[go: up one dir, main page]

CN104674627A - Joint construction method for preventing reflection cracks generated during spreading of asphalt on old concrete pavement - Google Patents

Joint construction method for preventing reflection cracks generated during spreading of asphalt on old concrete pavement Download PDF

Info

Publication number
CN104674627A
CN104674627A CN201510077194.XA CN201510077194A CN104674627A CN 104674627 A CN104674627 A CN 104674627A CN 201510077194 A CN201510077194 A CN 201510077194A CN 104674627 A CN104674627 A CN 104674627A
Authority
CN
China
Prior art keywords
asphalt
old
layer
horseshoe
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510077194.XA
Other languages
Chinese (zh)
Other versions
CN104674627B (en
Inventor
徐勋倩
瞿志军
陈德元
葛文璇
何长春
周海燕
苏秋明
汤天培
朱勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Shishen Industry and Trade Co Ltd
Original Assignee
Nantong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong University filed Critical Nantong University
Priority to CN201510077194.XA priority Critical patent/CN104674627B/en
Publication of CN104674627A publication Critical patent/CN104674627A/en
Application granted granted Critical
Publication of CN104674627B publication Critical patent/CN104674627B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/06Methods of making joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/35Toppings or surface dressings; Methods of mixing, impregnating, or spreading them

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

本发明涉及一种预防旧水泥路面加铺沥青反射裂缝的接缝构造方法,先对需要接缝加固的旧混凝土面板进行板间弯沉差测定,合格后,在两块旧混凝土面板的接缝处跨缝切割出等间距的条形凹槽,再使用冲击钻对条形凹槽端部进行垂直钻孔;根据孔深、凹槽长度和板间接缝宽度,弯起钢筋,完成马蹄筋成型;在条形凹槽内和端部竖孔内植入马蹄形钢筋后,向清孔后的钻孔内灌入环氧树脂植筋胶;以及拌合水泥碎石砼浇筑,浇筑入凹槽内形成植筋保护层;在两块旧混凝土面板的上层自下而上依次铺上数层保护罩面。本发明的优点在于:通过降低旧板板缝两侧的相对垂直位移,预防反射裂缝的产生和发展,进而减少或阻止旧水泥路面加铺沥青面层反射裂缝的出现。

The invention relates to a joint construction method for preventing asphalt reflection cracks on the old cement pavement. Firstly, the deflection difference between the plates is measured for the old concrete panels that need joint reinforcement. Cut strip-shaped grooves at equal intervals across the joints, and then use the impact drill to vertically drill the ends of the strip-shaped grooves; according to the depth of the hole, the length of the groove and the width of the joint between the plates, bend the steel bar to complete the forming of the horseshoe bar ; After the horseshoe-shaped steel bars are implanted in the strip grooves and the vertical holes at the ends, epoxy resin planting glue is poured into the drilled holes after the holes are cleared; Form a protective layer of planting bars; lay several layers of protective covers on the upper layers of the two old concrete panels from bottom to top. The invention has the advantages of preventing the occurrence and development of reflective cracks by reducing the relative vertical displacement on both sides of the old slab seam, thereby reducing or preventing the occurrence of reflective cracks in the asphalt surface layer added to the old cement road surface.

Description

一种预防旧水泥路面加铺沥青反射裂缝的接缝构造方法A Joint Construction Method for Preventing Asphalt Reflective Cracks Overlaid on Old Cement Pavement

技术领域 technical field

本发明涉及道路与交通工程技术领域,特别涉及一种预防旧水泥路面加铺沥青反射裂缝的接缝构造方法。 The invention relates to the technical field of road and traffic engineering, in particular to a joint construction method for preventing asphalt reflection cracks on old cement pavement.

背景技术 Background technique

水泥混凝土具有的良好的抗变形能力和水稳定性,19 世纪80、90 年代各地大量建设水泥混凝土路面。目前我国很多地区或城市道路中水泥混凝土路面面临维修改造,采用较多的旧水泥路面改造技术方案是旧水泥路面上加铺沥青罩面。 Cement concrete has good deformation resistance and water stability. In the 1880s and 1890s, a large number of cement concrete pavements were built in various places. At present, the cement concrete pavement in many areas or urban roads in our country is facing maintenance and renovation, and the old cement pavement reconstruction technical solution is to add asphalt overlay on the old cement pavement.

由于旧水泥路面加铺沥青罩面自身结构的特性,使用一段时间后,沥青加铺罩面层在车辆荷载和温度的作用下极易出现裂缝。造成加铺沥青面层反射裂缝的原因是旧水泥板的水平位移和在板缝两侧的相对垂直位移。板缝产生两侧垂直位移的原因是行车荷载。对于存在板底脱空的水泥混凝土路面,下层旧混凝土板块的接缝处,混凝土板快无法跟随基层变形,混凝土板块间不能协同工作。行车荷载作用下混凝土面层板接缝处将产生比较可观的附加应力,使结构处于不利受力状态。在行车荷载的反复作用下, 加铺层受到两种应力的反复作用, 因此随着时间延长, 加铺层对应裂缝位置的上下表面会出现反射裂缝, 并沿着结构厚度方向扩展,最终形成贯通整个加铺层的反射裂缝。对于没有出现脱空, 层间接触条件良好的加铺层路面, 行车荷载对反射裂缝的产生的影响不明显, 但对反射裂缝在加铺层中的扩展产生极大影响。水平位移是由环境温度及湿度变化引起的。季节的温度变化造成水泥板的收缩与膨胀, 昼夜的温度以及湿度变化都会造成就水泥板的变形, 从而引起水泥板接缝处的水平位移, 使加铺层在与旧水泥混凝土路面板接触位置处产生应力集中, 诱发加铺层层底反射裂缝的产生。随后在行车荷载的反复作用下, 裂缝逐渐沿厚度方向贯穿整个加铺层。水平位移的大小与板的大小有关, 板越大, 水平位移也越大。就旧水泥路面加铺沥青结构而言, 垂直位移应当是大部分水泥路面加铺沥青面层层反射裂缝产生并发展的主要原因。因此采用适当的方法最大程度上减小板间竖向相对位移是延缓反射裂缝出现的主要手段。 Due to the structural characteristics of the asphalt overlay on the old cement pavement, after a period of use, the asphalt overlay overlay is prone to cracks under the action of vehicle load and temperature. The cause of the reflective cracks in the overlay asphalt surface is the horizontal displacement of the old cement slab and the relative vertical displacement on both sides of the slab seam. The reason for the vertical displacement on both sides of the plate seam is the driving load. For the cement concrete pavement with voids at the bottom of the slab, at the joints of the old concrete slabs on the lower floor, the concrete slabs can hardly follow the deformation of the base layer, and the concrete slabs cannot work together. Under the action of traffic load, considerable additional stress will be generated at the joints of concrete surface slabs, which will put the structure in an unfavorable stress state. Under the repeated action of the traffic load, the overlay layer is subjected to repeated stresses of two kinds. Therefore, as time goes by, reflection cracks will appear on the upper and lower surfaces of the overlay layer corresponding to the crack positions, and expand along the thickness direction of the structure, finally forming a through Reflective cracks throughout the overlay. For the overlay pavement with no void and good interlayer contact conditions, the impact of traffic load on the generation of reflective cracks is not obvious, but it has a great impact on the expansion of reflective cracks in the overlay. Horizontal displacement is caused by changes in ambient temperature and humidity. Seasonal temperature changes cause the shrinkage and expansion of the cement board, and day and night temperature and humidity changes will cause the deformation of the cement board, which will cause the horizontal displacement of the cement board joints, so that the overlay layer will be in contact with the old cement concrete pavement. Stress concentration occurs at the place, which induces reflection cracks at the bottom of the overlay layer. Subsequently, under the repeated action of the traffic load, the cracks gradually penetrated the entire overlay layer along the thickness direction. The magnitude of the horizontal displacement is related to the size of the plate, the larger the plate, the greater the horizontal displacement. As far as the asphalt structure of the old cement pavement is concerned, the vertical displacement should be the main reason for the generation and development of reflection cracks in the asphalt surface layer of most cement pavements. Therefore, using appropriate methods to minimize the vertical relative displacement between plates is the main means to delay the occurrence of reflective cracks.

现有防止反射裂缝的技术措施主要集中在加铺层结构的设计,有:(1)加大沥青加铺层厚度;(2)加设土工格栅或土工布作为防水层;(3)利用被加筋材料的粘结嵌锁作用,增设网状加强筋;(4)增设应力吸收层,如设置开级配大粒径沥青碎石应力吸收层。方案(1)、(4)通过增加加铺层的厚度可以影响反射裂缝出现的位置和形态,却不能有效地减缓裂缝的扩展速度防止反射裂缝的产生和发展。同时,增加沥青加铺层厚度的方法一方面受到路面标高的限制,另一方面必将增加路面造价,而且在夏季高温情况下沥青混合料高温蠕变易产生车辙,也就失去了由于旧水泥混凝土板作基层所产生的强基薄面的优势。方案(2)、(3)对荷载型反射裂缝的效果有限,但施工工艺比较复杂,且不利于加铺复合结构的层间抗剪。 The existing technical measures to prevent reflection cracks mainly focus on the design of the overlay structure, including: (1) increasing the thickness of the asphalt overlay; (2) adding geogrid or geotextile as a waterproof layer; (3) using For the bonding and interlocking effect of the reinforced material, add mesh reinforcing ribs; (4) Add a stress-absorbing layer, such as setting an open-graded large-size asphalt macadam stress-absorbing layer. Schemes (1) and (4) can affect the position and shape of reflective cracks by increasing the thickness of the overlay layer, but they cannot effectively slow down the crack propagation speed and prevent the occurrence and development of reflective cracks. At the same time, the method of increasing the thickness of the asphalt overlay layer is limited by the elevation of the pavement on the one hand, and will increase the cost of the pavement on the other hand. In addition, in the case of high temperature in summer, the high-temperature creep of the asphalt mixture is easy to produce ruts, and it loses the old cement. The advantages of the strong base and thin surface produced by using concrete slabs as the base. Schemes (2) and (3) have limited effects on load-type reflective cracks, but the construction technology is relatively complicated, and it is not conducive to the interlayer shear resistance of the overlay composite structure.

水泥混凝土路面板块间设置接缝是为了消除温度变化所引起的温度应力,防止温度变化所产生的路面损坏,但是从水泥凝土路面板承受荷载的角度来看,板间接缝的存在削弱了混凝土板的整体性,特别是在车轮荷载行驶经过板间接缝时,板缝两侧的相对垂直位移越大,旧水泥板块的应力集中越明显,反射裂缝病害也越严重。 The purpose of setting joints between cement concrete pavement slabs is to eliminate the temperature stress caused by temperature changes and prevent pavement damage caused by temperature changes. Especially when the wheel load passes through the joint between plates, the greater the relative vertical displacement on both sides of the joint, the more obvious the stress concentration of the old cement plate, and the more serious the reflection crack disease.

行车荷载的反复作用是旧水泥路面沥青加铺结构反射裂缝出现的重要诱因. 数值计算分析结果发现,在车辆荷载作用过程中, 原水泥路面接缝处两侧板边弯沉差过大导致沥青层底面应力过大而开裂, 而后裂缝向加铺层表面扩展形成路表裂缝. 针对沥青加铺层的这种破坏模式, 设计时应将重点放在对原水泥路面弯沉差和平均弯沉的控制上. 在不同加铺层厚度情况下, 随弯沉差变化, 加铺层底面接缝处剪应力有基本相同的变化规律。 即弯沉差较小, 随弯沉差增大, 面层剪应力迅速增加; 当弯沉差增加到一定程度以后, 剪应力呈现缓慢增加趋势. 这种变化规律说明, 加铺沥青层时, 若原水泥路面接缝处传荷情况非常好, 沥青加铺层反射裂缝开裂寿命主要依赖原水泥路面接缝处传荷能力衰减的速率; 若弯沉差处于较高水平, 那么沥青加铺层的剪应力从开始加铺就处于持续较高的水平, 反射裂缝出现的速率就会比较快, 此时加铺层的开裂寿命主要依赖于加铺层的厚度。但通过增加加铺层的厚度来延缓剪切型反射裂缝的出现是不经济的。因此, 加铺沥青层之前严格控制原水泥路面接缝处弯沉差是延缓反射裂缝出现的最有效措施。 The repeated action of traffic load is an important cause of reflection cracks in the old cement pavement asphalt overlay structure. Numerical calculation and analysis results show that during the process of vehicle load, the deflection difference of the two sides of the original cement pavement joint is too large, resulting in asphalt The stress on the bottom surface of the asphalt layer is too large and cracks, and then the cracks spread to the surface of the overlay layer to form cracks on the road surface. For this failure mode of the asphalt overlay layer, the design should focus on the deflection difference and average deflection of the original cement pavement In terms of control. Under the condition of different overlay layer thicknesses, the shear stress at the bottom joint of the overlay layer has basically the same variation law as the deflection difference changes. That is, the deflection difference is small, and as the deflection difference increases, the shear stress of the surface layer increases rapidly; when the deflection difference increases to a certain extent, the shear stress shows a slow increasing trend. This change law shows that when the asphalt layer is added, If the load transfer at the joints of the original cement pavement is very good, the cracking life of the reflective cracks of the asphalt overlay mainly depends on the decay rate of the load transfer capacity at the joints of the original cement pavement; if the deflection difference is at a high level, then the asphalt overlay The shear stress is at a high level continuously from the beginning of the overlay, and the rate of reflection cracks will be faster. At this time, the cracking life of the overlay mainly depends on the thickness of the overlay. However, it is uneconomical to delay the occurrence of shear-type reflective cracks by increasing the thickness of the overlay. Therefore, strictly controlling the deflection difference at the joints of the original cement pavement before laying the asphalt layer is the most effective measure to delay the occurrence of reflective cracks.

发明内容 Contents of the invention

本发明要解决的技术问题是提供一种预防旧水泥路面加铺沥青反射裂缝的接缝构造方法,以控制原水泥路面接缝处弯沉差,防止和减缓旧水泥路面加铺沥青罩面反射裂缝的出现。 The technical problem to be solved by the present invention is to provide a joint construction method for preventing asphalt reflection cracks on the old cement pavement, so as to control the deflection difference at the joints of the original cement pavement, prevent and slow down the reflection of the old cement pavement overlaying asphalt overlay The appearance of cracks.

为解决上述技术问题,本发明的技术方案为:一种预防旧水泥路面加铺沥青反射裂缝的接缝构造方法,其特征在于,所述步骤为: In order to solve the above-mentioned technical problems, the technical solution of the present invention is: a joint construction method for preventing old cement pavement overlaying asphalt reflection cracks, characterized in that, the steps are:

a)  旧混凝土面板的弯沉预处理:对需要接缝加固的两块旧混凝土面板进行板间弯沉差测定,挑选出弯沉差测定超0.04mm以上的旧混凝土面板; a) Deflection pretreatment of old concrete panels: measure the deflection difference between the two old concrete panels that need joint reinforcement, and select the old concrete panels whose deflection difference exceeds 0.04mm;

b)  植筋预处理: 对弯沉差测定值在0.04mm以上的旧混凝土面板进行植筋预处理,在两块旧混凝土面板接缝处的车辆荷载作用附加应力集中区域跨缝切割出等间距的条形凹槽,并将各条形凹槽定为植筋部位;对条形凹槽端部进行垂直钻孔,且该孔一直延伸至位于旧水泥混凝土面板下端基层的内部,形成垂直方向的钻孔; b) Reinforcement pretreatment: Carry out rebar pretreatment for the old concrete panels whose measured deflection difference is above 0.04mm, and cut out equal intervals across the joints of the additional stress concentration area of the vehicle load at the joint of the two old concrete panels The strip-shaped grooves, and each strip-shaped groove is defined as the planting bar; the end of the strip-shaped groove is vertically drilled, and the hole extends to the inside of the base layer at the lower end of the old cement concrete panel, forming a vertical direction drilling;

c)  清理:利用吹风机对条形凹槽以及钻孔进行吹扫进行清槽、清孔处理; c) Cleaning: Use a blower to blow the strip grooves and drilled holes to clean the grooves and holes;

d)  马蹄形钢筋成型:根据孔深、凹槽长度和板间接缝宽度,将螺纹钢筋两端折弯成马蹄形,完成马蹄形钢筋成型; d) Forming of horseshoe-shaped steel bar: According to the depth of the hole, the length of the groove and the width of the joint between the plates, bend the two ends of the threaded steel bar into a horseshoe shape to complete the forming of the horseshoe-shaped steel bar;

e)  植筋:沿着条形凹槽方向垂直植入马蹄形钢筋,马蹄形钢筋两端折弯部分插入钻孔内; e) Rebar planting: vertically implant horseshoe-shaped steel bars along the direction of the strip groove, and insert the bent parts at both ends of the horseshoe-shaped steel bars into the drilled holes;

f)  灌胶:向钻孔内灌入环氧树脂植筋胶,直至孔深的2/3位置处; f) Glue filling: pour epoxy resin planting glue into the drilled hole until it reaches 2/3 of the hole depth;

g)  植筋保护层制作:拌合水泥碎石浇筑进条形凹槽内并封堵钻孔,最终形成植筋保护层,并养护; g) Production of reinforcement protection layer: mix cement gravel and pour it into the strip groove and seal the drill holes, finally form the protection layer of reinforcement and maintain it;

h)  后续沥青加铺罩面结构:在两块旧混凝土面板的上层自下而上依次铺上乳化沥青透层油层、沥青碎石纤维封层、粗粒式沥青砼层、乳化沥青粘层油层、中粒式沥青砼层、乳化沥青粘层、沥青玛蹄脂碎石层。 h) Subsequent asphalt overlay structure: Lay emulsified asphalt oil layer, asphalt gravel fiber seal layer, coarse-grained asphalt concrete layer, and emulsified asphalt sticky layer oil layer on the upper layer of the two old concrete panels in sequence from bottom to top , Medium-grain asphalt concrete layer, emulsified asphalt sticky layer, asphalt mastic macadam layer.

优选的,所述步骤a中对于弯沉差测定值超过0.06mm的旧混凝土面板,在进行步骤b前进行板灌浆处理;灌浆材料选用水泥砂浆,抗压强度≥15Mpa,水泥砂浆的级配组成为:水泥:水=1.0:5, 再以水泥砂浆总质量为基准,添加铝粉0.001wt%,早强剂0.01wt%。 Preferably, in the step a, for the old concrete panels whose measured deflection difference exceeds 0.06mm, grouting is performed before step b; the grouting material is cement mortar with compressive strength ≥ 15Mpa, and the gradation composition of cement mortar is It is: cement: water = 1.0:5, then based on the total mass of cement mortar, add 0.001wt% of aluminum powder and 0.01wt% of early strength agent.

优选的,所述步骤b中,条形凹槽切割方向为平行于旧混凝土面板上车辆行驶的方向,其纵向长度为旧混凝土面板长边的1/25,宽度与马蹄形钢筋的直径相配,深度为旧混凝土面板厚度的1/3-1/4,相邻的条形凹槽之间的间距为100-120cm,最外侧的条形凹槽距离旧混凝土面板板边为30-45cm。 Preferably, in the step b, the cutting direction of the strip-shaped groove is parallel to the driving direction of the vehicle on the old concrete panel, its longitudinal length is 1/25 of the long side of the old concrete panel, the width matches the diameter of the horseshoe-shaped steel bar, and the depth It is 1/3-1/4 of the thickness of the old concrete panel, the distance between adjacent strip grooves is 100-120cm, and the distance between the outermost strip groove and the edge of the old concrete panel is 30-45cm.

优选的,所述步骤b中,钻孔的直径比马蹄筋直径大4-6mm,钻孔伸入旧水泥混凝土面板下端基层4-6cm。 Preferably, in the step b, the diameter of the drilled hole is 4-6mm larger than that of the horseshoe tendon, and the drilled hole extends 4-6cm into the base layer at the lower end of the old cement concrete panel.

优选的,所述步骤d中,马蹄形钢筋为直径20-35mm的螺纹钢筋, 马蹄形钢筋总长 L筋=L条+2*H板+2*5cm+L缝,其中,L条为条形凹槽的长度,H板为旧混凝土面板板厚,L缝为两旧混凝土面板之间板缝宽度,马蹄形钢筋植入旧混凝土面板底部基层的深度3-5cm。 Preferably, in the step d, the horseshoe-shaped steel bar is a threaded steel bar with a diameter of 20-35mm, the total length of the horseshoe-shaped steel bar L bar=L bar+2*H plate+2*5cm+L seam, wherein, the L bar is a strip groove The H plate is the thickness of the old concrete panel, the L joint is the width of the plate gap between the two old concrete panels, and the depth of the horseshoe-shaped steel bar implanted in the base layer at the bottom of the old concrete panel is 3-5cm.

优选的,所述步骤g中,沥青碎石纤维封层厚度为0.8cm,粗粒式沥青砼层厚度为8cm,中粒式沥青砼层厚度为5cm,高粘度沥青玛蹄脂碎石层厚度为4cm;所述粗粒式沥青砼保护层采用的标号是AC-25C、中粒式沥青砼保护层中采用的标号是AC-16C,高粘度沥青玛蹄脂碎石层中采用的标号是SMA-13。 Preferably, in the step g, the thickness of the asphalt macadam fiber seal layer is 0.8cm, the thickness of the coarse-grained asphalt concrete layer is 8cm, the thickness of the medium-grained asphalt concrete layer is 5cm, and the thickness of the high-viscosity asphalt mastic macadam layer is It is 4cm; The label adopted in the coarse-grained asphalt concrete protective layer is AC-25C, the label adopted in the medium-grained asphalt concrete protective layer is AC-16C, and the label adopted in the high-viscosity asphalt mastic macadam layer is SMA-13.

本发明的优点在于:通过在两块旧混凝土路面板的接缝处之间植入马蹄形螺纹钢筋,能够和旧混凝土路面板紧密粘接在一起,形成“栓锁”效应,一方面可以控制旧混凝土路面板接缝处裂痕的宽度,另一方面有效抑制板间裂缝向上部沥青加铺层扩展,降低旧板板缝两侧的相对垂直位移,预防反射裂缝的产生和发展,进而减少或阻止加铺沥青面层反射裂缝的出现 。 The advantage of the present invention is that: by implanting horseshoe-shaped threaded steel bars between the joints of two old concrete road slabs, it can be closely bonded with the old concrete road slabs to form a "bolt-lock" effect. On the one hand, it can control the old On the other hand, it can effectively inhibit the cracks between the slabs from spreading to the upper asphalt overlay layer, reduce the relative vertical displacement on both sides of the old slab slab joints, prevent the occurrence and development of reflective cracks, and then reduce or prevent Overlay asphalt surfacing reflects the appearance of cracks.

在旧水泥路面上还加铺沥青碎石纤维封层、粗粒式沥青砼、中粒式沥青砼保护层、高粘度沥青玛蹄脂碎石面层及改性乳化沥青粘结层,通过加强旧水泥路面板块间接缝的防水、层间粘结性以及弯沉性能,从而实现预防旧水泥路面加铺沥青铺面反射裂缝的目的。 On the old cement pavement, asphalt macadam fiber seal layer, coarse-grained asphalt concrete, medium-grained asphalt concrete protective layer, high-viscosity asphalt mastic macadam surface layer and modified emulsified asphalt bonding layer are added. The waterproof, interlayer cohesion and deflection performance of the joints between the old cement pavement slabs, so as to prevent the reflective cracks of the asphalt pavement on the old cement pavement.

本方法在进行植筋前,先对旧混凝土路面板的弯沉差进行测定,对测定值在0.04-0.06mm的旧混凝土路面板进行植筋,而对于测定值超过0.06mm的旧混凝土路面板先进行板灌浆处理后再植筋,通过上述处理,从而保证待植筋的旧混凝土路面板的强度,确保植筋的有效进行。 In this method, the deflection difference of the old concrete road slab is measured before the reinforcement is planted, and the old concrete road slab with a measured value of 0.04-0.06mm is planted with reinforcement, and the old concrete road slab with a measured value exceeding 0.06mm The slab grouting treatment is carried out before the bars are planted. Through the above treatment, the strength of the old concrete road slab to be planted with bars is ensured, and the bar planting is effectively carried out.

对条形凹槽的长度、宽度和间距,马蹄形钢筋的直径、长度,沥青碎石纤维封层的厚度等这些数据进行合理的设计,以确保最大限度的防止和减缓旧水泥路面加铺沥青罩面反射裂缝的出现。 The length, width and spacing of strip grooves, the diameter and length of horseshoe-shaped steel bars, the thickness of asphalt macadam fiber seal, etc., should be reasonably designed to ensure maximum prevention and slowdown of asphalt cover on old cement pavement Surface reflection cracks appear.

在垂直钻孔孔壁、凹槽槽壁与马蹄形钢筋之间的间隙中填充环氧树脂固结胶及水泥碎石保护层,环氧树脂胶层增强了马蹄形钢筋协同工作性能,而水泥碎石保护层保护并加强了马蹄形钢筋的结构。 Fill the gap between the vertical drilling hole wall, the groove wall and the horseshoe-shaped steel bar with epoxy resin consolidation glue and cement gravel protective layer. The cover protects and strengthens the structure of the horseshoe rebar.

附图说明 Description of drawings

图1为本发明的预防旧水泥路面加铺沥青反射裂缝的接缝构造方法的植筋平面布置位置示意图。 Fig. 1 is the schematic diagram of the planar layout position of the planting bar of the joint construction method for preventing old cement pavement overlaying asphalt reflection cracks of the present invention.

图2为本发明的预防旧水泥路面加铺沥青反射裂缝的接缝构造方法的接缝处构造布置示意图。 Fig. 2 is a schematic diagram of the joint structure layout of the joint construction method for preventing asphalt reflection cracks on the old cement pavement overlay of the present invention.

具体实施方式 Detailed ways

实施例1 Example 1

本实施例中,首先旧混凝土面板的弯沉预处理,对需要接缝加固的两块旧混凝土面板进行板间弯沉差测定,挑选出弯沉差测定超0.04-0.06mm之间的旧混凝土面板。 In this embodiment, first, the deflection pretreatment of the old concrete panels is carried out, and the deflection difference between the two old concrete panels that need joint reinforcement is measured, and the old concrete with a deflection difference exceeding 0.04-0.06mm is selected. panel.

对于弯沉差在0.04-0.06mm之间的旧混凝土面板,其面加铺沥青反射裂缝的接缝构造方法通过以下几个步骤实现: For old concrete panels with a deflection difference between 0.04-0.06mm, the joint construction method of paving asphalt reflective cracks on the surface is realized through the following steps:

第一步,植筋预处理:在两块旧混凝土面板8的接缝处的车辆荷载作用附加应力集中区域跨缝切割出等间距的条形凹槽13,该条形凹槽13即为植筋部位,再使用冲击钻对条形凹槽13的端部进行垂直钻孔,且该孔一直延伸至位于旧混凝土面板8下端的基层9的内部,形成垂直方向的钻孔。 The first step, the pretreatment of planting reinforcement: in the joint of the two old concrete panels 8, the additional stress concentration area of the vehicle load acts on the joint and cuts out strip grooves 13 at equal intervals across the joint, and the strip grooves 13 are the planting Rib position, use impact drill to carry out vertical drilling to the end of strip groove 13 again, and this hole extends to be positioned at the inside of base 9 at the lower end of old concrete panel 8 all the time, forms the drilling of vertical direction.

条形凹槽13的结构具体如示意图1所示,条形凹槽切割方向为平行于旧混凝土面板上车辆行驶的方向,条形凹槽13的长度为旧混凝土面板板块长边的1/25,条形凹槽13的宽度与马蹄形钢筋的直径相配,条形凹槽13的深度为旧混凝土面板厚度的1/3-1/4, The structure of the strip groove 13 is specifically shown in schematic diagram 1. The cutting direction of the strip groove is parallel to the direction of the vehicle on the old concrete panel, and the length of the strip groove 13 is 1/25 of the long side of the old concrete panel plate , the width of the strip groove 13 matches the diameter of the horseshoe steel bar, and the depth of the strip groove 13 is 1/3-1/4 of the thickness of the old concrete panel,

有限元分析和实验结果表明,旧混凝土面板行车荷载影响最不利位置为靠近板边缘位置为板跨度1/10,也就是说真正起到防护作用的主要是在板边缘区域;就植筋间距及数量而言,植筋越密集对板的削弱越明显,植筋数量过多既浪费材料又费工时,防护效果却不理想。因此,本发明中,相邻的两个条形凹槽13之间的间距控制在100-120cm,最外侧的条形凹槽13距离旧混凝土面板8的板边为30-45cm。 The finite element analysis and experimental results show that the most unfavorable position of the traffic load on the old concrete slab is close to the edge of the slab, which is 1/10 of the slab span. In terms of quantity, the denser the planting bars, the more obvious the weakening of the board will be. Too many planting bars will waste materials and time-consuming, but the protective effect is not ideal. Therefore, in the present invention, the distance between two adjacent strip-shaped grooves 13 is controlled at 100-120cm, and the distance between the outermost strip-shaped groove 13 and the edge of the old concrete panel 8 is 30-45cm.

上述步骤中,在对条形凹槽13以及端部孔11进行成型时,应尽量减少对两块旧混凝土面板8板块的损伤,避免板块开裂和保证板块的整体性,条形凹槽13的底部要修平、侧面宜修整接近垂直,冲击钻的钻头的直径比马蹄形钢筋12的直径大4mm-6mm,钻孔的孔深比开槽后旧混凝土面板厚>4cm,一般钻孔的孔深比开槽后旧混凝土面板厚4-6cm, In the above steps, when molding the strip groove 13 and the end hole 11, the damage to the two old concrete panels 8 should be minimized to avoid cracking of the panels and ensure the integrity of the panels. The bottom should be flattened, and the side should be trimmed close to vertical. The diameter of the drill bit of the impact drill is 4mm-6mm larger than that of the horseshoe-shaped steel bar 12, and the depth of the drilled hole is >4cm thicker than that of the old concrete panel after slotting. The thickness of the old concrete panel is 4-6cm after slotting,

第二步,清理:利用吹风机对条形凹槽以及钻孔进行吹扫进行清槽、清孔处理; The second step, cleaning: use a blower to blow the strip grooves and drilled holes to clean the grooves and holes;

第三步,马蹄形钢筋成型:根据孔深、凹槽长度和板间接缝宽度,将螺纹钢筋两端折弯成马蹄形,完成马蹄形钢筋成型; The third step, forming the horseshoe-shaped steel bar: according to the depth of the hole, the length of the groove and the width of the joint between the plates, bend the two ends of the threaded steel bar into a horseshoe shape to complete the forming of the horseshoe-shaped steel bar;

马蹄形钢筋12的具体结构如示意图2所示,其采用直径20-35mm的螺纹钢筋, 马蹄形钢筋总长 L筋=L条+2*H板+2*5cm+L缝,其中,L条为条形凹槽的长度,H板为旧混凝土面板板厚,L缝为两旧混凝土面板之间板缝宽度,马蹄形钢筋植入旧混凝土面板底部基层的深度3-5cm。 The concrete structure of horseshoe-shaped steel bar 12 is as shown in schematic diagram 2, and it adopts the threaded steel bar of diameter 20-35mm, and horseshoe-shaped steel bar total length L bar=L bar+2*H board+2*5cm+L seam, and wherein, L bar is bar shape The length of the groove, the H plate is the thickness of the old concrete panel, the L joint is the width of the plate gap between the two old concrete panels, and the depth of the horseshoe-shaped steel bar implanted in the bottom base of the old concrete panel is 3-5cm.

第四步,植筋:沿着条形凹槽方向垂直植入马蹄形钢筋,马蹄形钢筋两端折弯部分插入钻孔内; The fourth step, planting bars: vertically implant horseshoe-shaped steel bars along the direction of the strip groove, and insert the bent parts at both ends of the horseshoe-shaped steel bars into the drilled holes;

第五步,灌胶:向钻孔内灌入环氧树脂植筋胶,直至孔深的2/3位置处;应保证插入植筋后胶充满孔壁与钢筋之间的空隙部分,保证良好的抗渗水性能。 The fifth step, glue filling: pour epoxy resin planting glue into the drilled hole until the 2/3 position of the hole depth; after inserting the planting bar, it should be ensured that the glue fills the gap between the hole wall and the steel bar to ensure good waterproof performance.

第六步,植筋保护层制作:拌合水泥碎石浇筑进条形凹槽13内并封堵钻孔,最终形成植筋保护层,并养护;在本步骤中,浇筑用的水泥碎石砼采用的是为标号C20-C40的水泥。 The sixth step is to make the reinforcement protective layer: mix cement macadam and pour it into the strip groove 13 and seal the drill holes, finally form the reinforcement protection layer and maintain it; in this step, the cement macadam used for pouring What concrete adopts is the cement of label C20-C40.

第七步,后续沥青加铺罩面结构:具体分布如示意图2中所示,在两块旧混凝土面板8的上层自下而上依次铺上乳化沥青透层油层7、沥青碎石纤维封层6、粗粒式沥青砼层5、乳化沥青粘层油层4、中粒式沥青砼层3、乳化沥青粘层2、高粘度沥青玛蹄脂碎石层板1。其中,较为关键的各保护层中:沥青碎石纤维封层厚度为0.8cm,粗粒式沥青砼层厚度为8cm,中粒式沥青砼层厚度为5cm,高粘度沥青玛蹄脂碎石层厚度为4cm。 The seventh step is the subsequent asphalt overlay structure: the specific distribution is shown in the schematic diagram 2. On the upper layer of the two old concrete panels 8, the emulsified asphalt permeable oil layer 7 and the asphalt macadam fiber seal layer are laid sequentially from bottom to top. 6. Coarse-grained asphalt concrete layer 5. Emulsified asphalt sticky oil layer 4. Medium-grained asphalt concrete layer 3. Emulsified asphalt sticky layer 2. High-viscosity asphalt mastic macadam layer 1. Among them, among the more critical protective layers: the thickness of the asphalt macadam fiber seal layer is 0.8cm, the thickness of the coarse-grained asphalt concrete layer is 8cm, the thickness of the medium-grained asphalt concrete layer is 5cm, and the high-viscosity asphalt mastic macadam layer The thickness is 4cm.

在本步骤中,粗粒式沥青砼保护层5采用的标号是AC-25C、中粒式沥青砼保护层3中采用的标号是AC-16C,高粘度沥青玛蹄脂碎石混凝土面层1中采用的标号为SMA-13。 In this step, the label used in the coarse-grained asphalt concrete protective layer 5 is AC-25C, the label adopted in the medium-grained asphalt concrete protective layer 3 is AC-16C, and the high-viscosity asphalt mastic macadam concrete surface layer 1 The designation used in is SMA-13.

实施例2 Example 2

本实施例中,对需要接缝加固的两块旧混凝土面板进行板间弯沉差测定,挑选出弯沉差测定值超过0.06mm的旧混凝土面板。 In this embodiment, the deflection difference between the two old concrete panels requiring joint reinforcement is measured, and the old concrete panels whose measured value of the deflection difference exceeds 0.06 mm are selected.

对于弯沉差超过0.06mm之间的旧混凝土面板,其在进行加铺沥青反射裂缝的接缝处理时,需要在实施例1的基础上,在对旧混凝土面板进行植筋预处理之前,先对就混凝土面板进行板灌浆处理,使得板间弯沉差小于弯沉差容许值,便于满足设计标准要求,以及确保后续植筋的有效性和成功率。灌浆材料选用水泥砂浆,抗压强度≥15Mpa,水泥砂浆的级配组成为:水泥:水=1.0:5, 再以水泥砂浆总质量为基准,添加铝粉0.001wt%,早强剂0.01wt%。 若添加外加剂,则水按产品要求及可参照《混凝土外加剂应用技术规范》GB50119-2013 执行。 For the old concrete panels whose deflection difference exceeds 0.06mm, when performing joint treatment of overlaying asphalt reflective cracks, it is necessary to pre-treat the old concrete panels before planting bars on the basis of Example 1. The slab grouting treatment is carried out on the concrete slab, so that the deflection difference between the slabs is less than the allowable value of the deflection difference, which is convenient to meet the requirements of the design standard and ensure the effectiveness and success rate of the subsequent reinforcement. The grouting material is cement mortar with compressive strength ≥ 15Mpa. The gradation composition of cement mortar is: cement: water = 1.0:5, based on the total mass of cement mortar, add 0.001wt% of aluminum powder and 0.01wt% of early strength agent . If the admixture is added, the water shall be in accordance with the product requirements and may refer to the "Technical Specifications for the Application of Concrete Admixtures" GB50119-2013.

本发明的方法的原理为:植入筋(植入的筋即为马蹄形钢筋6)的刚度大于水泥混凝土的刚度,在旧混凝土面板5在接缝处产生微小的竖向位移差,即测定板间弯沉差超过一定限值(>0.04mm),植入筋在板间接缝处具有传递弯矩和剪力的作用,提高板间的协调工作能力,有助于减少板边的变形和附加应力,植入筋将行车方向前、后相邻板联结在一起,使得植入筋和旧混凝土面板5的板块之间进行应力重分布和协调变形,提高旧水泥路面加铺沥青罩面结构的整体抗剪和整体抗拉强度。 The principle of the method of the present invention is: the stiffness of the implanted bar (the implanted bar is the horseshoe-shaped steel bar 6) is greater than the stiffness of the cement concrete, and a small vertical displacement difference is generated at the joint of the old concrete panel 5, that is, the measuring plate If the deflection difference between plates exceeds a certain limit (>0.04mm), the implanted ribs can transmit bending moment and shear force at the joints between plates, improve the coordination ability between plates, and help reduce deformation and additional The implanted tendons connect the front and rear adjacent plates together in the driving direction, so that stress redistribution and coordinated deformation are carried out between the implanted tendons and the plates of the old concrete panel 5, and the performance of the asphalt overlay structure on the old cement pavement is improved. Overall shear and overall tensile strength.

马蹄形钢筋12能和旧混凝土面板8紧密粘结在一起,形成“栓锁”效应,可以控制水泥混凝土接缝处裂缝的宽度,有效抑制板间裂缝向上部沥青加铺层扩展,防止加铺层表面形成反射裂缝。 The horseshoe-shaped steel bar 12 can be closely bonded with the old concrete panel 8 to form a "bolt lock" effect, which can control the width of the crack at the cement-concrete joint, effectively inhibit the cracks between the panels from spreading to the upper asphalt overlay, and prevent the overlay Reflective cracks form on the surface.

对于板间已经产生弯沉差超过0.06mm,要进行旧板灌浆处理,调整至板间弯沉差低于0.06mm,减少板底脱空带来的附加应力。 If the deflection difference between the boards exceeds 0.06mm, the old board should be grouted to adjust the deflection difference between the boards to less than 0.06mm to reduce the additional stress caused by the void at the bottom of the board.

以上显示和描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。 The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above. Those skilled in the industry should understand that the present invention is not limited by the above-mentioned embodiments. What are described in the above-mentioned embodiments and the description only illustrate the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention will also have Variations and improvements are possible, which fall within the scope of the claimed invention. The protection scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1.一种预防旧水泥路面加铺沥青反射裂缝的接缝构造方法,其特征在于,所述步骤为: 1. A joint construction method for preventing old cement pavement from overlaying asphalt reflection cracks, characterized in that, the steps are: 旧混凝土面板的弯沉预处理:对需要接缝加固的两块旧混凝土面板进行板间弯沉差测定,挑选出弯沉差测定超0.04mm以上的旧混凝土面板; Deflection pretreatment of old concrete panels: measure the deflection difference between the two old concrete panels that need joint reinforcement, and select the old concrete panels whose deflection difference exceeds 0.04mm; 植筋预处理: Reinforcement pretreatment: 对弯沉差测定值在0.04mm以上的旧混凝土面板进行植筋预处理,在两块旧混凝土面板接缝处的车辆荷载作用附加应力集中区域跨缝切割出等间距的条形凹槽,并将各条形凹槽定为植筋部位; For the old concrete panels whose deflection difference is more than 0.04mm, carry out pretreatment for planting bars, and cut strip grooves at equal intervals across the joints in the area where the additional stress concentration of the vehicle load acts on the joints of the two old concrete panels, and Define each strip-shaped groove as the planting bar part; 对条形凹槽端部进行垂直钻孔,且该孔一直延伸至位于旧水泥混凝土面板下端基层的内部,形成垂直方向的钻孔; Carry out vertical drilling on the end of the strip groove, and the hole has been extended to the inside of the base layer at the lower end of the old cement concrete panel to form a vertical drilling; 清理:利用吹风机对条形凹槽以及钻孔进行吹扫进行清槽、清孔处理; Cleaning: Use a blower to blow the strip grooves and drilled holes to clean the grooves and holes; 马蹄形钢筋成型:根据孔深、凹槽长度和板间接缝宽度,将螺纹钢筋两端折弯成马蹄形,完成马蹄形钢筋成型; Forming of horseshoe-shaped steel bar: According to the depth of the hole, the length of the groove and the width of the joint between the plates, the two ends of the threaded steel bar are bent into a horseshoe shape to complete the forming of the horseshoe-shaped steel bar; 植筋:沿着条形凹槽方向垂直植入马蹄形钢筋,马蹄形钢筋两端折弯部分插入钻孔内; Rebar planting: vertically implant horseshoe-shaped steel bars along the direction of the strip groove, and insert the bent parts at both ends of the horseshoe-shaped steel bars into the drilled holes; 灌胶:向钻孔内灌入环氧树脂植筋胶,直至孔深的2/3位置处; Glue filling: pour epoxy resin planting glue into the drilled hole until it reaches 2/3 of the hole depth; 植筋保护层制作:拌合水泥碎石浇筑进条形凹槽内并封堵钻孔,最终形成植筋保护层,并养护; Production of reinforcement protection layer: mix cement gravel and pour it into the strip groove and seal the drill holes, finally form the reinforcement protection layer and maintain it; 后续沥青加铺罩面结构:在两块旧混凝土面板的上层自下而上依次铺上乳化沥青透层油层、沥青碎石纤维封层、粗粒式沥青砼层、乳化沥青粘层油层、中粒式沥青砼层、乳化沥青粘层、沥青玛蹄脂碎石层。 Subsequent asphalt overlay structure: Lay emulsified asphalt penetration layer oil layer, asphalt gravel fiber seal layer, coarse-grained asphalt concrete layer, emulsified asphalt adhesive layer oil layer, medium Granular asphalt concrete layer, emulsified asphalt sticky layer, asphalt mastic macadam layer. 2. 根据权利要求1所述的预防旧水泥路面加铺沥青反射裂缝的接缝构造方法,其特征在于:所述步骤a中对于弯沉差测定值超过0.06mm的旧混凝土面板,在进行步骤b前进行板灌浆处理;灌浆材料选用水泥砂浆,抗压强度≥15Mpa,水泥砂浆的级配组成为:水泥:水=1.0:5, 再以水泥砂浆总质量为基准,添加铝粉0.001wt%,早强剂0.01wt%。 2. The joint construction method for preventing old cement pavement overlaying asphalt reflection cracks according to claim 1, characterized in that: in the step a, for the old concrete panel whose measured value of deflection difference exceeds 0.06mm, in the step of Board grouting treatment before b; the grouting material is cement mortar with compressive strength ≥ 15Mpa, the gradation composition of cement mortar is: cement: water = 1.0:5, and then based on the total mass of cement mortar, add aluminum powder 0.001wt% , early strength agent 0.01wt%. 3. 根据权利要求1所述的预防旧水泥路面加铺沥青反射裂缝的接缝构造方法,其特征在于:所述步骤b中,条形凹槽切割方向为平行于旧混凝土面板上车辆行驶的方向,其纵向长度为旧混凝土面板长边的1/25,宽度与马蹄形钢筋的直径相配,深度为旧混凝土面板厚度的1/3-1/4,相邻的条形凹槽之间的间距为100-120cm,最外侧的条形凹槽距离旧混凝土面板板边为30-45cm。 3. The joint construction method of preventing old cement pavement overlaying asphalt reflection cracks according to claim 1, is characterized in that: in the described step b, the cutting direction of the strip groove is parallel to the direction of vehicle running on the old concrete panel direction, its longitudinal length is 1/25 of the long side of the old concrete panel, its width matches the diameter of the horseshoe steel bar, its depth is 1/3-1/4 of the thickness of the old concrete panel, and the spacing between adjacent strip grooves 100-120cm, and the outermost strip groove is 30-45cm away from the edge of the old concrete panel. 4.根据权利要求1所述的预防旧水泥路面加铺沥青反射裂缝的接缝构造方法,其特征在于:所述步骤b中,钻孔的直径比马蹄筋直径大4-6mm,钻孔伸入旧水泥混凝土面板下端基层4-6cm。 4. the joint construction method of preventing old cement pavement overlaying asphalt reflection cracks according to claim 1, is characterized in that: in the described step b, the diameter of the borehole is 4-6mm larger than the horseshoe tendon diameter, and the borehole extends Insert 4-6cm into the lower base of the old cement concrete panel. 5. 根据权利要求1所述的预防旧水泥路面加铺沥青反射裂缝的接缝构造方法,其特征在于:所述步骤d中,马蹄形钢筋为直径20-35mm的螺纹钢筋, 马蹄形钢筋总长 L筋=L条+2*H板+2*5cm+L缝,其中,L条为条形凹槽的长度,H板为旧混凝土面板板厚,L缝为两旧混凝土面板之间板缝宽度,马蹄形钢筋植入旧混凝土面板底部基层的深度3-5cm。 5. the seam construction method of prevention old cement pavement overlay asphalt reflection crack according to claim 1, it is characterized in that: in described step d, horseshoe-shaped steel bar is the threaded steel bar of diameter 20-35mm, horseshoe-shaped steel bar total length L bar =L bar+2*H board+2*5cm+L seam, wherein, L bar is the length of the strip groove, H board is the thickness of the old concrete panel, L joint is the width of the board seam between two old concrete panels, The horseshoe-shaped steel bars are implanted into the base layer at the bottom of the old concrete panel to a depth of 3-5cm. 6. 根据权利要求1所述的预防旧水泥路面加铺沥青反射裂缝的接缝构造方法,其特征在于: 所述步骤g中,沥青碎石纤维封层厚度为0.8cm,粗粒式沥青砼层厚度为8cm,中粒式沥青砼层厚度为5cm,高粘度沥青玛蹄脂碎石层厚度为4cm;所述粗粒式沥青砼保护层采用的标号是AC-25C、中粒式沥青砼保护层中采用的标号是AC-16C,高粘度沥青玛蹄脂碎石层中采用的标号是SMA-13。 6. The joint construction method of preventing old cement pavement overlaying asphalt reflection cracks according to claim 1, is characterized in that: In the described step g, the thickness of the asphalt macadam fiber seal layer is 0.8cm, and the coarse-grained asphalt concrete The thickness of the layer is 8cm, the thickness of the medium-grained asphalt concrete layer is 5cm, and the thickness of the high-viscosity asphalt mastic macadam layer is 4cm; the label used for the coarse-grained asphalt concrete protective layer is AC-25C, medium-grained asphalt concrete The code used in the protective layer is AC-16C, and the code used in the high-viscosity bituminous mastic macadam layer is SMA-13.
CN201510077194.XA 2015-02-13 2015-02-13 A kind of seam construction method preventing old cement concrete road to add black top reflection crack Active CN104674627B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510077194.XA CN104674627B (en) 2015-02-13 2015-02-13 A kind of seam construction method preventing old cement concrete road to add black top reflection crack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510077194.XA CN104674627B (en) 2015-02-13 2015-02-13 A kind of seam construction method preventing old cement concrete road to add black top reflection crack

Publications (2)

Publication Number Publication Date
CN104674627A true CN104674627A (en) 2015-06-03
CN104674627B CN104674627B (en) 2016-08-17

Family

ID=53310174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510077194.XA Active CN104674627B (en) 2015-02-13 2015-02-13 A kind of seam construction method preventing old cement concrete road to add black top reflection crack

Country Status (1)

Country Link
CN (1) CN104674627B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105956241A (en) * 2016-04-25 2016-09-21 长安大学 Method for determining grouting material performance of void beneath cement-concrete road slab
CN105975653A (en) * 2016-04-25 2016-09-28 长安大学 Simulated analysis method of water damage of cement concrete road surface material
CN106087706A (en) * 2016-07-22 2016-11-09 中铁第四勘察设计院集团有限公司 Precast body wet seam attachment structure and wet connecing thereof dry make construction method
CN106436525A (en) * 2016-09-27 2017-02-22 南通大学 A Composite Structure for Restraining Reflective Cracks on Old Cement Concrete Pavement and Its Reform Method
CN107044080A (en) * 2016-12-07 2017-08-15 华南农业大学 A kind of concrete panel crack steel plate sewing method
CN109811609A (en) * 2019-03-18 2019-05-28 上海市城市建设设计研究总院(集团)有限公司 The seam construction of prefabricated assembled concrete base plate
CN109914215A (en) * 2019-04-22 2019-06-21 中国港湾工程有限责任公司 The construction method for preventing and treating airfield pavement overlay reflection crack
CN111074762A (en) * 2019-12-11 2020-04-28 南通大学 Seamless expansion joint of compound concrete bridge face of carbon cloth
CN112176817A (en) * 2020-08-20 2021-01-05 中冶天工集团有限公司 Method for treating cracks of base panel of road reconstruction project
CN112942090A (en) * 2021-01-27 2021-06-11 河南中交路通工程监理咨询有限公司 Road and bridge structure with large-particle-size asphalt concrete and construction process thereof
CN113175236A (en) * 2021-05-18 2021-07-27 宁波市建设集团股份有限公司 Novel injection method chemical bar planting construction method
CN113642083A (en) * 2021-08-25 2021-11-12 中交路桥北方工程有限公司 Special-shaped splicing design method for new and old roads
CN114457714A (en) * 2022-02-22 2022-05-10 南通大学 A prefabricated smart light-emitting pavement structure and its installation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100605636B1 (en) * 2004-07-02 2006-08-01 의왕개발 주식회사 Concrete Forming Finish Formwork
KR100628749B1 (en) * 2006-06-19 2006-10-02 (주)미래기술단 Prefabricated road El-type side opening installation structure
CN1898442A (en) * 2004-12-16 2007-01-17 德国睿铁有限责任公司 Concrete track for rail vehicles
CN102102340A (en) * 2010-12-28 2011-06-22 河北路桥集团有限公司 Bridge expansion and contraction device and installation method thereof
CN103194949A (en) * 2013-04-03 2013-07-10 西安公路研究院 Structure and method for repairing cracks of oblique prestressed cement concrete pavement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100605636B1 (en) * 2004-07-02 2006-08-01 의왕개발 주식회사 Concrete Forming Finish Formwork
CN1898442A (en) * 2004-12-16 2007-01-17 德国睿铁有限责任公司 Concrete track for rail vehicles
KR100628749B1 (en) * 2006-06-19 2006-10-02 (주)미래기술단 Prefabricated road El-type side opening installation structure
CN102102340A (en) * 2010-12-28 2011-06-22 河北路桥集团有限公司 Bridge expansion and contraction device and installation method thereof
CN103194949A (en) * 2013-04-03 2013-07-10 西安公路研究院 Structure and method for repairing cracks of oblique prestressed cement concrete pavement

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105975653A (en) * 2016-04-25 2016-09-28 长安大学 Simulated analysis method of water damage of cement concrete road surface material
CN105956241B (en) * 2016-04-25 2018-12-21 长安大学 A kind of determination method of Void Under Concrete Pavement Slab grouting material performance
CN105956241A (en) * 2016-04-25 2016-09-21 长安大学 Method for determining grouting material performance of void beneath cement-concrete road slab
CN106087706A (en) * 2016-07-22 2016-11-09 中铁第四勘察设计院集团有限公司 Precast body wet seam attachment structure and wet connecing thereof dry make construction method
CN106087706B (en) * 2016-07-22 2018-04-03 中铁第四勘察设计院集团有限公司 The wet seam attachment structure of precast body and its wet connect dry make construction method
CN106436525A (en) * 2016-09-27 2017-02-22 南通大学 A Composite Structure for Restraining Reflective Cracks on Old Cement Concrete Pavement and Its Reform Method
CN106436525B (en) * 2016-09-27 2018-10-16 南通大学 A kind of old concrete road surface inhibits the composite construction and remodeling method of reflection crack
CN107044080A (en) * 2016-12-07 2017-08-15 华南农业大学 A kind of concrete panel crack steel plate sewing method
CN109811609B (en) * 2019-03-18 2024-03-12 上海市城市建设设计研究总院(集团)有限公司 Joint structure of prefabricated assembled concrete base plate
CN109811609A (en) * 2019-03-18 2019-05-28 上海市城市建设设计研究总院(集团)有限公司 The seam construction of prefabricated assembled concrete base plate
CN109914215A (en) * 2019-04-22 2019-06-21 中国港湾工程有限责任公司 The construction method for preventing and treating airfield pavement overlay reflection crack
CN111074762A (en) * 2019-12-11 2020-04-28 南通大学 Seamless expansion joint of compound concrete bridge face of carbon cloth
CN111074762B (en) * 2019-12-11 2021-08-31 南通大学 A carbon fiber cloth composite concrete bridge deck seamless expansion joint
CN112176817A (en) * 2020-08-20 2021-01-05 中冶天工集团有限公司 Method for treating cracks of base panel of road reconstruction project
CN112942090A (en) * 2021-01-27 2021-06-11 河南中交路通工程监理咨询有限公司 Road and bridge structure with large-particle-size asphalt concrete and construction process thereof
CN112942090B (en) * 2021-01-27 2022-09-23 河南中交路通工程监理咨询有限公司 Construction process of road and bridge structure with large-particle-size asphalt concrete
CN113175236A (en) * 2021-05-18 2021-07-27 宁波市建设集团股份有限公司 Novel injection method chemical bar planting construction method
CN113642083A (en) * 2021-08-25 2021-11-12 中交路桥北方工程有限公司 Special-shaped splicing design method for new and old roads
CN113642083B (en) * 2021-08-25 2024-06-11 中交路桥建设有限公司 Abnormal splicing design method for new road and old road
CN114457714A (en) * 2022-02-22 2022-05-10 南通大学 A prefabricated smart light-emitting pavement structure and its installation method

Also Published As

Publication number Publication date
CN104674627B (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN104674627B (en) A kind of seam construction method preventing old cement concrete road to add black top reflection crack
Roesler et al. Continuously reinforced concrete pavement manual, guidelines for design, construction, maintenance, and rehabilitation
CN106436525B (en) A kind of old concrete road surface inhibits the composite construction and remodeling method of reflection crack
CN105019365B (en) Structure for rapidly restoring hinge joint of hollow slab bridge and construction method thereof
CN103938514B (en) A kind of cement pavement Darkening process structure and construction method
CN107313320A (en) The embedded reinforcement asphalt pavement structure of cement concrete pavement and construction method
CN101487216B (en) Structure and method for improving connection intensity of asphalt surface coat and cement stabilizing base course interface
CN108547195A (en) A kind of porous asphalt pavement structure and construction method
CN201817761U (en) Sliding type continuous reinforced concrete pavement and combined pavement
CN104631268B (en) A kind of concrete road pavement structure
CN105239484A (en) Road surface structure suitable for heavy-duty traffic
CN111535108A (en) A kind of high-strength permanent pavement and construction method thereof
Knapton Ground bearing concrete slabs
US6682260B2 (en) Roller compacted concrete paving sealing method
Vanelstraete et al. Laboratory testing and numerical modelling of overlay systems on cement concrete slabs
MD4160C1 (en) Motorroad
Vanelstraete et al. Crack prevention and use of overlay systems
CN108978388A (en) A kind of anti-passage salt tolerant erosion composite block material tube panel of assembled and construction technology
CN206902487U (en) The embedded reinforcement asphalt pavement structure of cement concrete pavement
Gulden Continuously reinforced concrete pavement: extending service life of existing pavements
CN110629624A (en) A double-layer laminated prefabricated pavement and its construction method
Authority Manual for Low Volume Roads
CN113174797B (en) Device and method for repairing and improving road surface bearing capacity
CN209162562U (en) An assembled composite block pavement structure with resistance to moving and salt corrosion
Ling et al. Suspended road system on Peat: A case study in Sibu, Sarawak.

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200825

Address after: Group 3, Shiqiao village, Qianqiao Town, Fengxian District, Shanghai, 201424

Patentee after: SHANGHAI SHISHEN INDUSTRY AND TRADE Co.,Ltd.

Address before: 226000 Jiangsu Province, Nantong City Chongchuan District sik Road No. 9

Patentee before: NANTONG University