CN104727215A - Temporary passing bridge for construction - Google Patents
Temporary passing bridge for construction Download PDFInfo
- Publication number
- CN104727215A CN104727215A CN201510128043.2A CN201510128043A CN104727215A CN 104727215 A CN104727215 A CN 104727215A CN 201510128043 A CN201510128043 A CN 201510128043A CN 104727215 A CN104727215 A CN 104727215A
- Authority
- CN
- China
- Prior art keywords
- screw nut
- bridge
- hand
- nut pair
- bridge body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/12—Portable or sectional bridges
- E01D15/133—Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种建筑用临时通行桥,包括第一、第二、第三桥体,第一、第二、第三桥体上端设有通行平板,第一、第三桥体的底部设有丝杆螺母钻头装置,并且第一桥体左端和第三桥体右端均设有手摇式丝杆螺母抽拉装置;所述丝杆螺母钻头装置包括一底部带有钻头的第一丝杆螺母副,所述第一丝杆螺母副上端设有能使第一丝杆螺母副行进伸缩的电动马达装置;所述手摇式丝杆螺母抽拉装置包括一凹槽,所述凹槽内设有一底部带有手摇式丝杆螺母副的横板,所述横板活动端设有螺栓固定孔;本发明通过拼接以及横向、纵向的丝杆螺母系统,使得桥梁的安装方式以及与河底的连接方式得以大大简化,而且安全牢固。
The invention discloses a temporary passage bridge for construction, which comprises first, second and third bridge bodies. There is a screw nut drill device, and the left end of the first bridge body and the right end of the third bridge body are equipped with a hand-operated screw nut pulling device; the screw nut drill device includes a first screw rod with a drill bit at the bottom Nut pair, the upper end of the first screw nut pair is provided with an electric motor device that can make the first screw nut pair travel and expand; the hand-operated screw nut pulling device includes a groove, and the groove There is a horizontal plate with a hand-operated screw nut pair at the bottom, and a bolt fixing hole is provided at the movable end of the horizontal plate; the present invention makes the installation method of the bridge and the connection with the river through splicing and horizontal and vertical screw nut systems. The connection method of the bottom can be greatly simplified, and it is safe and firm.
Description
技术领域technical field
本发明涉及一种建筑通行装置,尤其涉及一种建筑用临时通行桥。The invention relates to a building passing device, in particular to a temporary building passing bridge.
背景技术Background technique
在一些宽度较小的河上建设桥梁时,有时候出于临时通行的需要,须在在建桥梁附近架设一座临时通行用桥梁,该桥梁同时还可用于辅助桥梁建设之用,通常的做法是架设一座用木头或竹编而成的简易桥梁,待正式桥梁建好后即行拆除,但同时,这样的桥梁的安全隐患也是比较大的,尤其是遇到河水经常涨落的河流,安全隐患就更大。When building bridges on some rivers with small widths, sometimes due to the needs of temporary traffic, a temporary bridge for traffic must be erected near the bridge under construction. The bridge can also be used for auxiliary bridge construction. The usual way is to erect A simple bridge made of wood or bamboo will be dismantled after the formal bridge is built, but at the same time, the safety hazards of such a bridge are relatively large, especially in rivers where the river water often fluctuates. .
发明内容Contents of the invention
本发明就是针对上述问题,提出一种建筑用临时通行桥,该临时通行桥安装简单,使用牢固,安全度也大大提高。The present invention aims at the above problems and proposes a temporary access bridge for construction. The temporary access bridge is simple to install, firm to use and greatly improved in safety.
为达到上述技术目的,本发明采用了一种建筑用临时通行桥,包括能相互通过螺栓连接的第一桥体、第二桥体和第三桥体,所述第一、第二、第三桥体上端设有通行平板,所述第一、第三桥体的底部设有丝杆螺母钻头装置,并且所述第一桥体的左端和第三桥体的右端均设有手摇式丝杆螺母抽拉装置;所述丝杆螺母钻头装置包括一底部带有钻头的第一丝杆螺母副,所述第一丝杆螺母副上端设有能使第一丝杆螺母副行进伸缩的电动马达装置;所述手摇式丝杆螺母抽拉装置包括一凹槽,所述凹槽内设有一底部带有手摇式丝杆螺母副的横板,所述横板活动端设有螺栓固定孔。In order to achieve the above-mentioned technical purpose, the present invention adopts a kind of temporary access bridge for construction, including the first bridge body, the second bridge body and the third bridge body which can be connected with each other by bolts, the first, second and third bridge bodies The upper end of the bridge body is provided with a passage plate, the bottoms of the first and third bridge bodies are provided with screw nut drill devices, and the left end of the first bridge body and the right end of the third bridge body are equipped with hand-operated screw nuts. Rod nut pulling device; the screw nut drill device includes a first screw nut pair with a drill bit at the bottom, and the upper end of the first screw nut pair is provided with an electric motor that can make the first screw nut pair travel and expand. Motor device; the hand-operated screw nut pulling device includes a groove, and a horizontal plate with a hand-operated screw nut pair at the bottom is arranged in the groove, and the movable end of the horizontal plate is fixed with a bolt hole.
本发明通过拼接以及横向、纵向的丝杆螺母系统,使得桥梁的安装方式以及与河底的连接方式得以大大简化,而且安全牢固。The present invention greatly simplifies the installation mode of the bridge and the connection mode with the river bottom through splicing and horizontal and vertical screw nut systems, and is safe and firm.
附图说明Description of drawings
图1所示的是本发明外观结构示意图;What Fig. 1 shows is the schematic diagram of appearance structure of the present invention;
其中,1、第一桥体;2、第二桥体;3、第三桥体;4、通行平板;5、钻头;6、第一丝杆螺母副;7、电动马达装置;8、凹槽;9、手摇式丝杆螺母副;10、横板;11、螺栓固定孔。Among them, 1. The first bridge body; 2. The second bridge body; 3. The third bridge body; 4. The passage plate; 5. The drill bit; 6. The first screw nut pair; Groove; 9, hand screw nut pair; 10, horizontal plate; 11, bolt fixing hole.
具体实施方式Detailed ways
下面结合附图和具体实施方式对本发明作进一步详细地说明。The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
由图1可知,一种建筑用临时通行桥,包括能相互通过螺栓连接的第一桥体1、第二桥体2和第三桥体3,在第一桥体1、第二桥体2、第三桥体3上端设有通行平板4,在第一桥体1、第三桥体3的底部设有丝杆螺母钻头装置,并且在第一桥体1左端和第三桥体3的右端均设有手摇式丝杆螺母抽拉装置;As can be seen from Fig. 1, a temporary access bridge for construction includes a first bridge body 1, a second bridge body 2 and a third bridge body 3 which can be connected to each other by bolts. , the upper end of the third bridge body 3 is provided with a passage plate 4, the bottom of the first bridge body 1 and the third bridge body 3 is provided with a screw nut drill device, and at the left end of the first bridge body 1 and the third bridge body 3 The right end is equipped with a hand-operated screw nut pulling device;
在本发明中,优选的丝杆螺母钻头装置包括一底部带有钻头5的第一丝杆螺母副6,在第一丝杆螺母副6的上端设有能使第一丝杆螺母副6行进伸缩的电动马达装置7。In the present invention, the preferred screw nut drill device includes a first screw nut pair 6 with a drill bit 5 at the bottom, and an upper end of the first screw nut pair 6 is provided to enable the first screw nut pair 6 to advance. Telescopic electric motor unit 7 .
在本发明中,优选的手摇式丝杆螺母抽拉装置包括一凹槽8,在凹槽8内设有一底部带有手摇式丝杆螺母副9的横板10,在横板10的活动端设有螺栓固定孔11。In the present invention, the preferred hand-operated screw nut pulling device includes a groove 8, and a horizontal plate 10 with a hand-operated screw nut pair 9 at the bottom is provided in the groove 8. The movable end is provided with a bolt fixing hole 11 .
本发明具体是这样使用的:首先第一桥体1、第二桥体2和第三桥体3通过螺栓连接,第二桥体2在实际使用中可为一个或多个,如果桥面比较宽,则可用多个第二桥体2进行连接,如果桥面比较窄,则可用少量第二桥体进行连接;接着通过手摇式丝杆螺母副9将横板10向左右两侧延伸,同时采用螺栓通过螺栓固定孔11将横板10和河岸两端进行固定连接,最后启动电动马达装置7,将第一丝杆螺母副6连同底部的钻头5深深扎入河底,起到固定的作用,这样即完成临时通行桥的架设。The present invention is specifically used in this way: first, the first bridge body 1, the second bridge body 2 and the third bridge body 3 are connected by bolts, and the second bridge body 2 can be one or more in actual use. wide, then a plurality of second bridge bodies 2 can be used for connection; if the bridge deck is relatively narrow, a small amount of second bridge bodies can be used for connection; At the same time, bolts are used to fix the horizontal plate 10 and the two ends of the river bank through the bolt fixing holes 11, and finally the electric motor device 7 is started, and the first screw nut pair 6 and the drill bit 5 at the bottom are deeply inserted into the river bottom to play a role of fixing. In this way, the erection of the temporary access bridge is completed.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510128043.2A CN104727215B (en) | 2015-03-23 | 2015-03-23 | Temporary passing bridge for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510128043.2A CN104727215B (en) | 2015-03-23 | 2015-03-23 | Temporary passing bridge for construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104727215A true CN104727215A (en) | 2015-06-24 |
CN104727215B CN104727215B (en) | 2017-02-01 |
Family
ID=53451578
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510128043.2A Expired - Fee Related CN104727215B (en) | 2015-03-23 | 2015-03-23 | Temporary passing bridge for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104727215B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105220610A (en) * | 2015-10-26 | 2016-01-06 | 中国海洋石油总公司 | A kind of for the new trestle between offshore oil platform |
CN111305036A (en) * | 2020-03-31 | 2020-06-19 | 山东华邦建设集团有限公司 | Combined roof pipeline trestle |
CN111560832A (en) * | 2020-05-18 | 2020-08-21 | 河南建筑职业技术学院 | Steel frame bridge structure of concatenation fast |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2156249A1 (en) * | 1971-11-12 | 1973-05-17 | Kloeckner Humboldt Deutz Ag | MOBILE BRIDGE LAYING DEVICE |
CN2554221Y (en) * | 2002-06-24 | 2003-06-04 | 徐杰 | Quick assembling bridge |
GB2362630B (en) * | 2000-05-23 | 2004-04-07 | Rodney Philpin | A modular ramp |
WO2010134735A2 (en) * | 2009-05-22 | 2010-11-25 | Park Jungkeuk | Mobile multipurpose temporary bridge |
US20120031017A1 (en) * | 2005-07-22 | 2012-02-09 | Stroyer Benjamin G | Boardwalk, deck and platform system |
CN203583346U (en) * | 2013-10-28 | 2014-05-07 | 沈宝山 | Highway quick clearing device |
CN203729194U (en) * | 2013-12-04 | 2014-07-23 | 国网河南省电力公司驻马店供电公司 | Height-adjustable temporary passage bridge for cable trench with fixing rotary head |
-
2015
- 2015-03-23 CN CN201510128043.2A patent/CN104727215B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2156249A1 (en) * | 1971-11-12 | 1973-05-17 | Kloeckner Humboldt Deutz Ag | MOBILE BRIDGE LAYING DEVICE |
GB2362630B (en) * | 2000-05-23 | 2004-04-07 | Rodney Philpin | A modular ramp |
CN2554221Y (en) * | 2002-06-24 | 2003-06-04 | 徐杰 | Quick assembling bridge |
US20120031017A1 (en) * | 2005-07-22 | 2012-02-09 | Stroyer Benjamin G | Boardwalk, deck and platform system |
WO2010134735A2 (en) * | 2009-05-22 | 2010-11-25 | Park Jungkeuk | Mobile multipurpose temporary bridge |
CN203583346U (en) * | 2013-10-28 | 2014-05-07 | 沈宝山 | Highway quick clearing device |
CN203729194U (en) * | 2013-12-04 | 2014-07-23 | 国网河南省电力公司驻马店供电公司 | Height-adjustable temporary passage bridge for cable trench with fixing rotary head |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105220610A (en) * | 2015-10-26 | 2016-01-06 | 中国海洋石油总公司 | A kind of for the new trestle between offshore oil platform |
CN105220610B (en) * | 2015-10-26 | 2017-03-22 | 中国海洋石油总公司 | Novel trestle used between offshore oil platforms |
CN111305036A (en) * | 2020-03-31 | 2020-06-19 | 山东华邦建设集团有限公司 | Combined roof pipeline trestle |
CN111560832A (en) * | 2020-05-18 | 2020-08-21 | 河南建筑职业技术学院 | Steel frame bridge structure of concatenation fast |
Also Published As
Publication number | Publication date |
---|---|
CN104727215B (en) | 2017-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109457800B (en) | Assembled concrete column connection node | |
CN104727215B (en) | Temporary passing bridge for construction | |
CN105064510A (en) | Prefabricated concrete external wall plate connecting device | |
JP2015113703A (en) | Energy-dissipating junction assembly and aseismic structure using the same | |
CN209339309U (en) | A prefabricated concrete column-to-column connection node | |
CN204435195U (en) | A kind of facade asymmetric space arch arch bridge structure | |
CN106013158A (en) | Aluminum alloy formwork one-edge formwork-supporting device | |
CN104005487A (en) | Self-resetting and prestressed buckling-restrained brace of I-shaped angle steel assembled-type steel structure | |
CN201649308U (en) | A wood base beam socket type original bamboo column foundation | |
CN204384761U (en) | A kind of bridge construction tower crane pile foundation sustaining wall | |
CN111893902A (en) | End butt structure of swivel bridge | |
CN204299181U (en) | A kind of the fixed support that plate hangs mould falls | |
CN209114620U (en) | A kind of connection structure for the connection of assembled dry construction shear wall | |
CN203769665U (en) | Detachable folding type vertical sleeving derrick | |
CN202543907U (en) | Operating platform for concreting construction of cast-in-place pile or concrete-filled steel tube column | |
CN204343670U (en) | Concrete construction insulated column artificial eye fixed structure | |
CN103967157A (en) | Tubular single plate self-resetting prestressing anti-buckling support for assembled steel structure | |
CN204626633U (en) | A kind of basement shrinkage joint joint structure and apply the basement of this structure | |
CN204299072U (en) | The two badly bleeding stair of a kind of two circular hollow steel column supporting | |
CN203878968U (en) | Connecting structure between scaffold and main body structure | |
CN211850023U (en) | A modular building prestressed tenon joint structure | |
CN220335720U (en) | Structure reinforcing device for road bridge engineering | |
CN205677354U (en) | A municipal engineering safety fence | |
CN206328658U (en) | A kind of concrete floor power transmission connection structure | |
CN205822469U (en) | Girder steel and concrete peg shear connections structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170201 Termination date: 20180323 |