- bridge
- cable
- steel
- box girder
- section steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 230000003014 reinforcing effect Effects 0.000 title claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 123
- 239000010959 steel Substances 0.000 claims abstract description 123
- 239000002131 composite material Substances 0.000 claims abstract description 16
- 238000005728 strengthening Methods 0.000 claims abstract description 13
- 230000002787 reinforcement Effects 0.000 claims description 55
- 201000010099 disease Diseases 0.000 claims description 5
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 claims description 5
- 238000009434 installation Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 10
- 238000005452 bending Methods 0.000 abstract description 9
- 238000011161 development Methods 0.000 abstract description 6
- 230000009471 action Effects 0.000 abstract description 4
- 230000002411 adverse Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 43
- 239000004567 concrete Substances 0.000 description 8
- 239000011513 prestressed concrete Substances 0.000 description 8
- 238000010586 diagram Methods 0.000 description 7
- 229920000049 Carbon (fiber) Polymers 0.000 description 4
- 239000004917 carbon fiber Substances 0.000 description 4
- 238000013461 design Methods 0.000 description 4
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 4
- 239000011208 reinforced composite material Substances 0.000 description 4
- 239000011150 reinforced concrete Substances 0.000 description 4
- 239000000853 adhesive Substances 0.000 description 3
- 230000001070 adhesive effect Effects 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000011378 shotcrete Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000003822 epoxy resin Substances 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 231100000989 no adverse effect Toxicity 0.000 description 1
- 229920000647 polyepoxide Polymers 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000008719 thickening Effects 0.000 description 1
- 230000001131 transforming effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/04—Cable-stayed bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及一种用于加固PSC连续箱梁桥的斜拉桥结构及施工方法,该结构包括桥塔、拉索和放置在桥面中心线上的组合型钢,通过斜拉桥体系改变PSC连续梁桥受力状况,提高其承载能力。通过连接装置使型钢锚固箱梁顶板上。桥塔焊接在组合型钢上,通过拉索连接桥塔和组合型钢。传统斜拉桥中,中跨跨中无索区域主梁受到很大的轴向拉力;而桥塔根部主梁受到很大的轴向拉力。本发明将组合型钢锚固在主梁上,并用拉索连接组合型钢,这样过大的轴向拉力、压力都作用在组合型钢上,对主梁无不利影响,而组合型钢在拉索作用力下对主梁提供向上的提升力,增强了主梁抗弯、抗剪能力,减小了主梁下挠变形,并能抑制主梁裂缝的发展。本发明高效、简单、安全和经济。
The invention relates to a cable-stayed bridge structure and a construction method for strengthening a PSC continuous box girder bridge. To improve the bearing capacity of beam bridges. The section steel is anchored to the top plate of the box girder through the connecting device. The bridge pylon is welded on the composite section steel, and the bridge tower and the composite section steel are connected by stay cables. In traditional cable-stayed bridges, the main girder in the mid-span mid-span cable-free area is subject to a large axial tension; while the main girder at the root of the pylon is subject to a large axial tension. The present invention anchors the combined section steel on the main girder, and connects the combined section steel with a cable, so that the excessive axial tension and pressure act on the combined section steel without adverse effects on the main beam, and the combined section steel is under the action force of the cable Provide upward lifting force to the main beam, enhance the bending resistance and shear resistance of the main beam, reduce the deflection deformation of the main beam, and inhibit the development of cracks in the main beam. The invention is efficient, simple, safe and economical.
Description
技术领域technical field
本发明涉及一种用于加固PSC连续箱梁桥的斜拉桥结构及施工方法(PSC:预应力钢筋混凝土),该发明的加固结构包括桥塔、拉索和放置在桥面中心线上的组合型钢,通过斜拉桥体系改变PSC连续梁桥受力状况,从而提高其承载能力。通过连接装置使型钢锚固箱梁顶板上。桥塔焊接在组合型钢上,通过拉索连接桥塔和组合型钢。传统斜拉桥中,中跨跨中无索区域主梁受到很大的轴向拉力;而桥塔根部主梁受到很大的轴向拉力。过大的拉力、压力都对主梁产生不利影响。本发明中将组合型钢锚固在主梁上,并用拉索连接组合型钢,这样过大的轴向拉力、压力都作用在组合型钢上,对主梁无不利影响,而组合型钢在拉索作用力下对主梁提供向上的提升力,增强了主梁抗弯、抗剪能力,减小了主梁下挠变形,并能抑制主梁裂缝的发展。这种斜拉桥的加固方法可以使提高PSC连续箱梁桥承载力更加高效、简单、安全和经济。The present invention relates to a cable-stayed bridge structure and construction method (PSC: prestressed reinforced concrete) for strengthening a PSC continuous box girder bridge, the reinforced structure of the invention includes bridge towers, stay cables and a bridge placed on the centerline of the bridge deck Combined section steel, through the cable-stayed bridge system, changes the stress condition of the PSC continuous girder bridge, thereby improving its bearing capacity. The section steel is anchored to the top plate of the box girder through the connecting device. The bridge tower is welded on the composite section steel, and the bridge tower and the composite section steel are connected by cables. In traditional cable-stayed bridges, the main girder in the mid-span mid-span cable-free area is subject to a large axial tension; while the main girder at the root of the pylon is subject to a large axial tension. Excessive tension and pressure have adverse effects on the main beam. In the present invention, the composite section steel is anchored on the main beam, and the composite section steel is connected with a drag cable, so that the excessive axial tension and pressure all act on the composite section steel, which has no adverse effect on the main beam, and the composite section steel exerts force on the cable The lower part provides upward lifting force to the main girder, which enhances the bending resistance and shear resistance of the main girder, reduces the deflection deformation of the main girder, and can inhibit the development of cracks in the main girder. The reinforcement method of this cable-stayed bridge can make it more efficient, simple, safe and economical to increase the bearing capacity of the PSC continuous box girder bridge.
背景技术Background technique
目前国内外对桥梁进行加固改造的主要技术方法如下:At present, the main technical methods for strengthening and transforming bridges at home and abroad are as follows:
1)增大截面加固法:这种方法通过增加混凝土构件的截面和增加配筋,提高构件的承载力和刚度。根据加固目的和要求的不同,可以增大截面为主的加固,也可以是以增加配筋为主的加固。加固中须要确保新旧混凝土结合良好。但这种方法缺点也非常明显,由于加固中不可避免地增加了结构自重,所以对于本发明所研究的大跨度预应力混凝土连续箱梁桥不是很适用。1) Increased section reinforcement method: This method increases the bearing capacity and stiffness of the component by increasing the section of the concrete component and increasing the reinforcement. Depending on the purpose and requirements of the reinforcement, it can be reinforced mainly by increasing the section, or by increasing the reinforcement. During reinforcement, it is necessary to ensure that the old and new concrete are well bonded. But the disadvantage of this method is also very obvious, because the structure self-weight is inevitably increased in the reinforcement, so it is not very suitable for the long-span prestressed concrete continuous box girder bridge studied by the present invention.
2)加厚桥面补强法:该方法是凿除原有的桥面铺装层,重新铺设一层混凝土或钢筋混凝土补强层。这种方法能修复已经出现裂缝、剥离等病害的桥面板,又能增加原有主梁的有效高度,增加主梁的抗弯能力,改善铰接梁的荷载横向分布,从而提高桥梁的承载能力。但这种方法由于增加了桥梁自重,使恒载弯矩增加较多,并且仍然受到原桥梁结构下缘受拉区域钢筋允许应力的限制,故此加固方法一般只适用于跨径较小的T形梁桥或板梁。该方法同样对于大跨度预应力混凝土连续箱梁桥加固效果不佳。2) Reinforcing method of thickening the bridge deck: This method is to chisel out the original bridge deck pavement layer and re-lay a layer of concrete or reinforced concrete reinforcement layer. This method can repair bridge decks that have cracks, peeling and other diseases, and can increase the effective height of the original main girder, increase the bending resistance of the main girder, and improve the lateral load distribution of the hinged girder, thereby improving the bearing capacity of the bridge. However, this method increases the dead load bending moment due to the increase of the bridge's own weight, and is still limited by the allowable stress of the steel bars in the tension area of the lower edge of the original bridge structure. Therefore, the reinforcement method is generally only suitable for T-shaped bridges with small spans. Girder bridge or slab girder. This method is also not effective for long-span prestressed concrete continuous box girder bridges.
3)增大梁肋加固法:增大梁肋加固法常用于T梁加固,对于这类桥梁,可以将梁的下端加宽,增大横截面面积,并在新混凝土截面中增设受力主筋。但增大截面后同样增加了结构自重,也不适用于大跨度预应力混凝土连续箱梁桥加固。3) Increased beam rib reinforcement method: The increased beam rib reinforcement method is often used to strengthen T-beams. For this type of bridge, the lower end of the beam can be widened to increase the cross-sectional area, and add the main reinforcement in the new concrete section. However, the self-weight of the structure is also increased after the section is enlarged, and it is not suitable for the reinforcement of long-span prestressed concrete continuous box girder bridges.
4)粘贴碳纤维加固法:粘贴碳纤维加固法是利用粘结剂碳纤维增强复合材料(CFRP)粘贴在梁体混凝土表面,当梁体受到汽车、人群等活载时,碳纤维与梁体混凝土协调变形而共同受力,从而提高了桥梁的承载能力与刚度,起到了加固作用。但是由于施工中需要粘贴增强复合材料到梁底,需要工人站在支架上涂抹粘结剂,操作极为不便,粘贴质量难以得到保障。同时,由于增强复合材料仅在桥梁受到活载时参与工作,属于被动受力,当增强复合材料发挥作用时,被加固的梁体下挠变形往往已经较大,因此,在大跨度预应力混凝土连续箱梁桥已经发生较大下挠变形的情况下,加固效果不理想。4) Paste carbon fiber reinforcement method: Paste carbon fiber reinforcement method is to use the adhesive carbon fiber reinforced composite material (CFRP) to paste on the concrete surface of the beam body. Joint force, thereby improving the bearing capacity and stiffness of the bridge, played a role in reinforcement. However, due to the need to paste the reinforced composite material to the bottom of the beam during construction, workers need to stand on the bracket to apply the adhesive, which is extremely inconvenient to operate and difficult to guarantee the quality of the paste. At the same time, since the reinforced composite material only participates in the work when the bridge is subjected to live load, it is a passive force. When the reinforced composite material plays a role, the downward deflection of the reinforced beam is often already large. Therefore, in the large-span prestressed concrete The reinforcement effect of continuous box girder bridge is not ideal when large deflection deformation has occurred.
5)增设承重构件加固法:当桥梁承载力不能满足要求,但梁体结构基本完好时,为了提高承载力,可以采用增加承重构件的方法,新增构件的承载力和刚度较大。施工中必须确保新旧构件之间的连接可靠,使其共同参与受力作用,这种加固方法施工期间要对交通影响较大,而且存在新旧构件受力不同步的问题。5) Reinforcement method of adding load-bearing components: When the bearing capacity of the bridge cannot meet the requirements, but the beam structure is basically intact, in order to increase the bearing capacity, the method of adding load-bearing components can be adopted, and the bearing capacity and stiffness of the newly added components are relatively large. During construction, it is necessary to ensure that the connection between the old and new components is reliable so that they can participate in the force action together. This reinforcement method will have a great impact on traffic during construction, and there is a problem that the force of the old and new components is not synchronized.
6)粘贴钢板加固法:利用环氧树脂系列黏结剂将钢板粘贴在钢筋混凝土结构物的受拉侧或薄弱部位,使钢板与原结构物形成整体共同受力,提高结构物的抗弯、抗剪能力及刚度,改善原结构物的钢筋及混凝土的应力状态,限制裂缝发展,从而提高桥梁的承载力与耐久性。与粘贴碳纤维加固法相似,粘贴钢板加固法同样属于被动加固,也不适用于已经发生较大下挠变形的大跨度预应力混凝土连续箱梁桥。6) Paste steel plate reinforcement method: use epoxy resin series adhesive to paste the steel plate on the tensile side or weak part of the reinforced concrete structure, so that the steel plate and the original structure form a whole joint force, and improve the bending resistance and anti-corrosion of the structure. The shear capacity and stiffness can improve the stress state of the steel bars and concrete of the original structure, and limit the development of cracks, thereby improving the bearing capacity and durability of the bridge. Similar to the pasting carbon fiber reinforcement method, the pasting steel plate reinforcement method is also passive reinforcement, and it is not suitable for long-span prestressed concrete continuous box girder bridges that have undergone large deflection deformation.
7)体外预应力加固法:体外预应力加固梁式桥,是一种改变了梁体原有受力状态的加固方法。当桥梁结构承载力不足或需要提高荷载等级时可以考虑采用体外预应力加固法。这一方法是在梁体外部布置施加了预应力的钢筋或钢丝束,以改善桥梁的受力状况。这种方法往往需要在梁体安装预应力锚固装置,对梁体产生损伤;局部过大的压应力存在超限的可能性,造成安全隐患。7) External prestress reinforcement method: External prestress reinforcement beam bridge is a reinforcement method that changes the original stress state of the beam body. When the bearing capacity of the bridge structure is insufficient or the load level needs to be increased, the external prestressing reinforcement method can be considered. This method is to arrange prestressed steel bars or steel wire bundles outside the beam body to improve the stress condition of the bridge. This method often requires the installation of prestressed anchorage devices on the beam body, causing damage to the beam body; local excessive compressive stress may exceed the limit, causing safety hazards.
8)改变桥梁体系加固法:这种加固方法是通过改变桥梁结构体系来减少主梁内应力、提高承载能力。如在简支梁下增设支架或桥墩;将相邻两跨简支梁连接成为连续梁。这种加固方法施工中往往要在桥下作业来增设桥墩,因而占用桥下净空,影响交通或桥梁泄洪。这种加固方式效果较好,是目前国内外解决临时通行超重车的常见措施。重车通行后,再拆除临时桥墩或支架。本发明中的加固方法就属于这种方法。8) Change the bridge system reinforcement method: This reinforcement method is to reduce the internal stress of the main girder and improve the bearing capacity by changing the bridge structure system. Such as adding supports or piers under simply supported beams; connecting two adjacent spans of simply supported beams to form continuous beams. In the construction of this reinforcement method, it is often necessary to work under the bridge to add piers, thereby occupying the clearance under the bridge and affecting traffic or bridge flood discharge. This reinforcement method has a better effect and is a common measure to solve the problem of temporarily passing overweight vehicles both at home and abroad. After heavy vehicles pass, remove temporary piers or supports. The reinforcement method in the present invention belongs to this method.
9)锚喷混凝土加固法:锚喷混凝土加固法是利用机械喷射高压、高速的混凝土到已锚固好的钢筋网上,使其凝固硬化形成钢筋混凝土结构,增大原桥梁结构强度和刚度。但此种加固方法在浆砌片石拱桥加固中运用较多,能较好地解决石拱桥常见病害。9) Anchor shotcrete reinforcement method: The anchor shotcrete reinforcement method is to use mechanical spraying of high-pressure, high-speed concrete onto the anchored steel mesh to make it solidify and harden to form a reinforced concrete structure, increasing the strength and stiffness of the original bridge structure. However, this reinforcement method is widely used in the reinforcement of masonry masonry arch bridges, and can better solve the common diseases of stone arch bridges.
我国道路交通量随社会经济的发展而迅猛增长;同时,以往规范中设计荷载标准值相对较低导致大量桥梁承载能力相对不足,存在不容忽视的安全隐患。针对当前常规桥梁加固方法在提高大跨度预应力混凝土连续箱梁桥承载力时还存在一些不足的情况,本发明以既有大跨度预应力混凝土箱梁桥为研究对象,搜集并分析导致其承载力不足的桥梁病害及设计缺陷,设计出一种用于加固PSC连续箱梁桥的斜拉桥结构及施工方法,使提高PSC连续箱梁桥承载力更加高效、简单、安全和经济。With the development of society and economy, the road traffic volume in our country has increased rapidly. At the same time, the relatively low design load standard value in the previous codes has led to a relatively insufficient carrying capacity of a large number of bridges, and there are potential safety hazards that cannot be ignored. In view of the fact that the current conventional bridge reinforcement methods still have some deficiencies in improving the bearing capacity of long-span prestressed concrete continuous box girder bridges, this invention takes the existing long-span prestressed concrete box girder bridges as the research object, collects and analyzes the bearing capacity of the existing long-span prestressed concrete box girder bridges. In order to improve the bearing capacity of PSC continuous box girder bridge, it is more efficient, simple, safe and economical.
发明内容Contents of the invention
本发明的目的是提高加固PSC连续箱梁桥效益,设计出一种用于加固PSC连续箱梁桥的斜拉桥结构及施工方法,本发明的结构特征如下:The purpose of the invention is to improve the benefit of strengthening the PSC continuous box girder bridge, and design a kind of cable-stayed bridge structure and construction method for strengthening the PSC continuous box girder bridge. The structural features of the present invention are as follows:
斜拉桥结构的加固原理:The strengthening principle of cable-stayed bridge structure:
箱梁顶板1和组合型钢2通过竖向预应力钢筋3及连接装置10锚固在一起,拉索4连接桥塔5和组合型钢2,桥塔5焊接在组合型钢2上,拉索4对组合型钢2施加拉力,使组合型钢2受到轴力和竖向提升力,由于锚固作用,箱梁顶板1也受到竖向提升力,桥塔5受到拉索4的拉力,桥塔5将作用力传递给桥墩上方的组合型钢2,组合型钢2再将荷载传递给箱梁0号块6,0号块6承受作用力传递给中支点支座7,然后通过桥墩8和基础9传递至地基。组合型钢在区域AB、CD受到轴向压力,在无索区域BC受到轴向拉力,这样过大的压力、拉力由组合型钢承担而不是主梁自身,避免了过大的轴力对主梁的不利影响,同时使主梁受到了向上的提升力。从而增强PSC连续箱梁桥主梁抗弯、抗剪能力,减小主梁下挠变形,并能抑制主梁裂缝的发展。The box girder roof 1 and the combined steel 2 are anchored together by the vertical prestressed steel bar 3 and the connecting device 10, the cable 4 connects the bridge tower 5 and the combined steel 2, the bridge tower 5 is welded on the combined steel 2, and the 4 pairs of the cables are combined The section steel 2 exerts tensile force, so that the combined section steel 2 is subjected to axial force and vertical lifting force. Due to the anchoring effect, the box girder roof 1 also receives the vertical lifting force, and the bridge tower 5 receives the pulling force of the cable 4, and the bridge tower 5 transmits the force To the combined section steel 2 above the bridge pier, the combined section steel 2 then transmits the load to the No. 0 block 6 of the box girder, and the No. 0 block 6 bears the force and transmits it to the middle fulcrum support 7, and then transmits the load to the foundation through the pier 8 and the foundation 9. The combined section steel is subjected to axial pressure in the areas AB and CD, and axial tension in the cable-free area BC. In this way, the excessive pressure and tension are borne by the combined section steel instead of the main beam itself, which avoids the impact of excessive axial force on the main beam. Adverse effects, while the main girder is subjected to an upward lifting force. Therefore, the bending and shearing resistance of the main girder of the PSC continuous box girder bridge can be enhanced, the deflection deformation of the main girder can be reduced, and the development of cracks in the main girder can be inhibited.
斜拉桥结构包括:The cable-stayed bridge structure includes:
箱梁顶板1、组合型钢2、竖向预应力钢筋3、拉索4、桥塔5、0号块6、中支点支座7、桥墩8、基础9、连接装置10、第一钻孔11、拉索锚头12、拉索锚固块13、挡板14、局部加强钢板15、钢锚横梁16、牛腿17、拉索锚头18、箱梁19、第二钻孔20、竖直钢板21、下水平钢板22和上水平钢板23。Box girder roof 1, combined section steel 2, vertical prestressed steel bars 3, cables 4, bridge towers 5, block 0 6, middle fulcrum supports 7, bridge piers 8, foundation 9, connecting devices 10, first drilling 11 , cable anchor head 12, cable anchor block 13, baffle plate 14, local reinforced steel plate 15, steel anchor beam 16, corbel 17, cable anchor head 18, box girder 19, second drill hole 20, vertical steel plate 21, the lower horizontal steel plate 22 and the upper horizontal steel plate 23.
加固前,箱梁19作用在桥墩8上,桥墩8作用于基础9上,基础9作用于地基上,箱梁19、桥墩8和基础9形成标准的三跨连续箱梁桥。Before reinforcement, the box girder 19 acts on the pier 8, the pier 8 acts on the foundation 9, and the foundation 9 acts on the foundation. The box girder 19, the pier 8 and the foundation 9 form a standard three-span continuous box girder bridge.
组合型钢2由竖直钢板21、下水平钢板22、上水平钢板23、拉索锚固块13、挡板14、局部加强钢板15焊接而成。箱梁19为PSC材料结构。使用机械在下水平钢板22上打出第一钻孔11,连接装置10与竖向预应力钢筋3连接,并将组合型钢2和箱梁顶板1锚固为一体。The combined section steel 2 is welded by a vertical steel plate 21, a lower horizontal steel plate 22, an upper horizontal steel plate 23, a cable anchor block 13, a baffle plate 14, and a local reinforced steel plate 15. The box girder 19 is a PSC material structure. Use machinery to punch out the first drill hole 11 on the lower horizontal steel plate 22, connect the connecting device 10 with the vertical prestressed steel bar 3, and anchor the combined section steel 2 and the box girder top plate 1 as a whole.
桥塔5焊接在组合型钢2上,桥塔5由钢锚横梁16、牛腿17组成。钢锚横梁16用来承担拉索4的水平力,拉索4的垂直分力由牛腿17来传递给桥塔5,这样的结构使桥塔5尽量处于受压状态。这样布置的钢锚横梁16和牛腿17避免了桥塔与拉索连接处因应力过大而发生破坏。The bridge tower 5 is welded on the composite section steel 2, and the bridge tower 5 is made up of a steel anchor beam 16 and a corbel 17. The steel anchor beam 16 is used to bear the horizontal force of the stay cable 4, and the vertical component force of the stay cable 4 is transmitted to the bridge tower 5 by the corbel 17. Such a structure makes the bridge tower 5 be in a compressed state as much as possible. The steel anchor crossbeam 16 and the corbel 17 arranged in this way prevent the connection between the bridge tower and the cable from being damaged due to excessive stress.
拉索由拉索4、拉索锚头12、拉索锚头18组成。拉索锚头12、拉索锚头18分别将拉索4锚固于组合型钢2和桥塔5上。Dragline is made up of dragline 4, dragline anchor head 12, dragline anchor head 18. The drag cable anchor head 12 and the drag cable anchor head 18 anchor the drag cable 4 to the combined section steel 2 and the bridge tower 5 respectively.
根据以上发明的结构特征,其施工方法如下:According to the structural features of the above invention, its construction method is as follows:
在箱梁19、桥墩8和基础9组成的标准三跨连续箱梁桥上,按图8加工组合型钢2,其中上水平钢板23在施工最后焊接到组合型钢2上。在组合型钢2设计位置打出第一钻孔11。利用连接装置10连接竖向预应力钢筋3,在桥面中心线布置组合型钢2后,再利用连接装置10将组合型钢2锚固在箱梁顶板1上。On the standard three-span continuous box girder bridge formed by box girder 19, bridge pier 8 and foundation 9, the composite section steel 2 is processed according to Fig. 8, wherein the upper horizontal steel plate 23 is welded to the composite section steel 2 at the end of construction. Drill out the first borehole 11 at the design position of the combined section steel 2 . The vertical prestressed steel bar 3 is connected by the connecting device 10 , and after the combined section steel 2 is arranged on the center line of the bridge deck, the combined section steel 2 is anchored on the box girder roof 1 by the connecting device 10 .
加工桥塔5节段,现场拼接焊接桥塔5节段并安装钢锚横梁16。利用卷扬机、滑轮提升各个拉索,牵引至桥塔孔道内就位后,用拉索锚头18固定。同样对梁端拉索进行安装,利用千斤顶张拉各拉索后用拉索锚头12锚固。根据桥梁结构形式及病害程度调整各拉索索力,使桥梁处于良好的受力状态。最后安装、焊接上水平钢板23,并对所有钢构件进行防锈处理。Process the 5 sections of the bridge tower, splice and weld the 5 sections of the bridge tower on site and install the steel anchor beam 16. Utilize winch, pulley to promote each stay cable, after pulling in place in bridge tower duct, fix with stay cable anchor head 18. Install the stay cables at the beam end equally, and use the stay cable anchor head 12 to anchor after utilizing the jack to stretch each stay cable. According to the structure form and disease degree of the bridge, adjust the force of each cable to keep the bridge in a good stress state. Install and weld the horizontal steel plate 23 at last, and carry out antirust treatment to all steel members.
本发明的有益效果:Beneficial effects of the present invention:
本发明为一种用于加固PSC连续箱梁桥的斜拉桥结构及施工方法,通过组合型钢、拉索、桥塔对PSC连续箱梁桥加固的作用,使连续箱梁桥达到了主动加固的效果,克服了传统加固方法加固效果差、对原桥梁结构局部位置破损大等缺点,能有效提高主梁抗弯、抗剪能力,减小主梁下挠变形,并抑制主梁裂缝的发展。The present invention relates to a cable-stayed bridge structure and a construction method for strengthening a PSC continuous box girder bridge. The continuous box girder bridge achieves active reinforcement through the combined steel, stay cables and bridge towers for strengthening the PSC continuous box girder bridge. It overcomes the shortcomings of traditional reinforcement methods such as poor reinforcement effect and large local damage to the original bridge structure. It can effectively improve the bending and shear resistance of the main girder, reduce the deflection deformation of the main girder, and inhibit the development of cracks in the main girder.
本发明中涉及到的机械、材料在桥梁施工中极为普遍,使这种加固方法的实用性得到保证。桥塔、组合型钢、钢锚横梁在工厂预制加工,现场拼装,加工质量可以得到保障,而且可以有效缩短工期。施工区域主要在桥面中央分隔带区域中,占用空间少,不中断交通,对交通影响小,适用于交通任务量大的桥梁加固。The machinery and materials involved in the present invention are very common in bridge construction, so that the practicability of this reinforcing method is guaranteed. Bridge pylons, combined section steel, and steel anchor beams are prefabricated in the factory and assembled on site. The processing quality can be guaranteed, and the construction period can be effectively shortened. The construction area is mainly in the central divider area of the bridge deck, which occupies less space, does not interrupt traffic, and has little impact on traffic. It is suitable for bridge reinforcement with heavy traffic tasks.
附图说明Description of drawings
图1加固前三跨PSC连续箱梁桥顺桥向剖面构造图;Fig. 1 Structural diagram along the bridge direction of the three-span PSC continuous box girder bridge before reinforcement;
图2加固后斜拉桥体系桥梁立面图;Figure 2 is the bridge elevation of the reinforced cable-stayed bridge system;
图3加固后斜拉桥体系桥梁1/2立面图;Figure 3 is the 1/2 elevation of the bridge of the cable-stayed bridge system after strengthening;
图4加固前箱梁横截面图;Figure 4 cross-sectional view of the reinforced front box girder;
图5加固后箱梁横截面图;Figure 5 cross-sectional view of the reinforced box girder;
图6组合型钢节段立面图(安装上水平钢板前);Figure 6 Sectional Elevation of Combined Sectional Steel (Before Installing the Upper Horizontal Steel Plate);
图7组合型钢节段三维图;Figure 7 The three-dimensional diagram of the combined steel segment;
图8桥塔横桥向布置图。Figure 8 Layout of the bridge tower in the transverse direction.
图9桥梁加固前、后受力简图。Figure 9 is a schematic diagram of the force before and after the bridge is strengthened.
a)连续梁桥立面图a) Continuous girder bridge elevation
b)连续梁桥自重作用下受力图b) Force diagram of continuous girder bridge under self-weight
c)连续梁桥自重作用下弯矩图(单位:kN·m)c) Bending moment diagram of continuous girder bridge under its own weight (unit: kN m)
d)加固后成为斜拉桥体系受到向上的提升力d) After reinforcement, the cable-stayed bridge system is subjected to upward lifting force
e)加固后成为斜拉桥体系自重作用下弯矩图(单位:kN·m)e) After strengthening, it becomes the bending moment diagram of the cable-stayed bridge system under the action of its own weight (unit: kN m)
其中箱梁顶板1、组合型钢2、竖向预应力钢筋3、拉索4、桥塔5、0号块6、中支点支座7、桥墩8、基础9、连接装置10、第一钻孔11、拉索锚头12、拉索锚固块13、挡板14、局部加强钢板15、钢锚横梁16、牛腿17、拉索锚头18、箱梁19、第二钻孔20、竖直钢板21、下水平钢板22、上水平钢板23。Among them, box girder top plate 1, combined section steel 2, vertical prestressed steel bar 3, cable 4, bridge tower 5, block 0 6, middle pivot support 7, bridge pier 8, foundation 9, connection device 10, first drilling 11. Cable anchor head 12, cable anchor block 13, baffle plate 14, local reinforced steel plate 15, steel anchor beam 16, corbel 17, cable anchor head 18, box girder 19, second drill hole 20, vertical Steel plate 21, lower horizontal steel plate 22, upper horizontal steel plate 23.
具体实施方式detailed description
下面结合附图和具体实施方式对于本发明作进一步的说明;Below in conjunction with accompanying drawing and specific embodiment the present invention will be further described;
利用上述设计的一种用于加固PSC连续箱梁桥的斜拉桥结构及施工方法,具体步骤如下:Utilize a kind of cable-stayed bridge structure and construction method for strengthening PSC continuous box girder bridge of above-mentioned design, concrete steps are as follows:
步骤一:查阅资料并实测得到桥梁构造、病害状况,勘测得到预加固桥梁需要提高的承载力大小,用来得到桥塔、拉索、组合型钢、连接装置的受力情况,由此确定各部件的所需个数、尺寸、钢材等级及具体布置情况。Step 1: Consult the data and get the bridge structure and disease status through actual measurement, survey and get the bearing capacity of the pre-reinforced bridge, which is used to get the stress of the bridge tower, cable, combined steel, and connecting device, and then determine the components The required number, size, steel grade and specific layout.
步骤二:由步骤一中得到的受力情况及桥塔、拉索、组合型钢的结构形式确定拉索张拉顺序及各次张拉力。Step 2: Determine the cable tension sequence and each tension force based on the stress conditions obtained in step 1 and the structural form of bridge towers, cables, and combined steel sections.
步骤三:根据步骤一并考虑施工现场机械作业能力,由工厂加工桥塔(节段)、组合型钢(节段)、钢锚横梁。由连接装置尺寸确定钻孔大小。在下水平钢板22上打出若干个第一钻孔11,凿除桥面中心线处桥面铺装,露出竖向预应力钢筋3,利用连接装置10连接竖向预应力钢筋3,在桥面中心线布置组合型钢2后,再利用连接装置10将组合型钢2锚固在箱梁顶板1上。Step 3: According to the steps, the mechanical operation capacity of the construction site is considered together, and the bridge tower (segment), combined section steel (segment), and steel anchor beam are processed by the factory. The size of the drill hole is determined by the size of the connection device. Get some first boreholes 11 on the lower horizontal steel plate 22, chisel out the bridge deck pavement at the center line of the bridge deck, expose the vertical prestressed steel bar 3, utilize the connecting device 10 to connect the vertical prestressed steel bar 3, in the center of the bridge deck After the combined section steel 2 is arranged, the connecting device 10 is used to anchor the combined section steel 2 on the top plate 1 of the box girder.
步骤四:逐节段安装、焊接桥塔节段至组合型钢2上。同时在桥塔上安装临时工作平台,为安装拉索时提供便利。施工中严格控制拼装精度和焊接质量。为减小温度对拼装、焊接质量的不良影响,应选择温度适中的时间段进行施工。Step 4: Install and weld the bridge tower segments to the composite steel 2 segment by segment. At the same time, a temporary working platform is installed on the bridge tower to facilitate the installation of the cables. The assembly accuracy and welding quality are strictly controlled during construction. In order to reduce the adverse effect of temperature on assembly and welding quality, the time period with moderate temperature should be selected for construction.
步骤五:在桥塔5上安装滑轮、卷扬机提升拉索,按顺序牵引拉索到桥塔5孔道内就位后,用拉索锚头18锚固。将拉索另一端在组合型钢2上安装,并用拉索锚头12锚固。Step 5: Install pulleys and hoist cables on the bridge tower 5, pull the cables in order to be in place in the tunnel of the bridge tower 5, and anchor them with the cable anchor head 18. Install the other end of the drag cable on the combined section steel 2, and anchor it with the drag cable anchor head 12.
步骤六:加固过程中桥梁结构体系发生变化,导致桥梁结构内力发生重分布,因此需要调整拉索索力。依据步骤二,按顺序张拉拉索至各次的拉力。拉索的索力正确与否是加固效果的重要影响因素之一,应用可靠的方法测量各阶段拉索的索力,如有偏差,应及时调整,以免对桥梁不利。Step 6: The structural system of the bridge changes during the reinforcement process, resulting in redistribution of the internal force of the bridge structure, so the cable force needs to be adjusted. According to step 2, stretch the cables in sequence to the tension of each time. Whether the cable force of the cable is correct or not is one of the important factors affecting the reinforcement effect. A reliable method should be used to measure the cable force of the cable at each stage. If there is any deviation, it should be adjusted in time to avoid disadvantages to the bridge.
步骤七:上水平钢板23(节段)在拉索穿过的地方打出第二钻孔20,对其拼接后焊接。对所有钢构件进行防腐、防锈处理,则连续梁桥加固完成。Step 7: The upper horizontal steel plate 23 (segment) drills the second drill hole 20 at the place where the cable passes through, splices it and then welds it. Anti-corrosion and anti-rust treatment are carried out on all steel components, and the reinforcement of the continuous girder bridge is completed.
本发明中采用斜拉桥体系进行连续梁桥的加固,将轴力施加给组合型钢,对桥梁仅施加竖直向上的提升力。本发明中的受力说明如下,其中桥梁跨度取60m+90m+90m,桥梁自重取q=600kN/m,每处提升力均取1500kN。In the present invention, the cable-stayed bridge system is adopted to reinforce the continuous girder bridge, and the axial force is applied to the combined section steel, and only a vertical upward lifting force is applied to the bridge. The stress in the present invention is described as follows, wherein the span of the bridge is 60m+90m+90m, the self-weight of the bridge is q=600kN/m, and the lifting force at each place is 1500kN.
表1加固前、后受力对比表(单位:kN·m)Table 1 Force comparison table before and after reinforcement (unit: kN m)
总结:由受力简图图9及受力对比表可知,加固后桥梁在自重作用下内力明显降低,对桥梁能够进行“减负”,说明本发明中的加固方法效果明显。Summary: From the force diagram in Figure 9 and the force comparison table, it can be seen that the internal force of the reinforced bridge is significantly reduced under the action of its own weight, and the bridge can be "load-reduced", which shows that the reinforcement method in the present invention has an obvious effect.
以上所述,仅是本发明的较佳实施例而已,并非对本发明做任何形式上的限制,任何未脱离本发明技术方案内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。The above is only a preferred embodiment of the present invention, and does not limit the present invention in any form, and any simple modification made to the above embodiments according to the technical essence of the present invention does not depart from the content of the technical solution of the present invention. , equivalent changes and modifications all still belong to the scope of the technical solution of the present invention.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510052378.0A CN104652293B (en) | 2015-02-01 | 2015-02-01 | A kind of Cable-Stayed Bridge Structure for reinforcing PSC Continuous Box Girder Bridge and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510052378.0A CN104652293B (en) | 2015-02-01 | 2015-02-01 | A kind of Cable-Stayed Bridge Structure for reinforcing PSC Continuous Box Girder Bridge and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104652293A CN104652293A (en) | 2015-05-27 |
CN104652293B true CN104652293B (en) | 2016-06-22 |
Family
ID=53243889
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510052378.0A Active CN104652293B (en) | 2015-02-01 | 2015-02-01 | A kind of Cable-Stayed Bridge Structure for reinforcing PSC Continuous Box Girder Bridge and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104652293B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105603890A (en) * | 2015-11-16 | 2016-05-25 | 上海应用技术学院 | Extradosed type external cable reinforced girder bridge |
CN106012872B (en) * | 2016-06-28 | 2019-03-12 | 山东大学 | Cable-stayed reinforcement system and construction method for continuous rigid frame bridges without back-cable |
CN106836028B (en) * | 2017-04-12 | 2019-04-09 | 云南云岭高速公路工程咨询有限公司 | Concrete continuous rigid frame girder bridge strengthened with steel truss girder jacking and construction method |
CN107151987A (en) * | 2017-06-14 | 2017-09-12 | 沈阳建筑大学 | A kind of the oblique pull ruggedized construction and its construction method of the T-shaped rigid frame bridge of double width |
CN107119583A (en) * | 2017-06-14 | 2017-09-01 | 沈阳建筑大学 | A kind of T-shaped rigid frame bridge back of the body tower oblique pull ruggedized construction of double width and its construction method |
CN107268458B (en) * | 2017-06-14 | 2023-01-31 | 沈阳建筑大学 | Double-width continuous rigid frame bridge tie rod arch reinforcing structure and construction method thereof |
CN107119582B (en) * | 2017-06-14 | 2023-01-10 | 沈阳建筑大学 | A T-shaped rigid frame bridge back tower cable-stayed reinforcement structure and its construction method |
CN109024319B (en) * | 2018-09-21 | 2023-12-15 | 湖北省交通规划设计院股份有限公司 | Low-tower cable-stayed bridge reinforcing structure of double-amplitude continuous rigid frame bridge and construction method |
CN110878535A (en) * | 2019-12-02 | 2020-03-13 | 广西交通工程检测有限公司 | Diagonal tension load-adjusting system for reinforcing rigid truss bridge and reinforcing method thereof |
CN114150567A (en) * | 2020-09-05 | 2022-03-08 | 武汉日意科技有限公司 | Structure for preventing bridge body from shaking |
CN113356081B (en) * | 2021-07-15 | 2023-03-17 | 中交一公局集团有限公司 | Bridge incremental launching construction method and bridge precast beam structure |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006009449A (en) * | 2004-06-28 | 2006-01-12 | Kajima Corp | Truss panel girders and precast truss panels |
CN201169752Y (en) * | 2007-12-20 | 2008-12-24 | 中铁大桥勘测设计院有限公司 | External prestressed steel structure anchorage steering system for old bridge reinforcement |
CN101424075B (en) * | 2008-11-24 | 2010-10-20 | 重庆交通大学 | Concrete Box Girder Bridge Widening and Strengthening Structure and Its Construction Method |
CN202047377U (en) * | 2011-04-26 | 2011-11-23 | 中铁二院工程集团有限责任公司 | Reinforcing structure of concrete box girder |
-
2015
- 2015-02-01 CN CN201510052378.0A patent/CN104652293B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104652293A (en) | 2015-05-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104652293B (en) | A kind of Cable-Stayed Bridge Structure for reinforcing PSC Continuous Box Girder Bridge and construction method | |
CN104652242B (en) | Derrick connecting structure used for reinforcing PSC (Pre-stressed Concrete) continuous box girder bridge and construction method | |
CN108193607B (en) | Fabricated prestressed truss for reinforcement and construction method thereof | |
CN104264575B (en) | A kind of prestress steel case Concrete Combination Continuous Beam bridge structure and construction technology | |
CN101613997A (en) | A steel-concrete composite widening method | |
CN108060636B (en) | The construction method of overall assembled composite beam bridge | |
CN104652244B (en) | A kind of Suspension bridge structure for reinforcing PSC Continuous Box Girder Bridge and construction method | |
CN106012872B (en) | Cable-stayed reinforcement system and construction method for continuous rigid frame bridges without back-cable | |
CN108824221B (en) | Web replacement and strengthening method of concrete continuous girder bridge based on corrugated steel plate | |
CN106499211B (en) | Newly-increased outrigger frame Baogang anchor daraf(reciprocal of farad) structure | |
CN108867319A (en) | A kind of steel-UHPC combination beam and construction method for cable-stayed bridge | |
CN101298756A (en) | Technique for widening concrete box girder without increasing foot stall steel component | |
CN110878535A (en) | Diagonal tension load-adjusting system for reinforcing rigid truss bridge and reinforcing method thereof | |
CN106149569A (en) | The transforming methods of structural system of self-anchored suspension bridge First cable later girder construction | |
CN103898834A (en) | Concrete-filled steel tube composite beam and trussed cable tower cable-stayed bridge and construction method thereof | |
CN106320192B (en) | A kind of beam section replacing and reinforcing method for large span concrete continuous beam bridge | |
US20240271375A1 (en) | Composite rcc deck and prestressed parabolic bottom chord underslung open web steel girder bridge superstructure | |
CN115928611A (en) | Construction method for lightening hanging basket in cantilever beam pouring method | |
CN104612063A (en) | Concrete box beam first-aid repair method with prefabricated part on-site assembling combination beam | |
CN212561221U (en) | Diagonal tension load-adjusting system for reinforcing rigid truss bridge | |
CN211228068U (en) | Festival segmentation pier convenient to installation | |
CN104652249B (en) | A force transmission device between a cable and a main girder | |
Kasuga | Development of a new bridge construction method using suspension structures | |
Hewson | Design of prestressed concrete bridges | |
CN206902719U (en) | Preassembling support beam combines support system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210207 Address after: 100007 room d1031, No.11, Tibetan scripture hall Hutong, Dongcheng District, Beijing Patentee after: Beijing Guqiao Technology Co.,Ltd. Address before: 100124 No. 100 Chaoyang District Ping Tian Park, Beijing Patentee before: Beijing University of Technology |