CN104711933A - 悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法 - Google Patents

悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法 Download PDF

Info

Publication number
CN104711933A
CN104711933A CN201510135527.XA CN201510135527A CN104711933A CN 104711933 A CN104711933 A CN 104711933A CN 201510135527 A CN201510135527 A CN 201510135527A CN 104711933 A CN104711933 A CN 104711933A
Authority
CN
China
Prior art keywords
segment
arch ring
arch
stiff skeleton
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510135527.XA
Other languages
English (en)
Inventor
王鹏
王丰华
易辉
张�杰
杨洋
王毅力
吴娇媚
杜欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Original Assignee
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Chongqing Communications Research and Design Institute Co Ltd filed Critical China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority to CN201510135527.XA priority Critical patent/CN104711933A/zh
Publication of CN104711933A publication Critical patent/CN104711933A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法,其特征在于,包括以下步骤:(1)采用悬臂浇筑法左右对称、分节段浇筑拱圈段,悬臂浇筑形成的拱圈段长度为拱圈全长的1/2-3/4,每节段重量不超过200吨,待前一个节段硬化7-10天后开始浇筑下一个节段;(2)经步骤(1)后形成顶部开口的拱圈段,在开口处搭设劲性骨架,劲性骨架的两端分别与左右的拱圈段连接;(3)分节段段浇筑劲性骨架段的混凝土,将劲性骨架包裹在混凝土内,至此形成了完整的拱圈。该施工方法,既能完成对200-400m跨径拱桥的施工,又能节约成本。

Description

悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法
技术领域
本发明涉及一种悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法。
背景技术
钢筋混凝土拱桥施工方法主要有支架施工法、缆索吊装法、悬臂浇筑法、转体施工法、劲性骨架法。
悬臂浇筑法是利用拱座墩或修建临时墩作为斜拉索的临时支撑,利用临时斜拉索扣住已浇筑好的拱圈节段,采用移动挂篮从拱脚开始向拱圈对称悬臂浇筑混凝土,直至拱顶合龙。劲性骨架法是在事先形成的桁式拱骨架上分段浇筑混凝土,最终形成钢筋混凝土拱。
缺点:(1)支架施工法施工周期长,施工期间需要中断桥下通行;(2)悬臂浇筑法由于斜拉索拉力有限等原因,限制了拱桥的跨径;(3)劲性骨架法施工工艺复杂,施工成本高,对混凝土浇筑质量难以控制;(4)悬臂浇筑等方法施工的钢筋混凝土拱桥最大跨径约为200m,采用劲性骨架法施工的拱桥跨径一般为400m左右,对于200m-400m之间跨径的拱桥,悬臂浇筑法难以实现,劲性骨架法成本太高。
发明内容
有鉴于此,本发明的目的是提供一种悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法,既能完成对200-400m跨径拱桥的施工,又能节约成本。
所述悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法,包括以下步骤:
(1)采用悬臂浇筑法左右对称、分节段浇筑拱圈段,悬臂浇筑形成的拱圈段长度为拱圈全长的1/2-3/4,每节段重量不超过200吨,待前一个节段硬化7-10天后开始浇筑下一个节段;
(2)经步骤(1)后形成顶部开口的拱圈段,在开口处搭设劲性骨架,劲性骨架的两端分别与左右的拱圈段连接;
(3)分节段段浇筑劲性骨架段的混凝土,将劲性骨架包裹在混凝土内,至此形成了完整的拱圈。
进一步,所述步骤(1)中,悬臂浇筑形成的左拱圈段和右拱圈段的长度均为拱圈全长的1/4。
进一步,所述步骤(1)中,待前一个节段硬化8天后开始浇筑下一个节段。
本发明的有益效果:
本发明的悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法,其特征在于,包括以下步骤:(1)采用悬臂浇筑法左右对称、分节段浇筑拱圈段,悬臂浇筑形成的拱圈段长度为拱圈全长的1/2-3/4,每节段重量不超过200吨,待前一个节段硬化7-10天后开始浇筑下一个节段;(2)经步骤(1)后形成顶部开口的拱圈段,在开口处搭设劲性骨架,劲性骨架的两端分别与左右的拱圈段连接;(3)分节段段浇筑劲性骨架段的混凝土,将劲性骨架包裹在混凝土内,至此形成了完整的拱圈。该施工方法,既能完成对200-400m跨径拱桥的施工,又能节约成本。
附图说明
图1为顶部开口的拱圈段的结构示意图;
图2为本实施方法获得的拱圈的结构示意图。
其中1为悬臂浇筑法形成的左拱圈段,2为悬臂浇筑法形成的右拱圈段,3为劲性骨架。
具体实施方式
下面结合实施例来更好的说明本发明。
实施例
该悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法,包括以下步骤:
(1)采用悬臂浇筑法左右对称、分节段浇筑拱圈段,悬臂浇筑形成的拱圈段长度为拱圈全长的1/2-3/4,每节段重量不超过200吨,待前一个节段硬化7-10天后开始浇筑下一个节段;此实施例中,悬臂浇筑形成的左拱圈段和右拱圈段的长度均为拱圈全长的1/4,待前一个节段硬化8天后开始浇筑下一个节段;
(2)如图1所示,经步骤(1)后形成顶部开口的拱圈段,在开口处搭设劲性骨架,劲性骨架的两端分别与左右的拱圈段连接;
(3)分节段段浇筑劲性骨架段的混凝土,将劲性骨架包裹在混凝土内,每节段混凝土不超过200吨,至此形成了完整如图2所示的拱圈。
该施工方法,既能完成对200-400m跨径拱桥的施工,又能节约成本。
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。

Claims (3)

1.一种悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法,其特征在于,包括以下步骤:
(1)采用悬臂浇筑法左右对称、分节段浇筑拱圈段,悬臂浇筑形成的拱圈段长度为拱圈全长的1/2-3/4,每节段重量不超过200吨,待前一个节段硬化7-10天后开始浇筑下一个节段;
(2)经步骤(1)后形成顶部开口的拱圈段,在开口处搭设劲性骨架,劲性骨架的两端分别与左右的拱圈段连接;
(3)分节段段浇筑劲性骨架段的混凝土,将劲性骨架包裹在混凝土内,至此形成了完整的拱圈。
2.根据权利要求1所述的施工方法,其特征在于,所述步骤(1)中,悬臂浇筑形成的左拱圈段和右拱圈段的长度均为拱圈全长的1/4。
3.根据权利要求1所述的施工方法,其特征在于,所述步骤(1)中,待前一个节段硬化8天后开始浇筑下一个节段。
CN201510135527.XA 2015-03-26 2015-03-26 悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法 Pending CN104711933A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510135527.XA CN104711933A (zh) 2015-03-26 2015-03-26 悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510135527.XA CN104711933A (zh) 2015-03-26 2015-03-26 悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法

Publications (1)

Publication Number Publication Date
CN104711933A true CN104711933A (zh) 2015-06-17

Family

ID=53411625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510135527.XA Pending CN104711933A (zh) 2015-03-26 2015-03-26 悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法

Country Status (1)

Country Link
CN (1) CN104711933A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178200A (zh) * 2015-08-27 2015-12-23 中交一公局第四工程有限公司 悬浇拱桥一号节段施工的斜拉组合支架施工方法
CN106702911A (zh) * 2017-01-25 2017-05-24 中铁大桥局集团有限公司 一种提篮拱桥拱肋节段的二次横移吊装施工系统及方法
CN108589535A (zh) * 2018-04-09 2018-09-28 中交第二航务工程局有限公司 一种钢筋混凝土箱型拱桥施工方法
CN111914458A (zh) * 2020-08-18 2020-11-10 重庆交通大学 一种钢筋混凝土拱桥拱圈线形控制方法
CN112560321A (zh) * 2020-12-29 2021-03-26 重庆交通大学 一种劲性骨架混凝土拱桥拱圈外包混凝土采用分环分段浇筑长度的计算方法
CN115992490A (zh) * 2023-03-23 2023-04-21 中铁十七局集团第五工程有限公司 一种大跨度混凝土拱桥斜拉扣挂悬臂浇筑施工方法
CN116356718A (zh) * 2023-04-13 2023-06-30 贵州省交通规划勘察设计研究院股份有限公司 一种悬臂浇筑大跨径钢筋混凝土拱桥的施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2129854A (en) * 1982-06-01 1984-05-23 Oestlandske Spennbetong Arrangement for casting in sections of a prestressed concrete bridge in accordance with the cantilever construction method
CN1293287A (zh) * 2000-10-03 2001-05-02 周志祥 由立柱竖转形成的八字型拱桥
CN101195987A (zh) * 2007-12-27 2008-06-11 中交第二航务工程局有限公司 斜拉桥中跨顶推辅助合龙工艺及梁段拉移组合装置
CN101864735A (zh) * 2010-07-16 2010-10-20 中铁二局股份有限公司 高速铁路斜拉连续刚构组合桥合拢段施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2129854A (en) * 1982-06-01 1984-05-23 Oestlandske Spennbetong Arrangement for casting in sections of a prestressed concrete bridge in accordance with the cantilever construction method
CN1293287A (zh) * 2000-10-03 2001-05-02 周志祥 由立柱竖转形成的八字型拱桥
CN101195987A (zh) * 2007-12-27 2008-06-11 中交第二航务工程局有限公司 斜拉桥中跨顶推辅助合龙工艺及梁段拉移组合装置
CN101864735A (zh) * 2010-07-16 2010-10-20 中铁二局股份有限公司 高速铁路斜拉连续刚构组合桥合拢段施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
万娇: "《重庆交通大学硕士学位论文》", 1 June 2013 *
陈宝春;黄卿维: "600 m跨径混凝土拱桥的试设计研究", 《中外公路》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178200A (zh) * 2015-08-27 2015-12-23 中交一公局第四工程有限公司 悬浇拱桥一号节段施工的斜拉组合支架施工方法
CN106702911A (zh) * 2017-01-25 2017-05-24 中铁大桥局集团有限公司 一种提篮拱桥拱肋节段的二次横移吊装施工系统及方法
CN106702911B (zh) * 2017-01-25 2019-04-26 中铁大桥局集团有限公司 一种提篮拱桥拱肋节段的二次横移吊装施工方法
CN108589535A (zh) * 2018-04-09 2018-09-28 中交第二航务工程局有限公司 一种钢筋混凝土箱型拱桥施工方法
CN108589535B (zh) * 2018-04-09 2020-07-03 中交第二航务工程局有限公司 一种钢筋混凝土箱型拱桥施工方法
CN111914458A (zh) * 2020-08-18 2020-11-10 重庆交通大学 一种钢筋混凝土拱桥拱圈线形控制方法
CN111914458B (zh) * 2020-08-18 2022-06-17 重庆交通大学 一种钢筋混凝土拱桥拱圈线形控制方法
CN112560321A (zh) * 2020-12-29 2021-03-26 重庆交通大学 一种劲性骨架混凝土拱桥拱圈外包混凝土采用分环分段浇筑长度的计算方法
CN115992490A (zh) * 2023-03-23 2023-04-21 中铁十七局集团第五工程有限公司 一种大跨度混凝土拱桥斜拉扣挂悬臂浇筑施工方法
CN115992490B (zh) * 2023-03-23 2023-06-06 中铁十七局集团第五工程有限公司 一种大跨度混凝土拱桥斜拉扣挂悬臂浇筑施工方法
CN116356718A (zh) * 2023-04-13 2023-06-30 贵州省交通规划勘察设计研究院股份有限公司 一种悬臂浇筑大跨径钢筋混凝土拱桥的施工方法

Similar Documents

Publication Publication Date Title
CN104711933A (zh) 悬臂浇筑和劲性骨架结合的钢筋混凝土拱桥施工方法
CN107119574B (zh) 一种拱肋桥主梁的悬臂施工方法
CN201526011U (zh) 组合式无支架浇筑连续刚构桥梁边跨现浇段及合龙段
CN204662279U (zh) 带防护体系的滚动式砼箱梁桥转体施工合拢吊架装置
CN106930194B (zh) 柱间系梁与墩柱整体成型施工方法及所用模板支架
CN105926444A (zh) 一种混凝土拱桥成拱方法
CN103882798A (zh) 一种钢管混凝土强劲骨架的钢筋混凝土拱桥及其施工方法
CN106223607B (zh) 一种单模施工的空心柱模板及其施工方法
CN207919748U (zh) 一种装配式高延性混凝土梁柱节点
CN106638313A (zh) 一种大型盖梁半预制施工技术方法
CN106113230B (zh) 用于梯段预制的非定型、可周转模板体系及其施工方法
CN109898425A (zh) 一种用斜拉扣挂悬臂浇筑混凝土拱桥拱圈的施工方法
CN106948504A (zh) 装配式墙板防渗止水竖向接缝结构及其施工方法
CN202659247U (zh) 隧道仰拱施工背模及其组合钢模
CN104314013B (zh) 一种极不对称组合梁的双悬臂施工方法
CN104153573B (zh) V型圆柱混凝土的浇筑模具及施工方法
CN107419670A (zh) 拱梁组合式连续刚构桥上弦行走式挂篮施工装置及方法
CN104295001B (zh) 变截面预应力斜梁的施工工艺
CN109826232A (zh) 地铁车站的施工方法
CN109137747A (zh) 一种用于大跨度拱桥主梁施工的弹性吊架
CN104213728A (zh) 体育馆看台斜梁及其施工工艺
CN107142834A (zh) 一种下承式钢管混凝土系杆拱桥拱脚钢管定位结构及其施工方法
CN106351128A (zh) 斜拉桥边跨主梁的施工方法
CN115976959A (zh) 梁式桥短边跨直线段与合龙段挂篮一次性悬浇方法
CN110184943A (zh) 一种多跨连续梁预应力砼桥合拢施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150617