CN104846849A - Method for preventing basement bottom plate post-cast strip from leaking - Google Patents
Method for preventing basement bottom plate post-cast strip from leaking Download PDFInfo
- Publication number
- CN104846849A CN104846849A CN201410052726.XA CN201410052726A CN104846849A CN 104846849 A CN104846849 A CN 104846849A CN 201410052726 A CN201410052726 A CN 201410052726A CN 104846849 A CN104846849 A CN 104846849A
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- drainage tube
- basement bottom
- sides
- seepage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Sewage (AREA)
- Building Environments (AREA)
Abstract
The invention relates to a method for preventing a basement bottom plate from leaking, in particular to a method for preventing a basement bottom plate post-cast strip from leaking. The method comprises the steps that construction joints on the two sides of the basement bottom plate post-cast strip are cleared up and washed out, and no impurities such as mud blocks and garbage exist; professional waterproof construction persons are arranged to block found water seepage points; according to the floor thickness, a PVC tube with the matched diameter is selected for serving as a drainage tube; a PVC semicircular tube is laid along the post-cast strip and the concrete joints on the two sides in an opening-downward manner, the end of the drainage tube is led to a drainage ditch or a water collection well, the other side of the drainage tube is blocked by waterproof concrete, and the two sides of the drainage tube are firmly fixed through waterproof mortar or fine aggregate concrete, and are prevented from deviating or being damaged; and a basement floor is cast. According to the method, the phenomena that seepage points are found secondarily, and the specific seepage portion is hard to find are overcome; and processing is convenient, the time is saved, the cost is low, and adverse effects are avoided.
Description
Technical field
The present invention relates to basement, particularly relate to a kind of method of preventing basement bottom board seepage.
Background technology
Basement bottom plate rear pouring tape stitches as a kind of temporary construction, this seam is built after need retaining a period of time according to designing requirement again, total is linked to be entirety, but the steel plate for sealing water adopted due to ater-casting or rubber fastening band are along with the passing of service time, perishable, aging, have the possibility that seepage occurs, and once there is seepage easily heave terrace impact use, be difficult to find breakthrough, maintenance trouble, and cost is high simultaneously.
Summary of the invention
The present invention is intended to the defect overcoming prior art, provides a kind of method of preventing basement bottom plate rear pouring tape seepage.Present invention, avoiding secondary and find breakthrough, be difficult to the defect finding concrete seepage place, easy to deal with, save time, cost is low, and has no adverse effects.
In order to solve the problems of the technologies described above, a kind of method of preventing basement bottom plate rear pouring tape seepage of the present invention, it comprises:
Step one, rinses well the cleaning of basement bottom plate rear pouring tape both sides constuction joint, must not have the foreign material such as clod, rubbish;
Step 2, arranges professional waterproof construction personnel by complete for the seepage point shutoff found;
Step 3, selects the pvc pipe of a diameter matches as drainage tube according to terrace thickness, and namely with after longitudinally being cut from middle part, it is the diameter that principle selects pipe that PVC semi-circular tube upper surface is no less than 2cm apart from terrace surface;
Step 4, described PVC semi-circular tube is laid along ater-casting and both sides concrete seam in the mode that Open Side Down, and the termination of drainage tube is caused gutter or collecting well, opposite side waterproof concrete is blocked, drainage tube both sides waterproofing mortar or pea gravel concreten fixation, prevent its off normal or destruction;
Step 5, builds basement terrace.
The present invention is before building basement terrace, along the pre-buried semicircle PVC drainage tube of the concrete seam crossing in ater-casting and both sides, drainage tube covers between two parties on gap, after terrace has been built, gutter or collecting well will be flowed to along drainage tube at the water of seam crossing seepage, avoid percolating water play back and forth in the interlayer of structure base slab and terrace, heave terrace or penetrate into terrace surface along terrace self gap after the comparatively large and hydraulic pressure of leakage exceedes certain pressure, destroy basement terrace and using function.
The present invention has the features such as execute-in-place is simple, applicability is strong, material price is cheap; Adopt the method can overcome ater-casting opposing sedimentation and deformation ability weak, steel plate water stopper and rubber fastening band perishable aging, after certain life cycle, easily there is seepage, destroy terrace, cause basement ponding and impact to use.This technique avoids secondary and find breakthrough, be difficult to find concrete seepage place, deal with take a lot of work, time-consuming, costly, destructive large and affect the shortcomings such as using function.
Detailed description of the invention
A kind of method of preventing basement bottom plate rear pouring tape seepage of the present invention, it comprises:
First constuction joint cleaning in basement bottom plate rear pouring tape both sides is rinsed well, the foreign material such as clod, rubbish must not be had;
Arrange professional waterproof construction personnel by complete for the seepage point shutoff found;
Select the diameter of drainage tube according to terrace thickness, longitudinally cut later half pipe upper surface from middle part and be no less than apart from terrace surface the diameter that 2cm is principle selection pipe;
Laid along ater-casting and both sides concrete seam in the mode that Open Side Down by semicircle PVC drainage tube, and the termination of drainage tube is caused gutter or collecting well, opposite side waterproof concrete is blocked, stifled tight a little;
In the process of laying drainage tube, in drainage tube both sides waterproofing mortar or pea gravel concreten fixation, its off normal or destruction to be prevented.
Build basement terrace.
Claims (2)
1. prevent a method for basement bottom plate rear pouring tape seepage, it is characterized in that, it comprises:
Step one, rinses well the cleaning of basement bottom plate rear pouring tape both sides constuction joint, must not have the foreign material such as clod, rubbish;
Step 2, arranges professional waterproof construction personnel by complete for the seepage point shutoff found;
Step 3, selects the pvc pipe of a diameter matches as drainage tube according to terrace thickness, and after longitudinally being cut from middle part, it is the diameter that principle selects pipe that PVC semi-circular tube upper surface is no less than 2cm apart from terrace surface;
Step 4, described PVC semi-circular tube is laid along ater-casting and both sides concrete seam in the mode that Open Side Down, and the termination of drainage tube is caused gutter or collecting well, opposite side waterproof concrete is blocked, drainage tube both sides waterproofing mortar or pea gravel concreten fixation, prevent its off normal or destruction;
Step 5, builds basement terrace.
2. a kind of method of preventing basement bottom plate rear pouring tape seepage according to claim 1, is characterized in that, in described step 3, after described pvc pipe is longitudinally cut from middle part, PVC semi-circular tube upper surface is no less than 2cm apart from terrace surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410052726.XA CN104846849B (en) | 2014-02-17 | 2014-02-17 | A kind of method for preventing basement bottom plate rear pouring tape seepage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410052726.XA CN104846849B (en) | 2014-02-17 | 2014-02-17 | A kind of method for preventing basement bottom plate rear pouring tape seepage |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104846849A true CN104846849A (en) | 2015-08-19 |
CN104846849B CN104846849B (en) | 2017-06-30 |
Family
ID=53846807
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410052726.XA Active CN104846849B (en) | 2014-02-17 | 2014-02-17 | A kind of method for preventing basement bottom plate rear pouring tape seepage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104846849B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442415A (en) * | 2018-04-08 | 2018-08-24 | 中铁第四勘察设计院集团有限公司 | A kind of stifled row suitable for construction of underground structure combines water-tight device and method |
CN109339118A (en) * | 2018-11-06 | 2019-02-15 | 中国十七冶集团有限公司 | A kind of basement bottom board leakage-resistant device and construction method |
CN110295630A (en) * | 2019-07-26 | 2019-10-01 | 深圳市建工集团股份有限公司 | The late poured band structure of multilayer constraint antiseep |
CN110387908A (en) * | 2019-07-26 | 2019-10-29 | 深圳市建工集团股份有限公司 | The rear pouring tape construction method of multilayer constraint antiseep |
CN110552367A (en) * | 2018-05-31 | 2019-12-10 | 中国二十冶集团有限公司 | Drainage method for comprehensive pipe gallery |
CN111827364A (en) * | 2020-07-13 | 2020-10-27 | 深圳市建工集团股份有限公司 | Construction method for basement structure bottom plate leakage subarea point type drainage prevention and combination |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101298782A (en) * | 2008-06-13 | 2008-11-05 | 朱邃科 | Method and system for basement engineering water proof and water drain |
CN101943006A (en) * | 2010-09-07 | 2011-01-12 | 长安大学 | Treatment method of water leakage of construction joints of tunnel |
JP2013124540A (en) * | 2011-12-16 | 2013-06-24 | Agc Polymer Material Co Ltd | Waterproof construction method |
CN103321257A (en) * | 2013-06-18 | 2013-09-25 | 浙江海天建设集团有限公司 | Anti-cracking seepage-proof construction method for ultra-long mass concrete structure basement |
CN103469828A (en) * | 2013-09-25 | 2013-12-25 | 浙江天力建设集团有限公司 | Construction method of hydrophobic structure of post-cast strip of bottom plate of basement |
-
2014
- 2014-02-17 CN CN201410052726.XA patent/CN104846849B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101298782A (en) * | 2008-06-13 | 2008-11-05 | 朱邃科 | Method and system for basement engineering water proof and water drain |
CN101943006A (en) * | 2010-09-07 | 2011-01-12 | 长安大学 | Treatment method of water leakage of construction joints of tunnel |
JP2013124540A (en) * | 2011-12-16 | 2013-06-24 | Agc Polymer Material Co Ltd | Waterproof construction method |
CN103321257A (en) * | 2013-06-18 | 2013-09-25 | 浙江海天建设集团有限公司 | Anti-cracking seepage-proof construction method for ultra-long mass concrete structure basement |
CN103469828A (en) * | 2013-09-25 | 2013-12-25 | 浙江天力建设集团有限公司 | Construction method of hydrophobic structure of post-cast strip of bottom plate of basement |
Non-Patent Citations (2)
Title |
---|
解琦等: "在役山岭隧道渗漏水病害及整治方法", 《交通科技》 * |
陈立永等: "超深临水基础后浇带预埋注浆管施工技术", 《建筑技术》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442415A (en) * | 2018-04-08 | 2018-08-24 | 中铁第四勘察设计院集团有限公司 | A kind of stifled row suitable for construction of underground structure combines water-tight device and method |
CN110552367A (en) * | 2018-05-31 | 2019-12-10 | 中国二十冶集团有限公司 | Drainage method for comprehensive pipe gallery |
CN109339118A (en) * | 2018-11-06 | 2019-02-15 | 中国十七冶集团有限公司 | A kind of basement bottom board leakage-resistant device and construction method |
CN110295630A (en) * | 2019-07-26 | 2019-10-01 | 深圳市建工集团股份有限公司 | The late poured band structure of multilayer constraint antiseep |
CN110387908A (en) * | 2019-07-26 | 2019-10-29 | 深圳市建工集团股份有限公司 | The rear pouring tape construction method of multilayer constraint antiseep |
CN110387908B (en) * | 2019-07-26 | 2021-07-06 | 深圳市建工集团股份有限公司 | Multi-layer restraining anti-leakage post-pouring belt construction method |
CN110295630B (en) * | 2019-07-26 | 2024-05-31 | 深圳市建工集团股份有限公司 | Multilayer constraint anti-leakage post-pouring belt structure |
CN111827364A (en) * | 2020-07-13 | 2020-10-27 | 深圳市建工集团股份有限公司 | Construction method for basement structure bottom plate leakage subarea point type drainage prevention and combination |
Also Published As
Publication number | Publication date |
---|---|
CN104846849B (en) | 2017-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204357484U (en) | The drainage system of anti-tunnel invert constuction joint infiltration | |
CN104846849A (en) | Method for preventing basement bottom plate post-cast strip from leaking | |
CN204000956U (en) | A kind of basement bottom plate rear pouring tape structure | |
CN104806272A (en) | Tunnel diversion composite type waterproof and drainage system as well as construction method and use method thereof | |
CN204476470U (en) | A kind of waterproof and water drainage system of applicable tunnel project seam | |
CN202483588U (en) | Self water-proof drainage system of tunnel lining | |
CN203783601U (en) | Treatment system suitable for tunnel construction seam water leakage in cold regions | |
CN100516385C (en) | Connection method and structure of horizontal anti-seepage layer and drainage shaft in red mud storage yard | |
CN104652364A (en) | Construction method of vertical water-sealing structure for water conservancy project | |
CN106988440A (en) | A kind of waterproof construction and its construction method at subway station main body and accessory interface | |
CN109339118A (en) | A kind of basement bottom board leakage-resistant device and construction method | |
CN104652495A (en) | Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate | |
CN105821893A (en) | Recyclable drainage device applicable to underground engineering and construction method thereof | |
CN102367735B (en) | Back-to-back waterstop installation equipment for tunnel construction joint | |
CN201943093U (en) | Settlement joint water-proof structure for basement with drainage channel | |
CN107100099B (en) | A kind of reinforcement method for railway culvert | |
CN202073148U (en) | Novel anti-seepage floor drain system | |
CN108149701A (en) | It is a kind of for the shut-in well end pipe of plugging dewatering well and plugging dewatering well method | |
CN103205986A (en) | Concrete raft foundation construction-joint grouting device and construction method | |
CN201137209Y (en) | An underground drainage device | |
CN206616711U (en) | A kind of waterproof construction at subway station main body and accessory interface | |
CN205557323U (en) | Hinge joint drainage structures | |
CN101205766B (en) | Waterproof treatment method for joint of new station and old station | |
CN207159744U (en) | A kind of pavement drainage arrangement | |
KR20050017815A (en) | Construction and design method about center wall of two arch tunnel excavation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |