CN104612763A - Device for starting intermediate-pressure cylinder device by using neighbor turbine steam in unitized unit and starting method thereof - Google Patents
Device for starting intermediate-pressure cylinder device by using neighbor turbine steam in unitized unit and starting method thereof Download PDFInfo
- Publication number
- CN104612763A CN104612763A CN201410763159.9A CN201410763159A CN104612763A CN 104612763 A CN104612763 A CN 104612763A CN 201410763159 A CN201410763159 A CN 201410763159A CN 104612763 A CN104612763 A CN 104612763A
- Authority
- CN
- China
- Prior art keywords
- unit
- machine
- vapour
- adjacent
- main frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Control Of Turbines (AREA)
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
Abstract
本发明公开了一种单元制机组利用邻汽启动中压缸装置及其启动方法,包括本机和邻机,通过本机上本机辅汽联箱及其连接的锅炉再热器将气源通向汽轮机中压缸,汽源由通过管道与本机辅汽联箱相连通的邻机辅汽联箱提供。本发明通过管道将邻机汽源连向中压缸,进行本机中压缸启动,本机锅炉、启动风机和电动给水泵无需工作,能节约厂用电和燃油,完成汽轮机检修后的质量检查、驱动转子转动作现场工作,并可提前冲转、检验安装质量和进行机组并网前电气部分的空载试验,减少此期间的运行操作、维护工作量,还能缓解锅炉、汽机检修工期不协调,从而实现节能、降耗、机组经济性和可靠性高、利用率高,启动方法简单方便,操作安全可靠。
The invention discloses a unit system unit using adjacent steam to start a medium-pressure cylinder device and a starting method thereof. Leading to the medium pressure cylinder of the steam turbine, the steam source is provided by the auxiliary steam header of the adjacent machine connected to the auxiliary steam header of the local machine through the pipeline. The invention connects the steam source of the adjacent machine to the medium-pressure cylinder through the pipeline, and starts the medium-pressure cylinder of the machine. The boiler, the start-up fan and the electric feed water pump of the machine do not need to work, which can save power and fuel in the plant and improve the quality of the steam turbine after maintenance. Check and drive the rotor to work on-site, and can run ahead of time, check the installation quality and conduct no-load test of the electrical part before the unit is connected to the grid, reducing the operation and maintenance workload during this period, and also reducing the maintenance period of boilers and steam turbines Uncoordinated, so as to achieve energy saving, consumption reduction, high unit economy and reliability, high utilization rate, simple and convenient start-up method, safe and reliable operation.
Description
技术领域 technical field
本发明属于汽轮机技术领域,涉及一种单元制机组利用邻汽启动中压缸装置,还涉及该装置的启动方法。 The invention belongs to the technical field of steam turbines, and relates to a device for starting an intermediate-pressure cylinder with adjacent steam for a unitary unit, and also relates to a method for starting the device.
背景技术 Background technique
长期以来在大型单元制机组检修期间,经常出现锅炉和汽轮机的检修工期不能很好的协调一致,往往是汽轮机检修完毕急需检验检修效果或在现场需要有驱动转子转动作现场工作(如动平衡等)而锅炉因为某种原因不能点火。而当锅炉检修完毕后再点火、启动汽轮机时又发现汽轮机检修效果不佳需要返工,耽误工期。延长了机组的检修工期、降低了设备的可靠性、利用率和经济性。大型火电厂单元制机组设计时就存在相邻单元之间不能互相切换,一个单元中的主要设备故障不能运行时整个单元都只能停运,运行灵活性较差是造成汽机锅炉检修工期不能很好协调一致的主要原因。 For a long time, during the maintenance of large-scale unit units, it has often occurred that the maintenance schedules of boilers and steam turbines cannot be well coordinated. It is often because the steam turbines are overhauled and the results of the maintenance are urgently needed to be inspected or the on-site work (such as dynamic balance, etc.) is required to drive the rotor to rotate. ) and the boiler fails to ignite for some reason. However, when the boiler was overhauled and then ignited and the steam turbine was started, it was found that the overhaul effect of the steam turbine was not good and required rework, which delayed the construction period. The overhaul period of the unit is extended, and the reliability, utilization rate and economy of the equipment are reduced. In the design of large-scale thermal power plant unit units, adjacent units cannot be switched to each other. When the main equipment in a unit fails to operate, the entire unit can only be shut down. The poor operation flexibility results in the short maintenance period of steam turbine boilers. The main reason for the good coordination.
从机组实施的情况来看,从锅炉点火至电气试验结束,约用时60个小时,耗用燃油300t左右,耗用费用240万元/台;同时锅炉启动风机,汽机启动电动给水泵,机组启动耗费厂用电:(6300+3000+1700)*60=660000kw.h/台,耗用费用33万元/台,共计耗用费用273万元/台,价格昂贵。 Judging from the implementation of the unit, from the ignition of the boiler to the end of the electrical test, it takes about 60 hours, consumes about 300 tons of fuel oil, and costs 2.4 million yuan per unit; at the same time, the boiler starts the fan, the steam turbine starts the electric water pump, and the unit starts The power consumption of the factory: (6300+3000+1700)*60=660000kw.h/unit, the consumption cost is 330,000 yuan/unit, and the total consumption cost is 2.73 million yuan/unit, which is expensive.
发明内容 Contents of the invention
本发明要解决的技术问题是:提供一种单元制机组利用邻汽启动中压缸装置及其启动方法,可以实现锅炉风机不启动、不点火,汽轮机则不用启动电动给水泵,即可实现汽轮机的中压缸启动,完成汽轮机检修后的质量检查、驱动转子转动作现场工作(如动平衡等)和进行机组并网前电气部分的空载试验,以克服现有技术存在的问题。 The technical problem to be solved by the present invention is: to provide a unit system unit that uses adjacent steam to start the medium-pressure cylinder device and its starting method, which can realize that the boiler fan does not start and does not ignite, and the steam turbine does not need to start the electric feed water pump. Start the medium pressure cylinder, complete the quality inspection after the overhaul of the steam turbine, drive the rotor to rotate on-site (such as dynamic balance, etc.) and carry out the no-load test of the electrical part before the unit is connected to the grid, so as to overcome the problems existing in the existing technology.
本发明采取的技术方案为:一种单元制机组利用邻汽启动中压缸装置,包括本机和邻机,所述本机上设置有本机辅汽联箱,所述本机辅汽联箱连接锅炉再热器,所述锅炉再热器连接汽轮机中压缸,所述邻机上设置有邻机辅汽联箱,连接在邻机再热冷段管上,邻机辅汽联箱通过管道与本机辅汽联箱相连通。 The technical solution adopted by the present invention is: a unit unit unit utilizes the adjacent steam to start the medium-pressure cylinder device, including the local machine and the adjacent machine, the local machine is provided with the local auxiliary steam header, the local auxiliary steam The boiler reheater is connected to the boiler reheater, and the boiler reheater is connected to the intermediate pressure cylinder of the steam turbine. The auxiliary steam header of the adjacent machine is installed on the adjacent machine, which is connected to the reheating and cold section pipe of the adjacent machine. The auxiliary steam header of the adjacent machine passes through The pipeline is connected with the auxiliary steam header of the machine.
所述管道上设置阀门,能够将气源连通和切断,并能调节蒸汽流过的压力大小,并起到安全保护的作用。 A valve is arranged on the pipeline, which can connect and cut off the gas source, and can adjust the pressure of the steam flowing through, and play the role of safety protection.
所述阀门采用电动调节阀门,便于自动控制,降低劳动强度,控制精确。 The valve adopts an electric regulating valve, which is convenient for automatic control, reduces labor intensity and is precise in control.
所述管道采用外径为377mm、壁厚为16mm的压力管道,能够满足本机中中压缸的冲转压力要求,并且便于焊接和安装。 The pipeline adopts a pressure pipeline with an outer diameter of 377mm and a wall thickness of 16mm, which can meet the punching pressure requirements of the medium-pressure cylinder of the machine, and is convenient for welding and installation.
一种单元制机组利用邻汽启动中压缸装置的启动方法,包括一种单元制机组邻机汽源进行中压缸启动装置,该装置包括本机和邻机,所述本机上设置有本机辅汽联箱,所述本机辅汽联箱连接锅炉再热器,所述锅炉再热器连接汽轮机中压缸,所述邻机上设置有邻机辅汽联箱,连接在邻机再热冷段管上,邻机辅汽联箱通过管道与本机辅汽联箱相连通; A method for starting an intermediate-pressure cylinder device of a unit system unit using adjacent steam, including a device for starting the medium-pressure cylinder with the steam source of the adjacent unit of the unit system unit. The device includes a local machine and an adjacent machine. The auxiliary steam header of the local machine is connected to the boiler reheater, and the boiler reheater is connected to the intermediate pressure cylinder of the steam turbine. On the reheating and cold section pipes, the auxiliary steam header of the adjacent machine is connected with the auxiliary steam header of the local machine through pipes;
所述管道上设置阀门; A valve is set on the pipeline;
所述阀门采用电动调节阀门; The valve adopts electric regulating valve;
所述管道采用外径为377mm、壁厚为16mm的压力管道; The pipeline adopts a pressure pipeline with an outer diameter of 377mm and a wall thickness of 16mm;
一种单元制机组利用邻汽启动中压缸装置的启动方法,步骤包括如下: A method for starting a medium-pressure cylinder device using adjacent steam for a unit system unit, the steps of which include the following steps:
(1)主机循环水系统进行注水,将主机和邻机机组循泵出口联络门开启,利用邻机循泵向主机供循环水,开启开式水泵旁路门对主机机组氢冷器、闭式水冷却器、定子冷却水冷却器注水排空气; (1) Inject water into the circulating water system of the main engine, open the connecting door of the circulating pump outlet of the main engine and the adjacent machine unit, use the adjacent machine circulating pump to supply circulating water to the main engine, open the open water pump bypass door to the main engine unit hydrogen cooler, closed Water cooler and stator cooling water cooler inject water and exhaust air;
(2)主机机组定子冷却水系统注水,启动冷却水泵运行; (2) Inject water into the stator cooling water system of the main engine unit, and start the cooling water pump to run;
(3)凝汽器补水至水位800~1000mm; (3) Make up water to the condenser to the water level of 800~1000mm;
(4)凝结水系统注水; (4) Water injection of condensate system;
(5)隔离系统形成中压缸启动通道:(a)关闭主机过、再热器减温水手动门,关闭高旁减温水电动门;(b)关闭主高旁、过热器试验堵阀、高排逆止门;(c)关闭主机辅汽联箱至除氧器加热手动门,关闭主机辅汽联箱至小机用汽总门,关闭主机辅汽联箱至锅炉炉底加热等用汽总门,关闭主机辅汽联箱至磨煤机消防蒸汽总门,关闭主机辅汽联箱至暖通用汽总门,关闭启动锅炉至主机辅汽联箱进汽手动门;(c)关闭小机排汽碟阀和小机排汽减温水门; (5) The isolation system forms the starting channel of the medium pressure cylinder: (a) close the manual door of the superheater and reheater desuperheating water of the main engine, and close the electric door of the desuperheating water of the high side; (b) close the main high side, superheater test blocking valve, high (c) Close the manual door from the main engine auxiliary steam header to the deaerator heating, close the main engine auxiliary steam header to the small machine steam main door, close the main engine auxiliary steam header to the boiler bottom heating and other steam Main door, close main engine auxiliary steam header to coal mill fire-fighting steam main door, close main engine auxiliary steam header to heating general steam main door, close start boiler to main engine auxiliary steam header steam inlet manual door; (c) close Small machine exhaust steam disc valve and small machine exhaust steam desuperheating water valve;
(6)启动凝结水泵的再循环,同时向凝杂水母管供水; (6) Start the recirculation of the condensate pump and supply water to the condensate jellyfish pipe at the same time;
(7)启动真空泵对凝汽器抽真空; (7) Start the vacuum pump to evacuate the condenser;
(8)凝汽器达到真空0.03~0.05MPa后利用邻机辅汽汽源对主机辅汽联箱、轴封汽系统、主机冷段管道进行暖管; (8) After the condenser reaches a vacuum of 0.03~0.05MPa, use the auxiliary steam source of the adjacent machine to warm the auxiliary steam header of the main engine, the shaft seal steam system, and the cold section pipeline of the main engine;
(9)投入主机轴封汽,小机轴封汽不投用; (9) The shaft seal steam of the main machine is put into use, and the shaft seal steam of the small machine is not put into use;
(10)主机机组冲转:(a)开启邻机汽源,汽源通过邻机再热冷段—邻机辅汽联箱—主机辅汽联箱—主机再热冷段—主机炉再热器—主机中压缸,实现主机中压缸的冲转启动;(b)主机机组挂闸后设定目标转速为200r/min,升速率100r/min/min,进行冲转,主机机组冲转后注意盘车脱扣情况,利用低旁调节控制再热汽压力;(c)视主机再热汽压力趋于稳定,邻机汽包水位稳定后设定目标转速为1500r/min,升速率100r/min/min,继续升速,升速过程中逐渐关小主机低旁直至关完,利用邻机冷再至辅汽联箱电动门控制主机再热汽压在0.8~0.9MPa;(d)主机机组转速升至1500r/min后暖机60分钟,测量各轴承振动,机组胀差、缸胀、缸壁温差达到规定范围值,继续升速;(f)主机机组转速升至3000r/min,测量各轴承振动。 (10) The main engine unit rushes forward: (a) Turn on the steam source of the adjacent machine, and the steam source passes through the reheating and cooling section of the adjacent machine—the auxiliary steam header of the adjacent machine—the auxiliary steam header of the main engine—the reheating and cold section of the main engine—the reheating of the main engine furnace (b) Set the target speed to 200r/min after the main engine unit hangs the brake, and set the target speed to 200r/min, and the rising rate to 100r/min/min, to perform the reverse rotation, and the main engine unit to reverse Finally, pay attention to the cranking and tripping situation, and use the low side adjustment to control the reheating steam pressure; (c) depending on the main engine reheating steam pressure tends to be stable, set the target speed to 1500r/min and the rising rate to 100r after the steam drum water level of the adjacent machine is stable /min/min, continue to increase the speed, gradually turn off the main engine and lower side until the end of the speed increase, use the cooling of the adjacent engine and then go to the electric door of the auxiliary steam header to control the reheat steam pressure of the main engine at 0.8~0.9MPa; (d) After the speed of the main unit rises to 1500r/min, warm up the machine for 60 minutes, measure the vibration of each bearing, and the expansion difference of the unit, the cylinder expansion, and the temperature difference of the cylinder wall reach the specified range, and continue to increase the speed; (f) The speed of the main unit rises to 3000r/min, Measure the vibration of each bearing.
优选的,上述步骤(1)中将主机和邻机机组循泵出口联络门开至50%,能够满足中压缸冲转要求。 Preferably, in the above step (1), the outlet connecting door of the circulating pump of the main engine and the adjacent machine unit is opened to 50%, which can meet the requirements of the intermediate pressure cylinder.
优选的,上述步骤(8)中凝汽器真空达到0.03~0.05MPa。 Preferably, the vacuum of the condenser in the above step (8) reaches 0.03-0.05 MPa.
优选的,上述步骤(10)中冲转时中压联合汽门前压力0.6~0.8MPa、温度240~260℃,邻机机组的负荷≥450MW。 Preferably, in the above step (10), during the flushing, the pressure in front of the medium pressure combined steam valve is 0.6~0.8MPa, the temperature is 240~260°C, and the load of the adjacent unit is ≥450MW.
优选的,上述步骤(10)中主机机组冲转前主机低旁开至10%,利用邻机再热冷段至辅汽联箱电动门调节主机中压联合汽门前压力在0.8~0.9MPa。 Preferably, in the above step (10), before the main engine unit runs, the low side of the main engine is opened to 10%, and the pressure in front of the main engine medium pressure combined steam valve is adjusted to 0.8~0.9MPa by using the adjacent machine reheating and cooling section to the auxiliary steam header electric door .
本发明的有益效果:与现有技术相比,本发明采用管道将本机辅汽联箱与邻机辅汽联箱相连,将邻机汽源输送到本机对中压缸进行启动,本机锅炉不用启动风机和点火,汽机则不用启动电动给水泵,能节约厂用电和燃油,完成汽轮机检修后的质量检查、驱动转子转动作现场工作(如动平衡等),并可提前冲转、检验安装质量和进行机组并网前电气部分的空载试验,同时,还可减少此期间的运行操作、维护工作量,另外还能缓解锅炉、汽机检修工期不协调的矛盾,同时具有节能、降耗,机组经济性和可靠性高、能源利用率高的优点,采用管道连接的耗用费用3万/台,相比采用本机直接启动耗费的273万/台,具有很高的经济效用,启动方法简单方便,操作安全可靠。 Beneficial effects of the present invention: Compared with the prior art, the present invention uses pipes to connect the auxiliary steam header of the local machine with the auxiliary steam header of the adjacent machine, and transports the steam source of the adjacent machine to the machine to start the medium-pressure cylinder. The steam turbine does not need to start the fan and ignition, and the steam turbine does not need to start the electric feed pump, which can save power and fuel consumption, complete the quality inspection after the steam turbine is overhauled, and drive the rotor to perform on-site work (such as dynamic balance, etc.), and can be rushed in advance , inspect the installation quality and carry out the no-load test of the electrical part before the unit is connected to the grid. Consumption reduction, high unit economy and reliability, and high energy utilization rate. The cost of pipeline connection is 30,000 per unit, compared with the cost of 2.73 million per unit for direct startup of the machine, which has high economic utility. , The starting method is simple and convenient, and the operation is safe and reliable.
附图说明 Description of drawings
图1是本发明的结构示意图。 Fig. 1 is a structural schematic diagram of the present invention.
图中,1-邻机辅汽联箱,2-管道,3-阀门,4-本机辅汽联箱,5-锅炉再热器,6-本机中压缸,7-凝汽器,8-邻机再热冷段管,9-本机再热冷段管。 In the figure, 1-adjacent machine auxiliary steam header, 2-pipeline, 3-valve, 4-local machine auxiliary steam header, 5-boiler reheater, 6-local machine medium pressure cylinder, 7-condenser, 8-neighboring machine reheating cold section pipe, 9-local machine reheating cold section pipe.
具体实施方式 Detailed ways
如图1所示, 一种单元制机组利用邻汽启动中压缸装置,包括本机和邻机,所述本机上设置有本机辅汽联箱4,所述本机辅汽联箱4连接锅炉再热器5,所述锅炉再热器5连接汽轮机中压缸6,所述邻机上设置有邻机辅汽联箱1,连接在邻机再热冷段管8上,邻机辅汽联箱1通过管道2与本机辅汽联箱4相连通,采用管道将本机辅汽联箱与邻机辅汽联箱相连,依次从邻机再热冷段、邻机辅汽联箱、主机辅汽联箱、主机再热冷段、主机炉再热器和主机中压缸形成密闭汽源通道,将邻机气源输送到本机对中压缸进行启动,最终从与中压缸相连的凝汽器7排出,实现冲压缸冲转,本机锅炉不用启动风机和点火,汽机则不用启动电动给水泵,能节约厂用电和燃油,完成汽轮机检修后的质量检查、驱动转子转动作现场工作(如动平衡等),并可提前冲转、检验安装质量和进行机组并网前电气部分的空载试验,同时,还可减少此期间的运行操作、维护工作量,另外还能缓解锅炉、汽机检修工期不协调的矛盾,同时具有节能、降耗,机组经济性和可靠性高、能源利用率高的优点,采用管道连接的耗用费用3万/台,相比采用本机直接启动耗费的273万/台,具有很高的经济效用。 As shown in Figure 1, a unitary unit uses the adjacent steam to start the medium-pressure cylinder device, including the local machine and the adjacent machine. The local machine is provided with the local auxiliary steam header 4, and the local auxiliary steam header 4 is connected to the boiler reheater 5, the boiler reheater 5 is connected to the medium pressure cylinder 6 of the steam turbine, and the auxiliary steam header 1 of the adjacent machine is arranged on the adjacent machine, which is connected to the reheating and cold section pipe 8 of the adjacent machine, and the adjacent machine The auxiliary steam header 1 is connected with the auxiliary steam header 4 of the local machine through the pipe 2, and the auxiliary steam header of the local machine is connected with the auxiliary steam header of the adjacent machine through the pipeline, and the auxiliary steam The header, the auxiliary steam header of the main engine, the reheating and cold section of the main engine, the reheater of the main engine furnace and the medium-pressure cylinder of the main engine form a closed steam source channel, and the gas source of the adjacent machine is delivered to the machine to start the medium-pressure cylinder, and finally from the The condenser 7 connected to the medium-pressure cylinder is discharged to realize the punching of the stamping cylinder. The boiler of this machine does not need to start the fan and ignition, and the steam turbine does not need to start the electric feed pump, which can save power and fuel for the plant. After the completion of the quality inspection of the steam turbine, Drive the rotor to rotate for on-site work (such as dynamic balance, etc.), and can run in advance, check the installation quality and conduct no-load test of the electrical part before the unit is connected to the grid. At the same time, it can also reduce the operation and maintenance workload during this period. In addition, it can also alleviate the contradiction of uncoordinated boiler and steam turbine maintenance period, and has the advantages of energy saving, consumption reduction, high unit economy and reliability, and high energy utilization rate. The cost of pipeline connection is 30,000 per unit, compared with It costs 2.73 million per unit to start directly with this machine, which has high economic utility.
所述管道2上设置阀门3,能够将气源连通和切断,并能调节蒸汽流过的压力大小,并起到安全保护的作用。 The pipeline 2 is provided with a valve 3, which can connect and cut off the gas source, and can adjust the pressure of the steam flowing through, and play a role of safety protection.
所述阀门3采用电动调节阀门,是一种以电磁阀为向导阀的水力操作式阀门,控制反应准确快速,根据电信号遥控开启和关闭管道路系统,实现远程操作,并可取代闸阀和蝶阀用于大型电动操作系统。阀门关闭速度可调,平稳关闭而不产生压力波动,该阀门体积小、重量轻、维修简单、使用方便、安全可靠,便于自动控制,降低劳动强度,控制精确。 The valve 3 adopts an electric regulating valve, which is a hydraulically operated valve with a solenoid valve as the guide valve. The control response is accurate and fast, and the pipeline system is opened and closed remotely according to the electric signal to realize remote operation, and can replace gate valves and butterfly valves. For large electric operating systems. The closing speed of the valve is adjustable, and it closes smoothly without pressure fluctuations. The valve is small in size, light in weight, easy to maintain, easy to use, safe and reliable, easy to automatically control, reduces labor intensity, and has precise control.
所述管道2采用外径为377mm、壁厚为16mm的压力管道,大小与现有的设备的管外径相同,能够满足本机中中压缸的冲转压力要求,并且便于焊接和安装。 The pipe 2 is a pressure pipe with an outer diameter of 377 mm and a wall thickness of 16 mm, which is the same size as the pipe outer diameter of the existing equipment, can meet the punching pressure requirements of the medium-pressure cylinder of the machine, and is convenient for welding and installation.
如图1所示,为便于描述现假定提供汽源的邻机为2号机,准备利用邻机汽源启动的本机为1号机。 As shown in Figure 1, for the convenience of description, it is assumed that the adjacent machine that provides the steam source is No.
一种单元制机组利用邻汽启动中压缸装置包括管路系统改造步骤和启动步骤。 A unit system unit utilizes adjacent steam to start an intermediate-pressure cylinder device, which includes a pipeline system transformation step and a start-up step.
实施例1:一种单元制机组利用邻汽启动中压缸装置,改造步骤如下: Embodiment 1: A unit system unit uses adjacent steam to start the medium-pressure cylinder device, and the transformation steps are as follows:
(1)拆除1号机再热冷段至1号机辅汽联箱逆止门阀芯; (1) Remove the check gate spool from the reheating and cooling section of No. 1 unit to the auxiliary steam header of No. 1 unit;
(2)拆除1号机再热冷段至1号机辅汽联箱电动调节门,用短管进行短接; (2) Remove the reheating and cooling section of No. 1 unit to the electric adjustment door of the auxiliary steam header of No. 1 unit, and use short pipes to short-circuit;
(3)拆除2号机再热冷段至2号机辅汽联箱电动调节门,用短管进行短接; (3) Remove the reheating and cooling section of No. 2 unit to the electric adjustment door of the auxiliary steam header of No. 2 unit, and short-circuit it with a short pipe;
(4)将2号机再热冷段至2号机辅汽联箱电动门开关设为5秒脉冲电动; (4) Set the electric door switch of the reheating and cooling section of No. 2 unit to the auxiliary steam header of No. 2 unit as pulse electric for 5 seconds;
(5)其余全部原有管路系统不变,将1号机辅汽联箱与2号机辅汽联箱采用管道连接,并在该管道上设置阀门; (5) All other original piping systems remain unchanged, the auxiliary steam header of No. 1 unit is connected with the auxiliary steam header of No. 2 unit by pipelines, and valves are set on the pipelines;
(6)上述各步骤中选用的管道的管径、壁厚和材质,应与原管道一致,焊接时按材质要求进行。 (6) The pipe diameter, wall thickness and material of the pipe selected in the above steps should be consistent with the original pipe, and the welding should be carried out according to the material requirements.
实施例2:一种单元制机组利用邻汽启动中压缸装置的启动方法,采用一种单元制机组利用邻汽启动中压缸装置,步骤包括如下: Embodiment 2: A method for starting a medium-pressure cylinder device using adjacent steam for a unit system unit. A unit system unit is used to start the medium-pressure cylinder device with adjacent steam. The steps include the following:
(1)1号机循环水系统进行注水,将1、2号机组循泵出口联络门开至50%,利用2号机循泵向1号机供循环水,开启开式水泵旁路门对1号机组氢冷器、闭式水冷却器、定子冷却水冷却器注水排空气,可同时做1号机循泵联锁试验恢复备用; (1) Inject water into the circulating water system of unit 1, open the connecting door of the circulation pump outlet of units 1 and 2 to 50%, use the circulation pump of unit 2 to supply circulating water to unit 1, and open the bypass door of the open water pump The hydrogen cooler, closed water cooler, and stator cooling water cooler of Unit 1 are filled with water and exhausted, and can be used for the pump interlock test of Unit 1 at the same time to restore standby;
(2)1号机组定子冷却水系统注水,启动一台冷却水泵运行; (2) Inject water into the stator cooling water system of unit 1, and start a cooling water pump;
(3)凝汽器补水至正常水位800~1000mm; (3) Condenser water replenishment to normal water level 800~1000mm;
(4)凝结水系统注水排空气; (4) Condensate water system injects water and exhausts air;
(5)隔离系统形成中压缸启动通道:(a)关闭1号机过、再热器减温水手动门,关闭高旁减温水电动门;(b)关闭1号机高旁、过热器试验堵阀、高排逆止门;(c)关闭1号机辅汽联箱至除氧器加热手动门,关闭1号机辅汽联箱至小机用汽总门,关闭1号机辅汽联箱至锅炉炉底加热等用汽总门,关闭1号机辅汽联箱至磨煤机消防蒸汽总门,关闭1号机辅汽联箱至暖通用汽总门,关闭启动锅炉至1号机辅汽联箱进汽手动门;(c)关闭小机排汽碟阀和小机排汽减温水门; (5) The isolation system forms the starting channel of the medium-pressure cylinder: (a) Close the manual door of the desuperheating water of the No. 1 unit and the reheater, and close the electric door of the high-side desuperheating water; (b) Close the high-side and superheater test of the No. 1 unit Blocking valve, high row check door; (c) Close the auxiliary steam header of No. 1 unit to the deaerator heating manual door, close the auxiliary steam header of No. From the header to the boiler bottom heating steam main door, close the No. 1 auxiliary steam header to the coal mill fire-fighting steam main door, close the No. 1 auxiliary steam header to the heating general steam The steam inlet manual door of the auxiliary steam header of No. 1 unit; (c) close the exhaust steam disc valve of the small machine and the exhaust steam desuperheating water valve of the small machine;
(6)启动一台凝结水泵打再循环,同时向凝杂水母管供水; (6) Start a condensate pump to recirculate and supply water to the condensate jellyfish pipe at the same time;
(7)启动真空泵对凝汽器抽真空,观察真空泵冷却水应投运正常; (7) Start the vacuum pump to evacuate the condenser, and observe that the cooling water of the vacuum pump should be put into operation normally;
(8)凝汽器真空达到0.03~0.05MPa后利用2号机辅汽汽源对1号机辅汽联箱、轴封汽系统、1号机冷段管道进行暖管; (8) After the vacuum of the condenser reaches 0.03~0.05MPa, use the auxiliary steam source of No. 2 unit to warm up the auxiliary steam header of No. 1 unit, the shaft seal steam system, and the cold section pipeline of No. 1 unit;
(9)轴封汽暖管结束后投入1号机轴封汽,小机轴封汽不投; (9) After the shaft seal steam heating pipe is completed, the shaft seal steam of No. 1 unit is put into the shaft seal steam, and the shaft seal steam of the small machine is not input;
(10)主机机组冲转:(a)1号机启动汽源由2号机辅助汽源提供,汽源流经设备具体流向如下:2号机再热冷段—2号机辅汽联箱—1号机辅汽联箱—1号机再热冷段—1号炉再热器—1号机中压缸;(b)冲转时的蒸汽参数:中压联合汽门前压力0.6~0.8MPa、温度240~260℃,2号机组的负荷≥450MW;(c)1号机机组冲转前1号机低旁开至10%,利用2号机再热冷段至辅汽联箱电动门调节1号机中压联合汽门前压力在0.8~0.9MPa,1、2号机辅汽联箱安全门不应动作;(d)1号机机组挂闸后设定目标转速为200r/min,升速率100r/min/min,进行冲转,1号机机组冲转后注意盘车脱扣情况,利用低旁调节控制再热汽压力;(e)视1号机再热汽压力趋于稳定,2号机汽包水位稳定后设定目标转速为1500r/min,升速率100r/min/min,继续升速,升速过程中逐渐关小1号机低旁直至关完,利用2号机冷再至辅汽联箱电动门控制1号机再热汽压在0.8~0.9MPa;(f)1号机机组转速升至1500r/min后暖机60分钟,测量各轴承振动,视机组胀差、缸胀、缸壁温差达到设备操作规定范围后,继续升速;(g)1号机机组转速升至3000r/min,测量各轴承振动。 (10) The main engine unit reverses: (a) The start-up steam source of No. 1 unit is provided by the auxiliary steam source of No. 2 unit. The specific flow direction of the steam source flowing through the equipment is as follows: No. 2 unit reheating and cooling section - No. 2 unit auxiliary steam header - Auxiliary steam header of No. 1 unit—reheating and cooling section of No. 1 unit—reheater of No. 1 furnace—intermediate pressure cylinder of No. 1 unit; (b) Steam parameters during flushing: the pressure in front of the intermediary pressure combined steam valve is 0.6~0.8 MPa, temperature 240~260°C, load of No. 2 unit ≥ 450MW; (c) No. 1 unit low-side open to 10% before No. 1 unit reverses, use No. 2 unit to reheat and cool section to auxiliary steam header electric The door adjusts the pressure in front of the medium-pressure combined steam valve of No. 1 unit at 0.8~0.9MPa, and the safety door of the auxiliary steam header of No. 1 and No. 2 units should not operate; (d) Set the target speed to 200r/min after the unit of No. 1 unit hangs the gate , the rate of increase is 100r/min/min, and the reheating is carried out. After the No. 1 unit is reversing, pay attention to the cranking tripping situation, and use the low side adjustment to control the reheating steam pressure; (e) Depending on the reheating steam pressure of No. 1 unit tends to Stable, after the steam drum water level of No. 2 unit is stable, set the target speed to 1500r/min, and the increase rate is 100r/min/min, continue to increase the speed, and gradually turn down the low side of No. After the machine is cooled, go to the electric door of the auxiliary steam header to control the reheat steam pressure of No. 1 unit at 0.8~0.9MPa; (f) After the unit speed of No. 1 unit rises to 1500r/min, warm up the machine for 60 minutes, measure the vibration of each bearing, and inspect the unit After the expansion difference, cylinder expansion, and cylinder wall temperature difference reach the specified range of equipment operation, continue to increase the speed; (g) The speed of No. 1 unit is increased to 3000r/min, and the vibration of each bearing is measured.
以上启动方法简单、便捷、可行、安全、可靠、测试精确。 The above starting methods are simple, convenient, feasible, safe, reliable and accurate in testing.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410763159.9A CN104612763B (en) | 2014-12-12 | 2014-12-12 | A method for starting an intermediate-pressure cylinder device using adjacent steam for a unit system unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410763159.9A CN104612763B (en) | 2014-12-12 | 2014-12-12 | A method for starting an intermediate-pressure cylinder device using adjacent steam for a unit system unit |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104612763A true CN104612763A (en) | 2015-05-13 |
CN104612763B CN104612763B (en) | 2017-01-25 |
Family
ID=53147386
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410763159.9A Active CN104612763B (en) | 2014-12-12 | 2014-12-12 | A method for starting an intermediate-pressure cylinder device using adjacent steam for a unit system unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104612763B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106285796A (en) * | 2016-10-28 | 2017-01-04 | 山东电力建设第工程公司 | The auxiliary steam intermediate pressure cylinder start-up method of steam turbine |
CN107227979A (en) * | 2017-07-14 | 2017-10-03 | 上海电气电站设备有限公司 | A kind of combination circulation steam turbine quickly starts warming-up system and method |
CN107762575A (en) * | 2017-11-03 | 2018-03-06 | 北京国电龙源环保工程有限公司 | A kind of quick cooling system of power plant steam turbine and its cooling means |
CN108167036A (en) * | 2018-01-26 | 2018-06-15 | 西安热工研究院有限公司 | A kind of system and method for nuclear power generating sets vapor self |
CN109882254A (en) * | 2019-03-21 | 2019-06-14 | 上海汽轮机厂有限公司 | Control method of the Steam Turbine from start and stop |
CN111255536A (en) * | 2020-01-22 | 2020-06-09 | 中国能源建设集团广东省电力设计研究院有限公司 | FCB operation method of gas-steam unit power plant |
CN114109527A (en) * | 2021-11-17 | 2022-03-01 | 北京国电电力有限公司大连开发区热电厂 | Steam turbine adjusting method without pre-starting valve for realizing high-medium pressure combined start |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090204305A1 (en) * | 2008-02-05 | 2009-08-13 | Mitsubishi Heavy Industries, Ltd. | Turbine bypass control apparatus and turbine bypass control method |
US20100281877A1 (en) * | 2009-05-08 | 2010-11-11 | Kabushiki Kaisha Toshiba | Single shaft combined cycle power plant start-up method an single shaft combined cycle power plant |
CN202209668U (en) * | 2011-08-17 | 2012-05-02 | 山东源和电站工程技术有限公司 | Auxiliary steam source steam supply system of large thermal generator set |
CN203531977U (en) * | 2013-11-12 | 2014-04-09 | 中国电力工程顾问集团西南电力设计院 | Heat-engine plant adjacent machine auxiliary steam heating boiler starting system |
CN204299629U (en) * | 2014-12-12 | 2015-04-29 | 贵州电力试验研究院 | A kind of unit style unit utilizes adjacent vapour to start intermediate pressure cylinder device |
-
2014
- 2014-12-12 CN CN201410763159.9A patent/CN104612763B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090204305A1 (en) * | 2008-02-05 | 2009-08-13 | Mitsubishi Heavy Industries, Ltd. | Turbine bypass control apparatus and turbine bypass control method |
US20100281877A1 (en) * | 2009-05-08 | 2010-11-11 | Kabushiki Kaisha Toshiba | Single shaft combined cycle power plant start-up method an single shaft combined cycle power plant |
CN202209668U (en) * | 2011-08-17 | 2012-05-02 | 山东源和电站工程技术有限公司 | Auxiliary steam source steam supply system of large thermal generator set |
CN203531977U (en) * | 2013-11-12 | 2014-04-09 | 中国电力工程顾问集团西南电力设计院 | Heat-engine plant adjacent machine auxiliary steam heating boiler starting system |
CN204299629U (en) * | 2014-12-12 | 2015-04-29 | 贵州电力试验研究院 | A kind of unit style unit utilizes adjacent vapour to start intermediate pressure cylinder device |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106285796A (en) * | 2016-10-28 | 2017-01-04 | 山东电力建设第工程公司 | The auxiliary steam intermediate pressure cylinder start-up method of steam turbine |
CN107227979A (en) * | 2017-07-14 | 2017-10-03 | 上海电气电站设备有限公司 | A kind of combination circulation steam turbine quickly starts warming-up system and method |
CN107762575A (en) * | 2017-11-03 | 2018-03-06 | 北京国电龙源环保工程有限公司 | A kind of quick cooling system of power plant steam turbine and its cooling means |
CN108167036A (en) * | 2018-01-26 | 2018-06-15 | 西安热工研究院有限公司 | A kind of system and method for nuclear power generating sets vapor self |
CN109882254A (en) * | 2019-03-21 | 2019-06-14 | 上海汽轮机厂有限公司 | Control method of the Steam Turbine from start and stop |
CN109882254B (en) * | 2019-03-21 | 2021-07-30 | 上海汽轮机厂有限公司 | Control method for automatic start and stop of steam turbine set |
CN111255536A (en) * | 2020-01-22 | 2020-06-09 | 中国能源建设集团广东省电力设计研究院有限公司 | FCB operation method of gas-steam unit power plant |
CN114109527A (en) * | 2021-11-17 | 2022-03-01 | 北京国电电力有限公司大连开发区热电厂 | Steam turbine adjusting method without pre-starting valve for realizing high-medium pressure combined start |
Also Published As
Publication number | Publication date |
---|---|
CN104612763B (en) | 2017-01-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104612763B (en) | A method for starting an intermediate-pressure cylinder device using adjacent steam for a unit system unit | |
CN103382860B (en) | Steam turbine power generation heating system controlling method | |
CN109441575B (en) | Operation method of heating network system in heating period of steam combined cycle generator set | |
CN206785443U (en) | A kind of high-pressure natural gas cogeneration distributed energy resource system | |
CN111677567B (en) | Method for quickly starting gas-steam combined cycle unit to rated load | |
CN107664045B (en) | A high-temperature gas-cooled reactor steam turbine seal steam supply system and method | |
CN111255536B (en) | FCB operation method of gas-steam unit power plant | |
CN109322716A (en) | Combined cycle gas-steam turbine high back pressure thermal power plant unit and exchanging rotor not brennschluss machine method | |
CN207245763U (en) | A kind of high temperature gas cooled reactor Turbine Steam gland sealing steam supply system | |
CN207905867U (en) | A kind of steam turbine steam shaft seal steam supply system of jet dynamic control | |
CN205779041U (en) | A kind of steam turbine and heating system | |
CN204299629U (en) | A kind of unit style unit utilizes adjacent vapour to start intermediate pressure cylinder device | |
CN210088818U (en) | System for nuclear power starts electric boiler heat reserve | |
CN110118346B (en) | Nuclear power starting electric boiler hot standby system and method | |
CN208040541U (en) | Gas turbine cycle flue gas waste heat recovery and inlet gas cooling association system | |
CN103925022A (en) | Two-stage power generation system and method using low and medium pressure steam | |
CN202370596U (en) | Heating heat supply combined heat and power generation power generator set | |
CN106322346B (en) | A kind of method of direct current cooker sliding parameter blowing out | |
JPS5925853B2 (en) | Power plant operation control method and device for implementing this method | |
RU137999U1 (en) | MANEUVERED HEATING TURBO INSTALLATION | |
CN203744223U (en) | Critical unit heating system | |
CN208203372U (en) | A kind of quick hot starting, hot start system of large capacity regulating units | |
CN114961906B (en) | A system and operation method for rapid startup of a gas-steam combined cycle unit | |
CN104594964A (en) | Novel single-shaft natural gas combined cycle heat supply unit system | |
CN212252568U (en) | Subcritical parent pipe feedwater system boiler recirculation heat exchange start-up system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 550001 Jiefang Road, Nanming, Guizhou, No. 32, Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF GUIZHOU POWER GRID CO., LTD. Address before: 550002 Jiefang Road, Guizhou, No. 251, Patentee before: Guizhou Power Test Institute |
|
CP03 | Change of name, title or address |