CN105003082A - Glass curtain wall mounting equipment and glass curtain mounting method - Google Patents
Glass curtain wall mounting equipment and glass curtain mounting method Download PDFInfo
- Publication number
- CN105003082A CN105003082A CN201510399662.5A CN201510399662A CN105003082A CN 105003082 A CN105003082 A CN 105003082A CN 201510399662 A CN201510399662 A CN 201510399662A CN 105003082 A CN105003082 A CN 105003082A
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- track
- pulley
- main
- glass curtain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 239000011521 glass Substances 0.000 title abstract description 16
- 239000004575 stone Substances 0.000 claims description 25
- 229910000831 Steel Inorganic materials 0.000 claims description 24
- 239000010959 steel Substances 0.000 claims description 24
- 238000010276 construction Methods 0.000 claims description 17
- 238000009434 installation Methods 0.000 claims description 17
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- 230000001681 protective effect Effects 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides glass curtain wall mounting equipment and a glass curtain wall mounting method. The problems that a glass curtain wall swings in air violently when hoisted, the work efficiency is low and potential safety hazards exist are solved. According to a scheme, the glass curtain wall mounting equipment comprises a hoisting portion and a ground conveying portion, wherein the hoisting portion comprises a main winch, a position traction winch, a traction pulley track, a main hoist steering pulley subassembly, a traction steering pulley subassembly and a main hoist pulley subassembly which are arranged on the top of a building; the main hoist pulley subassembly is slidably connected with a traction track via rollers; the ground conveying portion comprises a glass curtain wall hoisting clamp, a track bearing trolley and a bearing track; and the bearing track is connected to the ground. According to the glass curtain wall mounting method in the scheme, a main winch rope is in a vertical hoisting state via the main hoist steering pulley subassembly and the main hoist pulley subassembly, the position traction winch draws the main hoist pulley subassembly on the traction pulley track via the traction steering pulley subassembly, a glass curtain wall on the track bearing trolley on the ground is fixedly connected with a glass curtain wall hoisting fixture, and the glass curtain wall hoisting clamp is connected with the main winch rope. The glass curtain wall mounting equipment swings in air slightly, is mounted and positioned accurately, and can be mounted continuously.
Description
Technical field
Architectural decoration field of the present invention, particularly relates to a kind of Glass Curtain Wall Construction equipment and construction installation method.
Background technology
At present, in super large glass curtain wall mounting construction field, generally adopt building operations tower crane to carry out lifting construction, this construction method, equipment volume is large, and consumed power is high, not working, inconvenient operation.During lifting, oscillating air is large, locates inaccurate, inefficiency, there is serious potential safety hazard.
Summary of the invention
For overcoming the technical deficiency that prior art exists, the invention discloses a kind of Glass Curtain Wall Construction equipment and construction installation method.
The invention has the beneficial effects as follows: during use, Hoisting Position is determined flexibly, easy to operate.During lifting, cis-position rope flexible constraint stone tongs, oscillating air is little, and install accurate positioning, operating efficiency is high, eliminates potential safety hazard, reduces construction cost, ensure that safety in production.
The technical scheme that present device realizes goal of the invention employing is: a kind of curtain wall erection equipment, erection equipment comprises: lifting part and ground transport portion.
(1). described lifting part comprises: be arranged on the main winch of building end face, position rack winch, hauling block track, main hang diverting pulley pack, pull round pulley assembly, main Hanging roller assembly, described main Hanging roller assembly comprises: framework, one group of roller, pull line junction button and a pair pulley, described a pair pulley respectively vertical axis and horizontal axis is arranged on the upper of framework, described one group of roller respectively horizontal direction and vertical direction is arranged on framework, corresponding with described hauling block track; Described main winch, position rack winch, traction track, main hang angle pulley group, pull round assembly pulley and be connected with building roof ground through mounting seat, described main Hanging roller group forms through one group of roller and traction track and is slidably connected.
(2). described ground transport portion comprises: curtain wall stone tongs, track carrying vehicle and bearing track, described curtain wall stone tongs comprises: side clip slot steel, clamp body, cord lock, cis-position rope, collet channel-section steel, described curtain wall stone tongs component parts correspondence arranges a pair, described side clip slot steel and collet channel-section steel are separately positioned on the two ends of clamp body shaped steel, cord lock is arranged on the upper end of clamp body shaped steel, described bearing track is connected with ground base, described track carrying vehicle comprises vehicle frame, a pair bearing wheels and one group of support roller, described bearing wheels and support roller are connected with vehicle frame two ends through bearing pin respectively, form track carrying vehicle moves horizontally conveying curtain wall structure along bearing track.
The technical scheme that the inventive method realizes goal of the invention employing is a kind of curtain wall mounting method, and the method realizes by means of the hoist engine being arranged on building roof ground, and construction installation method carries out according to the following steps:
Step 1: construction equipment is installed, lifting prepares, building top layer roofing and ground are determined equipment installation site, main winch is fixedly installed at building top layer roofing, position rack winch, hauling block track, master hangs diverting pulley pack, pull round pulley assembly and main Hanging roller assembly, traction elevator cable wire hangs diverting pulley pack through main, pull round pulley assembly formation and lift by crane state up and down, position rack winch cable wire is connected with main Hanging roller assembly through pulling round pulley assembly, position rack winch cable wire adjusts the Hoisting Position of main Hanging roller assembly at hauling block track, complete construction equipment to install, lifting prepares:
Step 2: outside the building enclose and set up scaffold, in construction starting point vertical direction, cis-position rope is set, by curtain wall handling on carrying vehicle, carrying vehicle and curtain wall contact surface arrange the protective pad preventing from colliding with, carrying vehicle moves to the vertical lower ground of curtain wall installation site, curtain wall stone tongs is fixedly connected with curtain wall, curtain wall stone tongs is connected with main winch cable wire, cis-position rope and curtain wall stone tongs is spacing is slidably connected, two ends are vertically set between roof semi girder and ground;
Step 3: main winch starts setting height(from bottom) of vertically being sling to by curtain wall, and operator uses sucker that curtain wall is moved to installation site, installs fixing, removes curtain wall stone tongs;
Step 4: repeat whole installations that step 1-3 completes curtain wall.
The invention has the beneficial effects as follows: during use, Hoisting Position is determined flexibly, easy to operate.During lifting, cis-position rope flexible constraint curtain wall stone tongs, hoisting process oscillating air is little, install accurate positioning, can implement to install continuously to the curtain wall of diverse location by changing main Hanging roller module position, installation effectiveness is high, eliminate potential safety hazard, ensure that safety in production, reduce construction cost, ensure that safety in production.
Below in conjunction with accompanying drawing, the present invention is described in detail.
Accompanying drawing explanation
Accompanying drawing 1 is floor end face lifting part scheme of installation of the present invention;
Accompanying drawing 2 is accompanying drawing 1 A-A sectional view;
Accompanying drawing 3 is accompanying drawing 2 C place close-up schematic view;
Accompanying drawing 4 is accompanying drawing 3 top view;
Accompanying drawing 5 is that master hangs diverting pulley pack schematic diagram;
Accompanying drawing 6 is accompanying drawing 5 top view;
Accompanying drawing 7 is bearing track and track carrying vehicle mounting structure schematic diagram;
Accompanying drawing 8 is accompanying drawing 7 left view;
Accompanying drawing 9 is curtain wall stone tongs and curtain wall connection diagram;
Accompanying drawing 10 is accompanying drawing 9 B-B generalized section;
Accompanying drawing 11 is side clip slot steel and clamp body chain connection motion schematic diagram.
In accompanying drawing, 1 main winch, 2 position rack winches, 3 masters hang diverting pulley pack, 3-1 horizontal axis pulley, 3-2 vertical axis pulley, 4 pull round pulley assembly, 5 main Hanging roller assemblies, 5-1 roller, 5-2 pulley, 5-3 balancing weight, 5-4 framework, 5-5 drag rope junction button, 6 hauling block tracks, 7 curtain wall stone tongs, 7-1 side clip slot steel, 7-2 clamp body, 7-3 cord lock, 7-4 cis-position rope, 7-5 link bolt, 7-6 collet channel-section steel, 8 track carrying vehicles, 8-1 vehicle frame, 8-2 bearing wheels, 8-3 support roller, 9 bearing tracks, 10 curtain walls.
Detailed description of the invention
Referring to accompanying drawing, a kind of curtain wall erection equipment, erection equipment comprises: lifting part and ground transport portion.
(1). described lifting part comprises: be arranged on the main winch 1 of building end face, position rack winch 2, hauling block track 6, main hang diverting pulley pack 3, pull round pulley assembly 4, main Hanging roller assembly 5, described main Hanging roller assembly 5 comprises: framework 5-4, one group of roller 5-1, pull line junction button 5-5 and a pair pulley 5-2, vertical axis and horizontal axis are arranged on the upper of framework 5-4 to described a pair pulley 5-2 respectively, described one group of roller 5-1 respectively horizontal direction and vertical direction is arranged on framework 5-4, corresponding with described hauling block track 6; Described main winch 1, position rack winch 2, traction track 6, main hang angle pulley group 3, pull round assembly pulley 4 and be connected with building roof ground through mounting seat, described main Hanging roller group 5 forms through one group of roller 5-1 and traction track 6 and is slidably connected.
(2). described ground transport portion comprises: curtain wall stone tongs 7, track carrying vehicle 8 and bearing track (9), described curtain wall stone tongs 7 comprises: side clip slot steel 7-1, clamp body 7-2, cord lock 7-3, cis-position rope 7-4, collet channel-section steel 7-6, described curtain wall stone tongs 7 component parts correspondence arranges a pair, described side clip slot steel 7-1 and collet channel-section steel 7-6 is separately positioned on the two ends of clamp body 7-2 shaped steel, cord lock 7-3 is arranged on the upper end of clamp body 7-2 shaped steel, described bearing track 9 is connected with ground base, described track carrying vehicle 8 comprises vehicle frame 8-1, a pair bearing wheels 8-2 and one group of support roller 8-3, described bearing wheels 8-2 and support roller 8-3 are connected with vehicle frame 8-1 two ends through bearing pin respectively, form track carrying vehicle 8 moves horizontally conveying curtain wall 10 structure along bearing track 9.
During use, the rope of main winch 1 hangs through main diverting pulley pack 3, main Hanging roller assembly 5 top sheave 5-2 form above-below direction lifting state after turning to, the rope of position rack winch 2 is connected with main Hanging roller assembly 5 through pull line junction button 5-5 through pulling round to be formed after pulley assembly 4 turns to, forming position rack winch 2 is to the traction of the main Hanging roller assembly 5 be slidably arranged on traction track 6, by the traction of rack winch 2 to main Hanging roller assembly 5, determine each installation site.Curtain wall 10 is arranged on track carrying vehicle 8, and track carrying vehicle 8 moves to the vertical lower of installation site along bearing track 9, and the rope of main winch 1 implements the upwards lifting to curtain wall through curtain wall stone tongs 7.The cord lock 7-3 of cis-position rope 7-4 on curtain wall stone tongs 7 plays flexible limit to curtain wall 10 process of lifting by crane.
In the embodiment of the present invention, described master hangs diverting pulley pack 3, it is identical to pull round pulley assembly 4 structure, and main hanging on diverting pulley pack 3 being respectively arranged with horizontal axis pulley 3-1 and vertical axis pulley 3-2.
Horizontal axis pulley 3-1 arranges object and is, when lifting by crane for building side glass curtain wall, the rope of main winch 1 directly lifts by crane installation by horizontal axis pulley 3-1 to curtain wall 10.
In the embodiment of the present invention, described side clip slot steel 7-1 is hinged through link bolt 7-5 and clamp body 7-2.The object of this structure is convenient to curtain wall stone tongs 7 be connected with curtain wall 10 is convenient by the rotation realization of side clip slot steel 7-1.
In the embodiment of the present invention, described cis-position rope 7-4 is slidably connected through cord lock 7-3 is spacing, and cis-position rope 7-4 two ends are vertically set between roof semi girder and ground.Cis-position rope 7-4 plays flexible limit effect to curtain wall stone tongs 7.
In the embodiment of the present invention, described main Hanging roller assembly 5 is provided with balancing weight 5-3.The object that balancing weight 5-3 is arranged prevents main Hanging roller assembly 5 at traction track 6 by force unbalance.
Claims (6)
1. a curtain wall erection equipment, erection equipment comprises: lifting part and ground transport portion, is characterized in that,
(1). described lifting part comprises: the main winch (1) being arranged on building end face, position rack winch (2), hauling block track (6), master hangs diverting pulley pack (3), pull round pulley assembly (4), main Hanging roller assembly (5), described main Hanging roller assembly (5) comprising: framework (5-4), one group of roller (5-1), pull line junction button (5-5) and a pair pulley (5-2), described a pair pulley (5-2) respectively vertical axis and horizontal axis is arranged on the upper of framework (5-4), described one group of roller (5-1) respectively horizontal direction and vertical direction is arranged on framework (5-4), corresponding with described hauling block track (6), described main winch (1), position rack winch (2), traction track (6), main hang angle pulley group (3), pull round assembly pulley (4) and be connected with building roof ground through mounting seat, described main Hanging roller group (5) forms through one group of roller (5-1) and traction track (6) and is slidably connected,
(2). described ground transport portion comprises: curtain wall stone tongs (7), track carrying vehicle (8) and bearing track (9), described curtain wall stone tongs (7) comprising: side clip slot steel (7-1), clamp body (7-2), cord lock (7-3), cis-position rope (7-4), collet channel-section steel (7-6), described curtain wall stone tongs (7) component parts correspondence arranges a pair, described side clip slot steel (7-1) and collet channel-section steel (7-6) are separately positioned on the two ends of clamp body (7-2) shaped steel, cord lock (7-3) is arranged on the upper end of clamp body (7-2) shaped steel, described bearing track (9) is connected with ground base, described track carrying vehicle (8) comprises vehicle frame (8-1), a pair bearing wheels (8-2) and one group of support roller (8-3), described bearing wheels (8-2) is connected with vehicle frame (8-1) two ends through bearing pin respectively with support roller (8-3), form track carrying vehicle (8) moves horizontally conveying curtain wall (10) structure along bearing track (9).
2. a kind of curtain wall erection equipment according to claim 1, it is characterized in that, described master hangs diverting pulley pack (3), it is identical to pull round pulley assembly (4) structure, and main hanging on diverting pulley pack (3) being respectively arranged with horizontal axis pulley (3-1) and vertical axis pulley (3-2).
3. a kind of curtain wall erection equipment according to claim 1, is characterized in that, described side clip slot steel (7-1) is hinged through link bolt (7-5) and clamp body (7-2).
4. a kind of curtain wall erection equipment according to claim 1, is characterized in that, described cis-position rope (7-4) is slidably connected through cord lock (7-3) is spacing, and cis-position rope (7-4) two ends are vertically set between roof semi girder and ground.
5. a kind of curtain wall erection equipment according to claim 1, is characterized in that, described main Hanging roller assembly (5) is provided with balancing weight (5-3).
6. a curtain wall mounting method, the method realizes by means of the hoist engine being arranged on building roof ground, and it is characterized in that, construction installation method carries out according to the following steps:
Step 1: construction equipment is installed, lifting prepares, building top layer roofing and ground are determined equipment installation site, main winch is fixedly installed at building top layer roofing, position rack winch, hauling block track, master hangs diverting pulley pack, pull round pulley assembly and main Hanging roller assembly, traction elevator cable wire hangs diverting pulley pack through main, pull round pulley assembly formation and lift by crane state up and down, position rack winch cable wire is connected with main Hanging roller assembly through pulling round pulley assembly, position rack winch cable wire adjusts the Hoisting Position of main Hanging roller assembly at hauling block track, complete construction equipment to install, lifting prepares:
Step 2: outside the building enclose and set up scaffold, in construction starting point vertical direction, cis-position rope is set, by curtain wall handling on carrying vehicle, carrying vehicle and curtain wall contact surface arrange the protective pad preventing from colliding with, carrying vehicle moves to the vertical lower ground of curtain wall installation site, curtain wall stone tongs is fixedly connected with curtain wall, curtain wall stone tongs is connected with main winch cable wire, cis-position rope and curtain wall stone tongs is spacing is slidably connected, two ends are vertically set between roof semi girder and ground;
Step 3: main winch starts setting height(from bottom) of vertically being sling to by curtain wall, and operator uses sucker that curtain wall is moved to installation site, installs fixing, removes curtain wall stone tongs;
Step 4: repeat whole installations that step 1-3 completes curtain wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510399662.5A CN105003082A (en) | 2015-07-09 | 2015-07-09 | Glass curtain wall mounting equipment and glass curtain mounting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510399662.5A CN105003082A (en) | 2015-07-09 | 2015-07-09 | Glass curtain wall mounting equipment and glass curtain mounting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105003082A true CN105003082A (en) | 2015-10-28 |
Family
ID=54375923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510399662.5A Pending CN105003082A (en) | 2015-07-09 | 2015-07-09 | Glass curtain wall mounting equipment and glass curtain mounting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105003082A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108843003A (en) * | 2018-07-15 | 2018-11-20 | 李华梅 | A kind of skyscraper ambetti automatic installation apparatus |
CN109306757A (en) * | 2018-12-03 | 2019-02-05 | 通号工程局集团建设工程有限公司 | A kind of arcuated roof glass curtain wall mounting construction device and construction method |
CN109610852A (en) * | 2018-11-26 | 2019-04-12 | 中冶天工集团有限公司 | A kind of scaffold horizontal transporter and its application method |
CN109601261A (en) * | 2018-12-28 | 2019-04-12 | 淮安福康电子科技有限公司 | A multi-layer mushroom picking cart |
CN110778126A (en) * | 2019-11-04 | 2020-02-11 | 深圳市维业装饰集团股份有限公司 | Construction method of building glass curtain wall |
CN111704046A (en) * | 2020-06-01 | 2020-09-25 | 中国一冶集团有限公司 | Unit type glass curtain wall lifting device and construction method |
CN112065063A (en) * | 2020-08-18 | 2020-12-11 | 新昌县城南乡量新机械厂 | Installation auxiliary device of glass building curtain wall |
CN112681673A (en) * | 2020-12-11 | 2021-04-20 | 福建六个六装饰工程有限公司 | Automatic decoration system for building curtain wall |
CN113401809A (en) * | 2021-07-29 | 2021-09-17 | 中青建安建设集团有限公司 | Curtain wall unit body hoisting system |
CN114620620A (en) * | 2022-02-28 | 2022-06-14 | 佛山市享方自动化设备有限公司 | Glazing installation device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007247227A (en) * | 2006-03-15 | 2007-09-27 | Toray Ind Inc | Soundproof wall |
CN102257229A (en) * | 2008-12-19 | 2011-11-23 | 布鲁克伯格工业发展公司 | A method for mounting facade elements on a multi-storey building |
CN102561560A (en) * | 2011-12-13 | 2012-07-11 | 中国建筑第二工程局有限公司 | Independent overhanging unit type composite stone curtain wall eave line and installation method thereof |
CN102619340A (en) * | 2011-03-08 | 2012-08-01 | 青光绪 | Mounting method for unitary glass curtain wall |
CN102747841A (en) * | 2012-06-27 | 2012-10-24 | 浙江宝业幕墙装饰有限公司 | Curtain wall assembly, turnover and hoisting equipment and construction method thereof |
CN103290961A (en) * | 2013-05-16 | 2013-09-11 | 一禾科技发展(上海)有限公司 | Hanging structure of glass curtain walls and method for installing glass curtain walls |
-
2015
- 2015-07-09 CN CN201510399662.5A patent/CN105003082A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007247227A (en) * | 2006-03-15 | 2007-09-27 | Toray Ind Inc | Soundproof wall |
CN102257229A (en) * | 2008-12-19 | 2011-11-23 | 布鲁克伯格工业发展公司 | A method for mounting facade elements on a multi-storey building |
CN102619340A (en) * | 2011-03-08 | 2012-08-01 | 青光绪 | Mounting method for unitary glass curtain wall |
CN102561560A (en) * | 2011-12-13 | 2012-07-11 | 中国建筑第二工程局有限公司 | Independent overhanging unit type composite stone curtain wall eave line and installation method thereof |
CN102747841A (en) * | 2012-06-27 | 2012-10-24 | 浙江宝业幕墙装饰有限公司 | Curtain wall assembly, turnover and hoisting equipment and construction method thereof |
CN103290961A (en) * | 2013-05-16 | 2013-09-11 | 一禾科技发展(上海)有限公司 | Hanging structure of glass curtain walls and method for installing glass curtain walls |
Non-Patent Citations (1)
Title |
---|
赵向东: "超大玻璃幕墙的滑轨移位起重装置设计和应用", 《铁道建筑技术》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108843003A (en) * | 2018-07-15 | 2018-11-20 | 李华梅 | A kind of skyscraper ambetti automatic installation apparatus |
CN109610852A (en) * | 2018-11-26 | 2019-04-12 | 中冶天工集团有限公司 | A kind of scaffold horizontal transporter and its application method |
CN109306757A (en) * | 2018-12-03 | 2019-02-05 | 通号工程局集团建设工程有限公司 | A kind of arcuated roof glass curtain wall mounting construction device and construction method |
CN109601261A (en) * | 2018-12-28 | 2019-04-12 | 淮安福康电子科技有限公司 | A multi-layer mushroom picking cart |
CN110778126A (en) * | 2019-11-04 | 2020-02-11 | 深圳市维业装饰集团股份有限公司 | Construction method of building glass curtain wall |
CN111704046A (en) * | 2020-06-01 | 2020-09-25 | 中国一冶集团有限公司 | Unit type glass curtain wall lifting device and construction method |
CN112065063A (en) * | 2020-08-18 | 2020-12-11 | 新昌县城南乡量新机械厂 | Installation auxiliary device of glass building curtain wall |
CN112065063B (en) * | 2020-08-18 | 2021-04-09 | 中建五局装饰幕墙有限公司 | Installation auxiliary device of glass building curtain wall |
CN112681673A (en) * | 2020-12-11 | 2021-04-20 | 福建六个六装饰工程有限公司 | Automatic decoration system for building curtain wall |
CN113401809A (en) * | 2021-07-29 | 2021-09-17 | 中青建安建设集团有限公司 | Curtain wall unit body hoisting system |
CN114620620A (en) * | 2022-02-28 | 2022-06-14 | 佛山市享方自动化设备有限公司 | Glazing installation device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105003082A (en) | Glass curtain wall mounting equipment and glass curtain mounting method | |
CN205953370U (en) | Perpendicular transport means of unitized curtain wall | |
CN204454402U (en) | Detachable winch hanging apparatus | |
CN104477736A (en) | Shaft elevator installation method | |
CN202080836U (en) | Material lifting equipment for aerial operation | |
CN104632088A (en) | Petroleum drilling machine tower-shaped derrick sleeving mounting method | |
CN111021749A (en) | Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof | |
CN210366784U (en) | Civil engineering is with dismantled and assembled small-size machinery hoisting accessory | |
CN110388066B (en) | Unit type curtain wall plate construction machine | |
CN104989111A (en) | Construction method for steel structure high-rise hoisting | |
CN104973517A (en) | Electric gantry platform for installing sintering machine head equipment and application method thereof | |
KR20140004732U (en) | Cart for ornamenting ship | |
CN213389707U (en) | Construction hanging basket with stable supporting device | |
CN202449763U (en) | Simple pneumatic crane | |
CN109763638A (en) | A kind of high-altitude overhanging facade special type working vehicle and its construction method | |
JP2008222382A (en) | Method for moving lifting device for installation | |
CN102062538B (en) | Method for mounting head sprocket wheel of belt sintering machine | |
CN101649684A (en) | Installing method of roof mast | |
CN202729645U (en) | Tower crane with elevator | |
CN202465078U (en) | Hoisting mechanism of crane | |
CN202465109U (en) | Motor-driven double-beam grab bucket gantry crane | |
CN201857225U (en) | Hoisting device for bridge crane frame | |
CN202518943U (en) | Creeper-traveler for coating bridge location | |
CN202390106U (en) | Lifting hook portal crane easy to maintain | |
CN106744404A (en) | Method for hoisting mill housing by using movable tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151028 |