CN104659700A - Automatic gas filling warning device of SF6 gas insulated metal closed switch equipment - Google Patents
Automatic gas filling warning device of SF6 gas insulated metal closed switch equipment Download PDFInfo
- Publication number
- CN104659700A CN104659700A CN201510045062.9A CN201510045062A CN104659700A CN 104659700 A CN104659700 A CN 104659700A CN 201510045062 A CN201510045062 A CN 201510045062A CN 104659700 A CN104659700 A CN 104659700A
- Authority
- CN
- China
- Prior art keywords
- gas
- valve
- gas tank
- air chamber
- air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B13/00—Arrangement of switchgear in which switches are enclosed in, or structurally associated with, a casing, e.g. cubicle
- H02B13/02—Arrangement of switchgear in which switches are enclosed in, or structurally associated with, a casing, e.g. cubicle with metal casing
- H02B13/035—Gas-insulated switchgear
- H02B13/065—Means for detecting or reacting to mechanical or electrical defects
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Gas-Insulated Switchgears (AREA)
Abstract
针对上述现有的人工SF6充气装置的缺陷或不足,公开一种SF6气体绝缘金属封闭开关设备自动充气报警装置。考虑根据封闭开关气室额定工作气压确定SF6充气工作的自动停止,根据气罐气压和重量确定气罐切换,并根据环境状态和充气状态检测发出相应的警报,开发一套SF6充气自动停止、报警、切换及监测装置,将GIS充气工作标准化、智能化和自动化,保证充气质量,提高充气效率,使得GIS充气更加安全、高效和经济,能有效保证封闭开关设备气体的绝缘强度和灭弧能力。
Aiming at the defects or deficiencies of the above-mentioned existing artificial SF 6 inflating devices, an automatic inflating alarm device for SF 6 gas-insulated metal-enclosed switchgear is disclosed. Consider determining the automatic stop of SF 6 inflation work based on the rated working pressure of the closed switch air chamber, determine the gas tank switching according to the air pressure and weight of the gas tank, and issue corresponding alarms according to the environmental status and inflation state detection, and develop a set of SF 6 inflation automatic stop , alarm, switching and monitoring devices, standardize, intelligentize and automate the GIS inflation work, ensure the inflation quality, improve the inflation efficiency, make GIS inflation safer, more efficient and economical, and can effectively ensure the insulation strength and arc extinguishing of closed switchgear gas ability.
Description
技术领域technical field
本发明属于电气工程高压气体封闭开关设备自动控制技术领域,具体涉及一种对气体绝缘封闭开关(GIS)设备自动充气报警的装置。The invention belongs to the technical field of automatic control of high-voltage gas-enclosed switchgear in electrical engineering, and in particular relates to a device for automatically filling and alarming gas-insulated-enclosed switchgear (GIS) equipment.
背景技术Background technique
随着电网发展,其电压等级越来越高,短路容量也越来越大,对电网设备的绝缘强度和灭弧能力的要求越来越高。针对这些要求,由于六氟化硫(SF6)气体强电负性的特点而具有优异的绝缘性能和灭弧性能,现已被广泛应用于高压开关领域,在高电压和超高压等级中断路器、气体绝缘金属封闭开关设备(GIS)等设备中被大量运用,并且也逐步向中低压领域渗透。特别的,由于GIS把断路器、隔离开关、母线、接地开关、互感器、出线套管或电缆终端头等分别装在各自密封间中集中组成一个整体外壳,并充以SF6气体作为绝缘介质,其具有结构紧凑、体积小、重量轻、不受大气条件影响、检修间隔长、无触电事故和电噪声干扰等优点,已经成为城市变电站的首选。With the development of the power grid, its voltage level is getting higher and higher, and the short-circuit capacity is also getting bigger and bigger, and the requirements for the insulation strength and arc extinguishing ability of the power grid equipment are getting higher and higher. In response to these requirements, due to the strong electronegativity of sulfur hexafluoride (SF 6 ) gas, it has excellent insulation performance and arc extinguishing performance, and has been widely used in the field of high-voltage switches to break circuits at high-voltage and ultra-high voltage levels It is widely used in equipment such as switchgear and gas-insulated metal-enclosed switchgear (GIS), and it has also gradually penetrated into the medium and low voltage fields. In particular, since GIS installs circuit breakers, disconnectors, busbars, grounding switches, transformers, outlet bushings or cable terminals in their respective sealed rooms to form an integral shell, and fills it with SF 6 gas as an insulating medium, It has the advantages of compact structure, small size, light weight, not affected by atmospheric conditions, long maintenance intervals, no electric shock accidents and electrical noise interference, etc., and has become the first choice for urban substations.
现如今SF6已成为电网中最重要的绝缘和灭弧气体介质。然而,虽然纯净的SF6气体具有优异的绝缘性能和灭弧性能,但是,随着其纯度的降低,特别是当气体纯度达不到规定的要求时,其电气性能会发生明显的劣化。如相关标准中就规定运行中SF6的气体纯度不得低于97%。在设备运行过程中,由于大电流开断和放电故障使SF6发生分解,产生氧气、水和其他分解化合物,不仅仅使绝缘材料发生劣化,还会腐蚀设备金属材料。特别的,水分含量的增加,会直接影响绝缘性能、开断性能和机械性能。因此,为发挥SF6气体优异的绝缘和灭弧性能,需要及时更换SF6不达标设备的SF6气体,保证电气设备的安全运行。Now SF 6 has become the most important insulating and arc-extinguishing gas medium in the power grid. However, although pure SF 6 gas has excellent insulation properties and arc extinguishing properties, its electrical properties will deteriorate significantly as its purity decreases, especially when the gas purity does not meet the specified requirements. For example, it is stipulated in relevant standards that the gas purity of SF 6 in operation shall not be lower than 97%. During the operation of the equipment, SF 6 decomposes due to large current breaking and discharge faults, producing oxygen, water and other decomposition compounds, which not only degrades the insulating materials, but also corrodes the metal materials of the equipment. In particular, the increase of moisture content will directly affect the insulation performance, breaking performance and mechanical performance. Therefore, in order to give full play to the excellent insulation and arc extinguishing properties of SF 6 gas, it is necessary to replace SF 6 gas in equipment that does not meet the SF 6 standard in time to ensure the safe operation of electrical equipment.
事实上,现有的SF6充气系统绝大部分都是依靠人工,需要工作人员在现场根据GIS气室(一个充有SF6气体密闭空间)气压表读数确定充气是否完成,以及根据气压罐气压表读数确定是否需要更换气罐,对于一个标准气室而言,完成全部换气往往需要10-15天的时间,整个充气效率低下。在充气现场,工作人员往往根据气室或者气罐气压表读数的变化快慢来判断气体是否结冰,以决定是否需要更换气罐,但由于工作人员的判断能力的差别,有可能导致气罐里还有较多六氟化硫气体的时候就被更换掉,造成了资源的浪费。在人工充气的过程中,因为工作人员读取气压表的时间间隔较长,操作阀门的速度慢,容易产生气室压强过高的情况,不仅仅造成资源的浪费,还增加了变电站投入运行的时间。人工充气的时候,一方面可能由于工作人员的操作失误而导致水、空气等杂质的进入,难以保证换气的质量,甚至有可能因为气体纯度的降低,导致其绝缘强度的降低,进而导致绝缘击穿,发生停电事故;另一方面可能导致六氟化硫气体排放到空气中,导致温室效应的加剧,并且可能导致密度比空气大的六氟化硫气体沉积到变电站的电缆沟等低洼地方,导致里面的氧气含量下降,当低于规程规定的额定值时,可能对工作人员造成人身伤害。In fact, most of the existing SF 6 inflation systems rely on manual work, requiring staff to determine whether the inflation is complete based on the barometer readings of the GIS gas chamber (a closed space filled with SF 6 gas) on the spot, and to determine whether the inflation is complete according to the pressure tank pressure. The meter reading determines whether the air tank needs to be replaced. For a standard air chamber, it often takes 10-15 days to complete all air changes, and the entire inflation efficiency is low. At the filling site, the staff often judge whether the gas is frozen according to the reading speed of the air chamber or the gas tank barometer, so as to decide whether the gas tank needs to be replaced. However, due to the difference in the judgment ability of the staff, it may lead to When there is more sulfur hexafluoride gas, it is replaced, resulting in a waste of resources. In the process of artificial inflation, because the time interval for the staff to read the barometer is long and the speed of operating the valve is slow, it is easy to cause the pressure of the air chamber to be too high, which not only causes a waste of resources, but also increases the cost of putting the substation into operation. time. When artificially inflating, on the one hand, it may be caused by the operator's operation error, which may lead to the entry of water, air and other impurities, making it difficult to ensure the quality of ventilation. On the other hand, it may lead to the emission of sulfur hexafluoride gas into the air, leading to the aggravation of the greenhouse effect, and may lead to the deposition of sulfur hexafluoride gas with a higher density than air in low-lying places such as cable trenches in substations , causing the oxygen content inside to drop, which may cause personal injury to the staff when it is lower than the rated value specified in the regulations.
发明内容Contents of the invention
针对上述现有的人工SF6充气装置的缺陷或不足,考虑根据封闭开关气室额定工作气压确定SF6充气工作的自动停止,根据气罐气压和重量确定气罐切换,并根据环境状态和充气状态检测发出相应的警报,开发一套SF6充气自动停止、报警、切换及监测装置,将GIS充气工作标准化、智能化和自动化,保证充气质量,提高充气效率,使得GIS充气更加安全、高效和经济,能有效保证封闭开关设备气体的绝缘强度和灭弧能力。In view of the defects or insufficiencies of the existing artificial SF 6 inflation devices mentioned above, it is considered to determine the automatic stop of the SF 6 inflation work according to the rated working pressure of the closed switch chamber, determine the gas tank switching according to the air pressure and weight of the gas tank, and determine the gas tank switching according to the environmental status and inflation pressure. State detection sends corresponding alarms, develops a set of SF 6 inflation automatic stop, alarm, switching and monitoring devices, standardizes, intelligentizes and automates GIS inflation work, ensures inflation quality, improves inflation efficiency, and makes GIS inflation safer, more efficient and more efficient It is economical and can effectively guarantee the insulation strength and arc extinguishing ability of the closed switchgear gas.
为实现本发明目的而采用的技术方案是这样的,一种SF6气体绝缘金属封闭开关设备自动充气报警装置,其特征在于:包括对第一气室、第二气室和第三气室供SF6气体的第一气罐、第二气罐、第三气罐和第四气罐。The technical solution adopted to realize the object of the present invention is as follows, a kind of SF 6 gas insulated metal-enclosed switchgear automatic filling alarm device, it is characterized in that: it includes the first air chamber, the second air chamber and the third air chamber supply The first gas tank, the second gas tank, the third gas tank and the fourth gas tank of SF 6 gas.
所述第一气罐、第二气罐、第三气罐和第四气罐分别放置在第一重量传感器、第二重量传感器、第三重量传感器和第四重量传感器The first gas tank, the second gas tank, the third gas tank and the fourth gas tank are respectively placed on the first weight sensor, the second weight sensor, the third weight sensor and the fourth weight sensor
所述第一气罐的出气口通过第一气罐支管与主管道连接,所述第一气罐支管上安装有第一气罐阀门。The gas outlet of the first gas tank is connected to the main pipeline through the first gas tank branch pipe, and the first gas tank valve is installed on the first gas tank branch pipe.
所述第二气罐的出气口通过第二气罐支管与主管道连接,所述第二气罐支管上安装有第二气罐阀门。The gas outlet of the second gas tank is connected to the main pipeline through a second gas tank branch pipe, and a second gas tank valve is installed on the second gas tank branch pipe.
所述第三气罐的出气口通过第三气罐支管与主管道连接,所述第三气罐支管上安装有第三气罐阀门。The gas outlet of the third gas tank is connected to the main pipeline through a third gas tank branch pipe, and a third gas tank valve is installed on the third gas tank branch pipe.
所述第四气罐的出气口通过第四气罐支管与主管道连接,所述第四气罐支管上安装有第四气罐阀门。The gas outlet of the fourth gas tank is connected to the main pipeline through the branch pipe of the fourth gas tank, and the valve of the fourth gas tank is installed on the branch pipe of the fourth gas tank.
所述主管道还与第一气室支管、第二气室支管和第三气室支管的进气端连通。The main pipe is also communicated with the intake ends of the first air chamber branch pipe, the second air chamber branch pipe and the third air chamber branch pipe.
所述第一气室支管的出气端接入第一气室。所述第一气室支管上安装有第一气室阀门。所述第一气室支管上还装有测量管内气体流量的第一流量传感器、测量管内气体压力的第一气压传感器、以及测量管内气体温度的第一温度传感器。The gas outlet end of the branch pipe of the first air chamber is connected to the first air chamber. A first air chamber valve is installed on the first air chamber branch pipe. The branch pipe of the first gas chamber is also equipped with a first flow sensor for measuring the gas flow in the tube, a first air pressure sensor for measuring the gas pressure in the tube, and a first temperature sensor for measuring the gas temperature in the tube.
所述第二气室支管的出气端接入第二气室。所述第二气室支管上安装有第二气室阀门。所述第二气室支管上还装有测量管内气体流量的第二流量传感器、测量管内气体压力的第二气压传感器、以及测量管内气体温度的第二温度传感器。The gas outlet end of the branch pipe of the second air chamber is connected to the second air chamber. A second air chamber valve is installed on the branch pipe of the second air chamber. The branch pipe of the second air chamber is also equipped with a second flow sensor for measuring the gas flow in the tube, a second air pressure sensor for measuring the gas pressure in the tube, and a second temperature sensor for measuring the gas temperature in the tube.
所述第三气室支管的出气端接入第三气室。所述第三气室支管上安装有第三气室阀门。所述第三气室支管上还装有测量管内气体流量的第三流量传感器、测量管内气体压力的第三气压传感器、以及测量管内气体温度的第三温度传感器。The gas outlet end of the branch pipe of the third air chamber is connected to the third air chamber. A third air chamber valve is installed on the branch pipe of the third air chamber. The branch pipe of the third air chamber is also equipped with a third flow sensor for measuring the gas flow in the tube, a third air pressure sensor for measuring the gas pressure in the tube, and a third temperature sensor for measuring the gas temperature in the tube.
所述第一流量传感器、第二流量传感器和第三流量传感器分别测量管内的气体流量:Q1、Q2和Q3。The first flow sensor, the second flow sensor and the third flow sensor respectively measure the gas flow in the pipe: Q 1 , Q 2 and Q 3 .
打开第一气罐阀门、第二气罐阀门、第三气罐阀门和第四气罐阀门中的至少一个,同时,打开第一气室阀门、第二气室阀门和第三气室阀门中的至少一个。Open at least one of the first gas tank valve, the second gas tank valve, the third gas tank valve and the fourth gas tank valve, and at the same time, open the first gas chamber valve, the second gas chamber valve and the third gas chamber valve at least one of the .
若第一气室阀门打开,当Q1<0.1L/s时,关闭第一气罐阀门、第二气罐阀门、第三气罐阀门和第四气罐阀门中已经打开的阀门,并更换对应的气罐。If the valve of the first air chamber is open, when Q 1 <0.1L/s, close the opened valves of the first, second, third, and fourth air tank valves, and replace them. corresponding gas tank.
若第二气室阀门打开,当Q2<0.1L/s时,关闭第一气罐阀门、第二气罐阀门、第三气罐阀门和第四气罐阀门中已经打开的阀门,并更换对应的气罐。If the valve of the second air chamber is open, when Q 2 <0.1L/s, close the opened valves of the first, second, third, and fourth air tank valves, and replace them. corresponding gas tank.
若第三气室阀门打开,当Q3<0.1L/s时,关闭第一气罐阀门、第二气罐阀门、第三气罐阀门和第四气罐阀门中已经打开的阀门,并更换对应的气罐。If the valve of the third air chamber is open, when Q 3 <0.1L/s, close the opened valves of the valves of the first air tank, the second air tank, the third air tank and the fourth air tank, and replace them corresponding gas tank.
所述第一气压传感器、第二气压传感器和第三气压传感器分别测量管内的气体压力:P1、P2和P3。The first air pressure sensor, the second air pressure sensor and the third air pressure sensor respectively measure the gas pressure in the tube: P 1 , P 2 and P 3 .
打开第一气罐阀门、第二气罐阀门、第三气罐阀门和第四气罐阀门中的至少一个,同时,打开第一气室阀门、第二气室阀门和第三气室阀门中的至少一个。Open at least one of the first gas tank valve, the second gas tank valve, the third gas tank valve and the fourth gas tank valve, and at the same time, open the first gas chamber valve, the second gas chamber valve and the third gas chamber valve at least one of the .
若第一气室阀门打开,当P1≥Pe时,关闭第一气室阀门。其中Pe为规程设定的额定值,例如对于110千伏GIS组合电器而言,其断路器气室的额定气压为0.6Mpa(表压20℃),其他气室的额定气压为0.4Mpa(表压20℃)。If the valve of the first air chamber is open, when P 1 ≥ Pe , close the valve of the first air chamber. Among them, P e is the rated value set by the regulations. For example, for a 110 kV GIS combined electrical appliance, the rated air pressure of the circuit breaker air chamber is 0.6Mpa (gauge pressure 20°C), and the rated air pressure of other air chambers is 0.4Mpa ( Gauge pressure 20°C).
若第二气室阀门打开,当P2≥Pe时,关闭第二气室阀门。If the valve of the second air chamber is open, when P 2 ≥ Pe , close the valve of the second air chamber.
若第三气室阀门打开,当P3≥Pe时,关闭第三气室阀门。If the valve of the third air chamber is open, when P 3 ≥ Pe , close the valve of the third air chamber.
所述第一温度传感器、第二温度传感器和第三温度传感器分别测量管内的气体温度:t1、t2和t3。The first temperature sensor, the second temperature sensor and the third temperature sensor respectively measure the gas temperature in the tube: t 1 , t 2 and t 3 .
打开第一气罐阀门、第二气罐阀门、第三气罐阀门和第四气罐阀门中的至少一个,同时,打开第一气室阀门、第二气室阀门和第三气室阀门中的至少一个。Open at least one of the first gas tank valve, the second gas tank valve, the third gas tank valve and the fourth gas tank valve, and at the same time, open the first gas chamber valve, the second gas chamber valve and the third gas chamber valve at least one of the .
若第一气室阀门打开,当t1>60℃时,关闭第一气室阀门。If the valve of the first air chamber is open, when t 1 >60°C, close the valve of the first air chamber.
若第二气室阀门打开,当t2>60℃时,关闭第二气室阀门。If the valve of the second air chamber is open, when t 2 >60°C, close the valve of the second air chamber.
若第三气室阀门打开,当t3>60℃时,关闭第三气室阀门。If the valve of the third air chamber is open, when t 3 >60°C, close the valve of the third air chamber.
所述第一重量传感器、第二重量传感器、第三重量传感器和第四重量传感器分别测量第一气罐、第二气罐、第三气罐和第四气罐的重量m1、m2、m3和m4。The first weight sensor, the second weight sensor, the third weight sensor and the fourth weight sensor respectively measure the weights m 1 , m 2 , m 3 and m 4 .
当m1≤ms时,关闭第一气罐阀门,并更换第一气罐。其中ms为设定的阈值,一般不同的六氟化硫气罐生产厂家的值不一样,对于一般的38-40L气罐,取值约为50kg。When m 1 ≤ m s , close the valve of the first gas tank and replace the first gas tank. Among them, m s is the set threshold value. Generally, different manufacturers of sulfur hexafluoride gas tanks have different values. For a general 38-40L gas tank, the value is about 50kg.
当m2≤ms时,关闭第二气罐阀门,并更换第二气罐。When m 2 ≤ m s , close the valve of the second gas tank and replace the second gas tank.
当m3≤ms时,关闭第三气罐阀门,并更换第三气罐。When m 3 ≤ m s , close the valve of the third gas tank and replace the third gas tank.
当m4≤ms时,关闭第四气罐阀门,并更换第四气罐。When m 4 ≤ m s , close the valve of the fourth gas tank and replace the fourth gas tank.
放置在装置附近或安装在主管道上的环境温湿度传感器测量装置所在区域的环境温度ten和环境湿度RHen。The ambient temperature and humidity sensor placed near the device or installed on the main pipeline measures the ambient temperature t en and ambient humidity RH en of the area where the device is located.
打开第一气罐阀门、第二气罐阀门、第三气罐阀门和第四气罐阀门中的至少一个,同时,打开第一气室阀门、第二气室阀门和第三气室阀门中的至少一个。Open at least one of the first gas tank valve, the second gas tank valve, the third gas tank valve and the fourth gas tank valve, and at the same time, open the first gas chamber valve, the second gas chamber valve and the third gas chamber valve at least one of the .
若RHen>90%或ten>60℃,关闭全部阀门,停止充气,发出警报。If RH en >90% or t en >60°C, close all valves, stop inflation, and send out an alarm.
若不在充气过程中,则闭锁阀门,禁止充气,发出警报。If it is not in the inflation process, the valve is closed to prohibit inflation and an alarm is issued.
本发明主要具有如下效果:The present invention mainly has following effect:
(1)通过计算机控制打开电磁阀门,检测环境温湿度t和RH是否满足规程要求值,即温度必须低于60℃,相对湿度需要小于90%;如果不满足要求,则关闭阀门停止充气。(1) Open the electromagnetic valve through computer control, and check whether the ambient temperature and humidity t and RH meet the requirements of the regulations, that is, the temperature must be lower than 60°C, and the relative humidity must be less than 90%; if the requirements are not met, close the valve to stop inflation.
(2)所述的自动充气装置能同时测量SF6气体流量Q,根据封闭开关气室气压P、体积V、温度t的关系,计算封闭开关气室所需气量V0,从而得到自动充气预计所需时间t;(2) The automatic inflation device can measure the SF 6 gas flow Q at the same time, and calculate the gas volume V 0 required for the closed switch gas chamber according to the relationship between the air pressure P of the closed switch gas chamber, the volume V, and the temperature t, so as to obtain the automatic inflation prediction required time t;
(3)测量气罐气压P1和重量M1,根据新瓶SF6重量M瓶和体积V瓶,利用公式M剩=M1-M瓶计算SF6气罐剩余气体量M剩,当剩余气体量小于阈值ms时发出更换气罐报警;(3) measure air tank air pressure P 1 and weight M 1 , according to new bottle SF 6 weight M bottle and volume V bottle , utilize formula M leftover =M 1 -M bottle to calculate SF 6 gas tank remaining gas amount M leftover , when remaining When the gas volume is less than the threshold m s , an alarm for replacing the gas tank is issued;
(4)当充气时间达到之前计算的所需时间t时,测量气体封闭开关气室气压P是否满足额定要求值Pe,当不满足要求(P≤Pe)时,重新根据气室气压和流量对时间进行修正;当满足要求(P≥Pe)时,则关闭阀门,完成充气。(4) When the inflation time reaches the previously calculated required time t, measure whether the air pressure P of the air chamber of the gas-enclosed switch meets the rated required value P e , and if it does not meet the requirements (P≤P e ), re-according to the air chamber air pressure and The flow rate is corrected for the time; when the requirement (P≥P e ) is met, the valve is closed to complete the inflation.
(5)当采用本装置对多个气室进行充气时,将多个气室与气罐连接,每个气室连接输气管均安装有可控阀门和传感器,如图3所示。打开阀门进行充气时,由传感器对气体状态进行检测,当环境温湿度和气体温度不满足要求时,则关闭阀门停止充气;当气室1气压满足要求时,则关闭气室的可控阀门1,该气室充气完成,其它气室继续充气。(5) When the device is used to inflate multiple air chambers, the multiple air chambers are connected to the gas tank, and each air chamber is connected to a gas delivery pipe equipped with a controllable valve and a sensor, as shown in FIG. 3 . When the valve is opened for inflation, the gas state is detected by the sensor. When the ambient temperature, humidity and gas temperature do not meet the requirements, the valve is closed to stop inflation; when the air pressure of the air chamber 1 meets the requirements, the controllable valve 1 of the air chamber is closed. , the air chamber is inflated, and the other air chambers continue to inflate.
附图说明Description of drawings
图1为本发明结构图。Fig. 1 is a structural diagram of the present invention.
图2为本发明多气室同时充气连接示意图。Fig. 2 is a schematic diagram of simultaneous inflation and connection of multiple air chambers of the present invention.
图3为重量传感器放置位置图。Figure 3 is a diagram of the location of the weight sensor.
图4为自动充气装置控制系统软件判断流程图。Fig. 4 is a flow chart for judging the software of the control system of the automatic inflation device.
图中:气罐(1),气罐阀门(2),气室阀门(5),流量传感器(6),气压传感器(7),温度传感器(8),气室(9),重量传感器(11),环境温湿度传感器(12),可移动平台(13),计算机(14),操作台(15)。第一气罐(101)、第二气罐(102)、第三气罐(103)、第四气罐(104)、第一重量传感器(111)、第二重量传感器(112)、第三重量传感器(113)、第四重量传感器(114)、第一气罐阀门(201)、第二气罐阀门(202)、第三气罐阀门(203)、第四气罐阀门(204)、第一气罐支管(301)、第二气罐支管(302)、第三气罐支管(303)、第四气罐支管(304)、第一气室支管(401)、第二气室支管(402)、第三气室支管(403)、第一气室阀门(501)、第二气室阀门(502)、第三气室阀门(503)、第一流量传感器(601)、第二流量传感器(602)、第三流量传感器(603)、第一气压传感器(701)、第二气压传感器(702)、第三气压传感器(703)、第一温度传感器(801)、第二温度传感器(802)、第三温度传感器(803)、第一气室(901)、第二气室(902)、第三气室(903)。In the figure: gas tank (1), gas tank valve (2), gas chamber valve (5), flow sensor (6), air pressure sensor (7), temperature sensor (8), gas chamber (9), weight sensor ( 11), an ambient temperature and humidity sensor (12), a movable platform (13), a computer (14), and an operating table (15). The first gas tank (101), the second gas tank (102), the third gas tank (103), the fourth gas tank (104), the first weight sensor (111), the second weight sensor (112), the third Weight sensor (113), the fourth weight sensor (114), the first gas tank valve (201), the second gas tank valve (202), the third gas tank valve (203), the fourth gas tank valve (204), The first gas tank branch pipe (301), the second gas tank branch pipe (302), the third gas tank branch pipe (303), the fourth gas tank branch pipe (304), the first gas chamber branch pipe (401), the second gas chamber branch pipe (402), third air chamber branch pipe (403), first air chamber valve (501), second air chamber valve (502), third air chamber valve (503), first flow sensor (601), second air chamber valve Flow sensor (602), third flow sensor (603), first air pressure sensor (701), second air pressure sensor (702), third air pressure sensor (703), first temperature sensor (801), second temperature sensor (802), a third temperature sensor (803), a first air chamber (901), a second air chamber (902), and a third air chamber (903).
具体实施方式Detailed ways
下面结合附图和实施例对本发明作进一步说明,但不应该理解为本发明上述主题范围仅限于下述实施例。在不脱离本发明上述技术思想的情况下,根据本领域普通技术知识和惯用手段,做出各种替换和变更,均应包括在本发明的保护范围内。The present invention will be further described below in conjunction with the accompanying drawings and embodiments, but it should not be understood that the scope of the subject matter of the present invention is limited to the following embodiments. Without departing from the above-mentioned technical ideas of the present invention, various replacements and changes made according to common technical knowledge and conventional means in this field shall be included in the protection scope of the present invention.
实施例1:Example 1:
一种SF6气体绝缘金属封闭开关设备自动充气报警装置,其特征在于:包括对第一气室901、第二气室902和第三气室903供SF6气体的第一气罐101、第二气罐102、第三气罐103和第四气罐104。A SF 6 gas insulated metal-enclosed switchgear automatic charging alarm device, characterized in that it includes a first gas tank 101 for supplying SF 6 gas to the first gas chamber 901, the second gas chamber 902 and the third gas chamber 903, and a second gas tank 101 Two gas tanks 102 , a third gas tank 103 and a fourth gas tank 104 .
所述第一气罐101、第二气罐102、第三气罐103和第四气罐104分别放置在第一重量传感器111、第二重量传感器112、第三重量传感器113和第四重量传感器114The first gas tank 101, the second gas tank 102, the third gas tank 103 and the fourth gas tank 104 are respectively placed on the first weight sensor 111, the second weight sensor 112, the third weight sensor 113 and the fourth weight sensor 114
所述第一气罐101的出气口通过第一气罐支管301与主管道16连接,所述第一气罐支管301上安装有第一气罐阀门201。The gas outlet of the first gas tank 101 is connected to the main pipeline 16 through a first gas tank branch pipe 301 , and a first gas tank valve 201 is installed on the first gas tank branch pipe 301 .
所述第二气罐102的出气口通过第二气罐支管302与主管道16连接,所述第二气罐支管302上安装有第二气罐阀门202。The gas outlet of the second gas tank 102 is connected to the main pipeline 16 through the second gas tank branch pipe 302 , and the second gas tank valve 202 is installed on the second gas tank branch pipe 302 .
所述第三气罐103的出气口通过第三气罐支管303与主管道16连接,所述第三气罐支管303上安装有第三气罐阀门203。The gas outlet of the third gas tank 103 is connected to the main pipeline 16 through a third gas tank branch pipe 303 , and a third gas tank valve 203 is installed on the third gas tank branch pipe 303 .
所述第四气罐104的出气口通过第四气罐支管304与主管道16连接,所述第四气罐支管304上安装有第四气罐阀门204。The gas outlet of the fourth gas tank 104 is connected to the main pipeline 16 through the fourth gas tank branch pipe 304 , and the fourth gas tank valve 204 is installed on the fourth gas tank branch pipe 304 .
所述主管道16还与第一气室支管401、第二气室支管402和第三气室支管403的进气端连通。The main pipe 16 is also in communication with the intake ends of the first air chamber branch pipe 401 , the second air chamber branch pipe 402 and the third air chamber branch pipe 403 .
所述第一气室支管401的出气端接入第一气室901。所述第一气室支管401上安装有第一气室阀门501。所述第一气室支管401上还装有测量管内气体流量的第一流量传感器601、测量管内气体压力的第一气压传感器701、以及测量管内气体温度的第一温度传感器801。The gas outlet end of the first air chamber branch pipe 401 is connected to the first air chamber 901 . A first air chamber valve 501 is installed on the first air chamber branch pipe 401 . The first gas chamber branch pipe 401 is also equipped with a first flow sensor 601 for measuring the gas flow in the pipe, a first air pressure sensor 701 for measuring the gas pressure in the pipe, and a first temperature sensor 801 for measuring the gas temperature in the pipe.
所述第二气室支管402的出气端接入第二气室902。所述第二气室支管402上安装有第二气室阀门502。所述第二气室支管402上还装有测量管内气体流量的第二流量传感器602、测量管内气体压力的第二气压传感器702、以及测量管内气体温度的第二温度传感器802。The gas outlet end of the second air chamber branch pipe 402 is connected to the second air chamber 902 . A second air chamber valve 502 is installed on the second air chamber branch pipe 402 . The second gas chamber branch pipe 402 is also equipped with a second flow sensor 602 for measuring the gas flow in the tube, a second air pressure sensor 702 for measuring the gas pressure in the tube, and a second temperature sensor 802 for measuring the gas temperature in the tube.
所述第三气室支管403的出气端接入第三气室903。所述第三气室支管403上安装有第三气室阀门503。所述第三气室支管403上还装有测量管内气体流量的第三流量传感器603、测量管内气体压力的第三气压传感器703、以及测量管内气体温度的第三温度传感器803。The gas outlet end of the third air chamber branch pipe 403 is connected to the third air chamber 903 . A third air chamber valve 503 is installed on the third air chamber branch pipe 403 . The third gas chamber branch pipe 403 is also equipped with a third flow sensor 603 for measuring the gas flow in the pipe, a third air pressure sensor 703 for measuring the gas pressure in the pipe, and a third temperature sensor 803 for measuring the gas temperature in the pipe.
实施例2:Example 2:
采用实施例1所述装置的一种控制SF6气体绝缘金属封闭开关设备自动充气的方法:A kind of control SF 6 gas-insulated metal-enclosed switchgear automatic inflation method adopting the device described in embodiment 1:
所述第一流量传感器601、第二流量传感器602和第三流量传感器603分别测量管内的气体流量:Q1、Q2和Q3。The first flow sensor 601 , the second flow sensor 602 and the third flow sensor 603 respectively measure the gas flow in the pipe: Q 1 , Q 2 and Q 3 .
打开第一气罐阀门201、第二气罐阀门202、第三气罐阀门203和第四气罐阀门204中的至少一个,同时,打开第一气室阀门501、第二气室阀门502和第三气室阀门503中的至少一个。Open at least one of the first gas tank valve 201, the second gas tank valve 202, the third gas tank valve 203 and the fourth gas tank valve 204, and at the same time, open the first gas chamber valve 501, the second gas chamber valve 502 and At least one of the third air chamber valves 503 .
若第一气室阀门501打开,当Q1<0.1L/s时,关闭第一气罐阀门201、第二气罐阀门202、第三气罐阀门203和第四气罐阀门204中已经打开的阀门,并更换对应的气罐。If the first gas chamber valve 501 is open, when Q 1 <0.1L/s, close the first gas tank valve 201, the second gas tank valve 202, the third gas tank valve 203 and the fourth gas tank valve 204 which have been opened valve, and replace the corresponding gas tank.
若第二气室阀门502打开,当Q2<0.1L/s时,关闭第一气罐阀门201、第二气罐阀门202、第三气罐阀门203和第四气罐阀门204中已经打开的阀门,并更换对应的气罐。If the second gas chamber valve 502 is open, when Q 2 <0.1L/s, close the first gas tank valve 201, the second gas tank valve 202, the third gas tank valve 203 and the fourth gas tank valve 204 that have been opened valve, and replace the corresponding gas tank.
若第三气室阀门503打开,当Q3<0.1L/s时,关闭第一气罐阀门201、第二气罐阀门202、第三气罐阀门203和第四气罐阀门204中已经打开的阀门,并更换对应的气罐。If the third gas chamber valve 503 is opened, when Q 3 <0.1L/s, close the first gas tank valve 201, the second gas tank valve 202, the third gas tank valve 203 and the fourth gas tank valve 204 that have been opened valve, and replace the corresponding gas tank.
实施例3:Example 3:
采用实施例1所述装置的一种控制SF6气体绝缘金属封闭开关设备自动充气的方法:A kind of control SF 6 gas-insulated metal-enclosed switchgear automatic inflation method adopting the device described in embodiment 1:
所述第一气压传感器701、第二气压传感器702和第三气压传感器703分别测量管内的气体压力:P1、P2和P3。The first air pressure sensor 701 , the second air pressure sensor 702 and the third air pressure sensor 703 respectively measure the gas pressure in the tube: P 1 , P 2 and P 3 .
打开第一气罐阀门201、第二气罐阀门202、第三气罐阀门203和第四气罐阀门204中的至少一个,同时,打开第一气室阀门501、第二气室阀门502和第三气室阀门503中的至少一个。Open at least one of the first gas tank valve 201, the second gas tank valve 202, the third gas tank valve 203 and the fourth gas tank valve 204, and at the same time, open the first gas chamber valve 501, the second gas chamber valve 502 and At least one of the third air chamber valves 503 .
若第一气室阀门501打开,当P1≥Pe时,关闭第一气室阀门501。If the first air chamber valve 501 is open, when P 1 ≥ Pe , close the first air chamber valve 501 .
若第二气室阀门502打开,当P2≥Pe时,关闭第二气室阀门502。If the second air chamber valve 502 is open, when P 2 ≥ Pe , close the second air chamber valve 502 .
若第三气室阀门503打开,当P3≥Pe时,关闭第三气室阀门503。If the third air chamber valve 503 is open, when P 3 ≥ Pe , close the third air chamber valve 503 .
实施例4:Example 4:
采用实施例1所述装置的一种控制SF6气体绝缘金属封闭开关设备自动充气的方法:A kind of control SF 6 gas-insulated metal-enclosed switchgear automatic inflation method adopting the device described in embodiment 1:
所述第一温度传感器801、第二温度传感器802和第三温度传感器803分别测量管内的气体温度:t1、t2和t3。The first temperature sensor 801 , the second temperature sensor 802 and the third temperature sensor 803 respectively measure the gas temperature in the tube: t 1 , t 2 and t 3 .
打开第一气罐阀门201、第二气罐阀门202、第三气罐阀门203和第四气罐阀门204中的至少一个,同时,打开第一气室阀门501、第二气室阀门502和第三气室阀门503中的至少一个。Open at least one of the first gas tank valve 201, the second gas tank valve 202, the third gas tank valve 203 and the fourth gas tank valve 204, and at the same time, open the first gas chamber valve 501, the second gas chamber valve 502 and At least one of the third air chamber valves 503 .
若第一气室阀门501打开,当t1>60℃时,关闭第一气室阀门501。If the first air chamber valve 501 is open, when t 1 >60°C, close the first air chamber valve 501 .
若第二气室阀门502打开,当t2>60℃时,关闭第二气室阀门502。If the second air chamber valve 502 is open, when t 2 >60°C, close the second air chamber valve 502 .
若第三气室阀门503打开,当t3>60℃时,关闭第三气室阀门503。If the third air chamber valve 503 is open, when t 3 >60°C, the third air chamber valve 503 is closed.
实施例5:Example 5:
采用实施例1所述装置的一种控制SF6气体绝缘金属封闭开关设备自动充气的方法:A kind of control SF 6 gas-insulated metal-enclosed switchgear automatic inflation method adopting the device described in embodiment 1:
所述第一重量传感器111、第二重量传感器112、第三重量传感器113和第四重量传感器114分别测量第一气罐101、第二气罐102、第三气罐103和第四气罐104的重量m1、m2、m3和m4。The first weight sensor 111, the second weight sensor 112, the third weight sensor 113 and the fourth weight sensor 114 respectively measure the first gas tank 101, the second gas tank 102, the third gas tank 103 and the fourth gas tank 104 The weight m 1 , m 2 , m 3 and m 4 .
当m1≤ms时,关闭第一气罐阀门201,并更换第一气罐101。When m 1 ≤ m s , close the valve 201 of the first gas tank, and replace the first gas tank 101 .
当m2≤ms时,关闭第二气罐阀门202,并更换第二气罐102。When m 2 ≤ m s , close the valve 202 of the second gas tank, and replace the second gas tank 102 .
当m3≤ms时,关闭第三气罐阀门203,并更换第三气罐103。When m 3 ≤ m s , close the valve 203 of the third gas tank, and replace the third gas tank 103 .
当m4≤ms时,关闭第四气罐阀门204,并更换第四气罐104。When m 4 ≤ m s , close the valve 204 of the fourth gas tank, and replace the fourth gas tank 104 .
实施例6:Embodiment 6:
采用实施例1所述装置的一种控制SF6气体绝缘金属封闭开关设备自动充气的方法:环境温湿度传感器12测量装置所在区域的环境温度ten和环境湿度RHen。A method for controlling the automatic inflation of SF 6 gas-insulated metal-enclosed switchgear using the device described in Embodiment 1: the ambient temperature and humidity sensor 12 measures the ambient temperature t en and ambient humidity RH en of the area where the device is located.
打开第一气罐阀门201、第二气罐阀门202、第三气罐阀门203和第四气罐阀门204中的至少一个,同时,打开第一气室阀门501、第二气室阀门502和第三气室阀门503中的至少一个。Open at least one of the first gas tank valve 201, the second gas tank valve 202, the third gas tank valve 203 and the fourth gas tank valve 204, and at the same time, open the first gas chamber valve 501, the second gas chamber valve 502 and At least one of the third air chamber valves 503 .
若RHen>90%或ten>60℃,关闭全部阀门,停止充气,发出警报。If RH en >90% or t en >60°C, close all valves, stop inflation, and send out an alarm.
实施例7:Embodiment 7:
采用实施例1所述装置的一种控制SF6气体绝缘金属封闭开关设备自动充气的方法:A kind of control SF 6 gas-insulated metal-enclosed switchgear automatic inflation method adopting the device described in embodiment 1:
打开第一气罐阀门201、第二气罐阀门202、第三气罐阀门203和第四气罐阀门204,同时,打开第一气室阀门501、第二气室阀门502和第三气室阀门503。Open the first gas tank valve 201, the second gas tank valve 202, the third gas tank valve 203 and the fourth gas tank valve 204, and at the same time, open the first gas chamber valve 501, the second gas chamber valve 502 and the third gas chamber Valve 503.
所述第一流量传感器601、第二流量传感器602和第三流量传感器603分别测量管内的气体流量:Q1、Q2和Q3。The first flow sensor 601 , the second flow sensor 602 and the third flow sensor 603 respectively measure the gas flow in the pipe: Q 1 , Q 2 and Q 3 .
所述第一气压传感器701、第二气压传感器702和第三气压传感器703分别测量管内的气体压力:P1、P2和P3。The first air pressure sensor 701 , the second air pressure sensor 702 and the third air pressure sensor 703 respectively measure the gas pressure in the tube: P 1 , P 2 and P 3 .
所述第一温度传感器801、第二温度传感器802和第三温度传感器803分别测量管内的气体温度:t1、t2和t3。The first temperature sensor 801 , the second temperature sensor 802 and the third temperature sensor 803 respectively measure the gas temperature in the tube: t 1 , t 2 and t 3 .
所述第一重量传感器111、第二重量传感器112、第三重量传感器113和第四重量传感器114分别测量第一气罐101、第二气罐102、第三气罐103和第四气罐104的重量m1、m2、m3和m4。The first weight sensor 111, the second weight sensor 112, the third weight sensor 113 and the fourth weight sensor 114 respectively measure the first gas tank 101, the second gas tank 102, the third gas tank 103 and the fourth gas tank 104 The weight m 1 , m 2 , m 3 and m 4 .
环境温湿度传感器12测量装置所在区域的环境温度ten和环境湿度RHen。The ambient temperature and humidity sensor 12 measures the ambient temperature t en and the ambient humidity RH en of the area where the device is located.
整个自动充气系统的阀门打开和关断情况与传感器采集到的数据之间的对应关系如下:The corresponding relationship between the opening and closing of the valve of the entire automatic inflation system and the data collected by the sensor is as follows:
表1传感器采集到的数据和阀门的开断情况对应表Table 1 Correspondence between the data collected by the sensor and the opening and closing of the valve
表中的pe为规程规定的气室的额定压力,对于断路器气室为0.6Mpa(表压20℃),对于其他气室为0.4Mpa(表压20℃)。ms为气罐的重量与因气压太低不能给气室充气的六氟化硫气体重量的和,对于一般的38-40L气罐,取值约为50kg。The pe in the table is the rated pressure of the air chamber specified in the regulations, which is 0.6Mpa (gauge pressure 20°C) for the circuit breaker air chamber and 0.4Mpa (gauge pressure 20°C) for other air chambers. m s is the sum of the weight of the gas tank and the weight of sulfur hexafluoride gas that cannot inflate the gas chamber because the air pressure is too low. For a general 38-40L gas tank, the value is about 50kg.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510045062.9A CN104659700B (en) | 2015-01-29 | 2015-01-29 | Automatic gas filling warning device of SF6 gas insulated metal closed switch equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510045062.9A CN104659700B (en) | 2015-01-29 | 2015-01-29 | Automatic gas filling warning device of SF6 gas insulated metal closed switch equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104659700A true CN104659700A (en) | 2015-05-27 |
CN104659700B CN104659700B (en) | 2017-02-22 |
Family
ID=53250532
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510045062.9A Active CN104659700B (en) | 2015-01-29 | 2015-01-29 | Automatic gas filling warning device of SF6 gas insulated metal closed switch equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104659700B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105846337A (en) * | 2016-05-18 | 2016-08-10 | 国家电网公司 | Novel inflatable switch cabinet |
CN108105585A (en) * | 2017-11-29 | 2018-06-01 | 广东电网有限责任公司惠州供电局 | A kind of real-time monitoring making-up air device and supplementing method for air for GIS device storage |
CN112152136A (en) * | 2020-09-21 | 2020-12-29 | 湖北省电力装备有限公司 | Gas-insulated metal-enclosed switchgear for high-voltage power |
CN112344216A (en) * | 2020-10-19 | 2021-02-09 | 广西电网有限责任公司百色供电局 | Multi-loop automatic control device of SF6 gas recovery device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008067538A (en) * | 2006-09-08 | 2008-03-21 | Central Res Inst Of Electric Power Ind | Abnormality detection method for gas insulated power equipment |
CN201162939Y (en) * | 2008-01-30 | 2008-12-10 | 金万林 | Full-automatic sulfur hexafluoride multifunctional inflation and recovery device |
CN201868315U (en) * | 2010-11-05 | 2011-06-15 | 山东电力集团公司泰安供电公司 | Sulfur hexafluoride gas-filling device |
JP2012012254A (en) * | 2010-06-30 | 2012-01-19 | Wakasawan Energ Kenkyu Center | Sf6 gas recovery device and sf6 gas recovery method |
CN202854298U (en) * | 2012-11-08 | 2013-04-03 | 贵州电力试验研究院 | Sulphur hexafluoride inflatable circuit breaker insulation state on-line monitoring device |
CN203521281U (en) * | 2013-09-28 | 2014-04-02 | 国家电网公司 | SF6 circuit breaker charging device |
CN203615055U (en) * | 2013-12-17 | 2014-05-28 | 国家电网公司 | Intelligent SF6 inflation device of electric equipment |
JP2014228127A (en) * | 2013-05-27 | 2014-12-08 | 三菱電機株式会社 | Gas recovery-recharging system |
-
2015
- 2015-01-29 CN CN201510045062.9A patent/CN104659700B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008067538A (en) * | 2006-09-08 | 2008-03-21 | Central Res Inst Of Electric Power Ind | Abnormality detection method for gas insulated power equipment |
CN201162939Y (en) * | 2008-01-30 | 2008-12-10 | 金万林 | Full-automatic sulfur hexafluoride multifunctional inflation and recovery device |
JP2012012254A (en) * | 2010-06-30 | 2012-01-19 | Wakasawan Energ Kenkyu Center | Sf6 gas recovery device and sf6 gas recovery method |
CN201868315U (en) * | 2010-11-05 | 2011-06-15 | 山东电力集团公司泰安供电公司 | Sulfur hexafluoride gas-filling device |
CN202854298U (en) * | 2012-11-08 | 2013-04-03 | 贵州电力试验研究院 | Sulphur hexafluoride inflatable circuit breaker insulation state on-line monitoring device |
JP2014228127A (en) * | 2013-05-27 | 2014-12-08 | 三菱電機株式会社 | Gas recovery-recharging system |
CN203521281U (en) * | 2013-09-28 | 2014-04-02 | 国家电网公司 | SF6 circuit breaker charging device |
CN203615055U (en) * | 2013-12-17 | 2014-05-28 | 国家电网公司 | Intelligent SF6 inflation device of electric equipment |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105846337A (en) * | 2016-05-18 | 2016-08-10 | 国家电网公司 | Novel inflatable switch cabinet |
CN108105585A (en) * | 2017-11-29 | 2018-06-01 | 广东电网有限责任公司惠州供电局 | A kind of real-time monitoring making-up air device and supplementing method for air for GIS device storage |
CN108105585B (en) * | 2017-11-29 | 2024-04-12 | 广东电网有限责任公司惠州供电局 | Real-time monitoring air supplementing device and method for GIS equipment storage |
CN112152136A (en) * | 2020-09-21 | 2020-12-29 | 湖北省电力装备有限公司 | Gas-insulated metal-enclosed switchgear for high-voltage power |
CN112344216A (en) * | 2020-10-19 | 2021-02-09 | 广西电网有限责任公司百色供电局 | Multi-loop automatic control device of SF6 gas recovery device |
Also Published As
Publication number | Publication date |
---|---|
CN104659700B (en) | 2017-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2817815B1 (en) | Moisture monitoring system | |
CN104659700B (en) | Automatic gas filling warning device of SF6 gas insulated metal closed switch equipment | |
CN109386731B (en) | An SF6 gas automatic filling system and filling method for GIS equipment | |
KR102540694B1 (en) | Power Supply Equipment for Train | |
KR102624742B1 (en) | Car Line Support Structure | |
KR20170117724A (en) | Apparatus for controlling insulating gas in gas insulated switchgear | |
CN204302440U (en) | Can to multiple stage SF 6insulation of electrical installation state and moisture carry out the device of on-line monitoring | |
CN101651303B (en) | Gas-insulated high-capacity combined switch device with metal shell | |
CN212750712U (en) | Built-in isolator and three-phase independent control's vacuum circuit breaker on post | |
CN105429041A (en) | Air insulated high-voltage switch cabinet | |
CN101075729B (en) | Environment-friendly gas insulated combined electrical apparatus | |
CN212007636U (en) | SF6 density relay inspection gas circuit connecting device | |
CN109038347A (en) | A kind of intelligent environmental protection type Inflatable ring main unit | |
CN101075730B (en) | Distributing fireproof wall structure | |
CN204967114U (en) | Aerify cabinet isolator air chamber | |
CN206506220U (en) | A kind of all sealed high voltage gas-filling cabinet | |
CN206471706U (en) | A kind of high pressure ring switchgear | |
CN114840494A (en) | A method, system and application for processing detection data of substation field operation | |
CN208571415U (en) | A kind of easy-operating gas-insulated switchgear of safety | |
CN209116013U (en) | A kind of SF6 gas automatic filling system of GIS device | |
CN203326465U (en) | Intelligent SF6 insulation ring main unit | |
CN206116136U (en) | Power transformer skeleton | |
CN204793823U (en) | Energy -concerving and environment -protective cubical switchboard | |
CN207910349U (en) | A kind of full-insulated full-sealed gas isolated gas-filling cabinet | |
CN210516597U (en) | Low-pressure electric locking device of inflating cabinet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |