, the output fault result is tripping of the low-voltage outlet switch.

图2是根据本发明实施例的另一种可选的用于配电网的监控方法中一个低压出线开关给多个集中器供电的示意图。Fig. 2 is a schematic diagram of a low-voltage outlet switch supplying power to multiple concentrators in another optional method for monitoring a distribution network according to an embodiment of the present invention.

参见图2,低压出线开关489(即,第一低压出线开关)通过接入点JR与集中器11、集中器12和集中器13连接,并对上述三个集中器供电。其中,集中器11采集11号楼至15号楼中用户代表的表计电压,集中器12采集16号楼至17号楼中用户代表的表计电压,集中器13采集18号楼中用户代表的表计电压。Referring to Fig. 2, the low-voltage outgoing line switch 489 (ie, the first low-voltage outgoing line switch) is connected to the concentrator 11, the concentrator 12 and the concentrator 13 through the access point JR, and supplies power to the three concentrators. Among them, the concentrator 11 collects the meter voltage of the user representatives in Building No. 11 to No. 15, the concentrator 12 collects the meter voltage of the user representatives in Building No. 16 to No. 17, and the concentrator 13 collects the meter voltage of the user representatives in Building No. 18. meter voltage.

在本发明实施例中,假设第一集中器为集中器11,那么第二集中器有两个,分别是集中器12和集中器13,则根据多层拓扑模型和状态信息对集中器进行分析,以判断配电网中集中器是否为故障设备或非集中器的设备是否为故障设备包括如下步骤S111至步骤S117:In the embodiment of the present invention, assuming that the first concentrator is concentrator 11, then there are two second concentrators, namely concentrator 12 and concentrator 13, and the concentrators are analyzed according to the multi-layer topology model and status information , to determine whether the concentrator in the distribution network is a faulty device or whether the non-concentrator is a faulty device, including the following steps S111 to step S117:

步骤S111,当接收到集中器11(即,第一集中器)的掉线信号时,获取集中器12和集中器13的工作状态。Step S111 , when receiving the offline signal of the concentrator 11 (ie, the first concentrator), acquire the working status of the concentrator 12 and the concentrator 13 .

步骤S113,判断集中器12和集中器13的工作状态是否正常,即,判断集中器12是否仍然能够采集16号楼至17号楼中用户代表的表计电压,以及集中器13是否仍然能够采集18号楼中用户代表的表计电压。Step S113, judging whether the working status of concentrator 12 and concentrator 13 is normal, that is, judging whether concentrator 12 can still collect the meter voltage of user representatives in Building No. 16 to No. 17, and whether concentrator 13 can still collect Meter voltage for user representatives in Building 18.

步骤S115,如果集中器12和集中器13的工作状态均为正常,则确定故障设备为集中器11。具体地,如果判断出集中器12仍然能够采集16号楼至17号楼中用户代表的表计电压,以及集中器13仍然能够采集18号楼中用户代表的表计电压,则确定故障设备为集中器11。Step S115 , if both the concentrator 12 and the concentrator 13 are in normal working status, it is determined that the faulty device is the concentrator 11 . Specifically, if it is judged that concentrator 12 can still collect the meter voltage of user representatives in Building No. 16 to No. 17, and concentrator 13 can still collect the meter voltage of user representatives in Building No. 18, then it is determined that the faulty equipment is Concentrator 11.

步骤S117,如果集中器12和集中器13的工作状态均为异常,则确定故障设备为低压出线开关489。具体地,如果判断出集中器12不能采集16号楼至17号楼中用户代表的表计电压,以及集中器13不能采集18号楼中用户代表的表计电压,则确定故障设备为低压出线开关489。In step S117, if both the concentrator 12 and the concentrator 13 are in abnormal working states, it is determined that the faulty device is the low-voltage outlet switch 489 . Specifically, if it is judged that the concentrator 12 cannot collect the meter voltage of the user representatives in Building No. 16 to No. 17, and the concentrator 13 cannot collect the meter voltage of the user representatives in Building No. 18, then it is determined that the faulty equipment is a low-voltage outgoing line Switch 489.

在本发明实施例中,当接收到某个集中器的掉线信号时,首先查找到为该集中器供电的低压出线开关,其次反向查找到上述低压出线开关所带的其它集中器,然后判断其它集中器的工作状态是否正常,当其它集中器的工作状态均正常时,则确定故障设备为上述产生掉线信号的集中器;当其它集中器的工作状态均异常(即,全部掉线)时,则确定故障设备为上述低压出线开关。此种场景下,可以100%的判断出集中器是否为故障设备。In the embodiment of the present invention, when receiving the offline signal of a certain concentrator, first find the low-voltage outgoing line switch that supplies power to the concentrator, and secondly find other concentrators that are carried by the above-mentioned low-voltage outgoing line switch in reverse, and then Judging whether the working status of other concentrators is normal, when the working status of other concentrators is all normal, then determine that the faulty equipment is the above-mentioned concentrator that generates the offline signal; when the working status of other concentrators is all abnormal (that is, all offline ), it is determined that the faulty device is the above-mentioned low-voltage outlet switch. In this scenario, it can be determined 100% whether the concentrator is a faulty device.

场景二:一个低压出线开关给一个集中器供电,即,一个低压出线开关带一个集中器。Scenario 2: A low-voltage outlet switch supplies power to a concentrator, that is, a low-voltage outlet switch with a concentrator.

对于上述场景二,又分为一次电网与通信网所带终端用户存在交叉和一次电网与通信网所带终端用户不存在交叉两种模式,接下来针对上述两种模式分别介绍。For the second scenario above, it is further divided into two modes: the primary grid and the end users of the communication network have crossover and the primary grid and the end users of the communication network have no crossover. Next, we will introduce the above two modes respectively.

模式一:一次电网与通信网所带终端用户存在交叉。Mode 1: There is an intersection between the primary power grid and the end users carried by the communication network.

可选地,在本发明实施例中,根据多层拓扑模型和状态信息对集中器进行分析,以判断配电网中集中器是否为故障设备或非集中器的设备是否为故障设备包括步骤S9至步骤S13,具体如下:Optionally, in the embodiment of the present invention, analyzing the concentrator according to the multi-layer topology model and status information to determine whether the concentrator in the distribution network is a faulty device or whether a device other than the concentrator is a faulty device includes step S9 Go to step S13, specifically as follows:

步骤S9,在接收到第三集中器的掉线信号、以及未接收到第三集中器对应的第二光网络单元的掉线信号的情况下,获取第一目标用户的表计电压,其中,第一目标用户的表计电压通过第四集中器采集,第二目标用户的表计电压通过第三集中器采集,第三集中器、第一目标用户和第二目标用户均由第二低压出线开关供电。Step S9, when the disconnection signal of the third concentrator is received and the disconnection signal of the second optical network unit corresponding to the third concentrator is not received, the meter voltage of the first target user is obtained, wherein, The meter voltage of the first target user is collected through the fourth concentrator, the meter voltage of the second target user is collected through the third concentrator, and the third concentrator, the first target user and the second target user are all outgoing from the second low voltage switch power supply.

第一目标用户为第二低压出线开关所供电的多个用户中的用户代表,且位于第四集中器的采集范围内。同样的,第二目标用户也为第二低压出线开关所供电的多个用户中的用户代表,且位于第三集中器的采集范围内。The first target user is a user representative among the multiple users powered by the second low-voltage outlet switch, and is located within the collection range of the fourth concentrator. Similarly, the second target user is also a user representative among the multiple users powered by the second low-voltage outlet switch, and is located within the collection range of the third concentrator.

步骤S11,判断第一目标用户的表计电压是否正常。Step S11, judging whether the meter voltage of the first target user is normal.

步骤S13,在判断出第一目标用户的表计电压正常的情况下,确定故障设备为第三集中器。Step S13, if it is determined that the meter voltage of the first target user is normal, determine that the faulty device is the third concentrator.

当故障设备为第三集中器时,输出的故障结果为集中器故障。When the faulty device is the third concentrator, the output fault result is concentrator fault.

需要说明的是,第三集中器和第四集中器由不同的低压出线开关供电。It should be noted that the third concentrator and the fourth concentrator are powered by different low-voltage outlet switches.

进一步可选地,在本发明实施例中,在判断第一目标用户的表计电压是否正常之后,根据多层拓扑模型和状态信息对集中器进行分析,以判断配电网中集中器是否为故障设备或非集中器的设备是否为故障设备还包括步骤S15至步骤S21,具体如下:Further optionally, in the embodiment of the present invention, after judging whether the meter voltage of the first target user is normal, the concentrator is analyzed according to the multi-layer topology model and status information to judge whether the concentrator in the distribution network is Whether the faulty device or the non-concentrator device is a faulty device also includes step S15 to step S21, specifically as follows:

步骤S15,在判断出第一目标用户的表计电压异常的情况下,则获取预设数量的第三目标用户的表计电压,其中,第三目标用户的表计电压通过第四集中器采集,第三目标用户也由第二低压出线开关供电,预设数量大于或等于一。Step S15, if it is judged that the meter voltage of the first target user is abnormal, then obtain a preset number of meter voltages of the third target user, wherein the meter voltage of the third target user is collected through the fourth concentrator , the third target user is also powered by the second low-voltage outlet switch, and the preset number is greater than or equal to one.

具体地,预设数量可以根据需求设置,例如,预设数量为2。第三目标用户为第二低压出线开关所供电的多个用户中非用户代表的用户,是随机选取的,且位于第四集中器的采集范围内。第一目标用户、第二目标用户和第三目标用户为互不相同的用户。Specifically, the preset number can be set according to requirements, for example, the preset number is 2. The third target user is a non-user representative user among the multiple users powered by the second low-voltage outlet switch, which is randomly selected and located within the collection range of the fourth concentrator. The first target user, the second target user and the third target user are different users.

步骤S17,判断第三目标用户的表计电压是否正常。具体地,判断预设数量的第三目标用户的表计电压是否正常。Step S17, judging whether the meter voltage of the third target user is normal. Specifically, it is judged whether the meter voltages of the preset number of third target users are normal.

步骤S19,在判断出第三目标用户的表计电压正常的情况下,确定故障设备为第三集中器。具体地,若判断出预设数量的第三目标用户的表计电压都正常,则确定故障设备为第三集中器。Step S19, if it is judged that the meter voltage of the third target user is normal, determine that the faulty device is the third concentrator. Specifically, if it is determined that the meter voltages of the preset number of third target users are all normal, then it is determined that the faulty device is the third concentrator.

步骤S21,在判断出第三目标用户的表计电压异常的情况下,确定故障设备为第二低压出线开关。具体地,若判断出预设数量的第三目标用户的表计电压都异常,则确定故障设备为第二低压出线开关。Step S21, if it is determined that the meter voltage of the third target user is abnormal, determine that the faulty device is the second low-voltage outlet switch. Specifically, if it is determined that the meter voltages of the preset number of third target users are all abnormal, then it is determined that the faulty device is the second low-voltage outlet switch.

当故障设备为第二低压出线开关时,输出的故障结果为低压出线开关跳闸。When the faulty device is the second low-voltage outgoing line switch, the output fault result is that the low-voltage outgoing line switch trips.

图3是根据本发明实施例的另一种可选的用于配电网的监控方法中一次电网与通信网存在交叉的示意图。如图3所示,在本发明实施例中,包括两个配电室,分别是A配电室和B配电室。Fig. 3 is a schematic diagram of another optional method for monitoring a distribution network according to an embodiment of the present invention, in which a primary grid and a communication network cross. As shown in FIG. 3 , in the embodiment of the present invention, two power distribution rooms are included, namely A power distribution room and B power distribution room.

针对A配电室的配置情况说明如下:A配电室设置有两个配电变压器(分别是配电变压器10-1和配电变压器10-2)、配变低压主开关401、配变低压主开关402、载波局端1、载波局端2、一个光网络单元(即,ONU1)以及包括低压出线开关411和低压出线开关421在内的多个低压出线开关。具体地,配电变压器10-1与配变低压主开关401连接,配变低压主开关401下设置有包括低压出线开关411在内的多个低压出线开关。ONU1通过网线分别与载波局端1和载波局端2相连接,还通过ONU电源线与配变低压主开关402连接,载波局端1通过电源线与配变低压主开关401连接,载波局端2通过电源线与配变低压主开关402连接。配电变压器10-2也与配变低压主开关402连接,配变低压主开关402下设置有包括低压出线开关421在内的多个低压出线开关。The configuration of power distribution room A is explained as follows: power distribution room A is equipped with two distribution transformers (distribution transformer 10-1 and distribution transformer 10-2), distribution transformer low-voltage main switch 401, distribution transformer low-voltage Main switch 402 , carrier central office 1 , carrier central office 2 , an optical network unit (ie, ONU1 ), and multiple low-voltage outgoing line switches including low-voltage outgoing line switch 411 and low-voltage outgoing line switch 421 . Specifically, the distribution transformer 10 - 1 is connected to the distribution transformer low-voltage main switch 401 , and a plurality of low-voltage outlet switches including a low-voltage outlet switch 411 are arranged under the distribution transformer low-voltage main switch 401 . The ONU1 is connected to the carrier local terminal 1 and the carrier local terminal 2 respectively through the network cable, and is also connected to the distribution transformer low-voltage main switch 402 through the ONU power line, the carrier local terminal 1 is connected to the distribution transformer low-voltage main switch 401 through the power line, and the carrier local terminal 2. Connect to the low-voltage main switch 402 of the distribution transformer through the power line. The distribution transformer 10-2 is also connected to the low-voltage main switch 402 of the distribution transformer, and a plurality of low-voltage outgoing switches including the low-voltage outgoing switch 421 are arranged under the low-voltage main switch 402 of the distribution transformer.

针对B配电室的配置情况说明如下:B配电室内设置有配电变压器10-3、配变低压主开关403、载波局端3、一个光网络单元(即,ONU2)、以及包括低压出线开关431在内的多个低压出线开关。具体地,配电变压器10-3与配变低压主开关403连接,配变低压主开关403下设置有包括低压出线开关431在内的多个低压出线开关。ONU2通过网线与载波局端3相连接,还通过ONU电源线与配变低压主开关403连接,载波局端3通过电源线与配变低压主开关403连接。The configuration of power distribution room B is described as follows: distribution transformer 10-3, low-voltage main switch 403 of distribution transformer, local carrier terminal 3, an optical network unit (that is, ONU2), and low-voltage outgoing line are installed in power distribution room B. A plurality of low-voltage outlet switches including switch 431. Specifically, the distribution transformer 10-3 is connected to the low-voltage main switch 403 of the distribution transformer, and a plurality of low-voltage outgoing line switches including the low-voltage outgoing line switch 431 are arranged under the low-voltage main switch 403 of the distribution transformer. The ONU2 is connected to the carrier local end 3 through a network cable, and is also connected to the low-voltage main switch 403 of the distribution transformer through the ONU power line, and the carrier local end 3 is connected to the low-voltage main switch 403 of the distribution transformer through a power line.

集中器A用于采集A楼中除标有斜线部分之外的楼层中用户代表(即,A楼中由下至上数第1层至第4层、以及第6层的用户中用户代表)的表计电压。此外,集中器A通过集中器电源线与为其供电的低压出线开关421连接。集中器B用于采集B楼的全部用户中用户代表的电压表计,以及A楼中标有斜线部分的用户中用户代表的电压表计,但是其的供电电源为B配电室内的低压出线开关431,集中器B通过集中器电源线与低压出线开关431连接。Concentrator A is used to collect user representatives on floors in building A except for the parts marked with slashes (that is, the user representatives in building A from the first floor to the fourth floor and the sixth floor from bottom to top) meter voltage. In addition, the concentrator A is connected to the low-voltage outlet switch 421 for power supply through the concentrator power line. Concentrator B is used to collect the voltmeters of all users in Building B, and the voltmeters of users in Building A marked with oblique lines, but its power supply is the low-voltage outgoing line in B distribution room The switch 431, the concentrator B is connected to the low-voltage outlet switch 431 through the concentrator power line.

图3中411路PJ01、421路PJ01和431路PJ01均代表接入点。In Figure 3, PJ01 411, PJ01 421 and PJ01 431 all represent access points.

参见图3,在本发明实施例中,根据所述多层拓扑模型和状态信息对所述集中器进行分析,以判断所述配电网中所述集中器是否为所述故障设备或非所述集中器的设备是否为所述故障设备如下步骤S119至步骤S131:Referring to Fig. 3, in the embodiment of the present invention, the concentrator is analyzed according to the multi-layer topology model and state information to determine whether the concentrator in the distribution network is the faulty device or not. Whether the device of the concentrator is the faulty device is as follows from step S119 to step S131:

步骤S119,当接收到集中器A的掉线信号,同时未接收到A配电室内ONU1的掉线信号时,查看集中器B所带(采集)的A楼中标有斜线部分的用户中用户代表(即,第一目标用户)的表计电压。该步骤同步骤S9,在此不再重复说明。Step S119, when the offline signal of concentrator A is received and the offline signal of ONU1 in the power distribution room of A is not received at the same time, check the users in the users marked with oblique lines in building A carried (collected) by concentrator B The meter voltage of the representative (ie, the first target user). This step is the same as step S9, and will not be repeated here.

需要说明的是,步骤S119中A配电室内集中器A相当于上述步骤S9中第三集中器,A配电室内ONU1相当于上述步骤S9中的第二光网络单元,步骤S119中用户代表的表计电压相当于上述步骤S9中的第一目标用户的表计电压。图3中A楼由下至上数第1层至第4层、以及第6层中的用户代表相当于上述步骤S9中第二目标用户。需要说明的是,在本发明实施例中,低压出线开关421为A楼中用户和集中器A供电,即,低压出线开关421为上述步骤S9中第二低压出线开关。It should be noted that the concentrator A in the power distribution room A in step S119 is equivalent to the third concentrator in the above step S9, the ONU1 in the power distribution room A is equivalent to the second optical network unit in the above step S9, and the user representative in step S119 The meter voltage corresponds to the meter voltage of the first target user in the above-mentioned step S9. In FIG. 3 , the user representatives on the 1st floor to the 4th floor, and the 6th floor from bottom to top in building A in FIG. 3 correspond to the second target user in the above step S9. It should be noted that, in the embodiment of the present invention, the low-voltage outgoing line switch 421 supplies power to users and the concentrator A in building A, that is, the low-voltage outgoing line switch 421 is the second low-voltage outgoing line switch in the above step S9.

步骤S121,判断上述用户代表的表计电压是否正常。该步骤相当于上述步骤S11,在此不再重复说明。Step S121, judging whether the meter voltage of the user representative is normal. This step is equivalent to the above-mentioned step S11, and will not be repeated here.

其中,如果正常,则执行步骤S123;如果异常,则执行步骤S125。Wherein, if normal, execute step S123; if abnormal, execute step S125.

步骤S123,确定故障设备为集中器A。该步骤同步骤S13,在此不再重复说明In step S123, it is determined that the faulty device is the concentrator A. This step is the same as step S13, and will not be repeated here

步骤S125,再随机选取2个低频表计自动点招。具体地,在A楼中标有斜线部分的用户中随机选取2个除用户代表外的用户的表计电压,该步骤相当于上述步骤S15,在此不再重复说明。Step S125, and then randomly select 2 low-frequency meters to automatically tap. Specifically, randomly select the meter voltages of two users other than the user representative from the users marked with oblique lines in Building A. This step is equivalent to the above step S15, and will not be repeated here.

需要说明的是,步骤S125中2个相当于上述步骤S15中的预设数量,步骤S125中随机选取2个除用户代表外的用户的表计电压相当于上述步骤S15中获取预设数量的第三目标用户的表计电压。It should be noted that the two in step S125 are equivalent to the preset number in the above step S15, and the meter voltages of two randomly selected users other than the user representative in step S125 are equivalent to the first meter voltage of the preset number obtained in the above step S15. Three target user's meter voltage.

步骤S127,判断2个低频表计自动点招的返回值是否正常。该步骤相当于上述步骤S17,在此不再重复说明。Step S127, judging whether the return values of the automatic taps of the two low-frequency meters are normal. This step is equivalent to the above-mentioned step S17, and will not be repeated here.

其中,如果2个低频表计自动点招的返回值均正常,则执行步骤S129,如果2个低频表计自动点招的返回值均异常,则执行步骤S131。Wherein, if the return values of the two low-frequency meters are normal, execute step S129; if the return values of the two low-frequency meters are abnormal, execute step S131.

步骤S129,判断故障设备为集中器A。该步骤相当于上述步骤S19,在此不再重复说明。Step S129, judging that the faulty device is the concentrator A. This step is equivalent to the above-mentioned step S19, and will not be repeated here.

步骤S131,判断故障设备为低压出线开关421。该步骤相当于上述步骤S21,在此不再重复说明。Step S131 , judging that the faulty device is the low-voltage outlet switch 421 . This step is equivalent to the above-mentioned step S21, and will not be repeated here.

还需要说明的是,步骤S131中低压出线开关421即为上述步骤S19中第二低压出线开关。It should also be noted that the low-voltage outgoing line switch 421 in step S131 is the second low-voltage outgoing line switch in the above-mentioned step S19.

在本发明实施例中,通过上述步骤,可以100%的判断出集中器是否为故障设备(即,集中器是否故障)。In the embodiment of the present invention, through the above steps, it can be determined 100% whether the concentrator is a faulty device (that is, whether the concentrator is faulty).

模式二:一次电网与通信网所带终端用户不存在交叉。Mode 2: There is no intersection between the primary power grid and the end users carried by the communication network.

可选地,在本发明实施例中,根据所述多层拓扑模型和状态信息对所述集中器进行分析,以判断所述配电网中所述集中器是否为所述故障设备或非所述集中器的设备是否为所述故障设备包括步骤S23至步骤S27,具体如下:Optionally, in the embodiment of the present invention, the concentrator is analyzed according to the multi-layer topology model and status information to determine whether the concentrator in the distribution network is the faulty device or not. Whether the equipment of the concentrator is the faulty equipment comprises step S23 to step S27, specifically as follows:

步骤S23,在接收到第五集中器的掉线信号、以及未接收到第五集中器对应的第三光网络单元的掉线信号的情况下,判断第一预设时间内是否接收到第四目标用户的停电报修消息,其中,第四目标用户和第五集中器均由第三低压出线开关供电。Step S23, if the disconnection signal of the fifth concentrator is received and the disconnection signal of the third optical network unit corresponding to the fifth concentrator is not received, it is judged whether the fourth ONU is received within the first preset time. The power outage report message of the target user, wherein both the fourth target user and the fifth concentrator are powered by the third low-voltage outlet switch.

具体地,第一预设时间的时长可以根据需求设置,例如,10min。停电报修消息中包含第四目标用户的编号。第四目标用户为第三低压出线开关所供电的多个用户中的任意用户,且位于第五集中器的采集范围内。Specifically, the duration of the first preset time can be set according to requirements, for example, 10 minutes. The number of the fourth target user is included in the power outage report message. The fourth target user is any user among the multiple users powered by the third low-voltage outlet switch, and is located within the collection range of the fifth concentrator.

步骤S25,在判断出第一预设时间内接收到第四目标用户的停电报修消息的情况下,确定故障设备为第三低压出线开关。Step S25, if it is judged that a power outage report message from the fourth target user is received within the first preset time, determine that the faulty device is the third low-voltage outlet switch.

当故障设备为第三低压出线开关时,输出的故障结果为低压出线开关跳闸。When the faulty device is the third low-voltage outlet switch, the output fault result is tripping of the low-voltage outlet switch.

步骤S27,在判断出第一预设时间内未接收到第四目标用户的停电报修消息的情况下,确定故障设备为第三低压出线开关或者第五集中器。Step S27, if it is judged that no power outage report message from the fourth target user has been received within the first preset time, determine that the faulty device is the third low-voltage outlet switch or the fifth concentrator.

进一步可选地,在本发明实施例中,在确定故障设备为第三低压出线开关或者第五集中器之后,根据多层拓扑模型和状态信息对集中器进行分析,以判断配电网中集中器是否为故障设备或非集中器的设备是否为故障设备还包括步骤S29至步骤S31:Further optionally, in the embodiment of the present invention, after determining that the faulty device is the third low-voltage outlet switch or the fifth concentrator, the concentrator is analyzed according to the multi-layer topology model and status information to determine whether the concentrator in the distribution network Whether the device is a faulty device or whether the non-concentrator is a faulty device also includes step S29 to step S31:

步骤S29,判断第二预设时间内是否接收到第四目标用户的停电报修消息,其中,第二预设时间的起始时间为第一预设时间的结束时间。Step S29 , judging whether a power outage report message from the fourth target user is received within a second preset time, wherein the start time of the second preset time is the end time of the first preset time.

具体地,第二预设时间时长同样也可以根据用户需求设置,可以与第一预设时间的时长相同,也可以与第一预设时间的时长不同,例如:10min。Specifically, the duration of the second preset time can also be set according to user requirements, and can be the same as or different from the duration of the first preset time, for example, 10 minutes.

步骤S31,在判断出第二预设时间内接收到第四目标用户的停电报修消息的情况下,确定故障设备为第三低压出线开关。Step S31 , if it is determined that a power outage report message from the fourth target user is received within the second preset time, determine that the faulty device is the third low-voltage outlet switch.

图4是根据本发明实施例的另一种可选的用于配电网的监控方法中一次电网与通信网不存在交叉的示意图。如图4所示,在本发明实施例中,只包括一个配电室,即A配电室。Fig. 4 is a schematic diagram of another optional method for monitoring a distribution network according to an embodiment of the present invention, in which there is no intersection between the primary power grid and the communication network. As shown in FIG. 4 , in the embodiment of the present invention, only one power distribution room is included, that is, A power distribution room.

图4中A配电室的配置情况与图3中A配电室的配置情况相同,具体可以参见上述实施例中对A配电室的介绍说明,在此不再赘述。The configuration of the power distribution room A in FIG. 4 is the same as that of the power distribution room A in FIG. 3 . For details, please refer to the description of the power distribution room A in the above embodiments, and details will not be repeated here.

需要说明的是,在本发明实施例中,集中器A用于采集A楼1至3层中用户代表的表计电压,该集中器A由低压出线开关411供电,通过集中器电源线与低压出线开关411连接。此外,低压出线开关411还对A楼1至3层的用户供电。图4中411路PJ01和421路PJ01均代表接入点。It should be noted that, in the embodiment of the present invention, the concentrator A is used to collect the meter voltage of the user representatives in the 1st to 3rd floors of building A. Outgoing switch 411 is connected. In addition, the low-voltage outlet switch 411 also supplies power to users on floors 1 to 3 of Building A. In Figure 4, PJ01 of 411 and PJ01 of 421 represent access points.

参见图4,在本发明实施例中,根据多层拓扑模型和状态信息对集中器进行分析,以判断配电网中集中器是否为故障设备或非集中器的设备是否为故障设备包括如下步骤S133至步骤S143:Referring to Fig. 4, in the embodiment of the present invention, the concentrator is analyzed according to the multi-layer topology model and state information to determine whether the concentrator in the distribution network is a faulty device or whether the non-concentrator is a faulty device, including the following steps S133 to step S143:

步骤S133,当接收到集中器A的掉线信号,同时未接收到A配电室内的ONU1掉线信号时,获取为集中器A供电的低压出线开关411。Step S133 , when the offline signal of the concentrator A is received and the offline signal of the ONU1 in the power distribution room of A is not received, the low-voltage outlet switch 411 for supplying power to the concentrator A is obtained.

其中,步骤S133中的集中器A相当于上述步骤S23中的第五集中器,步骤S133中A配电室内的ONU1相当于上述步骤S23中的第三光网络单元,步骤S133中的低压出线开关411相当于上述步骤S23中第三低压出线开关。Wherein, the concentrator A in step S133 is equivalent to the fifth concentrator in the above-mentioned step S23, the ONU1 in the power distribution room of A in the step S133 is equivalent to the third optical network unit in the above-mentioned step S23, and the low-voltage outlet switch in the step S133 411 is equivalent to the third low-voltage outlet switch in the above step S23.

步骤S135,查看10分钟内是否收到低压出线开关411所带(供电的)用户(即,A楼1至3层的用户)的停电报修消息,其中,停电报修消息中带有用户编号。该步骤相当于上述步骤S23中判断第一预设时间内是否接收到第四目标用户的停电报修消息,再此不再重复说明。Step S135, check whether received within 10 minutes the low-voltage outgoing line switch 411 (power supply) users (that is, users on the 1st to 3rd floors of Building A) received a power outage repair message, wherein the power outage repair message contains the user number. This step is equivalent to judging in the above-mentioned step S23 whether a power outage report message from the fourth target user has been received within the first preset time, and the description will not be repeated here.

需要说明的是,步骤S135中的10分钟相当于上述步骤S23中的第一预设时间,步骤S135中的低压出线开关411所带用户相当于上述步骤S23中的第四目标用户。It should be noted that the 10 minutes in step S135 is equivalent to the first preset time in step S23 above, and the user brought by the low-voltage outlet switch 411 in step S135 is equivalent to the fourth target user in step S23 above.

其中,如果收到停电报修消息,则执行步骤S137;如果未收到停电报修消息,则执行步骤S139。Wherein, if a power outage report message is received, step S137 is performed; if a power outage report message is not received, step S139 is performed.

步骤S137,确定故障设备为低压出线开关411。该步骤相当于上述步骤S25,在此不再重复说明。In step S137, it is determined that the faulty device is the low-voltage outlet switch 411. This step is equivalent to the above-mentioned step S25, and will not be repeated here.

步骤S139,确定故障设备为集中器A或低压出线开关411。该步骤相当于上述步骤S27,在此不再重复说明。In step S139, it is determined that the faulty device is the concentrator A or the low-voltage outlet switch 411. This step is equivalent to the above step S27, and will not be repeated here.

步骤S141,如已确定故障设备为集中器A或低压出线开关411,则再次判断10分钟内是否接收到低压出线开关411所带用户(即,A楼中1至3层的用户)的停电报修消息。该步骤相当于上述步骤S29,在此不再重复说明。Step S141, if it has been determined that the faulty device is the concentrator A or the low-voltage outgoing line switch 411, then judge again whether a power outage report has been received from the user (that is, the users on the 1st to 3rd floors of Building A) brought by the low-voltage outgoing line switch 411 within 10 minutes information. This step is equivalent to the above-mentioned step S29, and will not be repeated here.

其中,如果收到用户的停电报修消息,执行步骤S143。Wherein, if a power outage report message from the user is received, step S143 is executed.

步骤S143,明确故障设备为低压出线开关411。该步骤相当于上述步骤S31,在此不再重复说明。In step S143 , it is determined that the faulty device is the low-voltage outlet switch 411 . This step is equivalent to the above-mentioned step S31, and will not be repeated here.

可选地,在本发明实施例中,设备包括光网络单元,根据多层拓扑模型和状态信息对设备进行分析,以判断配电网中是否存在故障设备包括:根据多层拓扑模型和状态信息对光网络单元进行分析,以判断配电网中光网络单元是否为故障设备或非光网络单元的设备是否为故障设备。Optionally, in this embodiment of the present invention, the device includes an optical network unit, and analyzing the device according to the multi-layer topology model and state information to determine whether there is a faulty device in the distribution network includes: according to the multi-layer topology model and state information The optical network unit is analyzed to judge whether the optical network unit in the distribution network is a faulty device or whether the equipment other than the optical network unit is a faulty device.

对于对光网络单元进行分析的情形,配电网的状态信息包括光拓扑数据、ONU台账数据、ONU运行数据、通信检修计划和通信光缆故障。其中,光拓扑数据中包含OLT拓扑数据和ONU拓扑数据;ONU台账数据中包含ONU网口对应配变和ONU供电电源数据(对应到配变);ONU运行数据中包含ONU实时掉线信号、以及ONU与局端设备连接端口掉线信号数据;通信检修计划中包括通信检修的起始时间、结束时间以及受到影响的ONU;通信光缆故障中包含光缆故障和故障简报信息;故障简报信息中包含开始时间、恢复时间以及ONU影响情况。对于该情形,根据多层拓扑模型和状态信息对光网络单元进行分析,以判断配电网中光网络单元是否为故障设备或非光网络单元的设备是否为故障设备可以分为以下两种场景:For the analysis of the optical network unit, the state information of the distribution network includes optical topology data, ONU ledger data, ONU operation data, communication maintenance plan and communication cable failure. Among them, optical topology data includes OLT topology data and ONU topology data; ONU ledger data includes ONU network port corresponding distribution transformer and ONU power supply data (corresponding to distribution transformer); ONU operation data includes ONU real-time offline signal, And the disconnected signal data of the connection port between the ONU and the central office equipment; the communication maintenance plan includes the start time, end time and affected ONU of the communication maintenance; the communication optical cable fault includes the cable fault and fault briefing information; the fault briefing information includes Start time, recovery time, and ONU impact. For this situation, the optical network unit is analyzed according to the multi-layer topology model and state information to determine whether the optical network unit in the distribution network is a faulty device or whether the equipment other than the optical network unit is a faulty device can be divided into the following two scenarios :

场景三:有配电自动化。配电自动化(DA)是一项集计算机技术、数据传输、控制技术、现代化设备及管理于一体的综合信息管理系统。Scenario 3: There is power distribution automation. Distribution Automation (DA) is a comprehensive information management system integrating computer technology, data transmission, control technology, modern equipment and management.

可选地,在本发明实施例中,根据多层拓扑模型和状态信息对光网络单元进行分析,以判断配电网中光网络单元是否为故障设备或非光网络单元的设备是否为故障设备包括步骤S33至步骤S37,具体如下:Optionally, in the embodiment of the present invention, the optical network unit is analyzed according to the multi-layer topology model and state information to determine whether the optical network unit in the distribution network is a faulty device or whether a device other than an optical network unit is a faulty device Including step S33 to step S37, specifically as follows:

步骤S33,接收到第四光网络单元的掉线信号。Step S33, receiving a disconnection signal from the fourth ONU.

步骤S35,获取与目标配电变压器对应的10KV进线开关的状态,其中,目标配电变压器为与第四光网络单元对应的配电变压器。Step S35, acquiring the state of the 10KV incoming line switch corresponding to the target distribution transformer, wherein the target distribution transformer is the distribution transformer corresponding to the fourth optical network unit.

步骤S37,根据10KV进线开关的状态,判断故障设备是否为第四光网络单元。Step S37, according to the state of the 10KV incoming line switch, it is judged whether the faulty device is the fourth optical network unit.

具体地,步骤S37中根据10KV进线开关的状态,判断故障设备是否为第四光网络单元包括如下步骤S371:Specifically, in step S37, according to the state of the 10KV incoming line switch, judging whether the faulty device is the fourth optical network unit includes the following steps S371:

步骤S371,若10KV进线开关满足预设条件,则确定故障设备为第四光网络单元,其中,预设条件为闭合、存在电流、且有功值。若10KV进线开关不满足预设条件,则确定10KV进线开关所对应的配电变压器的供电范围或区域停电。Step S371, if the 10KV incoming switch satisfies preset conditions, then determine that the faulty device is the fourth optical network unit, wherein the preset conditions are closed, current, and active power. If the 10KV incoming line switch does not meet the preset conditions, it is determined that the power supply range or area of the distribution transformer corresponding to the 10KV incoming line switch is out of power.

当故障设备为第四光网络单元时,输出的故障结果为光网络单元故障。When the faulty device is the fourth optical network unit, the output fault result is that the optical network unit is faulty.

场景四:无配电自动化。Scenario 4: No power distribution automation.

对于上述场景四,又分为一次电网与通信网所带终端用户存在交叉和一次电网与通信网所带终端用户不存在交叉两种模式,接下来针对上述两种模式分别介绍。For the above scenario 4, it is further divided into two modes: the primary grid and the end users of the communication network have crossover and the primary power grid and the end users of the communication network do not have crossover. Next, we will introduce the above two modes respectively.

模式三:一次电网与通信网所带终端用户存在交叉。即,ONU所带全部集中器采集的用户,存在非本ONU所在配电室(柱变)电源供电(即存在间谍表)。Mode 3: There is an intersection between the end users of the primary power grid and the communication network. That is, the users collected by all the concentrators carried by the ONU are powered by a power supply other than the power distribution room (column transformer) where the ONU is located (that is, there is a spy meter).

可选地,在本发明实施例中,根据所述多层拓扑模型和状态信息对所述光网络单元进行分析,以判断所述配电网中所述光网络单元是否为所述故障设备或非所述光网络单元的设备是否为所述故障设备包括步骤S41至步骤S51,具体如下:Optionally, in this embodiment of the present invention, the optical network unit is analyzed according to the multi-layer topology model and status information to determine whether the optical network unit in the distribution network is the faulty device or Whether the device other than the optical network unit is the faulty device includes step S41 to step S51, specifically as follows:

步骤S41,在接收到第五光网络单元的掉线信号的情况下,获取通信检修计划和通信光缆故障信息,其中,第五光网络单元为与第六集中器具有关联关系的光网络单元。Step S41 , in the case of receiving the disconnection signal of the fifth ONU, where the fifth ONU is an ONU associated with the sixth concentrator, acquiring a communication maintenance plan and communication cable failure information.

步骤S43,根据通信检修计划和通信光缆故障信息判断第五光网络单元是否已存在通信故障。Step S43, judging whether there is a communication failure in the fifth ONU according to the communication maintenance plan and the failure information of the communication optical cable.

步骤S45,在根据通信检修计划和通信光缆故障信息判断出第五光网络单元不存在通信故障的情况下,获取第五目标用户的表计电压,其中,第五目标用户的表计电压通过第七集中器所采集,第六集中器用户采集第六目标用户的表计电压,第五目标用户和第六目标用户均由第一配变低压主开关供电。Step S45, if it is judged that there is no communication failure in the fifth optical network unit according to the communication maintenance plan and the communication cable failure information, obtain the meter voltage of the fifth target user, wherein the meter voltage of the fifth target user passes through the first The seventh concentrator collects the meter voltage of the sixth target user, and the sixth concentrator user collects the meter voltage of the sixth target user. Both the fifth target user and the sixth target user are powered by the low-voltage main switch of the first distribution transformer.

第五目标用户为第一配变低压主开关所供电的多个用户中的用户代表,且位于第七集中器的采集范围内。同样的,第六目标用户也为第一配变低压主开关所供电的多个用户中的用户代表,且第六目标用户位于第六集中器的采集范围内。The fifth target user is a user representative among the multiple users powered by the low-voltage main switch of the first distribution transformer, and is located within the collection range of the seventh concentrator. Similarly, the sixth target user is also a user representative among the multiple users powered by the low-voltage main switch of the first distribution transformer, and the sixth target user is located within the collection range of the sixth concentrator.

步骤S47,判断第五目标用户的目标表计电压是否正常。Step S47, judging whether the target meter voltage of the fifth target user is normal.

步骤S49,在判断出第五目标用户的目标表计电压正常的情况下,确定故障设备为第五光网络单元。Step S49, if it is determined that the target meter voltage of the fifth target user is normal, determine that the faulty device is the fifth ONU.

当故障设备为第五光网络单元时,输出的故障结果为光网络单元故障。When the faulty device is the fifth ONU, the output fault result is that the ONU is faulty.

步骤S51,在判断出第五目标用户的表计电压异常的情况下,确定故障设备为第一配变低压主开关。Step S51, when it is determined that the meter voltage of the fifth target user is abnormal, determine that the faulty device is the low-voltage main switch of the first distribution transformer.

当故障设备为第一配变低压主开关时,输出的故障结果为配变低压主开关跳闸。When the faulty device is the low-voltage main switch of the first distribution transformer, the output fault result is that the low-voltage main switch of the distribution transformer trips.

需要说明的是,第六集中器和第七集中器由不同的配变低压主开关供电。It should be noted that the sixth concentrator and the seventh concentrator are powered by different low-voltage main switches of distribution transformers.

对于上述模式三的示意图可以参见图3。具体地,对本实施例而言,图3中A配电室内的ONU1相当于第五光网络单元;图3中集中器A相当于第六集中器;图3中集中器B相当于第七集中器;图3中配变低压主开关402相当于第一配变低压主开关;第六集中器采集图3中A楼除斜线部分外的楼层中用户代表(即,第六目标用户)的表计电压;第七集中器采集图3中A楼斜线部分的楼层中用户代表(即,第五目标用户)的表计电压,以及B楼中用户代表的表计电压。Refer to FIG. 3 for the schematic diagram of the third mode above. Specifically, for this embodiment, the ONU1 in the power distribution room A in FIG. 3 is equivalent to the fifth optical network unit; the concentrator A in FIG. 3 is equivalent to the sixth concentrator; the concentrator B in FIG. 3 is equivalent to the seventh concentrator distribution transformer low-voltage main switch 402 in Figure 3 is equivalent to the first distribution transformer low-voltage main switch; the sixth concentrator collects user representatives (that is, the sixth target user) in the floor of A building in Figure 3 except the hatched part Meter voltage: the seventh concentrator collects the meter voltage of the user representative (ie, the fifth target user) on the floor of the oblique line in Building A in FIG. 3 , and the meter voltage of the user representative in Building B.

在本发明实施例中,通过上述步骤,可以100%的判断出光网络单元是否为故障设备(即,光网络单位是否故障)。In the embodiment of the present invention, through the above steps, it can be determined 100% whether the ONU is a faulty device (that is, whether the ONU is faulty).

模式四:一次电网与通信网所带终端用户不存在交叉。即,即:ONU所带集中器采集的全部表计电压均来该ONU所在的配电室(柱变)。Mode 4: There is no intersection between the primary power grid and the end users carried by the communication network. That is, all the meter voltage collected by the concentrator attached to the ONU comes from the power distribution room (column transformer) where the ONU is located.

可选地,在本发明实施例中,根据多层拓扑模型和状态信息对光网络单元进行分析,以判断配电网中光网络单元是否为故障设备或非光网络单元的设备是否为故障设备包括步骤S53至步骤S61,具体如下:Optionally, in the embodiment of the present invention, the optical network unit is analyzed according to the multi-layer topology model and state information to determine whether the optical network unit in the distribution network is a faulty device or whether a device other than an optical network unit is a faulty device Including step S53 to step S61, specifically as follows:

步骤S53,在接收到第六光网络单元的掉线信号的情况下,获取通信检修计划和通信光缆故障信息。Step S53, in the case of receiving the disconnection signal of the sixth optical network unit, acquiring the communication maintenance plan and the failure information of the communication optical cable.

步骤S55,根据通信检修计划和通信光缆故障信息判断第六光网络单元是否已存在通信故障。Step S55, judging whether the sixth ONU has a communication failure according to the communication maintenance plan and the failure information of the communication optical cable.

步骤S57,在根据通信检修计划和通信光缆故障信息判断出第六光网络单元不存在通信故障的情况下,判断第三预设时间内是否接收到第七目标用户的停电报修消息,其中,第七目标用户与第六光网络单元均由第二配变低压主开关供电。Step S57, when it is judged that there is no communication fault in the sixth optical network unit according to the communication maintenance plan and the fault information of the communication optical cable, it is judged whether a power outage report message from the seventh target user has been received within the third preset time, wherein, the first Both the seven target users and the sixth optical network unit are powered by the low-voltage main switch of the second distribution transformer.

具体地,第七目标用户为第二配变低压主开关所供电的多个用户中的任意用户。Specifically, the seventh target user is any user among the multiple users powered by the low-voltage main switch of the second distribution transformer.

步骤S59,在判断出第三预设时间内接收到第七目标用户的停电报修消息的情况下,确定故障设备为第二配变低压主开关。Step S59, when it is judged that the seventh target user's power outage report message is received within the third preset time, it is determined that the faulty device is the low-voltage main switch of the second distribution transformer.

当故障设备为第二配变低压主开关时,输出的故障结果为配变低压主开关跳闸。When the faulty device is the low-voltage main switch of the second distribution transformer, the output fault result is that the low-voltage main switch of the distribution transformer trips.

步骤S61,在判断出第三预设时间内未接收到第七目标用户的停电报修消息的情况下,确定故障设备为第二配变低压主开关或者第六光网络单元。Step S61, if it is judged that no power outage report message from the seventh target user has been received within the third preset time, determine that the faulty device is the second distribution transformer low-voltage main switch or the sixth optical network unit.

进一步可选地,在确定故障设备为第二配变低压主开关或者第六光网络单元之后,其中,根据多层拓扑模型和状态信息对光网络单元进行分析,以判断配电网中光网络单元是否为故障设备或非光网络单元的设备是否为故障设备还包括如下的步骤S63至步骤S65:Further optionally, after determining that the faulty device is the second distribution transformer low-voltage main switch or the sixth optical network unit, wherein the optical network unit is analyzed according to the multi-layer topology model and status information, to determine whether the optical network unit in the distribution network Whether the unit is a faulty device or whether a device other than an optical network unit is a faulty device also includes the following steps S63 to S65:

步骤S63,判断第四预设时间内是否接收到第七目标用户的停电报修消息,其中,第四预设时间的起始时间为第三预设时间的结束时间。Step S63 , judging whether a power outage report message from the seventh target user is received within a fourth preset time, wherein the start time of the fourth preset time is the end time of the third preset time.

步骤S65,在判断出第四预设时间内接收到停电报修消息的情况下,确定故障设备为第二配变低压主开关。Step S65, when it is judged that a power outage report message is received within the fourth preset time, determine that the faulty device is the low-voltage main switch of the second distribution transformer.

图5是根据本发明实施例的又一种可选的用于电网的监控方法中一次电网与通信网不存在交叉的示意图。如图5所示,在本发明实施例中,包括一个配电室,即A配电室。Fig. 5 is a schematic diagram of another optional monitoring method for a power grid according to an embodiment of the present invention, in which there is no intersection between the primary power grid and the communication network. As shown in FIG. 5 , in the embodiment of the present invention, one power distribution room is included, that is, A power distribution room.

图5中A配电室的配置情况与图3中A配电室的配置情况相同,具体可以参见上述实施例中对A配电室的介绍说明,在此不再赘述。集中器A和A楼1至6层中的用户均由低压出线开关421供电,集中器A通过集中器电源线与低压出线开关421连接。图5中421路PJ01代表接入点。The configuration of the power distribution room A in FIG. 5 is the same as that of the power distribution room A in FIG. 3 . For details, please refer to the description of the power distribution room A in the above embodiments, and details will not be repeated here. The concentrator A and the users on floors 1 to 6 of building A are powered by the low-voltage outgoing line switch 421, and the concentrator A is connected to the low-voltage outgoing line switch 421 through the concentrator power line. In Figure 5, the 421-way PJ01 represents the access point.

参见图5,在本发明实施例中,根据所述多层拓扑模型和状态信息对所述光网络单元进行分析,以判断所述配电网中所述光网络单元是否为所述故障设备或非所述光网络单元的设备是否为所述故障设备包括如下步骤S211至步骤S221:Referring to FIG. 5, in the embodiment of the present invention, the optical network unit is analyzed according to the multi-layer topology model and state information to determine whether the optical network unit in the distribution network is the faulty device or Whether the device other than the optical network unit is the faulty device includes the following steps S211 to S221:

步骤S211,当收到A配电室内ONU1的掉线信号时,获取通信检修计划和通信光缆故障信息,以判断上述ONU1是否以已经存在通信问题。Step S211, when receiving the disconnection signal of the ONU1 in the power distribution room A, obtain the communication maintenance plan and communication cable failure information to determine whether the above-mentioned ONU1 has a communication problem.

具体地,步骤S211中的A配电室内ONU1相当于上述步骤S53中的第六光网络单元。Specifically, the ONU1 in the power distribution room A in step S211 is equivalent to the sixth optical network unit in step S53.

步骤S213,若判断出ONU1不存在通信问题,则查看为该ONU1供电的配变低压主开关402,同时供电的用户(即,A楼中的用户)10分钟内是否有停电报修消息,其中,该停电报修消息中带有该用户的编号。Step S213, if it is judged that there is no communication problem in ONU1, then check the low-voltage main switch 402 of the distribution transformer that supplies power to the ONU1, and whether the user (that is, the user in Building A) who supplies power at the same time has a power outage report message within 10 minutes, wherein, The user's number is included in the power outage report message.

具体地,步骤S213中配变低压主开关402相当于上述步骤S57中第二配变低压主开关,步骤S213中配变低压主开关同时供电的用户即为上述步骤S57中第七目标用户,步骤S213中的10分钟即为上述步骤S57中的第三预设时间。Specifically, the low-voltage main switch 402 of the distribution transformer in step S213 is equivalent to the second low-voltage main switch of the distribution transformer in the above step S57, and the user who simultaneously supplies power to the low-voltage main switch of the distribution transformer in step S213 is the seventh target user in the above step S57. The 10 minutes in S213 is the third preset time in the above step S57.

步骤S215,如果10分钟内有用户报修,则确定故障设备为配变低压主开关402。Step S215, if there is a repair report from the user within 10 minutes, then it is determined that the faulty device is the low-voltage main switch 402 of the distribution transformer.

步骤S217,如果10分钟内没有用户报修,则确定故障设备为ONU1或配变低压主开关402。Step S217, if there is no repair report from the user within 10 minutes, then it is determined that the faulty device is ONU1 or the low-voltage main switch 402 of the distribution transformer.

步骤S219,如已确定故障设备为ONU1或配变低压主开关402,再次判断10分钟内是否出现用户(即,A楼中的用户)报修。其中,如果出现用户报修,执行步骤S221。Step S219, if it is determined that the faulty device is the ONU1 or the low-voltage main switch 402 of the distribution transformer, it is judged again whether there is a user (ie, a user in building A) calling for repair within 10 minutes. Wherein, if there is a user report for repair, step S221 is executed.

步骤S221,明确故障设备为配变低压主开关402。In step S221, it is determined that the faulty device is the low-voltage main switch 402 of the distribution transformer.

通过上述描述可知,在本发明实施例中,判断ONU是否故障需要依赖于用户报修的情况,能够准确判断出部分ONU是否故障,但无法做到100%判断。It can be seen from the above description that in the embodiment of the present invention, judging whether an ONU is faulty depends on the situation of the user reporting for repair, and it is possible to accurately judge whether some ONUs are faulty, but it is impossible to make a 100% judgment.

为了提高对ONU是否故障判断的准确性,可选地,在本发明实施例中,设备还包括辅助电源,辅助电源用于在第七光网络单元的主电源断电时,在第一预设时间段内向第七光网络单元供电。具体地,辅助电源可以为电池或者不间断电源(简称,UPS)。In order to improve the accuracy of judging whether the ONU is faulty, optionally, in the embodiment of the present invention, the device further includes an auxiliary power supply, which is used to switch the first preset Supply power to the seventh optical network unit within the time period. Specifically, the auxiliary power supply may be a battery or an uninterruptible power supply (UPS for short).

其中,根据多层拓扑模型和状态信息对光网络单元进行分析,以判断配电网中光网络单元是否为故障设备或非光网络单元的设备是否为故障设备包括步骤S67至步骤S71:Wherein, the optical network unit is analyzed according to the multi-layer topology model and state information to determine whether the optical network unit in the distribution network is a faulty device or whether a device other than an optical network unit is a faulty device, including steps S67 to S71:

步骤S67,在接收到第七光网络单元的掉线信号的情况下,判断接收到掉线信号之前的第一预设时间段内是否接收到第七光网络单元的网口丢失信号,其中,网口丢失信号与向第七光网络单元供电的配电变压器对应。Step S67, in the case of receiving the disconnection signal of the seventh optical network unit, judge whether the network port loss signal of the seventh optical network unit is received within the first preset time period before receiving the disconnection signal, wherein, The lost signal of the network port corresponds to the distribution transformer supplying power to the seventh optical network unit.

具体地,由于上述辅助电源可以在第七光网络单元的主电源断电时,继续对第七光网络单元供电1至5分钟,第一预设时间段可以为1至5分钟。Specifically, since the auxiliary power supply may continue to supply power to the seventh ONU for 1 to 5 minutes when the main power supply of the seventh ONU is powered off, the first preset time period may be 1 to 5 minutes.

步骤S69,在判断出接收到网口丢失信号的情况下,确定故障设备为向第七光网络单元供电的配电变压器。Step S69, if it is judged that the network port loss signal is received, it is determined that the faulty device is a distribution transformer supplying power to the seventh optical network unit.

当故障设备为配电变压器时,输出的故障结果为配电变压器故障。When the faulty device is a distribution transformer, the output fault result is a distribution transformer fault.

步骤S71,在判断出未接收到网口丢失信号的情况下,确定故障设备为第七光网络单元。Step S71, if it is judged that the network port loss signal is not received, determine that the faulty device is the seventh optical network unit.

在本发明实施例中,通过设置辅助电源,能够100%的判断出光网络单元是否故障。In the embodiment of the present invention, by setting the auxiliary power supply, it can be determined 100% whether the optical network unit is faulty.

为了提高对ONU是否故障判断的准确性,可选地,在本发明实施例中,设备还包括辅助电源,辅助电源用于在第八光网络单元的主电源断电时,在第二预设时间段内向第七光网络单元供电。具体地,辅助电源可以为电池或者不间断电源(简称,UPS)。In order to improve the accuracy of judging whether the ONU is faulty, optionally, in the embodiment of the present invention, the device further includes an auxiliary power supply, and the auxiliary power supply is used when the main power supply of the eighth optical network unit Supply power to the seventh optical network unit within the time period. Specifically, the auxiliary power supply may be a battery or an uninterruptible power supply (UPS for short).

其中,根据多层拓扑模型和状态信息对光网络单元进行分析,以判断配电网中光网络单元是否为故障设备或非光网络单元的设备是否为故障设备包括步骤S73至步骤S77:Wherein, the optical network unit is analyzed according to the multi-layer topology model and state information to determine whether the optical network unit in the distribution network is a faulty device or whether a device other than an optical network unit is a faulty device, including steps S73 to S77:

步骤S73,在接收到第八光网络单元的网口丢失信号的情况下,判断在接收到网口丢失信号之后的第二预设时间段内,是否接收到第八光网络单元的掉线信号。Step S73, in the case of receiving the network port loss signal of the eighth optical network unit, judge whether to receive the disconnection signal of the eighth optical network unit within the second preset time period after receiving the network port loss signal .

具体地,由于上述辅助电源可以在第八光网络单元的主电源断电,继续对第八光网络单元供电1至5分钟,第二预设时间段可以为1至5分钟。Specifically, since the auxiliary power supply may continue to supply power to the eighth ONU for 1 to 5 minutes when the main power supply of the eighth ONU is powered off, the second preset time period may be 1 to 5 minutes.

步骤S75,在判断出接收到掉线信号的情况下,确定故障设备为向第八光网络单元供电的配电变压器。Step S75, if it is judged that the disconnection signal is received, it is determined that the faulty device is a distribution transformer supplying power to the eighth optical network unit.

具体地,在判断出接收到掉线信号的情况下,若网口丢失信号与向第八光网络单元供电的配电变压器对应(即,若向网口丢失信号所对应的网口供电的配电变压器与向第八光网络单元供电的配电变压器为同一变压器),确定故障设备为向第八光网络单元供电的配电变压器。Specifically, if it is determined that the disconnected signal is received, if the network port loses the signal and corresponds to the power distribution transformer that supplies power to the eighth optical network unit (that is, if the network port loses the signal to the network port corresponding to the power distribution transformer The electrical transformer and the distribution transformer supplying power to the eighth optical network unit are the same transformer), and it is determined that the faulty device is the distribution transformer supplying power to the eighth optical network unit.

步骤S77,在判断出未接收到掉线信号的情况下,确定故障设备为与网口丢失信号对应的配电变压器。具体地,确定故障设备为向网口丢失信号所对应的网口供电的配电变压器。Step S77, if it is judged that no disconnection signal has been received, determine that the faulty device is the distribution transformer corresponding to the network port loss signal. Specifically, it is determined that the faulty device is a power distribution transformer that supplies power to the network port corresponding to the lost signal of the network port.

当故障设备为配电变压器时,输出的故障结果为配电变压器故障。When the faulty device is a distribution transformer, the output fault result is a distribution transformer fault.

在本发明实施例中,通过设置辅助电源,能够100%的判断出光网络单元(即,ONU)是否故障。In the embodiment of the present invention, by setting the auxiliary power supply, it can be determined 100% whether the optical network unit (that is, the ONU) is faulty.

图6是根据本发明实施例的另一种可选的用于配电网的监控方法中低压出线开关跳闸的示意图。在本发明实施例中,小区配电室中包括两个配电变压器,分别是变压器10-7和变压器10-8。Fig. 6 is a schematic diagram of tripping of a low-voltage outlet switch in another optional monitoring method for a distribution network according to an embodiment of the present invention. In the embodiment of the present invention, the community power distribution room includes two distribution transformers, namely a transformer 10-7 and a transformer 10-8.

其中,变压器10-7与配变低压主开关407连接,配变低压主开关407下设置有低压出线开关471、低压出线开关472和低压出线开关473,其中,低压出线开关471与π1接箱中的开关1-1连接,π1接箱中除了包括开关1-1外,还包括开关1-2和开关1-3。光一总开关与π1接箱中的开关1-2连接,并且还分别与1号楼的1至9层中的用户连接。需要说明的是,1号楼1至3层中的A用户为上述实施例中的目标用户,4至6层中的A用户为上述实施例中的目标用户,7至9层中的A用户为上述实施例中的目标用户。可以通过集中器1分别采集1号楼1至3层中的A用户、1号楼4至6层中的A用户和1号楼7至9层中的A用户的表计电压,即,采集表1、表2和表3的表计电压。Among them, the transformer 10-7 is connected to the low-voltage main switch 407 of the distribution transformer, and the low-voltage outgoing line switch 471, the low-voltage outgoing line switch 472 and the low-voltage outgoing line switch 473 are arranged under the low-voltage main switch 407 of the distribution transformer. The switch 1-1 is connected, and the π1 connection box includes not only the switch 1-1, but also the switch 1-2 and the switch 1-3. The light-one main switch is connected with the switches 1-2 in the π1 connection box, and is also connected with the users in the 1st to 9th floors of Building 1 respectively. It should be noted that user A on floors 1 to 3 of Building 1 is the target user in the above embodiment, user A on floors 4 to 6 is the target user in the above embodiment, and user A on floors 7 to 9 is the target user in the above embodiment. is the target user in the above embodiment. The meter voltages of A users on floors 1 to 3 of Building 1, users of A on floors 4 to 6 of Building 1, and users of A on floors 7 to 9 of Building 1 can be collected through the concentrator 1, that is, to collect Meter voltage for Table 1, Table 2, and Table 3.

其中,变压器10-8与配变低压主开关408连接,配变低压主开关408下设置有低压出线开关484、低压出线开关485和低压出线开关486,其中,π1接箱中的开关1-3与π2接箱中的开关1-1连接。参见图6,同样的,π2接箱中也包括三个开关,分别是1-1、1-2和1-3,光二总开关与π2接箱中的开关1-2连接,并且还分别与2号楼的1至9层中的用户连接。需要说明的是,2号楼1至3层中的A用户为上述实施例中的目标用户,4至6层中的A用户为上述实施例中的目标用户,7至9层中的A用户也是上述实施例中的目标用户。可以通过集中器2分别采集2号楼1至3层中的A用户、2号楼4至6层中的A用户和2号楼7至9层中的A用户的表计电压,即,采集表4、表5和表6的表计电压。Among them, the transformer 10-8 is connected to the distribution transformer low-voltage main switch 408, and the distribution transformer low-voltage main switch 408 is provided with a low-voltage outlet switch 484, a low-voltage outlet switch 485, and a low-voltage outlet switch 486. Among them, the switches 1-3 in the π1 connection box Connect with switch 1-1 in the π2 connection box. Referring to Fig. 6, similarly, three switches are also included in the π2 connection box, which are 1-1, 1-2 and 1-3 respectively, and the light two main switch is connected with the switch 1-2 in the π2 connection box, and also connected with User connections in floors 1 to 9 of Building 2. It should be noted that user A on floors 1 to 3 of Building 2 is the target user in the above embodiment, user A on floors 4 to 6 is the target user in the above embodiment, and user A on floors 7 to 9 is the target user in the above embodiment. It is also the target user in the above embodiments. The meter voltages of A users on floors 1 to 3 of Building 2, users A on floors 4 to 6 of Building 2, and users A on floors 7 to 9 of Building 2 can be collected through the concentrator 2, that is, collecting Meter voltages for Table 4, Table 5, and Table 6.

参见图6,根据集中器1和集中器2是否产生掉线信号,本发明实施例分为两种情况:Referring to Fig. 6, according to whether the concentrator 1 and the concentrator 2 generate a disconnection signal, the embodiment of the present invention is divided into two situations:

情况一:当接收到集中器1的掉线信号以及集中器2的掉线信号时,可以先根据电网检修计划,判断是否为检修计划导致停电。在判断出不是检修计划导致停电的情况下,考虑到光一总开关和光二总开关同时跳闸的可能性很小,直接判断低压出线开关471跳闸,即低压出线开关471为故障设备。Situation 1: When receiving the off-line signal of concentrator 1 and the off-line signal of concentrator 2, it can first judge whether the power outage is caused by the maintenance plan according to the power grid maintenance plan. In the case of judging that the power outage is not caused by the maintenance plan, considering that the possibility of simultaneous tripping of the main light switch 1 and the light 2 main switch is very small, it is directly judged that the low-voltage outgoing line switch 471 tripped, that is, the low-voltage outgoing line switch 471 is a faulty device.

情况二:当接收到集中器1的掉线信号,未收到集中器2的掉线信号时,可以先根据电网检修计划,判断是否为检修计划导致停电。在判断出不是检修计划导致停电的情况下,判断1号楼1至3层中的用户A、4至6层中的用户A以及7至9层中的用户A的表计电压是否正常,也即,判断表1、表2和表3的表计电压是否正常。如果判断出1号楼1至3层中的用户A、4至6层中的用户A以及7至9层中的用户A的表计电压至少一个不正常,则确定集中器1故障或光一总开关跳闸,即集中器1或者光一总为故障设备。Situation 2: When receiving the disconnection signal from concentrator 1 but not receiving the disconnection signal from concentrator 2, you can first judge whether the maintenance plan caused the power outage according to the grid maintenance plan. In the case of judging that the power outage is not caused by the maintenance plan, it is also necessary to judge whether the meter voltages of users A on floors 1 to 3, users A on floors 4 to 6, and users A on floors 7 to 9 of Building 1 are normal. That is, judge whether the meter voltages of Table 1, Table 2, and Table 3 are normal. If it is judged that at least one of the meter voltages of users A on the 1st to 3rd floors, 4th to 6th floors, and 7th to 9th floors of Building 1 is abnormal, then it is determined that the concentrator 1 is faulty or the light The switch trips, that is, the concentrator 1 or the light 1 is always a faulty device.

图7是根据本发明实施例的另一种可选的用于配电网的监控方法中配变低压主开关跳闸的示意图。Fig. 7 is a schematic diagram of tripping of a low-voltage main switch of a distribution transformer in another optional monitoring method for a distribution network according to an embodiment of the present invention.

参见图7,本发明实施例中包括6个π接箱和6个集中器,其中,6个π接箱分别是π3接箱、π4接箱、π5接箱、π6接箱、π7接箱和π8接箱,且每个π接箱中都分别设置三个开关,分别是开关1-1、开关1-2和开关1-3。6个集中器分别是集中器3、集中器4、集中器5、集中器6、集中器7和集中器8。小区配电室中包括两个变压器,分别是变压器10-9和变压器10-10。Referring to Fig. 7, the embodiment of the present invention includes 6 π connection boxes and 6 concentrators, wherein the 6 π connection boxes are respectively π3 connection box, π4 connection box, π5 connection box, π6 connection box, π7 connection box and π8 connection boxes, and each π connection box is equipped with three switches, namely switch 1-1, switch 1-2 and switch 1-3. The six concentrators are concentrator 3, concentrator 4, concentrator Concentrator 5, concentrator 6, concentrator 7 and concentrator 8. The community power distribution room includes two transformers, namely a transformer 10-9 and a transformer 10-10.

其中,变压器10-9与配变低压主开关409连接,配变低压主开关409下设置有低压出线开关491、低压出线开关492和低压出线开关493。低压出线开关491与π3接箱中的开关1-1连接。π3接箱与集中器3相对应,且其内的开关1-3与π4接箱的开关1-1连接,π4接箱与集中器4相对应。Wherein, the transformer 10-9 is connected with the low-voltage main switch 409 of the distribution transformer, and a low-voltage outgoing line switch 491 , a low-voltage outgoing line switch 492 and a low-voltage outgoing line switch 493 are arranged under the low-voltage main switch 409 of the distribution transformer. The low-voltage outlet switch 491 is connected with the switch 1-1 in the π3 connection box. The π3 junction box corresponds to the concentrator 3, and the switches 1-3 inside it are connected to the switches 1-1 of the π4 junction box, and the π4 junction box corresponds to the concentrator 4.

低压出线开关492与π5接箱中的开关1-1连接。π5接箱与集中器5相对应,且其内的开关1-3与π6接箱的开关1-1连接,π6接箱与集中器6相对应。The low-voltage outlet switch 492 is connected with the switch 1-1 in the π5 connection box. The π5 junction box corresponds to the concentrator 5, and the switches 1-3 in it are connected to the switches 1-1 of the π6 junction box, and the π6 junction box corresponds to the concentrator 6.

低压出线开关493与π7接箱中的开关1-1连接。π7接箱与集中器7相对应,且其内的开关1-3与π8接箱的开关1-1连接,π8接箱与集中器8相对应。The low-voltage outlet switch 493 is connected with the switch 1-1 in the π7 connection box. The π7 junction box corresponds to the concentrator 7, and the switches 1-3 in it are connected to the switches 1-1 of the π8 junction box, and the π8 junction box corresponds to the concentrator 8.

变压器10-10与配变低压主开关4102连接,配变低压主开关4102下设置有低压出线开关4104、低压出线开关4105和低压出线开关4106。The transformer 10-10 is connected to the low-voltage main switch 4102 of the distribution transformer, and a low-voltage outgoing line switch 4104, a low-voltage outgoing line switch 4105, and a low-voltage outgoing line switch 4106 are arranged under the low-voltage main switch 4102 of the distribution transformer.

在本实施例中,当接收到低压出线开关491、低压出线开关492、低压出线开关493所供电的所有集中器的掉线信号,同时未收到低压出线开关4104、低压出线开关4105、低压出线开关4106所供电的所有集中器的掉线信号时,首先可以根据电网检修计划,排除计划导致停电;其次,由于低压出线开关491、低压出线开关492、低压出线开关493所供电的所有集中器同时失电,低压出线开关4104、低压出线开关4105、低压出线开关4106所供电的所有集中器都未失电,可以确定为配变低压开关409跳闸,即配变低压开关409为故障设备。In this embodiment, when the offline signals of all concentrators powered by the low-voltage outgoing line switch 491, the low-voltage outgoing line switch 492, and the low-voltage outgoing line switch 493 are received, the low-voltage outgoing line switch 4104, the low-voltage outgoing line switch 4105, and the low-voltage outgoing line switch When the signal of all concentrators powered by switch 4106 is disconnected, firstly, according to the grid maintenance plan, the power outage caused by the plan can be ruled out; secondly, all concentrators powered by low-voltage outgoing line switch 491, low-voltage outgoing line switch 492, and low-voltage outgoing line switch 493 simultaneously Power failure, all the concentrators powered by the low-voltage outlet switch 4104, low-voltage outlet switch 4105, and low-voltage outlet switch 4106 have not lost power, and it can be determined that the low-voltage switch 409 of the distribution transformer has tripped, that is, the low-voltage switch 409 of the distribution transformer is a faulty device.

图8是根据本发明实施例的另一种可选的用于配电网的监控方法中开闭站开关跳闸的示意图。本发明实施例指的是没有配电自动化系统的配电网中的开闭站开关跳闸。Fig. 8 is a schematic diagram of another optional method for monitoring a distribution network according to an embodiment of the present invention, in which a switch of a switching station trips. The embodiment of the present invention refers to the tripping of the switching station switch in the distribution network without a distribution automation system.

参见图8,本发明实施例包括一个A开闭站的开闭站开关211和3个小区配电室,具体为A小区配电室、B小区配电室和C小区配电室。A小区配电室中有一个配变变压器10-4,配变变压器10-4与配变低压主开关404连接,配变低压主开关404下设置有低压出线开关441、低压出线开关442和低压出线开关443。B小区配电室中有一个配变变压器10-5,配变变压器10-5与配变低压主开关405连接,配变低压主开关405下设置有低压出线开关451、低压出线开关452和低压出线开关453。C小区配电室中有一个配变变压器10-6,配变变压器10-6与配变低压主开关406连接,配变低压主开关406下设置有低压出线开关461、低压出线开关462和低压出线开关463。Referring to FIG. 8 , the embodiment of the present invention includes a switching station switch 211 of A switching station and 3 community power distribution rooms, specifically, the A community power distribution room, the B community power distribution room and the C community power distribution room. There is a distribution transformer 10-4 in the power distribution room of community A, and the distribution transformer 10-4 is connected to the low-voltage main switch 404 of the distribution transformer. The low-voltage outlet switch 441, the low-voltage outlet switch 442 and the low-voltage Outlet switch 443. There is a distribution transformer 10-5 in the power distribution room of residential area B, and the distribution transformer 10-5 is connected to the low-voltage main switch 405 of the distribution transformer. The low-voltage outgoing switch 451, the low-voltage outgoing switch 452 and the low-voltage Outlet switch 453. There is a distribution transformer 10-6 in the power distribution room of Community C. The distribution transformer 10-6 is connected to the low-voltage main switch 406 of the distribution transformer. A low-voltage outlet switch 461, a low-voltage outlet switch 462 and a low-voltage Outlet switch 463.

在本实施例中,首先可以根据通信检修计划、通信光缆故障信息,排除通信问题;其次可以根据电网检修计划,排除计划导致停电;然后如果接收到低压出线开关441、低压出线开关442和低压出线开关443的掉线信号,可以判定出上述多个低压出线开关跳闸,同时对应台区考核表无电压、电流,以及对应的变电站10KV出线开关的电压、电流和有功均正常,则判断A开闭站的开闭站出线开关211跳闸。In this embodiment, firstly, the communication problem can be eliminated according to the communication maintenance plan and the fault information of the communication optical cable; secondly, according to the grid maintenance plan, the power outage caused by the plan can be eliminated; then if the low-voltage outgoing line switch 441, the low-voltage outgoing line switch The off-line signal of switch 443 can determine that the above-mentioned multiple low-voltage outlet switches have tripped, and at the same time, there is no voltage and current in the corresponding station area assessment table, and the voltage, current and active power of the corresponding substation 10KV outlet switch are normal, then it is judged that A is on and off The opening and closing station outlet switch 211 of the station is tripped.

根据本发明实施例,还提供了一种用于配电网的监控装置,该监控装置主要用于执行本发明实施例上述内容所提供的监控方法,以下对本发明实施例所提供的用于配电网的监控装置做具体介绍:According to the embodiment of the present invention, there is also provided a monitoring device for distribution network, the monitoring device is mainly used to implement the monitoring method provided in the above content of the embodiment of the present invention, the following is the distribution network provided by the embodiment of the present invention The monitoring device of the power grid is introduced in detail:

图9是根据本发明实施例的一种用于配电网的监控装置的示意图。如图9所示,该监控装置主要包括建立单元100、采集单元200、判断单元300和输出单元400,其中:Fig. 9 is a schematic diagram of a monitoring device for a power distribution network according to an embodiment of the present invention. As shown in Figure 9, the monitoring device mainly includes an establishment unit 100, an acquisition unit 200, a judgment unit 300 and an output unit 400, wherein:

建立单元100用于建立配电网的多层拓扑模型,其中,多层拓扑模型用于表征配电网中各个设备之间的拓扑结构。具体地,多层拓扑模型可以为三层,每层分别是10KV配网、10KV变压器台区以及低压设备和用户智能表。The establishment unit 100 is used to establish a multi-layer topology model of the distribution network, wherein the multi-layer topology model is used to characterize the topology structure among various devices in the distribution network. Specifically, the multi-layer topology model can be three layers, and each layer is a 10KV distribution network, a 10KV transformer station area, low-voltage equipment, and user smart meters.

采集单元200用于从数据源中采集配电网的状态信息。具体地,配电网的状态信息包括集中器电源信息、集中器心跳数据、光网络单元(Optical Network Unit,简称ONU)数据、检修计划数据、电网拓扑数据、EMS实时数据等。The collection unit 200 is used for collecting state information of the distribution network from data sources. Specifically, the status information of the distribution network includes concentrator power information, concentrator heartbeat data, optical network unit (Optical Network Unit, ONU for short) data, maintenance plan data, grid topology data, EMS real-time data, etc.

判断单元300用于根据多层拓扑模型和状态信息对设备进行分析,以判断配电网中是否存在故障设备。The judging unit 300 is configured to analyze the equipment according to the multi-layer topology model and state information, so as to judge whether there is a faulty equipment in the power distribution network.

输出单元400用于在判断出配电网中存在故障设备的情况下,输出故障结果,其中,故障结果包括电网故障和/或通信故障。The output unit 400 is configured to output a fault result when it is judged that there is a faulty device in the power distribution network, wherein the fault result includes a grid fault and/or a communication fault.

在本发明实施例中,通过建立配电网的拓扑模型,采集配电网的状态信息,进而根据上述拓扑模型和状态信息对配电网中设备进行分析,实现了对配电网中设备的运行情况进行监控,从而能够及时主动的发现配电网中出现故障的设备(即,故障设备),并且能够进一步地确定上述出现故障的设备所属的故障类型,与相关技术中,只能依靠用户报修的被动方式来确定出现故障相比,达到了不依靠用户报修,就能够及时主动发现配电网中存在的故障的目的,从而实现了提高工作人员解决故障的时效性的技术效果,进而解决了现有技术中无法及时发现配电网中存在的故障的技术问题。In the embodiment of the present invention, by establishing the topology model of the distribution network, collecting the state information of the distribution network, and then analyzing the equipment in the distribution network according to the above topology model and state information, the equipment in the distribution network is realized. The operating conditions are monitored, so that it is possible to promptly and proactively discover the faulty equipment (that is, the faulty equipment) in the distribution network, and to further determine the type of fault to which the above-mentioned faulty equipment belongs. In related technologies, only the user can rely on Compared with the passive method of reporting for repairs to determine the occurrence of faults, it achieves the purpose of actively discovering the faults in the distribution network in a timely manner without relying on the user's repairs, thereby achieving the technical effect of improving the timeliness of the staff to solve the faults, and then solving the problem. It solves the technical problem that the faults in the distribution network cannot be found in time in the prior art.

此外,在本发明实施例还实现了分辨电网设备故障和通信设备故障的效果。In addition, the embodiment of the present invention also achieves the effect of distinguishing the failure of the grid equipment and the failure of the communication equipment.

可选地,上述实施例中的设备包括配电设备和用于传输所述配电网的状态信息的通信设备。Optionally, the device in the foregoing embodiment includes a power distribution device and a communication device for transmitting state information of the distribution network.

可选地,电网故障包括以下任意一种:低压出线开关跳闸、配变低压主开关跳闸、配电变压器故障和开闭站出线开关跳闸;通信故障包括以下任意一种:光网络单元故障、光纤故障、集中器故障和集中器下联端口故障。Optionally, the power grid failure includes any of the following: tripping of the low-voltage outlet switch, tripping of the low-voltage main switch of the distribution transformer, distribution transformer failure, and tripping of the outlet switch of the switching station; communication failure includes any of the following: failure of the optical network unit, optical fiber failure, concentrator failure, and concentrator downlink port failure.

可选地,数据源包括以下至少之一:用户用电采集系统、调度EMS系统、配电自动化系统、OMS系统和配电网通信系统。Optionally, the data source includes at least one of the following: user electricity collection system, dispatch EMS system, distribution automation system, OMS system and distribution network communication system.

可选地,在本发明实施例中,判断单元300包括获取模块、第一判断模块、第一确定模块和、第二确定模块。其中,获取模块,用于在接收到第一设备的异常信号的情况下,获取拓扑结构中至少一个与第一设备具有相同父节点的第二设备的工作状态;第一判断模块,用于判断第二设备的工作状态是否正常;第一确定模块,用于在判断出第二设备的工作状态为异常的情况下,确定故障设备为父节点对应的设备;第二确定模块,用于在判断出第二设备的工作状态为正常的情况下,确定故障设备为第一设备。Optionally, in this embodiment of the present invention, the judgment unit 300 includes an acquisition module, a first judgment module, a first determination module, and a second determination module. Among them, the acquisition module is used to acquire the working status of at least one second device that has the same parent node as the first device in the topology when the abnormal signal of the first device is received; the first judgment module is used to judge Whether the working state of the second device is normal; the first determining module is used to determine that the faulty device is the device corresponding to the parent node when it is judged that the working state of the second device is abnormal; the second determining module is used to judge whether the working state of the second device is abnormal If the working state of the second device is normal, it is determined that the faulty device is the first device.

在本发明实施例中,根据各个设备在拓扑结构中的结构关系,当任意一个设备产生异常信号时,通过纵向追源、横向验证、一层一层向上推导的方式对拓扑结构中与该设备相关联的其它设备进行分析,能够准确的确定出故障设备,达到了提高确定故障设备的准确性的效果。In the embodiment of the present invention, according to the structural relationship of each device in the topology, when any device generates an abnormal signal, the device in the topology is analyzed by means of vertical tracing, horizontal verification, and layer-by-layer upward derivation. Analyzing other associated devices can accurately determine the faulty device, achieving the effect of improving the accuracy of determining the faulty device.

可选地,在本发明实施例中,设备包括集中器,判断单元300包括第二判断模块。第二判断模块用于根据多层拓扑模型和状态信息对集中器进行分析,以判断配电网中集中器是否为故障设备或非集中器的设备是否为故障设备。Optionally, in this embodiment of the present invention, the device includes a concentrator, and the judging unit 300 includes a second judging module. The second judging module is used to analyze the concentrator according to the multi-layer topology model and status information, so as to judge whether the concentrator is a faulty device or whether the non-concentrator is a faulty device in the distribution network.

可选地,在本发明实施例中,设备包括光网络单元,其中,判断单元300包括第三判断模块。第三判断模块用于根据多层拓扑模型和状态信息对光网络单元进行分析,以判断配电网中光网络单元是否为故障设备或非光网络单元的设备是否为故障设备。Optionally, in this embodiment of the present invention, the device includes an optical network unit, where the judging unit 300 includes a third judging module. The third judging module is used to analyze the optical network unit according to the multi-layer topology model and state information, so as to judge whether the optical network unit in the distribution network is a faulty device or whether the equipment other than the optical network unit is a faulty device.

上述本发明实施例序号仅仅为了描述,不代表实施例的优劣。The serial numbers of the above embodiments of the present invention are for description only, and do not represent the advantages and disadvantages of the embodiments.

在本发明的上述实施例中,对各个实施例的描述都各有侧重,某个实施例中没有详述的部分,可以参见其他实施例的相关描述。In the above-mentioned embodiments of the present invention, the descriptions of each embodiment have their own emphases, and for parts not described in detail in a certain embodiment, reference may be made to relevant descriptions of other embodiments.

在本申请所提供的几个实施例中,应该理解到,所揭露的技术内容,可通过其它的方式实现。其中,以上所描述的装置实施例仅仅是示意性的,例如所述单元的划分,可以为一种逻辑功能划分,实际实现时可以有另外的划分方式,例如多个单元或组件可以结合或者可以集成到另一个系统,或一些特征可以忽略,或不执行。另一点,所显示或讨论的相互之间的耦合或直接耦合或通信连接可以是通过一些接口,单元或模块的间接耦合或通信连接,可以是电性或其它的形式。In the several embodiments provided in this application, it should be understood that the disclosed technical content can be realized in other ways. Wherein, the device embodiments described above are only illustrative. For example, the division of the units may be a logical function division. In actual implementation, there may be other division methods. For example, multiple units or components may be combined or may be Integrate into another system, or some features may be ignored, or not implemented. In another point, the mutual coupling or direct coupling or communication connection shown or discussed may be through some interfaces, and the indirect coupling or communication connection of units or modules may be in electrical or other forms.

所述作为分离部件说明的单元可以是或者也可以不是物理上分开的,作为单元显示的部件可以是或者也可以不是物理单元,即可以位于一个地方,或者也可以分布到多个单元上。可以根据实际的需要选择其中的部分或者全部单元来实现本实施例方案的目的。The units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or may be distributed to multiple units. Part or all of the units can be selected according to actual needs to achieve the purpose of the solution of this embodiment.

另外,在本发明各个实施例中的各功能单元可以集成在一个处理单元中,也可以是各个单元单独物理存在,也可以两个或两个以上单元集成在一个单元中。上述集成的单元既可以采用硬件的形式实现,也可以采用软件功能单元的形式实现。In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, each unit may exist separately physically, or two or more units may be integrated into one unit. The above-mentioned integrated units can be implemented in the form of hardware or in the form of software functional units.

所述集成的单元如果以软件功能单元的形式实现并作为独立的产品销售或使用时,可以存储在一个计算机可读取存储介质中。基于这样的理解,本发明的技术方案本质上或者说对现有技术做出贡献的部分或者该技术方案的全部或部分可以以软件产品的形式体现出来,该计算机软件产品存储在一个存储介质中,包括若干指令用以使得一台计算机设备(可为个人计算机、服务器或者网络设备等)执行本发明各个实施例所述方法的全部或部分步骤。而前述的存储介质包括:U盘、只读存储器(ROM,Read-Only Memory)、随机存取存储器(RAM,Random Access Memory)、移动硬盘、磁碟或者光盘等各种可以存储程序代码的介质。If the integrated unit is realized in the form of a software function unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the essence of the technical solution of the present invention or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium , including several instructions to make a computer device (which may be a personal computer, a server, or a network device, etc.) execute all or part of the steps of the methods described in various embodiments of the present invention. The aforementioned storage media include: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes. .

以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above is only a preferred embodiment of the present invention, and it should be pointed out that for those of ordinary skill in the art, some improvements and modifications can be made without departing from the principle of the present invention. It should be regarded as the protection scope of the present invention.

Claims (24)

  1. A kind of 1. monitoring method for power distribution network, it is characterised in that including:
    The multilayer topological model of power distribution network is established, wherein, the multilayer topological model is used to characterize each in the power distribution network set Topological structure between standby;
    The status information of the power distribution network is gathered from data source;
    The equipment is analyzed according to the multilayer topological model and the status information, to judge to be in the power distribution network It is no faulty equipment to be present;
    If judging the faulty equipment in the power distribution network be present, fail result is exported, wherein, the fail result includes Electric network fault and/or communication failure,
    Wherein, the equipment is analyzed according to the multilayer topological model and the status information, to judge the distribution Include in net with the presence or absence of faulty equipment:
    In the case where receiving the abnormal signal of the first equipment, obtain and at least one in the topological structure set with described first The working condition of standby the second equipment with identical father node;
    Judge whether the working condition of second equipment is normal;
    In the case where the working condition for judging second equipment is exception, it is the father node to determine the faulty equipment Corresponding equipment;
    In the case of the working condition for judging second equipment is normal, determine that the faulty equipment sets for described first It is standby.
  2. 2. according to the method for claim 1, it is characterised in that the equipment includes controller switching equipment and for transmitting described match somebody with somebody The communication equipment of the status information of power network.
  3. 3. according to the method for claim 1, it is characterised in that the electric network fault include it is following any one:Low pressure goes out Wiretap tripping operation, the tripping operation of distribution low-voltage main switch, distribution transformer failure and the tripping operation of Switching Station outlet switch;The communication failure Including it is following any one:Optical network unit failure, fiber failure, concentrator failure and concentrator second line of a couplet port failure.
  4. 4. according to the method for claim 1, it is characterised in that the data source includes at least one of:User power utilization Acquisition system, scheduling EMS system, electrical power distribution automatization system, OMS and distribution network communication system.
  5. 5. according to the method for claim 1, it is characterised in that the equipment includes concentrator, according to more etale topologies Model and the status information are analyzed the equipment, to judge with the presence or absence of faulty equipment to include in the power distribution network:
    The concentrator is analyzed according to the multilayer topological model and the status information, to judge in the power distribution network Whether the concentrator is whether the equipment of the faulty equipment or the non-concentrator is the faulty equipment.
  6. 6. according to the method for claim 5, it is characterised in that according to the multilayer topological model and the status information pair The concentrator is analyzed, to judge whether concentrator described in the power distribution network is the faulty equipment or the non-concentration Whether the equipment of device is that the faulty equipment includes:
    Signal and the first optical-fiber network list corresponding to first concentrator is not received receiving going offline for the first concentrator In the case of the signal that goes offline of member, the working condition of the second concentrator is obtained, wherein, second concentrator and first collection Middle device is switched by the first low-pressure line-outgoing and powered;
    Judge whether the working condition of second concentrator is normal;
    In the case of the working condition for judging second concentrator is normal, determine the faulty equipment for the described first collection Middle device;
    In the case where judging the working condition exception of second concentrator, determine that the faulty equipment is low for described first Extrude wiretap.
  7. 7. according to the method for claim 5, it is characterised in that according to the multilayer topological model and the status information pair The concentrator is analyzed, to judge whether concentrator described in the power distribution network is the faulty equipment or the non-concentration Whether the equipment of device is that the faulty equipment includes:
    Signal and the second optical-fiber network list corresponding to the 3rd concentrator is not received receiving going offline for the 3rd concentrator In the case of the signal that goes offline of member, the meter voltage of first object user is obtained, wherein, the meter electricity of the first object user Pressure is gathered by the 4th concentrator, and the meter voltage of the second targeted customer is gathered by the 3rd concentrator, the 3rd collection Middle device, the first object user and second targeted customer switch by the second low-pressure line-outgoing and powered;
    Judge whether the meter voltage of the first object user is normal;
    In the case of the meter voltage for judging the first object user is normal, it is the described 3rd to determine the faulty equipment Concentrator.
  8. 8. according to the method for claim 7, it is characterised in that judging the meter voltage of the first object user Whether it is normal after, the concentrator is analyzed according to the multilayer topological model and the status information, to judge State whether concentrator described in power distribution network is whether the equipment of the faulty equipment or the non-concentrator is the faulty equipment Also include:
    In the case where judging the meter electric voltage exception of the first object user, then the 3rd target for obtaining predetermined number is used The meter voltage at family, wherein, the meter voltage of the 3rd targeted customer is gathered by the 4th concentrator, the 3rd mesh Mark user and power supply is switched by second low-pressure line-outgoing, the predetermined number is more than or equal to one;
    Judge whether the meter voltage of the 3rd targeted customer is normal;
    In the case of the meter voltage for judging the 3rd targeted customer is normal, it is the described 3rd to determine the faulty equipment Concentrator;
    In the case where judging the meter electric voltage exception of the 3rd targeted customer, it is described second to determine the faulty equipment Low-pressure line-outgoing switchs.
  9. 9. according to the method for claim 5, it is characterised in that according to the multilayer topological model and the status information pair The concentrator is analyzed, to judge whether concentrator described in the power distribution network is the faulty equipment or the non-concentration Whether the equipment of device is that the faulty equipment includes:
    Signal and the 3rd optical-fiber network list corresponding to the 5th concentrator is not received receiving going offline for the 5th concentrator In the case of the signal that goes offline of member, message is reported in the power failure for judging whether to receive the 4th targeted customer in the first preset time for repairment, Wherein, the 4th targeted customer and the 5th concentrator switch by the 3rd low-pressure line-outgoing powers;
    Judging that the power failure that the 4th targeted customer is received in first preset time reports the situation of message for repairment Under, determine that the faulty equipment switchs for the 3rd low-pressure line-outgoing;
    Judging that the power failure for not receiving the 4th targeted customer in first preset time reports the feelings of message for repairment Under condition, determine the faulty equipment for the 3rd low-pressure line-outgoing switch or the 5th concentrator.
  10. 10. according to the method for claim 9, it is characterised in that it is determined that the faulty equipment goes out for the 3rd low pressure After wiretap or the 5th concentrator, the concentrator is entered according to the multilayer topological model and the status information Row analysis, with judge concentrator described in the power distribution network whether be the faulty equipment or the non-concentrator equipment whether Also include for the faulty equipment:
    Message is reported in the power failure for judging whether to receive the 4th targeted customer in the second preset time for repairment, wherein, it is described The initial time of second preset time is the end time of first preset time;
    Judging that the power failure that the 4th targeted customer is received in second preset time reports the situation of message for repairment Under, determine that the faulty equipment switchs for the 3rd low-pressure line-outgoing.
  11. 11. according to the method for claim 1, it is characterised in that the equipment includes optical network unit, according to the multilayer Topological model and the status information are analyzed the equipment, to judge to whether there is faulty equipment bag in the power distribution network Include:
    The optical network unit is analyzed according to the multilayer topological model and the status information, to judge the distribution Whether optical network unit described in net is whether the equipment of the faulty equipment or the non-optical network unit is that the failure is set It is standby.
  12. 12. according to the method for claim 11, it is characterised in that according to the multilayer topological model and the status information The optical network unit is analyzed, with judge optical network unit described in the power distribution network whether be the faulty equipment or Whether the equipment of the non-optical network unit is that the faulty equipment includes:
    Receive the signal that goes offline of the 4th optical network unit;
    Obtain the state of corresponding with target distribution transformer 10KV service entrance switch, wherein, the target distribution transformer for Distribution transformer corresponding to 4th optical network unit;
    According to the state of the 10KV service entrance switch, judge whether the faulty equipment is the 4th optical network unit.
  13. 13. according to the method for claim 12, it is characterised in that according to the state of the 10KV service entrance switch, judge institute State whether faulty equipment is that the 4th optical network unit includes:
    If the 10KV service entrance switch meets preparatory condition, it is determined that the faulty equipment is the 4th optical network unit, its In, the preparatory condition is closure, electric current be present and have work value.
  14. 14. according to the method for claim 11, it is characterised in that according to the multilayer topological model and the status information The optical network unit is analyzed, with judge optical network unit described in the power distribution network whether be the faulty equipment or Whether the equipment of the non-optical network unit is that the faulty equipment includes:
    In the case where receiving the signal that goes offline of the 5th optical network unit, communication repair schedule and communications optical cable failure letter are obtained Breath, wherein, the 5th optical network unit is the optical network unit for having with the 6th concentrator incidence relation;
    Judge that whether existing the 5th optical network unit is logical according to the communication repair schedule and communications optical cable fault message Believe failure;
    Judging that institute is not present in the 5th optical network unit according to the communication repair schedule and communications optical cable fault message In the case of stating communication failure, the meter voltage of the 5th targeted customer is obtained, wherein, the meter voltage of the 5th targeted customer Gathered by the 7th concentrator, the 6th concentrator user gathers the meter voltage of the 6th targeted customer, the 5th mesh Mark user and the 6th targeted customer power by the first distribution low-voltage main switch;
    Judge whether the meter voltage of the 5th targeted customer is normal;
    In the case of the meter voltage for judging the 5th targeted customer is normal, it is the described 5th to determine the faulty equipment Optical network unit;
    In the case where judging the meter electric voltage exception of the 5th targeted customer, it is described first to determine the faulty equipment Distribution low-voltage main switch.
  15. 15. according to the method for claim 11, it is characterised in that according to the multilayer topological model and the status information The optical network unit is analyzed, with judge optical network unit described in the power distribution network whether be the faulty equipment or Whether the equipment of the non-optical network unit is that the faulty equipment includes:
    In the case where receiving the signal that goes offline of the 6th optical network unit, communication repair schedule and communications optical cable failure letter are obtained Breath;
    Judge that whether existing the 6th optical network unit is logical according to the communication repair schedule and communications optical cable fault message Believe failure;
    Judging that institute is not present in the 6th optical network unit according to the communication repair schedule and communications optical cable fault message In the case of stating communication failure, message is reported in the power failure for judging whether to receive the 7th targeted customer in the 3rd preset time for repairment, its In, the 7th targeted customer powers with the 6th optical network unit by the second distribution low-voltage main switch;
    Judging that the power failure that the 7th targeted customer is received in the 3rd preset time reports the situation of message for repairment Under, it is the second distribution low-voltage main switch to determine the faulty equipment;
    Judging that the power failure for not receiving the 7th targeted customer in the 3rd preset time reports the feelings of message for repairment Under condition, it is the second distribution low-voltage main switch or the 6th optical network unit to determine the faulty equipment.
  16. 16. according to the method for claim 15, it is characterised in that it is determined that the faulty equipment matches somebody with somebody step-down for described second After pressing main switch or the 6th optical network unit, wherein, according to the multilayer topological model and the status information pair The optical network unit is analyzed, to judge whether optical network unit described in the power distribution network is the faulty equipment or non- Whether the equipment of the optical network unit is that the faulty equipment also includes:
    Message is reported in the power failure for judging whether to receive the 7th targeted customer in the 4th preset time for repairment, wherein, it is described The initial time of 4th preset time is the end time of the 3rd preset time;
    In the case where judging that the power failure is received in the 4th preset time reports message for repairment, the faulty equipment is determined For the second distribution low-voltage main switch.
  17. 17. according to the method for claim 11, it is characterised in that the equipment also includes accessory power supply, the auxiliary electricity Source is used to, in the main power source power-off of the 7th optical network unit, supply to the 7th optical network unit in the first preset time period Electricity, wherein, the optical network unit is analyzed according to the multilayer topological model and the status information, with described in judgement Optical network unit described in power distribution network whether be the faulty equipment or the non-optical network unit equipment whether be it is described therefore Barrier equipment includes:
    In the case where receiving the signal that goes offline of the 7th optical network unit, judgement is received before the signal that goes offline Whether the network interface lossing signal of seventh optical network unit is received in first preset time period, wherein, the network interface Lossing signal is corresponding with the distribution transformer powered to the 7th optical network unit;
    In the case where judging to receive the network interface lossing signal, it is to the 7th optical-fiber network to determine the faulty equipment The distribution transformer of unit power supply;
    In the case where judging not receive the network interface lossing signal, it is the 7th optical-fiber network to determine the faulty equipment Unit.
  18. 18. according to the method for claim 11, it is characterised in that the equipment also includes accessory power supply, the auxiliary electricity Source is used to, in the main power source power-off of the 8th optical network unit, supply to the 8th optical network unit in the second preset time period Electricity, wherein, the optical network unit is analyzed according to the multilayer topological model and the status information, with described in judgement Optical network unit described in power distribution network whether be the faulty equipment or the non-optical network unit equipment whether be it is described therefore Barrier equipment includes:
    In the case where receiving the network interface lossing signal of the 8th optical network unit, judge receiving the network interface loss In second preset time period after signal, if receive the signal that goes offline of the 8th optical network unit;
    In the case where judging to receive the signal that goes offline, it is to the 8th optical network unit to determine the faulty equipment The distribution transformer of power supply;
    In the case where judging not receive the signal that goes offline, determine that the faulty equipment is and the network interface lossing signal Corresponding distribution transformer.
  19. A kind of 19. supervising device for power distribution network, it is characterised in that including:
    Unit is established, for establishing the multilayer topological model of power distribution network, wherein, the multilayer topological model is used to characterize described match somebody with somebody Topological structure in power network between each equipment;
    Collecting unit, for gathering the status information of the power distribution network from data source;
    Judging unit, for being analyzed according to the multilayer topological model and status information the equipment, with described in judgement It whether there is faulty equipment in power distribution network;
    Output unit, in the case where the faulty equipment be present in judging the power distribution network, exporting fail result, its In, the fail result includes electric network fault and/or communication failure,
    Wherein, the judging unit includes:
    Acquisition module, in the case where receiving the abnormal signal of the first equipment, obtaining at least one in the topological structure Individual and first equipment has the working condition of the second equipment of identical father node;
    First judge module, for judging whether the working condition of second equipment is normal;
    First determining module, in the case of being exception in the working condition for judging second equipment, determine the event Barrier equipment is equipment corresponding to the father node;
    Second determining module, in the case of being normal in the working condition for judging second equipment, determine the event Barrier equipment is first equipment.
  20. 20. device according to claim 19, it is characterised in that the equipment is described including controller switching equipment and for transmitting The communication equipment of the status information of power distribution network.
  21. 21. device according to claim 19, it is characterised in that the electric network fault include it is following any one:Low pressure Outlet switch tripping operation, the tripping operation of distribution low-voltage main switch, distribution transformer failure and the tripping operation of Switching Station outlet switch;The communication event Barrier include it is following any one:Optical network unit failure, fiber failure, concentrator failure and concentrator second line of a couplet port failure.
  22. 22. device according to claim 19, it is characterised in that the data source includes at least one of:User uses Electric acquisition system, scheduling EMS system, electrical power distribution automatization system, OMS and distribution network communication system.
  23. 23. device according to claim 19, it is characterised in that the equipment includes concentrator, wherein, it is described to judge list Member includes:
    Second judge module, for being analyzed according to the multilayer topological model and the status information the concentrator, To judge whether concentrator described in the power distribution network is whether the equipment of the faulty equipment or the non-concentrator is described Faulty equipment.
  24. 24. device according to claim 19, it is characterised in that the equipment includes optical network unit, wherein, it is described to sentence Disconnected unit includes:
    3rd judge module, for being analyzed according to the multilayer topological model and status information the optical network unit, To judge whether optical network unit described in the power distribution network is that the equipment of the faulty equipment or the non-optical network unit is No is the faulty equipment.
CN201510528623.0A 2015-08-25 2015-08-25 Monitoring method and device for power distribution network Active CN105071539B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510528623.0A CN105071539B (en) 2015-08-25 2015-08-25 Monitoring method and device for power distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510528623.0A CN105071539B (en) 2015-08-25 2015-08-25 Monitoring method and device for power distribution network

Publications (2)

Publication Number Publication Date
CN105071539A CN105071539A (en) 2015-11-18
CN105071539B true CN105071539B (en) 2018-01-23

Family

ID=54500850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510528623.0A Active CN105071539B (en) 2015-08-25 2015-08-25 Monitoring method and device for power distribution network

Country Status (1)

Country Link
CN (1) CN105071539B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105486982A (en) * 2015-12-29 2016-04-13 安徽海兴泰瑞智能科技有限公司 Power grid device distributed fault diagnosis method
CN105467276B (en) * 2016-01-13 2018-09-21 国网浙江省电力公司 A kind of line fault monitoring method and system
CN106877317B (en) * 2017-03-23 2019-04-23 天津大学 Definition, Network Form, Operation Mode and Transition Method of Flexible Distribution Network
CN107180524B (en) * 2017-05-15 2019-11-01 国网天津市电力公司 A kind of network monitoring method of power information acquisition system
CN110082618A (en) * 2019-04-16 2019-08-02 国网湖南省电力有限公司 A kind of optimization method of area's power-off event concentrator active reporting
CN110058126A (en) * 2019-05-29 2019-07-26 国网北京市电力公司 Distribution network fault judgment method and device
CN111010351B (en) * 2019-12-10 2024-03-08 新奥数能科技有限公司 An Internet of Things data transmission method and system
CN112597634B (en) * 2020-12-06 2022-11-18 国网山东省电力公司电力科学研究院 Method and system for verifying distribution network topology data
CN113923102B (en) * 2021-10-11 2023-12-26 广东省电信规划设计院有限公司 Method and device for analyzing power supply faults of Internet of things equipment
CN114004311A (en) * 2021-11-17 2022-02-01 国网冀北电力有限公司承德供电公司 Power distribution network fault positioning method and device, server and storage medium
CN114610709A (en) * 2021-12-21 2022-06-10 昆明能讯科技有限责任公司 GIS-based power grid equipment problem longitudinal correlation analysis method and storage medium
CN115474026B (en) * 2022-09-13 2024-11-29 国网北京市电力公司 Power grid fault monitoring method, device and storage medium

Also Published As

Publication number Publication date
CN105071539A (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN105071539B (en) Monitoring method and device for power distribution network
CN109613329B (en) Fine line loss analysis system
WO2017166735A1 (en) Power-grid self-healing system and self-healing logic thereof in 110kv chain power-supply mode
CN109995145A (en) An active judgment method for low-voltage distribution network faults based on intelligent distribution and transformer terminals
CN104135070B (en) A kind of analog channel method for diagnosing faults of electrical power distribution automatization system
CN111654005B (en) A method for low-voltage leakage monitoring, judgment and self-healing in distribution station area
CN110048507B (en) Automatic inspection method and system for power distribution automation system
CN104579839B (en) A kind of substation communication network state on_line monitoring system and method
CN202475009U (en) Comprehensive processing system of failure of power distribution and supply grid
CN104124761B (en) A kind of power distribution network low pressure large user's integrated protection control method
CN105790990B (en) A kind of method and its system for supervising adapted telecommunication business
CN110086260B (en) Intelligent sensing management and control device for power distribution network
CN103490521A (en) Intelligent power distribution network fault treatment platform
CN107147215A (en) Distribution network fault location system and method combined with line overload data analysis
CN110460372A (en) A kind of passive optical network alarm management method and device
CN103501052A (en) Comprehensive fault handling method for power distribution and consumption network
CN106452571A (en) Power terminal communication access network topology dependent failure section determination and analysis methods
CN103926891B (en) Mobile Telecommunication Equipment Room environment in mobile stations equipment monitoring system and method
CN105718686A (en) Power distribution network simulation system based on event driving and simulation method thereof
CN103501053A (en) Comprehensive fault handling system for power distribution and consumption network
CN109885592A (en) A smart meter power failure processing device and method based on NB-IoT
CN112731062B (en) Method for diagnosing low-voltage user power failure by utilizing telecommunication terminal equipment
CN109639529A (en) The diagnostic method of intelligent substation remote control command exception
CN206412838U (en) Distribution Network Automation System Based on Dual-mode Communication
CN114139742A (en) A kind of distribution network management and control system and management and control method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant