[go: up one dir, main page]

CN104775553A - Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member - Google Patents

Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member Download PDF

Info

Publication number
CN104775553A
CN104775553A CN201510181234.5A CN201510181234A CN104775553A CN 104775553 A CN104775553 A CN 104775553A CN 201510181234 A CN201510181234 A CN 201510181234A CN 104775553 A CN104775553 A CN 104775553A
Authority
CN
China
Prior art keywords
wallboard
web
edge
wing
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510181234.5A
Other languages
Chinese (zh)
Other versions
CN104775553B (en
Inventor
崔家春
徐自然
杨联萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Modern Architectural Planning And Design Institute Co Ltd
Original Assignee
East China Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Architectural Design and Research Institute Co Ltd filed Critical East China Architectural Design and Research Institute Co Ltd
Priority to CN201510181234.5A priority Critical patent/CN104775553B/en
Publication of CN104775553A publication Critical patent/CN104775553A/en
Application granted granted Critical
Publication of CN104775553B publication Critical patent/CN104775553B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

本发明公开了一种新型L型叠合板式剪力墙边缘构件及其连接方法,适用于叠合板式装配式工业化建筑,主要用于叠合板式混凝土剪力墙结构。新型L型叠合板式剪力墙边缘构件主要由翼缘墙板、腹板墙板、通长纵向钢筋、纵向搭接钢筋、水平搭接钢筋、纵向搭接钢筋笼以及现浇混凝土芯墙组成,翼缘墙板和腹板墙板均为预制叠合墙板,在形成L型角部位边缘构件的一端,结构设计中所要求布置的箍筋和纵向钢筋预制在叠合墙板中。本发明的主要特点是将L型叠合板式剪力墙边缘构件装配化,为工程建造带来了四大优点:1)现场无需施工模板;2)现场无需绑扎钢筋;3)提高施工速度;4)提升叠合板式混凝土建筑的工业化程度。

The invention discloses a novel L-shaped laminated slab shear wall edge member and a connection method thereof, which are suitable for laminated slab assembled industrial buildings and are mainly used in laminated slab concrete shear wall structures. The edge components of the new L-shaped laminated slab shear wall are mainly composed of flange wall panels, web wall panels, full-length longitudinal reinforcement, longitudinal lap reinforcement, horizontal lap reinforcement, longitudinal lap reinforcement cages, and cast-in-place concrete core walls , the flange wall panels and the web wall panels are prefabricated laminated wall panels, and at one end of the edge member forming the L-shaped corner, the stirrups and longitudinal reinforcement required in the structural design are prefabricated in the laminated wall panels. The main feature of the present invention is that the edge components of the L-shaped laminated slab shear wall are assembled, which brings four advantages to the engineering construction: 1) no construction formwork is required on site; 2) no binding steel bars are required on site; 3) construction speed is increased; 4) Improve the industrialization of laminated slab concrete buildings.

Description

一种新型L型叠合板式剪力墙边缘构件及其连接方法A new L-shaped laminated plate shear wall edge member and its connection method

技术领域technical field

本发明涉及建筑结构领域,具体涉及一种适用于叠合板式混凝土剪力墙结构的新型L型叠合板式剪力墙边缘构件及其连接方法。The invention relates to the field of building structures, in particular to a novel L-shaped composite slab shear wall edge member suitable for a composite slab concrete shear wall structure and a connection method thereof.

背景技术Background technique

随着人们生活水平的提升,对居住环境也有了更高的需求。传统粗放型的房屋建造方式已经逐渐被工业化、集成化的建造方式所取代。在此背景下,叠合板式混凝土剪力墙结构应运而生,它能实现住宅结构部件的标准化和模块化,减少现场模板支撑搭设,同时也能够降低施工周期。With the improvement of people's living standards, there is a higher demand for living environment. Traditional extensive housing construction methods have been gradually replaced by industrialized and integrated construction methods. In this context, the laminated slab concrete shear wall structure came into being, which can realize the standardization and modularization of residential structural components, reduce the erection of on-site formwork supports, and also reduce the construction period.

但是,根据目前所能获知的资料,包括申请公布号为CN102912900A的《一种预制装配叠合板式混凝土剪力墙结构及其施工方式》和授权公告号为CN202925721U的《一种预制装配叠合板式混凝土剪力墙结构》,目前的叠合板式混凝土剪力墙结构的L型角部位均采用现浇边缘构件,在具体实施时,建筑工人既需要现场绑扎钢筋,又需要搭设模板,降低了施工效率。However, according to the currently available information, including the application publication number CN102912900A "A Prefabricated Assembly Laminated Slab Concrete Shear Wall Structure and Its Construction Method" and the authorized announcement No. CN202925721U "A Prefabricated Assembly Laminated Slab Concrete Shear Wall Structure" Concrete Shear Wall Structure", the L-shaped corners of the current laminated slab concrete shear wall structure all use cast-in-place edge components. efficiency.

发明内容Contents of the invention

针对现有技术的不足,本发明旨在提供一种新型L型叠合板式剪力墙边缘构件及其连接方法,在不降低结构整体性的前提下,免除了L型叠合板式剪力墙边缘构件的钢筋绑扎和模板搭设,达到了提高叠合板式混凝土剪力墙结构建造效率的效果。Aiming at the deficiencies of the prior art, the present invention aims to provide a novel L-shaped laminated slab shear wall edge member and its connection method, which eliminates the need for L-shaped laminated slab shear walls without reducing the structural integrity. The reinforcement binding and formwork erection of the edge components have achieved the effect of improving the construction efficiency of the laminated slab concrete shear wall structure.

为了实现上述目的,本发明采用如下技术方案:In order to achieve the above object, the present invention adopts the following technical solutions:

一种新型L型叠合板式剪力墙边缘构件,包括箍筋、纵向钢筋、纵向搭接钢筋、水平搭接钢筋;还包括翼缘墙板和腹板墙板,两者均为由两层墙板组成的预制叠合墙板;翼缘墙板的两层墙板之间、腹板墙板的两层墙板之间则为现浇混凝土芯墙;翼缘墙板和腹板墙板的其中一端相互结合并呈L型;箍筋和纵向钢筋根据结构设计的要求分布并预埋在翼缘墙板和腹板墙板内;所述水平搭接钢筋设置在翼缘墙板两层墙板之间的现浇混凝土芯墙中,而纵向搭接钢筋则根据结构设计分布在所述现浇混凝土芯墙中。A new L-shaped laminated plate shear wall edge member, including stirrups, longitudinal reinforcement, longitudinal lap reinforcement, horizontal lap reinforcement; also includes flange wall panels and web wall panels, both of which are composed of two layers Prefabricated laminated wall panels composed of wall panels; cast-in-place concrete core walls between the two layers of wall panels of the flange wall panels and between the two layers of wall panels of the web wall panels; the flange wall panels and the web wall panels One end of them is combined with each other and is L-shaped; the stirrups and longitudinal reinforcement are distributed according to the requirements of the structural design and embedded in the flange wall panel and the web wall panel; the horizontal overlapping reinforcement is arranged on the two layers of the flange wall panel In the cast-in-place concrete core wall between the wall panels, the longitudinal lap steel bars are distributed in the cast-in-place concrete core wall according to the structural design.

进一步地,所述水平搭接钢筋的一端位于所述腹板墙板两层墙板之间的现浇混凝土芯墙中,且与腹板墙板位于外侧的墙板的内侧面相接触。Further, one end of the horizontally lapped steel bar is located in the cast-in-place concrete core wall between two layers of the web wall panels, and is in contact with the inner surface of the outer wall panels of the web panels.

进一步地,预埋在所述腹板墙板内的箍筋设有向翼缘墙板方向延伸的外伸段,并套箍有通长纵向钢筋。Further, the stirrup pre-embedded in the web wall panel is provided with an overhanging section extending toward the flange wall panel, and is hooped with a full-length longitudinal steel bar.

进一步地,所述翼缘墙板和腹板墙板交汇处的现浇混凝土芯墙中设有纵向搭接钢筋笼,所述纵向搭接钢筋笼主要由若干纵向搭接钢筋连接而成。Further, the cast-in-place concrete core wall at the junction of the flange wall panel and the web wall panel is provided with a longitudinally overlapping reinforcement cage, and the longitudinally overlapping reinforcement cage is mainly formed by connecting several longitudinally overlapping reinforcements.

上述新型L型叠合板式剪力墙边缘构件的连接方法包括如下步骤:The connection method of the above-mentioned novel L-type laminated plate shear wall edge member comprises the following steps:

S1预留纵向搭接钢筋:在现场预定位置预留纵向搭接钢筋和通长纵向钢筋;S1 Reserved longitudinal overlapping reinforcement: reserve longitudinal overlapping reinforcement and full-length longitudinal reinforcement at the predetermined position on site;

S2翼缘墙板就位:将预埋有箍筋和纵向钢筋的翼缘墙板吊装至预定位置,调整翼缘墙板的水平度和垂直度,并固定;S2 flange wall panel in place: hoist the flange wall panel with pre-embedded stirrups and longitudinal reinforcement to the predetermined position, adjust the levelness and verticality of the flange wall panel, and fix it;

S3水平搭接钢筋的插入:将水平搭接钢筋插入翼缘墙板的两层墙板之间,确保其不影响腹板墙板的就位,水平搭接钢筋的直径和间距根据设计要求确定;翼缘墙板两层墙板之间留有允许水平搭接钢筋滑动的空间;S3 Insertion of horizontally lapped steel bars: Insert horizontally lapped steel bars between the two layers of wall panels of the flange wall panels to ensure that they do not affect the positioning of the web wall panels. The diameter and spacing of horizontally lapped steel bars are determined according to design requirements ; There is a space between the two layers of the flange wall panels to allow the sliding of the horizontally lapped steel bars;

S4腹板墙板的就位:将预埋有纵向钢筋和箍筋的腹板墙板吊装至预定位置,调整腹板墙板的水平度和垂直度,并固定;S4 Web wall panel placement: hoist the web wall panel with pre-embedded longitudinal steel bars and stirrups to the predetermined position, adjust the levelness and verticality of the web wall panel, and fix it;

S5水平搭接钢筋的就位:将水平搭接钢筋向腹板墙板方向滑出,使其一端进入腹板墙板中,直至碰到腹板墙板位于外侧的墙板的内侧面;S5 Placement of the horizontally lapped steel bar: Slide the horizontally lapped steel bar toward the web wall panel, so that one end of it enters the web wall panel until it touches the inner surface of the wall panel on the outer side of the web wall panel;

S6纵向搭接钢筋笼的插入:将纵向搭接钢筋笼插入到翼缘墙板和腹板墙板交汇处;Insertion of S6 longitudinally lapped reinforcement cage: Insert the longitudinally lapped reinforcement cage into the intersection of the flange wall panel and the web wall panel;

S7现浇混凝土芯墙浇筑施工:混凝土浇筑前检查叠合墙板安装的尺寸偏差、稳固度,符合质量要求后,浇筑混凝土芯墙。S7 Cast-in-situ concrete core wall pouring construction: check the size deviation and stability of the laminated wall panel installation before concrete pouring, and pour the concrete core wall after meeting the quality requirements.

本发明的有益效果在于:The beneficial effects of the present invention are:

1、通过将L形叠合板式剪力墙边缘构件的箍筋和纵向钢筋直接预制在叠合墙板内,免除了现场工人的钢筋绑扎和模板搭设,从而有效降低劳动强度,提高叠合板式混凝土剪力墙结构建造效率,提升建筑工业化程度;1. By directly prefabricating the stirrups and longitudinal steel bars of the edge members of the L-shaped laminated slab shear wall in the laminated wall panel, the on-site workers are exempted from the reinforcement binding and formwork erection, thereby effectively reducing labor intensity and improving the laminated slab. Concrete shear wall structure construction efficiency, improve the degree of industrialization of construction;

2、位于腹板墙板和翼缘墙板的交汇处的箍筋外伸段、水平搭接钢筋的一端和纵向搭接钢筋笼的设置,保证了L形叠合板式剪力墙边缘构件的整体性,即结构的整体性。2. The setting of the stirrup extension section at the intersection of the web wall panel and the flange wall panel, one end of the horizontally lapped reinforcement and the longitudinally lapped reinforcement cage ensures the edge components of the L-shaped laminated slab shear wall. Integrity, that is, the integrity of the structure.

附图说明Description of drawings

图1为传统L型叠合板式剪力墙边缘构件横向剖视平面图;Fig. 1 is a transverse sectional plane view of edge members of a traditional L-shaped laminated slab shear wall;

图2为新型L型叠合板式剪力墙边缘构件横向剖视平面图;Fig. 2 is the transverse sectional plane view of the edge member of the novel L-shaped laminated slab shear wall;

图3为本发明连接方法步骤S1的示意图;3 is a schematic diagram of step S1 of the connection method of the present invention;

图4为本发明连接方法步骤S2的示意图;4 is a schematic diagram of step S2 of the connection method of the present invention;

图5a和图5b为本发明连接方法步骤S3的示意图;5a and 5b are schematic diagrams of step S3 of the connection method of the present invention;

图6为本发明连接方法步骤S4的示意图;6 is a schematic diagram of step S4 of the connection method of the present invention;

图7为本发明连接方法步骤S5的示意图;7 is a schematic diagram of step S5 of the connection method of the present invention;

图8a、图8b和图8c为本发明连接方法步骤S6的示意图。Fig. 8a, Fig. 8b and Fig. 8c are schematic diagrams of step S6 of the connection method of the present invention.

具体实施方式Detailed ways

以下将结合附图对本发明作进一步的描述,需要说明的是,本实施例以本技术方案为前提,给出了详细的实施方式和具体的操作过程,但本发明的保护范围并不限于本实施例。The present invention will be further described below in conjunction with the accompanying drawings. It should be noted that this embodiment is based on the technical solution, and provides detailed implementation and specific operation process, but the protection scope of the present invention is not limited to the present invention. Example.

如图1所示,传统的叠合板式混凝土剪力墙结构的L型叠合板式剪力墙边缘构件采用传统现浇方式,在将一号叠合墙板101和二号叠合墙板102吊装就位并调平固定后,需要建筑工人绑扎边缘构件内的纵向钢筋104和箍筋105,布置水平搭接钢筋106和第二水平搭接钢筋107,待钢筋绑扎完成后还需进一步搭设模板,最后浇筑混凝土芯墙108,其中纵向搭接钢筋103分布在混凝土芯墙108中。一号叠合墙板101和二号叠合墙板102的交汇处留有安装容差缝109。As shown in Figure 1, the edge components of the L-shaped laminated slab shear wall of the traditional laminated slab concrete shear wall structure adopt the traditional cast-in-place method, and the No. 1 laminated wall panel 101 and the No. 2 laminated wall panel 102 are placed After being hoisted in place, leveled and fixed, construction workers are required to bind the longitudinal steel bars 104 and stirrup bars 105 in the edge members, arrange the horizontally lapped steel bars 106 and the second horizontally lapped steel bars 107, and further build formwork after the steel bars are bound , and finally the concrete core wall 108 is poured, wherein the longitudinally overlapping steel bars 103 are distributed in the concrete core wall 108 . An installation tolerance seam 109 is left at the junction of the No. 1 laminated wall panel 101 and the No. 2 laminated wall panel 102 .

由上可知,传统的叠合板式混凝土剪力墙结构的L型叠合板式剪力墙边缘构件的施工效率较低,工人的劳动强度较大。It can be seen from the above that the construction efficiency of the edge members of the L-shaped laminated slab shear wall of the traditional laminated slab concrete shear wall structure is low, and the labor intensity of the workers is relatively high.

如图2所示,本发明提供的一种新型L型叠合板式剪力墙边缘构件,包括箍筋5、纵向钢筋4、纵向搭接钢筋3、水平搭接钢筋6;还包括翼缘墙板10和腹板墙板11,两者均为由两层墙板组成的预制叠合墙板;翼缘墙板10的两层墙板之间、腹板墙板11的两层墙板之间则为现浇混凝土芯墙8;翼缘墙板10和腹板墙板11的其中一端相互结合并呈L型,其交汇处留有安装容差缝9;箍筋5和纵向钢筋4根据结构设计的要求分布并预埋在翼缘墙板10和腹板墙板11内;所述水平搭接钢筋6设置在翼缘墙板10两层墙板之间的现浇混凝土芯墙8中,而纵向搭接钢筋3则根据结构设计预留并最终分布在所述现浇混凝土芯墙8中。As shown in Figure 2, a novel L-shaped laminated plate shear wall edge member provided by the present invention includes stirrups 5, longitudinal reinforcement 4, longitudinal lapping reinforcement 3, and horizontal lapping reinforcement 6; it also includes a flange wall Panel 10 and web wall panel 11, both are prefabricated laminated wall panels composed of two layers of wall panels; Between them is a cast-in-place concrete core wall 8; one end of the flange wall panel 10 and the web wall panel 11 are combined with each other in an L shape, and an installation tolerance joint 9 is left at the intersection; the stirrup 5 and the longitudinal reinforcement 4 are based on The requirements of the structural design are distributed and pre-embedded in the flange wall panel 10 and the web wall panel 11; the horizontal lap steel bars 6 are arranged in the cast-in-place concrete core wall 8 between the two layers of the flange wall panel 10 , while the longitudinal lap steel bars 3 are reserved and finally distributed in the cast-in-place concrete core wall 8 according to the structural design.

更进一步地,所述水平搭接钢筋6的一端位于所述腹板墙板11两层墙板之间的现浇混凝土芯墙8中,且与腹板墙板11位于外侧的墙板的内侧面相接触。Furthermore, one end of the horizontally lapped steel bar 6 is located in the cast-in-place concrete core wall 8 between the two layers of the web wall panel 11, and is located on the inner side of the outer wall panel with the web wall panel 11 Face to face contact.

进一步地,预埋在所述腹板墙板11内的箍筋5设有向翼缘墙板10方向延伸的外伸段13,并套箍有通长纵向钢筋12。Further, the stirrup 5 pre-embedded in the web wall panel 11 is provided with an overhanging section 13 extending toward the flange wall panel 10 and is hooped with a long longitudinal steel bar 12 .

进一步地,所述翼缘墙板10和腹板墙板11交汇处的现浇混凝土芯墙中设有纵向搭接钢筋笼14,所述纵向搭接钢筋笼14主要由若干纵向搭接钢筋连接而成。Further, the cast-in-place concrete core wall at the intersection of the flange wall panel 10 and the web wall panel 11 is provided with a longitudinally overlapping reinforcement cage 14, and the longitudinally overlapping reinforcement cage 14 is mainly connected by several longitudinally overlapping reinforcement bars. made.

上述新型L型叠合板式剪力墙边缘构件的连接方法包括如下步骤:The connection method of the above-mentioned novel L-type laminated plate shear wall edge member comprises the following steps:

S1如图3所示,在现场预定位置预留纵向搭接钢筋3和通长纵向钢筋12;S1, as shown in Figure 3, reserve longitudinal lap reinforcement bars 3 and full-length longitudinal reinforcement bars 12 at predetermined positions on site;

S2翼缘墙板就位:如图4所示,将预埋有箍筋5和纵向钢筋4的翼缘墙板10吊装至预定位置,调整翼缘墙板10的水平度和垂直度,并固定;S2 flange wall panels in place: as shown in Figure 4, hoist the flange wall panels 10 pre-embedded with stirrups 5 and longitudinal steel bars 4 to the predetermined position, adjust the levelness and verticality of the flange wall panels 10, and fixed;

S3水平搭接钢筋的插入:如图5a、图5b所示,将水平搭接钢筋6插入翼缘墙板10的两层墙板之间,确保其不影响腹板墙板11的就位,水平搭接钢筋6的直径和间距根据设计要求确定;翼缘墙板10两层墙板之间留有允许水平搭接钢筋6滑动的空间;S3 Insertion of horizontally lapped steel bars: as shown in Figure 5a and Figure 5b, insert horizontally lapped steel bars 6 between the two layers of wall panels of the flange wall panel 10 to ensure that it does not affect the position of the web wall panel 11, The diameter and spacing of the horizontally lapped steel bars 6 are determined according to the design requirements; there is a space between the two-layer wallboards of the flange wall panel 10 to allow the horizontally lapped steel bars 6 to slide;

S4腹板墙板的就位:如图6所示,将同样预埋有纵向钢筋4和箍筋5的腹板墙板11吊装至预定位置,调整腹板墙板11的水平度和垂直度,并固定;S4 Placement of the web wall panel: as shown in Figure 6, hoist the web wall panel 11 with the same pre-embedded longitudinal steel bars 4 and stirrups 5 to the predetermined position, and adjust the horizontality and verticality of the web wall panel 11 , and fixed;

S5水平搭接钢筋的就位:如图7所示,将水平搭接钢筋6向腹板墙板11方向滑出,使其一端进入腹板墙板11中,直至碰到腹板墙板11位于外侧的墙板的内侧面;S5 Placement of the horizontally lapped steel bar: as shown in Figure 7, slide the horizontally lapped steel bar 6 toward the web wall panel 11, so that one end enters the web wall panel 11 until it touches the web wall panel 11 the inner side of the wall panel located on the outer side;

S6纵向搭接钢筋笼的插入:如图8a、图8b和图8c所示,将纵向搭接钢筋笼14插入到翼缘墙板10和腹板墙板11交汇处。S6 Insertion of longitudinally overlapping reinforcement cages: as shown in Fig. 8a, Fig. 8b and Fig. 8c, insert the longitudinally overlapping reinforcing cages 14 into the intersection of the flange wall panels 10 and the web panel 11.

S7现浇混凝土芯墙浇筑施工:混凝土浇筑前检查叠合墙板安装的尺寸偏差、稳固度,符合质量要求后,浇筑混凝土芯墙8。S7 Cast-in-situ concrete core wall pouring construction: check the size deviation and stability of the laminated wall panel installation before concrete pouring, and pour the concrete core wall 8 after meeting the quality requirements.

对于本领域的技术人员来说,可以根据以上的技术方案和构思,作出各种相应的改变和变形,而所有的这些改变和变形都应该包括在本发明权利要求的保护范围之内。For those skilled in the art, various corresponding changes and modifications can be made according to the above technical solutions and ideas, and all these changes and modifications should be included in the protection scope of the claims of the present invention.

Claims (5)

1. a Novel L-shaped overlaid plate type shear wall edge member, comprises stirrup, longitudinal reinforcement, longitudinal lap joint reinforcing bar, level overlap joint reinforcing bar, it is characterized in that, also comprise edge of a wing wallboard and web wallboard, both prefabricated composite wallboard all for being made up of two-layer wallboard; It is then cast-in-situ concrete core wall between the two-layer wallboard of edge of a wing wallboard, between the two-layer wallboard of web wallboard; Wherein one end of edge of a wing wallboard and web wallboard be combined with each other and is L-type; Stirrup and longitudinal reinforcement distribute according to the requirement of structure design and are embedded in edge of a wing wallboard and web wallboard; In the cast-in-situ concrete core wall of described level overlap joint steel-bar arrangement between the two-layer wallboard of edge of a wing wallboard, longitudinal lap joint reinforcing bar is then distributed in described cast-in-situ concrete core wall according to structure design.
2. a kind of Novel L-shaped overlaid plate type shear wall edge member according to claim 1, it is characterized in that, in the cast-in-situ concrete core wall between the two-layer wallboard of described web wallboard of one end of described level overlap joint reinforcing bar, and contact with the medial surface that web wallboard is positioned at the wallboard in outside.
3. a kind of Novel L-shaped overlaid plate type shear wall edge member according to claim 1, is characterized in that, the stirrup be embedded in described web wallboard is provided with overhanging section that extends to wallboard direction, the edge of a wing, and cuff has elongated longitudinal reinforcement.
4. a kind of Novel L-shaped overlaid plate type shear wall edge member according to claim 1, it is characterized in that, be provided with longitudinal lap joint reinforcing cage in the cast-in-situ concrete core wall of described edge of a wing wallboard and web wallboard intersection, described longitudinal lap joint reinforcing cage forms primarily of some longitudinal lap joint bar connecting.
5. a method of attachment for Novel L-shaped overlaid plate type shear wall edge member according to claim 1, is characterized in that, comprise the steps:
S1 at the scene precalculated position reserves longitudinal lap joint reinforcing bar and elongated longitudinal reinforcement;
S2 edge of a wing wallboard is in place: will be embedded with the edge of a wing wallboard lifting of stirrup and longitudinal reinforcement to precalculated position, the levelness of adjustment edge of a wing wallboard and verticality, and fixing;
The insertion of S3 level overlap joint reinforcing bar: level is overlapped reinforcing bar and insert between the two-layer wallboard of edge of a wing wallboard, guarantee that it does not affect the in place of web wallboard, diameter and the spacing of level overlap joint reinforcing bar are determined according to designing requirement; The space of tolerable injury level overlap joint slip of bar is left between the two-layer wallboard of edge of a wing wallboard;
S4 web wallboard in place: the web wallboard lifting of longitudinal reinforcement and stirrup will be embedded with to precalculated position, the levelness of adjustment web wallboard and verticality, and fixing;
S5 level overlaps the in place of reinforcing bar: level is overlapped reinforcing bar and skid off to web wallboard direction, its one end is entered in web wallboard, until encounter the medial surface that web wallboard is positioned at the wallboard in outside;
The insertion of S6 longitudinal lap joint reinforcing cage: longitudinal lap joint reinforcing cage is inserted into edge of a wing wallboard and web wallboard intersection;
S7 cast-in-situ concrete core wall pouring construction: check dimensional errors, stable degree that composite wallboard is installed before concreting, after conforming to quality requirements, concreting core wall.
CN201510181234.5A 2015-04-16 2015-04-16 Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member Active CN104775553B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510181234.5A CN104775553B (en) 2015-04-16 2015-04-16 Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510181234.5A CN104775553B (en) 2015-04-16 2015-04-16 Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member

Publications (2)

Publication Number Publication Date
CN104775553A true CN104775553A (en) 2015-07-15
CN104775553B CN104775553B (en) 2017-04-19

Family

ID=53617289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510181234.5A Active CN104775553B (en) 2015-04-16 2015-04-16 Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member

Country Status (1)

Country Link
CN (1) CN104775553B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317137A (en) * 2015-10-14 2016-02-10 史世英 Prefabricated wall, prefabricated wallboard, construction method of prefabricated wall and production method of prefabricated wallboard
CN106245813A (en) * 2016-09-30 2016-12-21 浙江宝业现代建筑工业化制造有限公司 Integration overlapped shear wall plate L-type horizontal connecting node
CN106284751A (en) * 2016-09-30 2017-01-04 浙江宝业现代建筑工业化制造有限公司 A kind of heat preservation decoration integrative overlapped shear wall plate L-type connects node and construction method
CN106284755A (en) * 2016-10-20 2017-01-04 南通联泷建筑材料有限公司 A kind of wallboard is dry with the L font of wallboard spells steel attachment structure
CN107097331A (en) * 2017-06-05 2017-08-29 承德绿建建筑节能科技有限公司 Sectional die, casting method and precast wall body structure for pouring precast wall body
CN108797845A (en) * 2018-06-27 2018-11-13 中广核工程有限公司 Steel plate concrete structure wall crosses connecting node reinforcement structure
CN109235885A (en) * 2018-11-05 2019-01-18 中欧云建科技发展有限公司 A kind of full-automatic docking prefabricated double-walled linked system of L-type concrete construction
CN109881790A (en) * 2019-03-09 2019-06-14 中铁建设集团有限公司 Steel bar template integrated wall adds movable reinforcing bar connecting structure and installation method
CN110453777A (en) * 2019-07-30 2019-11-15 美好建筑装配科技有限公司 A kind of architectural structure system based on prefabricated heat preservation wall
CN110886383A (en) * 2019-11-29 2020-03-17 西藏涛扬新型建材科技有限公司 Prefabricated concrete structure building structure based on fiber reinforced cladding wood substrate
CN110886409A (en) * 2019-11-29 2020-03-17 西藏涛扬新型建材科技有限公司 Fast assembly type reinforced concrete wall structure
CN111236476A (en) * 2020-03-06 2020-06-05 四川中宇建设工程有限公司 Edge member of steel reinforced concrete shear wall and construction method
CN111691581A (en) * 2020-06-12 2020-09-22 中国建筑标准设计研究院有限公司 On-site formwork-free longitudinal and transverse wall connecting structure for superposed shear wall and construction process
CN114809764A (en) * 2022-03-19 2022-07-29 北京工业大学 Assembly type T-shaped column and ecological inner wall self-tapping nail cluster connecting structure and manufacturing method
CN117107955A (en) * 2023-10-18 2023-11-24 中铁建工集团有限公司 Beam wall integrated structure and decoration construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202000485U (en) * 2011-01-20 2011-10-05 上海市城市建设设计研究院 L-shaped connecting node for superposed outer wall of shear wall structure
CN202324349U (en) * 2011-11-04 2012-07-11 中冶建工集团有限公司 Integral type welding hooping for L-shaped edge member of shear wall
US20130239504A1 (en) * 2006-11-29 2013-09-19 Stala Integrated Assemblies, Llc Method and devices for framing openings in cast-in-place walls
CN204266415U (en) * 2014-10-08 2015-04-15 绍兴宝业西伟德混凝土预制件有限公司 The vertical antidetonation connected node of the prefabricated overlapped shear wall of L-type
CN204551824U (en) * 2015-04-16 2015-08-12 华东建筑设计研究院有限公司 A kind of Novel L-shaped overlaid plate type shear wall edge member

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130239504A1 (en) * 2006-11-29 2013-09-19 Stala Integrated Assemblies, Llc Method and devices for framing openings in cast-in-place walls
CN202000485U (en) * 2011-01-20 2011-10-05 上海市城市建设设计研究院 L-shaped connecting node for superposed outer wall of shear wall structure
CN202324349U (en) * 2011-11-04 2012-07-11 中冶建工集团有限公司 Integral type welding hooping for L-shaped edge member of shear wall
CN204266415U (en) * 2014-10-08 2015-04-15 绍兴宝业西伟德混凝土预制件有限公司 The vertical antidetonation connected node of the prefabricated overlapped shear wall of L-type
CN204551824U (en) * 2015-04-16 2015-08-12 华东建筑设计研究院有限公司 A kind of Novel L-shaped overlaid plate type shear wall edge member

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317137A (en) * 2015-10-14 2016-02-10 史世英 Prefabricated wall, prefabricated wallboard, construction method of prefabricated wall and production method of prefabricated wallboard
CN106245813A (en) * 2016-09-30 2016-12-21 浙江宝业现代建筑工业化制造有限公司 Integration overlapped shear wall plate L-type horizontal connecting node
CN106284751A (en) * 2016-09-30 2017-01-04 浙江宝业现代建筑工业化制造有限公司 A kind of heat preservation decoration integrative overlapped shear wall plate L-type connects node and construction method
CN106284755A (en) * 2016-10-20 2017-01-04 南通联泷建筑材料有限公司 A kind of wallboard is dry with the L font of wallboard spells steel attachment structure
CN107097331B (en) * 2017-06-05 2023-12-08 承德绿建建筑节能科技有限公司 Combined mold for pouring prefabricated wall body, pouring method and prefabricated wall body structure
CN107097331A (en) * 2017-06-05 2017-08-29 承德绿建建筑节能科技有限公司 Sectional die, casting method and precast wall body structure for pouring precast wall body
CN108797845A (en) * 2018-06-27 2018-11-13 中广核工程有限公司 Steel plate concrete structure wall crosses connecting node reinforcement structure
CN109235885A (en) * 2018-11-05 2019-01-18 中欧云建科技发展有限公司 A kind of full-automatic docking prefabricated double-walled linked system of L-type concrete construction
CN109881790A (en) * 2019-03-09 2019-06-14 中铁建设集团有限公司 Steel bar template integrated wall adds movable reinforcing bar connecting structure and installation method
CN109881790B (en) * 2019-03-09 2024-04-16 中铁建设集团有限公司 Connection structure and installation method for reinforcing steel bar template integrated wall body added with movable reinforcing steel bars
CN110453777A (en) * 2019-07-30 2019-11-15 美好建筑装配科技有限公司 A kind of architectural structure system based on prefabricated heat preservation wall
CN110886409A (en) * 2019-11-29 2020-03-17 西藏涛扬新型建材科技有限公司 Fast assembly type reinforced concrete wall structure
CN110886383A (en) * 2019-11-29 2020-03-17 西藏涛扬新型建材科技有限公司 Prefabricated concrete structure building structure based on fiber reinforced cladding wood substrate
CN111236476A (en) * 2020-03-06 2020-06-05 四川中宇建设工程有限公司 Edge member of steel reinforced concrete shear wall and construction method
CN111691581A (en) * 2020-06-12 2020-09-22 中国建筑标准设计研究院有限公司 On-site formwork-free longitudinal and transverse wall connecting structure for superposed shear wall and construction process
CN114809764A (en) * 2022-03-19 2022-07-29 北京工业大学 Assembly type T-shaped column and ecological inner wall self-tapping nail cluster connecting structure and manufacturing method
CN114809764B (en) * 2022-03-19 2024-03-22 北京工业大学 A structure and method for connecting the prefabricated T-shaped column and the ecological interior wall self-tapping nail block
CN117107955A (en) * 2023-10-18 2023-11-24 中铁建工集团有限公司 Beam wall integrated structure and decoration construction method thereof
CN117107955B (en) * 2023-10-18 2023-12-22 中铁建工集团有限公司 Beam wall integrated structure and decoration construction method thereof

Also Published As

Publication number Publication date
CN104775553B (en) 2017-04-19

Similar Documents

Publication Publication Date Title
CN104775553B (en) Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member
CN104775555B (en) A kind of T-shaped composite plate shear wall edge member and attaching method thereof
CN108589986B (en) A prefabricated composite wall structure based on bolt connection and its construction method
CN102168455B (en) U-shaped closed tendon connection structure of horizontal joints in assembled shear wall structures
CN101586366B (en) Connecting structure and construction method of precast concrete plates and beams, and building comprising same
CN103541463B (en) Wallboard and shear wall allowing floor location provided with post-pouring belt comprising same and construction method for shear wall
CN108360712A (en) A kind of assembled steel reinforced concrete shear force wall and its construction method
CN202012136U (en) U-shaped closed rib connection structure for horizontal seam of assembling shear wall structure
CN106968381B (en) Prefabricated precast shear wall and composite panel joints connected by combined grouting sleeves
CN102877649B (en) Prefabricated concrete structure interlayer pouring construction method
CN103410265A (en) Splicing structure of laminated floor slab
CN105064529A (en) Prefabricated and assembled large-board shear wall structure with concealed bracings
CN106193623B (en) A kind of prefabricated concrete structure construction method
CN103470040A (en) Splicing method of composite floor slab and beam
CN208251372U (en) A kind of assembled steel reinforced concrete shear force wall
CN105937277A (en) Connection Structure of L-shaped Shear Wall Edge Members
CN108265822A (en) A kind of prefabricated board connecting structure
CN110761398A (en) Horizontal seam connected node of prefabricated structure wallboard unit of assembled
CN110029836A (en) A kind of concrete structure reinforcing bars template integrative installation technology dwelling house system
CN105569222A (en) Vertical connection technology for precast assembled large panel shear walls with concealed supports
CN105937275A (en) T-shaped shear wall edge member connecting structure
CN109667376A (en) Novel superposed superstructure and its construction method suitable for steel construction H profile steel beam
CN204551824U (en) A kind of Novel L-shaped overlaid plate type shear wall edge member
CN204571019U (en) A kind of novel T-shaped overlaid plate type shear wall edge member
CN207405842U (en) An integral fully prefabricated floor slab unsupported connection structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211110

Address after: 200040 Building 1, No. 421 Haifang Road, Jing'an District, Shanghai

Patentee after: Shanghai modern architectural planning and Design Institute Co., Ltd

Address before: 200041 4th floor, No. 268, Shimen 2nd Road, Shanghai

Patentee before: East China Architectural Design and Research Institute Co., Ltd

TR01 Transfer of patent right