CN104821897A - Authority management system used for transformer substation digital platform and application thereof - Google Patents
Authority management system used for transformer substation digital platform and application thereof Download PDFInfo
- Publication number
- CN104821897A CN104821897A CN201510216005.2A CN201510216005A CN104821897A CN 104821897 A CN104821897 A CN 104821897A CN 201510216005 A CN201510216005 A CN 201510216005A CN 104821897 A CN104821897 A CN 104821897A
- Authority
- CN
- China
- Prior art keywords
- user
- authority
- role
- unit
- substation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012544 monitoring process Methods 0.000 claims abstract description 15
- 238000012986 modification Methods 0.000 claims description 10
- 230000004048 modification Effects 0.000 claims description 10
- 238000000034 method Methods 0.000 claims description 8
- 238000013475 authorization Methods 0.000 claims description 6
- 238000012423 maintenance Methods 0.000 abstract description 7
- 238000010276 construction Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
本发明涉及一种用于变电站数字化平台的权限管理系统,包括:用户行为监控模块,根据用户被赋予的权限允许或拒绝用户的操作请求;还包括:用户角色创建模块,用于根据平台业务逻辑创建拥有指定权限的用户角色;角色指派模块,分别与用户角色创建模块和用户行为监控模块连接,用于为平台中的用户指派用户角色,并赋予用户该用户角色的权限。与现有技术相比,本发明用户角色创建模块创建多个用户角色,再通过向用户指派用户角色的方式来对用户进行权限的赋予,可以在平台承接大量用户时,减少了维护人员的工作量。
The present invention relates to an authority management system for a substation digital platform, including: a user behavior monitoring module, which allows or rejects the user's operation request according to the authority granted to the user; Create a user role with specified permissions; the role assignment module is connected with the user role creation module and the user behavior monitoring module respectively, and is used to assign user roles to users in the platform and grant users the permissions of the user roles. Compared with the prior art, the user role creation module of the present invention creates multiple user roles, and then assigns user roles to users to grant permissions to users, which can reduce the work of maintenance personnel when the platform accepts a large number of users quantity.
Description
技术领域technical field
本发明涉及权限管理技术,尤其是涉及一种用于变电站数字化平台的权限管理系统及其应用。The invention relates to authority management technology, in particular to an authority management system for a substation digital platform and an application thereof.
背景技术Background technique
电力是现代生产和生活必不可少的动力,也是当代最方便、最易控制、适用范围最广泛的现代化能源。改革开放以来,我国处于快速发展之中,经济总量持续增长,人民生活水平不断提高,对电力的需求越来越大。安全、可靠、经济、充足的电力供应是保证经济社会发展的重要基础,电力行业在国民经济中扮演着重要的基础产业和先行产业的角色。电力发展一方面需要满足经济社会日益提高的电力需求,要不断提高电力设施设计建设的现代化水平,构筑智能电网系统,满足未来信息化社会对电力系统的需求。同时,对电力系统设施的设计建设而言,构建全生命周期的信息化模型,科学管理电网系统设计建设流程是构建智能电网的重要前提。Electricity is an indispensable power for modern production and life, and it is also the most convenient, most controllable, and most widely applicable modern energy source. Since the reform and opening up, my country has been in the process of rapid development, the total economic volume has continued to grow, people's living standards have continued to improve, and the demand for electricity has increased. Safe, reliable, economical and sufficient power supply is an important basis for ensuring economic and social development, and the power industry plays an important role in the national economy as a basic industry and a leading industry. On the one hand, power development needs to meet the increasing demand for power in the economy and society. It is necessary to continuously improve the modernization level of power facility design and construction, build a smart grid system, and meet the needs of the future information society for power systems. At the same time, for the design and construction of power system facilities, building a full life cycle information model and scientifically managing the design and construction process of the power grid system are important prerequisites for building a smart grid.
目前,基于IFC数据格式的建筑信息建模(Building Information Modeling,BIM)标准已被广泛应用于各种建筑工程中。由于信息化平台需要承接众多的用户的接入,此时如果对每一个用户进行单独的权限配置,这对于权限管理系统的维护人员有着巨大的压力,维护难度大,工作量大。At present, the building information modeling (Building Information Modeling, BIM) standard based on the IFC data format has been widely used in various construction projects. Since the information platform needs to undertake the access of many users, if each user is configured with individual rights at this time, this will put a huge pressure on the maintenance personnel of the rights management system, and the maintenance will be difficult and the workload will be heavy.
发明内容Contents of the invention
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种用于变电站数字化平台的权限管理系统及其应用。The object of the present invention is to provide a rights management system for a substation digital platform and its application in order to overcome the above-mentioned defects in the prior art.
本发明的目的可以通过以下技术方案来实现:The purpose of the present invention can be achieved through the following technical solutions:
一种用于变电站数字化平台的权限管理系统,包括:A rights management system for substation digital platform, including:
用户行为监控模块,根据用户被赋予的权限允许或拒绝用户的操作请求;The user behavior monitoring module allows or rejects the user's operation request according to the authority granted to the user;
还包括:Also includes:
用户角色创建模块,用于根据平台业务逻辑创建拥有指定权限的用户角色;User role creation module, used to create user roles with specified permissions according to platform business logic;
角色指派模块,分别与用户角色创建模块和用户行为监控模块连接,用于为平台中的用户指派用户角色,并赋予用户该用户角色的权限。The role assigning module is respectively connected with the user role creation module and the user behavior monitoring module, and is used for assigning user roles to users in the platform, and granting users the permissions of the user roles.
所述用户角色创建模块包括:The user role creation module includes:
新建单元,用于新建用户角色;New unit, used to create new user roles;
权限配置单元,用于根据平台业务逻辑为用户角色配置对应的权限;The permission configuration unit is used to configure corresponding permissions for user roles according to the platform business logic;
用户角色库,分别与新建单元、权限配置单元和用户角色分配模块连接,用于储存用户角色及其权限信息。The user role library is respectively connected with the new unit, the authority configuration unit and the user role allocation module, and is used for storing user roles and their authority information.
所述用户角色创建模块还包括用于修改用户角色及其权限信息的角色修改单元,该角色修改单元与用户角色库连接。The user role creation module further includes a role modification unit for modifying user roles and their authority information, and the role modification unit is connected with the user role database.
所述角色分配模块包括:The role assignment module includes:
账号注册单元,用于创建新用户;The account registration unit is used to create a new user;
权限分配单元,与用户角色库连接,用于为用户指派用户角色,并赋予该用户对应用户角色的权限;The authority allocation unit is connected with the user role database, and is used to assign user roles to users and grant the user the authority corresponding to the user roles;
用户权限库,分别与权限分配单元和用户行为监控模块连接,用于储存各用户及其权限信息。The user authority library is respectively connected with the authority allocation unit and the user behavior monitoring module, and is used for storing each user and its authority information.
所述角色分配模块还包括权限修改单元,该权限修改单元分别与用户权限库和用户角色库连接;The role assignment module also includes a permission modification unit, which is connected to the user permission database and the user role database respectively;
权限修改单元通过为用户指派新的用户角色,进而修改该用户的权限。The authority modifying unit modifies the user's authority by assigning a new user role to the user.
所述用户行为监控模块包括:The user behavior monitoring module includes:
用户行为获取单元,用于获取用户的操作请求;A user behavior acquisition unit, configured to acquire the user's operation request;
权限比对单元,分别与用户行为获取单元和用户权限库连接,用于查找并判断用户操作请求是否在用户角色库中该用户的权限范围内;The authority comparison unit is respectively connected with the user behavior acquisition unit and the user authority library, and is used to find and determine whether the user operation request is within the authority scope of the user in the user role library;
执行单元,与权限比对单元连接,用于根据权限比对单元的比对结果允许或拒绝用户的操作请求。The execution unit is connected with the authority comparison unit, and is used to allow or deny the user's operation request according to the comparison result of the authority comparison unit.
所述权限范围为由多个权限组成的集合,若用户操作请求与其中一个权限一致则判断用户操作请求在用户角色库中该用户的权限范围内。The scope of authority is a set composed of multiple authorities. If the user operation request is consistent with one of the authorities, it is determined that the user operation request is within the user's authority scope in the user role database.
所述权限和操作请求均为14-18位编码,其中:Both the permission and the operation request are coded with 14-18 digits, in which:
3位站点代码,用于表征变电站站点信息;3-digit site code, used to represent substation site information;
3位系统代码,用于表征变电站内的系统信息;3-digit system code, used to represent the system information in the substation;
4位设备代码,用于表征各系统内的设备信息;4-digit device code, used to represent the device information in each system;
4位主机代码,用于表征变电站内各系统或设备的控制主机信息;4-digit host code, used to represent the control host information of each system or equipment in the substation;
3位操作代码,用于表征对系统或设备的操作命令。3-bit operation code, used to represent the operation command to the system or equipment.
一种用于变电站数字化平台的权限管理系统的权限编码方式,包括步骤:A permission coding method for a permission management system of a substation digital platform, comprising steps:
S1:根据待编码权限对应的站点选择站点信息;S1: Select site information according to the site corresponding to the authority to be encoded;
S2:根据待编码权限对应的系统信息选择系统代码;S2: Select the system code according to the system information corresponding to the authorization to be coded;
S3:根据待编码权限对应的设备信息选择设备代码;S3: Select the device code according to the device information corresponding to the authorization to be coded;
S4:判断对应的设备是否有的独立控制主机,若为是,则根据该独立控制主机选择主机代码,并执行步骤S5,若为否,则根据对应系统的控制主机选择主机代码,并执行步骤S5;S4: Determine whether the corresponding device has an independent control host, if yes, select the host code according to the independent control host, and perform step S5, if not, select the host code according to the control host of the corresponding system, and perform steps S5;
S5:待编码权限对应的操作命令选择操作代码。S5: Select an operation code for an operation command corresponding to the permission to be coded.
与现有技术相比,本发明具有以下优点:Compared with the prior art, the present invention has the following advantages:
1)用户角色创建模块创建多个用户角色,再通过向用户指派用户角色的方式来对用户进行权限的赋予,可以在平台承接大量用户时,减少了维护人员的工作量。1) The user role creation module creates multiple user roles, and then assigns user roles to users to grant permissions to users, which can reduce the workload of maintenance personnel when the platform accepts a large number of users.
2)用户角色库可以对用户角色信息进行存储,并由角色修改单元对用户角色进行修改,可以提高用户角色的利用率。2) The user role database can store the user role information, and the user role can be modified by the role modifying unit, which can improve the utilization rate of the user role.
3)14-18位编码可以精确地识别每一个权限值,同时通过数字编码的方式进行权限的识别,可以提高比对精度。3) The 14-18-bit code can accurately identify each authority value, and at the same time identify the authority through digital encoding, which can improve the comparison accuracy.
4)通过站点、系统、设备的架构可以快速精确地识别每一个权限针对的设备,同时主机代码可以明确该操作所对应的控制主机,便于出现故障时明确控制主机,方便维护。4) Through the structure of the site, system, and equipment, the device targeted by each authority can be quickly and accurately identified. At the same time, the host code can specify the control host corresponding to the operation, so that the control host can be clearly defined when a failure occurs, and maintenance is facilitated.
附图说明Description of drawings
图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
其中:1、用户行为监控模块,2、用户角色创建模块,3、角色指派模块,4、用户。Among them: 1. User behavior monitoring module, 2. User role creation module, 3. Role assignment module, 4. User.
具体实施方式Detailed ways
下面结合附图和具体实施例对本发明进行详细说明。本实施例以本发明技术方案为前提进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is carried out on the premise of the technical solution of the present invention, and detailed implementation and specific operation process are given, but the protection scope of the present invention is not limited to the following embodiments.
一种用于变电站数字化平台的权限管理系统,如图1所示,包括:A rights management system for substation digital platform, as shown in Figure 1, including:
用户4行为监控模块1,根据用户4被赋予的权限允许或拒绝用户4的操作请求;The behavior monitoring module 1 of the user 4 allows or rejects the operation request of the user 4 according to the authority granted to the user 4;
还包括:Also includes:
用户角色创建模块2,用于根据平台业务逻辑创建拥有指定权限的用户角色;User role creation module 2, used to create user roles with specified permissions according to platform business logic;
角色指派模块3,分别与用户角色创建模块2和用户4行为监控模块1连接,用于为平台中的用户4指派用户角色,并赋予用户4该用户角色的权限。The role assignment module 3 is connected with the user role creation module 2 and the user 4 behavior monitoring module 1 respectively, and is used to assign a user role to the user 4 in the platform and grant the user 4 the authority of the user role.
用户角色创建模块2包括:User role creation module 2 includes:
新建单元,用于新建用户角色;New unit, used to create new user roles;
权限配置单元,用于根据平台业务逻辑为用户角色配置对应的权限;The permission configuration unit is used to configure corresponding permissions for user roles according to the platform business logic;
用户角色库,分别与新建单元、权限配置单元和用户角色分配模块连接,用于储存用户角色及其权限信息。The user role library is respectively connected with the new unit, the authority configuration unit and the user role allocation module, and is used for storing user roles and their authority information.
用户角色创建模块2还包括用于修改用户角色及其权限信息的角色修改单元,该角色修改单元与用户角色库连接。The user role creation module 2 also includes a role modification unit for modifying the user role and its authority information, and the role modification unit is connected with the user role database.
角色分配模块包括:The role assignment modules include:
账号注册单元,用于创建新用户4;The account registration unit is used to create a new user 4;
权限分配单元,与用户角色库连接,用于为用户4指派用户角色,并赋予该用户4对应用户角色的权限;The authority allocation unit is connected with the user role library, and is used to assign user roles to the user 4, and grant the user 4 the authority corresponding to the user role;
用户权限库,分别与权限分配单元和用户4行为监控模块1连接,用于储存各用户4及其权限信息。The user authority database is respectively connected with the authority allocation unit and the user 4 behavior monitoring module 1, and is used for storing each user 4 and its authority information.
角色分配模块还包括权限修改单元,该权限修改单元分别与用户权限库和用户角色库连接;The role assignment module also includes a permission modification unit, which is respectively connected with the user permission database and the user role database;
权限修改单元通过为用户4指派新的用户角色,进而修改该用户4的权限。The authority modifying unit further modifies the authority of the user 4 by assigning a new user role to the user 4 .
用户4行为监控模块1包括:User 4 behavior monitoring module 1 includes:
用户行为获取单元,用于获取用户4的操作请求;A user behavior acquisition unit, configured to acquire the operation request of the user 4;
权限比对单元,分别与用户行为获取单元和用户权限库连接,用于查找并判断用户4操作请求是否在用户角色库中该用户4的权限范围内;The authority comparison unit is connected with the user behavior acquisition unit and the user authority database respectively, and is used to find and judge whether the operation request of the user 4 is within the scope of authority of the user 4 in the user role database;
执行单元,与权限比对单元连接,用于根据权限比对单元的比对结果允许或拒绝用户4的操作请求。The execution unit is connected with the authority comparison unit, and is used to allow or deny the operation request of the user 4 according to the comparison result of the authority comparison unit.
权限范围为由多个权限组成的集合,若用户4操作请求与其中一个权限一致则判断用户4操作请求在用户角色库中该用户4的权限范围内。The scope of authority is a collection of multiple authorities. If the operation request of user 4 is consistent with one of the authorities, it is determined that the operation request of user 4 is within the scope of authority of user 4 in the user role database.
权限和操作请求均为14-18位编码,其中:Permissions and operation requests are coded in 14-18 digits, among which:
3位站点代码,用于表征变电站站点信息;3-digit site code, used to represent substation site information;
3位系统代码,用于表征变电站内的系统信息;3-digit system code, used to represent the system information in the substation;
4位设备代码,用于表征各系统内的设备信息;4-digit device code, used to represent the device information in each system;
4位主机代码,用于表征变电站内各系统或设备的控制主机信息;4-digit host code, used to represent the control host information of each system or equipment in the substation;
3位操作代码,用于表征对系统或设备的操作命令。3-bit operation code, used to represent the operation command to the system or equipment.
3位系统代码中第一位表示专业信息,专业信息包含大电气、暖通、给排水、水消防和建筑结构五类,这样的方式可以与变电站的结构类别对应,定位准确。The first digit of the 3-digit system code represents professional information, which includes five categories of electrical, HVAC, water supply and drainage, water and fire protection, and building structures. This method can correspond to the structural category of the substation and the positioning is accurate.
另外的,还可以选配4位的厂家信息,用于表征系统或设备的厂家,便于变电站维护时识别厂家,因为一般由厂家提供维修。In addition, 4-digit manufacturer information can also be selected to represent the manufacturer of the system or equipment, which is convenient for identifying the manufacturer during substation maintenance, because the manufacturer generally provides maintenance.
一种用于变电站数字化平台的权限管理系统的权限编码方式,包括步骤:A permission coding method for a permission management system of a substation digital platform, comprising steps:
S1:根据待编码权限对应的站点选择站点信息;S1: Select site information according to the site corresponding to the authority to be encoded;
S2:根据待编码权限对应的系统信息选择系统代码;S2: Select the system code according to the system information corresponding to the authorization to be coded;
S3:根据待编码权限对应的设备信息选择设备代码;S3: Select the device code according to the device information corresponding to the authorization to be coded;
S4:判断对应的设备是否有的独立控制主机,若为是,则根据该独立控制主机选择主机代码,并执行步骤S5,若为否,则根据对应系统的控制主机选择主机代码,并执行步骤S5;S4: Determine whether the corresponding device has an independent control host, if yes, select the host code according to the independent control host, and perform step S5, if not, select the host code according to the control host of the corresponding system, and perform steps S5;
S5:待编码权限对应的操作命令选择操作代码。S5: Select an operation code for an operation command corresponding to the permission to be coded.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510216005.2A CN104821897A (en) | 2015-04-29 | 2015-04-29 | Authority management system used for transformer substation digital platform and application thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510216005.2A CN104821897A (en) | 2015-04-29 | 2015-04-29 | Authority management system used for transformer substation digital platform and application thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104821897A true CN104821897A (en) | 2015-08-05 |
Family
ID=53732069
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510216005.2A Pending CN104821897A (en) | 2015-04-29 | 2015-04-29 | Authority management system used for transformer substation digital platform and application thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104821897A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106326692A (en) * | 2016-10-24 | 2017-01-11 | 北京亚控科技发展有限公司 | Method and device for operating authorization analysis of configurable management and control integration platform |
CN106778323A (en) * | 2016-10-24 | 2017-05-31 | 北京亚控科技发展有限公司 | A kind of safety key of configurable control integration platform |
CN106953840A (en) * | 2017-01-25 | 2017-07-14 | 贵州黔源电力股份有限公司 | A kind of water power far controls platform method for preventing misoperation and system |
CN107888575A (en) * | 2017-10-31 | 2018-04-06 | 广州市新誉工程咨询有限公司 | Terminal platform information interacting method and its application in BIM collaborative platforms |
CN111368286A (en) * | 2020-02-28 | 2020-07-03 | 深圳前海微众银行股份有限公司 | Authority control method, device, equipment and storage medium |
CN112734230A (en) * | 2021-01-08 | 2021-04-30 | 深圳市帧彩影视科技有限公司 | Control method and device for video post-production based on cloud platform and cloud platform |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101414253A (en) * | 2007-10-17 | 2009-04-22 | 华为技术有限公司 | Method and system for managing authority |
CN101582767A (en) * | 2009-06-24 | 2009-11-18 | 阿里巴巴集团控股有限公司 | Authorization control method and authorization server |
CN103186733A (en) * | 2011-12-30 | 2013-07-03 | 中国移动通信集团广东有限公司 | Database user behavior management system and database user behavior management method |
CN103500298A (en) * | 2013-10-12 | 2014-01-08 | 彩虹集团公司 | Method for achieving authorization distribution based on rule management |
-
2015
- 2015-04-29 CN CN201510216005.2A patent/CN104821897A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101414253A (en) * | 2007-10-17 | 2009-04-22 | 华为技术有限公司 | Method and system for managing authority |
CN101582767A (en) * | 2009-06-24 | 2009-11-18 | 阿里巴巴集团控股有限公司 | Authorization control method and authorization server |
CN103186733A (en) * | 2011-12-30 | 2013-07-03 | 中国移动通信集团广东有限公司 | Database user behavior management system and database user behavior management method |
CN103500298A (en) * | 2013-10-12 | 2014-01-08 | 彩虹集团公司 | Method for achieving authorization distribution based on rule management |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106326692A (en) * | 2016-10-24 | 2017-01-11 | 北京亚控科技发展有限公司 | Method and device for operating authorization analysis of configurable management and control integration platform |
CN106778323A (en) * | 2016-10-24 | 2017-05-31 | 北京亚控科技发展有限公司 | A kind of safety key of configurable control integration platform |
CN106778323B (en) * | 2016-10-24 | 2018-06-26 | 北京亚控科技发展有限公司 | A kind of safety key of configurable control integration platform |
CN106326692B (en) * | 2016-10-24 | 2018-07-06 | 北京亚控科技发展有限公司 | A kind of operating right analysis method and device of configurable control integration platform |
CN106953840A (en) * | 2017-01-25 | 2017-07-14 | 贵州黔源电力股份有限公司 | A kind of water power far controls platform method for preventing misoperation and system |
CN106953840B (en) * | 2017-01-25 | 2018-06-05 | 贵州黔源电力股份有限公司 | A kind of water power far controls platform method for preventing misoperation |
CN107888575A (en) * | 2017-10-31 | 2018-04-06 | 广州市新誉工程咨询有限公司 | Terminal platform information interacting method and its application in BIM collaborative platforms |
CN111368286A (en) * | 2020-02-28 | 2020-07-03 | 深圳前海微众银行股份有限公司 | Authority control method, device, equipment and storage medium |
CN112734230A (en) * | 2021-01-08 | 2021-04-30 | 深圳市帧彩影视科技有限公司 | Control method and device for video post-production based on cloud platform and cloud platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104821897A (en) | Authority management system used for transformer substation digital platform and application thereof | |
CN107357856B (en) | Method for realizing data integration and data service based on power grid panoramic service model | |
CN109559069B (en) | Production management method and device based on assembly type building platform and terminal equipment | |
CN106777644B (en) | Automatic generation method and device for power plant identification system code | |
CN108416230B (en) | Data access method based on data isolation model | |
CN106251452A (en) | A kind of unattended operation transformer station enters the station long-range Licensing Methods and execution system | |
CN106845794A (en) | A kind of online check method of electric network model that system is dispatched for intelligent grid | |
CN105427041A (en) | Standardized maintenance method for reconstruction and extension information point table of running substation | |
CN105404949A (en) | System and method for self-defining process | |
CN104952127A (en) | System and method for preventing error locking and misoperation | |
CN106023561A (en) | 'Four-meter-in-one' energy management integrated service system | |
CN104200331A (en) | Power grid model joining method and system of power system | |
CN105930170A (en) | SCD file semantic version management method based on comparison analysis results | |
CN105117822B (en) | Electric system basic data lean processing method | |
CN104467188A (en) | Operation and maintenance safety control system of transformer substation | |
CN105303309A (en) | Authority management method and system for energy efficiency management system | |
CN103729739B (en) | High-and-low-level grid operation mode network model integration system based on PSD-BPA | |
CN103248485B (en) | A kind of electric power secondary system access control method based on safety label and system | |
Kuzina | Conception of the operational information model of smart city control system | |
CN105447653A (en) | Model-based power business information resource coding method | |
CN106845802A (en) | A kind of power failure duration determination methods based on historical data statistics | |
CN115700504A (en) | Digital twin-based intelligent power grid deduction system | |
CN103745025A (en) | Integrated EMTDC (electromagnetic transient DC) comprehensive application platform of high-voltage direct current system | |
CN104199663A (en) | Comprehensive automated information table automatic generating method and system | |
CN113988430A (en) | A method and system for access control authority management based on associated production business |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150805 |
|
RJ01 | Rejection of invention patent application after publication |