CN104790962B - Method of switching earth pressure tunneling mode into muddy water tunneling mode for shield tunneling machine - Google Patents

Method of switching earth pressure tunneling mode into muddy water tunneling mode for shield tunneling machine Download PDF

Info

Publication number
CN104790962B
CN104790962B CN201510091383.2A CN201510091383A CN104790962B CN 104790962 B CN104790962 B CN 104790962B CN 201510091383 A CN201510091383 A CN 201510091383A CN 104790962 B CN104790962 B CN 104790962B
Authority
CN
China
Prior art keywords
valves
circulation
mud
mode
boring mode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510091383.2A
Other languages
Chinese (zh)
Other versions
CN104790962A (en
Inventor
方启超
赖伟文
易觉
李奕
赖理春
王洋
邝光霖
吴雄杰
赵德华
龙得海
邱曦帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Hua tunnel joint heavy equipment Co., Ltd.
Original Assignee
CHINA TUNNEL CONSTRUCTION Co Ltd GUANGDONG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA TUNNEL CONSTRUCTION Co Ltd GUANGDONG filed Critical CHINA TUNNEL CONSTRUCTION Co Ltd GUANGDONG
Priority to CN201510091383.2A priority Critical patent/CN104790962B/en
Publication of CN104790962A publication Critical patent/CN104790962A/en
Application granted granted Critical
Publication of CN104790962B publication Critical patent/CN104790962B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms
    • E21D9/124Helical conveying means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a method of switching an earth pressure tunneling mode into a muddy water tunneling mode for a shield tunneling machine. The method comprises the steps that an earth discharge gate of a screw conveyor is closed, and the screw conveyor is rotated forwards, so that effective earth blockage is formed inside the screw conveyor; a muddy water treater is started, a regulation valve set is switched on, and a built-in bypass loop flow mode is started; an automatic pressure-maintaining mode is started, corresponding valves are switched on gradually, and mud is injected into an earth bin; a cutter disc is started, and an earth bin stirring bar and the cutter disc are utilized to stir earth mass inside the bin; the built-in bypass loop flow mode is switched to, and the cutter disc is rotated at a low speed so that sufficient stirring is achieved; after the built-in bypass loop flow mode is normal, an inverse loop flow bin cleaning mode is switched to for cleaning the earth bin and pipelines; after the earth bin and the pipelines are normal, a forward loop flow bin cleaning mode is switched to, mud circulation is reinforced, and the automatic pressure-maintaining mode is started; a loop flow forward tunneling loop flow mode is switched to. By the adoption of the method, the earth pressure tunneling mode can be conveniently, rapidly and safely switched into the muddy water tunneling mode without detaching and installing any component.

Description

The method that shield machine switches to muddy water boring mode by soil pressure boring mode
Technical field
The present invention relates to a kind of underground engineering shield construction method, particularly a kind of double mode shield machine tunnels mould by soil pressure The method that formula switches to muddy water boring mode.
Background technology
Shield Method has become one of important technology of tunnel construction.In general the species of Suporting structure with ground Matter condition is corresponding, and what is adopted at present is substantially monotype shield machine, it is impossible to carry out pattern switching utilization.Tunneling method The one of which of earth pressure balanced driving or slurry-water balance type driving is only, therefore shield machine adapts to ground environment, earth's surface The ability to work of environment and long range is extremely restricted.
Particularly change greatly in the geological condition for passing through area of advancing, complex location, earth's surface construction of structures, river The complex environments such as river valley, pipeline.Easily there is the problems such as tunneling difficulty in the shield machine of single boring mode.
The shield machine of traditional single-mode is that, than choosing, adaptability teaching, one is to select soil pressure balance type shield by type selecting One kind in structure machine or slurry-water balance type shield machine;Two is while selected two kinds of shield machines, are separately in engineering, cause increasing Oil (gas) filling device Meteorological or increase originate the expense of the great numbers such as active well.Due to the limitation of shield machine single-mode, this side Method is applied and cannot just be changed in constructing tunnel once selecting, if having to change shield machine then to need to spend very big Jing Ji cost and duration cost.The construction period is affected, is increased engineering cost, construction is adversely affected.
On the basis of for abundant slurry shield in compound stratum, EPB shield tunneling construction experience, with reference to muddy water, soil pressure The practical experience that double mode shield machine is used, take the lead in the new ideas mode switch function for proposing.But now in industry do not have Switched to the construction method of soil pressure boring mode or realized by muddy water boring mode and muddy water is switched to by soil pressure boring mode The construction method of boring mode.
The content of the invention
The purpose of the present invention, is to provide the side that a kind of shield machine is switched to muddy water boring mode by soil pressure boring mode Method, which is not required to carry out under given conditions assembling and disassembling any part, can realize safety as needed at any time, quickly switch.
The present invention solves the solution of its technical problem:Shield machine switches to muddy water driving mould by soil pressure boring mode The method of formula, comprises the following steps,
1)The unearthed gate of screw machine is closed, screw machine is rotated forward, makes screw machine be internally formed effectively soil plug;
2)Start Slurry treatment machine, open and adjust valve group, starter motor internal bypass circulation;
3)Recover interlocking, the hand sluice valve before the row's of opening mud valve opens automatic pressure-maintaining pattern, progressively opens corresponding Valve, fills mud toward in soil storehouse;
4)Start cutterhead, the soil body in storehouse be stirred using native storehouse stirring rod, cutterhead;
5)Machine internal bypass circulation is switched to, slow rotation cutterhead makes stirring abundant;
6)Switch to after standby internal bypass circulation is normal against sending circulation to bring down stocks, Tu Cang and pipeline are cleaned;
7)After Tu Cang and pipeline are normal, switch to, increase mud circulation, open automatic pressure-maintaining mould Formula;
8)Switch to circulation and just sending digging circulation, complete the switching that soil pressure boring mode switches to muddy water boring mode.
As the further improvement of above-mentioned technical proposal, in step 2)In, the machine internal bypass circulation is divided into one machine of circulation Internal bypass, two machine internal bypass of circulation, four machine internal bypass of three machine internal bypass of circulation and circulation;The flow direction of one machine internal bypass of the circulation It is for ground high-quality serosity → AV10 valves → send mud pipeline → AV3 valves → mud line → floor treatment, other in two machine of the circulation The flow direction on road is ground high-quality serosity → AV10 valves → send mud pipeline → AV1 valves → AV5 valves → discharge pipeline → floor treatment, described The flow direction for circulating three machine internal bypass is ground high-quality serosity → AV10 valves → send mud pipeline → AV4 valves → AV2 valves → mud line → floor treatment, the flow direction of four machine internal bypass of the circulation be ground high-quality serosity → AV10 valves → send mud pipeline → AV1 valves → MV3 valves → AV2 valves → mud line → floor treatment.
As the further improvement of above-mentioned technical proposal, in step 3)In, the viscosity of the mud irrigated toward Tu Cang is not Less than 22S, its proportion is 1.13 ~ 1.16g/cm.
As the further improvement of above-mentioned technical proposal, in step 3)In, the perfusion flow direction of the mud is ground high-quality Serosity → AV10 valves → send mud pipeline → CV1 valves → MV1 valves → Tu Cang.
As the further improvement of above-mentioned technical proposal, in step 5)Described in machine internal bypass circulation be ground high-quality serosity → AV10 valves → send mud pipeline → AV1 valves → MV3 valves → AV2 valves → mud line → floor treatment.
As the further improvement of above-mentioned technical proposal, in step 6)In, the inverse flow direction for sending circulation to bring down stocks is ground High-quality serosity → AV10 valves → send mud pipeline → AV4 valves → MV2 valves → Tu Cang → MV1 valves → AV5 valves → mud line → ground Process.
As the further improvement of above-mentioned technical proposal, in step 6)In, start screw machine, by screw machine by native storehouse Bulky grain stone discharge.
As the further improvement of above-mentioned technical proposal, in step 7)In, the mud flow of the automatic pressure-maintaining pattern is Ground high-quality serosity → AV10 valves → send mud pipeline → CV1 valves → MV1 valves → Tu Cang.
As the further improvement of above-mentioned technical proposal, in step 8)In, the circulation is just sending the flow direction of digging circulation to be Ground high-quality serosity → AV10 valves → send mud pipeline → AV1 valves → MV1 valves → Tu Cang → MV2 valves → AV2 → mud line → ground Face is processed.
The invention has the beneficial effects as follows:
(1)Any part need not be dismounted, easily and fast, safely.
(2)After switching to muddy water boring mode, it is broken that the conveying worm that shield machine itself is configured can be used as exclusion bulky grain Stone, compares with the quarrying case of traditional muddy water pattern shield machine configuration, without crushing large particle, does not result in the stifled of mud channel Plug.
Description of the drawings
For the technical scheme being illustrated more clearly that in the embodiment of the present invention, below will be to making needed for embodiment description Accompanying drawing is briefly described.Obviously, described accompanying drawing is a part of embodiment of the present invention, rather than is all implemented Example, those skilled in the art on the premise of not paying creative work, can be designed with obtaining other according to these accompanying drawings Scheme and accompanying drawing.
Fig. 1 is the schematic diagram that a machine internal bypass is circulated in the present invention;
Fig. 2 is the schematic diagram that two machine internal bypass are circulated in the present invention;
Fig. 3 is the schematic diagram that three machine internal bypass are circulated in the present invention;
Fig. 4 is the schematic diagram that four machine internal bypass are circulated in the present invention;
The flow graph of mud when Fig. 5 is automatic pressure-maintaining pattern in the present invention;
Fig. 6 is the inverse schematic diagram for sending circulation to bring down stocks in the present invention;
Fig. 7 is the schematic diagram that circulation is just sending digging circulation in the present invention.
Specific embodiment
The technique effect of the design, concrete structure and generation of the present invention is carried out clearly below with reference to embodiment and accompanying drawing Chu, it is fully described by, to be completely understood by the purpose of the present invention, feature and effect.Obviously, described embodiment is this Bright a part of embodiment, rather than whole embodiments, based on embodiments of the invention, those skilled in the art is not paying The other embodiment obtained on the premise of creative work, belongs to the scope of protection of the invention.In addition, be previously mentioned in text All connection/annexations, not singly refer to that component directly connects, and refer to and can be added deduct by adding according to the situation that is embodied as Few couple auxiliary, constitutes more excellent draw bail.
With reference to Fig. 1~Fig. 7, the method that shield machine switches to muddy water boring mode by soil pressure boring mode, including following step Suddenly,
1)The unearthed gate of screw machine is closed, screw machine is rotated forward, makes screw machine be internally formed effectively soil plug;
2)Start Slurry treatment machine, open and adjust valve group, starter motor internal bypass circulation;
3)Recover interlocking, the hand sluice valve before the row's of opening mud valve is opened automatic pressure-maintaining pattern, progressively opens phase manually The valve answered, the filling mud toward in soil storehouse 12;
4)Start cutterhead, the soil body in storehouse be stirred using native storehouse stirring rod, cutterhead;
5)Machine internal bypass circulation is switched to, slow rotation cutterhead makes stirring abundant;
6)Switch to after standby internal bypass circulation is normal against sending circulation to bring down stocks, native storehouse 12 and pipeline are cleaned;
7)After native storehouse 12 and pipeline are normal, switch to, increase mud circulation, open automatic pressure-maintaining mould Formula;
8)Switch to circulation and just sending digging circulation, complete the switching that soil pressure boring mode switches to muddy water boring mode.
It is further used as preferred embodiment, in step 2)In, the machine internal bypass circulation is divided into other in one machine of circulation Road, two machine internal bypass of circulation, four machine internal bypass of three machine internal bypass of circulation and circulation;The flow direction of one machine internal bypass of the circulation is ground Face high-quality 1 → AV10 of serosity valve 2 → send mud pipeline → AV3 3 → mud lines of valve → floor treatment, two machine internal bypass of the circulation Flow direction be ground high-quality 1 → AV10 of serosity valve 2 → send mud pipeline → AV1 valve 4 → AV5,7 → discharge pipelines of valve → floor treatment, institute The flow direction for stating three machine internal bypass of circulation is ground high-quality 1 → AV10 of serosity valve 2 → send mud pipeline → AV4 5 → AV2 of valve valves 6 → row Mud pipeline → floor treatment, the flow direction of four machine internal bypass of the circulation be ground high-quality 1 → AV10 of serosity valve 2 → send mud pipeline → AV1 valves 4 → MV3 valves → AV2 6 → mud lines of valve → floor treatment.
It is further used as preferred embodiment, in step 3)In, the viscosity toward the mud of soil storehouse 12 perfusion is not little In 22S, its proportion is 1.13 ~ 1.16g/cm.
It is further used as preferred embodiment, in step 3)In, the perfusion of mud flow direction is ground high-quality serosity 1 → AV10 valves 2 → send mud pipeline → CV1 8 → MV1 of valve valves 10 → native storehouse 12.
It is further used as preferred embodiment, in step 5)Described in machine internal bypass circulation be ground high-quality serosity 1 → AV10 valves 2 → send mud pipeline → AV1 valve 4 → MV3 valve 9 → AV2,6 → mud lines of valve → floor treatment.
It is further used as preferred embodiment, in step 6)In, the inverse flow direction for sending storehouse circulation to laundry is ground high-quality 1 → AV10 of serosity valves 2 → send 11 → native storehouse of mud pipeline → AV4 5 → MV2 of valve valves, 12 → MV1 valve 10 → AV5,7 → mud lines of valve → floor treatment.
It is further used as preferred embodiment, in step 6)In, start screw machine, by screw machine by native storehouse 12 Bulky grain stone is discharged.
It is further used as preferred embodiment, in step 7)In, the mud flow of the automatic pressure-maintaining pattern is ground High-quality 1 → AV10 of serosity valves 2 → send mud pipeline → CV1 8 → MV1 of valve valves 10 → native storehouse 12
It is further used as preferred embodiment, in step 8)In, it is ground that the circulation is just sending the flow direction of digging circulation High-quality 1 → AV10 of serosity valves 2 → send 10 → native storehouse of mud pipeline → AV1 4 → MV1 of valve valves, 12 → MV2 valve 11 → AV2,6 → spoil disposals of valve Pipeline → floor treatment.
The following is a preferred embodiment of the present invention.
(1)Select the position for pattern switching, preparation before switching.
Preparation includes:1. arrange adjustment valve group, corollary equipment to prepare;The all of mud from ground, tunnel, shield machine Slurry pipeline and element are unobstructed normal.2. release screw machine interlocking;3. mud modulation, meets use requirement.
(2)The unearthed gate of screw machine is closed, screw machine is rotated forward, soil plug is made.
First arrange dregs in storehouse suitably outer, release interlocking and screw machine is rotated forward in the case where closing screw machine is unearthed gate, Make screw machine be internally formed effectively soil plug, keep pressure P ± 10KPa in native storehouse 12(P is current support pressure value).Screw machine turns Fast 1.2rpm, screw machine soil pressure(Before)Pressure P+40KPa, screw machine soil pressure(Afterwards)Pressure P+30KPa.
(3)Start circulation, carry out bypass operation, it is ensured that the normal work of pipeline and mud disposal system, see accompanying drawing 1 ~ 4. The open and-shut mode of mud, spoil disposal, bypass valve is sent to show on the touchscreen.
Concrete operation method:Start Slurry treatment machine, open and adjust valve group, start muddy water circulatory system.Mud flow:
Circulate a machine internal bypass:Ground high-quality 1 → AV10 of serosity valve 2 → send mud pipeline → AV3 3 → mud lines of valve → ground Face is processed;Remaining pipeline valve group closure state.
Circulate two machine internal bypass:Ground high-quality 1 → AV10 of serosity valve 2 → send mud pipeline → AV1 valve 4 → AV5,7 → spoil disposals of valve Pipe → floor treatment;Remaining pipeline valve group closure state.
Circulate three machine internal bypass:Ground high-quality 1 → AV10 of serosity valve 2 → send mud pipeline → AV4 valve 5 → AV2,6 → spoil disposals of valve Pipeline → floor treatment;Remaining pipeline valve group closure state.
Circulate four machine internal bypass:Ground high-quality 1 → AV10 of serosity valve 2 → send mud pipeline → AV1 valve 4 → MV3,9 → AV2 of valve 6 → mud line of valve → floor treatment;Remaining pipeline valve group closure state.
(4)Recover interlocking, the hand sluice valve before the row's of opening mud valve opens automatic pressure-maintaining pattern.CV1 is opened progressively manually Valve 8, toward soil storehouse 12 filling mud.See accompanying drawing 5, mud flow:Ground high-quality 1 → AV10 of serosity valve 2 → send mud pipeline → CV1 valves 8 → MV1 valves, 10 → native storehouse 12;
Mud requires index:Viscosity is not less than 22S(200ML funnels), than weighing about 1.15g/cm.The native storehouse 12 of control is intrinsic pressure Power P ± 10KPa, can be adjusted by the appropriate casting of screw machine.
(5)Start cutterhead, the soil body in storehouse be stirred using native storehouse stirring rod, cutterhead.Cutterhead slow rotation, 0.5rpm.Otch hydraulic pressure is adjusted to steady pressure by CV1 valves 8, and is adjusted by the appropriate casting of screw machine.
Main points:Cause out because of the change of dregs filling state in the change of state of soil, screw machine casting efficiency and storehouse When the soil pressure in digging face changes, stablizing for excavation face soil pressure should be kept by increasing, subtracting screw machine rotating speed.Only by increasing, subtracting spiral shell When rotation machine rotating speed can not tackle the soil pressure change of excavation face, by soil pressure in automatic pressure-maintaining mode stable storehouse.
(6)MV1 valves 10, MV2 valves 11 are closed, MV3 valves 9 are opened, four machine internal bypass of circulation are switched to, slow rotation cutterhead makes Stirring is abundant.Circulation opens form:Ground high-quality 1 → AV10 of serosity valve 2 → send mud pipeline → AV1 valve 4 → MV3 valve 9 → AV2 valves 6 → mud line → floor treatment;Remaining pipeline valve group closure state.See accompanying drawing 4.
(7)Standby internal bypass is normal, opens MV1, MV2 valve 11, closes MV3 valves 9.Selection carries out inverse sending storehouse circulation, circulation to laundry Unlatching form:Ground high-quality 1 → AV10 of serosity valve 2 → send 11 → native storehouse of mud pipeline → AV4 5 → MV2 of valve valves 12 → MV1 valve 10 → AV5 7 → mud lines of valve → floor treatment;See accompanying drawing 6.
It is inverse to send storehouse circulation main points to laundry:
1. circulation system also has inverse recurrent state, when blocking or machine occurs in the pipeline between machine internal bypass and machine internal bypass When blocking occurs in the interior spoil disposal mouth of pipe, when cannot wash logical by normal bypass, inverse recurrent state can be realized by bypass pipe, instead Remove to flushing line and block.Inverse storehouse circulation of sending to laundry is selected to be exactly to wash the mouth of pipe blocked by dregs under logical soil pressure boring mode Or the pipeline blocked by block stone.
2. cutterhead rotating speed 0.5rpm, inverse to send storehouse circulation to laundry, when negative pressure early warning value occur in spoil disposal stock pump P2 pumps, in storehouse on pressure Rise.Now, 13 releasing pressure automatically of VE valves, returns machine internal bypass.See accompanying drawing 1.
3. standby internal bypass is normal, is switched to above-mentioned(6)、(7), recover inverse and send storehouse circulation to laundry.Until inverse feeding storehouse, spoil disposal Flow reaches normal driving flow value.
If the 3. larger block stone of granule, it is impossible to by arranging outside pipeline, using screw machine and double mode shield machine can be arranged on On P0 pumps, by screw machine discharge.
Screw machine calculus removing principle one:Using P0 pumps, centre bore of the pipeline near base bearing is passed through, and increases native storehouse 12 Interior circulation flow, circular flow are bigger, are deposited in 12 bottom of native storehouse(Soil-discharging port)Native slag will be carried over native storehouse 12 sooner, help Dregs is smoothly discharged, blocking is effectively prevented.
Screw machine calculus removing principle two:Screw machine plays a part of similar quarrying case.Using flexible screw machine, pound before closing Door, the row's of carrying out bulky grain dregs.
(8)It is inverse send circulation bring down stocks it is normal after, switch to, increase mud circulation, see accompanying drawing 1.If now There is negative pressure early warning value in P2 pumps, return machine internal bypass.Now may block for thick liquid discharge mouth or pipeline blockage:First check for judging stifled Plug position, if being deposited in the native slag of 12 bottom of native storehouse(Or block stone)Result in blockage, then can take(7).Carry out bypass again to wash Pipe, will be arranged outside the debris in pipeline, as far as possible until just sending digging pattern normal.
(9)MV2 valves 11 are closed, automatic pressure-maintaining pattern is opened, switching muddy water boring mode is completed.See accompanying drawing 5, mud stream To:Ground high-quality 1 → AV10 of serosity valve 2 → send mud pipeline → CV1 8 → MV1 of valve valves 10 → native storehouse 12.
(10)Circulation is just sending digging circulation, sees accompanying drawing 7, mud flow:Ground high-quality 1 → AV10 of serosity valve 2 → send mud pipe 10 → native storehouse of road → AV1 4 → MV1 of valve valves, 12 → MV2 valve 11 → AV2,6 → mud lines of valve → floor treatment.
(11)Normal muddy water boring mode
To ensure the seriality of switching operation and shortening handoff procedure, can be using in the effective drilling depth of an endless tube piece(With 1.5 meters Or as a example by the section of jurisdiction of 1.2 meters of wide cuts)Inside complete, it is to avoid the job interruption that pipe sheet assembling brings, also, adjusted by control system And management means, effective control ground settlement.
It is more than that the better embodiment to the present invention is illustrated, but the invention is not limited to the reality Example is applied, those of ordinary skill in the art on the premise of without prejudice to spirit of the invention can also make a variety of equivalent modifications or replace Change, the modification of these equivalents or replacement are all contained in the application claim limited range.

Claims (9)

1. the method that shield machine switches to muddy water boring mode by soil pressure boring mode, it is characterised in that:Comprise the following steps,
1)The unearthed gate of screw machine is closed, screw machine is rotated forward, makes screw machine be internally formed effectively soil plug;
2)Start Slurry treatment machine, open and adjust valve group, starter motor internal bypass circulation;
3)Recover interlocking, the hand sluice valve before the row's of opening mud valve is opened automatic pressure-maintaining pattern, progressively opens corresponding valve Door, fills mud toward in soil storehouse;
4)Start cutterhead, the soil body in storehouse be stirred using native storehouse stirring rod, cutterhead;
5)Machine internal bypass circulation is switched to, slow rotation cutterhead makes stirring abundant;
6)Switch to after standby internal bypass circulation is normal against sending circulation to bring down stocks, Tu Cang and pipeline are cleaned;
7)After Tu Cang and pipeline are normal, switch to, increase mud circulation, open automatic pressure-maintaining pattern;
8)Switch to circulation and just sending digging circulation, complete the switching that soil pressure boring mode switches to muddy water boring mode.
2. the method that shield machine according to claim 1 switches to muddy water boring mode by soil pressure boring mode, its feature It is:In step 2)In, the machine internal bypass circulation is divided in one machine internal bypass of circulation, two machine internal bypass of circulation, three machines of circulation Four machine internal bypass of bypass and circulation;The flow direction of one machine internal bypass of the circulation is ground high-quality serosity → AV10 valves → send mud pipeline → AV3 valves → mud line → floor treatment, the flow direction of two machine internal bypass of the circulation be ground high-quality serosity → AV10 valves → The flow direction of mud pipeline → AV1 valves → AV5 valves → discharge pipeline → floor treatment, three machine internal bypass of the circulation is sent to starch for ground high-quality Liquid → AV10 valves → send mud pipeline → AV4 valves → AV2 valves → mud line → floor treatment, the stream of four machine internal bypass of the circulation To for ground high-quality serosity → AV10 valves → send mud pipeline → AV1 valves → MV3 valves → AV2 valves → mud line → floor treatment.
3. the method that shield machine according to claim 1 switches to muddy water boring mode by soil pressure boring mode, its feature It is:In step 3)In, the viscosity toward the mud of Tu Cang perfusions is not less than 22S, and its proportion is 1.13 ~ 1.16g/cm.
4. the method that shield machine according to claim 1 switches to muddy water boring mode by soil pressure boring mode, its feature It is:In step 3)In, the perfusion of mud flow direction for ground high-quality serosity → AV10 valves → send mud pipeline → CV1 valves → MV1 valves → Tu Cang.
5. the method that shield machine according to claim 1 switches to muddy water boring mode by soil pressure boring mode, its feature It is:In step 5)Described in machine internal bypass circulation be ground high-quality serosity → AV10 valves → send mud pipeline → AV1 valves → MV3 valves → AV2 valves → mud line → floor treatment.
6. the method that shield machine according to claim 1 switches to muddy water boring mode by soil pressure boring mode, its feature It is:In step 6)In, the inverse flow direction for sending circulation to bring down stocks is ground high-quality serosity → AV10 valves → send mud pipeline → AV4 valves → MV2 valves → Tu Cang → MV1 valves → AV5 valves → mud line → floor treatment.
7. the method that shield machine according to claim 1 switches to muddy water boring mode by soil pressure boring mode, its feature It is:In step 6)In, start screw machine, the bulky grain stone in native storehouse is discharged by screw machine.
8. the method that shield machine according to claim 1 switches to muddy water boring mode by soil pressure boring mode, its feature It is:In step 7)In, the mud flow of the automatic pressure-maintaining pattern be ground high-quality serosity → AV10 valves → send mud pipeline → CV1 valves → MV1 valves → Tu Cang.
9. the method that shield machine according to claim 1 switches to muddy water boring mode by soil pressure boring mode, its feature It is:In step 8)In, the circulation just sending the flow direction of digging circulation be ground high-quality serosity → AV10 valves → send mud pipeline → AV1 valves → MV1 valves → Tu Cang → MV2 valves → AV2 valves → mud line → floor treatment.
CN201510091383.2A 2015-02-28 2015-02-28 Method of switching earth pressure tunneling mode into muddy water tunneling mode for shield tunneling machine Active CN104790962B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510091383.2A CN104790962B (en) 2015-02-28 2015-02-28 Method of switching earth pressure tunneling mode into muddy water tunneling mode for shield tunneling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510091383.2A CN104790962B (en) 2015-02-28 2015-02-28 Method of switching earth pressure tunneling mode into muddy water tunneling mode for shield tunneling machine

Publications (2)

Publication Number Publication Date
CN104790962A CN104790962A (en) 2015-07-22
CN104790962B true CN104790962B (en) 2017-04-26

Family

ID=53556097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510091383.2A Active CN104790962B (en) 2015-02-28 2015-02-28 Method of switching earth pressure tunneling mode into muddy water tunneling mode for shield tunneling machine

Country Status (1)

Country Link
CN (1) CN104790962B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150516B (en) * 2016-08-30 2018-10-02 中国铁建重工集团有限公司 Quarrying apparatus and its control method, development machine
CN107576477B (en) * 2017-09-28 2024-05-07 中铁隧道局集团有限公司 Slurry shield machine circulation system test device and matched test method
CN109630149B (en) * 2018-12-21 2021-02-09 广州轨道交通建设监理有限公司 Multi-mode shield constructs machine
CN111219194B (en) * 2020-03-20 2021-07-27 中铁隧道局集团有限公司 Slurry/soil pressure dual-mode shield and tunneling mode conversion method thereof
CN112761650B (en) * 2020-12-31 2022-07-15 中铁工程服务有限公司 Double-mode shield muck treatment method
CN112780289B (en) * 2020-12-31 2022-07-15 中铁工程服务有限公司 Dual-mode shield muck treatment system
CN114165246A (en) * 2021-12-08 2022-03-11 北京市市政四建设工程有限责任公司 A mud-water pipeline for mud-water-earth-pressure dual-mode shield machine and using method
CN115788461B (en) * 2022-12-16 2023-08-04 盾科工程装备有限公司 Slurry suction type shield tunneling machine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0042993A1 (en) * 1980-06-30 1982-01-06 Kabushiki Kaisha Iseki Kaihatsu Koki Shield tunneling method and machine therefor
CN202707070U (en) * 2012-08-09 2013-01-30 中铁隧道装备制造有限公司 Composite shield machine with earth pressure balance and slurry balance double modes
CN202970722U (en) * 2012-11-14 2013-06-05 广东华隧建设股份有限公司 Double-mode shield tunneling machine
CN204140080U (en) * 2014-09-12 2015-02-04 广东华隧建设股份有限公司 A kind of double-screw type bimodulus shield machine

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57172097A (en) * 1981-04-14 1982-10-22 Tekken Constr Co Control apparatus of mud water stable liquid of drilling machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0042993A1 (en) * 1980-06-30 1982-01-06 Kabushiki Kaisha Iseki Kaihatsu Koki Shield tunneling method and machine therefor
CN202707070U (en) * 2012-08-09 2013-01-30 中铁隧道装备制造有限公司 Composite shield machine with earth pressure balance and slurry balance double modes
CN202970722U (en) * 2012-11-14 2013-06-05 广东华隧建设股份有限公司 Double-mode shield tunneling machine
CN204140080U (en) * 2014-09-12 2015-02-04 广东华隧建设股份有限公司 A kind of double-screw type bimodulus shield machine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
分析三菱泥水平衡盾构机环流系统的配置与操作;李飞;《科技信息》;20071231(第34期);第351-352页 *

Also Published As

Publication number Publication date
CN104790962A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN104790962B (en) Method of switching earth pressure tunneling mode into muddy water tunneling mode for shield tunneling machine
CN104775826A (en) Continuous switching construction method of muddy water soil pressure double-mode type shield
CN103603689B (en) Curtain grouting construction method for treating mined-out areas
CN109882190B (en) Multi-mode closed TBM suitable for long and large mountain tunnel and construction method thereof
CN209354134U (en) A kind of double mode shield machine
CN109281685A (en) A kind of decompression type shield machine step by step
CN109505617B (en) Tunnel boring machine
CN108755807A (en) A kind of water conservancy row silt device
CN204002831U (en) A kind of screw machine blowout prevention structure
CN109723452A (en) A kind of mud and water balance earth pressure balance bi-mode intelligent pipe jacking tunnelling machine
CN109458191B (en) Dual-mode shield tunneling machine dregs conveying system
CN104695969B (en) The method that shield machine is switched to soil pressure boring mode by muddy water boring mode
CN208267901U (en) A kind of lotion gravity flow filling piping and the blocking emergency treatment device that drills
CN110725683B (en) A slurry circulation slag discharge system for shaft boring machine
CN110905533B (en) Tunneling method for composite stratum of EPB-TBM dual-mode shield tunneling machine
CN206035493U (en) Shield machine
CN209244574U (en) A kind of intelligence push-bench
CN207048793U (en) A kind of decompression type shield machine step by step
CN100370175C (en) Pipe connector
CN208918541U (en) A kind of device for abolishing cutterhead mud cake
CN209568488U (en) A kind of channel cleanout device
CN209354138U (en) Muddy water open type double mode development machine
CN113120519A (en) Slag discharge surge buffering device for shield construction and construction method thereof
CN109653277A (en) A kind of pick branch anchor combined unit ditch excavating gear and method
CN215170022U (en) Device for preventing spiral conveyer from slag discharge and gushing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180615

Address after: 528308 Lun Jiao Street office, Shunde District, Foshan, Guangdong, often teaches the first floor of E block 129229, Zhenxing Road, neighborhood committee.

Patentee after: China Railway Hua tunnel joint heavy equipment Co., Ltd.

Address before: 510620 9, Xingye Bank building, 101 Tianhe Road, Tianhe District, Guangzhou, Guangdong.

Patentee before: China Tunnel Construction Co., Ltd. Guangdong