CN104749548B - A dual-purpose fast wiring test meter stand for three-phase electric energy meters - Google Patents
A dual-purpose fast wiring test meter stand for three-phase electric energy meters Download PDFInfo
- Publication number
- CN104749548B CN104749548B CN201510143986.2A CN201510143986A CN104749548B CN 104749548 B CN104749548 B CN 104749548B CN 201510143986 A CN201510143986 A CN 201510143986A CN 104749548 B CN104749548 B CN 104749548B
- Authority
- CN
- China
- Prior art keywords
- terminal
- electric energy
- energy meter
- voltage
- wiring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 41
- 238000002788 crimping Methods 0.000 claims abstract description 25
- 238000009434 installation Methods 0.000 claims description 7
- 230000001360 synchronised effect Effects 0.000 claims description 4
- 238000004891 communication Methods 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 8
- 238000000034 method Methods 0.000 description 5
- 238000012795 verification Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种电能表测试用快速接线装置,具体涉及一种三相电能表两用快速接线测试表架,可以适应三相直接式和互感器式两种类型电能表的快速接线,在电能表校准时方便校表台与电能表快速的连接或分离,使用此部件可有效提高工作效率。The invention relates to a quick wiring device for electric energy meter testing, in particular to a dual-purpose quick wiring test stand for three-phase electric energy meters, which can be adapted to the fast wiring of two types of electric energy meters of three-phase direct type and transformer type. When the meter is calibrated, it is convenient to quickly connect or separate the meter calibration table and the electric energy meter. Using this part can effectively improve work efficiency.
背景技术Background technique
电能表在完成组装后都需要进行接线检测,测试电能表是否合格。在目前的三相检定装置上,针对直接式和互感器式两种三相电能表为了简化接线采用不同测试装置进行检定,每个装置分别配置一种接表架。配置直接式接表架的装置不能对互感器式电能表进行测试接线,配置互感器式接表架的装置不能对直接式电能表进行测试接线。设备使用效率很低,必须配置两套检定装置。迫切需要一种结构简单,使用方便,可适应三相直接式和互感器式两种类型电能表的快速接线架。After the watt-hour meter is assembled, wiring inspection is required to test whether the watt-hour meter is qualified. In the current three-phase verification device, different test devices are used for verification for two kinds of three-phase electric energy meters of direct type and transformer type in order to simplify the wiring, and each device is equipped with a meter connection frame. The device equipped with the direct meter connecting frame cannot test and connect the transformer type electric energy meter, and the device equipped with the transformer type meter connecting frame cannot perform test wiring on the direct type electric energy meter. The use efficiency of the equipment is very low, and two sets of verification devices must be configured. Urgently need a kind of simple in structure, easy to use, can adapt to three-phase direct-type and transformer-type two types of electric energy meters fast wiring rack.
发明内容Contents of the invention
为了克服上述缺陷,本发明的目的在于提供一种结构简单、安全可靠、可快速调整电压、电流接线位置接表架,通过快速调整接线端子位置适应三相两种接线规格的电能表测试接线需求的三相电能表两用快速接线测试表架。In order to overcome the above-mentioned defects, the purpose of the present invention is to provide a simple structure, safe and reliable, can quickly adjust the voltage and current connection position to connect the meter frame, and quickly adjust the position of the terminal to meet the test wiring requirements of the three-phase two wiring specifications of the electric energy meter The three-phase electric energy meter dual-purpose quick wiring test meter stand.
为了实现上述目的,本发明采用的技术方案为:一种三相电能表两用快速接线测试表架,包括测试面板,以及位于测试面板上的电流接线压接手柄、电流接线端子模块和电压脉冲辅助端子模块,其特征在于:所述的电流接线压接手柄将电能表压接到电流接线端子模块上,所述的电压脉冲辅助端子模块包括电压接线端子和脉冲辅助信号端子,电压接线端子和脉冲辅助信号端子安装于电压脉冲辅助信号安装块,通过信号端子压接把手和电压脉冲辅助信号端子移动模块使电压接线端子和脉冲辅助信号端子压接在电能表对应的测试端子上。In order to achieve the above object, the technical solution adopted by the present invention is: a dual-purpose quick wiring test stand for a three-phase electric energy meter, including a test panel, and a current connection crimping handle, a current connection terminal module and a voltage pulse on the test panel The auxiliary terminal module is characterized in that: the current connection crimping handle crimps the electric energy meter to the current connection terminal module, the voltage pulse auxiliary terminal module includes a voltage connection terminal and a pulse auxiliary signal terminal, the voltage connection terminal and The pulse auxiliary signal terminal is installed on the voltage pulse auxiliary signal installation block, and the voltage connection terminal and the pulse auxiliary signal terminal are crimped on the corresponding test terminals of the energy meter through the signal terminal crimping handle and the voltage pulse auxiliary signal terminal moving module.
所述的电压脉冲辅助信号端子移动模块包括设有信号端子压接把手的可旋转的横杆、与横杆固定连接的第一连杆部、与第一连杆部前端连接的倾斜设置的第二连杆部、与第二连杆部后端连接的电压脉冲辅助信号安装块。The voltage pulse auxiliary signal terminal moving module includes a rotatable crossbar provided with a signal terminal crimping handle, a first connecting rod part fixedly connected to the crossbar, and an inclined second connecting rod part connected to the front end of the first connecting rod part. The second link part and the voltage pulse auxiliary signal installation block connected to the rear end of the second link part.
所述的横杆的旋转与信号端子压接把手的旋转同步,第一连杆部的旋转与横杆的旋转同步,第一连杆部的旋转方式为孔位于第一连杆部的前端或后端。The rotation of the crossbar is synchronized with the rotation of the signal terminal crimping handle, the rotation of the first link part is synchronized with the rotation of the crossbar, and the rotation mode of the first link part is that the hole is located at the front end of the first link part or rear end.
所述的电压脉冲辅助端子模块还设有电能表定位块,电能表定位块为设定长度的卡槽。The voltage pulse auxiliary terminal module is also provided with a positioning block of the electric energy meter, and the positioning block of the electric energy meter is a slot with a set length.
所述的电压接线端子为插拔式结构,测试直接式电能表时把电压接线端子插入直接式电压接线位置,测试互感器式电能表时把电压接线端子插入互感器式电压接线位置。The voltage connection terminal is a plug-in structure. When testing the direct type electric energy meter, insert the voltage connection terminal into the direct type voltage connection position, and when testing the transformer type electric energy meter, insert the voltage connection terminal into the transformer type voltage connection position.
所述的电流接线端子模块上设置6个可左右移动调节的电流端子,直接式电能表采用直接式定位块把电流端子移动到直接式电能表接线位置,互感器式电能表采用互感器定位块把电流端子移动到互感器式电能表接线位置。The current terminal module is provided with 6 current terminals that can be moved left and right. The direct type electric energy meter uses a direct positioning block to move the current terminal to the direct type electric energy meter wiring position, and the transformer type electric energy meter adopts a transformer positioning block. Move the current terminal to the wiring position of the transformer type electric energy meter.
所述的脉冲辅助信号端子包括多功能信号端子、有功信号端子、无功信号端子、RS485通讯端子、报警和跳闸信号端子。The pulse auxiliary signal terminals include multifunctional signal terminals, active signal terminals, reactive signal terminals, RS485 communication terminals, alarm and trip signal terminals.
分析国家电网《QGDW 1356-2013 三相智能电能表型式规范》对智能电能表外观尺寸的要求。直接式和互感器式两种规格的电能表接线尺寸除了电流端子左右间距和电压接线位置不同外,其余尺寸完全一致。只需要这两处的接线端子能够进行快速调整,满足接线要求即可。Analyze the requirements of State Grid's "QGDW 1356-2013 Three-phase Smart Energy Meter Type Specification" for the appearance and size of smart energy meters. The wiring dimensions of the two specifications of the direct type and the transformer type electric energy meters are exactly the same except for the left and right spacing of the current terminals and the position of the voltage connection. It is only necessary that the connecting terminals at these two places can be adjusted quickly to meet the wiring requirements.
电流接线端子快速调整方式:电流测试信号采用从电能表下面压接接线方式,设计一套具有6个可左右自由移动的电流接线端子模块,再针对直接式和互感器式两种规格的电能表设计两种电流端子定位模块,分为直接式定位块和互感器式定位块。测试直接式电能表时,用直接式定位块对电流接线端子进行快速调整限位;测试互感器式电能表时,用互感器式定位块对电流接线端子进行快速调整限位;Quick adjustment method of current terminal: The current test signal adopts the crimping connection method from the bottom of the electric energy meter, and a set of six current terminal modules that can move freely left and right is designed, and then it is aimed at electric energy meters of two specifications: direct type and transformer type. Two current terminal positioning modules are designed, which are divided into direct positioning block and transformer positioning block. When testing the direct type electric energy meter, use the direct type positioning block to quickly adjust the limit of the current terminal; when testing the transformer type electric energy meter, use the transformer type positioning block to quickly adjust the limit of the current terminal;
电压接线端子快速调整方式:电压和脉冲辅助信号端子采用从电能表正面压接接线方式,直接式电能表与互感器式电能表脉冲辅助信号接线位置完全一致,接线位置无需调整,只需要调整电压接线位置即可。在电压脉冲辅助端子模块上针对两种电能表设置两个电压接线端子安装位置,电压接线端子采用插拔方式,测试直接式电能表时把电压接线端子插入直接式电压接线位置,测试互感器式电能表时把电压接线端子插入互感器式电压接线位置。Quick adjustment method of voltage terminal: The voltage and pulse auxiliary signal terminals are connected by crimping from the front of the energy meter. The wiring position of the direct type energy meter and the transformer type energy meter pulse auxiliary signal are exactly the same, and the wiring position does not need to be adjusted, only the voltage needs to be adjusted The wiring location is fine. On the voltage pulse auxiliary terminal module, two voltage terminal installation positions are set for the two types of electric energy meters. The voltage terminal adopts the plug-in method. Insert the voltage terminal into the voltage connection position of the transformer when installing the electric energy meter.
本发明的有益效果是,基于本发明的三相电能表快速接线表架结构简单,性能稳定可靠,操作简单方便,节省了接拆线时间,提高了设备的使用效率,可有效提高工作效率,本发明可以广泛应用在三相电能表检定装置上。The beneficial effect of the present invention is that the three-phase watt-hour meter quick-wiring table frame based on the present invention has simple structure, stable and reliable performance, simple and convenient operation, saves the connection and disconnection time, improves the use efficiency of the equipment, and can effectively improve the work efficiency. The invention can be widely applied to the verification device of the three-phase electric energy meter.
附图说明Description of drawings
图1-2 是本发明三相电能表两用快速接线表架装配图;Fig. 1-2 is the assembly diagram of the dual-purpose quick wiring meter frame of the three-phase electric energy meter of the present invention;
图3-4 是本发明三相电能表两用快速接线表架电流接线端子图;Fig. 3-4 is the current connection terminal diagram of the three-phase electric energy meter dual-purpose quick wiring meter stand of the present invention;
图5-7 是本发明三相电能表两用快速接线表架电压脉冲辅助信号快速接线端子图;Fig. 5-7 is the quick wiring terminal diagram of the voltage pulse auxiliary signal of the three-phase electric energy meter dual-purpose quick wiring meter stand of the present invention;
图8-10 是本发明三相电能表两用快速接线表架测试接线端子图;Figures 8-10 are test terminal diagrams of the three-phase electric energy meter dual-purpose quick wiring meter stand of the present invention;
图11-12 是本发明三相电能表两用快速接线表架使用图;Figures 11-12 are diagrams showing the usage of the three-phase electric energy meter dual-purpose quick wiring meter frame of the present invention;
图13为本发明的电压脉冲辅助信号端子移动模块工作状态示意图;13 is a schematic diagram of the working state of the voltage pulse auxiliary signal terminal moving module of the present invention;
图14为本发明的电压脉冲辅助信号端子移动模块非工作状态示意图。Fig. 14 is a schematic diagram of the non-working state of the voltage pulse auxiliary signal terminal moving module of the present invention.
具体实施方式detailed description
如图1-2所示,三相电能表两用快速接线表架由测试面板1、电流接线压接手柄2、电流接线端子模块3和电压脉冲辅助端子模块4组成。As shown in Figure 1-2, the three-phase electric energy meter dual-purpose quick wiring meter rack consists of a test panel 1, a current wiring crimping handle 2, a current wiring terminal module 3 and a voltage pulse auxiliary terminal module 4.
如图3-4所示为电流接线端子模块3,在电流接线端子模块3上设置6个可左右移动调节的电流端子3-1,用于电流接线。对应两种结构型式的电能表采用定位块3-2进行快速卡位调整,直接式电能表采用直接式定位块把电流端子3-1移动到直接式电能表接线位置,互感器式电能表采用互感器定位块把电流端子3-1移动到互感器式电能表接线位置。位置调整到位后,通过电流接线压接手柄2把电能表压接到电流端子上,进行接线。As shown in Fig. 3-4, the current terminal module 3 is provided with six current terminals 3-1 which can be moved left and right for adjustment on the current terminal module 3 for current connection. Corresponding to the two structural types, the electric energy meter adopts the positioning block 3-2 for fast card position adjustment, the direct type electric energy meter uses the direct type positioning block to move the current terminal 3-1 to the wiring position of the direct type electric energy meter, and the transformer type electric energy meter adopts The transformer positioning block moves the current terminal 3-1 to the wiring position of the transformer type electric energy meter. After the position is adjusted in place, the electric energy meter is crimped to the current terminal through the current wiring crimping handle 2 for wiring.
图5-7为电压脉冲辅助端子模块4的结构图,此模块包括电能表定位块4-1、电压脉冲辅助信号安装块4-2、电压接线端子4-4、脉冲辅助信号端子4-5和信号端子压接把手4-3、电压脉冲辅助信号端子移动模块。电压接线端子4-4、脉冲辅助信号端子4-5安装在电压脉冲辅助信号安装块4-2上,通过信号端子压接把手4-3操作可以进行上下移动,需要接线时操作压接把手4-3顺时针旋转,把电压接线端子4-4和脉冲辅助信号端子4-5压接在电能表对应的测试端子上,拆线时只需逆时针旋转压接把手4-3即可。Figure 5-7 is a structural diagram of the voltage pulse auxiliary terminal module 4, which includes a power meter positioning block 4-1, a voltage pulse auxiliary signal installation block 4-2, a voltage connection terminal 4-4, and a pulse auxiliary signal terminal 4-5 and signal terminal crimping handle 4-3, voltage pulse auxiliary signal terminal moving module. The voltage connection terminal 4-4 and the pulse auxiliary signal terminal 4-5 are installed on the voltage pulse auxiliary signal installation block 4-2, and can be moved up and down through the operation of the signal terminal crimping handle 4-3, and the crimping handle 4 is operated when wiring is required -3 Rotate clockwise, crimp the voltage terminal 4-4 and pulse auxiliary signal terminal 4-5 on the corresponding test terminal of the electric energy meter, and only need to rotate the crimping handle 4-3 counterclockwise when removing the wires.
根据图13-14,具体移动原理如下:在非工作状态,信号端子压接把手4-3放置于横杆正上方,电压脉冲辅助信号端子移动模块的第一连杆部6和第二连杆部7的前端突出于横杆(以下以图13和14的右侧为前端,左侧为后端),横杆与第一连杆部的后端固定连接,横杆与第一侧面支撑部9连接,第二侧面支撑部10与第一侧面支撑部9临接,第二侧面部与第二连杆部连接,此时,第二连杆部与在第一连杆部的孔通过卡合部8连接,第二连杆部向下倾斜设置,且第二连杆部的前端与第一连杆部的前端连接;在工作状态,向下旋转信号端子压接把手4-3,带动横杆旋转180度,横杆带动第一连杆部旋转180度,旋转过程中第一连杆部与第二连杆部连接的位置从第一连杆部的前端变为第一连杆部的后端,使得第二连杆部和第二侧面部被向后推,第一侧面支撑部和第二侧面支撑部分离,使得与第二连杆部后端连接的电压脉冲辅助信号安装块后移,把电压接线端子4-4和脉冲辅助信号端子4-5压接在电能表对应的测试端子上。According to Figure 13-14, the specific movement principle is as follows: In the non-working state, the signal terminal crimping handle 4-3 is placed directly above the cross bar, and the voltage pulse assists the first link part 6 and the second link of the signal terminal moving module The front end of part 7 protrudes from the cross bar (hereinafter, the right side of Fig. 13 and 14 is the front end, and the left side is the rear end), the cross bar is fixedly connected with the rear end of the first link part, and the cross bar is connected with the first side support part 9, the second side support part 10 is adjacent to the first side support part 9, and the second side part is connected to the second link part. At this time, the second link part and the hole in the first link part are clamped The connecting part 8 is connected, and the second connecting rod part is inclined downward, and the front end of the second connecting rod part is connected with the front end of the first connecting rod part; in the working state, the signal terminal crimping handle 4-3 is rotated downward to drive The cross bar rotates 180 degrees, and the cross bar drives the first link part to rotate 180 degrees. During the rotation, the position where the first link part connects to the second link part changes from the front end of the first link part to the first link part The rear end of the second link part and the second side part are pushed back, and the first side support part and the second side support part are separated, so that the voltage pulse auxiliary signal mounting block connected with the rear end of the second link part Move backward, crimp the voltage terminal 4-4 and the pulse auxiliary signal terminal 4-5 to the corresponding test terminal of the electric energy meter.
为了满足两种电能表测试接线需求,如图8-10所示,电压接线端子4-4可以通过手动快速插拔,进行位置调整,直接式电能表时把电压接线端子4-4安装在直接式电压接线位置4-4-1处,满足直接式电能表电压接线要求;互感器式电能表时把电压接线端子4-4安装在互感器式电压接线位置4-4-2处,满足互感器式电能表电压接线要求。In order to meet the test wiring requirements of the two types of electric energy meters, as shown in Figure 8-10, the voltage terminal 4-4 can be quickly inserted and removed manually to adjust the position. Type voltage connection position 4-4-1, which meets the voltage connection requirements of the direct type electric energy meter; when the transformer type electric energy meter is installed, the voltage connection terminal 4-4 is installed at the position 4-4-2 of the transformer type voltage connection position, which meets the mutual inductance The voltage wiring requirements of the instrument type electric energy meter.
以上所述的本发明实施方式,并不构成对本发明保护范围的限定。任何在本发明的精神和原则之内所作的修改、等同替换和改进等,均应包含在本发明的权利要求保护范围之内。The embodiments of the present invention described above are not intended to limit the protection scope of the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principle of the present invention shall be included in the protection scope of the claims of the present invention.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510143986.2A CN104749548B (en) | 2015-03-30 | 2015-03-30 | A dual-purpose fast wiring test meter stand for three-phase electric energy meters |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510143986.2A CN104749548B (en) | 2015-03-30 | 2015-03-30 | A dual-purpose fast wiring test meter stand for three-phase electric energy meters |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104749548A CN104749548A (en) | 2015-07-01 |
CN104749548B true CN104749548B (en) | 2017-06-16 |
Family
ID=53589524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510143986.2A Active CN104749548B (en) | 2015-03-30 | 2015-03-30 | A dual-purpose fast wiring test meter stand for three-phase electric energy meters |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104749548B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108196216B (en) * | 2016-11-20 | 2024-08-13 | 国网江西省电力公司赣东北供电分公司 | A new type of three-phase voltage connection device for electric energy meter verification |
CN108802460B (en) * | 2017-05-04 | 2024-01-30 | 郑州三晖电气股份有限公司 | Compatible electric energy meter base and method for realizing compatibility |
CN107219495A (en) * | 2017-06-07 | 2017-09-29 | 国家电网公司 | For electric energy meter field wiring push type buckle electric wire connecting junction |
CN108132456A (en) * | 2017-12-25 | 2018-06-08 | 国网江苏省电力有限公司电力科学研究院 | A kind of three-phase intelligent electric-energy meter failure sorts check device |
CN109975587B (en) * | 2019-03-20 | 2024-04-05 | 贵州电网有限责任公司 | Take electric energy meter of quick mounting structure of mutual-inductor |
CN111413531A (en) * | 2020-05-13 | 2020-07-14 | 浙江圣意电气科技有限公司 | Connector for realizing replacement of electric energy meter without power interruption |
CN112362995B (en) * | 2020-11-11 | 2022-02-15 | 安徽南瑞中天电力电子有限公司 | Method and device for testing starting and shunt running of pre-accumulated electric energy distribution line loss module |
CN114002643A (en) * | 2021-11-25 | 2022-02-01 | 国网北京市电力公司 | Electric energy meter detection method, device, electronic device and computer-readable storage medium |
CN116027086B (en) * | 2023-03-31 | 2023-06-06 | 北京煜邦电力技术股份有限公司 | Easy-to-install electric energy meter |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2319121A (en) * | 1996-10-16 | 1998-05-13 | Campbell York Limited | Electric meter testing |
CN201281757Y (en) * | 2008-08-12 | 2009-07-29 | 杭州海兴电器有限公司 | Rapid connection fixture for checking electric energy meter |
CN201796139U (en) * | 2010-07-15 | 2011-04-13 | 刘军海 | Meter connecting seat for three-phase electric energy meter calibrating device |
CN202758066U (en) * | 2012-08-09 | 2013-02-27 | 费杏宝 | State grid three-phase direct type transformer type auxiliary terminal crimping device |
CN104237840A (en) * | 2014-09-25 | 2014-12-24 | 国家电网公司 | Integrated junction device for single-phase kilowatt-hour meter inspection and electric strength test |
CN204613391U (en) * | 2015-03-30 | 2015-09-02 | 国家电网公司 | A kind of three-phase electric energy meter dual-purpose fast-wiring test dial framework |
-
2015
- 2015-03-30 CN CN201510143986.2A patent/CN104749548B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2319121A (en) * | 1996-10-16 | 1998-05-13 | Campbell York Limited | Electric meter testing |
CN201281757Y (en) * | 2008-08-12 | 2009-07-29 | 杭州海兴电器有限公司 | Rapid connection fixture for checking electric energy meter |
CN201796139U (en) * | 2010-07-15 | 2011-04-13 | 刘军海 | Meter connecting seat for three-phase electric energy meter calibrating device |
CN202758066U (en) * | 2012-08-09 | 2013-02-27 | 费杏宝 | State grid three-phase direct type transformer type auxiliary terminal crimping device |
CN104237840A (en) * | 2014-09-25 | 2014-12-24 | 国家电网公司 | Integrated junction device for single-phase kilowatt-hour meter inspection and electric strength test |
CN204613391U (en) * | 2015-03-30 | 2015-09-02 | 国家电网公司 | A kind of three-phase electric energy meter dual-purpose fast-wiring test dial framework |
Also Published As
Publication number | Publication date |
---|---|
CN104749548A (en) | 2015-07-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104749548B (en) | A dual-purpose fast wiring test meter stand for three-phase electric energy meters | |
CN103698733B (en) | A kind of test connection terminal assemblies for electric energy metrical | |
CN201060217Y (en) | Electric energy meter multi-function junction box | |
CN204613391U (en) | A kind of three-phase electric energy meter dual-purpose fast-wiring test dial framework | |
CN104793125B (en) | A kind of test device of photovoltaic combiner box current divider measurement plate | |
CN203965480U (en) | A kind of test of lightning arrester device | |
CN103499805B (en) | Detection device compatible with three-phase intelligent electric energy meter and type-III special transform acquisition terminal | |
CN203443993U (en) | Electric energy metering wiring apparatus | |
CN203025343U (en) | Compound type intelligent terminal junction device | |
CN204065398U (en) | The aging verifying attachment of intelligent electric meter high/low temperature | |
CN207037062U (en) | One kind is used for electric energy meter field wiring push type buckle electric wire connecting junction | |
CN203448933U (en) | Welding displacement device | |
CN104237840B (en) | Integrated junction device for single-phase kilowatt-hour meter inspection and electric strength test | |
CN103983936B (en) | A kind of single three-phase electric energy meter integration calibration equipment | |
CN205562785U (en) | Calibrating installation and system of electric energy meter | |
CN202975220U (en) | Universal wire and cable plug connector tester | |
CN103345878A (en) | Car starter experiment table | |
CN103278735B (en) | Multifunctional three-phase transformer CT loop-around test instrument | |
CN203930044U (en) | A kind of verification conversion equipment of three-phase multifunctional electrical energy meter | |
CN102735894B (en) | Plug-in contact resistance measurement chuck | |
CN207407914U (en) | A kind of automatic crimping system of measurement instrument | |
CN203535213U (en) | Switchable calibration device for different specifications of electric energy meters | |
CN207730925U (en) | Electric energy meter field examines voltage sampling apparatus | |
CN221716708U (en) | Bus bar retaining clip | |
CN221125892U (en) | Device for testing insulation performance of frameless component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |