CN104930491B CN201510233496.1A CN201510233496A CN104930491B CN 104930491 B CN104930491 B CN 104930491B CN 201510233496 A CN201510233496 A CN 201510233496A CN 104930491 B CN104930491 B CN 104930491B
Authority
CN
China
Prior art keywords
tube panel
track girder
lifting
tube
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510233496.1A
Other languages
Chinese (zh)
Other versions
CN104930491A (en
Inventor
彭连勇
李开
刘慧兰
孟策
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201510233496.1A priority Critical patent/CN104930491B/en
Publication of CN104930491A publication Critical patent/CN104930491A/en
Application granted granted Critical
Publication of CN104930491B publication Critical patent/CN104930491B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tunnel Furnaces (AREA)

Abstract

nullThe invention discloses a kind of double reheat ultra supercritical tower boiler internal heating surface component installation system and method,The present invention is directed to double reheat ultra supercritical tower boiler equipment and arrange 8 layers of tube panel the most altogether,The increase of the tube panel number of plies increases the present situation of workload and difficulty of construction,By at furnace roof without media packs tube panel arranged beneath track girder and hoister lifting hook by the way of carry out tube panel lifting,Solve main hoisting machinery suspension hook and cannot carry out a difficult problem for equipment hoisting through ceiling and temperature-adjusting baffle,Lifting dedicated track beam and electric walking dolly,Facilitate tube panel equipment lifting and in place,Realize 8 layers of tube panel equipment to install simultaneously,Accelerate stove internal heating surface installation rate,And use the mount scheme of ground combination weld bond,Increase ground weld bond to greatest extent,Reduce equipment hoisting number of times,Reduce high mouth weld bond,While accelerating welded and installed speed,Reduce security risk.

Description

Double reheat ultra supercritical tower boiler internal heating surface component installation system and method
Technical field
The present invention relates to a kind of double reheat ultra supercritical tower boiler internal heating surface component installation system and method.
Background technology
Tower boiler because floor space is little, flue gas flow field uniformly, be prone to furnace stopping maintenance, possess the standby of excellence and quickly open The advantages such as dynamic feature, stove internal heating surface are conveniently hydrophobic, are widely applied in recent years.
Double reheat technology is to improve the effective way of the fired power generating unit thermal efficiency at present.Use the 1000MW of this technology super About 256.16 grams/kilowatt hour of criticality benchmark net coal consumption rate, reduces about 27.8 grams/thousand than 1000MW ultra supercritical single reheat unit Watt-hour, utilizes calculating in 6000 hours, every 1000MW unit can save standard coal 16.6 ten thousand tons every year, directly reduce discharging dioxy per year Changing nearly 200,000 tons of carbon, energy-saving and environmental protection are with the obvious advantage, have good economic and social benefit, are the important development of fired power generating unit Direction.
Double reheat formula tower boiler is different from " π " type double-flue boiler, and stove internal heating surface structure has special design Form, i.e. boiler furnace internal upper part is disposed with midfeather, and 100.924m to 122.24m burner hearth is divided into 2 flues of before and after, front Flue has been sequentially arranged primary superheater entrance tube panel, front flue H type fin economizer tube panel, low-pressure low-temperature reheating from top to bottom Device tube panel, rear pass has been sequentially arranged primary superheater entrance tube panel, rear pass H type fin economizer tube panel, height from top to bottom Forcing down temperature reheater tube panel, 100.924m layer is disposed with two-stage superheater tube panel, low-voltage high-temperature reheater tube panel, height with lower part Super pressure-high temperature reheater tube panel, three-stagesuperheater tube panel, primary superheater outlet tube panel, arranges 8 layers of tube panel, tube panel the most altogether The increase of the number of plies increases workload and difficulty of construction;Meanwhile, the stove internal heating surface number of plies reaches 8 layers, and between layers between Away from less, the one layer of tube panel that lifted that in lifting stove, tube panel used in the past arranges that suspender carries out the construction of lower floor's tube panel lifting again Method, will be greatly increased construction task, it is difficult to complete target of constructing on schedule.
Complete the heating surfaces such as burner hearth internal economizer, superheater, reheater the most safely and efficiently to install, become urgent need and solve Problem certainly.
Summary of the invention
The present invention is to solve the problems referred to above, it is proposed that a kind of double reheat ultra supercritical tower boiler internal heating surface parts Mounting system and method, this method by furnace roof without media packs tube panel arranged beneath track girder and hoister lifting hook by the way of Carry out tube panel lifting, solve main hoisting machinery suspension hook and cannot carry out a difficult problem for equipment hoisting through ceiling and temperature-adjusting baffle.
To achieve these goals, the present invention adopts the following technical scheme that
A kind of double reheat ultra supercritical tower boiler internal heating surface component installation system, is arranged on burner hearth including twice Portion, furnace roof are without the track girder below media packs tube panel, and twice track girder is respectively arranged at stokehold, furnace rear, on each track girder Being disposed with two electrical walking devices, track girder two ends are respectively arranged with lifting hook pulley, and the both sides of track girder are respectively fixed with and set It is placed in the hoist engine between the major-minor steelframe of boiler, hoist engine and be provided with pulley between the lifting hook pulley of homonymy, track girder both sides Hoist engine steel wire rope all by pulley through without medium panelized-tube-wall section key entry burner hearth, through lifting hook pulley and electric walking After the pulley of device, it is held within the hanger in the middle of track girder.
Described track girder lateral arrangement, and with the deviation of horizontal plane less than or equal to 10mm.
Described electrical walking device moves freely along track girder, is connected by pulley with track girder.
Described electrical walking device is electric walking dolly.
A kind of installation method based on said system, comprises the following steps:
(1) set up stove internal heating surface combined bay, tube panel equipment is welded, complete furnace roof and hang without media packs tube panel Dress;
(2) arranging twice track girder, hoist engine, wire rope hoist steel wire rope are arranged in track girder both sides;
(3) from the beginning of upper furnace, according to the order carried out to center, the most successively from the left and right sides to flue All types of tube panels lift simultaneously;
(4) after completing lifting, by furnace roof without passage reserved above media packs tube panel, by track girder, electric walking Walking apparatus removes inside burner hearth successively, recovers to be coated with tube panel, completes construction.
In described step (1), method particularly includes: set up combined bay, carry out tube panel equipment combination, welding, conscientious before combination According to drawing, tube panel equipment is numbered, prevents tube panel from misusing, before butt welding, tube panel steel alloy parts are carried out pipe spectrum point Analysis;Anabolic process needs check equipment deficiency, and determine defect processing scheme in time, to eliminate defect;After equipment has combined, Storage place is smooth, sets level, when padding, prevents tube panel from deforming when depositing.
In described step (2), after furnace roof has lifted without media packs tube panel, thereunder, twice track girder, rail are arranged Dao Liang stokehold, furnace rear respectively arrange 1 road, and left and right directions is arranged, must ensure track girder horizontal departure≤10mm, it is ensured that on track girder Electrical walking device can move freely, the track girder support by upper and lower, take root respectively to the transition beam of furnace roof and track On temperature-adjusting baffle doorframe below beam.
In described step (2), the method for arranging of hoist engine is, cigarette machine respectively the major-minor steelframe in the boiler left and right sides it Between, every steel wire rope of windlass keys in burner hearth by pulley through without medium panelized-tube-wall section, through the cunning of electric walking dolly Wheel and lifting hook pulley, steel cord ends is finally fixed on the hanger in the middle of track girder.
In described step (3), need the barrier clearing up on transport channel in advance, to ensure the coast is clear.
In described step (3), lifting is carried out the most successively, and order is as follows: before and after upper furnace, flue is carried out simultaneously, 4 covering devices respectively start from the stove left and right sides lifting, the every covering device in stokehold lift 4 groups before flue primary superheater entrance tube panel, After having welded, flue economizer tube panel before lifting 4 groups, lift 4 groups of low-pressure low-temperature reheater tube panels afterwards;Synchronization carries out furnace rear Tube panel equipment hoisting, is followed successively by 4 groups of rear pass primary superheater entrance tube panels, 4 groups of rear pass economizer tube panels, 4 groups of height force down Temperature reheater tube panel;Two set hanging apparatus on the most each track girder lift lower furnace portion heating surface jointly, are followed successively by: 4 groups Two-stage superheater tube panel, 4 groups of low-voltage high-temperature reheater tube panels, 2 groups of high pressure-temperature reheater tube panels, 1 group of three-stagesuperheater tube panel, 1 group of primary superheater outlet tube panel.
In described step (3), need to hang according to the order carried out to center, the most successively from the left and right sides Dress;Tube panel transport must be consistent with lifting sequence, it is to avoid retains a large amount of tube panel equipment inside burner hearth.
The invention have the benefit that
(1) present invention uses the mount scheme of ground combination weld bond, increases ground weld bond to greatest extent, and minimizing equipment hangs Dress number of times, reduces high mouth weld bond, while accelerating welded and installed speed, reduces security risk;
(2) present invention by furnace roof without media packs tube panel arranged beneath track girder and hoister lifting hook by the way of carry out Tube panel lifts, and solves main hoisting machinery suspension hook and cannot carry out a difficult problem for equipment hoisting through ceiling and temperature-adjusting baffle;
(3) the design lifting dedicated track beam and electric walking dolly of novelty, facilitates tube panel equipment lifting and in place, point Sheet lifting heating surface equipment, it is achieved 8 layers of tube panel equipment are installed simultaneously, accelerate stove internal heating surface installation rate.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Wherein: 1, hoist engine;2, track girder;3, electric walking dolly;4, hanger;5, lifting hook pulley;6, pulley.
Detailed description of the invention:
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
As it is shown in figure 1, a kind of double reheat ultra supercritical tower boiler internal heating surface component installation system, set including twice Be placed in upper furnace, furnace roof is respectively arranged at stokehold, furnace rear without the track girder 2 below media packs tube panel, twice track girder 2, Being disposed with two electrical walking devices on each track girder 2, track girder 2 two ends are respectively arranged with lifting hook pulley 5, track girder 2 Both sides are respectively fixed with the hoist engine 1 being arranged between the major-minor steelframe of boiler, hoist engine 1 and between the lifting hook pulley 5 of homonymy Being provided with pulley 6, the steel wire rope of the hoist engine 1 of track girder 2 both sides all keys in stove by pulley 6 through without medium panelized-tube-wall section Thorax, after the pulley of lifting hook pulley 5 and electrical walking device, is held within the hanger 4 in the middle of track girder 2.
Track girder 2 lateral arrangement, and with the deviation of horizontal plane less than or equal to 10mm.
Electrical walking device moves freely along track girder 2, is connected by pulley with track girder 2.
Electrical walking device is electric walking dolly 3.
Lift for realizing 8 layers of tube panel simultaneously, synchronize and header butt welding, at upper furnace, furnace roof without media packs pipe Screen arranged beneath 2 road track girder 2, per pass track girder 2 is arranged 2 electric walking dollies 3, guides hoist engine by walking dolly 1 steel wire rope enters burner hearth inside and at dolly arranged beneath suspension hook, from lifting by crane tube panel at the bottom of inner of the boiler chamber, it is achieved 8 layers of tube panel synchronize Lifting.
Key step includes:
Preparation of construction → stove internal heating surface combined bay sets up → and equipment conveying → equipment combination → lifting device arranges → sets Received shipment is transported to burner hearth → stove internal heating surface equipment hoisting → high-altitude butt welding → complete hanging device suspender and is removed.
(1) working drawing is standby and stove internal heating surface combines:
(1-1) feasible arrangement and method for construction is worked out.
(1-2) workmen is carried out safe examination, trains, tell somebody what one's real intentions are.
(1-3) set up combined bay, carry out tube panel equipment combination, conscientiously according to drawing, tube panel equipment is compiled before combination Number, prevent tube panel from misusing, before butt welding, tube panel steel alloy parts are carried out pipe analysis of spectrum;Anabolic process conscientiously checks equipment Defect, and in time determine defect processing scheme, elimination defect with management, owner and producer's work for personnel;After equipment has combined, deposit Storage place is smooth, sets level, when padding, prevents tube panel from deforming when depositing.
(2) suspender is arranged
(2-1) 2 road electric walking dolly 3 track girders after furnace roof has lifted, thereunder, are arranged without media packs tube panel 2,1 road is respectively arranged in track girder 2 stokehold, furnace rear, and left and right directions is arranged, per pass track girder 2 length 22m must ensure track girder 2 water Flat deviation≤10mm, it is ensured that the electric walking dolly 3 on track girder 2 can move freely.The track girder 2 support by upper and lower, Take root respectively on the temperature-adjusting baffle doorframe below the transition beam and track girder 2 of furnace roof.
(2-2) 4 electric walking dollies 3 are arranged: arrange 2 walking dollies, dolly power and control on per pass track girder 2 After power supply connects, test, it is ensured that move freely.
(2-3) hoist engine 1 is arranged, respectively between the major-minor steelframe in the boiler left and right sides, 136.5m layer arranges 2 10t volume Raising machine 1, every hoist engine 1 steel wire rope keys in burner hearth by pulley 6 through without medium panelized-tube-wall section, through electric walking dolly The pulley of 3 and lifting hook pulley 5, steel cord ends is finally fixed on the hanger 4 in the middle of track girder 2.
(3) tube panel lifting
(3-1) barrier on transport channel is cleared up in advance, it is ensured that the coast is clear.
(3-2) lifting is carried out the most successively, and order is as follows: before and after upper furnace, flue is carried out simultaneously, and 4 covering devices divide Lifting is not started from the stove left and right sides.Flue primary superheater entrance tube panel before hanging apparatus lifts 4 groups is often overlapped in stokehold, has welded Cheng Hou, flue economizer tube panel before lifting 4 groups, lift 4 groups of low-pressure low-temperature reheater tube panels afterwards;Synchronization carries out furnace rear tube panel and sets Standby lifting, is followed successively by 4 groups of rear pass primary superheater entrance tube panels, 4 groups of rear pass economizer tube panels, 4 groups of high pressure low temperature reheating Device tube panel;The most every 2 set hanging apparatus lift lower furnace portion heating surface jointly, are followed successively by: 4 groups of two-stage superheater tube panels, 4 groups low Super pressure-high temperature reheater tube panel, 2 groups of high pressure-temperature reheater tube panels, 1 group of three-stagesuperheater tube panel, 1 group of primary superheater outlet Screen.Lift according to the order carried out to center, the most successively from the left and right sides.Tube panel transport is sure to and lifting sequence Unanimously, it is to avoid inside burner hearth, retain a large amount of tube panel equipment.
Often set hanging apparatus includes 2, electrical walking device of track girder and is positioned at the same side with this electrical walking device Hanger 4, lifting hook pulley 5, hoist engine 1 and pulley 6.
(4) lifted rear device to remove
After completing lifting, by furnace roof without passage reserved above media packs tube panel, by the track girder of hanging apparatus 2, electric walking dolly 3 removes inside burner hearth successively, recovers to be coated with tube panel, completes construction.
Although the detailed description of the invention of the present invention is described by the above-mentioned accompanying drawing that combines, but not the present invention is protected model The restriction enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme, and those skilled in the art are not Need to pay various amendments or deformation that creative work can make still within protection scope of the present invention.

Claims (9)

1. an installation method based on double reheat ultra supercritical tower type boiler internal heating surface component installation system, described system System includes that twice are arranged at upper furnace, furnace roof is respectively arranged at without the track girder below media packs tube panel, twice track girder Stokehold, furnace rear, each track girder is disposed with two electrical walking devices, and track girder two ends are respectively arranged with lifting hook pulley, rail The both sides of road beam are respectively fixed with the hoist engine being arranged between the major-minor steelframe of boiler, hoist engine and be positioned at homonymy lifting hook pulley it Between be provided with pulley, the steel wire rope of the hoist engine of track girder both sides all by pulley through without medium panelized-tube-wall section key entry burner hearth, After the pulley of lifting hook pulley and electrical walking device, it is held within the hanger in the middle of track girder;
It is characterized in that: comprise the following steps:
(1) set up stove internal heating surface combined bay, tube panel equipment is welded, complete furnace roof and lift without media packs tube panel;
(2) arranging twice track girder, hoist engine, wire rope hoist steel wire rope are arranged in track girder both sides;
(3) from the beginning of upper furnace, according to all kinds of to flue of the order carried out to center, the most successively from the left and right sides Type tube panel lifts simultaneously;
(4) after completing lifting, by furnace roof without passage reserved above media packs tube panel, by track girder, electric walking dress Put and remove inside burner hearth successively, recover to be coated with tube panel, complete construction.
2. installation method as claimed in claim 1, is characterized in that: in described step (1), method particularly includes: set up combined bay, Carry out tube panel equipment combination, welding, conscientiously according to drawing, tube panel equipment is numbered before combination, prevents tube panel from misusing, boil on the nape opposite the mouth Before Han Jie, tube panel steel alloy parts are carried out pipe analysis of spectrum;Anabolic process needs check equipment deficiency, and determine defect in time Processing scheme, to eliminate defect;After equipment has combined, storage place is smooth, sets level, when padding, prevents tube panel from deforming when depositing.
3. installation method as claimed in claim 1, is characterized in that: in described step (2), and furnace roof lifts without media packs tube panel After completing, thereunder, arranging twice track girder, track girder stokehold, furnace rear respectively arrange 1 road, and left and right directions is arranged, must ensure Track girder horizontal departure≤10mm, it is ensured that the electrical walking device on track girder can move freely, track girder is by upper and lower Support, take root respectively on the temperature-adjusting baffle doorframe below the transition beam and track girder of furnace roof.
4. installation method as claimed in claim 1, is characterized in that: in described step (2), and the method for arranging of hoist engine is, volume Raising machine respectively between the major-minor steelframe in the boiler left and right sides, every steel wire rope of windlass is passed without WATER AS FLOW MEDIUM cold wall pipe by pulley Burner hearth keyed in by screen, and through pulley and the lifting hook pulley of electric walking dolly, steel cord ends is finally fixed in the middle of track girder On hanger.
5. installation method as claimed in claim 1, is characterized in that: in described step (3), needs to clear up on transport channel in advance Barrier, to ensure the coast is clear.
6. installation method as claimed in claim 1, is characterized in that: in described step (3), and lifting is carried out the most successively, Order is as follows: before and after upper furnace, flue is carried out simultaneously, and 4 covering devices start lifting respectively from the stove left and right sides, and stokehold is often set with Putting flue primary superheater entrance tube panel before lifting 4 groups, after having welded, before lifting 4 groups, flue economizer tube panel, lifts afterwards 4 groups of low-pressure low-temperature reheater tube panels;Synchronization carries out furnace rear tube panel equipment hoisting, is followed successively by 4 groups of rear pass primary superheater entrances Tube panel, 4 groups of rear pass economizer tube panels, 4 groups of high pressure low temperature reheater tube panels;Two set hanging apparatus on the most each track girder Common lifting lower furnace portion heating surface, is followed successively by: 4 groups of two-stage superheater tube panels, 4 groups of low-voltage high-temperature reheater tube panels, 2 groups of high pressure High temperature reheater tube panel, 1 group of three-stagesuperheater tube panel, 1 group of primary superheater outlet tube panel.
7. installation method as claimed in claim 1, is characterized in that: in described step (3), need according to from the left and right sides in The heart, the order carried out the most successively lift;Tube panel transport must be consistent with lifting sequence, it is to avoid deposits inside burner hearth Stay a large amount of tube panel equipment.
8. installation method as claimed in claim 1, is characterized in that: described track girder lateral arrangement, and with the deviation of horizontal plane Less than or equal to 10mm.
9. installation method as claimed in claim 1, is characterized in that: described electrical walking device moves freely along track girder, It is connected by pulley with track girder.
CN201510233496.1A 2015-05-08 2015-05-08 Double reheat ultra supercritical tower boiler internal heating surface component installation system and method Active CN104930491B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510233496.1A CN104930491B (en) 2015-05-08 2015-05-08 Double reheat ultra supercritical tower boiler internal heating surface component installation system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510233496.1A CN104930491B (en) 2015-05-08 2015-05-08 Double reheat ultra supercritical tower boiler internal heating surface component installation system and method

Publications (2)

Publication Number Publication Date
CN104930491A CN104930491A (en) 2015-09-23
CN104930491B true CN104930491B (en) 2016-11-16

Family

ID=54117774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510233496.1A Active CN104930491B (en) 2015-05-08 2015-05-08 Double reheat ultra supercritical tower boiler internal heating surface component installation system and method

Country Status (1)

Country Link
CN (1) CN104930491B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105627353A (en) * 2015-12-30 2016-06-01 青岛安装建设股份有限公司 Scribing installation technology for boiler film water-cooled walls
CN106379811B (en) * 2016-11-30 2017-11-21 山东电力建设第一工程公司 Unit side coal bunker structure π type boiler structural design mechanical arrangement structures and hanging method
CN106907698B (en) * 2017-03-10 2019-03-08 中国电建集团河南工程有限公司 High temperature reheater pipe arranges construction method for hanging

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005009592B4 (en) * 2005-02-28 2007-09-27 Alstom Technology Ltd. Quick assembly process for large steam generators
CN101042058B (en) * 2007-04-27 2011-12-07 冯伟忠 Novel steam-electric generating set
CN202324714U (en) * 2011-11-02 2012-07-11 中国电力工程顾问集团华东电力设计院 Truss type big-board beam system for tower boiler
CN102889570B (en) * 2012-09-11 2014-11-12 上海锅炉厂有限公司 Tower-type boiler with primary reheater and secondary reheater

Also Published As

Publication number Publication date
CN104930491A (en) 2015-09-23

Similar Documents

Publication Publication Date Title
CN104930491B (en) Double reheat ultra supercritical tower boiler internal heating surface component installation system and method
CN106015729B (en) A kind of reverse method in place of evaporated flue under sealing power house
CN102901081A (en) Double-flue double-reheat DC (Direct Current) boiler with overall horizontal arrangement on heating surface in boiler
CN106435087A (en) Sectional assembling and mounting method for converter vaporization flue
CN106086263A (en) A kind of collaborative hanging method of blast furnace cooling stave
CN109648513A (en) Horizontal U-shaped heat exchange of heat pipe restrains method for dismounting
CN104344389B (en) The hanging method of rear cigarette well snake-like tube row
CN106379810B (en) The device hanging method of 660MW units tower boiler three
CN106677564A (en) Combined main factory building of cycle power plant
CN105448366B (en) A kind of installation method of Nuclear Power Station Condensers
CN105421831B (en) Thermal power plant main building arrangement form based on joint side coal bunker scheme
CN103342321B (en) The integral replacing hanging method of in-service nuclear power station steam generator
CN106016233B (en) A kind of long solder joint of span few boiler penthouse and its hanging method
CN105019695A (en) High-position arrangement method and structure of combined main power house of split-shaft gas-steam combined-cycle power plant
CN103574570A (en) Novel heat recovery boiler of cement kiln head
CN205258515U (en) Frock is repaired to hot -blast furnace hot -blast branch pipe inside lining
CN105953599A (en) Construction method of condenser
CN205037736U (en) Fire roller kilns of archaize building product
CN102538476B (en) Rapid slag removing method of heating furnace
CN103602343A (en) A dry coke quenching system
CN207405845U (en) It is a kind of to be used to carry out large-scale component transport, the device having bad luck on light roof
CN205550772U (en) Waste heat recovery integral type catalysis incinerator
CN205656861U (en) Conventional big platform arrangement structure of island factory building of nuclear power station and conventional island of nuclear power station factory building
CN206955936U (en) A kind of coke oven smoke-guiding car
CN205400158U (en) Main plant building arrangement structure of single shaft gas -steam combined cycle unit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.6 building, zone 2, Hanyu financial and business center, hi tech Zone, Jinan City, Shandong Province

Patentee after: SEPCO1 ELECTRIC POWER CONSTRUCTION CORPORATION Co.,Ltd.

Address before: 250100 No. 244 industrial North Road, Shandong, Ji'nan

Patentee before: SEPCO1 ELECTRIC POWER CONSTRUCTION Corp.