CN104565791B - A kind of firm sectional material connection structure - Google Patents
A kind of firm sectional material connection structure Download PDFInfo
- Publication number
- CN104565791B CN104565791B CN201410742451.2A CN201410742451A CN104565791B CN 104565791 B CN104565791 B CN 104565791B CN 201410742451 A CN201410742451 A CN 201410742451A CN 104565791 B CN104565791 B CN 104565791B
- Authority
- CN
- China
- Prior art keywords
- pit
- embedding
- profile
- connection structure
- profile unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 title description 2
- 230000004308 accommodation Effects 0.000 claims abstract description 12
- 239000003292 glue Substances 0.000 claims description 17
- 238000002347 injection Methods 0.000 claims description 14
- 239000007924 injection Substances 0.000 claims description 14
- 239000000084 colloidal system Substances 0.000 claims description 4
- 239000000499 gel Substances 0.000 claims 1
- 230000002146 bilateral effect Effects 0.000 abstract description 3
- 239000002131 composite material Substances 0.000 description 4
- 239000000243 solution Substances 0.000 description 4
- 241001270131 Agaricus moelleri Species 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000037390 scarring Effects 0.000 description 1
Landscapes
- Finishing Walls (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明公开了一种牢靠的型材连接结构,包括第一型材单元和第二型材单元,所述第一型材单元包括:第一嵌接坑,其左坑壁为左侧板,右坑壁为中柱;第二嵌接坑,其左坑壁为所述中柱,右坑壁为右侧板体或右侧板组合体;所述第二型材单元包括:中柱容置坑,其左坑壁为末端被固定在第一嵌接坑内的第一连接钩,右坑壁为末端被固定在第二嵌接坑内的第二连接钩,所述中柱的末端位于中柱容置坑内;所述第一嵌接坑、中柱容置坑、第二嵌接坑按自左向右顺次布置。本发明取消了传统的双边抱钩连接结构所必然形成的空腔,故大大缩小连接结构的体积。本发明结构巧妙,安全稳固,组装快捷,可广泛用于型材单元的连接结构中。
The invention discloses a reliable profile connection structure, which includes a first profile unit and a second profile unit, the first profile unit includes: a first embedding pit, the left pit wall is a left plate, and the right pit wall is a The center column; the second embedding pit, the left pit wall is the center column, and the right pit wall is the right side plate body or the right side plate assembly; the second profile unit includes: the center column accommodation pit, the left side The pit wall is the first connecting hook whose end is fixed in the first embedding pit, the right pit wall is the second connecting hook whose end is fixed in the second embedding pit, and the end of the center post is located in the center post accommodating pit; The first embedding pit, the center pillar accommodating pit, and the second embedding pit are arranged in sequence from left to right. The present invention cancels the cavity inevitably formed by the traditional bilateral hook connection structure, so the volume of the connection structure is greatly reduced. The invention has ingenious structure, safety and stability, quick assembly and can be widely used in the connection structure of profile units.
Description
技术领域technical field
本发明涉及型材领域中的型材连接结构。The invention relates to a connection structure of profiles in the field of profiles.
背景技术Background technique
为了达到所需的型材形状,不少型材是采用型材单元互相连接而完成组成的,比如双色注胶型材或者拼接型材。不过对于组合型材而言,它的型材单元之间往往存在难以抵抗扭力、容易松脱的情况,于是现有设计中多是采用双边抱钩的连接结构。参照图1,双边抱钩的连接结构,包括左型材单元1a和右型材单元2a,右型材单元2a向左边上下伸出两条右连接钩21a,左型材单元1a向右边伸出两副连接组,分别与两条右连接钩21a连接,具体地,每副连接组包括位于外面的、抵靠住对应的右连接钩外侧的抵板11a以及位于里面的、与所述对应的右连接钩钩接的左连接钩12a。而上下两副连接组是彼此镜像对称的。这样,无论是向左扭还是向右扭,由于结构中既有钩接又有抵靠限位的关系,左型材单元1a和右型材单元2a都不容易彼此松脱,故这种双边抱钩连接结构的确比较稳固。但该连接结构有个显而易见的缺陷:为了抵抗左右的扭矩,它不得不制作出上下两副连接组(如果缺少了一个,则反向的扭矩可以轻易地使钩接位松开,抵板根本不能阻挡),而上下两副连接组配合上下两个右连接钩,自然就在结合时形成了一个腔体3a,该腔体3a体积庞大,占据空间,使得工程师们很难设计出轻便的组合型材,例如实际工作中仅需要提供一种“工”型的组合型材,但按照双边抱钩连接结构来设计,则最终会制作出“II”型。且要组成双边抱钩连接结构,则肯定需要对左型材单元1a和右型材单元2a的面板施力,这很容易就会使面板产生形变。In order to achieve the required profile shape, many profiles are formed by connecting profile units, such as double-color glue injection profiles or spliced profiles. However, for combined profiles, it is often difficult to resist torsion and easy to loosen between its profile units, so most of the existing designs use the connection structure of double-sided hooks. Referring to Figure 1, the connection structure of the double-sided hooks includes a left profile unit 1a and a right profile unit 2a, the right profile unit 2a protrudes two right connecting hooks 21a up and down to the left, and the left profile unit 1a protrudes two pairs of connecting groups to the right , are respectively connected with two right connecting hooks 21a, specifically, each pair of connecting groups includes an abutting plate 11a on the outside that abuts against the outer side of the corresponding right connecting hook and an inner one that is in contact with the corresponding right connecting hook connected left connecting hook 12a. The upper and lower connectomes are mirror images of each other. In this way, whether it is twisted to the left or to the right, due to the relationship between hooking and abutment in the structure, the left profile unit 1a and the right profile unit 2a are not easy to loosen each other, so this double-sided hook The connection structure is indeed relatively stable. But this connection structure has an obvious defect: in order to resist the left and right torque, it has to make two pairs of connection groups (if one is missing, the reverse torque can easily loosen the hook joint, and the abutment plate is not at all can not be blocked), and the upper and lower connecting groups cooperate with the upper and lower right connecting hooks, naturally forming a cavity 3a when combined, the cavity 3a is bulky and takes up space, making it difficult for engineers to design a portable combination Profiles, for example, only need to provide a combination of "I" type profiles in actual work, but if designed according to the double-sided hook connection structure, "II" type will eventually be produced. And to form a double-sided hook connection structure, it is necessary to apply force to the panels of the left profile unit 1a and the right profile unit 2a, which will easily cause deformation of the panels.
发明内容Contents of the invention
本发明要解决的技术问题是:提供一种牢靠的型材连接结构,它使得型材单元完成组合后,组合体占据空间小,不会出现传统的庞大腔体,且抗扭性能强,不易松脱。The technical problem to be solved by the present invention is to provide a reliable profile connection structure, which enables the combination of profile units to occupy a small space without the traditional large cavity, and has strong torsion resistance and is not easy to loose .
本发明解决其技术问题的解决方案是:The solution that the present invention solves its technical problem is:
一种牢靠的型材连接结构,包括第一型材单元和第二型材单元,所述第一型材单元包括:第一嵌接坑,其左坑壁为左侧板,右坑壁为中柱;第二嵌接坑,其左坑壁为所述中柱,右坑壁为右侧板体或右侧板组合体;所述第二型材单元包括:中柱容置坑,其左坑壁为末端被固定在第一嵌接坑内的第一连接钩,右坑壁为末端被固定在第二嵌接坑内的第二连接钩,所述中柱的末端位于中柱容置坑内;所述第一嵌接坑、中柱容置坑、第二嵌接坑按自左向右顺次布置。A reliable profile connection structure, including a first profile unit and a second profile unit, the first profile unit includes: a first embedding pit, the left pit wall is the left side plate, and the right pit wall is the center column; Two embedding pits, the left pit wall is the center column, and the right pit wall is the right side plate body or right side plate assembly; the second profile unit includes: the center column accommodation pit, the left pit wall is the end The first connecting hook is fixed in the first embedding pit, the right pit wall is the second connecting hook whose end is fixed in the second embedding pit, and the end of the central column is located in the accommodating pit of the central column; the first The embedding pit, the center column accommodating pit, and the second embedding pit are arranged in order from left to right.
需要指出的是,本文所提到的左右等方位概念,仅为部件之间相对位置的描述,并不代表一种绝对的空间位置关系。It should be pointed out that the concepts of left, right and other orientations mentioned in this article are only descriptions of relative positions between components, and do not represent an absolute spatial position relationship.
从本发明的技术方案可以看到,所述中柱既作为第一嵌接坑的右坑壁,也同时作为第二嵌接坑的左坑壁,这对于现有技术而言产生了一个巨大的区别,即由于中柱担任了两壁同体角色,本发明的结构再也没有出现大跨度的腔体,极度节省了空间以及提高了位置设计的灵活度,且组合型材时不会出现压弯型材面板的现象。另外,所述第二嵌接坑的右坑壁可以是单体型材,也可以是结构的组合体,例如所述右侧板体是这样的结构:它是第一型材单元的右端伸出物,右侧板体的末端顶靠住第二型材单元或兜住第二连接钩末端。又或者,所述右侧板组合体是这样的结构:它包括两部分,一部分是第一型材单元右段的一拐折钩,另一部分是第二型材单元的一顶接台阶,所述拐折钩与顶接台阶紧密抵靠。From the technical solution of the present invention, it can be seen that the central column not only serves as the right pit wall of the first scarfing pit, but also serves as the left pit wall of the second scarring pit, which creates a huge problem for the prior art. The difference is that since the central column plays the same role as the two walls, the structure of the present invention no longer has a large-span cavity, which greatly saves space and improves the flexibility of position design, and there will be no bending when combining profiles Profile panel phenomenon. In addition, the right pit wall of the second embedding pit can be a single profile, or a combination of structures, for example, the right side plate body is such a structure: it is the right end of the first profile unit , the end of the right plate body is against the second profile unit or embraces the end of the second connecting hook. Alternatively, the right side plate assembly has such a structure: it includes two parts, one part is a turning hook on the right section of the first profile unit, and the other part is a top connecting step of the second profile unit, the turning The folding hook is closely against the abutting step.
为了让型材连接结构更加牢靠,可以对所述三个坑进行注胶,让连接钩与中柱进行钩接等。实际上,通过控制注胶量与拼合长度、时间,可以一次注胶完成三个坑内的板材注胶固定。例如仅在中柱容置坑内注胶,压接型材时坑内胶体自然会漫溢到隔壁的第一嵌接坑和第二嵌接坑内,最终固化时将中柱和两边连接钩均固定。In order to make the profile connection structure more reliable, the three pits can be injected with glue, so that the connecting hook and the center column can be hooked together. In fact, by controlling the amount of glue injection and the length and time of splicing, the glue injection and fixing of the plates in the three pits can be completed at one time. For example, glue is only injected in the center column accommodation pit, and the glue in the pit will naturally overflow into the first and second scarfing pits next door when the profile is crimped, and the center column and the connecting hooks on both sides are fixed when it is finally cured.
本发明的有益效果是:从上述技术方案可见,在本发明的连接结构中,第一嵌接坑、中柱容置坑、第二嵌接坑按自左向右顺次布置,且中柱同时作为两边的坑壁,使得整套连接结构中不再出现宽阔的腔体,原本双边抱钩连接结构两边都需要设置一对钩加注胶,而中柱实际上是将两边朝内侧的单钩功能糅合到自身中,这样在进行型材拼合时,不再会轻易地就将面板给压弯,而且腾出更广阔的设计空间让工程师可以设计其他的型材功能结构。对本发明进行型材的两边扭动时,由于中柱插入到了中柱容置坑内,两边又有左侧板、右侧板/右侧板体的夹持包裹,可供摇动的空隙已经非常小,扭转松脱的趋势被迫转化为将两连接钩拔出嵌接坑的趋势,不过两连接钩的末端又分别被固定极难拔出,故强行施加扭力几乎只可能使第一连接钩或第二连接钩的根部断裂(此由型材材质、厚度等因素决定,是客观存在的问题,再巧妙的连接结构设计也不能克服,但型材单元互相松脱的问题却可以通过优化连接结构来克服),但却很难出现型材单元互相松脱,真正实现了小体积的组合型材单元牢靠连接。本发明结构巧妙,安全稳固,组装快捷,可广泛用于型材单元的连接结构中。The beneficial effects of the present invention are: It can be seen from the above technical solution that in the connection structure of the present invention, the first embedding pit, the center column accommodating pit, and the second embedding pit are arranged in sequence from left to right, and the center post At the same time, as the pit walls on both sides, there is no longer a wide cavity in the whole connection structure. In the original bilateral hook connection structure, a pair of hooks need to be installed on both sides to add glue, but the center column is actually a single hook with both sides facing inward. The function is integrated into itself, so that when the profiles are assembled, the panels will no longer be easily bent, and a wider design space will be freed up for engineers to design other profile functional structures. When twisting both sides of the profile in the present invention, since the center column is inserted into the center column accommodation pit, and there are left side plate, right side plate/right side plate clamped and wrapped on both sides, the space for shaking is already very small. The trend of twisting and loosening is forced to be transformed into the trend of pulling out the two connecting hooks from the scarfing pit, but the ends of the two connecting hooks are respectively fixed and extremely difficult to pull out, so it is almost only possible to force the first connecting hook or the second connecting hook The root of the second connecting hook is broken (this is determined by the profile material, thickness and other factors, and it is an objective problem that cannot be overcome by clever connection structure design, but the problem of the mutual loosening of the profile units can be overcome by optimizing the connection structure) , but it is difficult for the profile units to loosen from each other, which truly realizes the firm connection of the small-volume composite profile units. The invention has ingenious structure, safety and stability, quick assembly and can be widely used in the connection structure of profile units.
附图说明Description of drawings
为了更清楚地说明本发明实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单说明。显然,所描述的附图只是本发明的一部分实施例,而不是全部实施例,本领域的技术人员在不付出创造性劳动的前提下,还可以根据这些附图获得其他设计方案和附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following will briefly describe the drawings that need to be used in the description of the embodiments. Apparently, the described drawings are only some embodiments of the present invention, not all embodiments, and those skilled in the art can obtain other designs and drawings based on these drawings without creative work.
图1是组合型材设计中采用的传统的双边抱钩连接结构示意图;Figure 1 is a schematic diagram of the traditional bilateral hook connection structure used in the design of composite profiles;
图2是本发明实施例1的结构示意图;Fig. 2 is the structural representation of embodiment 1 of the present invention;
图3是本发明实施例2的结构示意图;Fig. 3 is the structural representation of embodiment 2 of the present invention;
图4是本发明实施例3的结构示意图;Fig. 4 is the structural representation of embodiment 3 of the present invention;
图5是本发明实施例4的结构示意图;Fig. 5 is a schematic structural view of Embodiment 4 of the present invention;
图6是本发明实施例5的结构示意图;Fig. 6 is a schematic structural view of Embodiment 5 of the present invention;
图7是本发明实施例6的结构示意图;Figure 7 is a schematic structural view of Embodiment 6 of the present invention;
图8是本发明实施例7的结构示意图;Figure 8 is a schematic structural view of Embodiment 7 of the present invention;
图9是本发明运用在实践中其中一种范例的示意图。FIG. 9 is a schematic diagram of an example of the present invention in practice.
具体实施方式detailed description
以下将结合实施例和附图对本发明的构思、具体结构及产生的技术效果进行清楚、完整地描述,以充分地理解本发明的目的、特征和效果。显然,所描述的实施例只是本发明的一部分实施例,而不是全部实施例,基于本发明的实施例,本领域的技术人员在不付出创造性劳动的前提下所获得的其他实施例,均属于本发明保护的范围。另外,文中所提到的所有联接/连接关系,并非单指构件直接相接,而是指可根据具体实施情况,通过添加或减少联接辅件,来组成更优的联接结构。本发明创造中的各个技术特征,在不互相矛盾冲突的前提下可以交互组合。The idea, specific structure and technical effects of the present invention will be clearly and completely described below in conjunction with the embodiments and accompanying drawings, so as to fully understand the purpose, features and effects of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, rather than all of them. Based on the embodiments of the present invention, other embodiments obtained by those skilled in the art without creative efforts belong to The protection scope of the present invention. In addition, all the connection/connection relationships mentioned in this article do not refer to the direct connection of components, but mean that a better connection structure can be formed by adding or reducing connection accessories according to specific implementation conditions. The various technical features in the invention can be combined interactively on the premise of not conflicting with each other.
实施例1:参照图2,一种牢靠的型材连接结构,包括第一型材单元1和第二型材单元2,所述第一型材单元1包括:第一嵌接坑,其左坑壁为左侧板21,右坑壁为中柱22;第二嵌接坑,其左坑壁为所述中柱22,右坑壁为右侧板体23或右侧板组合体24;所述第二型材单元2包括:中柱容置坑,其左坑壁为末端被固定在第一嵌接坑内的第一连接钩11,右坑壁为末端被固定在第二嵌接坑内的第二连接钩12,所述中柱22的末端位于中柱容置坑内;所述第一嵌接坑、中柱容置坑、第二嵌接坑按自左向右顺次布置。Embodiment 1: Referring to Figure 2, a reliable profile connection structure includes a first profile unit 1 and a second profile unit 2, the first profile unit 1 includes: a first embedding pit, the left pit wall is the left The side plate 21, the right pit wall is the center column 22; the second embedding pit, the left pit wall is the center column 22, the right pit wall is the right side plate body 23 or the right side plate assembly 24; the second The profile unit 2 includes: a central pillar accommodation pit, the left pit wall is the first connecting hook 11 whose end is fixed in the first embedding pit, and the right pit wall is the second connecting hook whose end is fixed in the second embedding pit 12. The end of the center pillar 22 is located in the center pillar accommodation pit; the first embedding pit, center pillar accommodation pit, and second embedding pit are arranged in sequence from left to right.
然后,本实施例中第二嵌接坑右坑壁采用右侧板组合体24,亦即图2中虚线所框部分,它是这样的结构:它包括两部分,一部分是第一型材单元1右段的一拐折钩,另一部分是第二型材单元2的一顶接台阶,所述拐折钩与顶接台阶紧密抵靠。Then, in the present embodiment, the right wall of the second embedding pit adopts the right side plate assembly 24, that is, the part framed by the dotted line in Fig. 2, which has such a structure: it includes two parts, one part is the first profile unit 1 A turning hook on the right section, and the other part is an abutting step of the second profile unit 2, and the turning hook closely abuts against the abutting step.
中柱容置坑内设有裹住中柱22末端的中注胶体。第一嵌接坑内、第二嵌接坑内各设有分别裹住第一连接钩11末端、第二连接钩12末端的侧边注胶体。此处可以采用上面曾提到的中间坑位一次注胶、未固化时通过压合挤压胶体使之溢出同时裹住两边的第一、第二连接钩末端,亦即所述中注胶体和侧边注胶体为同一整体。为了再次加强结构的牢固度,所述第一连接钩11与中柱22钩接,所述第二连接钩12也与中柱22钩接。这样一来,两边连接钩就再也无法轻易从各自的嵌接坑内拔出了。The central column accommodation pit is provided with a middle injection colloid wrapping the end of the central column 22 . In the first embedding pit and in the second embedding pit, there are respectively provided side injection glues wrapping the end of the first connecting hook 11 and the end of the second connecting hook 12 respectively. Here, the above-mentioned intermediate pit can be used for one-time injection of glue, and when it is not cured, press and squeeze the glue to overflow and wrap the ends of the first and second connecting hooks on both sides, that is, the middle injection glue and The side injection colloid is the same whole. In order to strengthen the firmness of the structure again, the first connecting hook 11 is hooked with the central column 22 , and the second connecting hook 12 is also hooked with the central column 22 . In this way, the connecting hooks on both sides can no longer be easily pulled out from their respective embedding pits.
从图2可看出,左侧板21左方和上方、右侧板组合体24的右方和上方都腾出了大片的设计空间,故左侧板21的左侧继续向左延伸成平板、右侧板组合体24右侧也继续向右延伸成平板,二者形成平顶的组合型材。As can be seen from Fig. 2, a large area of design space has been vacated on the left and upper sides of the left side panel 21 and the right side and upper side of the right side panel assembly 24, so the left side of the left side panel 21 continues to extend to the left to form a flat panel 1. The right side of the right side plate assembly 24 also continues to extend to the right to form a flat plate, and the two form a flat-top combined profile.
实施例2:参照图3,实施例2的结构与实施例1的结构基本相同,只是在左侧板21左方和上方腾出了设计空间之后,左侧板21是向上继续延长使整体呈现一种横放“T”字形的状态。Embodiment 2: Referring to Fig. 3, the structure of Embodiment 2 is basically the same as that of Embodiment 1, except that after the design space is vacated on the left side and above the left side panel 21, the left side panel 21 continues to extend upwards to make the overall appearance A state of "T" shape placed horizontally.
实施例3:参照图4,实施例3的结构与实施例1的结构基本相同,不过其第二嵌接坑右坑壁为右侧板体23,该右侧板体23是这样的结构:它是第一型材单元1的右端伸出物,右侧板体23的末端顶靠住第二型材单元2或兜住第二连接钩12末端。更具体地,本实施例中右侧板体23的末端顶靠住第二型材单元2。这样,第二型材单元2就更不容易翻转了。而左侧板21的左侧继续向左延伸成平板、右侧板体23右侧也继续向右延伸成平板,二者形成平顶的组合型材。Embodiment 3: Referring to Fig. 4, the structure of embodiment 3 is basically the same as that of embodiment 1, but the right pit wall of the second embedding pit is the right side plate body 23, and the right side plate body 23 has such a structure: It is the protruding part of the right end of the first profile unit 1 , and the end of the right plate body 23 abuts against the second profile unit 2 or wraps around the end of the second connecting hook 12 . More specifically, in this embodiment, the end of the right plate body 23 abuts against the second profile unit 2 . In this way, the second profile unit 2 is more difficult to overturn. The left side of the left side plate 21 continues to extend leftwards to become a flat plate, and the right side of the right side plate body 23 also continues to extend rightwards to form a flat plate, and the two form a flat-top composite profile.
实施例4:参照图5,实施例4的结构与实施例3的结构基本相同,不过其左侧板21是向上继续延长。Embodiment 4: Referring to FIG. 5 , the structure of embodiment 4 is basically the same as that of embodiment 3, but the left side plate 21 continues to extend upward.
实施例5:参照图6,实施例5的结构与实施例4的结构基本相同,不过其中柱22略为短小而并没有完全顶住中柱容置坑的底壁,而左侧板21则向左侧继续向左延伸成平板、右侧板体23右侧也继续向右延伸成平板,二者形成平顶的组合型材。至于中注胶体和侧边注胶体则可以按实际情况进行注胶,只要能将中柱和两连接钩固定牢固即可。Embodiment 5: Referring to Fig. 6, the structure of embodiment 5 is basically the same as that of embodiment 4, except that the column 22 is slightly short and does not completely withstand the bottom wall of the middle column accommodation pit, while the left side plate 21 faces The left side continues to extend to the left to form a flat plate, and the right side of the right plate body 23 also continues to extend to the right to form a flat plate, and the two form a flat-top composite profile. As for the middle injection glue and the side injection glue, you can inject glue according to the actual situation, as long as the center column and the two connecting hooks can be fixed firmly.
实施例6:参照图7,实施例6的结构与实施例5的结构基本相同,也是采用短小中柱的设计,不过其左侧板21上顶与第二型材单元2的上平面齐平。Embodiment 6: Referring to FIG. 7 , the structure of embodiment 6 is basically the same as that of embodiment 5, and also adopts the design of a short center column, but the top of the left side plate 21 is flush with the upper plane of the second profile unit 2 .
实施例7:参照图8,实施例7的结构与实施例4的结构基本相同,不过其右侧板体23的末端不是顶靠住第二型材单元2而是兜住第二连接钩12末端。这种结构也沿用了本发明的基本思路,为了保证第二型材单元2不容易向右扭转,右侧板体23的末端兜住第二连接钩12末端后所形成的第二嵌接坑内应当注有结实的胶体。Embodiment 7: Referring to FIG. 8, the structure of Embodiment 7 is basically the same as that of Embodiment 4, but the end of the right side plate body 23 is not against the second profile unit 2 but embraces the end of the second connecting hook 12 . This structure also follows the basic idea of the present invention. In order to ensure that the second profile unit 2 is not easy to twist to the right, the end of the right plate body 23 wraps around the end of the second connecting hook 12 and the second embedding pit formed after the end of the second connecting hook 12 should be Filled with strong colloid.
参照图9,此为本发明的一种实际应用的范例。图9展示了一种双色组合型材,它整体形态呈H形,左边为一个型材单元,右边为另一个型材单元,组合时,只需简单地将第一连接钩11、第二连接钩12插入到相应的嵌接坑内,同时使之与中柱22钩接、相应的嵌接坑和中柱容置坑内注胶固化即可。Referring to FIG. 9, this is an example of a practical application of the present invention. Figure 9 shows a two-color combination profile, which is H-shaped overall, with one profile unit on the left and another profile unit on the right. When assembling, simply insert the first connecting hook 11 and the second connecting hook 12 Go into the corresponding embedding pit, hook it with the center column 22 at the same time, inject glue into the corresponding embedding pit and the center column accommodating pit and solidify.
以上对本发明的较佳实施方式进行了具体说明,但本发明创造并不限于所述实施例,熟悉本领域的技术人员在不违背本发明精神的前提下还可作出种种的等同变型或替换,这些等同的变型或替换均包含在本申请权利要求所限定的范围内。The preferred embodiments of the present invention have been described in detail above, but the invention is not limited to the described embodiments, and those skilled in the art can also make various equivalent modifications or replacements without violating the spirit of the present invention. These equivalent modifications or replacements are all within the scope defined by the claims of the present application.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410742451.2A CN104565791B (en) | 2014-12-04 | 2014-12-04 | A kind of firm sectional material connection structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410742451.2A CN104565791B (en) | 2014-12-04 | 2014-12-04 | A kind of firm sectional material connection structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104565791A CN104565791A (en) | 2015-04-29 |
CN104565791B true CN104565791B (en) | 2017-05-31 |
Family
ID=53082512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410742451.2A Expired - Fee Related CN104565791B (en) | 2014-12-04 | 2014-12-04 | A kind of firm sectional material connection structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104565791B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106402635B (en) * | 2016-11-08 | 2019-02-19 | 朱成祥 | Two-color aluminum flat panel unit |
CN106617823A (en) * | 2017-01-10 | 2017-05-10 | 佛山市三水和美斯金铝业有限公司 | Aluminum furniture board |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2287969A (en) * | 1994-03-12 | 1995-10-04 | Midland Ind Holdings Plc | Structural component, e.g. lintel |
EP0960985A2 (en) * | 1998-05-29 | 1999-12-01 | Ernst Koller | I-section girder for building constructions |
CN201050265Y (en) * | 2007-04-29 | 2008-04-23 | 杨增光 | Split heat insulation section bar for casting |
CN202371436U (en) * | 2011-11-15 | 2012-08-08 | 广亚铝业有限公司 | Connecting structure of bicolor glue injection section |
CN104047510A (en) * | 2014-06-12 | 2014-09-17 | 朱成祥 | Glue injection combined section bar and glue injection product section bar production method applying same |
CN204372523U (en) * | 2014-12-04 | 2015-06-03 | 佛山市三水浩迪亚金属材料有限公司 | A kind of firm sectional material connection structure |
-
2014
- 2014-12-04 CN CN201410742451.2A patent/CN104565791B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2287969A (en) * | 1994-03-12 | 1995-10-04 | Midland Ind Holdings Plc | Structural component, e.g. lintel |
EP0960985A2 (en) * | 1998-05-29 | 1999-12-01 | Ernst Koller | I-section girder for building constructions |
CN201050265Y (en) * | 2007-04-29 | 2008-04-23 | 杨增光 | Split heat insulation section bar for casting |
CN202371436U (en) * | 2011-11-15 | 2012-08-08 | 广亚铝业有限公司 | Connecting structure of bicolor glue injection section |
CN104047510A (en) * | 2014-06-12 | 2014-09-17 | 朱成祥 | Glue injection combined section bar and glue injection product section bar production method applying same |
CN204372523U (en) * | 2014-12-04 | 2015-06-03 | 佛山市三水浩迪亚金属材料有限公司 | A kind of firm sectional material connection structure |
Also Published As
Publication number | Publication date |
---|---|
CN104565791A (en) | 2015-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104565791B (en) | A kind of firm sectional material connection structure | |
DE07717425T1 (en) | EMBEDDED LADDERWAVE CORE AND SANDWICH PLATE THEREOF | |
CN207063187U (en) | A kind of prefabricated unidirectional superimposed sheet plate side connecting structure | |
CN210797893U (en) | Connecting structure of steel bar and concrete filled steel tube column | |
WO2013149402A1 (en) | Middle frame for liquid crystal display device, and liquid crystal display device | |
CN204372523U (en) | A kind of firm sectional material connection structure | |
CN205242666U (en) | Buckling restrained brace | |
CN203220108U (en) | Foldable cabinet | |
CN206987301U (en) | A kind of spliced plaster line | |
CN206942539U (en) | A kind of doors and windows sealing corner brace | |
CN209757827U (en) | Tray | |
CN106402635A (en) | Flat plate unit of bicolor aluminum product | |
CN202718984U (en) | Connector for furniture | |
CN206673220U (en) | A kind of anti-loose structure of plug special | |
CN201665926U (en) | Anti-cold bridge double-sided metal thermal insulation plate | |
CN210599734U (en) | Novel indicate and connect plate structure | |
CN206972056U (en) | Spliced door with hidden handle | |
CN220815425U (en) | Corner connector for expansion glue injection | |
CN107100918A (en) | Embedded connecting piece for hollow cellular board | |
CN216690003U (en) | Glass bearing special-shaped bearing rib structure | |
CN212078331U (en) | An insulating wall made of concrete | |
CN207079736U (en) | One kind splicing wallboard | |
CN201962791U (en) | Reinforced concrete brick-free building structure | |
CN207315148U (en) | A kind of built-in assembling combination injecting glue corner brace | |
CN103255862B (en) | Connecting joint of stand column and cross beam of curtain wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 528000 Leping Road East, Leping Town, Sanshui District, Guangdong, Foshan Applicant after: FOSHAN SANSHUI HEMEISIJIN ALUMINIUM INDUSTRY CO.,LTD. Address before: 528000 Leping Road East, Leping Town, Sanshui District, Guangdong, Foshan Applicant before: FOSHAN CITY SANSHUI HAODIYA METAL MATERIALS Co.,Ltd. |
|
COR | Change of bibliographic data | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170531 |
|
CF01 | Termination of patent right due to non-payment of annual fee |