- CN105040823A CN105040823A CN201510359296.0A CN201510359296A CN105040823A CN 105040823 A CN105040823 A CN 105040823A CN 201510359296 A CN201510359296 A CN 201510359296A CN 105040823 A CN105040823 A CN 105040823A
- Authority
- CN
- China
- Prior art keywords
- floor beam
- prefabricated
- partition board
- partition plate
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005192 partition Methods 0.000 title claims abstract description 75
- 238000010276 construction Methods 0.000 title claims abstract description 17
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 27
- 239000002184 metal Substances 0.000 claims abstract description 27
- 239000010959 steel Substances 0.000 claims abstract description 27
- 230000003014 reinforcing effect Effects 0.000 claims description 28
- 239000008267 milk Substances 0.000 claims description 6
- 210000004080 milk Anatomy 0.000 claims description 6
- 235000013336 milk Nutrition 0.000 claims description 6
- 238000000034 method Methods 0.000 abstract description 4
- 238000009417 prefabrication Methods 0.000 abstract description 4
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract 4
- 239000011449 brick Substances 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000011505 plaster Substances 0.000 description 2
- 238000003908 quality control method Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The invention discloses a partition plate and floor beam connecting structure for a scissors staircase and a construction method of the partition plate and floor beam connecting structure. The partition plate and floor beam connecting structure comprises a prefabricated partition plate and prefabricated floor beams, wherein the prefabricated partition plate is arranged between the upper prefabricated floor beam and the lower prefabricated floor beam; two rows of reinforcing steel bars extending perpendicularly are respectively arranged on the upper end surface and the lower end surface of each prefabricated floor beam in advance; the distance between each two reinforcing steel bars is smaller than or equal to 600mm; two rows of metal corrugated tubes or connecting steel sleeves matched with the reinforcing steel bars are respectively embedded in the upper end surface and the lower end surface of the prefabricated partition plate; and the reinforcing steel bars are respectively inserted in the corresponding metal corrugated tubes or connecting steel sleeves and are fixed in a grouting manner. Compared with the prior art, the partition plate and floor beam connecting structure for the scissors staircase has the advantages that a prefabricated partition plate and prefabricated floor beam connecting mode is modified, a floor beam pouring and partition building process is omitted, total prefabrication and assembly construction of the scissors staircase is implemented, the labor is saved, the partition plate and floor beam connecting structure is quick and convenient to mount, and connection integrity of the prefabricated partition plate and the prefabricated floor beams is guaranteed.
Description
Technical field
The invention belongs to field of civil engineering, relate to prefabricated costruction, particularly relate to a kind of partition board of cantilever stair and the syndeton of floor beam and construction method thereof.
Background technology
For meeting the requirement of building fire protection specification, should arrange fire stop between general two cantilever stairs, this partition wall is formed by poured in place concrete or wall of laying bricks under normal circumstances.In fabricated assembly overall structure, have employed prefabricated reinforced concrete stair, if adopt said method again, on-the-spot formwork supporting plate, assembling reinforcement, concreting can reduce the efficiency of construction of staircase, affects stair construction period.Partition wall is built at scene by laying bricks or stones also to be needed to plaster to whitewash, and increases artificial and material, and difficult quality controls.Easily cause finished product stair to damage simultaneously, be unfavorable for applying of precast stair.Therefore, need by partition wall and floor beam prefabricated to realize the full prefabrication and assembly construction of staircase.
Summary of the invention
The present invention needs the problems referred to above solved to be for formwork supporting plate on-the-spot in above-mentioned prior art, assembling reinforcement, and concreting can reduce the efficiency of construction of staircase, affects stair construction period; Partition wall is built at scene by laying bricks or stones also to be needed to plaster to whitewash, and increases artificial and material, the deficiency that difficult quality controls, and provides a kind of efficiency of construction high, artificial and the cost of material is low, the partition board of quality controllable cantilever stair and the syndeton of floor beam and construction method thereof.
For solving the problems of the technologies described above, the technical solution used in the present invention is:
A kind of partition board of cantilever stair and the syndeton of floor beam, comprise prefabricated partition board and prefabricated floor beam, described prefabricated partition board is arranged between the prefabricated floor beam of upper and lower twice, the upper/lower terminal face of described prefabricated floor beam is preset with respectively the reinforcing bar that a row vertically stretches out, spacing between described reinforcing bar is less than or equal to 600mm, the upper/lower terminal face of prefabricated partition board be embedded with respectively the row metal bellows suitable with reinforcing bar or be connected steel bushing, reinforcing bar inserts corresponding metal bellows or connects the interior also grouting of steel bushing fixing respectively.
The thickness of prefabricated partition board is more than or equal to 120mm.
The thickness of prefabricated floor beam is more than or equal to 120mm.
Metal bellows or connection steel bushing are provided with the grouting mouth for being in the milk.
Metal bellows on the upper/lower terminal face of prefabricated partition board or connection steel bushing are positioned at same plane.
The construction method of the partition board of cantilever stair and the syndeton of floor beam, comprises the following steps:
(1) prefabricated partition board and prefabricated floor beam is manufactured, the upper/lower terminal face of prefabricated floor beam is preset with reinforcing bar that a row vertically stretches out respectively, spacing between reinforcing bar is less than or equal to 600mm, the upper/lower terminal face of prefabricated partition board is embedded with the row metal bellows suitable with reinforcing bar respectively or is connected steel bushing;
(2) hoisting prefabricated floor beam, is mounted to assigned address by prefabricated floor beam; The reinforcing bar that prefabricated floor beam lower surface is stretched out inserted respectively the metal bellows on the prefabricated partition board upper surface below it or connect in steel bushing;
(3) hoisting prefabricated partition board, by prefabricated partition board lifting to prefabricated floor beam;
(4) reinforcing bar on prefabricated floor beam upper surface inserted respectively the metal bellows on the prefabricated partition board lower surface above it or connect in steel bushing;
(5) metal bellows or connection steel bushing are in the milk, fixing prefabricated partition board and prefabricated floor beam.
Compared with prior art, the invention has the beneficial effects as follows: by improving the connected mode of prefabricated partition board and prefabricated floor beam, eliminate the building process with partition wall of building of floor beam, achieve the full prefabrication and assembly construction between cantilever stair, save artificial, quick and easy for installation, ensure the connection integrity of prefabricated partition board and prefabricated floor beam simultaneously.
Accompanying drawing explanation
Fig. 1 is the structural representation of the partition board of cantilever stair of the present invention and the syndeton of floor beam;
Fig. 2 is the lateral view of the partition board of cantilever stair of the present invention and the syndeton of floor beam.
Wherein, 1, prefabricated partition board, 2, prefabricated floor beam, 3, reinforcing bar, 4, metal bellows or connect steel bushing, 5, grouting mouth.
Detailed description of the invention
In conjunction with the accompanying drawings, the present invention is further detailed explanation.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present invention are described in a schematic way, and therefore it only shows the formation relevant with the present invention.
As shown in Figure 1, a kind of partition board of cantilever stair and the syndeton of floor beam, comprise prefabricated partition board 1 and prefabricated floor beam 2, described prefabricated partition board 1 is arranged on, between the prefabricated floor beam 2 of lower twice, described prefabricated floor beam 2 upper, lower both ends of the surface are preset with respectively the reinforcing bar 3 that a row vertically stretches out, spacing between described reinforcing bar 3 is less than or equal to 600mm, prefabricated partition board 1 upper, lower both ends of the surface be embedded with respectively the row metal bellows suitable with reinforcing bar 3 or be connected steel bushing 4, reinforcing bar 3 inserts corresponding metal bellows or connects the interior also grouting of steel bushing 4 fixing respectively.
The thickness of prefabricated partition board 1 is more than or equal to 120mm.
The thickness of prefabricated floor beam 2 is more than or equal to 120mm.
Metal bellows or connection steel bushing 4 are provided with the grouting mouth 5 for being in the milk.
Metal bellows on the upper/lower terminal face of prefabricated partition board 1 or connection steel bushing 4 are positioned at same plane.
The construction method of the partition board of cantilever stair and the syndeton of floor beam, comprises the following steps:
(1) prefabricated partition board 1 and prefabricated floor beam 2 is manufactured, the upper/lower terminal face of prefabricated floor beam 2 is preset with reinforcing bar 3 that a row vertically stretches out respectively, spacing between reinforcing bar 3 is less than or equal to 600mm, the upper/lower terminal face of prefabricated partition board 1 is embedded with the row metal bellows suitable with reinforcing bar 3 respectively or is connected steel bushing 4;
(2) hoisting prefabricated floor beam 2, is mounted to assigned address by prefabricated floor beam 2; The reinforcing bar 3 that prefabricated floor beam 2 lower surface is stretched out inserted respectively the metal bellows on prefabricated partition board 1 upper surface below it or connect in steel bushing 4;
(3) hoisting prefabricated partition board 1, lifts on prefabricated floor beam 2 by prefabricated partition board 1;
(4) reinforcing bar 3 on prefabricated floor beam 2 upper surface inserted respectively the metal bellows on prefabricated partition board 1 lower surface above it or connect in steel bushing 4;
(5) metal bellows or connection steel bushing 4 are in the milk, fixing prefabricated partition board 1 and prefabricated floor beam 2.
Compared with prior art, the invention has the beneficial effects as follows: by improving the connected mode of prefabricated partition board and prefabricated floor beam, eliminate the building process with partition wall of building of floor beam, achieve the full prefabrication and assembly construction between cantilever stair, save artificial, quick and easy for installation, ensure the connection integrity of prefabricated partition board and prefabricated floor beam simultaneously.
With above-mentioned according to desirable embodiment of the present invention for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this invention technological thought, can carry out various change and amendment completely.The technical scope of this invention is not limited to the content on manual, must determine its technical scope according to right.
Claims (6)
1. the partition board of a cantilever stair and the syndeton of floor beam, comprise prefabricated partition board and prefabricated floor beam, described prefabricated partition board is arranged on, between the prefabricated floor beam of lower twice, it is characterized in that: described prefabricated floor beam upper, lower both ends of the surface are preset with respectively the reinforcing bar that a row vertically stretches out, spacing between described reinforcing bar is less than or equal to 600mm, prefabricated partition board upper, lower both ends of the surface be embedded with respectively the row metal bellows suitable with reinforcing bar or be connected steel bushing, reinforcing bar inserts corresponding metal bellows or connects the interior also grouting of steel bushing fixing respectively.
2. the partition board of cantilever stair according to claim 1 and the syndeton of floor beam, is characterized in that: the thickness of prefabricated partition board is more than or equal to 120mm.
3. the partition board of cantilever stair according to claim 1 and the syndeton of floor beam, is characterized in that: the thickness of prefabricated floor beam is more than or equal to 120mm.
4. the partition board of cantilever stair according to claim 1 and the syndeton of floor beam, is characterized in that: metal bellows or connection steel bushing are provided with the grouting mouth for being in the milk.
5. the partition board of cantilever stair according to claim 1 and the syndeton of floor beam, is characterized in that: the metal bellows on the upper/lower terminal face of prefabricated partition board or connection steel bushing are positioned at same plane.
6. the construction method of the partition board of cantilever stair according to claim 1 and the syndeton of floor beam, is characterized in that: comprise the following steps:
(1) prefabricated partition board and prefabricated floor beam is manufactured, the upper/lower terminal face of prefabricated floor beam is preset with reinforcing bar that a row vertically stretches out respectively, spacing between reinforcing bar is less than or equal to 600mm, the upper/lower terminal face of prefabricated partition board is embedded with the row metal bellows suitable with reinforcing bar respectively or is connected steel bushing;
(2) hoisting prefabricated floor beam, is mounted to assigned address by prefabricated floor beam; The reinforcing bar that prefabricated floor beam lower surface is stretched out inserted respectively the metal bellows on the prefabricated partition board upper surface below it or connect in steel bushing;
(3) hoisting prefabricated partition board, by prefabricated partition board lifting to prefabricated floor beam;
(4) reinforcing bar on prefabricated floor beam upper surface inserted respectively the metal bellows on the prefabricated partition board lower surface above it or connect in steel bushing;
(5) metal bellows or connection steel bushing are in the milk, fixing prefabricated partition board and prefabricated floor beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510359296.0A CN105040823A (en) | 2015-06-26 | 2015-06-26 | Partition plate and floor beam connecting structure for scissors staircase and construction method of partition plate and floor beam connecting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510359296.0A CN105040823A (en) | 2015-06-26 | 2015-06-26 | Partition plate and floor beam connecting structure for scissors staircase and construction method of partition plate and floor beam connecting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105040823A true CN105040823A (en) | 2015-11-11 |
Family
ID=54447765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510359296.0A Pending CN105040823A (en) | 2015-06-26 | 2015-06-26 | Partition plate and floor beam connecting structure for scissors staircase and construction method of partition plate and floor beam connecting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105040823A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105888077A (en) * | 2016-06-17 | 2016-08-24 | 福建工程学院 | Fabricated shear wall connecting device and construction method thereof |
CN109339220A (en) * | 2018-11-02 | 2019-02-15 | 山东海龙建筑科技有限公司 | Assembled integral stairwell and its production and construction method |
CN111188458A (en) * | 2020-01-09 | 2020-05-22 | 付萍 | Method for constructing concrete shear stair fire-proof partition wall by applying prefabricated concrete beams |
CN111535490A (en) * | 2020-05-11 | 2020-08-14 | 中力建设集团有限公司 | Fabricated floor and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102235034A (en) * | 2010-04-22 | 2011-11-09 | 上海市第七建筑有限公司 | Prefabricated part and construction method for connecting prefabricated part with main structure |
JP4926255B2 (en) * | 2010-02-12 | 2012-05-09 | 株式会社フジタ | Connecting and fixing structure of precast concrete members |
CN103216044A (en) * | 2012-01-20 | 2013-07-24 | 中冶建筑研究总院有限公司 | Moisture permeation and water proofing Cement grouting steel bar connecting structure of precast concrete unit |
CN103352514A (en) * | 2013-06-17 | 2013-10-16 | 南京长江都市建筑设计股份有限公司 | Connection structure of steel bars of prefabricated parapet |
GB2503228A (en) * | 2012-06-19 | 2013-12-25 | Laing O Rourke Plc | Pre-cast column assembly with reinforcement and connection parts |
CN204753834U (en) * | 2015-06-26 | 2015-11-11 | 南京长江都市建筑设计股份有限公司 | Partition plate of scissors stair and connection structure of floor roof beam |
-
2015
- 2015-06-26 CN CN201510359296.0A patent/CN105040823A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4926255B2 (en) * | 2010-02-12 | 2012-05-09 | 株式会社フジタ | Connecting and fixing structure of precast concrete members |
CN102235034A (en) * | 2010-04-22 | 2011-11-09 | 上海市第七建筑有限公司 | Prefabricated part and construction method for connecting prefabricated part with main structure |
CN103216044A (en) * | 2012-01-20 | 2013-07-24 | 中冶建筑研究总院有限公司 | Moisture permeation and water proofing Cement grouting steel bar connecting structure of precast concrete unit |
GB2503228A (en) * | 2012-06-19 | 2013-12-25 | Laing O Rourke Plc | Pre-cast column assembly with reinforcement and connection parts |
CN103352514A (en) * | 2013-06-17 | 2013-10-16 | 南京长江都市建筑设计股份有限公司 | Connection structure of steel bars of prefabricated parapet |
CN204753834U (en) * | 2015-06-26 | 2015-11-11 | 南京长江都市建筑设计股份有限公司 | Partition plate of scissors stair and connection structure of floor roof beam |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105888077A (en) * | 2016-06-17 | 2016-08-24 | 福建工程学院 | Fabricated shear wall connecting device and construction method thereof |
CN105888077B (en) * | 2016-06-17 | 2018-06-08 | 福建工程学院 | Fabricated shear wall attachment device and its construction method |
CN109339220A (en) * | 2018-11-02 | 2019-02-15 | 山东海龙建筑科技有限公司 | Assembled integral stairwell and its production and construction method |
CN109339220B (en) * | 2018-11-02 | 2023-11-03 | 山东海龙建筑科技有限公司 | Assembling an integrated stairwell and its production and construction method |
CN111188458A (en) * | 2020-01-09 | 2020-05-22 | 付萍 | Method for constructing concrete shear stair fire-proof partition wall by applying prefabricated concrete beams |
CN111535490A (en) * | 2020-05-11 | 2020-08-14 | 中力建设集团有限公司 | Fabricated floor and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10865557B2 (en) | Prestressed assembled concrete frame-joint connecting structure and constructing method thereof | |
EP2848750A1 (en) | Method of casting in-situ steel wire mesh cement slab with spliced rack and suspended formwork | |
CN108005387B (en) | Synchronous construction method for cast-in-place main body of assembled wallboard and short-limb shear wall | |
CN105317137A (en) | Prefabricated wall, prefabricated wallboard, construction method of prefabricated wall and production method of prefabricated wallboard | |
CN107130684A (en) | A kind of fabricated structure and its construction method | |
CN105507470B (en) | A kind of periphery overlapping overall assembled floor and its construction method | |
CN105569264A (en) | Double-faced superposed beam and construction method thereof | |
CN103015747A (en) | Full-assembled integral pouring composite house and construction method thereof | |
KR101184362B1 (en) | T-typed Precast Concrete Slab and Contstruction Method Thereof | |
CN107476470A (en) | Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method | |
CN106968381A (en) | With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection | |
CN111734018A (en) | Formwork structure, disassembly-free mold and concrete wall construction method | |
CN106121145A (en) | A kind of split blade type assembling stair and preparation method thereof and assembly method | |
CN204753834U (en) | Partition plate of scissors stair and connection structure of floor roof beam | |
CN105040823A (en) | Partition plate and floor beam connecting structure for scissors staircase and construction method of partition plate and floor beam connecting structure | |
CN113719029A (en) | Assembly type beam-column connecting joint based on hidden corbels and construction method thereof | |
CN103883054A (en) | Cable-strut rib beam combined floor and construction method thereof | |
CN103194982B (en) | Construction method for short cantilever support at bridge side span cast-in-situ segment | |
CN110439291A (en) | A kind of assembled production and construction method suitable for low-rise building | |
CN115749043A (en) | Assembled building wallboard connected node structure | |
CN215907293U (en) | Rendering-free exhaust flue and assembly type flue mounting structure | |
CN205224332U (en) | Prefabricated wall body and prefabricated wallboard | |
US20090301011A1 (en) | Reinforced concrete ceiling and process for the manufacture thereof | |
CN112593632A (en) | Fabricated beam-slab structure suitable for large-span high-clearance building and construction method thereof | |
CN109267578B (en) | Inclined plane plain concrete structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151111 |