[go: up one dir, main page]

CN104905501B - The installation constitution and clock and watch of band - Google Patents

The installation constitution and clock and watch of band Download PDF

Info

Publication number
CN104905501B
CN104905501B CN201510107418.7A CN201510107418A CN104905501B CN 104905501 B CN104905501 B CN 104905501B CN 201510107418 A CN201510107418 A CN 201510107418A CN 104905501 B CN104905501 B CN 104905501B
Authority
CN
China
Prior art keywords
belt
hole
fitting portion
spring bar
case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510107418.7A
Other languages
Chinese (zh)
Other versions
CN104905501A (en
Inventor
横尾将
横尾一将
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Casio Computer Co Ltd
Original Assignee
Casio Computer Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Casio Computer Co Ltd filed Critical Casio Computer Co Ltd
Publication of CN104905501A publication Critical patent/CN104905501A/en
Application granted granted Critical
Publication of CN104905501B publication Critical patent/CN104905501B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Springs (AREA)

Abstract

本发明提供一种带的安装构造以及钟表,在对壳体、带施加了冲击、振动时能够使向弹簧杆传递的冲击、振动衰减来而防止弹簧杆的破损、带的脱落,从而能够提高耐冲击性、耐振动性。该带的安装构造具备:带安装部,其在两个脚部的对置的面贯穿设置有带安装孔;连结节体,其具有形成有第一贯通孔的第一嵌合部;缓冲部件,其具有第二嵌合部,该第二嵌合部能够与第一嵌合部嵌合且形成有在嵌合状态下与第一贯通孔连通的第二贯通孔;以及弹簧杆,其在第一贯通孔及第二贯通孔插通且两端部插入于带安装孔,第二贯通孔的内径与弹簧杆的外径相同,第一贯通孔的内径比弹簧杆的外径大,弹簧杆相对于连结节体具有游隙地配置。

The present invention provides a belt mounting structure and a timepiece, which can attenuate the impact and vibration transmitted to the spring rod when impact and vibration are applied to the case and the belt, thereby preventing damage to the spring rod and falling off of the belt, thereby improving Shock resistance, vibration resistance. The strap mounting structure includes: a strap mounting portion having a strap mounting hole penetrating through opposing surfaces of the two leg portions; a connecting node having a first fitting portion formed with a first through hole; and a cushioning member. , which has a second fitting portion, which can be fitted with the first fitting portion and is formed with a second through hole communicating with the first through hole in the fitted state; and a spring rod, which is in the The first through hole and the second through hole are inserted and both ends are inserted into the belt mounting hole, the inner diameter of the second through hole is the same as the outer diameter of the spring bar, the inner diameter of the first through hole is larger than the outer diameter of the spring bar, and the spring The rod is arranged with play relative to the joint body.

Description

带的安装构造以及钟表Wearing structure and the clock of the belt

技术领域technical field

本发明涉及带的安装构造以及钟表。The present invention relates to a belt mounting structure and a timepiece.

背景技术Background technique

以往,作为在钟表等的壳体上安装带的结构,公知有使用弹簧杆来将带固定于壳体的结构。Conventionally, as a structure for attaching a band to a case of a timepiece or the like, a structure in which the band is fixed to the case using a spring bar is known.

例如,专利文献1中公开了如下结构,即,具备筒状部件、在筒状部件的端部沿该筒状部件的轴向能够进退地设置的一对销、以及配置在筒状部件的内部且向使销从筒状部件的端部突出的前进方向对销进行施力的施力部件,销的后方至少具备弹簧杆(连结件),该弹簧杆构成为,通过与处于从筒状部件的端部离开销的行程大小的位置的卡定部卡定,来防止销从筒状部件脱离,并利用该弹簧杆将带安装于钟表壳体。For example, Patent Document 1 discloses a structure including a cylindrical member, a pair of pins provided at the end of the cylindrical member so as to be able to advance and retreat along the axial direction of the cylindrical member, and a pin disposed inside the cylindrical member. And to the urging member that urges the pin in the forward direction that makes the pin protrude from the end of the cylindrical member, the rear of the pin is at least equipped with a spring bar (connecting member), and the spring bar is configured to pass through the pin from the cylindrical member. The locking part at the position where the end part of the pin is away from the stroke of the pin is locked to prevent the pin from detaching from the cylindrical member, and the band is mounted on the watch case by using the spring bar.

专利文献1所记载的结构中,与在弹簧杆不具备这样的构造的情况比较,能够期待提高弹簧杆相对于钟表的落下冲击时等的负荷的强度的效果。In the structure described in Patent Document 1, compared with the case where the spring bar does not have such a structure, the effect of increasing the strength of the spring bar against a load such as when the timepiece is dropped and impacted can be expected.

现有技术文献prior art literature

专利文献1:日本特开2007-89882号公报Patent Document 1: Japanese Patent Laid-Open No. 2007-89882

然而,如专利文献1所记载的结构那样,在弹簧杆与壳体、带直接接触的情况下,在当钟表的安装时、落下时等对壳体、带施加了强烈的冲击时,该冲击直接向弹簧杆传递。特别是在施加了沿壳体和带接近、分离的方向的冲击、沿壳体和带相互扭转的方向的冲击的情况、在反复施加高频、高振幅振动那样的环境下使用的情况等下,在连结有壳体和带的弹簧杆部分施加较大的冲击。However, as in the structure described in Patent Document 1, when the spring bar is in direct contact with the case and the band, when a strong impact is applied to the case or the band when the timepiece is installed or dropped, the shock will Pass directly to the spring bar. In particular, when shocks are applied in the direction in which the case and the belt approach or separate, in the direction in which the case and the belt twist each other, or when the product is used in an environment where high-frequency and high-amplitude vibrations are repeatedly applied, etc. , a larger impact is applied to the part of the spring bar that connects the housing and the belt.

并且,为了体现钟表等的高级感,而壳体、带不由树脂等形成而是由金属材料形成,但在壳体、带由金属材料形成的情况下,由于在壳体、带侧不怎么能够吸收冲击,所以直接施加于弹簧杆的冲击更大。In addition, in order to reflect the high-end sense of clocks, etc., the casing and the band are not formed of resin or the like but are formed of a metal material. However, when the casing and the band are formed of a metal material, it is not very possible to move the belt on the side of the casing and the band. Absorbs shocks, so shocks applied directly to the spring bar are greater.

该情况下,如专利文献1所记载的结构那样仅在弹簧杆内设置缓和冲击的构造的话,则无法充分防止弹簧杆的破损、弹簧杆拆下所产生的带的脱落的担忧。In this case, simply providing a shock-absorbing structure in the spring bar like the structure described in Patent Document 1 cannot sufficiently prevent damage to the spring bar or the risk of the belt falling off when the spring bar is removed.

发明内容Contents of the invention

本发明是鉴于以上的情况而完成的,其目的在于提供如下带的安装构造以及钟表,即,当对壳体、带施加冲击、振动时,能够使向弹簧杆传递的冲击、振动衰减而防止弹簧杆的破损、带的脱落,从而能够提高耐冲击性、耐振动性。The present invention has been accomplished in view of the above circumstances, and its object is to provide a belt mounting structure and a timepiece that can attenuate the impact and vibration transmitted to the spring bar when impact and vibration are applied to the case and the belt to prevent The breakage of the spring bar and the falling off of the belt can be improved, so that the impact resistance and vibration resistance can be improved.

为了解决上述课题,本发明的带的安装构造是在壳体上安装带的带的安装构造,其特征在于,具备:In order to solve the above-mentioned problems, the belt mounting structure of the present invention is a belt mounting structure in which a belt is mounted on a casing, and is characterized in that it includes:

带安装部,其设于上述壳体的侧部,具有对置的两个脚部,且在该脚部的对置的面贯穿设置有带安装孔;The belt installation part is arranged on the side part of the above-mentioned housing, has two opposite feet, and a belt installation hole is provided through the opposite surface of the feet;

连结节体,其设置在上述带的向上述壳体安装的安装侧端部,具有形成有沿上述带的宽度方向延伸的第一贯通孔的第一嵌合部,且安装于上述带安装部;The connecting node is provided at the attachment-side end portion of the belt attached to the housing, has a first fitting portion formed with a first through hole extending in the width direction of the belt, and is attached to the belt attachment portion. ;

缓冲部件,其具有第二嵌合部,且将上述连结节体保持于上述带安装部的规定的位置,该第二嵌合部能够与上述第一嵌合部嵌合,并形成有在嵌合状态下与上述第一贯通孔连通的第二贯通孔;以及The buffer member has a second fitting portion capable of fitting the first fitting portion and is formed with A second through hole communicating with the first through hole in the closed state; and

弹簧杆,其在上述第一贯通孔及上述第二贯通孔插通,并在上述带向上述壳体安装的安装状态下,两端部分别插入于上述带安装部的上述带安装孔,a spring bar that is inserted through the first through hole and the second through hole, and has both ends inserted into the belt attachment holes of the belt attachment portion in a state where the belt is attached to the case,

上述第二贯通孔的内径与上述弹簧杆的外径相同,上述第一贯通孔的内径比上述弹簧杆的外径大,从而上述弹簧杆相对于上述连结节体具有游隙地配置。The inner diameter of the second through hole is the same as the outer diameter of the spring bar, and the inner diameter of the first through hole is larger than the outer diameter of the spring bar, so that the spring bar is arranged with play relative to the connecting joint body.

并且,本发明的钟表的特征在于,具备:Furthermore, the timepiece of the present invention is characterized in that it has:

方案1至方案4任一项中所述的带的安装构造;The installation structure of the belt described in any one of schemes 1 to 4;

壳体;以及casing; and

安装于上述壳体的带。Belt mounted to the case above.

发明的效果如下。The effects of the invention are as follows.

根据本发明,起到如下效果,即,当对壳体、带施加冲击、振动时,能够使向弹簧杆传递的冲击、振动衰减而防止弹簧杆的破损、带的脱落,从而能够提高耐冲击性、耐振动性。According to the present invention, when an impact or vibration is applied to the casing or the belt, the impact and vibration transmitted to the spring bar can be attenuated to prevent damage to the spring bar and the belt to fall off, thereby improving impact resistance. resistance, vibration resistance.

附图说明Description of drawings

图1是使用了第一实施方式的带的安装构造的钟表的主视图。FIG. 1 is a front view of a timepiece using a strap mounting structure of a first embodiment.

图2是放大了第一实施方式的钟表壳体和带的安装部分的主要部分立体图,图2(a)表示从钟表的表面侧观察的状态,图2(b)表示从钟表的背面侧观察的状态。Fig. 2 is an enlarged perspective view of the main part of the watch case and the attachment portion of the band of the first embodiment, Fig. 2(a) shows the state viewed from the front side of the watch, and Fig. 2(b) shows the state seen from the back side of the watch status.

图3(a)是连结节体的立体图,图3(b)是缓冲部件的立体图。FIG. 3( a ) is a perspective view of a coupling body, and FIG. 3( b ) is a perspective view of a cushioning member.

图4是表示在第一实施方式中使连结节体和缓冲部件成为一体的结构的分解立体图。Fig. 4 is an exploded perspective view showing a structure in which a connecting segment and a cushioning member are integrated in the first embodiment.

图5(a)及图(b)是说明将成为一体后的连结节体以及缓冲部件安装于钟表壳体的带安装部的情形的主要部分侧视图。5(a) and 5(b) are main part side views illustrating how the integrated connecting joint body and buffer member are attached to the strap attaching portion of the watch case.

图6是使用了第二实施方式的带的安装构造的钟表的主视图。Fig. 6 is a front view of a timepiece using the strap mounting structure of the second embodiment.

图7是放大了第二实施方式的钟表壳体和带的安装部分的主要部分立体图,图7(a)表示从钟表的表面侧观察的状态,图7(b)表示从钟表的背面侧观察的状态。Fig. 7 is an enlarged perspective view of main parts of the watch case and the belt attachment portion of the second embodiment, Fig. 7(a) shows the state seen from the front side of the watch, and Fig. 7(b) shows the state seen from the back side of the watch status.

图8(a)是连结节体的立体图,图8(b)是缓冲部件的立体图。FIG. 8( a ) is a perspective view of a joint body, and FIG. 8( b ) is a perspective view of a cushioning member.

图9(a)是表示第二实施方式的连结节体以及缓冲部件的立体图,图9(b)是表示第二实施方式的连结节体以及缓冲部件的侧视图。FIG. 9( a ) is a perspective view showing the connecting node and the cushioning member of the second embodiment, and FIG. 9( b ) is a side view showing the connecting node and the cushioning member of the second embodiment.

图10(a)及图10(b)是说明将连结节体以及缓冲部件安装于钟表壳体的带安装部的情形的主要部分侧视图。Fig. 10(a) and Fig. 10(b) are main part side views explaining how the connecting joint body and the buffer member are attached to the belt attaching portion of the timepiece case.

具体实施方式detailed description

(第一实施方式)(first embodiment)

参照图1至图5,对本发明的带的安装构造以及钟表的第一实施方式进行说明。Referring to FIGS. 1 to 5 , a first embodiment of a belt attachment structure and a timepiece according to the present invention will be described.

此外,对于以下说明的实施方式,为了实施本发明而赋予了技术上优选的各种限定,但本发明的范围不限定于以下的实施方式以及图示例子。In addition, various limitations technically preferable for carrying out the present invention are given to the embodiments described below, but the scope of the present invention is not limited to the following embodiments and illustrated examples.

图1是使用了本实施方式的带的安装构造的钟表的主视图。FIG. 1 is a front view of a timepiece using the strap attachment structure of this embodiment.

如图1所示,钟表100具备:具有钟表壳体10的钟表主体1、和安装于该钟表壳体10的带2。As shown in FIG. 1 , a timepiece 100 includes a timepiece body 1 having a timepiece case 10 , and a band 2 attached to the timepiece case 10 .

如后文所述,带2通过具备带安装部15、连结节体20、缓冲部件3以及弹簧杆4的带安装构造,而安装于钟表壳体10。As will be described later, the band 2 is attached to the timepiece case 10 by a band attaching structure including the band attaching portion 15 , the joint body 20 , the buffer member 3 , and the spring bar 4 .

钟表主体1具备:钟表壳体10、具有指针及液晶面板等的未图示的显示部、以及容纳在钟表壳体10内且使指针等动作的钟表模块(未图示)等。并且,本实施方式的钟表主体1由透明的玻璃等形成,并具备覆盖显示部的上部的挡风部件11。The timepiece body 1 includes a timepiece case 10 , a display unit (not shown) having hands, a liquid crystal panel, and the like, and a timepiece module (not shown) housed in the timepiece case 10 to operate the hands and the like. Furthermore, the timepiece body 1 of the present embodiment is formed of transparent glass or the like, and includes a windshield member 11 covering the upper portion of the display unit.

此外,显示部的结构没有特别限定,可以是仅由指针构成的模拟方式,也可以是由液晶面板构成的数字方式。并且,也可以是具备指针和液晶面板双方的结构。In addition, the configuration of the display unit is not particularly limited, and may be an analog type consisting of only pointers, or a digital type consisting of a liquid crystal panel. In addition, it may be configured to include both pointers and a liquid crystal panel.

并且,在钟表主体1的侧面,设有用于进行各种操作的操作按钮12。Further, on the side surface of the timepiece body 1, operation buttons 12 for performing various operations are provided.

本实施方式的钟表壳体10例如由不锈钢、钛等金属材料形成。The timepiece case 10 of the present embodiment is formed of, for example, a metal material such as stainless steel or titanium.

在钟表壳体10的上下(图1中上下、钟表的6点侧和12点侧)方向的侧部,分别设有供带2安装的带安装部15。On the sides of the watch case 10 in the vertical direction (up and down in FIG. 1 , the 6 o'clock side and the 12 o'clock side of the watch), strap attachment portions 15 for attaching the strap 2 are respectively provided.

图2(a)以及图2(b)是放大了本实施方式的钟表壳体10和带2的安装部分的主要部分立体图,图2(a)表示从钟表100的表面侧观察的状态,图2(b)表示从钟表100的背面侧观察的状态。Fig. 2 (a) and Fig. 2 (b) are main part perspective views of the mounting part of the timepiece case 10 and the belt 2 of the enlarged present embodiment, Fig. 2 (a) shows the state viewed from the surface side of the timepiece 100, the figure 2(b) shows the state viewed from the back side of the timepiece 100 .

并且,图3(a)是连结节体的立体图,图3(b)是缓冲部件的立体图。3( a ) is a perspective view of a joint body, and FIG. 3( b ) is a perspective view of a cushioning member.

如图1等所示,带安装部15具有对置的两个脚部151。如图2(b)所示,在该脚部151的对置的面,分别贯穿设置有带安装孔152。As shown in FIG. 1 and the like, the belt attachment portion 15 has two opposing leg portions 151 . As shown in FIG. 2( b ), belt attachment holes 152 are formed through the opposing surfaces of the leg portions 151 .

带安装孔152是供后述的弹簧杆4的前端部41嵌入并卡定的凹部。如后文所述,在本实施方式中,弹簧杆4的前端部41形成为锥状。带安装孔152与该弹簧杆4的前端部41的形状对应地随着趋向中央部而变深,从而能够将弹簧杆4的前端部41稳定地保持于孔的中央部。The belt attachment hole 152 is a concave portion into which the front end portion 41 of the spring bar 4 described later is fitted and locked. As will be described later, in the present embodiment, the front end portion 41 of the spring rod 4 is formed in a tapered shape. The belt attachment hole 152 becomes deeper toward the center according to the shape of the front end 41 of the spring bar 4 , so that the front end 41 of the spring bar 4 can be stably held at the center of the hole.

对于本实施方式中安装于钟表壳体10的带2而言,例如通过将由不锈钢、钛等金属材料形成的多个节体(即,带节,带件)锁状地连结而构成。The band 2 attached to the timepiece case 10 in this embodiment is constituted by, for example, connecting a plurality of segments (ie, band segments, band members) formed of metal materials such as stainless steel and titanium in a lock-like manner.

在带2的向钟表壳体10安装的安装侧端部,设有安装到带安装部15的连结节体20。At the attachment-side end portion of the band 2 attached to the timepiece case 10 , there is provided a connecting node 20 attached to the band attaching portion 15 .

如图2(a)、图2(b)以及图3(a)所示,连结节体20具有:在一对脚部21之间形成有凹部22的第一嵌合部23;以及向与安装到钟表壳体10的安装侧相反的一侧伸出的突出部24。As shown in Fig. 2 (a), Fig. 2 (b) and Fig. 3 (a), the joint node 20 has: a first fitting portion 23 with a concave portion 22 formed between a pair of leg portions 21; Attached to the protrusion 24 protruding from the side opposite to the mounting side of the timepiece case 10 .

第一嵌合部23的凹部22成为接受后述的缓冲部件3的凸部32的形状。The concave portion 22 of the first fitting portion 23 is shaped to receive the convex portion 32 of the cushioning member 3 described later.

在第一嵌合部23(在本实施方式中,构成第一嵌合部23的一对脚部21),形成有沿带2的宽度方向(图1中横向)延伸的第一贯通孔25。In the first fitting portion 23 (in this embodiment, the pair of leg portions 21 constituting the first fitting portion 23 ), a first through hole 25 extending in the width direction of the belt 2 (horizontal direction in FIG. 1 ) is formed. .

第一贯通孔25供弹簧杆4插通。本实施方式中,第一贯通孔25的内径形成为比弹簧杆4的外径大,弹簧杆4相对于连结节体20具有游隙地配置。The first through hole 25 allows the spring rod 4 to pass through. In the present embodiment, the inner diameter of the first through hole 25 is formed larger than the outer diameter of the spring bar 4 , and the spring bar 4 is arranged with play relative to the connecting joint body 20 .

并且,在本实施方式中,在将连结节体20嵌入钟表壳体10的带安装部15的状态下,第一贯通孔25的中心与钟表壳体10侧的带安装孔152的中心大致一致。In addition, in the present embodiment, in a state where the connecting joint body 20 is fitted into the band attachment portion 15 of the timepiece case 10, the center of the first through hole 25 substantially coincides with the center of the band attachment hole 152 on the side of the timepiece case 10. .

并且,在第一嵌合部23(在本实施方式中,构成第一嵌合部23的一对脚部21),形成有与第一贯通孔25相同地沿带2的宽度方向(图1中横向)延伸的第一轴孔26。In addition, in the first fitting portion 23 (in the present embodiment, a pair of leg portions 21 constituting the first fitting portion 23 ), the first through hole 25 is formed along the width direction of the belt 2 ( FIG. 1 ). The first shaft hole 26 extending in the transverse direction.

在使连结节体20和缓冲部件3嵌合的嵌合状态下,第一轴孔26与形成于后述的第二嵌合部30的第二轴孔34连通而构成一个相连的轴孔。通过在该轴孔插通结合用轴部件51(参照图4等),来使连结节体20以及缓冲部件3成为一体。In the fitted state where the connecting joint body 20 and the cushioning member 3 are fitted, the first shaft hole 26 communicates with a second shaft hole 34 formed in the second fitting portion 30 described later to form a single continuous shaft hole. By inserting the coupling shaft member 51 (see FIG. 4 and the like) through the shaft hole, the coupling joint body 20 and the cushioning member 3 are integrated.

在本实施方式中,该一个相连的轴孔由具有与结合用轴部件51的外径大致相等的内径的小径部26a、和设于该小径部26a的任意一端侧且具有比小径部26a大的内径的大径部26b构成。In this embodiment, the one connected shaft hole consists of a small-diameter portion 26a having an inner diameter substantially equal to the outer diameter of the coupling shaft member 51, and a diameter larger than the small-diameter portion 26a provided on either end side of the small-diameter portion 26a. The inner diameter of the large diameter portion 26b constitutes.

如图4所示,结合用轴部件51从轴孔的小径部26a朝向大径部26b插入,从大径部26b侧插入C型圈52(参照图4等)。C型圈52的直径比大径部26b的内径小,且比小径部26a的内径大,通过在结合用轴部件51的插入侧前端部从大径部26b侧嵌入C型圈52,来将结合用轴部件51固定为不会从轴孔脱落。As shown in FIG. 4 , the coupling shaft member 51 is inserted from the small diameter portion 26a of the shaft hole toward the large diameter portion 26b, and the C-ring 52 is inserted from the large diameter portion 26b side (see FIG. 4 and the like). The diameter of the C-shaped ring 52 is smaller than the inner diameter of the large-diameter portion 26b, and larger than the inner diameter of the small-diameter portion 26a. By inserting the C-shaped ring 52 from the large-diameter portion 26b side into the front end portion of the coupling shaft member 51 on the insertion side, the C-shaped ring 52 is inserted. The coupling shaft member 51 is fixed so as not to come off from the shaft hole.

在突出部24,形成有沿带2的宽度方向(图1中横向)延伸的贯通孔27。A through-hole 27 extending in the width direction (horizontal direction in FIG. 1 ) of the belt 2 is formed in the protruding portion 24 .

在本实施方式中,通过在该贯通孔27插通未图示的轴部件而将未图示的节体等连结于连结节体20,来形成带2。In this embodiment, the belt 2 is formed by inserting an unshown shaft member through the through-hole 27 and connecting a not-shown node or the like to the connection node 20 .

缓冲部件3构成为能够弹性变形,且对施加于钟表壳体10、带2的冲击进行吸收。The cushioning member 3 is configured to be elastically deformable and absorb impacts applied to the timepiece case 10 and the band 2 .

缓冲部件3例如由弹性体(elastomer)等弹性材料形成。具体而言,缓冲部件3由聚氨酯树脂、硅酮橡胶(silicone rubber)等形成。此外,形成缓冲部件3的材料是具有缓冲效果的材料即可,不限定于在此举例表示的材料。The cushioning member 3 is formed of elastic materials such as elastomers, for example. Specifically, the cushioning member 3 is formed of urethane resin, silicone rubber, or the like. In addition, the material which forms the cushioning member 3 should just be a material which has a cushioning effect, and is not limited to the material shown here as an example.

如图2(a)以及图3(b)所示,缓冲部件3具有:形成为能够与连结节体20的第一嵌合部23嵌合的第二嵌合部30;以及向该第二嵌合部30的两侧部伸出的一对伸出部31。As shown in Fig. 2 (a) and Fig. 3 (b), the cushioning member 3 has: the second fitting part 30 formed to be able to fit the first fitting part 23 of the connecting joint body 20; A pair of protruding parts 31 protrude from both sides of the fitting part 30 .

本实施方式中,第二嵌合部30以及伸出部31的向钟表壳体10安装的安装侧的面呈沿着钟表壳体10的侧面形状的形状,在将带2安装于钟表壳体10的状态下,第二嵌合部30以及伸出部31的端面紧贴于钟表壳体10的侧面。In this embodiment, the surface of the second fitting portion 30 and the extension portion 31 on the side of the watch case 10 attached to the watch case 10 has a shape along the side shape of the watch case 10, and when the band 2 is attached to the watch case 10 , the end surfaces of the second fitting portion 30 and the protruding portion 31 are in close contact with the side surface of the watch case 10 .

在安装有带2的状态下,缓冲部件3将连结节体20保持于钟表壳体10的带安装部15的规定的位置。In a state where the strap 2 is attached, the cushioning member 3 holds the connecting joint 20 at a predetermined position of the strap attaching portion 15 of the timepiece case 10 .

在本实施方式中,第二嵌合部30具有沿带2的延伸方向(图1中上下方向)突出的凸部32。凸部32如上所述地被纳入第一嵌合部23的凹部22,呈与之嵌合的形状。In the present embodiment, the second fitting portion 30 has a convex portion 32 protruding in the direction in which the belt 2 extends (the vertical direction in FIG. 1 ). As mentioned above, the convex part 32 is accommodated in the concave part 22 of the 1st fitting part 23, and has the shape fitted into it.

在第二嵌合部30(在本实施方式中,构成第二嵌合部30的凸部32),形成有沿带2的宽度方向(图1中横向)延伸的第二贯通孔33。A second through hole 33 extending in the width direction of the belt 2 (horizontal direction in FIG. 1 ) is formed in the second fitting portion 30 (in this embodiment, the convex portion 32 constituting the second fitting portion 30 ).

在使连结节体20和缓冲部件3嵌合的嵌合状态下,第二贯通孔33与第一贯通孔25连通,在该连通状态下,在第一贯通孔25以及第二贯通孔33插通弹簧杆4。此外,本实施方式的第二贯通孔33配置为,其中心成为比第一贯通孔25的中心更向带安装方向的外侧(即,与钟表壳体10对置的一侧的相反侧)偏移的位置。In the fitting state where the connecting joint body 20 and the buffer member 3 are fitted, the second through hole 33 communicates with the first through hole 25 , and in this communicating state, the first through hole 25 and the second through hole 33 are inserted into the second through hole 33 . Through the spring rod 4. In addition, the second through hole 33 in this embodiment is arranged such that its center is offset to the outside of the belt attachment direction (that is, the side opposite to the side facing the timepiece case 10 ) from the center of the first through hole 25 . moved position.

本实施方式中,第二贯通孔33的内径与弹簧杆4的外径大致相同,弹簧杆4以大致没有游隙的状态嵌入于第二贯通孔33内。In this embodiment, the inner diameter of the second through hole 33 is substantially the same as the outer diameter of the spring rod 4 , and the spring rod 4 is fitted into the second through hole 33 with substantially no play.

并且,在第二嵌合部30(在本实施方式中,构成第二嵌合部30的凸部32),形成有与第二贯通孔33相同地沿带2的宽度方向(图1中横向)延伸的第二轴孔34。In addition, in the second fitting portion 30 (in this embodiment, the convex portion 32 constituting the second fitting portion 30 ), a second through hole 33 is formed along the width direction of the belt 2 (lateral direction in FIG. 1 ). ) Extended second shaft hole 34.

如上所述,在使连结节体20和缓冲部件3嵌合的嵌合状态下,第二轴孔34与形成于第一嵌合部23的第一轴孔26连通,从而构成供结合用轴部件51(参照图4等)插入的一个相连的轴孔。As described above, in the fitting state where the connecting joint body 20 and the cushioning member 3 are fitted, the second shaft hole 34 communicates with the first shaft hole 26 formed in the first fitting portion 23 to constitute a coupling shaft. A connected shaft hole into which part 51 (see FIG. 4 etc.) is inserted.

弹簧杆4是在第一贯通孔25以及第二贯通孔33插通的棒状的部件。弹簧杆4例如具备筒状部件、在该筒状部件的两端部能够沿弹簧杆4的轴向进退地设置的一对销、以及在筒状部件的内部向筒状部件的外侧对销进行施力的弹簧(均未图示)。The spring bar 4 is a rod-shaped member inserted through the first through hole 25 and the second through hole 33 . The spring rod 4 includes, for example, a cylindrical member, a pair of pins provided at both ends of the cylindrical member so as to be able to move forward and backward along the axial direction of the spring rod 4, and a pair of pins that are mounted on the inside of the cylindrical member toward the outside of the cylindrical member. The spring (all not shown) of applying force.

弹簧杆4通过以在形成于带侧的第一贯通孔25以及第二贯通孔33插通的状态将一方的销插入于带安装部15的一方的带安装孔152,并以使另一个销在克服弹簧力而暂时压入筒状部件的内部的状态插入于另一方的带安装孔152,从而使带2连结于钟表壳体10。The spring bar 4 inserts one pin into the belt mounting hole 152 of the belt mounting part 15 in a state of passing through the first through hole 25 and the second through hole 33 formed on the belt side, and makes the other pin The band 2 is connected to the timepiece case 10 by being inserted into the other band attachment hole 152 while being temporarily pressed into the interior of the cylindrical member against the spring force.

如上所述,弹簧杆4的两侧的前端部41形成为锥状,带安装孔152与该弹簧杆4的前端部41的形状对应地随着趋向中央部而变深。由此,若弹簧杆4的前端部41插入于带安装孔152,则弹簧杆4的前端部41稳定地保持于带安装孔152的中央部。As described above, the front end portions 41 on both sides of the spring bar 4 are tapered, and the belt attachment hole 152 becomes deeper toward the center in accordance with the shape of the front end portions 41 of the spring bar 4 . Thus, when the front end portion 41 of the spring bar 4 is inserted into the belt attachment hole 152 , the front end portion 41 of the spring bar 4 is stably held in the center portion of the belt attachment hole 152 .

在本实施方式中,由如下部件构成带的安装构造,即:在两个脚部的对置的面贯穿设置有带安装孔152的钟表壳体10侧的带安装部15;连结节体20,其具有形成有沿带2的宽度方向延伸的第一贯通孔25的第一嵌合部23,且安装到带安装部15;缓冲部件3,其具有第二嵌合部30,该第二嵌合部30能够与第一嵌合部23嵌合、且形成有在嵌合状态下与第一贯通孔25连通的第二贯通孔33;弹簧杆4,其在第一贯通孔25以及第二贯通孔33插通,并在带2向钟表壳体10安装的安装状态下,两端部分别插入于带安装部15的带安装孔152。In the present embodiment, the strap attachment structure is constituted by the strap attachment portion 15 on the side of the watch case 10 in which the strap attachment hole 152 is penetratingly provided on the opposing surfaces of the two leg portions; , which has a first fitting portion 23 formed with a first through hole 25 extending in the width direction of the belt 2, and is mounted to the belt mounting portion 15; a buffer member 3, which has a second fitting portion 30, the second The fitting part 30 can be fitted with the first fitting part 23 and is formed with a second through hole 33 communicating with the first through hole 25 in the fitted state; The two through holes 33 are passed through, and when the band 2 is attached to the watch case 10 , both ends are respectively inserted into the band attaching holes 152 of the band attaching portion 15 .

接下来,参照图4、图5(a)以及图5(b),对本实施方式的带的安装构造以及钟表的作用进行说明。Next, with reference to FIG. 4 , FIG. 5( a ) and FIG. 5( b ), the belt attachment structure and the action of the timepiece according to this embodiment will be described.

图4是表示在本实施方式中使连结节体20和缓冲部件3成为一体的结构的分解立体图。FIG. 4 is an exploded perspective view showing a structure in which the connecting joint body 20 and the cushioning member 3 are integrated in the present embodiment.

并且,图5(a)以及图5(b)是说明将成为一体后的连结节体20以及缓冲部件3安装于钟表壳体10的带安装部15的情形的主要部分侧视图。5( a ) and FIG. 5( b ) are main part side views illustrating how the integrated connecting joint body 20 and buffer member 3 are attached to the strap attachment portion 15 of the watch case 10 .

当在钟表壳体10安装带2而组装钟表100时,首先,如图4所示,在连结节体20的第一嵌合部23的凹部22嵌合缓冲部件3的第二嵌合部30的凸部32。此时,以使形成于第一嵌合部23的第一轴孔26和形成于第二嵌合部30的第二轴孔34成为一个相连的轴孔的方式对连结节体20和缓冲部件3进行对位。When assembling the timepiece 100 by attaching the band 2 to the timepiece case 10, first, as shown in FIG. The convex part 32. At this time, the connecting joint body 20 and the cushioning member are arranged so that the first shaft hole 26 formed in the first fitting part 23 and the second shaft hole 34 formed in the second fitting part 30 form a single continuous shaft hole. 3 for counterpoint.

而且,在第一轴孔26和第二轴孔34成为一个相连的轴孔的状态下,从作为小径部26a而形成的一侧朝向另一侧插入结合用轴部件51,从作为大径部26b而形成的一侧插入C型圈52,并将C型圈52嵌入结合用轴部件51的插入侧前端部。由此,连结节体20和缓冲部件3成为一体。And, in the state where the first shaft hole 26 and the second shaft hole 34 form one continuous shaft hole, the coupling shaft member 51 is inserted from the side formed as the small-diameter portion 26a toward the other side, and the shaft member 51 is inserted from the side formed as the large-diameter portion 26a. 26b is inserted into the C-shaped ring 52, and the C-shaped ring 52 is fitted into the insertion-side front end of the coupling shaft member 51. Thereby, the connection joint body 20 and the cushioning member 3 are integrated.

并且,在形成于第一嵌合部23的第一贯通孔25和形成于第二嵌合部30的第二贯通孔33内插通弹簧杆4。Furthermore, the spring bar 4 is inserted into the first through hole 25 formed in the first fitting portion 23 and the second through hole 33 formed in the second fitting portion 30 .

如上所述,由于第二贯通孔33的内径与弹簧杆4的外径大致相同(同等),所以弹簧杆4以紧贴在第二贯通孔33内的状态配置。与此相对,由于第一贯通孔25的内径形成为比弹簧杆4的外径大,所以弹簧杆4相对于连结节体20的第一贯通孔25以具有游隙的状态配置。As described above, since the inner diameter of the second through hole 33 is substantially the same (equal to) the outer diameter of the spring bar 4 , the spring bar 4 is arranged in a state of being closely attached to the second through hole 33 . On the other hand, since the inner diameter of the first through hole 25 is formed larger than the outer diameter of the spring bar 4 , the spring bar 4 is arranged with a play with respect to the first through hole 25 of the connection joint body 20 .

在本实施方式中,在将弹簧杆4安装于带安装部15前,如图5(a)所示,弹簧杆4以及供弹簧杆4插入的第二贯通孔33构成为,其中心成为比第一贯通孔25的中心更向带安装方向的外侧(即,与钟表壳体10对置的一侧的相反侧)偏移的位置。In this embodiment, before the spring bar 4 is attached to the belt mounting part 15, as shown in FIG. The center of the first through hole 25 is further shifted to the outside in the band mounting direction (ie, the side opposite to the side facing the timepiece case 10 ).

接下来,将成为一体后的连结节体20以及缓冲部件3配置于钟表壳体10的带安装部15的两个脚部151之间。此时,如图5(a)所示,缓冲部件3的第二嵌合部30以及伸出部31的端面以与钟表壳体10的侧面对置的方式配置。Next, the integrated connecting joint body 20 and the buffer member 3 are disposed between the two leg portions 151 of the band attachment portion 15 of the timepiece case 10 . At this time, as shown in FIG. 5( a ), the end surfaces of the second fitting portion 30 and the protruding portion 31 of the shock absorbing member 3 are arranged to face the side surface of the timepiece case 10 .

而且,将插通于第一贯通孔25以及第二贯通孔33的弹簧杆4的一侧的前端部41在形成于带安装部15的一侧的脚部151的带安装孔152插入。Then, the front end portion 41 of the spring bar 4 inserted through the first through hole 25 and the second through hole 33 is inserted into the belt attachment hole 152 formed in the leg portion 151 of the belt attachment portion 15 .

并且,一边压入弹簧杆4的另一侧的前端部41一边将其插入到形成于带安装部15的另一侧的脚部151的带安装孔152。此时,通过向钟表壳体10的一侧(图5(a)中箭头所示的方向)按压并嵌入连结节体20以及缓冲部件3,从而按压缓冲部件3而使之收缩。而且,当弹簧杆4的另一侧的前端部41插入到带安装部15的另一侧的带安装孔152时,如图5(b)所示,弹簧杆4以及供弹簧杆4插入的第二贯通孔33的中心移动至与第一贯通孔25的中心大致一致的位置。Then, the other end portion 41 of the spring bar 4 is inserted into the belt attachment hole 152 formed in the other leg portion 151 of the belt attachment portion 15 while being pushed in. At this time, the cushioning member 3 is pressed and shrunk by pressing and fitting the joint joint body 20 and the cushioning member 3 toward one side of the timepiece case 10 (in the direction indicated by the arrow in FIG. 5( a )). And when the front end portion 41 on the other side of the spring bar 4 is inserted into the belt mounting hole 152 on the other side of the belt mounting portion 15, as shown in FIG. The center of the second through hole 33 is moved to a position substantially coincident with the center of the first through hole 25 .

弹簧杆4因弹簧力被按压而沿带2的宽度方向展开,由此弹簧杆4的两侧的前端部41分别卡定于带安装部15内,从而结束带2向钟表壳体10的安装。The spring bar 4 is pressed by the spring force and expands along the width direction of the band 2, so that the front ends 41 on both sides of the spring bar 4 are respectively locked in the band mounting portion 15, thereby completing the installation of the band 2 to the watch case 10 .

如上所述,由于在带安装状态下,弹簧杆4的轴中心与第一贯通孔25的中心大致一致,所以成为在弹簧杆4与第一贯通孔25之间相对于弹簧杆4的外周大致均匀地设有游隙的状态(参照图5(b))。As mentioned above, since the axial center of the spring bar 4 and the center of the first through hole 25 approximately coincide with each other in the belt-mounted state, it becomes approximately between the spring bar 4 and the first through hole 25 with respect to the outer circumference of the spring bar 4 . A state where play is evenly provided (see FIG. 5(b)).

并且,如图5(b)等所示,缓冲部件3的与钟表壳体10对置的面比连结节体20的与钟表壳体10对置的面更向钟表壳体10侧突出。因此,只要不施加如较大地压扁缓冲部件3那样的较强的力,连结节体20就不与钟表壳体10接触。Furthermore, as shown in FIG. Therefore, unless a strong force such as greatly crushing the shock absorbing member 3 is applied, the connecting joint body 20 does not come into contact with the timepiece case 10 .

如上所述,根据本实施方式,使形成有第二贯通孔33的缓冲部件3的第二嵌合部30与形成有第一贯通孔25的连结节体20的第一嵌合部23嵌合,在第一贯通孔25以及第二贯通孔33插通弹簧杆4,而配置在钟表壳体10侧的带安装部15的两个脚部151之间,并使弹簧杆4的前端部41在贯穿设置于脚部151的对置的面的带安装孔152卡定,从而将带2安装于钟表壳体10。而且,第二贯通孔33的内径与弹簧杆4的外径相同,相对于此,第一贯通孔25的内径形成为比弹簧杆4的外径大,弹簧杆4相对于连结节体20具有游隙地配置。As described above, according to the present embodiment, the second fitting portion 30 of the buffer member 3 formed with the second through hole 33 is fitted to the first fitting portion 23 of the coupling node 20 formed with the first through hole 25 . , the spring bar 4 is inserted through the first through hole 25 and the second through hole 33, and is arranged between the two legs 151 of the belt mounting part 15 on the watch case 10 side, and the front end 41 of the spring bar 4 The band 2 is attached to the timepiece case 10 by engaging with the band attachment hole 152 provided through the opposing surface of the leg portion 151 . Moreover, the inner diameter of the second through hole 33 is the same as the outer diameter of the spring bar 4, whereas the inner diameter of the first through hole 25 is formed larger than the outer diameter of the spring bar 4, and the spring bar 4 has Configured with play.

由此,在对钟表壳体10、带2未施加任何冲击等的状态、或在即使施加了冲击等而该冲击也是在缓冲部件3的弹性变形的范围内能够吸收的程度的情况下,弹簧杆4不与连结节体20接触,施加于带2的冲击等不直接传递至弹簧杆4。另外,施加于钟表壳体10的冲击等也由与钟表壳体10接触的缓冲部件3吸收。因此,当对钟表壳体10、带2施加有冲击等时,使向弹簧杆4传递的冲击等衰减而防止弹簧杆4的破损、带2的脱落,从而能够提高钟表100的耐冲击性、耐振动性。Thus, in a state where no impact or the like is applied to the timepiece case 10 or the band 2, or even if an impact or the like is applied, the impact can be absorbed within the range of elastic deformation of the cushioning member 3, the spring The rod 4 is not in contact with the connecting node body 20 , and the impact or the like applied to the belt 2 is not directly transmitted to the spring rod 4 . In addition, shocks and the like applied to the timepiece case 10 are also absorbed by the cushioning member 3 in contact with the timepiece case 10 . Therefore, when an impact or the like is applied to the watch case 10 or the band 2, the impact or the like transmitted to the spring bar 4 is attenuated to prevent breakage of the spring bar 4 and falling off of the band 2, thereby improving the impact resistance of the timepiece 100, Vibration resistance.

另外,这样,弹簧杆4相对于连结节体20具有游隙地配置,但由于弹簧杆4在连结节体20的第一贯通孔25内插通,所以当对钟表壳体10、带2施加有缓冲部件3不能完全吸收那样的较大的冲击等时,弹簧杆4与连结节体20的第一贯通孔25对接而卡定。由此,能够可靠地防止带2脱落。In addition, in this way, the spring bar 4 is arranged with play with respect to the connecting node body 20, but since the spring bar 4 is inserted into the first through hole 25 of the connecting node body 20, when the timepiece case 10 and the belt 2 are applied, When the buffer member 3 cannot completely absorb such a large impact, the spring bar 4 abuts against the first through-hole 25 of the connecting joint body 20 to lock it. Thereby, it is possible to reliably prevent the belt 2 from coming off.

另外,第二嵌合部30具有沿带2的延伸方向突出的凸部32,第一嵌合部23具有接受该凸部32的形状的凹部22。由此,仅使凸部32和凹部22嵌合就能够容易地进行定位,从而部件的组装容易。In addition, the second fitting portion 30 has a convex portion 32 protruding in the extending direction of the belt 2 , and the first fitting portion 23 has a concave portion 22 having a shape that receives the convex portion 32 . Thereby, positioning can be easily performed only by fitting the convex part 32 and the recessed part 22, and assembly of components becomes easy.

并且,在第一嵌合部23以及第二嵌合部30形成有在嵌合状态下连通的轴孔26、34,连结节体20和缓冲部件3通过在该轴孔26、34插通结合用轴部件51而成为一体。这样,由于使连结节体20和缓冲部件3成为一体,所以带2向钟表壳体10的组装变得容易。In addition, shaft holes 26 and 34 communicating in the fitted state are formed in the first fitting portion 23 and the second fitting portion 30 , and the connecting joint body 20 and the cushioning member 3 are coupled through the shaft holes 26 and 34 . It is integrated with the shaft member 51 . As described above, since the connecting joint body 20 and the cushioning member 3 are integrated, the assembly of the band 2 to the timepiece case 10 becomes easy.

另外,不使用用于将带2安装于钟表壳体10的弹簧杆4,而使用与其不同的部件的结合用轴部件51使连结节体20和缓冲部件3成为一体,从而将弹簧杆4保持为相对于连结节体20具有游隙的状态。因此,能够防止对带2施加的冲击等经由连结节体20向弹簧杆4传递。In addition, instead of using the spring bar 4 for attaching the band 2 to the watch case 10, the connecting joint body 20 and the buffer member 3 are integrated using a coupling shaft member 51 which is a different member, thereby holding the spring bar 4 This is a state where there is play with respect to the connecting joint body 20 . Therefore, it is possible to prevent an impact or the like applied to the belt 2 from being transmitted to the spring bar 4 via the connection joint body 20 .

另外,能够以缓冲部件3的弹性变形量来吸收冲击,而能够充分确保能够进行缓冲部件3的缓冲的宽度。In addition, the shock can be absorbed by the amount of elastic deformation of the cushioning member 3 , and a sufficient width for cushioning by the cushioning member 3 can be ensured.

另外,由于缓冲部件3的与钟表壳体10对置的面比连结节体20的与钟表壳体10对置的面更向钟表壳体10侧突出,所以能够防止施加于钟表壳体10的冲击等直接向带2侧传递。特别是在钟表壳体10以及带2(构成带2的连结节体20)均由金属材料形成的情况下,能够防止金属彼此直接相互碰撞而相互摩擦,从而能够防止钟表壳体10、带2损伤或破损。In addition, since the surface of the buffer member 3 facing the timepiece case 10 protrudes toward the timepiece case 10 side than the surface of the connecting joint body 20 facing the timepiece case 10, it is possible to prevent the force applied to the timepiece case 10 Shock and the like are directly transmitted to the belt 2 side. In particular, when the watch case 10 and the band 2 (connecting nodes 20 constituting the band 2 ) are both formed of metal materials, it is possible to prevent the metals from colliding directly with each other and rubbing against each other, thereby preventing the watch case 10 and the band 2 from colliding with each other. damaged or broken.

另外,在本实施方式中,在将带2安装于钟表壳体10时,一边按压缓冲部件3使之收缩一边嵌入弹簧杆4。因此,在将带2从钟表壳体10拆下时,若将弹簧杆4的一方前端部41从带安装孔152拆下,则缓冲部件3因欲返回原先的形状的复原力而向从钟表壳体10拆下的方向挤压带2。由此,能够比较容易地拆下带。In addition, in the present embodiment, when the band 2 is attached to the timepiece case 10, the spring bar 4 is fitted while the buffer member 3 is pressed and shrunk. Therefore, when the belt 2 is detached from the watch case 10, if the one front end 41 of the spring bar 4 is detached from the belt mounting hole 152, the cushioning member 3 will move toward the watch from the watch due to the restoring force of returning to the original shape. The strip 2 is squeezed in the direction in which the housing 10 is removed. Thereby, the belt can be detached relatively easily.

另外,在包括连结节体20的带2、钟表壳体10由金属材料形成的情况下,通过配置由聚氨酯树脂、硅酮橡胶等具有与金属不同的质感的材料形成的缓冲部件3,能够体现与仅由金属材料构成的钟表不同的轻便的外观、外观设计。In addition, when the belt 2 including the joint body 20 and the watch case 10 are formed of a metal material, by arranging the cushioning member 3 formed of a material having a texture different from that of metal, such as urethane resin or silicone rubber, it is possible to realize The lightweight appearance and design are different from clocks made of only metal materials.

此外,在本实施方式中,举例表示了缓冲部件3的第二嵌合部30具有凸部32、连结节体20的第一嵌合部23具有接受该凸部32的形状的凹部22的情况,但第一嵌合部23以及第二嵌合部30的形状不限定于此。In addition, in this embodiment, the case where the second fitting part 30 of the cushioning member 3 has the convex part 32 and the first fitting part 23 of the connection node 20 has the concave part 22 of the shape which receives this convex part 32 was shown as an example. , but the shapes of the first fitting portion 23 and the second fitting portion 30 are not limited thereto.

第一嵌合部23以及第二嵌合部30中任一个具有凸部,另一个具有接受该凸部32的形状的凹部即可,也可以构成为,连结节体20的第一嵌合部23具有凸部,缓冲部件3的第二嵌合部30具有接受该凸部的形状的凹部。Either one of the first fitting portion 23 and the second fitting portion 30 may have a convex portion, and the other may have a concave portion in a shape that receives the convex portion 32 , or it may be configured such that the first fitting portion of the joint body 20 is connected. 23 has a convex portion, and the second fitting portion 30 of the cushioning member 3 has a concave portion in a shape that receives the convex portion.

另外,在本实施方式中,举例表示了使用结合用轴部件51和C型圈52使连结节体20和缓冲部件3成为一体的情况,但使连结节体20和缓冲部件3成为一体的结构不限定于此。In addition, in this embodiment, the case where the coupling joint body 20 and the cushioning member 3 are integrated using the joint shaft member 51 and the C-ring 52 is shown as an example, but the structure in which the coupling joint body 20 and the cushioning member 3 are integrated Not limited to this.

(第二实施方式)(second embodiment)

接下来,参照图6至图10(a)、图10(b),对本发明的带的安装构造以及钟表的第二实施方式进行说明。此外,本实施方式中,由于连结节体以及缓冲部件的结构与第一实施方式不同,所以以下特别对与第一实施方式不同的方面进行说明。Next, a second embodiment of the belt attachment structure and the timepiece of the present invention will be described with reference to FIGS. In addition, in this embodiment, since the structure of a connection joint body and a buffer member differs from 1st Embodiment, especially the point which differs from 1st Embodiment is demonstrated below.

图6是使用了本实施方式的带的安装构造的钟表的主视图。Fig. 6 is a front view of a timepiece using the strap attachment structure of this embodiment.

如图6所示,与第一实施方式相同,本实施方式的钟表200具备:具有钟表壳体10的钟表主体1、和安装于该钟表壳体10的带2。As shown in FIG. 6 , like the first embodiment, the timepiece 200 of this embodiment includes a timepiece body 1 having a timepiece case 10 , and a band 2 attached to the timepiece case 10 .

如后文所述,带2通过具备带安装部15、连结节体7、缓冲部件8以及弹簧杆4的带安装构造,从而安装于钟表壳体10。As will be described later, the band 2 is attached to the timepiece case 10 by a band attaching structure including the band attaching portion 15 , the joint body 7 , the buffer member 8 , and the spring bar 4 .

图7(a)以及图7(b)是放大了本实施方式的钟表壳体10和带2的安装部分的主要部分立体图,图7(a)表示从钟表200的表面侧观察的状态,图7(b)表示从钟表200的背面侧观察的状态。Fig. 7 (a) and Fig. 7 (b) are the principal part perspective views of the mounting part of the timepiece case 10 and band 2 of this embodiment enlarged, Fig. 7 (a) shows the state viewed from the surface side of the timepiece 200, the figure 7(b) shows the state viewed from the back side of the timepiece 200 .

另外,图8(a)是连结节体的立体图,图8(b)是缓冲部件的立体图。In addition, FIG. 8( a ) is a perspective view of a joint body, and FIG. 8( b ) is a perspective view of a cushioning member.

如图7(a)、图7(b)以及图8(a)所示,连结节体7具有沿带2的宽度方向延伸且配置为在带安装状态下与钟表壳体10的带安装部15的外侧面接触的连结部71、和从该连结部71向与安装到钟表壳体10的安装侧相反的一侧伸出的第一嵌合部72。As shown in Fig. 7 (a), Fig. 7 (b) and Fig. 8 (a), the connecting node body 7 has a band mounting portion extending along the width direction of the band 2 and configured to be connected to the watch case 10 in the band mounting state. The connecting portion 71 that contacts the outer surface of the watch case 15 and the first fitting portion 72 that protrudes from the connecting portion 71 to the side opposite to the side that is attached to the timepiece case 10 .

本实施方式中,连结部71的向钟表壳体10安装的安装侧的面呈沿着带安装部15的外侧面的形状,在带2安装于钟表壳体10的状态下,连结部71的端面紧贴于钟表壳体10的侧面。In this embodiment, the surface of the connection portion 71 on the side of the attachment to the watch case 10 is shaped along the outer surface of the strap attachment portion 15. The end face is in close contact with the side of the watch case 10 .

在本实施方式中,连结部71在侧视情况下呈大致L字状,具有与钟表壳体10的侧面以及底面的一部分抵接的抵接面71a。此外,连结部71、抵接面71a的形状等不限定于在此举例表示的形状。In the present embodiment, the coupling portion 71 has a substantially L-shape in a side view, and has an abutment surface 71 a that abuts on a part of the side surface and the bottom surface of the timepiece case 10 . In addition, the shape of the connection part 71, the contact surface 71a, etc. are not limited to the shape shown here as an example.

并且,连结节体7的连结部71的与钟表壳体10抵接的一侧的相反侧的面以及连结部71的下表面成为在一端相互相交的两个对接面71b。In addition, the surface of the connecting portion 71 of the connecting joint body 7 opposite to the side contacting the timepiece case 10 and the lower surface of the connecting portion 71 form two abutting surfaces 71b intersecting at one end.

对接面71b是与缓冲部件8对接的面,在本实施方式中,两个对接面71b大致呈直角地相交(参照图9(b)等)。此外,对接面71b的形状、相交的角度等不限定于此在此举例表示的形状和角度。The mating surface 71b is a surface mating with the cushioning member 8, and in this embodiment, the two mating surfaces 71b intersect substantially at right angles (see FIG. 9( b ) and the like). In addition, the shape of the butt surface 71b, the angle of intersection, etc. are not limited to the shapes and angles exemplified here.

本实施方式中,第一嵌合部72具有沿带2的延伸方向(图6中上下方向)突出的凸部73。凸部73如后文所述地被纳入缓冲部件8的第二嵌合部83,呈与之嵌合的形状。In the present embodiment, the first fitting portion 72 has a convex portion 73 that protrudes along the extending direction of the belt 2 (vertical direction in FIG. 6 ). The convex part 73 is accommodated in the 2nd fitting part 83 of the cushioning member 8 as mentioned later, and has a shape fitted thereto.

在第一嵌合部72(在本实施方式中,构成第一嵌合部72的凸部73),形成有沿带2的宽度方向(图6中横向)延伸的第一贯通孔74。A first through hole 74 extending in the width direction of the belt 2 (horizontal direction in FIG. 6 ) is formed in the first fitting portion 72 (in this embodiment, the convex portion 73 constituting the first fitting portion 72 ).

第一贯通孔74供弹簧杆4插通。本实施方式中,第一贯通孔74的内径形成为比弹簧杆4的外径大,弹簧杆4相对于连结节体7具有游隙地配置。The spring rod 4 is inserted through the first through hole 74 . In the present embodiment, the inner diameter of the first through hole 74 is formed to be larger than the outer diameter of the spring bar 4 , and the spring bar 4 is arranged with play relative to the coupling node body 7 .

另外,在本实施方式中,在将连结节体7嵌入于钟表壳体10的带安装部15的状态下,第一贯通孔74的中心与钟表壳体10侧的带安装孔152的中心大致一致(参照图10(a)以及图10(b))。In addition, in the present embodiment, in the state where the coupling joint body 7 is fitted into the band attachment portion 15 of the timepiece case 10, the center of the first through hole 74 is approximately equal to the center of the band attachment hole 152 on the timepiece case 10 side. consistent (see Fig. 10(a) and Fig. 10(b)).

另外,在第一嵌合部72(在本实施方式中,构成第一嵌合部72的凸部73),形成有沿带2的宽度方向(图1中横向)延伸的贯通孔75。In addition, a through hole 75 extending in the width direction of the belt 2 (horizontal direction in FIG. 1 ) is formed in the first fitting portion 72 (in this embodiment, the convex portion 73 constituting the first fitting portion 72 ).

在本实施方式中,通过在该贯通孔75插通未图示的轴部件而将未图示的节体等连结于连结节体7,从而形成带2。In this embodiment, the belt 2 is formed by inserting an unillustrated shaft member through the through-hole 75 to connect an unillustrated node body or the like to the connection node body 7 .

如图7(a)、图7(b)以及图8(b)所示,本实施方式的缓冲部件8具有:沿带2的宽度方向延伸的板状的基体部81、和在该基体部81的两端部立起设置的一对脚部82。As shown in Fig. 7(a), Fig. 7(b) and Fig. 8(b), the cushioning member 8 of this embodiment has: a plate-shaped base portion 81 extending in the width direction of the belt 2, and A pair of leg portions 82 are erected at both ends of 81 .

两个脚部82的间隔比连结节体7的第一嵌合部72的宽度稍大,连结节体7的第一嵌合部72在带安装状态下嵌入于两个脚部82之间,两个脚部82构成纳入第一嵌合部72的第二嵌合部83。The interval between the two leg portions 82 is slightly larger than the width of the first fitting portion 72 of the connecting node body 7, and the first fitting portion 72 of the connecting node body 7 is embedded between the two leg portions 82 in the belt-installed state. The two leg portions 82 constitute a second fitting portion 83 accommodated in the first fitting portion 72 .

在第二嵌合部83(在本实施方式中,构成第二嵌合部83的一对脚部82),形成有沿带2的宽度方向(图6中横向)延伸的第二贯通孔84。In the second fitting portion 83 (in this embodiment, a pair of leg portions 82 constituting the second fitting portion 83 ), a second through hole 84 extending in the width direction of the belt 2 (horizontal direction in FIG. 6 ) is formed. .

第二贯通孔84供弹簧杆4插通。本实施方式中,第二贯通孔84的内径与弹簧杆4的外径大致相同,弹簧杆4以大致没有游隙的状态嵌入到第二贯通孔84内。The second through hole 84 is inserted through the spring rod 4 . In this embodiment, the inner diameter of the second through hole 84 is substantially the same as the outer diameter of the spring rod 4 , and the spring rod 4 is fitted into the second through hole 84 with substantially no play.

另外,本实施方式中,基体部81的上表面以及脚部82的向钟表壳体10安装的安装侧的面成为与连结节体7的连结部71的两个对接面71b对接的对应面85。In addition, in this embodiment, the upper surface of the base portion 81 and the surface of the leg portion 82 on the mounting side to the watch case 10 serve as the corresponding surface 85 that abuts against the two abutting surfaces 71 b of the connecting portion 71 of the connecting joint body 7 . .

在本实施方式中,与连结部71的对接面71b对应,作为对应面85的基体部81的上表面以及脚部82的向钟表壳体10安装的安装侧的面相互呈大致直角地相交(参照图9(b)等)。In the present embodiment, corresponding to the mating surface 71b of the connecting portion 71, the upper surface of the base portion 81 as the corresponding surface 85 and the surface of the leg portion 82 on the mounting side to the watch case 10 intersect each other at approximately right angles ( Refer to Fig. 9(b) etc.).

图9(a)是表示使连结节体7和缓冲部件8嵌合而使弹簧杆4在第一贯通孔74以及第二贯通孔84插通的状态的立体图,图9(b)是图9(a)所示的连结节体7以及缓冲部件8的侧视图。此外,图9(b)中省略了在第一贯通孔74以及第二贯通孔84插通的弹簧杆4的图示。Fig. 9 (a) is a perspective view showing a state in which the spring rod 4 is inserted through the first through hole 74 and the second through hole 84 by fitting the connecting joint body 7 and the cushioning member 8, and Fig. 9 (b) is the state shown in Fig. 9 (a) is a side view of the joint body 7 and the buffer member 8 shown. In addition, illustration of the spring bar 4 inserted in the 1st through-hole 74 and the 2nd through-hole 84 is abbreviate|omitted in FIG.9(b).

如图9(a)以及图9(b)所示,在本实施方式中,在缓冲部件8侧的对应面85与连结节体7侧的对接面71b对接的状态下,使弹簧杆4在第一贯通孔74以及第二贯通孔84插通。As shown in Fig. 9(a) and Fig. 9(b), in this embodiment, in the state where the corresponding surface 85 on the side of the buffer member 8 is abutted against the mating surface 71b on the side of the joint body 7, the spring rod 4 is placed on the The first through hole 74 and the second through hole 84 are inserted therethrough.

在本实施方式中,在将弹簧杆4安装于带安装部15前,弹簧杆4以及供弹簧杆4插入的第二贯通孔84构成为,其中心成为比第一贯通孔74的中心更向带安装方向的外侧(即,与钟表壳体10对置的一侧的相反侧)偏移的位置。In this embodiment, before the spring bar 4 is attached to the belt attachment part 15, the spring bar 4 and the second through-hole 84 into which the spring bar 4 is inserted are configured such that the center thereof is further inward than the center of the first through-hole 74 . A position where the outer side (that is, the side opposite to the side facing the timepiece case 10 ) is shifted in the installation direction.

并且,该状态下将弹簧杆4的两个前端部41分别插入于带安装部151的带安装孔152。此时,向将对应面85按压于对接面71b的方向按压缓冲部件8并嵌入弹簧杆4。由此,连结节体7和缓冲部件8成为一体,并且带2安装到钟表壳体10。And, in this state, the two front end portions 41 of the spring bar 4 are respectively inserted into the belt attachment holes 152 of the belt attachment portion 151 . At this time, the buffer member 8 is pressed in a direction in which the corresponding surface 85 is pressed against the mating surface 71b, and the spring bar 4 is fitted. Thereby, the connecting joint body 7 and the buffer member 8 are integrated, and the band 2 is attached to the timepiece case 10 .

此外,其它结构与第一实施方式相同,从而对相同部件标注相同的符号,并省略其说明。In addition, other structures are the same as those of the first embodiment, and therefore the same components are given the same reference numerals and their descriptions are omitted.

接下来,参照图10(a)以及图10(b),对本实施方式的带的安装构造以及钟表的作用进行说明。Next, with reference to FIG. 10( a ) and FIG. 10( b ), the belt attachment structure and the action of the timepiece according to this embodiment will be described.

图10(a)以及图10(b)是说明成为一体后的连结节体7以及缓冲部件8安装于钟表壳体10的带安装部15的情形的主要部分侧视图。10( a ) and 10 ( b ) are main part side views illustrating how the integrated connecting joint body 7 and buffer member 8 are attached to the strap attachment portion 15 of the timepiece case 10 .

当在钟表壳体10安装带2而组装钟表200时,首先,在缓冲部件8的第二嵌合部83的两个脚部82之间嵌合连结节体7的第一嵌合部72的凸部73。When assembling the timepiece 200 by attaching the band 2 to the timepiece case 10 , first, the first fitting portion 72 of the link body 7 is fitted between the two leg portions 82 of the second fitting portion 83 of the buffer member 8 . convex portion 73 .

并且,在形成于第一嵌合部72的第一贯通孔74和形成于第二嵌合部83的第二贯通孔84内插通弹簧杆4。Furthermore, the spring bar 4 is inserted into the first through hole 74 formed in the first fitting portion 72 and the second through hole 84 formed in the second fitting portion 83 .

如上所述,由于第二贯通孔84的内径与弹簧杆4的外径大致相同,所以弹簧杆4以紧贴在第二贯通孔84内的状态配置。与此相对,由于第一贯通孔74的内径形成为比弹簧杆4的外径大,所以弹簧杆4相对于第一贯通孔74以具有游隙的状态配置。As described above, since the inner diameter of the second through-hole 84 is substantially the same as the outer diameter of the spring bar 4 , the spring bar 4 is arranged in a state of being in close contact with the second through-hole 84 . On the other hand, since the inner diameter of the first through hole 74 is formed larger than the outer diameter of the spring bar 4 , the spring bar 4 is disposed with play relative to the first through hole 74 .

在本实施方式中,在将弹簧杆4安装于带安装部15前,如图10(a)所示,弹簧杆4以及供弹簧杆4插入的第二贯通孔84构成为,其中心成为比第一贯通孔74的中心更向带安装方向的外侧(即,与钟表壳体10对置的一侧的相反侧)偏移的位置。In this embodiment, before attaching the spring bar 4 to the belt mounting part 15, as shown in FIG. The center of the first through hole 74 is further shifted to the outside in the band attachment direction (ie, the side opposite to the side facing the timepiece case 10 ).

接下来,将连结节体7以及缓冲部件8配置于钟表壳体10的带安装部15的两个脚部151之间。此时,如图10(a)所示,连结节体7的抵接面71a以与钟表壳体10的侧面以及下表面对置的方式配置。Next, the connecting joint body 7 and the cushioning member 8 are disposed between the two leg portions 151 of the strap mounting portion 15 of the timepiece case 10 . At this time, as shown in FIG. 10( a ), the abutting surface 71 a of the connecting joint body 7 is disposed so as to face the side surface and the lower surface of the timepiece case 10 .

并且,将插通于第一贯通孔74以及第二贯通孔84的弹簧杆4的一侧的前端部41在形成于带安装部15的一侧的脚部151的带安装孔152插入。Then, the front end portion 41 of the spring bar 4 inserted through the first through hole 74 and the second through hole 84 is inserted into the strap attachment hole 152 formed in the leg portion 151 of the strap attachment portion 15 .

并且,一边压入弹簧杆4的另一侧的前端部41一边将其插入到形成于带安装部15的另一侧的脚部151的带安装孔152。此时,向钟表壳体10的一侧(图10(a)中箭头所示的斜上方向)按压并嵌入连结节体7以及缓冲部件8,从而按压缓冲部件8使之收缩。而且,当弹簧杆4的另一侧的前端部41插入于带安装部15的另一侧的带安装孔152时,缓冲部件8的对应面85相对于连结节体7的对接面71b被强力地按压而连结节体7和缓冲部件8以没有松动的状态紧贴并成为一体。另外,如图10(b)所示,弹簧杆4以及供弹簧杆4插入的第二贯通孔84的中心移动至与第一贯通孔74的中心大致一致的位置。Then, the other end portion 41 of the spring bar 4 is inserted into the belt attachment hole 152 formed in the other leg portion 151 of the belt attachment portion 15 while being pushed in. At this time, the connecting joint body 7 and the buffer member 8 are pressed and fitted to one side of the watch case 10 (in the oblique upward direction indicated by the arrow in FIG. 10( a )), and the buffer member 8 is pressed to shrink. Moreover, when the front end portion 41 on the other side of the spring rod 4 is inserted into the belt installation hole 152 on the other side of the belt installation portion 15, the corresponding surface 85 of the buffer member 8 is strongly forced against the butt surface 71b of the joint body 7. The joint body 7 and the cushioning member 8 are tightly pressed together without loosening and integrated. In addition, as shown in FIG. 10( b ), the center of the spring bar 4 and the second through hole 84 into which the spring bar 4 is inserted moves to a position substantially coincident with the center of the first through hole 74 .

弹簧杆4因弹簧力被按压而沿带2的宽度方向展开,由此弹簧杆4的两侧的前端部41分别卡定在带安装部15内,从而结束带2向钟表壳体10的安装。The spring bar 4 is pressed by the spring force and expands along the width direction of the band 2, whereby the front ends 41 on both sides of the spring bar 4 are respectively locked in the band mounting portion 15, thereby completing the installation of the band 2 to the watch case 10 .

如上所述,由于在带安装状态下,弹簧杆4的轴中心与第一贯通孔74的中心大致一致,所以成为在弹簧杆4与第一贯通孔74之间相对于弹簧杆4的外周大致均匀地设有游隙的状态(参照图10(b))。As mentioned above, since the axial center of the spring bar 4 and the center of the first through hole 74 are substantially coincident in the belt-mounted state, the outer circumference of the spring bar 4 between the spring bar 4 and the first through hole 74 is approximately equal to that of the spring bar 4. A state where play is evenly provided (see FIG. 10(b)).

此外,其它方面与第一实施方式相同,从而省略其说明。In addition, other points are the same as those of the first embodiment, and thus description thereof will be omitted.

如上所述,根据本实施方式,除了能够得到与第一实施方式相同的效果之外,还能够得到以下的效果。As described above, according to this embodiment, in addition to the same effects as those of the first embodiment, the following effects can be obtained.

即,在本实施方式中,不需要为了使连结节体7和缓冲部件8成为一体而使用销等其它部件。因此,能够减少部件件数,并且能够减少组装工时,从而能够抑制制造成本。That is, in the present embodiment, it is not necessary to use other members such as pins in order to integrate the connecting joint body 7 and the cushioning member 8 . Therefore, the number of components can be reduced, and the number of assembly man-hours can be reduced, thereby suppressing manufacturing costs.

另外,连结节体7具有在一端相互相交的两个对接面71b,缓冲部件8具有与该两个对接面对应的对应面85,在使对应面85对接而压接于对接面71b的状态下,使连结节体7以及缓冲部件8成为一体而固定于钟表壳体10。因此,连结节体7和缓冲部件8以两个面紧贴,从而以没有松动的状态可靠地固定于钟表壳体10。In addition, the connecting joint body 7 has two butt surfaces 71b intersecting each other at one end, and the cushioning member 8 has a corresponding surface 85 corresponding to the two butt surfaces, and the corresponding surfaces 85 are butted and pressed against the butt surface 71b. Next, the connecting joint body 7 and the buffer member 8 are integrally fixed to the timepiece case 10 . Therefore, both surfaces of the connecting joint body 7 and the buffer member 8 are in close contact with each other, and are securely fixed to the timepiece case 10 without loosening.

此外,以上对本发明的实施方式进行了说明,但本发明不限定于这样的实施方式,当然在不脱离其主旨的范围内能够进行各种变形。In addition, although embodiment of this invention was described above, this invention is not limited to such embodiment, Of course, various deformation|transformation is possible in the range which does not deviate from the summary.

例如,在本实施方式中,举例表示了钟表壳体10由金属材料形成的情况,但形成钟表壳体10的材料不限定于在此举例表示的材料。例如也可以由聚芳酯树脂、ABS树脂等形成。For example, in this embodiment, the case where the timepiece case 10 is formed of a metal material is shown as an example, but the material forming the timepiece case 10 is not limited to the materials shown as examples here. For example, polyarylate resin, ABS resin, etc. can also be formed.

另外,在本实施方式中,举例表示了带2通过连结由金属材料形成的多个节体而构成的情况,但带2的材料、结构不限定于在此举例表示的材料、结构。In addition, in this embodiment, the case where the belt 2 is constituted by connecting a plurality of nodes made of a metal material is shown as an example, but the material and structure of the belt 2 are not limited to the materials and structures shown as examples here.

例如,带也可以通过连结由金属材料、树脂等各种材料构成的多个部件(节体)而构成。For example, the belt may be configured by connecting a plurality of members (segments) made of various materials such as metal materials and resins.

另外,带2也可以是例如将由POM(即,聚缩醛(polyacetal)或者聚甲醛(polyoxymethylene))、ABS树脂、聚芳酯树脂、聚碳酸酯等硬质塑料、皮革等形成的带状的部件连结于连结节体20而成。In addition, the belt 2 may be, for example, a belt-shaped belt made of hard plastics such as POM (that is, polyacetal or polyoxymethylene), ABS resin, polyarylate resin, polycarbonate, or the like. The components are connected to the joint body 20 .

另外,在本实施方式中,作为用于连结带2和带安装部15的连结部件,对使用了弹簧杆4的情况进行了说明,但不一定必需是弹簧杆4,也可以是能够压缩变形的简单的杆。In addition, in this embodiment, the case where the spring bar 4 is used as the connection member for connecting the belt 2 and the belt attachment portion 15 has been described, but the spring bar 4 does not necessarily have to be a spring bar 4 and may be compressively deformable. simple pole.

另外,在本实施方式中,作为钟表100举例表示了手表,但也可以不是手表,而是怀表、用钥匙链等相对于包等能够装卸地构成的钟表等。In addition, in this embodiment, a wristwatch is shown as an example of the timepiece 100 , but instead of a wristwatch, a pocket watch, a timepiece configured to be detachable from a bag or the like by a key chain or the like may be used.

另外,上述各实施方式中,举例表示了带的安装构造用于钟表的情况,但带的安装构造不限定于用于钟表的情况。In addition, in each of the above-mentioned embodiments, the case where the strap attachment structure is used for a timepiece is shown as an example, but the strap attachment structure is not limited to the case where it is used for a timepiece.

例如,当在计步器、心率计、高度计、气压计等的壳体安装带的情况下,也可以使用本发明的带的安装构造。For example, when a belt is attached to a housing of a pedometer, heart rate meter, altimeter, barometer, etc., the belt attachment structure of the present invention can also be used.

以上对本发明的几个实施方式进行了说明,但本发明的范围不限定于上述的实施方式,包括与权利要求书所记载的发明的范围等效的范围。Several embodiments of the present invention have been described above, but the scope of the present invention is not limited to the above-described embodiments, and includes a range equivalent to the scope of the invention described in the claims.

Claims (4)

1.一种带的安装构造,在壳体上安装带,其具备:1. A belt installation structure, the belt is installed on the housing, which has: 带安装部,其设于上述壳体的侧部,具有对置的两个脚部,且在该脚部的对置的面上贯穿设置有带安装孔;The belt mounting part is provided on the side of the above-mentioned housing, has two opposite feet, and a belt installation hole is provided through the opposite surface of the feet; 连结节体,其设置在上述带的向上述壳体安装的安装侧端部,具有形成有沿上述带的宽度方向延伸的第一贯通孔的第一嵌合部,且安装于上述带安装部;The connecting node is provided at the attachment-side end portion of the belt attached to the housing, has a first fitting portion formed with a first through hole extending in the width direction of the belt, and is attached to the belt attachment portion. ; 缓冲部件,其具有第二嵌合部,且将上述连结节体保持于上述带安装部的规定的位置,该第二嵌合部能够与上述第一嵌合部嵌合,并形成有在嵌合状态下与上述第一贯通孔连通的第二贯通孔;以及The buffer member has a second fitting portion capable of fitting the first fitting portion and is formed with A second through hole communicating with the first through hole in the closed state; and 弹簧杆,其在上述第一贯通孔及上述第二贯通孔插通,并在上述带向上述壳体安装的安装状态下,两端部分别插入于上述带安装部的上述带安装孔,a spring bar that is inserted through the first through hole and the second through hole, and has both ends inserted into the belt attachment holes of the belt attachment portion in a state where the belt is attached to the case, 上述第二贯通孔的内径与上述弹簧杆的外径相同,上述第一贯通孔的内径比上述弹簧杆的外径大,从而上述弹簧杆相对于上述连结节体具有游隙地配置,The inner diameter of the second through hole is the same as the outer diameter of the spring rod, and the inner diameter of the first through hole is larger than the outer diameter of the spring rod, so that the spring rod is arranged with play relative to the connecting joint body, 上述带的安装构造的特征在于,The above belt mounting structure is characterized in that, 在上述第一嵌合部以及上述第二嵌合部,形成有在嵌合状态下连通的轴孔,上述连结节体和上述缓冲部件通过在该轴孔插通结合用轴部件而成为一体,A shaft hole communicating in a fitted state is formed in the first fitting portion and the second fitting portion, and the coupling joint body and the buffer member are integrated by inserting a coupling shaft member through the shaft hole, 上述第一嵌合部以及上述第二嵌合部的任一方具有沿带的延伸方向突出的凸部,另一方具有呈接受该凸部的形状的凹部。Either one of the first fitting portion and the second fitting portion has a convex portion protruding in the extending direction of the belt, and the other has a concave portion in a shape to receive the convex portion. 2.一种带的安装构造,在壳体上安装带,其具备:2. A belt installation structure, the belt is installed on the housing, which has: 带安装部,其设于上述壳体的侧部,具有对置的两个脚部,且在该脚部的对置的面上贯穿设置有带安装孔;The belt mounting part is provided on the side of the above-mentioned housing, has two opposite feet, and a belt installation hole is provided through the opposite surface of the feet; 连结节体,其设置在上述带的向上述壳体安装的安装侧端部,具有形成有沿上述带的宽度方向延伸的第一贯通孔的第一嵌合部,且安装于上述带安装部;The connecting node is provided at the attachment-side end portion of the belt attached to the case, has a first fitting portion formed with a first through hole extending in the width direction of the belt, and is attached to the belt attachment portion. ; 缓冲部件,其具有第二嵌合部,且将上述连结节体保持于上述带安装部的规定的位置,该第二嵌合部能够与上述第一嵌合部嵌合,并形成有在嵌合状态下与上述第一贯通孔连通的第二贯通孔;以及The buffer member has a second fitting portion capable of fitting the first fitting portion and is formed with A second through hole communicating with the first through hole in the closed state; and 弹簧杆,其在上述第一贯通孔及上述第二贯通孔插通,并在上述带向上述壳体安装的安装状态下,两端部分别插入于上述带安装部的上述带安装孔,a spring bar that is inserted through the first through hole and the second through hole, and has both ends inserted into the belt attachment holes of the belt attachment portion in a state where the belt is attached to the case, 上述第二贯通孔的内径与上述弹簧杆的外径相同,上述第一贯通孔的内径比上述弹簧杆的外径大,从而上述弹簧杆相对于上述连结节体具有游隙地配置,The inner diameter of the second through hole is the same as the outer diameter of the spring rod, and the inner diameter of the first through hole is larger than the outer diameter of the spring rod, so that the spring rod is arranged with play relative to the connecting joint body, 上述带的安装构造的特征在于,The above belt mounting structure is characterized in that, 上述连结节体具有在一端相互相交的两个对接面,并在上述缓冲部件设有与该两个对接面对应的对应面,The connecting node body has two butt surfaces intersecting each other at one end, and the buffer member is provided with a corresponding surface corresponding to the two butt surfaces, 在使上述对应面与上述对接面对接的状态下,通过使上述弹簧杆插通于上述第一贯通孔以及上述第二贯通孔,并使上述弹簧杆的两端部分别插入于上述带安装部的上述带安装孔,从而上述连结节体和上述缓冲部件成为一体,并且上述带被安装于上述壳体。In the state where the corresponding surface is in contact with the mating surface, the spring rod is inserted into the first through hole and the second through hole, and both ends of the spring rod are respectively inserted into the belt. The above-mentioned belt installation hole of the part is opened, so that the above-mentioned coupling joint body and the above-mentioned buffer member are integrated, and the above-mentioned belt is installed on the above-mentioned housing. 3.根据权利要求2所述的带的安装构造,其特征在于,3. The belt mounting structure according to claim 2, wherein: 上述第一嵌合部以及上述第二嵌合部的任一方具有沿带的延伸方向突出的凸部,另一方具有呈接受该凸部的形状的凹部。Either one of the first fitting portion and the second fitting portion has a convex portion protruding in the extending direction of the belt, and the other has a concave portion in a shape to receive the convex portion. 4.一种钟表,其特征在于,具备:4. A clock, characterized in that it has: 权利要求1~3任一项中所述的带的安装构造;The installation structure of the belt described in any one of claims 1 to 3; 壳体;以及casing; and 安装于上述壳体的带。Belt mounted to the case above.
CN201510107418.7A 2014-03-13 2015-03-12 The installation constitution and clock and watch of band Active CN104905501B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014-049881 2014-03-13
JP2014049881A JP6020494B2 (en) 2014-03-13 2014-03-13 Band mounting structure and watch

Publications (2)

Publication Number Publication Date
CN104905501A CN104905501A (en) 2015-09-16
CN104905501B true CN104905501B (en) 2017-08-15

Family

ID=54075279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510107418.7A Active CN104905501B (en) 2014-03-13 2015-03-12 The installation constitution and clock and watch of band

Country Status (2)

Country Link
JP (1) JP6020494B2 (en)
CN (1) CN104905501B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2995672B2 (en) 1991-07-16 1999-12-27 ユニチカ株式会社 Knitting method of reversible organization by circular knitting machine with switching device
JP6284042B2 (en) * 2015-12-10 2018-02-28 カシオ計算機株式会社 Band and watch
EP3246765B1 (en) * 2016-05-16 2019-02-06 The Swatch Group Research and Development Ltd. Intermediate bracelet link for wrist watch
JP6308403B2 (en) * 2016-05-18 2018-04-11 カシオ計算機株式会社 Band and watch
JP7192410B2 (en) * 2018-11-06 2022-12-20 セイコーエプソン株式会社 band and wrist equipment
JP7358923B2 (en) 2019-11-11 2023-10-11 カシオ計算機株式会社 Band attachment device and watch
JP7578061B2 (en) * 2021-04-26 2024-11-06 セイコーエプソン株式会社 Bands and Watches

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1406536A (en) * 2001-08-29 2003-04-02 雷达表公司 Watch strap connector
JP2010243166A (en) * 2009-04-01 2010-10-28 Seiko Epson Corp clock

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3532962B2 (en) * 1994-06-21 2004-05-31 シチズン時計株式会社 Fixed structure of watch attachment
JPH09234104A (en) * 1996-03-01 1997-09-09 Citizen Watch Co Ltd Movable end fitting part of watch case
JP2002034617A (en) * 2000-07-28 2002-02-05 Casio Comput Co Ltd Watch band
JP3800941B2 (en) * 2000-09-26 2006-07-26 カシオ計算機株式会社 Electronic watch
JP2007089882A (en) * 2005-09-29 2007-04-12 Seiko Epson Corp Couplings, watchbands, and watches
JP5831846B2 (en) * 2012-02-20 2015-12-09 カシオ計算機株式会社 Band and watch

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1406536A (en) * 2001-08-29 2003-04-02 雷达表公司 Watch strap connector
JP2010243166A (en) * 2009-04-01 2010-10-28 Seiko Epson Corp clock

Also Published As

Publication number Publication date
JP2015173688A (en) 2015-10-05
JP6020494B2 (en) 2016-11-02
CN104905501A (en) 2015-09-16
HK1209990A1 (en) 2016-04-15

Similar Documents

Publication Publication Date Title
CN104905501B (en) The installation constitution and clock and watch of band
TWI451442B (en) Wearable electronic device
CN102283474B (en) Watch band and wristwatch
US11460812B2 (en) Band and wrist-worn device
CN103156342A (en) Connecting unit, band and electronic device including band
CN206880231U (en) belt and watch
JP6364763B2 (en) Case and clock
KR20010043047A (en) Wristwatch case
CN102068088A (en) Portable object with an interchangeable bracelet or strap
CN109557800B (en) Cases and Clocks
US8007165B1 (en) Coupling assembly for a wristwatch
JP2019045489A (en) Watch case with movable horn
US8366326B2 (en) Optical fiber connector
CN109463859B (en) Band and timepiece
HK1209990B (en) Mounting structure of watch strap and watch
US11022944B2 (en) Fixing device for a bracelet
CN107411248A (en) Connection chain link
JP3203156U (en) Watch band connector
JPH11211A (en) Band mounting structure
CN114098243B (en) Belt link, belt and timepiece
US8763868B2 (en) Hinged bracelet
JP3743826B2 (en) Watches
JP5800205B2 (en) Member connection structure, band mounting structure, and watch
JP2007089882A (en) Couplings, watchbands, and watches
JP2004069422A (en) clock

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1209990

Country of ref document: HK

GR01 Patent grant
GR01 Patent grant
REG Reference to a national code

Ref country code: HK

Ref legal event code: GR

Ref document number: 1209990

Country of ref document: HK