CN104612448B - A kind of steel-structured grain depot and installation method - Google Patents

A kind of steel-structured grain depot and installation method Download PDF

Info

Publication number
CN104612448B
CN104612448B CN201510067798.6A CN201510067798A CN104612448B CN 104612448 B CN104612448 B CN 104612448B CN 201510067798 A CN201510067798 A CN 201510067798A CN 104612448 B CN104612448 B CN 104612448B
Authority
CN
China
Prior art keywords
steel
metope
roofing
roof
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510067798.6A
Other languages
Chinese (zh)
Other versions
CN104612448A (en
Inventor
杨立田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Furuida Building Technology Co Ltd
Original Assignee
Liaoning Furuida Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Furuida Building Technology Co Ltd filed Critical Liaoning Furuida Building Technology Co Ltd
Priority to CN201510067798.6A priority Critical patent/CN104612448B/en
Publication of CN104612448A publication Critical patent/CN104612448A/en
Application granted granted Critical
Publication of CN104612448B publication Critical patent/CN104612448B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/51Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture specially adapted for storing agricultural or horticultural products

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of steel-structured grain depot and installation method, belong to technical field of grain storage equipment.Including ground, steel frame, metope, roofing, ground is composite bed ground, wherein pre-buried sill anchor;Steel frame is fixedly connected with sill anchor, including steel column, girder steel, metope purlin, roof purline, metope tie rod, roofing tie rod, steel column is bolted with girder steel, forms equally distributed portal frame, metope purlin is arranged on the outside of steel column, and vertical with steel column;Metope tie rod is bolted and is arranged between metope purlin, and roofing tie rod is bolted and is arranged between roof purline;Metope is water proof type metope, is fixedly installed on the outside of steel frame, and the bottom on the outside of which is provided with aproll;Some windows are provided with metope, are provided with window drive link on each window;One side wall is provided with double-deck door, is uniformly provided with air vent to side wall bottom;Roofing is water proof type roofing, is arranged at the top of steel frame.Steel construction is firm, water resistance and good heat insulating.

Description

A kind of steel-structured grain depot and installation method
Technical field
The invention belongs to technical field of grain storage equipment, more particularly to a kind of steel-structured grain depot and installation method.
Background technology
China is a large agricultural country, and the production of grain and storage have a long history, according to China nearly 50 years over A large amount of historical relics being unearthed and historical Textual Research, Chinese infant farming are imparted rudimentary knowledge to beginners in Upper Palaeolithic, are developed in the epoch new period(Away from Modern about 10,000 years or so).And the storage of grain is the continuation of agricultural cultivation, storage technology is accompanied by the development of agricultural 's.After entering the epoch new period, as the development of infant farming, agricultural production reach a certain scale, grain is occurred in that Residue, just gradually develops into storage by grain processing.And silo is the important component part of View of Grain Storage Technoiogy.
Existing silo mainly has following several:
(1)The silo of chamber storehouse is that China is built at most, using a kind of most common storehouse type, based on horizontal warehouse at present, Multi-storied warehouse and arch storehouse are less.Horizontal warehouse is typically long 20~25 meters, 10~20 meters of span, and Capacity Ratio is larger, and the building having can be stored up Index of flow kiloton.The construction of chamber storehouse is generally brick wall, Wa Ding, wood roof truss, Colophonium terrace.The terrace of the chamber storehouse that builds at present and Roofing typically has floor, roof boarding and ceiling, compares heat insulation and moisture-proof, and vent window is arranged at Cang Qiang tops, can open and close, so that grain heap is logical Wind, but airtight performance is poor, and the advantage of chamber storehouse is that construction is simple, and expenditure of construction is relatively low;Have the disadvantage to take up an area more, realize silo Mechanization is more difficult.
(2)Brick dumpy silo and soil circle storehouse:They are cylinder, and top is arch.Difference is that the former is masonry structure, after Person is cob structure.The simple structure in this warehouse, can be gathered materials on the spot with treatment in accordance with local conditions, and cost is relatively low honest and clean.It can be in bulk Grain storage, airtight performance preferably, are easy to suffocating treatment.Have the disadvantage that capacity is little, performance of ventilating is poor.
(3)Storehouse justified by steel plate:This kind of storehouse is welded by steel plate.Two-layered steel plates heat insulation structural, inside and outside interlayer are typically adopted 5 centimetres are divided into, the appearance brushing aluminium powder in storehouse is in case external heat is absorbed and in incoming storehouse.The advantage of steel plate He Cang is:Water-fast Performance is good, can prevent outside moisture, dampness from invading;Airtight performance is good, is easy to fumigant insect killing;Maintenance cost is relatively low;Build fast And it is simple.Have the disadvantage to consume great deal of steel.
(4)Armored concrete vertical silo:This silo is counted as a kind of modernization silo, universal in some developed countries Using China not yet popularizes at present, but it is the developing direction of barn building from now on.The mechanization of armored concrete vertical silo Change degree is higher, is typically made up of control station, storehouse cylinder group and reception, three part of dispensing apparatus.Be provided with elevator, weigh, clear up and The machinerys such as dust suction.The vertical silo that China builds has two kinds of reinforced concrete structure and masonry structure.Storehouse cylinder group is by 6~24 Cylinder is one group, and each drum diameter is general 6 meters, high 30 meters, can accommodate 500~600 tons of grain.The characteristics of vertical silo is storage capacity Greatly, floor space is little, and mechanization degree is high, saves manpower, high working efficiency, with good closed, insect prevention, protection against rodents, anti-passeris montani saturati And fire protecting performance, be conducive to grain and oil safe storage.But this silo of construction is relatively costly, and technical requirements are higher.Further, since The airtight performance in warehouse is good, and grain heap is high, and wet, the steam in grain heap is difficult to distribute, and also affects poison to middle lower floor during pharmacy fumigation Infiltration, such case should be noted that in actual storage.
(5)Underground bin:Cavern underground bin, mainly using high mountain natural conditions, digs a hole and forms, and the coating in warehouse has tens of Rice is not affected by solar radiant heat to hundreds of meter of thickness.Each hole portion arranges safety door, sealed door, mouse preventing door, and the four of door Week is all embedded with sealing strip, systematic security protection obturator.This version, with easy construction, gathers materials on the spot, ties The advantages of structure is firm, water resistance is good, and have fire prevention, moistureproof, closed, heat-insulated, constant temperature, low temperature the features such as.Which has the disadvantage to lead to Wind poor performance, it is inconvenient that grain enters export;Due to geographic factor, being also possible to of having brings difficulty to transport.
Steel-structured grain depot has become the development trend in food storage field at this stage, and the development of food storage technology Only stage which must be passed by.Existing steel construction silo mainly with the following drawback that:1st, it is not enough that pressure is born:During a large amount of grain storages, to steel Structure-steel framing can produce very big pressure, and the only steel construction of monolayer purlin is difficult to bear this pressure in some cases;2nd, water proofing property Can be poor:Conventional bulk grain depot roofing and metope adopt traditional waterproof coiled material, metope to adopt water-repellent paint waterproof, but these tradition Waterproof measure all exist waterproof material aging after there is endosmosis hydrometeor, grain is often because flood causes damage.
Content of the invention
For solving above-mentioned technical problem, the present invention proposes a kind of steel-structured grain depot and installation method.
The technical scheme is that and be achieved in that:
A kind of steel-structured grain depot, including ground, steel frame, metope and roofing, is embedded with lower margin anchor in the ground Bolt;The steel frame is bolted to connection with the sill anchor, and the metope is fixedly installed on the steel frame Outside, the roofing is arranged at the top of the steel frame, and the bottom on the outside of the metope is provided with aproll;On the metope Several windows are provided with, on each described window, window drive link is provided with;Metope described in side is provided with double-deck door, Described in offside, metope bottom is uniformly provided with several air vents.
Used as further technical scheme, the steel frame is bolted to connection with the sill anchor, described Steel frame includes steel column, girder steel, metope purlin, roof purline, metope tie rod, roofing tie rod, the steel column and the girder steel Be bolted, form equally distributed portal frame, the metope purlin is arranged on the outside of the steel column, and with the steel Post is vertical;The metope tie rod is bolted and is arranged between the metope purlin, and the roofing tie rod is solid by bolt Surely it is arranged between the roof purline;
Used as further technical scheme, the steel frame also includes metope angle brace and roof knee-bracing, the metope corner Support is connected with the metope purlin by bolt one end, the other end and the metope angle brace connecting plate being fixedly installed on the girder steel Connection, the roof knee-bracing are connected with the roof knee-bracing connecting plate being fixedly installed on the roof purline by bolt one end, The other end is connected with the girder steel.
Used as further technical scheme, the ground includes the concrete layer for setting gradually from top to bottom, waterproof layer, mixes Solidifying soil screed-coat, mixed stone rolling layers, rammed earth layer.
Used as further technical scheme, the metope includes steel board, the inner glass silk for from inside to outside setting gradually Cotton heat-insulation layer, metope purlin air layer, outside glass silk flosssilk wadding heat-insulation layer, exterior wall color corrugated sheet steel.
Used as further technical scheme, the roofing includes that the steel wire for from inside to outside setting gradually, glass silk flosssilk wadding are protected Warm layer, roof color steel plate;Interior ridge tiles, institute are provided between the steel wire and the roof purline of the adjacent roofing junction State roof color steel plate end and outside to be respectively equipped with roof boarding and turn over eaves and outer ridge tiles, the outer ridge tiles two ends are set by blocking fixation It is placed on the roof color steel plate.
Used as further technical scheme, the stem stem both sides of the steel column are interval with some stiffeners.
Used as further technical scheme, the bottom on the inside of the metope is provided with skirt.
As further technical scheme, between the adjacent steel column, column braces frame is additionally provided with;The adjacent steel Horizontal shore is additionally provided between beam.
As further technical scheme, between the adjacent column braces frame and between the adjacent horizontal shore Connected by tie-rod.
A kind of installation method of steel-structured grain depot, including:
Choose specification the processing and manufacturing of the steel frame;
Lay foundation, first by rammed earth, compacted coefficient forms rammed earth layer 105, while pre- buried more than or equal to 0.93 Foot bolt, then pours mixed stone and rolls 104, and the thickness for mixing stone rolling layers is 290mm, lays a layer concrete screed-coat, over the ground Base carry out levelling, looked for flat after lay waterproof layer, waterproof layer is by 1:It is 5% to keep away water that 2 cement mortar mixes mass percent Slurry proportioning is formed, and its thickness is 18mm, finally lays a layer concrete layer on waterproof layer, and surface layer uses 1:1 cement mortar is with beating It is 90mm with the thickness of press polish, concrete layer and concrete leveling layer;
Using crane on the basis of steel column is arranged on levelling foot pin, steel column is corrected after installation, Then column braces and tie-rod are installed and is fastened.Then using crane by steel girder erection on steel column, a three Pin portal frame After installing, horizontal support is installed between the first two portal frame, correct rear locking horizontal support to be adjusted is then pacified Fill other portal frames.Roof purline is installed after all portal frames all adjust positioning, and adjusts its glacing flatness, roof purline Roofing tie rod is installed after installation, then roof knee-bracing is installed, finally metope purlin is installed;
By metope on metope purlin, on its metope, the installing port at window and gate is then reserved, then carried out Turn vertical angle installation, gable to install and the installation of exterior wall flashing;
Two roofings are arranged on roof purline using crane, roof boarding are installed between roofing end and turn over eaves, roofing Interior ridge tiles is installed between top and roof purline, outer ridge tiles is by closure on roofing;
Finally the push-and-pull gate of double-deck door, gear grain gate are installed, then window and window drive link are installed to respectively From position on.
Beneficial effects of the present invention are:
1st, Construction of Steel Structure is adopted, shortens construction period.
2nd, materials are saved, and reduce construction cost low.
3rd, good waterproof performance:Steel construction grain depot application color steel in bulk does that roof waterproof is good, and metope exterior bottom is provided with scattered Water, the building node of roofing are also adopted by ridge tiles waterproof, and up to 100% antiseep, metope is also the color steel of application to old-fashioned roofing on year-on-year basis , there is no the phenomenons such as endosmosis aqueous vapor in plate, prevented grain because the situation that flood is lost occurs.
4th, good heat preservation performance:Steel construction grain depot metope insulation in bulk is incubated using double glazing cotton and air layer physics, roofing Insulation material is also adopted by, heat insulating coefficient can reach 0.015.
5th, the steel frame at metope and roofing is reinforced using steel column, purlin, the triple steel construction pieces of tie rod, intensity is higher, Allowable stress is bigger, and grain depot structure is more stable.
Description of the drawings
Fig. 1 is the facade structures schematic diagram of the present invention.
Fig. 2 is the back elevation structural representation of the present invention.
Fig. 3 is the side elevation structural representation of the present invention.
Fig. 4 is the side cross-sectional view of the present invention.
Fig. 5 is the structural representation on the ground of the present invention.
Fig. 6 is the steel frame schematic diagram of the present invention.
Fig. 7 is the schematic diagram of the roof building node of the present invention.
Fig. 8 is the metope angle brace structural representation of the present invention.
Fig. 9 is the roof knee-bracing structural representation of the present invention.
Figure 10 is the metope structure schematic diagram of the present invention.
Figure 11 is the column braces structural representation of the present invention.
Figure 12 is the horizontal support structure schematic diagram of the present invention.
In figure:1st, ground;101st, concrete layer;102nd, waterproof layer;103rd, concrete leveling layer;104th, stone rolling layers are mixed; 105th, rammed earth layer;2nd, sill anchor;3rd, steel frame;301st, steel column;302nd, girder steel;303rd, metope purlin;304th, roofing Purlin;305th, metope tie rod;306th, roofing tie rod;307th, metope angle brace;308th, roof knee-bracing;309th, stiffener;4th, metope; 401st, steel board;402nd, inner glass silk flosssilk wadding heat-insulation layer;403rd, metope purlin air layer;404th, outside glass silk flosssilk wadding heat-insulation layer; 405th, exterior wall color corrugated sheet steel;5th, roofing;501st, steel wire;502nd, glass silk flosssilk wadding heat-insulation layer;503rd, roof color steel plate;504th, interior Ridge tiles;505th, roof boarding turns over eaves;506th, outer ridge tiles;507th, block;6th, double-deck door;7th, window;8th, window drive link;9th, divulge information Hole;10th, skirt;11st, aproll;12nd, column braces;13rd, horizontal support;14th, tie-rod.
Specific embodiment
Accompanying drawing in below in conjunction with the embodiment of the present invention, to the embodiment of the present invention in technical scheme carry out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiment.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
As shown in Fig. 1 ~ 12, it is a kind of one embodiment of steel-structured grain depot of the invention, including:
Ground 1, sill anchor 2, steel frame 3, metope 4, the double-deck door 6 of 5, two, roofing, some windows 7, window are passed Lever 8, air vent 9, skirt 10, aproll 11.
Ground 1 be composite bed ground, including set gradually from top to bottom concrete layer 101, waterproof layer 102, concrete Screed-coat 103, mixed stone rolling layers 104, rammed earth layer 105, moisture effect are good.
Sill anchor 2 is just embedded in wherein during ground 1 is built.
Steel frame 3 includes steel column 301, girder steel 302, metope purlin 303, roof purline 304, metope tie rod 305, roofing Tie rod 306.Steel column 301 is bolted with girder steel 302, forms equally distributed portal frame.Pass through spiral shell on the outside of steel column 301 Bolt is fixed with the metope purlin 303 vertical with steel column 301, be bolted on the outside of girder steel 302 be provided with vertical with girder steel 302 Roof purline 304.It is bolted on the outside of metope purlin 303 and is provided with the metope tie rod 305 vertical with metope purlin 303, It is bolted on the outside of roof purline 304 and is provided with the roofing tie rod 306 vertical with roof purline 304.Metope tie rod 305 passes through Bolt is fixedly installed between metope purlin 303, parallel with metope purlin 303, and roofing tie rod 306 is bolted and is arranged at Between roof purline 304, parallel with roof purline 304.All parts all adopt bolt to fasten, and installation and removal are all very just Prompt;And, after installing tie rod additional, the wall part of steel frame 3 is firmer, can bear bigger power.The stem stem both sides of steel column 301 Interval is additionally provided with some stiffeners 309, in order to reinforce steel column 301.Steel column of the steel column 301 for H profile steel, girder steel 302 are H profile steel Girder steel, metope purlin of the metope purlin 303 for H profile steel, roof purline of the roof purline 304 for C-type steel, metope tie rod 305 are C The metope tie rod of shaped steel, roofing tie rod of the roofing tie rod 306 for round steel.
In order to further consolidate above-mentioned steel construction, metope angle brace 307 and roof knee-bracing 308, wall on steel frame 3, is additionally provided with Angle brace 307 one end in face is connected with metope purlin 303 by bolt, and the other end is connected with the metope angle brace on girder steel 302 by bolt Fishplate bar connects, and 308 one end of roof knee-bracing is connected with the roof knee-bracing connecting plate on roof purline 304 by bolt, and the other end leads to Cross bolt to be connected with girder steel 302.Metope angle brace of the metope angle brace 307 for L-type angle steel, roofing of the roof knee-bracing 308 for L-type angle steel Angle brace.
The bottom of the steel column 301 in steel frame 3 is also embedded in a part when ground 1 is built, imbed the bottom at end with Sill anchor 2 is bolted to connection, and it is too deep that steel column 301 need not be imbedded, can save resources, but also can allow grain depot Steel frame 3 is more stable.
Be located between the steel column 301 at four angles of grain depot and positioned near metope 4 and between the steel column 301 at middle part also It is provided with multiple column braces framves 12.Between the girder steel 302 at the ridge two ends of grain depot and between the girder steel 302 at middle part It is additionally provided with multiple horizontal shores 13.Pass through tie-rod between adjacent intercolumniation bracing frame 12 and between adjacent level bracing frame 13 14 connections.Bracing frame technical ability is so set reinforcement effect is prayed to steel frame 3, significant points are done with more firm support, also Energy material-saving, removes the unnecessary waste to reinforcement material from.
Metope 4 is fixedly installed on outside of the steel frame 3 perpendicular to ground 1, and roofing 5 is arranged at the top of steel frame 3. Steel board 401 that metope 4 includes from inside to outside setting gradually, inner glass silk flosssilk wadding heat-insulation layer 402, metope purlin air layer 403, Outside glass silk flosssilk wadding heat-insulation layer 404, exterior wall color corrugated sheet steel 405.Steel wire 501 that roofing 5 includes from inside to outside setting gradually, Glass silk flosssilk wadding heat-insulation layer 502, roof color steel plate 503.The metope 4 of grain depot, roofing 5 are all coated by color steel, grain depot water resistance It is increased dramatically.The insulation construction of glass silk flosssilk wadding heat-insulation layer is both provided with metope 4, roofing 5 so that the heat insulation effect of grain depot More preferably.
Skirt 10 is arranged on the bottom on the inside of metope 4, and as corner is compared with impact is vulnerable to, installing skirt 10 can be preferably Make to be firmly combined between body of wall and ground, reduce deformation of wall, it is to avoid external force collision is damaged, and skirt is also easier Cleaning, while there is moistureproof effect.Upper surface is the bottom that the aproll 11 on inclined-plane is arranged on outside, makes corner on the outside of grain depot attached Near hydrops can be drained rapidly, and prevent dripping for eaves from washing away the soil on exterior wall surrounding ground, reduce wall body with basis By the possibility of water immersion, protection wall body and basis, the life-span of grain depot can be extended.
The installing port of door and window is reserved with the metope 4 of side, is respectively mounted double-deck door 6 and window 7.Double-deck door 6 is wrapped Internal layer gear grain gate, outer layer push-and-pull gate is included, internal layer gear grain gate is used for stopping grain and the sealing in grain depot, outer layer push-and-pull Play the protection to internal layer gate and the effect of further sealing thermal insulation in gate.With 4 offside of metope for arranging double-deck door 6 4 bottom of metope is uniformly provided with air vent 9, for being aerated ventilation inside grain depot, being dried to grain at any time, it is ensured that Grain is not in the phenomenon such as to go mouldy.Window 7 is equipped with the metope 4 of surrounding, and window drive link 8 is arranged on the outside of metope 4, per Individual window 7 is equipped with window drive link 8.In addition to the window 7 above double-deck door 6, the handle of all windows 7 all with corresponding Window drive link 8 upper end connection.The partial distance ground of operation is implemented in the lower end of window drive link 8, i.e. operator to be had About 1.5 m ~ 1.7 m, facilitate operator's window opening-closing to be aerated ventilation, ensure the air quality in grain depot.
Interior ridge tiles 504, adjacent roofing are provided between the steel wire 501 and roof purline 304 of adjacent 5 junction of the roofing 503 end of roof color steel plate of 5 junctions is equipped with roof boarding and turns over eaves 505, the roof color steel plate 503 of 5 junction of adjacent roofing Outside is provided with outer ridge tiles 506, and 506 two ends of outer ridge tiles are fixedly installed on roof color steel plate 503 by closure 507.Interior ridge tiles 504 And outer ridge tiles 506 together constitutes the protection to gap between adjacent roofing 5, rainwater is not entered in grain depot from gap Portion.And 507 closure by gap between external ridge tiles 506 and roof color steel plate 503 are blocked, further ensure its waterproof Property.
Bolt is 10.9 grades of friction type high strength bolts.
After using above-mentioned material, the overall structure of grain depot more can be consolidated, and construction quality is further ensured, is extended The service life of grain depot.
The installation method of this steel-structured grain depot, completes according to following steps:
1)Geographical position, construction area first according to job site designing the specification of steel frame, then processing system Produce steel column 301 in Steel Structure, girder steel 302, metope purlin 303, roof purline 304, metope tie rod 305, roofing tie rod 306, The specification of metope angle brace 307, roof knee-bracing 308 and other supporting members, first checks the specification of each material before marching into the arena, then will Placing of material is in specified location;
2)Lay foundation, first by rammed earth, compacted coefficient forms rammed earth layer 105, while pre-buried more than or equal to 0.93 Foundation bolt 2, then pours mixed stone and rolls 104, and the thickness for mixing stone rolling layers is 290mm, lays a layer concrete screed-coat 103, ground is carried out levelling, looked for flat after lay waterproof layer 102, waterproof layer 102 is by 1:2 cement mortar mixes quality percentage Form than the water slurry proportioning of keeping away for 5%, its thickness is 18mm, finally lays a layer concrete layer 101, face on waterproof layer 102 Layer uses 1:1 cement mortar is 90mm with the thickness that beats with press polish, concrete layer and concrete leveling layer.
3)Using crane on the basis of steel column 301 is arranged on levelling foot pin, steel column 301 is entered after installation Then column braces 12 and tie-rod 14 are installed and are fastened by row correction.Then girder steel 302 is arranged on steel column 301 using crane On, after a three Pin portal frame is installed, horizontal support 13 is installed between the first two portal frame, to be adjusted correct after Locking horizontal support 13, then installs other portal frames.Roof purline is installed after all portal frames all adjust positioning 304, and its glacing flatness is adjusted, roof purline 304 installs roofing tie rod 306 after installing, and then installs roof knee-bracing 308, Finally metope purlin 303 is installed.
4)By metope 4 on metope purlin 303, on its metope 4, then reserve the installation at window 7 and gate 6 Mouthful, then carry out turning vertical angle installation, gable installation and the installation of exterior wall flashing;
5)Two roofings 5 are arranged on roof purline 304 using crane, roof boarding are installed between 5 end of roofing and are turned over Eaves 505, is provided with interior ridge tiles 504 between 5 top of roofing and roof purline 304, outer ridge tiles 506 is arranged on room by closure 507 On face 5;
6)Finally the push-and-pull gate of double-deck door 6, gear grain gate are installed, then window 7 and window drive link 8 are installed To on respective position.
These are only presently preferred embodiments of the present invention, not in order to limit the present invention, all spirit in the present invention and Within principle, any modification, equivalent substitution and improvements that is made etc. should be included within the scope of the present invention.

Claims (6)

1. a kind of steel-structured grain depot, including ground(1), steel frame(3), metope(4)And roofing(5), the metope(4)Gu The steel frame is arranged at surely(3)Outside, the roofing(5)It is arranged at the steel frame(3)Top, the metope (4)On be provided with several windows(7);The steel frame(3)Including steel column(301), girder steel(302), metope purlin (303), roof purline(304), metope tie rod(305), roofing tie rod(306), metope angle brace(307)And roof knee-bracing(308), The steel column(301)With the girder steel(302)It is bolted, forms equally distributed portal frame, it is characterised in that institute State ground(1)In be embedded with sill anchor(2);The steel frame(3)Steel column(301)Bottom also build ground(1) When be embedded in a part, imbed the bottom at end and the sill anchor(2 )It is bolted to connection, the metope(4)Outward The bottom of side is provided with aproll(11);Each described window(7)On be provided with window drive link(8);Metope described in side(4)On It is provided with double-deck door(6), metope described in offside(4)Bottom is uniformly provided with several air vents(9);
The metope angle brace(307)By bolt one end and the metope purlin(303)Connection, the other end be fixedly installed on institute State girder steel(302)On metope angle brace connecting plate connection, the roof knee-bracing(308)By bolt one end be fixedly installed on institute State roof purline(304)On the connection of roof knee-bracing connecting plate, the other end and the girder steel(302)Connection;
The metope(4)Including the steel board for from inside to outside setting gradually(401), inner glass silk flosssilk wadding heat-insulation layer(402), metope Purlin air layer(403), outside glass silk flosssilk wadding heat-insulation layer(404), exterior wall color corrugated sheet steel(405);
The roofing(5)Quantity be two, include the steel wire for from inside to outside setting gradually respectively(501), glass silk flosssilk wadding protect Warm layer(502), roof color steel plate(503);The adjacent roofing(5)The steel wire of junction(501)With the roofing purlin Bar(304)Between be provided with interior ridge tiles(504), two roof color steel plates(503)Relative end is respectively equipped with roof boarding and turns over Eaves(505), two roof color steel plates(503)Outer ridge tiles is provided with the outside of relative end(506), the outer ridge tiles(506) Two ends are by closure(507)It is fixedly installed on the roof color steel plate(503)On.
2. a kind of steel-structured grain depot according to claim 1, it is characterised in that:The metope purlin(303)It is arranged at The steel column(301)Outside, and with the steel column(301)Vertically;The metope tie rod(305)It is bolted and is arranged at The metope purlin(303)Between, the roofing tie rod(306)It is bolted and is arranged at the roof purline(304)It Between.
3. a kind of steel-structured grain depot according to claim 1, it is characterised in that:The ground(1)Including from top to bottom according to The concrete layer of secondary setting(101), waterproof layer(102), concrete leveling layer(103), mixed stone rolling layers(104)And rammed earth Layer(105).
4. a kind of steel-structured grain depot according to claim 1, it is characterised in that:The steel column(301)Stem stem both sides between Every being provided with some stiffeners(309).
5. a kind of steel-structured grain depot according to claim 1, it is characterised in that:
It is located at the adjacent steel column at four angles of grain depot(301 )Between and be located near metope(4 )And be located in the middle part of grain depot Adjacent steel column(301 )Between be additionally provided with multiple column braces framves(12);Adjacent steel near the ridge two ends of grain depot Beam(302 )Between and adjacent girder steel in the middle part of grain depot( 302)Between be additionally provided with multiple horizontal shores(13); The adjacent column braces frame(12)Between and the adjacent horizontal shore(13)Between pass through tie-rod(14)Connection.
6. a kind of installation method of steel-structured grain depot as claimed in claim 1, it is characterised in that include:
Choose specification the processing and manufacturing of the steel frame;
Lay foundation, first by rammed earth, compacted coefficient forms rammed earth layer more than or equal to 0.93(105), while pre- buried Foot bolt, then pours mixed stone rolling layers(104), the thickness for mixing stone rolling layers is 290mm, lays a layer concrete screed-coat, Ground is carried out levelling, looked for flat after lay waterproof layer, waterproof layer is by 1:It is 5% that 2 cement mortar mixes mass percent Water slurry proportioning of keeping away form, its thickness be 18mm, on waterproof layer, finally lay a layer concrete layer, surface layer uses 1:1 water Cement mortar is 90mm with the thickness that beats with press polish, concrete layer and concrete leveling layer;
Using crane on the basis of steel column is arranged on levelling foot pin, steel column is corrected after installation, then Column braces and tie-rod are installed and is fastened;
Then using crane by steel girder erection on steel column, after a three Pin portal frame is installed, in the first two portal frame Between horizontal support is installed, to be adjusted correct after locking horizontal support, other portal frames are then installed;
Roof purline is installed after all portal frames all adjust positioning, and adjusts its glacing flatness, roof purline is installed after installing Then roof knee-bracing is installed by roofing tie rod, is finally installed metope purlin;
By metope on metope purlin, on its metope, the installing port at window and gate is then reserved, then carry out turning vertical Angle is installed, gable is installed and exterior wall aproll is installed;
Two roofings are arranged on roof purline using crane, roof boarding are installed between the relative end of two roofings and are turned over Eaves, is provided with interior ridge tiles between roofing top and roof purline, outer ridge tiles is by closure installed in the relative end of two roofings On the outside of portion;
Finally the push-and-pull gate of double-deck door, gear grain gate are installed, then window and window drive link are installed to respective On position.
CN201510067798.6A 2015-02-07 2015-02-07 A kind of steel-structured grain depot and installation method Active CN104612448B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510067798.6A CN104612448B (en) 2015-02-07 2015-02-07 A kind of steel-structured grain depot and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510067798.6A CN104612448B (en) 2015-02-07 2015-02-07 A kind of steel-structured grain depot and installation method

Publications (2)

Publication Number Publication Date
CN104612448A CN104612448A (en) 2015-05-13
CN104612448B true CN104612448B (en) 2017-03-15

Family

ID=53147075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510067798.6A Active CN104612448B (en) 2015-02-07 2015-02-07 A kind of steel-structured grain depot and installation method

Country Status (1)

Country Link
CN (1) CN104612448B (en)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831979B (en) * 2015-05-25 2018-05-04 哈尔滨北仓粮食仓储工程设备有限公司 Keep the temperature steel construction horizontal warehouse
CN104847152B (en) * 2015-05-25 2018-08-14 哈尔滨北仓粮食仓储工程设备有限公司 Constant temperature airtight heat preservation steel construction horizontal warehouse
CN105317269B (en) * 2015-11-05 2018-05-22 黑龙江鼎熠勘测设计有限公司 A kind of gear grain structure for integrated steel structure horizontal warehouse in bulk
CN105507433B (en) * 2016-01-12 2018-12-04 中冶建筑研究总院有限公司 Thermal insulation wall surface system and breeding room
CN106049735A (en) * 2016-07-26 2016-10-26 安徽海螺建材设计研究院 Factory building roofing structure
CN107165322A (en) * 2017-07-14 2017-09-15 天水大成精工制造有限公司 A kind of building roof structure
CN109898649A (en) * 2017-12-11 2019-06-18 美建建筑系统(中国)有限公司 A kind of high strength steel constructional device
CN108612319A (en) * 2018-06-12 2018-10-02 青岛科华钢结构有限公司 A kind of method for rapidly mounting of provisional steel structures coating
CN110616842B (en) * 2019-08-20 2021-05-14 上海宝冶冶金工程有限公司 Construction method of purline assembly in steel structure coal shed
CN110630074A (en) * 2019-08-30 2019-12-31 上海市基础工程集团有限公司 Prefabricated assembled soil collection box for shield tunnel engineering construction
CN110630075A (en) * 2019-09-18 2019-12-31 南阳汉方艾业有限公司 A method for making a rainproof, fireproof, ventilated and environment-friendly mugwort leaf warehouse
CN110761485A (en) * 2019-09-29 2020-02-07 中国二十冶集团有限公司 Method for installing C-shaped closed stock ground portal steel frame structure
CN110725596A (en) * 2019-10-22 2020-01-24 北京粮猫科技有限公司 Full cast-in-place self-ventilation double-layer roof grain storage bin structure and construction method
CN110725424B (en) * 2019-10-22 2021-08-27 北京建工新型建材有限责任公司 Passive steel structure house
CN112376776A (en) * 2020-10-27 2021-02-19 上海市政工程设计研究总院(集团)有限公司 Assembled roof with partially-wrapped composite beam and construction method thereof
CN112411890A (en) * 2020-11-10 2021-02-26 上海宝冶集团有限公司 Acid-proof roof board installation method
CN112575899B (en) * 2020-12-08 2022-08-16 中博农畜牧科技股份有限公司 Membrane roof cowshed for improving comfort of dairy cows and installation method and application thereof

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2070264C1 (en) * 1994-06-30 1996-12-10 Геннадий Григорьевич Михайлов Method for making and installation of cylindrical tanks with a shell of spiral type, lifting and weighting devices
CN1277302A (en) * 1999-06-14 2000-12-20 樊志 Construction process of plant building in goal type steel frame structure
CN2432297Y (en) * 2000-05-22 2001-05-30 石长胜 Rat-proofing metallic grain-storage
CN2747294Y (en) * 2004-11-28 2005-12-21 山东万事达钢结构有限公司 Steel room skeleton consisting of cold-bending profile steel component and connector connected by screw
DE202008012358U1 (en) * 2008-09-17 2009-01-02 Nestro Lufttechnik Gmbh Device for storing bulk material
CA2659921A1 (en) * 2008-03-24 2009-09-24 Ctb, Inc. Bin sidewall panel concept
CN201695728U (en) * 2010-06-13 2011-01-05 大庆石油学院 Novel gate type steel frame grain warehouse
CN102094465A (en) * 2010-12-08 2011-06-15 中冶建筑研究总院有限公司 Composite heat-insulating containment system and construction method thereof
CN201924626U (en) * 2011-01-30 2011-08-10 沈阳电力勘测设计院 Fabricated steel-structure house for transformer substation
CN102296858A (en) * 2011-06-29 2011-12-28 中建二局第三建筑工程有限公司 Cement production line clinker storage warehouse roof steel structure and construction method thereof
CN202866321U (en) * 2012-08-17 2013-04-10 雅致集成房屋股份有限公司 Slope roof lightweight steel construction mobile home

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2070264C1 (en) * 1994-06-30 1996-12-10 Геннадий Григорьевич Михайлов Method for making and installation of cylindrical tanks with a shell of spiral type, lifting and weighting devices
CN1277302A (en) * 1999-06-14 2000-12-20 樊志 Construction process of plant building in goal type steel frame structure
CN2432297Y (en) * 2000-05-22 2001-05-30 石长胜 Rat-proofing metallic grain-storage
CN2747294Y (en) * 2004-11-28 2005-12-21 山东万事达钢结构有限公司 Steel room skeleton consisting of cold-bending profile steel component and connector connected by screw
CA2659921A1 (en) * 2008-03-24 2009-09-24 Ctb, Inc. Bin sidewall panel concept
DE202008012358U1 (en) * 2008-09-17 2009-01-02 Nestro Lufttechnik Gmbh Device for storing bulk material
CN201695728U (en) * 2010-06-13 2011-01-05 大庆石油学院 Novel gate type steel frame grain warehouse
CN102094465A (en) * 2010-12-08 2011-06-15 中冶建筑研究总院有限公司 Composite heat-insulating containment system and construction method thereof
CN201924626U (en) * 2011-01-30 2011-08-10 沈阳电力勘测设计院 Fabricated steel-structure house for transformer substation
CN102296858A (en) * 2011-06-29 2011-12-28 中建二局第三建筑工程有限公司 Cement production line clinker storage warehouse roof steel structure and construction method thereof
CN202866321U (en) * 2012-08-17 2013-04-10 雅致集成房屋股份有限公司 Slope roof lightweight steel construction mobile home

Also Published As

Publication number Publication date
CN104612448A (en) 2015-05-13

Similar Documents

Publication Publication Date Title
CN104612448B (en) A kind of steel-structured grain depot and installation method
CN204531519U (en) A kind of metope and roof heat insulation system
CN204311811U (en) Three layers of overall shell structure bulk storage storehouse
EP2954126B1 (en) Method of insulating a building
CN208473113U (en) A kind of factory building roof rack project installation structure
CN204530989U (en) A kind of for the steel frame in steel-structured grain depot
CN111287311A (en) Construction method of cold-formed thin-wall light steel structure building
CN207609425U (en) A device for improving kiln dwelling performance
CN217353235U (en) Building group
CN207686079U (en) Active multiple fireproof heat insulating external wall structure
CN106639452A (en) Lightweight-steel-structure grain storing granary
CN110725596A (en) Full cast-in-place self-ventilation double-layer roof grain storage bin structure and construction method
CN206360074U (en) A kind of heat-insulated and sound-absorbing metope and earth construction
CN211690738U (en) Cold-formed thin-wall light steel structure building
CN205100442U (en) Wood constructs local -style dwelling houses roofing structure
CN206512867U (en) A kind of good ground of effect of heat insulation and external wall structure
CN110130528A (en) A kind of comfortable energy conservation is complete to assemble adobe house and its method of construction
Olshesky Retrofitting a historic building envelope for disaster resilience and sustainability
CN207376846U (en) Prefabricated fireproof thermal insulating external wall panel
CN217353236U (en) Parapet structure
CN207499582U (en) Moisture-proof yurt
KR100976970B1 (en) Construction method of tile roof structure of Hanok
CN207277712U (en) Waterproof thermal-insulated roof structure
CN217326665U (en) An antique building with two floors and above
CN211257988U (en) Grain storage bin structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant