CN104573949A - Intelligent construction decision support system - Google Patents
Intelligent construction decision support system Download PDFInfo
- Publication number
- CN104573949A CN104573949A CN201410841722.XA CN201410841722A CN104573949A CN 104573949 A CN104573949 A CN 104573949A CN 201410841722 A CN201410841722 A CN 201410841722A CN 104573949 A CN104573949 A CN 104573949A
- Authority
- CN
- China
- Prior art keywords
- management
- project
- platform
- enterprise
- decision support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 238000000034 method Methods 0.000 claims abstract description 30
- 230000008569 process Effects 0.000 claims abstract description 28
- 238000012544 monitoring process Methods 0.000 claims abstract description 6
- 238000011161 development Methods 0.000 claims description 9
- 238000012423 maintenance Methods 0.000 claims description 6
- 238000013461 design Methods 0.000 claims description 5
- 230000002195 synergetic effect Effects 0.000 claims description 4
- 238000003326 Quality management system Methods 0.000 claims description 2
- 238000012549 training Methods 0.000 claims description 2
- 238000012546 transfer Methods 0.000 claims description 2
- 238000005457 optimization Methods 0.000 abstract description 2
- 238000007726 management method Methods 0.000 description 56
- 238000005516 engineering process Methods 0.000 description 7
- 238000011156 evaluation Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000007418 data mining Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000011002 quantification Methods 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000013528 artificial neural network Methods 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000003066 decision tree Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000003745 diagnosis Methods 0.000 description 1
- 238000012407 engineering method Methods 0.000 description 1
- 230000005284 excitation Effects 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000013139 quantization Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to an intelligent construction decision support system, which comprises an integrated project management system of enterprises, a collaborative office platform, a financial management platform of enterprises, a human resource management platform of enterprises, a remote monitoring platform of engineering projects, an archive management platform of enterprises, a network procurement platform, and data center and knowledge management. With adoption of the intelligent construction decision support system, various problems caused by geographical restrictions are solved effectively; a process manager effectively monitors the processes, finds the bottleneck and management problems of the processes timely, and optimizes the processes, so that a basis of scientific and rational decision is provided for the optimization of the processes in the future.
Description
Technical field
The present invention relates to a kind of construction intelligent decision support system.
Background technology
Software both at home and abroad about project management emerges in an endless stream, the project software such as BO, P6 of the famous foreign companies such as such as SAP, Orange, domestic Project Management Software is then led by Newgrand, Kingdee, these softwares have accomplished that four get it right than (estimated cost, planned costs, responsibility cost, real cost), the early warning of single index risk threshold values.But application seldom in the excavation of data, the incidence relation etc. between the factor relation of one-to-many, each index is analyzed in lack of wisdom, be difficult to the modern data mining such as decision tree, the neural network prediction project development trend of accomplishing that utilization science is tight, aid decision making.Present stage, domestic and international correlative study has focused on above the informationization of building enterprise, to informationization and the management of information resources then shorter mention of whole building trade.Along with the development of data mining technology, project information resource management becomes building trade important topic from now on.
Minstry of Housing and Urban-Rural Development of People Republic of China (MOHURD) is defined as construction industry development direction information-aided construction, and informationization has become one of important content of the superfine qualification of enterprise in charge of construction.This will cause the upsurge of building industry implementation information.Meanwhile, domestic most large-scale retail businesses have set about applying intelligent decision support system, in order to excavate the mass data of enterprise.Along with the development and perfection of Informationization of Construction Enterprises, project intelligent decision support system also will be subject to the attention of construction enterprises.
The development of building industry self simultaneously is also faced with many challenges:
Business decision aspect
1. decision maker is difficult to the data message got at any time required for decision-making, and a lot of management is all by rule of thumb, is all observation and the diagnosis of coming to a line with company leader personally;
2. monthly all can see a lot of form, but effective means are lacked to the retrospective analysis of report data;
3. the form majority that high level is seen be manual " filling out " out, lower one deck " is filled out " data and is seen to last layer, and the data through processing layer by layer are finally aggregated into high level and just lose its due effect;
4. the objective market division of company and all right re-quantization of analysis, thus any class business can be analyzed fast to corporate profit's percentage contribution, business decision layer needs to analyze business to corporate profit from multiple angles such as industry, region, owner's character and contributes, and utilizes existing form to be difficult to these data obtaining fast wanting;
5. some Enterprise System Sum fanction formed of company is difficult to land execution, and some the management and control indexs as company are difficult to carry out necessity in key link and intervene timely.
Functional department's aspect of company
1. there is invisible barrier between department, information flow and communication have some setbacks, and the information of some department is difficult to be obtained by other departments in need;
2. the basic management standard that corporate level ought to be unified is set up not comprehensive, such as unified project management operation flow, cost accounting subject, resource code etc.
Branch office and subsidiary company's aspect
1. be difficult to the unified management realizing enterprise, due to management disunity, can branch office and subsidiary company do to depend on to a great extent that whether the leader of branch office and subsidiary company is competent well, because branch office is not legal person, branch office loses, and legal liabilities department of still making a public possession goes to bear;
2. some branch office is unsuitable emphasizes " innovation ", and cause and disorderly create and risk operation, result destroys some effective ways of enterprise;
3. the credit and debt of branch office and subsidiary company is difficult to monitor constantly, and such as project is receivable, subpackage debt, material purchases debt etc. are difficult to control at any time;
4. exist branch office and subsidiary company leader in office time achievement passable, hour indicator core of leaving one's post but produces the situation of loss, owing to reporting the output value to have larger manual operation space in process, under loss of capital project delays clearing etc. situation temporarily, will throw into question and can not feed back at any time.
Project management level
1. legal person is difficult to realize the effective monitoring to project, and current company is too much in project under construction, is distributed in multiple provinces and cities and area, only carries out management by objective, despise process monitoring, is difficult to ensure good expected results;
2. be then that Cost Accounting is delayed, what generally adopt at present is the cost information that financial system feeds back, and obvious payment funding stage and business generation and cost occur not to be synchronous;
3. resource purchasing process is difficult to effective monitoring, and current purchase of goods and materials power differs in main office, branch office and subsidiary company's aspect situation, and most resource purchasing procedure management information is difficult to grasp;
4. be difficult to process evaluation project management performance, at present to the progressive quantification of the appraisement system of project management result, process evaluation means are relatively single, and process evaluation and effective excitation are often complemented each other.
(5) employee's aspect
1. the responsibility needs of employee are clear further, and the description of responsibility is at present relatively general and be difficult to perform and supervise quantize, and responsibility clearly prerequisite is the clear of operation flow;
2. be difficult to reasonably evaluate employee performance, and the examination Employees' achievement of science, interior business flow process complete is not clearly had to describe, just cannot define and quantificational description job duty, there is no responsibility clearly, what just mean performance assessment criteria is difficult to quantification, thus is unfavorable for the performance of Staff activity.
Summary of the invention
The problem to be solved in the present invention is to provide a kind of construction intelligent decision support system.
For solving the problems of the technologies described above, construction intelligent decision support system of the present invention, comprise Enterprise Integrated project management system, synergetic office work platform, finicial administration of enterprise platform, enterprise human resource management platform, engineering project remote monitoring platform, management of enterprise archives platform, network stocking platform, data center and information management;
-described Enterprise Integrated project management system comprises project management management system, contract management system, plan and progress control system, resource apparatus management system, Project Cost Management Information System, Project quality management system, project security management system, project document management system, project risk management system, project completion system, project later stage operation maintenance system;
-described enterprise human resource management platform comprises personnel management, HRP system, performance and payroll administration, attendance checking system, human resources contract management, welfare management, Training Management, social security overall management, self-aid system;
-described management of enterprise archives platform comprises department information management, company's file administration, records transfer and importing, archives trial management, data maintenance, file retrieval and statistical report form, system and manages.
Its Integrated Development based on .NET, debugging enironment, the service of flow process, event and adapter layout engine, adopt XForm Designer as the built-in Form Designer of system, design based on pluggable architectural framework.
Construction intelligent decision support system of the present invention efficiently solves region and limits the various problems caused, workflow management person effectively supervises flow process, the bottleneck of Timeliness coverage flow process and problem of management, Optimizing Flow, for the optimization of flow process in the future provides the foundation providing scientific and reasonable decision-making, instead of depend merely on experience, thus reach the object continued to optimize, reach the overall sharing of data, ensure that the consistance of data, reduce the repetition typing of data, save a large amount of manpowers, change to knowledge based enterprises, greatly reduce the maintenance of IT department software, flow process exploitation and management work.
Embodiment
Native system based on Integrated Development, the debugging enironment of .NET, the service of flow process, event and adapter layout engine.
1. integrate existing organizational structure and external system integrated
BPM directly can utilize existing institutional framework and user profile in Enterprise IT System and without the need to import or synchronous.They are consistent forever (in fact they use same set of data), and each operation system can realize data series connection by BPM, when user fills in document, user can extract data from outside Heterogeneous systems, in work flow process, data can be outputted to various Heterogeneous systems.These Heterogeneous systemss can be: system of ERP, HR, financial system, exploitation certainly etc.
② ActiveProcess
Active Process is the combination of workflow technology and .net technology, is .net technology is dissolved into flow definition, allows user to express oneself distinctive logic with .net code in most links of flow definition.Active Process significantly promotes flow process descriptive power, is the effective guarantee that BPM systems stay is deeply applied.Simultaneously this compiling and the mechanism that performs also makes system effectiveness get a promotion.
3. plug type server architecture.
System designs based on pluggable architectural framework, and any third-party institutional framework can be inserted in system, once institutional framework is inserted in system, similarly is the same with user profile simple by the institutional framework of oneself.No matter your user and institutional framework are positioned at AD, or in HR system, or in the system of peculiar exploitation, their circulation business can be utilized.
④ Xform Designer
XForm Designer is the built-in Form Designer of system, its design feature that is visual, that exempt to programme greatly alleviates the workload of list electronization migration, make the importing of BPM system more easily, more efficient, XForm Designer is a real asp.net Form Designer simultaneously, the list designed is standard asp.net list, has good opening and plasticity.
1, Enterprise Operation System
The running environment of enterprise application system comprises IT infrastructure etc., is an IT environment comprising various " software and hardware ".If there is no the support of Enterprise Operation System, the exploitation of enterprise application system must oneself independent face to these problems of process, exploitation effort, cannot be integrated, defines " information island " one by one.In order to solve the integration problem of IT application in enterprises, the support of Enterprise Operation System just must be had.
2, synergetic office work platform
In conjunction with informatization strategy and the urban d evelopment of my company, build general headquarters-branch office-item manager branch three grades unification, comprehensive, synergetic office work platform, form information integerated, single-sign-on, merit can completely enterprise-level portal application.
3, Enterprise Comprehensive Management System
This platform will cover project under construction Life cycle, realize online project examination, project contract management, plan and progress control, resource management, project safety and the function such as quality, project risk, project completion management, the operation maintenance of project later stage, by the whole application in project under construction, thus strengthen main office to the master control ability of whole project, the simultaneously constantly decision-making of accumulation Whole Life Cycle of Projects and management data, and then cultivate the core competitiveness of enterprise.
4, finicial administration of enterprise platform
The construction overall goal of financial management platform becomes overall process finance type manage for making enterprise be managed from financial type afterwards, finally moves towards intelligence, efficient and optimal control.Be embodied on the basis adjusted on satisfied basis, realize comprehensive unification of the financial centralism of main office, comprehensive budget, capital management and financial report, help enterprise to change from accounting type to decision-making manageability, finally realize maximum enterprise value.
5, enterprise human resource management platform
The some problem that this platform will help enterprise to solve human resource management comprehensively, thus increase work efficiency, standardising process manages, and realizes information sharing, reaches the target of human resources. comprehensively
6. management of enterprise archives platform
The abundant computer of this platform and existing network technology realize the scientific and technological class formed all departments, document class, the archives of other types such as official document class, from the formation of e-file, collect, arrange, final filing and online enquiries utilize, borrowing statistics carries out general management, realize the robotization of archives and information management transmission, file intergration, sharedization, make full use of computing machine and realize file administration, replace the behindhand type of original manual management archives, increase work efficiency, file administration is built into one advanced, comprehensive digitized business system, thus file administration is classified as the important component part of Enterprise Knowledge Management System.
7. network stocking platform
Based on internet, for need user and the supplier of resource (goods and materials, labor service, equipment, professional subpackage etc.) have erected a transaction platform, meet " recruit, throw, comment, determine " demand of adoption process.
8. data center and information management
First be Data Collection management, key is construction business process data and informationization; Next is data mart modeling, and being processed into what information needs planning and design, as Discourse of Enterprise's ration, management and control index, technique engineering method etc.; Be finally knowledge dissemination, target is the knowledge allowing the people needed can get needs at any time easily.
Claims (2)
1. a construction intelligent decision support system, it is characterized in that: comprise Enterprise Integrated project management system, synergetic office work platform, finicial administration of enterprise platform, enterprise human resource management platform, engineering project remote monitoring platform, management of enterprise archives platform, network stocking platform, data center and information management;
-described Enterprise Integrated project management system comprises project management management system, contract management system, plan and progress control system, resource apparatus management system, Project Cost Management Information System, Project quality management system, project security management system, project document management system, project risk management system, project completion system, project later stage operation maintenance system;
-described enterprise human resource management platform comprises personnel management, HRP system, performance and payroll administration, attendance checking system, human resources contract management, welfare management, Training Management, social security overall management, self-aid system;
-described management of enterprise archives platform comprises department information management, company's file administration, records transfer and importing, archives trial management, data maintenance, file retrieval and statistical report form, system and manages.
2. according to construction intelligent decision support system according to claim 1, it is characterized in that: its Integrated Development based on .NET, debugging enironment, the service of flow process, event and adapter layout engine, adopt XForm Designer as the built-in Form Designer of system, design based on pluggable architectural framework.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410841722.XA CN104573949A (en) | 2014-12-30 | 2014-12-30 | Intelligent construction decision support system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410841722.XA CN104573949A (en) | 2014-12-30 | 2014-12-30 | Intelligent construction decision support system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104573949A true CN104573949A (en) | 2015-04-29 |
Family
ID=53089958
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410841722.XA Pending CN104573949A (en) | 2014-12-30 | 2014-12-30 | Intelligent construction decision support system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104573949A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107480912A (en) * | 2017-08-31 | 2017-12-15 | 福建四创软件有限公司 | Hydraulic engineering construction comprehensive management system based on big data analysis and Internet of Things |
CN107705020A (en) * | 2017-10-12 | 2018-02-16 | 山东联诚工程建设监理有限公司 | A kind of overall process intelligence engineering supervisory information managing and control system |
CN108460506A (en) * | 2017-02-17 | 2018-08-28 | 上海欧弗信息科技有限公司 | Quantify intelligence system |
CN108764724A (en) * | 2018-05-29 | 2018-11-06 | 吉林工程技术师范学院 | A technology management system |
CN111898853A (en) * | 2020-06-18 | 2020-11-06 | 深圳瑞和建筑装饰股份有限公司 | Engineering construction fine management system |
CN112016892A (en) * | 2020-08-27 | 2020-12-01 | 西安热工研究院有限公司 | Project management system integrated with multiple systems |
CN112184068A (en) * | 2020-10-27 | 2021-01-05 | 陕西交建云数据科技有限公司 | ERP-based road engineering project information cooperation method |
CN112613793A (en) * | 2020-12-30 | 2021-04-06 | 卡斯柯信号有限公司 | BPM-based project cost information automatic analysis and processing system |
US11126938B2 (en) * | 2017-08-15 | 2021-09-21 | Accenture Global Solutions Limited | Targeted data element detection for crowd sourced projects with machine learning |
CN116542638A (en) * | 2023-07-07 | 2023-08-04 | 中国核工业二三建设有限公司 | Decision support system and method for nuclear power installation |
-
2014
- 2014-12-30 CN CN201410841722.XA patent/CN104573949A/en active Pending
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108460506A (en) * | 2017-02-17 | 2018-08-28 | 上海欧弗信息科技有限公司 | Quantify intelligence system |
US11126938B2 (en) * | 2017-08-15 | 2021-09-21 | Accenture Global Solutions Limited | Targeted data element detection for crowd sourced projects with machine learning |
CN107480912A (en) * | 2017-08-31 | 2017-12-15 | 福建四创软件有限公司 | Hydraulic engineering construction comprehensive management system based on big data analysis and Internet of Things |
CN107705020A (en) * | 2017-10-12 | 2018-02-16 | 山东联诚工程建设监理有限公司 | A kind of overall process intelligence engineering supervisory information managing and control system |
CN108764724A (en) * | 2018-05-29 | 2018-11-06 | 吉林工程技术师范学院 | A technology management system |
CN111898853A (en) * | 2020-06-18 | 2020-11-06 | 深圳瑞和建筑装饰股份有限公司 | Engineering construction fine management system |
CN112016892A (en) * | 2020-08-27 | 2020-12-01 | 西安热工研究院有限公司 | Project management system integrated with multiple systems |
CN112184068A (en) * | 2020-10-27 | 2021-01-05 | 陕西交建云数据科技有限公司 | ERP-based road engineering project information cooperation method |
CN112184068B (en) * | 2020-10-27 | 2024-06-11 | 陕西交建云数据科技有限公司 | Highway engineering project information collaboration method based on ERP |
CN112613793A (en) * | 2020-12-30 | 2021-04-06 | 卡斯柯信号有限公司 | BPM-based project cost information automatic analysis and processing system |
CN116542638A (en) * | 2023-07-07 | 2023-08-04 | 中国核工业二三建设有限公司 | Decision support system and method for nuclear power installation |
CN116542638B (en) * | 2023-07-07 | 2023-10-20 | 中国核工业二三建设有限公司 | Decision support system and method for nuclear power installation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104573949A (en) | Intelligent construction decision support system | |
Zhou et al. | Risk management in distributed wind energy implementing Analytic Hierarchy Process | |
US9536225B2 (en) | Aggregating business analytics architecture and configurator | |
CN111144836A (en) | Smart building integrated collaborative big data platform | |
Hu et al. | Research and application of capability maturity model for Chinese intelligent manufacturing | |
Tyuleneva | Problems and prospects of regional mining industry digitalization | |
Chornous et al. | Integration of information systems for predictive workforce analytics: Models, synergy, security of entrepreneurship | |
CN105760989A (en) | Geographic information system monitoring economic operation data | |
CN105631612A (en) | System and method of evaluating individual performance and capability of public servant based on big data | |
Agarwal et al. | Risk based initial cost assessment while planning a hydropower project | |
CN108510200A (en) | The computational methods and device of data assets operation benefits based on Life cycle | |
Safari | An effective practical approach for business process modeling and simulation in service industries | |
Sharma et al. | Probing frugal innovation from the quality lens | |
Li et al. | Smartcmp: A cloud cost optimization governance practice of smart cloud management platform | |
CN105023100A (en) | Database and middleware non-index quantitative management platform for platform software | |
Johansen et al. | Time elasticity-who and what determines the correct project duration? | |
Babordina et al. | Formation of the business model of oil producing enterprises | |
CN116739208A (en) | Unified management system for power supply service | |
CN108520332A (en) | System and method for asset management of wind farm equipment | |
Sun et al. | Design of an enterprise financial risk management system based on big data mining | |
Maalla | Research on Data Transmission Security and Early Warning | |
Su et al. | System dynamics modeling for green IT strategies: SAP sustainability development case | |
Zhou et al. | An empirical study on project management of reconstruction after disaster based on interpretation system | |
Li | Study on the application of information technology in enterprise risk management | |
Maksimov et al. | Cost reengineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150429 |
|
WD01 | Invention patent application deemed withdrawn after publication |