CN104843147A - Underwater excavation system construction of sand pump vessel guided and located by steel ropes - Google Patents
Underwater excavation system construction of sand pump vessel guided and located by steel ropes Download PDFInfo
- Publication number
- CN104843147A CN104843147A CN201410050452.0A CN201410050452A CN104843147A CN 104843147 A CN104843147 A CN 104843147A CN 201410050452 A CN201410050452 A CN 201410050452A CN 104843147 A CN104843147 A CN 104843147A
- Authority
- CN
- China
- Prior art keywords
- excavation
- sand pumping
- sand
- ship
- sand pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004576 sand Substances 0.000 title claims abstract description 113
- 238000009412 basement excavation Methods 0.000 title claims abstract description 67
- 238000010276 construction Methods 0.000 title claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 title abstract description 31
- 239000010959 steel Substances 0.000 title abstract description 31
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 19
- 239000000203 mixture Substances 0.000 claims description 7
- 239000003643 water by type Substances 0.000 claims 2
- 238000005086 pumping Methods 0.000 abstract description 88
- 238000000034 method Methods 0.000 description 4
- 238000004873 anchoring Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
本发明公开了一种钢索导向、定位抽砂船水下开挖系统构成,其特征在于:系统由两端固定岸边的定位钢索1、水中抽砂开挖的抽砂船3及固定在抽砂船船体上连接定位钢索的绞盘2组成。抽砂开挖时,抽砂船沿着钢索导向平行移动、锁定,船上抽砂管5连接的抽砂笼头4在可移动到的范围边线边线6内进行抽砂开挖作业。开挖系统可以多种组合方式适应现场不同工况,根据抽砂船船体大小、数量、船上抽砂笼头作业移动能够覆盖的范围及工期要求等因素,灵活确定系统由一条钢索导向、定位一台抽砂船构成系统,或由多条钢索导向、定位相应多台抽砂船构成系统。系统组合灵活,操作简单,在水中可以真正固定船体位置,有效防止欠挖、漏挖和重复开挖,极大地提高挖掘效率。
The invention discloses an underwater excavation system for a steel cable guiding and positioning sand pumping ship, which is characterized in that the system consists of a positioning steel cable 1 fixed at both ends of the bank, a sand pumping ship 3 for sand pumping and excavation in water, and a fixed It consists of a capstan 2 connected with a positioning cable on the hull of the sand pumping ship. During sand pumping and excavation, the sand pumping ship moves and locks in parallel along the cable guide, and the sand pumping faucet 4 connected to the sand pumping pipe 5 on the ship carries out sand pumping and excavation operations within the movable range sideline and sideline 6. The excavation system can be combined in a variety of ways to adapt to different working conditions on site. According to the size and quantity of the sand pumping ship, the range that the sand pumping bridle can cover on the ship, and the requirements of the construction period, it is flexibly determined that the system is guided by a steel cable and positioned by a A sand pumping ship constitutes a system, or a system is composed of multiple sand pumping ships guided and positioned correspondingly by multiple steel cables. The system is flexible in combination and easy to operate. It can truly fix the position of the hull in water, effectively prevent under-excavation, missing excavation and repeated excavation, and greatly improve the excavation efficiency.
Description
技术领域technical field
本发明涉及水下开挖施工技术领域,特别涉及一种钢索导向、定位抽砂船水下开挖系统构成。The invention relates to the technical field of underwater excavation construction, in particular to the construction of an underwater excavation system for a steel cable-guided and positioned sand pumping ship.
背景技术Background technique
在水利工程、道桥工程、港航工程及河道疏浚工程中,经常遇到无法采用群井降水、沉箱排水等方法情况,需要带水进行水下开挖施工,最常用的开挖工具是抽砂船,即用船载水泵抽取临近水底水,用高速水流带走水下介质。由于作业时是用船锚对抽砂船船体进行水上定位,船锚是通过柔性钢索联结船体,在抽砂船抽砂开挖作业时,受风、水流等因素影响,船体会在一定范围内移动,这种传统定位方法不能保证船体相对于水底真正处于静止状态,水下抽砂开挖存在超挖、漏挖和重复开挖等问题,严重地影响抽砂开挖施工效率。In water conservancy projects, road and bridge projects, port and navigation projects, and river dredging projects, it is often encountered that methods such as group well dewatering and caisson drainage cannot be used, and water needs to be carried out for underwater excavation construction. The most commonly used excavation tool is pumping The sand ship uses the on-board water pump to pump the water near the bottom, and uses the high-speed water flow to take away the underwater medium. Since the anchor is used to position the hull of the sand pumping ship on water during the operation, and the anchor is connected to the hull by a flexible steel cable. This traditional positioning method cannot ensure that the hull is truly stationary relative to the bottom of the water. There are problems such as over-excavation, under-excavation and repeated excavation in underwater sand pumping excavation, which seriously affects the construction efficiency of sand pumping excavation.
另外用船锚对船体定位方法移动船体操作复杂,每次移动船体都需要收锚、抛锚操作,工作效率低。In addition, the operation of moving the hull with the anchor to the hull positioning method is complicated, and the anchoring and anchoring operations are required every time the hull is moved, and the work efficiency is low.
发明内容Contents of the invention
本发明提供了一种钢索导向、定位抽砂船水下开挖系统构成,可以克服以前无法真正固定船体位置、存在超挖、漏挖和重复开挖等问题,提高抽砂开挖施工效率。The invention provides an underwater excavation system for a steel cable-guided and positioned sand pumping ship, which can overcome the problems of over-excavation, under-excavation and repeated excavation, and improve the construction efficiency of sand pumping and excavation. .
本发明所采用的技术方案是:The technical scheme adopted in the present invention is:
一种钢索导向、定位抽砂船水下开挖系统构成,其特征在于:系统由两端固定岸边的定位钢索、水中抽砂开挖的抽砂船及固定在抽砂船船体上连接定位钢索的绞盘组成。抽砂开挖时,抽砂船沿着钢索导向平行移动、锁定,船上抽砂管连接的抽砂笼头在可移动到的范围边线内进行抽砂开挖作业。An underwater excavation system for a cable-guided and positioned sand pumping ship is characterized in that the system consists of a positioning steel cable fixed at both ends on the shore, a sand pumping ship for sand pumping and excavation in water, and a sand pumping ship fixed on the hull of the sand pumping ship It consists of a winch connected with a positioning cable. During sand pumping and excavation, the sand pumping ship moves in parallel along the cable guide and locks, and the sand pumping tap connected to the sand pumping pipe on the ship carries out sand pumping and excavation operations within the sideline of the movable range.
开挖系统中导向、定位钢索需要拉直,且两端分别固定在需要开挖作业水域相对应的岸边两侧,In the excavation system, the guiding and positioning cables need to be straightened, and the two ends are respectively fixed on both sides of the bank corresponding to the water area where excavation is required.
抽砂船通过固定在抽砂船船体上的绞盘连接导向、定位钢索,并沿着钢索导向平行移动。The sand pumping ship connects and guides the steel cable through the winch fixed on the hull of the sand pumping ship, and moves parallelly along the cable guide.
抽砂船抽砂开挖作业区域范围为钢索至抽砂笼头可移动至船尾的最大距离之间的水域。The sand pumping and excavation operation area of the sand pumping ship is the water area between the steel cable and the maximum distance that the sand pumping bridle can move to the stern.
开挖系统可以多种组合方式适应现场不同工况。可以由一条钢索导向、定位一台抽砂船构成系统,也可以由多条钢索导向、定位相应多台抽砂船构成系统。The excavation system can be combined in various ways to adapt to different working conditions on site. The system can be composed of one steel cable guiding and positioning one sand pumping ship, or it can be composed of multiple steel cables guiding and positioning corresponding multiple sand pumping ships.
系统抽砂船数量可以根据抽砂船船体大小、数量、船上抽砂笼头作业移动能够覆盖的范围及工期要求等因素灵活确定。The number of sand pumping ships in the system can be flexibly determined according to factors such as the size and quantity of the sand pumping ship hull, the range that can be covered by the movement of the sand pumping tap on the ship, and the requirements of the construction period.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
1.本发明用两端分别固定在两岸钢索导向、锁定船体在水中的位置,能保证船体沿着钢索导引的线路移动,在抽砂开挖时,可保证船体相对于水底真正处于静止状态,有效防止欠挖、漏挖及重复开挖,极大地提高抽砂开挖效率。1. In the present invention, the two ends are respectively fixed on the two sides of the cable to guide and lock the position of the hull in the water, which can ensure that the hull moves along the line guided by the steel cable. In the static state, it can effectively prevent under-excavation, missed excavation and repeated excavation, and greatly improve the efficiency of sand pumping and excavation.
2.本发明可以适应现场不同工况灵活组合,操作简单,可以根据抽砂船船体大小、数量、船上抽砂笼头作业移动能够覆盖的范围及工期要求等因素灵活确定系统抽砂船数量。2. The present invention can adapt to different working conditions on site and be flexibly combined, and the operation is simple. The number of sand pumping ships in the system can be flexibly determined according to factors such as the size and quantity of the sand pumping ship hull, the range that can be covered by the movement of the sand pumping tap on the ship, and the construction period requirements.
附图说明Description of drawings
图1为钢索导向、定位抽砂船水下开挖系统构成示意图;Figure 1 is a schematic diagram of the composition of the underwater excavation system of the cable-guided and positioned sand pumping vessel;
图2为由4台抽砂船组成的水下开挖系统示意图。Fig. 2 is a schematic diagram of an underwater excavation system composed of four sand pumping ships.
具体实施方式Detailed ways
系统由两端固定岸边的定位钢索(1)、水中抽砂开挖的抽砂船(3)及固定在抽砂船船体上连接定位钢索的绞盘(2)组成。抽砂开挖时,抽砂船(3)沿着钢索(1)导向平行移动、锁定,船上抽砂管(5)连接的抽砂笼头(4)在可移动到的范围边线(6)内进行抽砂开挖作业。The system is composed of a positioning steel cable (1) with both ends fixed to the shore, a sand pumping ship (3) for pumping sand in water and excavating, and a winch (2) fixed on the hull of the sand pumping ship and connected with the positioning steel cable. During sand pumping and excavation, the sand pumping ship (3) moves parallelly along the steel cable (1) and locks, and the sand pumping tap (4) connected to the sand pumping pipe (5) on the ship is at the sideline of the movable range (6) Sand pumping and excavation operations are carried out.
开挖系统中导向、定位钢索(1)需要拉直,且两端分别固定在需要开挖作业水域相对应的岸边两侧,In the excavation system, the guiding and positioning steel cables (1) need to be straightened, and the two ends are respectively fixed on both sides of the bank corresponding to the water area to be excavated.
抽砂船(3)通过固定在抽砂船船体上的绞盘(2)连接导向、定位钢索(1),并沿着钢索(1)导向平行移动。The sand pumping ship (3) connects and guides the steel cable (1) through the capstan (2) fixed on the hull of the sand pumping ship, and moves parallelly along the steel cable (1) guide.
抽砂船(3)抽砂开挖作业区域范围为钢索(1)至抽砂笼头(4)可移动至船尾的最大距离之间的水域。The sand pumping excavation operation area of the sand pumping ship (3) is the water area between the steel cable (1) and the maximum distance that the sand pumping tap (4) can move to the stern.
开挖系统可以多种组合方式适应现场不同工况。可以由一条钢索(1)导向、定位一台抽砂船(3)构成系统,也可以由多条钢索(1)导向、定位相应多台抽砂船(3)构成系统。The excavation system can be combined in various ways to adapt to different working conditions on site. A system can be formed by guiding and positioning one sand pumping ship (3) by one steel cable (1), or by guiding and positioning a plurality of sand pumping ships (3) correspondingly by multiple steel cables (1).
系统抽砂船数量可以根据抽砂船(3)船体大小、数量、船上抽砂笼头(4)作业移动能够覆盖的范围及工期要求等因素灵活确定。The number of sand pumping ships in the system can be flexibly determined according to factors such as the size and quantity of the sand pumping ships (3), the range that can be covered by the operation movement of the sand pumping tap (4) on board, and the construction period requirements.
实施例一:用1条定位钢索和1台抽砂船组成的本发明Embodiment one: the present invention that is formed with 1 positioning steel cable and 1 sand pumping ship
本发明由1条导向、定位钢索(1)和1条抽砂船(3)通过固定在抽砂船船体上的绞盘(2)连接组成。即系统由1条两端固定岸边的定位钢索(1)、1条水中抽砂开挖的抽砂船(3)及固定在抽砂船船体上连接定位钢索的绞盘(2)组成。抽砂开挖时,抽砂船(3)沿着钢索(1)导向平行移动、锁定,船上抽砂管(5)连接的抽砂笼头(4)在可移动到的范围边线(6)内进行抽砂开挖作业。The invention is composed of a guiding and positioning steel cable (1) and a sand pumping ship (3) connected by a capstan (2) fixed on the sand pumping ship hull. That is to say, the system consists of a positioning cable (1) with both ends fixed to the shore, a sand pumping ship (3) for sand pumping and excavation in water, and a winch (2) fixed on the hull of the sand pumping ship and connected to the positioning cable . During sand pumping and excavation, the sand pumping ship (3) moves parallelly along the steel cable (1) and locks, and the sand pumping tap (4) connected to the sand pumping pipe (5) on the ship is at the sideline of the movable range (6) Sand pumping and excavation operations are carried out.
实施例二:用4条导向、定位钢索和4台抽砂船组成的本发明Embodiment two: the present invention that forms with 4 guiding, positioning steel cables and 4 sand pumping ships
船体较小或开挖区域较大时,为提高挖掘效率,可以用多台抽砂船(3)构成系统,本例为4条导向、定位钢索(1)和4条抽砂船(3)通过固定在抽砂船船体上的绞盘(2)连接组成系统。即系统由4条两端固定岸边的定位钢索(1)、4条水中抽砂开挖的抽砂船(3)及固定在抽砂船船体上连接定位钢索的绞盘(2)组成。根据抽砂船(3)抽砂开挖作业区域范围确定定位钢索(1)间距,抽砂开挖时,抽砂船(3)沿着钢索(1)导向平行移动、锁定,1#船与2#船、2#船与3#船、3#船与4#船处于错位位置,船上抽砂管(5)连接的抽砂笼头(4)在可移动到的范围边线(6)内进行抽砂开挖作业,相互不干扰,有效防止了欠挖、漏挖及重复开挖,加快了开挖速度。When the hull is small or the excavation area is large, in order to improve the excavation efficiency, multiple sand pumping ships (3) can be used to form a system. In this example, 4 guiding and positioning cables (1) and 4 sand pumping ships (3 ) are connected to form a system through winches (2) fixed on the hull of the sand pumping vessel. That is to say, the system consists of 4 positioning steel cables (1) with both ends fixed to the shore, 4 sand pumping ships (3) for excavating sand in water, and a winch (2) fixed on the hull of the sand pumping ship and connected to the positioning steel cables . Determine the distance between the positioning steel cables (1) according to the sand pumping excavation area of the sand pumping ship (3). During sand pumping and excavation, the sand pumping ship (3) moves and locks in parallel along the guide of the steel cable (1), 1# Ship and 2# ship, 2# ship and 3# ship, 3# ship and 4# ship are in misaligned positions, and the sand pumping tap (4) connected to the sand pumping pipe (5) on the ship is at the sideline of the movable range (6) Sand pumping and excavation operations are carried out within the machine without interfering with each other, which effectively prevents under-excavation, missed excavation and repeated excavation, and speeds up the excavation.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410050452.0A CN104843147A (en) | 2014-02-13 | 2014-02-13 | Underwater excavation system construction of sand pump vessel guided and located by steel ropes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410050452.0A CN104843147A (en) | 2014-02-13 | 2014-02-13 | Underwater excavation system construction of sand pump vessel guided and located by steel ropes |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104843147A true CN104843147A (en) | 2015-08-19 |
Family
ID=53843230
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410050452.0A Pending CN104843147A (en) | 2014-02-13 | 2014-02-13 | Underwater excavation system construction of sand pump vessel guided and located by steel ropes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104843147A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030056403A1 (en) * | 1994-04-07 | 2003-03-27 | Paul Smit | Method and vessel for treating an underwater bed |
CN2679245Y (en) * | 2004-01-30 | 2005-02-16 | 胜利油田胜利石油化工建设有限责任公司三分公司 | Underwater ditcher for pipeline-crossing river |
WO2005070049A2 (en) * | 2004-01-15 | 2005-08-04 | Great Lakes Dredge & Dock Company | Marine backhoe dredge |
CN201952829U (en) * | 2011-01-28 | 2011-08-31 | 中国交通建设股份有限公司 | Positioning and traveling device with double steel piles and double trolleys for suction dredger |
CN202765738U (en) * | 2012-09-24 | 2013-03-06 | 浙江浙电经济技术研究院 | Reciprocating type power transport system |
CN203996790U (en) * | 2014-02-13 | 2014-12-10 | 黑龙江省水利科学研究院 | Cable wire guiding, location sand pump dredger wet excavation system |
-
2014
- 2014-02-13 CN CN201410050452.0A patent/CN104843147A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030056403A1 (en) * | 1994-04-07 | 2003-03-27 | Paul Smit | Method and vessel for treating an underwater bed |
WO2005070049A2 (en) * | 2004-01-15 | 2005-08-04 | Great Lakes Dredge & Dock Company | Marine backhoe dredge |
CN2679245Y (en) * | 2004-01-30 | 2005-02-16 | 胜利油田胜利石油化工建设有限责任公司三分公司 | Underwater ditcher for pipeline-crossing river |
CN201952829U (en) * | 2011-01-28 | 2011-08-31 | 中国交通建设股份有限公司 | Positioning and traveling device with double steel piles and double trolleys for suction dredger |
CN202765738U (en) * | 2012-09-24 | 2013-03-06 | 浙江浙电经济技术研究院 | Reciprocating type power transport system |
CN203996790U (en) * | 2014-02-13 | 2014-12-10 | 黑龙江省水利科学研究院 | Cable wire guiding, location sand pump dredger wet excavation system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104696588A (en) | Deepwater subsea pipeline starting laying method | |
CN105370208A (en) | Underwater drill-burst ship and drilling construction method thereof | |
CN108032971A (en) | A kind of underwater leading truck and its method of work that cable technology is worn based on HDD | |
CN106193161A (en) | A kind of strand is inhaled boat landing forward position and is surpassed low coverage ship dredging construction method | |
CN104421491B (en) | A kind ofly uphang working equipment and the operational method across submerged pipeline processing for deep water | |
CN203996790U (en) | Cable wire guiding, location sand pump dredger wet excavation system | |
CN108832551A (en) | The laying of batholith sea bed high-pressure undersea cable and guard method | |
CN107956228A (en) | A kind of seabed twists imbibition pressure control system | |
CN102561454B (en) | Water intake method utilizing pipe jacking vertically | |
CN104843147A (en) | Underwater excavation system construction of sand pump vessel guided and located by steel ropes | |
CN103398218B (en) | Construction and protection method for long-distance parallel subsea pipeline | |
CN105715908B (en) | A kind of submarine pipeline flexible board group scour protection device | |
CN102953366B (en) | Monitoring device for foundation of floating hydraulic structure in shallow sea area | |
CN107658794A (en) | Laying method for submarine cable | |
CN205101675U (en) | Long distance submarine pipe line is pipe laying construction system after ditching in advance | |
CN206888047U (en) | A kind of cutter suction dredger | |
CN105156759A (en) | Method for crossed crossing construction of composite hose | |
CN104058071B (en) | A kind of semi-submersible dredget | |
CN206623969U (en) | A kind of water-jet extra large cable fishing device | |
CN109372047A (en) | A kind of three way ropes position system suitable for cutter suction dredger | |
CN215592411U (en) | Large-diameter steel pipe water lifting device in small-sized river channel | |
EP3243734A1 (en) | Assembly of a vessel and a floating module | |
CN204401679U (en) | Novel hydraulic suction dredge | |
CN209099429U (en) | A kind of three way ropes position system applied to cutter suction dredger | |
CN209099415U (en) | A kind of three way ropes position system suitable for cutter suction dredger |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150819 |
|
WD01 | Invention patent application deemed withdrawn after publication |