CN104594655A - Application method for dismantling temporary supports in brick-concrete structure wall - Google Patents

Application method for dismantling temporary supports in brick-concrete structure wall Download PDF

Info

Publication number
CN104594655A
CN104594655A CN201410745232.XA CN201410745232A CN104594655A CN 104594655 A CN104594655 A CN 104594655A CN 201410745232 A CN201410745232 A CN 201410745232A CN 104594655 A CN104594655 A CN 104594655A
Authority
CN
China
Prior art keywords
wall
brick wall
collar tie
tie beam
temporary support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410745232.XA
Other languages
Chinese (zh)
Inventor
金喜龙
张宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU GULI CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
HANGZHOU GULI CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU GULI CONSTRUCTION ENGINEERING Co Ltd filed Critical HANGZHOU GULI CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201410745232.XA priority Critical patent/CN104594655A/en
Publication of CN104594655A publication Critical patent/CN104594655A/en
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses an application method for dismantling temporary supports in a brick-concrete structure wall. The application method comprises the steps that first, the surface plastering layer of a bearing brick wall to be dismantled is chiseled away, and the position of a ring beam is found out; second, according to the designed scheme, the bearing brick wall is hollowed out at certain intervals; third, the temporary supports are placed in hollowed-out holes; fourth, the bearing brick wall between the temporary supports is dismantled, and a static force nondestructive cutting mode is used for cutting off the parts, exposed at the bottom of the beam, of a supporting steel tube; fifth, the construction of increasing the section of the ring beam is conducted according to the designed scheme; sixth, after the curing strength of concrete meets the design demand, the remaining bearing brick wall is dismantled; at last, the cut parts, exposed on the bottom face of the beam, of the steel tube is subjected to preservative treatment. According to the application method for dismantling the temporary supports in the brick-concrete structure wall, the bearing brick wall is dismantled and reinforced, the construction cost and the influence range are both lowered to the minimum, and great social benefits and social benefits are created.

Description

A kind of brick mix structure body of wall removes the application process of temporary support
Technical field
The present invention relates in a kind of brick mix structure because removing load-bearing brick wall, enlarging section reinforcing need be carried out to former collar tie beam, need to collar tie beam temporary support technology, be specifically related to the application process that a kind of brick mix structure body of wall removes temporary support.
Background technology
Brick mix structure removes bearing wall, and mainly adopt the mode arranging transform beams first to reinforce and demolish walls afterwards, the work plane strengthened due to load-bearing brick wall and collar tie beam overlaps, and the main method setting up steel pipe scaffold support that adopts unloads collar tie beam at present; The method construction workload is large, and limits by on-the-spot site condition, and the duration is spun out; For the interim unloading that collar tie beam enlarging section is underpinning structure beam, when special building cover structure is the semi-rigid systems such as prestressed porous plate, when unloading load-bearing brick wall, full hall support scaffolding need be set up from flooring base, transmit top load-bearing brick wall load by floor system conversion again, workload is very large and limit by field condition.
Summary of the invention
(1) technical problem that will solve
For solving the problem, the present invention proposes the application process that a kind of brick mix structure body of wall removes temporary support, this technology can be carried out temporarily the load-bearing collar tie beam of any floor, and construction plant range effects is little, and constructing operation is convenient, greatly shortens the construction period; Effectively can solve because semi-rigid floor system damages self because stiffness by itself deficiency cannot effectively change load-bearing brick wall load, prevent first tearing load-bearing brick wall open and cause structure collar tie beam to occur excessive degree of disturbing distortion, produce destructive crack.
(2) technical scheme
Brick mix structure body of wall of the present invention removes the application process of temporary support,
The first step, cuts the surperficial rendering layer intending removing load-bearing brick wall, and finds out the position of collar tie beam;
Second step, according to the scheme of design, keep at a certain distance away and draw hole to load-bearing brick wall, dimension of opening is as the criterion needed for the width supported, height, flattens hole base plate simultaneously;
3rd step, places temporary support to drawn hole, and holds out against collar tie beam; Temporary support adopts in hot pressing seamless steel pipe and waters full plain concrete, two ends arrange end and hold steel plate and make; The end of described lower end holds below steel plate and is provided with jack; The requirement for height that the height of described hot pressing seamless steel pipe can be increased according to collar tie beam adjusts;
4th step, removes the load-bearing brick wall between temporary support; And adopt static(al) to can't harm the side of cutting
Method cuts off the supporting steel pipe part be exposed at the bottom of beam;
5th step, carries out the construction of collar tie beam enlarging section by design scheme;
6th step, after concrete curing intensity reaches designing requirement, removes remaining load-bearing brick wall;
Finally, soffit part is exposed to the steel pipe cut and carries out preservative treatment, and add the mortar cover that reinforced mesh whitewashes adequate thickness.
Further, the construction of described collar tie beam enlarging section comprises concrete interface dabbing, bar planting, reinforcing bar binding, installs template, concreting.
(3) beneficial effect
The present invention compared with prior art, it has following beneficial effect: brick mix structure body of wall of the present invention removes the application process of temporary support, by adopting the method for the interim steel pipe support of structure collar tie beam, load-bearing brick wall is removed and reinforces, its operating expenses and influence basin are all reduced to minimum, create great economic benefit and social benefit.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
1-jack, 2-collar tie beam, 3-Flat gasket, 4-load-bearing brick wall, 5-hot pressing seamless steel pipe.
Detailed description of the invention
Embodiment 1:
As shown in Figure 1, brick mix structure body of wall of the present invention removes the application process of temporary support, the first step, cuts the surperficial rendering layer intending removing load-bearing brick wall 4, and finds out the position of collar tie beam 2;
Second step, according to the scheme of design, keep at a certain distance away and draw hole to load-bearing brick wall, dimension of opening is as the criterion needed for the width supported, height, flattens hole base plate simultaneously;
3rd step, places temporary support to drawn hole, and holds out against collar tie beam; Temporary support adopts in hot pressing seamless steel pipe and waters full plain concrete, two ends arrange end and hold steel plate and make; Jack 1 is installed bottom it; The requirement for height that the height of described hot pressing seamless steel pipe 5 can be increased according to collar tie beam adjusts;
4th step, removes the load-bearing brick wall between temporary support; And the method adopting static(al) to can't harm cutting cuts off the supporting steel pipe part be exposed at the bottom of beam;
5th step, carries out the construction of collar tie beam enlarging section by design scheme; The construction of described collar tie beam enlarging section comprises concrete interface dabbing, bar planting, reinforcing bar binding, installs template, concreting.
6th step, after concrete curing intensity reaches designing requirement, removes remaining load-bearing brick wall;
Finally, soffit part is exposed to the steel pipe cut and carries out preservative treatment, and add the mortar cover that reinforced mesh whitewashes adequate thickness.
Embodiment recited above is only be described the preferred embodiment of the present invention, not limits the spirit and scope of the present invention.Under the prerequisite not departing from design concept of the present invention; the various modification that this area ordinary person makes technical scheme of the present invention and improvement; all should drop into protection scope of the present invention, the technology contents of request protection of the present invention, all records in detail in the claims.

Claims (2)

1. brick mix structure body of wall removes an application process for temporary support, it is characterized in that:
The first step, cuts the surperficial rendering layer intending removing load-bearing brick wall, and finds out the position of collar tie beam;
Second step, according to the scheme of design, keep at a certain distance away and draw hole to load-bearing brick wall, dimension of opening is as the criterion needed for the width supported, height, flattens hole base plate simultaneously;
3rd step, places temporary support to drawn hole, and holds out against collar tie beam; Temporary support adopts in hot pressing seamless steel pipe and waters full plain concrete, two ends arrange end and hold steel plate and make; The end of described lower end holds below steel plate and is provided with jack; The requirement for height that the height of described hot pressing seamless steel pipe can be increased according to collar tie beam adjusts;
4th step, removes the load-bearing brick wall between temporary support; And adopt static(al) to can't harm the side of cutting
Method cuts off the supporting steel pipe part be exposed at the bottom of beam;
5th step, carries out the construction of collar tie beam enlarging section by design scheme;
6th step, after concrete curing intensity reaches designing requirement, removes remaining load-bearing brick wall;
Finally, soffit part is exposed to the steel pipe cut and carries out preservative treatment, and add the mortar cover that reinforced mesh whitewashes adequate thickness.
2. brick mix structure body of wall according to claim 1 removes the application process of temporary support, it is characterized in that: the construction of described collar tie beam enlarging section comprises concrete interface dabbing, bar planting, reinforcing bar binding, installs template, concreting.
CN201410745232.XA 2014-12-05 2014-12-05 Application method for dismantling temporary supports in brick-concrete structure wall Pending CN104594655A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410745232.XA CN104594655A (en) 2014-12-05 2014-12-05 Application method for dismantling temporary supports in brick-concrete structure wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410745232.XA CN104594655A (en) 2014-12-05 2014-12-05 Application method for dismantling temporary supports in brick-concrete structure wall

Publications (1)

Publication Number Publication Date
CN104594655A true CN104594655A (en) 2015-05-06

Family

ID=53120672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410745232.XA Pending CN104594655A (en) 2014-12-05 2014-12-05 Application method for dismantling temporary supports in brick-concrete structure wall

Country Status (1)

Country Link
CN (1) CN104594655A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222540A (en) * 2018-03-23 2018-06-29 兰州理工大学 The load bearing wall that brick mix structure is changed to frame structure changes girder construction and construction method
CN108265996A (en) * 2017-12-28 2018-07-10 浙江核力建筑特种技术有限公司 A kind of masonry structure break wall punch it is pre- top restore construction
CN110284729A (en) * 2019-06-12 2019-09-27 上海市建筑装饰工程集团有限公司 A kind of historical building wall sectional type cutting disassembling method
CN112112444A (en) * 2020-07-28 2020-12-22 广东建科建筑工程技术开发有限公司 A kind of prestressed steel pipe support structure and construction method thereof
CN113136991A (en) * 2021-04-27 2021-07-20 申保军 Connection method for filling gaps between wall and main structure beam
CN114482618A (en) * 2022-01-05 2022-05-13 中核华辰建筑工程有限公司 Construction method for static force demolition of reinforced concrete structure
CN114635586A (en) * 2022-02-22 2022-06-17 中国华冶科工集团有限公司 Brick-concrete structure bearing wall dismantling method and supporting frame
CN116065854A (en) * 2023-02-16 2023-05-05 山东省建筑工程质量检验检测中心有限公司 Diagonal bracing assembly type high-rise wall column replacement reinforcement supporting equipment and diagonal bracing assembly type high-rise wall column replacement reinforcement supporting method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0033658A1 (en) * 1980-02-04 1981-08-12 Pynford Limited Improvements relating to in situ cast beams
US20080229701A1 (en) * 2004-02-24 2008-09-25 Angela Duffy Building Apparatus and Method
CN101509319A (en) * 2009-04-09 2009-08-19 青岛市胶州建设集团有限公司 Replacement construction method for post-adding reinforced concrete beam unit for wall
CN103410344A (en) * 2013-07-08 2013-11-27 中冶天工上海十三冶建设有限公司 Reinforced concrete wall beam strengthening and reinforcing device and wall beam strengthening method
CN103711327A (en) * 2012-10-08 2014-04-09 中国石油化工集团公司 Method for joist reinforcement during demolition of lower portion of masonry bearing wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0033658A1 (en) * 1980-02-04 1981-08-12 Pynford Limited Improvements relating to in situ cast beams
US20080229701A1 (en) * 2004-02-24 2008-09-25 Angela Duffy Building Apparatus and Method
CN101509319A (en) * 2009-04-09 2009-08-19 青岛市胶州建设集团有限公司 Replacement construction method for post-adding reinforced concrete beam unit for wall
CN103711327A (en) * 2012-10-08 2014-04-09 中国石油化工集团公司 Method for joist reinforcement during demolition of lower portion of masonry bearing wall
CN103410344A (en) * 2013-07-08 2013-11-27 中冶天工上海十三冶建设有限公司 Reinforced concrete wall beam strengthening and reinforcing device and wall beam strengthening method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265996A (en) * 2017-12-28 2018-07-10 浙江核力建筑特种技术有限公司 A kind of masonry structure break wall punch it is pre- top restore construction
CN108265996B (en) * 2017-12-28 2020-08-04 浙江核力建筑特种技术有限公司 Masonry structure wall-breaking hole-opening pre-jacking recovery construction method
CN108222540A (en) * 2018-03-23 2018-06-29 兰州理工大学 The load bearing wall that brick mix structure is changed to frame structure changes girder construction and construction method
CN110284729A (en) * 2019-06-12 2019-09-27 上海市建筑装饰工程集团有限公司 A kind of historical building wall sectional type cutting disassembling method
CN112112444A (en) * 2020-07-28 2020-12-22 广东建科建筑工程技术开发有限公司 A kind of prestressed steel pipe support structure and construction method thereof
CN113136991A (en) * 2021-04-27 2021-07-20 申保军 Connection method for filling gaps between wall and main structure beam
CN114482618A (en) * 2022-01-05 2022-05-13 中核华辰建筑工程有限公司 Construction method for static force demolition of reinforced concrete structure
CN114635586A (en) * 2022-02-22 2022-06-17 中国华冶科工集团有限公司 Brick-concrete structure bearing wall dismantling method and supporting frame
CN114635586B (en) * 2022-02-22 2023-12-01 中国华冶科工集团有限公司 Method for dismantling bearing wall of brick-concrete structure and supporting frame
CN116065854A (en) * 2023-02-16 2023-05-05 山东省建筑工程质量检验检测中心有限公司 Diagonal bracing assembly type high-rise wall column replacement reinforcement supporting equipment and diagonal bracing assembly type high-rise wall column replacement reinforcement supporting method
CN116065854B (en) * 2023-02-16 2025-01-10 山东省建筑工程质量检验检测中心有限公司 Diagonal bracing assembly type high-rise wall column replacement reinforcement supporting equipment and diagonal bracing assembly type high-rise wall column replacement reinforcement supporting method

Similar Documents

Publication Publication Date Title
CN104594655A (en) Application method for dismantling temporary supports in brick-concrete structure wall
CN108005387B (en) Synchronous construction method for cast-in-place main body of assembled wallboard and short-limb shear wall
CN105464244A (en) Prefabricated integrated shear wall construction method
CN103104091B (en) Sliding mold whole lifting platform and construction method
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN103615053A (en) Construction method for post-cast belt of cast-in-place reinforced concrete structure
CN102561690A (en) Construction method for supporting structures on two sides of post-cast strip by use of brick column
CN202324606U (en) U-shaped force bearing seat
CN111535347A (en) Prefabricated slab tire membrane nested connection structure and construction method
CN103321405B (en) Large formwork lifting construction method for shear wall and cylinder concrete structure
CN103061508A (en) Triangular slip form device and construction method for the same triangular slip form
CN104088473A (en) Construction structure and method used for underpinning load-bearing wall
CN106760851A (en) The construction method of the newly-increased Seismic Isolation of Isolation Layer of existing brick mix structure
CN103882883B (en) Tower crane and garage frame post share a foundation construction method
CN209989847U (en) Shear force wall post-cast strip prefabricated plate closing device
CN104213708A (en) Integral construction method of anchor bolt-free fireproof wall
CN103696437A (en) Construction method for cutting latticed column
JP5865567B2 (en) Connecting slab and its construction method
CN202391140U (en) Thickness control mould of cast-in-place concrete floor
CN104675138B (en) A kind of slab balcony reinforcement means for sound insulation and noise reducing transformation
CN109267578B (en) Inclined plane plain concrete structure and construction method thereof
CN203947493U (en) Assembling type device for detecting manhole
CN116005565A (en) A bridge construction technique
CN111379337B (en) Secondary structure anti-seepage and anti-leakage construction method
CN104264992B (en) Construction method for high-rise building pipe rooms

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150506

WD01 Invention patent application deemed withdrawn after publication