CN105064539A - New wall and old wall connector and construction method thereof - Google Patents

New wall and old wall connector and construction method thereof Download PDF

Info

Publication number
CN105064539A
CN105064539A CN201510481297.2A CN201510481297A CN105064539A CN 105064539 A CN105064539 A CN 105064539A CN 201510481297 A CN201510481297 A CN 201510481297A CN 105064539 A CN105064539 A CN 105064539A
Authority
CN
China
Prior art keywords
wall
new
old
fixture
wall fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510481297.2A
Other languages
Chinese (zh)
Other versions
CN105064539B (en
Inventor
娄挺
李汾霞
丁园
应艳
徐晨怡
陈宇新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIZHOU CONSTUCTION INSTALLATION ENGINEERING Co
Original Assignee
TAIZHOU CONSTUCTION INSTALLATION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIZHOU CONSTUCTION INSTALLATION ENGINEERING Co filed Critical TAIZHOU CONSTUCTION INSTALLATION ENGINEERING Co
Priority to CN201510481297.2A priority Critical patent/CN105064539B/en
Publication of CN105064539A publication Critical patent/CN105064539A/en
Application granted granted Critical
Publication of CN105064539B publication Critical patent/CN105064539B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention provides a new wall and old wall connector and a construction method thereof, and belongs to the technical field of buildings. The problem that an existing joint between a new wall and an old wall cracks is solved. The new wall and old wall connector comprises an elongated old wall fixing piece and a strip-sheet-shaped new wall fixing piece; a projected buckle is arranged at one end of the new wall fixing piece; a buckle chute is formed in the old wall fixing piece along the longitudinal direction; and one end of the new wall fixing piece can be inlaid in the buckle chute and is buckled with the buckle. By the new wall and old wall connector and the new wall and old wall connector construction method, an obtained new wall and old wall connecting structure cannot crack within 15 years at least; and by wall surface treatment technologies such as wall plastering net fixing and wall plastering tile fixing, the circumstance that the joint between the new wall and the old wall cracks can be eliminated thoroughly.

Description

The construction method of Xin Qiang and old wall connector and connector
Technical field
The invention belongs to building technical field, relate to a kind of wall, particularly a kind of Xin Qiang and old wall connector.
The invention belongs to building technical field, relate to a kind of wall, particularly the construction method of a kind of Xin Qiang and old wall connector.
Background technology
In house decoration and rehousing engineering, by striking wall and building new wall, to change the inner structure office in house be one of common decorative means.After having fitted up one or two years, between Xin Qiang and old wall, seam crossing produces cracking phenomena gradually, and then affects aesthetic property, even produces the accident such as to leak.
Summary of the invention
The present invention proposes a kind of Xin Qiang and old wall connector, the technical problem to be solved in the present invention how to make seam crossing cracking phenomena between Xin Qiang and old wall delay generation, preferably thoroughly eliminates.
The present invention proposes a kind of applicable Xin Qiang of practice of construction requirement and the construction method of old wall connector.
The technical problem that will solve of the present invention realizes by following technical proposal: Ben Xinqiang and old wall connector, comprises old wall fixture and the new wall fixture in bar shaped sheet in strip; One end of new wall fixture has the hasp of protrusion, old wall fixture longitudinally has and an end of new wall fixture can be made to embed and can form the hasp chute of snapping with hasp.
The construction method of Ben Xinqiang and old wall connector, first fixes old wall fixture, and old wall fixture is fixed on the new wall joint face of old body of wall, hasp chute is towards new body of wall to be built; Fix new wall fixture again, after building some layers of brick, an end of new wall fixture embeds hasp chute and makes hasp and hasp chute form snapping, move down new wall fixture until new wall fixture relies on mutually with top layer brick, continue afterwards to lay bricks, after the sand ash solidification of laying bricks used, new wall fixture is just fixedly connected with new body of wall.
Compared with prior art, Ben Xinqiang can be cut or is connected in series by many old wall fixtures according to high the carrying out of actual wall with the old wall fastener length in old wall connector.New wall anchor structure is simple, easy to process, the advantage that cost is low.In a stifled new body of wall, arrange multiple new wall fixture according to actual conditions, in other words, multiple new wall fixture all can form snapping with an old wall fixture.
In the construction method of Ben Xinqiang and old wall connector, old wall fixture was just fixed on old body of wall before building new body of wall, thus had the advantage of easy construction.Fixing new wall fixture interts to carry out in building a wall, and avoids unnecessary new wall fixture impact to build a wall; New wall fixture can slide up and down relative to old wall fixture, and then facilitate new wall fixture to embed in old wall fixture, and ensure in the sand ash that new wall fixture is entirely arranged between two-layer brick, improve stability under loading significantly, and then seam crossing cracking phenomena between Xin Qiang and old wall at least can be made to delay generation; By theoretical and actual reckoning, the Xin Qiang adopting the construction method of above-mentioned Xin Qiang and old wall connector He Xinqiang and old wall connector to obtain and old wall syndeton can not produce cracking phenomena at least 15 years; Paste the metope such as net, tile fixing treatment process in conjunction with wall plastering and thoroughly can eliminate seam crossing cracking phenomena between Xin Qiang and old wall.
Accompanying drawing explanation
Fig. 1 is the perspective view of Ben Xinqiang and old wall connector.
Fig. 2 is the plan structure schematic diagram of Ben Xinqiang and old wall connector.
Fig. 3 and Fig. 4 is the another kind of structural representation of new wall fixture in Ben Xinqiang and old wall connector.
Fig. 5 is the perspective view of the construction method of Ben Xinqiang and old wall connector.
In figure, 1, old wall fixture; 1a, hasp chute; 2, new wall fixture; 2a, hasp; 2b, through hole; 2c, annular through groove; 2d, flank; 3, old body of wall.
Detailed description of the invention
Be below specific embodiments of the invention and by reference to the accompanying drawings, technical scheme of the present invention is further described, but the present invention be not limited to these embodiments.
Embodiment one
As depicted in figs. 1 and 2, Ben Xinqiang and old wall connector comprise old wall fixture 1 and the new wall fixture 2 in bar shaped sheet in strip.
New wall fixture 2 can be embedded in the sand ash of two-layer brick in bar shaped sheet, and effectively can also ensure connection area, ensures bonding strength.One both sides, end of new wall fixture 2 all have the hasp 2a of protrusion, and new wall fixture 2 can adopt the direct punching molding of corrosion resistant plate.New wall fixture 2 has multiple through hole 2b, and husky ash just can embed in through hole 2b, and then improves the bonding strength between new wall fixture 2 and new body of wall significantly.
Old wall fixture 1 can be connected with multiple new wall fixture 2 in strip, also has convenient advantage of installing.Old wall fixture 1 can adopt stainless steel band roll forming, forms the rectangular tube that a sidewall has opening; In other words, old wall fixture 1 longitudinally has an end of new wall fixture 2 can be made to embed and the hasp chute 1a of snapping can be formed with hasp 2a.This structure old wall fixture 1 has structure advantage simple, easy to process; Conveniently old wall fixture 1 is fixed on old body of wall 3, several fixing holes on another sidewall of old wall fixture 1.
The construction method of Ben Xinqiang and old wall connector fixes new wall fixture 2 sequence construction again by first fixing old wall fixture 1.Specifically, fixing old wall fixture 1 is that old wall fixture 1 is fixedly connected with by expansion bolt with the new wall joint face of old body of wall 3, and hasp chute 1a is towards new body of wall to be built; This syndeton ensures connectivity robustness between old wall fixture 1 and old body of wall 3 effectively.
The common brick block high of employing 240 × 115 × 53 is the new body of wall of 2.7 meters, arranges 5 new wall fixtures 2 between new body of wall and old body of wall 3.Fixing new wall fixture 2 is after piling up four layers of common brick solidly, and an end of new wall fixture 2 is embedded hasp chute 1a by mode as shown in Figure 5 of pressing; Namely new wall fixture 2 embeds hasp chute 1a vertically, after rotating new wall fixture 290 °, new wall fixture 2 is in level, the hasp 2a of new wall the fixture 2 and hasp chute 1a of old wall fixture 1 forms snapping, move down new wall fixture 2 until new wall fixture 2 relies on mutually with top layer brick, pile up four layers of common brick afterwards successively and a new wall fixture 2 is installed, piling up until complete new body of wall.After the sand ash solidification of laying bricks used, new wall fixture 2 is just fixedly connected with new body of wall.
Embodiment two
The present embodiment with the structure of embodiment one and principle substantially identical, basic something in common no longer burden describes, different place is only described, different place is: as shown in Figure 3 and Figure 4, new wall fixture 2 has multiple annular through groove 2c, and in construction, the flank 2d in the middle of annular through groove 2c is made its flexural deformation to side pressing, husky ash just can embed in new wall fixture 2, flank 2d embeds in husky ash, and then improves the bonding strength between new wall fixture 2 and new body of wall significantly.

Claims (8)

1. Xin Qiang and an old wall connector, is characterized in that, Ben Xinqiang and old wall connector comprise old wall fixture (1) and the new wall fixture (2) in bar shaped sheet in strip; One end of new wall fixture (2) has the hasp (2a) of protrusion, old wall fixture (1) longitudinally has and an end of new wall fixture (2) can be made to embed and can form the hasp chute (1a) of snapping with hasp (2a).
2. Xin Qiang according to claim 1 and old wall connector, is characterized in that, described new wall fixture (2) has multiple through hole (2b).
3. Xin Qiang according to claim 1 and old wall connector, is characterized in that, described new wall fixture (2) and old wall fixture (1) all adopt stainless steel to make.
4. Xin Qiang according to claim 1 and old wall connector, is characterized in that, several fixing holes on a sidewall of described old wall fixture (1).
5. Xin Qiang according to claim 1 and old wall connector, is characterized in that, described new wall fixture (2) has multiple annular through groove (2c) and forms flexible flank (2d).
6. the construction method of Xin Qiang and old wall connector described in a Claims 1-4 any one, it is characterized in that, the construction method of Ben Xinqiang and old wall connector by first fixing old wall fixture (1), then is fixed new wall fixture (2) sequential steps and is carried out;
Fixing old wall fixture (1) is the new wall joint face old wall fixture (1) being fixed on old body of wall (3), and hasp chute (1a) is towards new body of wall to be built;
Fixing new wall fixture (2) first builds some layers of brick, again an end of new wall fixture (2) embedded hasp chute (1a) and make hasp (2a) and hasp chute (1a) form snapping, moving down new wall fixture (2) until new wall fixture (2) relies on mutually with top layer brick; Finally continue to lay bricks; After the sand ash solidification of laying bricks used, new wall fixture (2) is just fixedly connected with new body of wall.
7. the construction method of Xin Qiang according to claim 6 and old wall connector, it is characterized in that, in described fixing new wall fixture (2) step, new wall fixture (2) first vertically arranges and an end of new wall fixture (2) is embedded hasp chute (1a), rotate new wall fixture (2) 90 ° again, make new wall fixture (2) be in level, hasp (2a) and hasp chute (1a) form snapping.
8. a construction method for Xin Qiang described in claim 5 and old wall connector, is characterized in that, the construction method of Ben Xinqiang and old wall connector by first fixing old wall fixture (1), then is fixed new wall fixture (2) sequential steps and carried out;
Fixing old wall fixture (1) is the new wall joint face old wall fixture (1) being fixed on old body of wall (3), and hasp chute (1a) is towards new body of wall to be built;
Fixing new wall fixture (2) first builds some layers of brick, again the flank (2d) in the middle of annular through groove (2c) in new wall fixture (2) is made its flexural deformation to side pressing, and an end of new wall fixture (2) embedded hasp chute (1a) and makes hasp (2a) and hasp chute (1a) form snapping, move down new wall fixture (2) until new wall fixture (2) relies on mutually with top layer brick; Finally continue to lay bricks; After the sand ash solidification of laying bricks used, new wall fixture (2) is just fixedly connected with new body of wall.
CN201510481297.2A 2015-08-03 2015-08-03 New wall and old wall connector Active CN105064539B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510481297.2A CN105064539B (en) 2015-08-03 2015-08-03 New wall and old wall connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510481297.2A CN105064539B (en) 2015-08-03 2015-08-03 New wall and old wall connector

Publications (2)

Publication Number Publication Date
CN105064539A true CN105064539A (en) 2015-11-18
CN105064539B CN105064539B (en) 2017-04-19

Family

ID=54494026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510481297.2A Active CN105064539B (en) 2015-08-03 2015-08-03 New wall and old wall connector

Country Status (1)

Country Link
CN (1) CN105064539B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335666A (en) * 2020-03-24 2020-06-26 圣都家居装饰有限公司 Paving method and paving device for wall bricks

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736814A (en) * 2009-12-15 2010-06-16 浙江宝业建设集团有限公司 Aseismatic structural column connecting piece for building wall and construction method thereof
WO2011134680A1 (en) * 2010-04-29 2011-11-03 Hilti Aktiengesellschaft Mounting rail
CN102691361A (en) * 2012-06-01 2012-09-26 苏州金楠新能源墙体工程有限公司 Environment-friendly outer wall and construction method thereof
CN103321318A (en) * 2012-03-22 2013-09-25 拜耳知识产权有限责任公司 Use of fibre-reinforced polyurethane for forming a rail for a fitting assembly
CN204781428U (en) * 2015-08-03 2015-11-18 台州建筑安装工程公司 Xin qiang and old wall connecting piece

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736814A (en) * 2009-12-15 2010-06-16 浙江宝业建设集团有限公司 Aseismatic structural column connecting piece for building wall and construction method thereof
WO2011134680A1 (en) * 2010-04-29 2011-11-03 Hilti Aktiengesellschaft Mounting rail
CN103321318A (en) * 2012-03-22 2013-09-25 拜耳知识产权有限责任公司 Use of fibre-reinforced polyurethane for forming a rail for a fitting assembly
CN102691361A (en) * 2012-06-01 2012-09-26 苏州金楠新能源墙体工程有限公司 Environment-friendly outer wall and construction method thereof
CN204781428U (en) * 2015-08-03 2015-11-18 台州建筑安装工程公司 Xin qiang and old wall connecting piece

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335666A (en) * 2020-03-24 2020-06-26 圣都家居装饰有限公司 Paving method and paving device for wall bricks

Also Published As

Publication number Publication date
CN105064539B (en) 2017-04-19

Similar Documents

Publication Publication Date Title
CN104314204B (en) Non-form stripping lightweight internal partition board and overall grouting construction method thereof
CN104196214B (en) The floating screed technique of a kind of plastering engineering and floating screed chi
CN204343463U (en) A kind of waterproof construction of prefabricated reinforced concrete composite wallboard piece
CN104032771B (en) Anti-cracking construction method for additionally arranging induction joint on underground structure
CN106284999A (en) Assembled architecture haydite concrete batten of internal partition mounting process
CN204199330U (en) The overall steel plate for sealing water in a kind of ater-casting
CN101012750B (en) Combined connection method between lining segment and inner lining in shield tunneling
CN108005269A (en) Modularization haydite concrete internal partition wall and its installation method
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN201952970U (en) Precast prestressed concrete wallboard
CN208363632U (en) A kind of concrete surface indent construction tool
CN204001270U (en) A kind of reinforced concrete wall and masonry wall syndeton
CN204781428U (en) Xin qiang and old wall connecting piece
CN104389358B (en) A kind of fire hydrant box back side body of wall and construction method thereof
CN105064539A (en) New wall and old wall connector and construction method thereof
CN103161240A (en) Thermal insulation wall
CN203081460U (en) Integrated positioning fixture for construction of tunnel two-liner end socket construction joint
CN102071771B (en) Building waste residue sintering-free embedded pipeline groove brick and using method thereof
CN204455812U (en) A kind of embedded part structure of bridge extension joint
CN104060831B (en) A kind of construction method of architecture interlayer combined wall
CN204418433U (en) A kind of adjustable masonry filler wall and frame column flexible connecting structure
CN204282633U (en) A kind of gypsum block for steel pipe buried in advance
CN204163744U (en) Net spray leveling layer self waterproof structure between a kind of subway station stake
CN204357070U (en) Decoration expanded joint structure
CN202401824U (en) Fence coping structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant