CN104727215A - Temporary passing bridge for construction - Google Patents

Temporary passing bridge for construction Download PDF

Info

Publication number
CN104727215A
CN104727215A CN201510128043.2A CN201510128043A CN104727215A CN 104727215 A CN104727215 A CN 104727215A CN 201510128043 A CN201510128043 A CN 201510128043A CN 104727215 A CN104727215 A CN 104727215A
Authority
CN
China
Prior art keywords
screw nut
bridge
hand
nut pair
bridge body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510128043.2A
Other languages
Chinese (zh)
Other versions
CN104727215B (en
Inventor
李伟坡
许舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University of Forestry and Technology
Original Assignee
Central South University of Forestry and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University of Forestry and Technology filed Critical Central South University of Forestry and Technology
Priority to CN201510128043.2A priority Critical patent/CN104727215B/en
Publication of CN104727215A publication Critical patent/CN104727215A/en
Application granted granted Critical
Publication of CN104727215B publication Critical patent/CN104727215B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/133Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种建筑用临时通行桥,包括第一、第二、第三桥体,第一、第二、第三桥体上端设有通行平板,第一、第三桥体的底部设有丝杆螺母钻头装置,并且第一桥体左端和第三桥体右端均设有手摇式丝杆螺母抽拉装置;所述丝杆螺母钻头装置包括一底部带有钻头的第一丝杆螺母副,所述第一丝杆螺母副上端设有能使第一丝杆螺母副行进伸缩的电动马达装置;所述手摇式丝杆螺母抽拉装置包括一凹槽,所述凹槽内设有一底部带有手摇式丝杆螺母副的横板,所述横板活动端设有螺栓固定孔;本发明通过拼接以及横向、纵向的丝杆螺母系统,使得桥梁的安装方式以及与河底的连接方式得以大大简化,而且安全牢固。

The invention discloses a temporary passage bridge for construction, which comprises first, second and third bridge bodies. There is a screw nut drill device, and the left end of the first bridge body and the right end of the third bridge body are equipped with a hand-operated screw nut pulling device; the screw nut drill device includes a first screw rod with a drill bit at the bottom Nut pair, the upper end of the first screw nut pair is provided with an electric motor device that can make the first screw nut pair travel and expand; the hand-operated screw nut pulling device includes a groove, and the groove There is a horizontal plate with a hand-operated screw nut pair at the bottom, and a bolt fixing hole is provided at the movable end of the horizontal plate; the present invention makes the installation method of the bridge and the connection with the river through splicing and horizontal and vertical screw nut systems. The connection method of the bottom can be greatly simplified, and it is safe and firm.

Description

一种建筑用临时通行桥Temporary access bridge for construction

技术领域technical field

本发明涉及一种建筑通行装置,尤其涉及一种建筑用临时通行桥。The invention relates to a building passing device, in particular to a temporary building passing bridge.

背景技术Background technique

在一些宽度较小的河上建设桥梁时,有时候出于临时通行的需要,须在在建桥梁附近架设一座临时通行用桥梁,该桥梁同时还可用于辅助桥梁建设之用,通常的做法是架设一座用木头或竹编而成的简易桥梁,待正式桥梁建好后即行拆除,但同时,这样的桥梁的安全隐患也是比较大的,尤其是遇到河水经常涨落的河流,安全隐患就更大。When building bridges on some rivers with small widths, sometimes due to the needs of temporary traffic, a temporary bridge for traffic must be erected near the bridge under construction. The bridge can also be used for auxiliary bridge construction. The usual way is to erect A simple bridge made of wood or bamboo will be dismantled after the formal bridge is built, but at the same time, the safety hazards of such a bridge are relatively large, especially in rivers where the river water often fluctuates. .

发明内容Contents of the invention

本发明就是针对上述问题,提出一种建筑用临时通行桥,该临时通行桥安装简单,使用牢固,安全度也大大提高。The present invention aims at the above problems and proposes a temporary access bridge for construction. The temporary access bridge is simple to install, firm to use and greatly improved in safety.

为达到上述技术目的,本发明采用了一种建筑用临时通行桥,包括能相互通过螺栓连接的第一桥体、第二桥体和第三桥体,所述第一、第二、第三桥体上端设有通行平板,所述第一、第三桥体的底部设有丝杆螺母钻头装置,并且所述第一桥体的左端和第三桥体的右端均设有手摇式丝杆螺母抽拉装置;所述丝杆螺母钻头装置包括一底部带有钻头的第一丝杆螺母副,所述第一丝杆螺母副上端设有能使第一丝杆螺母副行进伸缩的电动马达装置;所述手摇式丝杆螺母抽拉装置包括一凹槽,所述凹槽内设有一底部带有手摇式丝杆螺母副的横板,所述横板活动端设有螺栓固定孔。In order to achieve the above-mentioned technical purpose, the present invention adopts a kind of temporary access bridge for construction, including the first bridge body, the second bridge body and the third bridge body which can be connected with each other by bolts, the first, second and third bridge bodies The upper end of the bridge body is provided with a passage plate, the bottoms of the first and third bridge bodies are provided with screw nut drill devices, and the left end of the first bridge body and the right end of the third bridge body are equipped with hand-operated screw nuts. Rod nut pulling device; the screw nut drill device includes a first screw nut pair with a drill bit at the bottom, and the upper end of the first screw nut pair is provided with an electric motor that can make the first screw nut pair travel and expand. Motor device; the hand-operated screw nut pulling device includes a groove, and a horizontal plate with a hand-operated screw nut pair at the bottom is arranged in the groove, and the movable end of the horizontal plate is fixed with a bolt hole.

本发明通过拼接以及横向、纵向的丝杆螺母系统,使得桥梁的安装方式以及与河底的连接方式得以大大简化,而且安全牢固。The present invention greatly simplifies the installation mode of the bridge and the connection mode with the river bottom through splicing and horizontal and vertical screw nut systems, and is safe and firm.

附图说明Description of drawings

图1所示的是本发明外观结构示意图;What Fig. 1 shows is the schematic diagram of appearance structure of the present invention;

其中,1、第一桥体;2、第二桥体;3、第三桥体;4、通行平板;5、钻头;6、第一丝杆螺母副;7、电动马达装置;8、凹槽;9、手摇式丝杆螺母副;10、横板;11、螺栓固定孔。Among them, 1. The first bridge body; 2. The second bridge body; 3. The third bridge body; 4. The passage plate; 5. The drill bit; 6. The first screw nut pair; Groove; 9, hand screw nut pair; 10, horizontal plate; 11, bolt fixing hole.

具体实施方式Detailed ways

下面结合附图和具体实施方式对本发明作进一步详细地说明。The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

由图1可知,一种建筑用临时通行桥,包括能相互通过螺栓连接的第一桥体1、第二桥体2和第三桥体3,在第一桥体1、第二桥体2、第三桥体3上端设有通行平板4,在第一桥体1、第三桥体3的底部设有丝杆螺母钻头装置,并且在第一桥体1左端和第三桥体3的右端均设有手摇式丝杆螺母抽拉装置;As can be seen from Fig. 1, a temporary access bridge for construction includes a first bridge body 1, a second bridge body 2 and a third bridge body 3 which can be connected to each other by bolts. , the upper end of the third bridge body 3 is provided with a passage plate 4, the bottom of the first bridge body 1 and the third bridge body 3 is provided with a screw nut drill device, and at the left end of the first bridge body 1 and the third bridge body 3 The right end is equipped with a hand-operated screw nut pulling device;

在本发明中,优选的丝杆螺母钻头装置包括一底部带有钻头5的第一丝杆螺母副6,在第一丝杆螺母副6的上端设有能使第一丝杆螺母副6行进伸缩的电动马达装置7。In the present invention, the preferred screw nut drill device includes a first screw nut pair 6 with a drill bit 5 at the bottom, and an upper end of the first screw nut pair 6 is provided to enable the first screw nut pair 6 to advance. Telescopic electric motor unit 7 .

在本发明中,优选的手摇式丝杆螺母抽拉装置包括一凹槽8,在凹槽8内设有一底部带有手摇式丝杆螺母副9的横板10,在横板10的活动端设有螺栓固定孔11。In the present invention, the preferred hand-operated screw nut pulling device includes a groove 8, and a horizontal plate 10 with a hand-operated screw nut pair 9 at the bottom is provided in the groove 8. The movable end is provided with a bolt fixing hole 11 .

本发明具体是这样使用的:首先第一桥体1、第二桥体2和第三桥体3通过螺栓连接,第二桥体2在实际使用中可为一个或多个,如果桥面比较宽,则可用多个第二桥体2进行连接,如果桥面比较窄,则可用少量第二桥体进行连接;接着通过手摇式丝杆螺母副9将横板10向左右两侧延伸,同时采用螺栓通过螺栓固定孔11将横板10和河岸两端进行固定连接,最后启动电动马达装置7,将第一丝杆螺母副6连同底部的钻头5深深扎入河底,起到固定的作用,这样即完成临时通行桥的架设。The present invention is specifically used in this way: first, the first bridge body 1, the second bridge body 2 and the third bridge body 3 are connected by bolts, and the second bridge body 2 can be one or more in actual use. wide, then a plurality of second bridge bodies 2 can be used for connection; if the bridge deck is relatively narrow, a small amount of second bridge bodies can be used for connection; At the same time, bolts are used to fix the horizontal plate 10 and the two ends of the river bank through the bolt fixing holes 11, and finally the electric motor device 7 is started, and the first screw nut pair 6 and the drill bit 5 at the bottom are deeply inserted into the river bottom to play a role of fixing. In this way, the erection of the temporary access bridge is completed.

Claims (1)

1.一种建筑用临时通行桥,其特征在于,包括能相互通过螺栓连接的第一桥体、第二桥体和第三桥体,所述第一、第二、第三桥体上端设有通行平板,所述第一、第三桥体的底部设有丝杆螺母钻头装置,并且所述第一桥体的左端和第三桥体的右端均设有手摇式丝杆螺母抽拉装置;所述丝杆螺母钻头装置包括一底部带有钻头的第一丝杆螺母副,所述第一丝杆螺母副上端设有能使第一丝杆螺母副行进伸缩的电动马达装置;所述手摇式丝杆螺母抽拉装置包括一凹槽,所述凹槽内设有一底部带有手摇式丝杆螺母副的横板,所述横板活动端设有螺栓固定孔。1. A temporary access bridge for building, is characterized in that, comprises the first bridge body, the second bridge body and the 3rd bridge body that can be connected by bolt mutually, described first, second, the 3rd bridge body upper end is provided with There is a passage plate, the bottom of the first and third bridges is equipped with a screw nut drill device, and the left end of the first bridge and the right end of the third bridge are equipped with hand-operated screw nuts for pulling device; the screw nut drill device includes a first screw nut pair with a drill bit at the bottom, and the upper end of the first screw nut pair is provided with an electric motor device that enables the first screw nut pair to travel and expand; The hand-operated screw nut pulling device includes a groove, and a horizontal plate with a hand-operated screw nut pair at the bottom is arranged in the groove, and a bolt fixing hole is provided at the movable end of the horizontal plate.
CN201510128043.2A 2015-03-23 2015-03-23 Temporary passing bridge for construction Expired - Fee Related CN104727215B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510128043.2A CN104727215B (en) 2015-03-23 2015-03-23 Temporary passing bridge for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510128043.2A CN104727215B (en) 2015-03-23 2015-03-23 Temporary passing bridge for construction

Publications (2)

Publication Number Publication Date
CN104727215A true CN104727215A (en) 2015-06-24
CN104727215B CN104727215B (en) 2017-02-01

Family

ID=53451578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510128043.2A Expired - Fee Related CN104727215B (en) 2015-03-23 2015-03-23 Temporary passing bridge for construction

Country Status (1)

Country Link
CN (1) CN104727215B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105220610A (en) * 2015-10-26 2016-01-06 中国海洋石油总公司 A kind of for the new trestle between offshore oil platform
CN111305036A (en) * 2020-03-31 2020-06-19 山东华邦建设集团有限公司 Combined roof pipeline trestle
CN111560832A (en) * 2020-05-18 2020-08-21 河南建筑职业技术学院 Steel frame bridge structure of concatenation fast

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2156249A1 (en) * 1971-11-12 1973-05-17 Kloeckner Humboldt Deutz Ag MOBILE BRIDGE LAYING DEVICE
CN2554221Y (en) * 2002-06-24 2003-06-04 徐杰 Quick assembling bridge
GB2362630B (en) * 2000-05-23 2004-04-07 Rodney Philpin A modular ramp
WO2010134735A2 (en) * 2009-05-22 2010-11-25 Park Jungkeuk Mobile multipurpose temporary bridge
US20120031017A1 (en) * 2005-07-22 2012-02-09 Stroyer Benjamin G Boardwalk, deck and platform system
CN203583346U (en) * 2013-10-28 2014-05-07 沈宝山 Highway quick clearing device
CN203729194U (en) * 2013-12-04 2014-07-23 国网河南省电力公司驻马店供电公司 Height-adjustable temporary passage bridge for cable trench with fixing rotary head

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2156249A1 (en) * 1971-11-12 1973-05-17 Kloeckner Humboldt Deutz Ag MOBILE BRIDGE LAYING DEVICE
GB2362630B (en) * 2000-05-23 2004-04-07 Rodney Philpin A modular ramp
CN2554221Y (en) * 2002-06-24 2003-06-04 徐杰 Quick assembling bridge
US20120031017A1 (en) * 2005-07-22 2012-02-09 Stroyer Benjamin G Boardwalk, deck and platform system
WO2010134735A2 (en) * 2009-05-22 2010-11-25 Park Jungkeuk Mobile multipurpose temporary bridge
CN203583346U (en) * 2013-10-28 2014-05-07 沈宝山 Highway quick clearing device
CN203729194U (en) * 2013-12-04 2014-07-23 国网河南省电力公司驻马店供电公司 Height-adjustable temporary passage bridge for cable trench with fixing rotary head

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105220610A (en) * 2015-10-26 2016-01-06 中国海洋石油总公司 A kind of for the new trestle between offshore oil platform
CN105220610B (en) * 2015-10-26 2017-03-22 中国海洋石油总公司 Novel trestle used between offshore oil platforms
CN111305036A (en) * 2020-03-31 2020-06-19 山东华邦建设集团有限公司 Combined roof pipeline trestle
CN111560832A (en) * 2020-05-18 2020-08-21 河南建筑职业技术学院 Steel frame bridge structure of concatenation fast

Also Published As

Publication number Publication date
CN104727215B (en) 2017-02-01

Similar Documents

Publication Publication Date Title
CN109457800B (en) Assembled concrete column connection node
CN104727215B (en) Temporary passing bridge for construction
CN105064510A (en) Prefabricated concrete external wall plate connecting device
JP2015113703A (en) Energy-dissipating junction assembly and aseismic structure using the same
CN209339309U (en) A prefabricated concrete column-to-column connection node
CN204435195U (en) A kind of facade asymmetric space arch arch bridge structure
CN106013158A (en) Aluminum alloy formwork one-edge formwork-supporting device
CN104005487A (en) Self-resetting and prestressed buckling-restrained brace of I-shaped angle steel assembled-type steel structure
CN201649308U (en) A wood base beam socket type original bamboo column foundation
CN204384761U (en) A kind of bridge construction tower crane pile foundation sustaining wall
CN111893902A (en) End butt structure of swivel bridge
CN204299181U (en) A kind of the fixed support that plate hangs mould falls
CN209114620U (en) A kind of connection structure for the connection of assembled dry construction shear wall
CN203769665U (en) Detachable folding type vertical sleeving derrick
CN202543907U (en) Operating platform for concreting construction of cast-in-place pile or concrete-filled steel tube column
CN204343670U (en) Concrete construction insulated column artificial eye fixed structure
CN103967157A (en) Tubular single plate self-resetting prestressing anti-buckling support for assembled steel structure
CN204626633U (en) A kind of basement shrinkage joint joint structure and apply the basement of this structure
CN204299072U (en) The two badly bleeding stair of a kind of two circular hollow steel column supporting
CN203878968U (en) Connecting structure between scaffold and main body structure
CN211850023U (en) A modular building prestressed tenon joint structure
CN220335720U (en) Structure reinforcing device for road bridge engineering
CN205677354U (en) A municipal engineering safety fence
CN206328658U (en) A kind of concrete floor power transmission connection structure
CN205822469U (en) Girder steel and concrete peg shear connections structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant