CN104561730A - Method for producing GCr15 bearing steel billets - Google Patents
Method for producing GCr15 bearing steel billets Download PDFInfo
- Publication number
- CN104561730A CN104561730A CN201410811222.1A CN201410811222A CN104561730A CN 104561730 A CN104561730 A CN 104561730A CN 201410811222 A CN201410811222 A CN 201410811222A CN 104561730 A CN104561730 A CN 104561730A
- Authority
- CN
- China
- Prior art keywords
- slag
- casting
- steel
- temperature
- described step
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Landscapes
- Treatment Of Steel In Its Molten State (AREA)
Abstract
The invention discloses a method for producing GCr15 bearing steel billets. The method comprises the following process steps: pretreating molten iron, adding the molten iron into a 120-tonnage top-bottom combined blowing converter, LF, VD, 150mm*150mm billet continuous casting machine, performing high-line billet casting and heating, performing high pressure water scale removing, rolling and controlling cooling. Desulfurization is performed in the converter by adopting a double slag process, and endpoint catching carbon practice is realized; reduction refining, deep desulfurization and high alkalinity of molten steel are realized by virtue of LF refining; the hydrogen and nitrogen in the molten steel are removed by virtue of VD, the steel is cooled after air breaking, the slag inclusion is removed, and further desulfurization is realized; according to the continuous casting process, a low super-heat low cooling process, an electromagnetic stirring technology and a casting slow cooling process are adopted, and the casting billet quality is improved; and moreover, sufficient heating time and heating temperature are guaranteed in the casting billet heating process, the casting billet heating uniformity is guaranteed, and the carbides are fully dissolved. According to the production method disclosed by the invention, the content of oxygen, nitrogen and slag inclusion in the steel can be well controlled, and the rolled products have good comprehensive mechanical properties and meet the national standard.
Description
Technical field
The invention belongs to the Technology field of smelting iron and steel, particularly relate to a kind of production method of GCr15 Bearing Steel Billet.
Background technology
Along with the development of Domestic Automotive Industry and the progress of society, the product demand of the high added values such as bearing steel is increasing, and these products have very strict requirement to harmful element, inclusion content and kind in steel,
Bearing steel is mainly used to the part manufacturing rolling bearing, they operationally subject high repeated load, therefore roller bearing steel should have high hardness, wear resistance and fatigue strength, wherein GCr15 be a kind of alloy content less, there is superperformance, most widely used high-carbon-chromium bearing steel.Research shows, reduces [O] content in steel and can increase substantially the fatigue lifetime of bearing steel.Therefore will control in the important means of ultra low levels as improving SNR by [O] content in steel at present.And bearing steel inclusion type, size and quantity have significant impact the fatigue lifetime on product.
The smelting procedure of current production GCr15 bearing steel is mainly: converter procedure, the converter process of existing smelting GCr15 bearing steel, terminal catch carbon >=0.09, finishing slag basicity > 3.0; LF refining procedure, existing LF refining procedure finishing slag basicity 5-7; VD operation, soft blow time 5min, but do not adopt brokenly empty rear calm; Continuous casting working procedure, M-EMS Current 400A, frequency 2.5Hz, and adopt the strong cold technique of high pulling rate.
Summary of the invention
Technical problem to be solved by this invention is, under raising carbon content of molten steel, by temperature and the control of converter smelting molten steel, finished product total oxygen demand is made to be less than 10ppm, by optimizing the operations such as converter smelting, refining and continuous casting, a kind of production method of GCr15 Bearing Steel Billet is proposed.
In order to solve the problems of the technologies described above, the technical solution used in the present invention is: a kind of production method of GCr15 Bearing Steel Billet, comprises the steps:
(1) hot metal pretreatment: select the molten iron met the demands, carries out molten iron pretreatment desulfurizing, requires into stove molten iron [S]≤0.02%;
(2) top and bottom combined blown converter: adopt double slag process, early stage, Reasonable adjustment rifle position, adopted 450-500nm
3the large bottom blowing stirring of/h, ensure that the fusing of slag is all right, the middle and later periods adopts 250-300nm
3the bottom blowing of/h medium tenacity, prevents slag getting dry, terminal highcasting speed and pushing off the slag operation, and carbon content control is at 0.1%-0.3%, and red packet is tapped, tapping temperature 1610-1640 DEG C;
(3) LF refining: after molten steel enters the station, killing, makes white slag to electricity rapidly, adds CaO in two batches, adjusts depending on slag fluidity bauxitic clay;
(4) VD vacuum outgas: adopt 67Pa high vacuum time 15min, adopts soft blow pattern, after vacuum-treat, get steel sample and slag specimen, weak churning time 20-30min, forbids exposed molten steel face, and vacuum-treat terminates, residual aluminium content requirement Als > 0.010%, before molten steel departures, calm 5 minutes, get slag specimen, get N and T [O] in steel sample analysis steel, before departures, do not do Ca process;
(5) continuous casting working procedure: control molten steel overheat and be not more than 30 DEG C, 1500-1505 DEG C of cast, tundish temperature≤1481 DEG C, control steel inclusion, prevent the nozzle clogging of low overheat casting cycle, accurately controls casting process molten steel temperature in tundish and stablizes; Continuous casting working procedure uses two-stage electromagnetic to stir; Weak cold low pulling rate casting; In the cast later stage, forbid ladle roughing slag;
(6) strand heating process: ensure sufficient heat-up time and Heating temperature, ensure strand homogeneous heating, carbide fully dissolves;
(7) high-pressure water descaling: utilize the mechanical impact force of high pressure water to remove the iron scale of casting billet surface;
(8) rolling process: control into final rolling temperature and laying temperature, guarantee that crystal grain is tiny, poker is even;
(9) aftertreatment: adopt stelmor production line air-cooled, obtain finished product.
In described step (2), finishing slag basicity 2.9-3.4, in terminal slag, iron level is between 13%-18%, floating plug and slag stop cone associating pushing off the slag, slag thickness < 50mm in strict control ladle.
In described step (2), control steel oxygen in water [O]
molten, adopt highcasting speed, effectively avoid the add-on of strong reductor aluminium, carbon dust, increase yield of alloy.
In described step (3), finishing slag R
2at 7-9, final slag composition: CaO=50-60%, SiO
2<10%, Al
2o
3=25-30%, MgO=5-8%.
In described step (3), reductor adopts the one in aluminum shot, silicon carbide, FeSi powder and calcium carbide.
In described step (4), the soft blow time is at more than 30min.
Weak cold low pulling rate casting in described step (5), specific water is 0.65L/kg, and pulling rate is 1.6m/min.
Two-stage electromagnetic is adopted to stir in described step (5), crystallizer electromagnetic stirring strength 350A, 2H
z; End electromagnetic agitation intensity 500A, 12H
z.
Strand heating process in described step (6), process furnace heating zone temperature: 1140-1160 DEG C, soaking zone temperature: 1220-1250 DEG C, tapping temperature: 1080-1100 DEG C; Heating zone heat-up time: 70-100min, soaking zone 70-100min heat-up time.
Entering final rolling temperature in described step (8) controls at 890-900 DEG C, and laying temperature controls at 810-820 DEG C.
The invention has the beneficial effects as follows: by strictly controlling each production link in smelting and the operation of rolling, thus propose a set of operational path more reasonably producing GCr15 Bearing Steel Billet.Through short run development and batch trial-production, square billet quality in kind reaches design requirements, and chemical Composition Control is more satisfactory, and macrostructure is good, and inclusion content is lower, and wire rod metallographic structure is normal, and carbide rank is lower.All meet GB GB/T18254-2002 " high-carbon-chromium bearing steel " and downstream customer requirement.
Embodiment
Below in conjunction with embodiment, the present invention is described in further detail:
The production method of GCr15 Bearing Steel Billet of the present invention, technical process is hot metal pretreatment → 120t top and bottom combined blown converter → LF → VD → 150mm × 150mm billet caster (band built-up type two sections of induction stirring techniques) → high line strand heating → high-pressure water descaling → rolling → control cold, comprises the steps:
(1) hot metal pretreatment: select the molten iron met the demands, carries out molten iron pretreatment desulfurizing, requires into stove molten iron [S]≤0.02%;
(2) top and bottom combined blown converter: adopt double slag process, early stage, Reasonable adjustment rifle position, adopted 450-500nm
3the large bottom blowing stirring of/h, ensure that the fusing of slag is all right, the middle and later periods adopts 250-300nm
3the bottom blowing of/h medium tenacity, prevents slag getting dry, terminal highcasting speed and pushing off the slag operation, and carbon content control is at 0.1%-0.3%, and red packet is tapped, tapping temperature 1610-1640 DEG C;
(3) LF refining: after molten steel enters the station, killing, makes white slag to electricity rapidly, adds CaO in two batches, adjusts depending on slag fluidity bauxitic clay;
(4) VD vacuum outgas: adopt 67Pa high vacuum time 15min, adopts soft blow pattern, after vacuum-treat, get steel sample and slag specimen, weak churning time 20-30min, forbids exposed molten steel face, and vacuum-treat terminates, residual aluminium content requirement Als > 0.010%, before molten steel departures, calm 5 minutes, get slag specimen, get N and T [O] in steel sample analysis steel, before departures, do not do Ca process;
(5) continuous casting working procedure: control molten steel overheat and be not more than 30 DEG C, 1500-1505 DEG C of cast, tundish temperature≤1481 DEG C, control steel inclusion, prevent the nozzle clogging of low overheat casting cycle, accurately controls casting process molten steel temperature in tundish and stablizes; Continuous casting working procedure uses two-stage electromagnetic to stir; Weak cold low pulling rate casting; In the cast later stage, forbid ladle roughing slag;
(6) strand heating process: ensure sufficient heat-up time and Heating temperature, ensure strand homogeneous heating, carbide fully dissolves;
(7) high-pressure water descaling: utilize the mechanical impact force of high pressure water to remove the iron scale of casting billet surface;
(8) rolling process: control into final rolling temperature and laying temperature, guarantee that crystal grain is tiny, poker is even;
(9) aftertreatment: adopt stelmor production line air-cooled, obtain finished product.
In described step (2), finishing slag basicity 2.9-3.4, in terminal slag, iron level is between 13%-18%, floating plug and slag stop cone associating pushing off the slag, slag thickness < 50mm in strict control ladle.
In described step (2), control steel oxygen in water [O]
molten, adopt highcasting speed, effectively avoid the add-on of strong reductor aluminium, carbon dust, increase yield of alloy.
In described step (3), finishing slag R
2at 7-9, final slag composition: CaO=50-60%, SiO
2<10%, Al
2o
3=25-30%, MgO=5-8%.
In described step (3), reductor adopts the one in aluminum shot, silicon carbide, FeSi powder and calcium carbide.
In described step (4), the soft blow time is at more than 30min.
Weak cold low pulling rate casting in described step (5), specific water is 0.65L/kg, and pulling rate is 1.6m/min.
Two-stage electromagnetic is adopted to stir in described step (5), crystallizer electromagnetic stirring strength 350A, 2H
z; End electromagnetic agitation intensity 500A, 12H
z.
Strand heating process in described step (6), process furnace heating zone temperature: 1140-1160 DEG C, soaking zone temperature: 1220-1250 DEG C, tapping temperature: 1080-1100 DEG C; Heating zone heat-up time: 70-100min, soaking zone 70-100min heat-up time.
Entering final rolling temperature in described step (8) controls at 890-900 DEG C, and laying temperature controls at 810-820 DEG C.
Produce GCr15 bearing steel to the present invention to be below described further.Concrete Production Flow Chart is: hot metal pretreatment → top and bottom combined blown converter → LF ladle refining → VD → billet continuous casting → turn over cooling bed → strand slow cooling → strand inspection → strand heating → high-pressure water descaling → thick, in roll, pre-finish rolling → finish rolling → subtract sizing → weave silk → stelmor is air-cooled → collection volume → inspection → bundling → weigh → put in storage.
(1) converter procedure
Adopt double slag process, early stage, Reasonable adjustment rifle position, adopted large bottom blowing (450-500nm
3/ h) stir, ensure that the fusing of slag is all right, the middle and later periods adopts medium tenacity (250-300nm
3/ h) bottom blowing, prevent slag getting dry, terminal highcasting speed and pushing off the slag operation, carbon content control is at 0.1%-0.3%, and red packet is tapped, tapping temperature 1610-1640 DEG C.Temperature and Composition Control situation are in table 1.
Table 1, enter stove hot metal composition and converter terminal and control situation
(2) LF refining procedure
Omnidistance control aluminium in refining process, refining cycle more than half forbidding feeds aluminium.To arc-covering slag operation be noted in refining process, require that finishing slag R2 is at 7-9, final slag composition: CaO 50-60%, SiO
2<10%, Al
2o
325-30%, MgO 5-8%; Slag adjusts alloying constituent in vain afterwards, determines oxygen.Molten steel departures Als > 0.02%.Refining time is not less than 60 minutes.Composition Control situation is in table 2.
Table 2, LF departures Composition Control situation (wt/%)
(3) VD vacuum outgas operation
Adopt 67Pa high vacuum time 15min.Adopt soft blow pattern.After vacuum-treat, get steel sample and slag specimen, weak churning time 20min.Forbid exposed molten steel face.Vacuum-treat terminates, residual aluminium content requirement Als > 0.010%.Before molten steel departures, calm 5 minutes.Get slag specimen, get N and T [O] in steel sample analysis steel.Ca process is not done before departures.N and T [O] control situation is in table 3.
Table 3, VD operation actually operating situation
(4) continuous casting working procedure
Control molten steel overheat and be not more than 30 DEG C.1502 DEG C of cast.Tundish temperature≤1481 DEG C.Control steel inclusion, prevent the nozzle clogging of low overheat casting cycle; Accurate control casting process molten steel temperature in tundish is stablized; Two-stage electromagnetic is used to stir (crystallizer 350A, 2HZ at continuous casting working procedure; End 500A, 12HZ); Adopt weak cold low pulling rate through row casting, cold specific water 0.65L/kg, pulling rate 1.6m/min; In the cast later stage, forbid ladle roughing slag.Strand macroscopic examination situation is in table 4.
Table 4, GCr15 continuous casting square billet macrostructure inspection situation
(5) rolling process
When ensureing that normal heating is produced, ensure sufficient heat-up time and Heating temperature, ensure strand homogeneous heating, carbide fully dissolves.Process furnace heating zone temperature: 1140-1160 DEG C, soaking zone temperature: 1220-1250 DEG C, tapping temperature: 1080-1100 DEG C.Heating zone heat-up time: 70-100min, soaking zone 70-100min heat-up time.Stocking inclusion and hoc scenario are if table 5, carbide ununiformity and microscopic pores situation are as table 6.
Table 5, level of inclusions
Table 6 carbide ununiformity and microscopic pores
Microscopic pores | Carbide strip | Carbide liquid-extraction | Carbide network | |
Standard | Nothing | ≤3.0 | ≤2.0 | - |
Maximum | Nothing | 2.5 | 0.5 | 3.0 |
The present invention is by modify to the production technique of original GCr15 bearing steel and perfect, under use 120t top and bottom combined blown converter, 120tLF refining furnace, 120t vacuum refining furnace, Comcast 6 machine 6 flow the condition of the equipment such as arc square billet continuous casting machine, stepping recuperative heater, high-speed wire mill, finally determine new production technique, improve continuous casting billet quality, reduce strand cost, improve quality product.
Above-described embodiment is only for illustration of technological thought of the present invention and feature, its object is to enable those skilled in the art understand content of the present invention and implement according to this, only can not limit the scope of the claims of the present invention with the present embodiment, namely the equal change done of all disclosed spirit or modification, still drop in the scope of the claims of the present invention.
Claims (10)
1. a production method for GCr15 Bearing Steel Billet, is characterized in that, comprises the steps:
(1) hot metal pretreatment: select the molten iron met the demands, carries out molten iron pretreatment desulfurizing, requires into stove molten iron [S]≤0.02%;
(2) top and bottom combined blown converter: adopt double slag process, early stage, Reasonable adjustment rifle position, adopted 450-500nm
3the large bottom blowing stirring of/h, ensure that the fusing of slag is all right, the middle and later periods adopts 250-300nm
3the bottom blowing of/h medium tenacity, prevents slag getting dry, terminal highcasting speed and pushing off the slag operation, and carbon content control is at 0.1%-0.3%, and red packet is tapped, tapping temperature 1610-1640 DEG C;
(3) LF refining: after molten steel enters the station, killing, makes white slag to electricity rapidly, adds CaO in two batches, adjusts depending on slag fluidity bauxitic clay;
(4) VD vacuum outgas: adopt 67Pa high vacuum time 15min, adopts soft blow pattern, after vacuum-treat, get steel sample and slag specimen, weak churning time 20-30min, forbids exposed molten steel face, and vacuum-treat terminates, residual aluminium content requirement Al s > 0.010%, before molten steel departures, calm 5 minutes, get slag specimen, get N and T [O] in steel sample analysis steel, before departures, do not do Ca process;
(5) continuous casting working procedure: control molten steel overheat and be not more than 30 DEG C, 1500-1505 DEG C of cast, tundish temperature≤1481 DEG C, control steel inclusion, prevent the nozzle clogging of low overheat casting cycle, accurately controls casting process molten steel temperature in tundish and stablizes; Continuous casting working procedure uses two-stage electromagnetic to stir; Weak cold low pulling rate casting; In the cast later stage, forbid ladle roughing slag;
(6) strand heating process: ensure sufficient heat-up time and Heating temperature, ensure strand homogeneous heating, carbide fully dissolves;
(7) high-pressure water descaling: utilize the mechanical impact force of high pressure water to remove the iron scale of casting billet surface;
(8) rolling process: control into final rolling temperature and laying temperature, guarantee that crystal grain is tiny, poker is even;
(9) aftertreatment: adopt stelmor production line air-cooled, obtain finished product.
2. the production method of GCr15 Bearing Steel Billet according to claim 1, it is characterized in that, in described step (2), finishing slag basicity 2.9-3.4, in terminal slag, iron level is between 13%-18%, floating plug and slag stop cone associating pushing off the slag, slag thickness < 50mm in strict control ladle.
3. the production method of GCr15 Bearing Steel Billet according to claim 1 and 2, is characterized in that, in described step (2), controls steel oxygen in water [O]
molten, adopt highcasting speed, effectively avoid the add-on of strong reductor aluminium, carbon dust, increase yield of alloy.
4. the production method of GCr15 Bearing Steel Billet according to claim 1, is characterized in that, in described step (3), and finishing slag R
2at 7-9, final slag composition: CaO=50-60%, SiO
2<10%, Al
2o
3=25-30%, MgO=5-8%.
5. the production method of GCr15 Bearing Steel Billet according to claim 1, is characterized in that, in described step (3), reductor adopts the one in aluminum shot, silicon carbide, FeSi powder and calcium carbide.
6. the production method of GCr15 Bearing Steel Billet according to claim 1, is characterized in that, in described step (4), the soft blow time is at more than 30min.
7. the production method of GCr15 Bearing Steel Billet according to claim 1, is characterized in that, weak cold low pulling rate casting in described step (5), specific water is 0.65L/kg, and pulling rate is 1.6m/min.
8. the production method of GCr15 Bearing Steel Billet according to claim 1, is characterized in that, adopts two-stage electromagnetic to stir, crystallizer electromagnetic stirring strength 350A, 2H in described step (5)
z; End electromagnetic agitation intensity 500A, 12H
z.
9. the production method of GCr15 Bearing Steel Billet according to claim 1, it is characterized in that, strand heating process in described step (6), process furnace heating zone temperature: 1140-1160 DEG C, soaking zone temperature: 1220-1250 DEG C, tapping temperature: 1080-1100 DEG C; Heating zone heat-up time: 70-100min, soaking zone 70-100min heat-up time.
10. the production method of GCr15 Bearing Steel Billet according to claim 1, is characterized in that, enter final rolling temperature in described step (8) and control at 890-900 DEG C, laying temperature controls at 810-820 DEG C.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410811222.1A CN104561730B (en) | 2014-12-22 | 2014-12-22 | A kind of production method of GCr15 Bearing Steel Billet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410811222.1A CN104561730B (en) | 2014-12-22 | 2014-12-22 | A kind of production method of GCr15 Bearing Steel Billet |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104561730A true CN104561730A (en) | 2015-04-29 |
CN104561730B CN104561730B (en) | 2016-09-07 |
Family
ID=53078796
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410811222.1A Active CN104561730B (en) | 2014-12-22 | 2014-12-22 | A kind of production method of GCr15 Bearing Steel Billet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104561730B (en) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105369013A (en) * | 2015-12-09 | 2016-03-02 | 武汉钢铁(集团)公司 | Method for controlling content of N in bearing steel GCr15 |
CN107385175A (en) * | 2017-06-29 | 2017-11-24 | 南京钢铁股份有限公司 | One kind reduces the other deformation method of GCr15 bearing steel banding carbide grades |
CN108660292A (en) * | 2018-05-24 | 2018-10-16 | 承德建龙特殊钢有限公司 | A method of producing high-alloy steel |
CN108842028A (en) * | 2018-08-31 | 2018-11-20 | 承德建龙特殊钢有限公司 | A kind of method of Ti content in reduction bearing steel |
CN110125356A (en) * | 2019-04-26 | 2019-08-16 | 首钢集团有限公司 | A kind of continuous small-billet casting production method of drilling tool cored steel |
CN110665970A (en) * | 2019-10-08 | 2020-01-10 | 武汉钢铁集团鄂城钢铁有限责任公司 | Production method of GCr15 hot rolled strip steel for spinning |
CN110846581A (en) * | 2019-12-05 | 2020-02-28 | 中天钢铁集团有限公司 | Smelting method for realizing ultrahigh purity of bearing steel by controlling alkalinity of furnace slag and combining electromagnetic stirring of tundish |
CN111441003A (en) * | 2020-04-03 | 2020-07-24 | 包头钢铁(集团)有限责任公司 | Rare earth-containing bearing circular tube blank |
CN111663019A (en) * | 2020-05-18 | 2020-09-15 | 包头钢铁(集团)有限责任公司 | Special refining slag for producing bearing steel by medium-sized converter and bearing steel production process thereof |
CN111957919A (en) * | 2020-07-27 | 2020-11-20 | 涟源钢铁集团有限公司 | Preparation method of 9SiCr hot-rolled wide strip steel |
CN112481549A (en) * | 2020-10-21 | 2021-03-12 | 南京钢铁股份有限公司 | Preparation method of GCr15 bearing steel |
CN112662832A (en) * | 2020-12-18 | 2021-04-16 | 芜湖新兴铸管有限责任公司 | Production method of special-section square billet of high-carbon chromium bearing steel |
CN113462961A (en) * | 2021-06-04 | 2021-10-01 | 包头钢铁(集团)有限责任公司 | Production method of rare earth-containing round-link chain wire rod |
CN113957319A (en) * | 2021-09-23 | 2022-01-21 | 包头钢铁(集团)有限责任公司 | Production method for improving 60kg/m steel rail low power and performance by changing blank compression ratio |
CN114000054A (en) * | 2021-10-19 | 2022-02-01 | 河南中原特钢装备制造有限公司 | GCr15SiMn bearing steel continuous casting billet and smelting continuous casting process thereof |
CN114752843A (en) * | 2022-04-01 | 2022-07-15 | 承德建龙特殊钢有限公司 | High-carbon chromium bearing steel and preparation method thereof |
CN114774619A (en) * | 2022-04-29 | 2022-07-22 | 中国铁建重工集团股份有限公司 | Low-nitrogen high-carbon chromium bearing steel and production method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101086203A (en) * | 2007-07-19 | 2007-12-12 | 天津钢铁有限公司 | Method for producing continuous casting round billet for petroleum bush using convertor process |
CN101653822A (en) * | 2009-05-25 | 2010-02-24 | 莱芜钢铁股份有限公司 | Electric furnace continuous casting short process production method of oil well pipe billets |
CN102337455A (en) * | 2011-09-05 | 2012-02-01 | 内蒙古包钢钢联股份有限公司 | High-toughness wear-resistant steel plate formed by rare earth through treatment |
CN103103448A (en) * | 2012-12-29 | 2013-05-15 | 内蒙古包钢钢联股份有限公司 | Low-alloy high-strength-toughness wear-resistant steel plate |
CN103103443A (en) * | 2012-12-28 | 2013-05-15 | 天津钢铁集团有限公司 | Bearing steel GCr15 production technology capable of preventing plugging of continuous casting water gap |
CN103266279A (en) * | 2013-05-31 | 2013-08-28 | 内蒙古包钢钢联股份有限公司 | Rare earth containing H profile steel with high strength and high toughness and production method thereof |
CN103276310A (en) * | 2013-05-31 | 2013-09-04 | 内蒙古包钢钢联股份有限公司 | Rare-earth-containing H-shaped steel with low-temperature toughness and production method thereof |
-
2014
- 2014-12-22 CN CN201410811222.1A patent/CN104561730B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101086203A (en) * | 2007-07-19 | 2007-12-12 | 天津钢铁有限公司 | Method for producing continuous casting round billet for petroleum bush using convertor process |
CN101653822A (en) * | 2009-05-25 | 2010-02-24 | 莱芜钢铁股份有限公司 | Electric furnace continuous casting short process production method of oil well pipe billets |
CN102337455A (en) * | 2011-09-05 | 2012-02-01 | 内蒙古包钢钢联股份有限公司 | High-toughness wear-resistant steel plate formed by rare earth through treatment |
CN103103443A (en) * | 2012-12-28 | 2013-05-15 | 天津钢铁集团有限公司 | Bearing steel GCr15 production technology capable of preventing plugging of continuous casting water gap |
CN103103448A (en) * | 2012-12-29 | 2013-05-15 | 内蒙古包钢钢联股份有限公司 | Low-alloy high-strength-toughness wear-resistant steel plate |
CN103266279A (en) * | 2013-05-31 | 2013-08-28 | 内蒙古包钢钢联股份有限公司 | Rare earth containing H profile steel with high strength and high toughness and production method thereof |
CN103276310A (en) * | 2013-05-31 | 2013-09-04 | 内蒙古包钢钢联股份有限公司 | Rare-earth-containing H-shaped steel with low-temperature toughness and production method thereof |
Non-Patent Citations (2)
Title |
---|
王海宝等: ""复吹转炉双渣法生产低磷钢工艺实践"", 《四川冶金》 * |
田志红等: ""非脱磷铁水在210t转炉高拉碳法冶炼高碳钢的生产工艺研究及实践"", 《钢铁》 * |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105369013B (en) * | 2015-12-09 | 2018-06-19 | 武汉钢铁有限公司 | The method for controlling N content in GCr15 bearing steels |
CN105369013A (en) * | 2015-12-09 | 2016-03-02 | 武汉钢铁(集团)公司 | Method for controlling content of N in bearing steel GCr15 |
CN107385175A (en) * | 2017-06-29 | 2017-11-24 | 南京钢铁股份有限公司 | One kind reduces the other deformation method of GCr15 bearing steel banding carbide grades |
CN108660292A (en) * | 2018-05-24 | 2018-10-16 | 承德建龙特殊钢有限公司 | A method of producing high-alloy steel |
CN108842028A (en) * | 2018-08-31 | 2018-11-20 | 承德建龙特殊钢有限公司 | A kind of method of Ti content in reduction bearing steel |
CN110125356A (en) * | 2019-04-26 | 2019-08-16 | 首钢集团有限公司 | A kind of continuous small-billet casting production method of drilling tool cored steel |
CN110665970B (en) * | 2019-10-08 | 2020-12-25 | 宝武集团鄂城钢铁有限公司 | Production method of GCr15 hot rolled strip steel for spinning |
CN110665970A (en) * | 2019-10-08 | 2020-01-10 | 武汉钢铁集团鄂城钢铁有限责任公司 | Production method of GCr15 hot rolled strip steel for spinning |
CN110846581A (en) * | 2019-12-05 | 2020-02-28 | 中天钢铁集团有限公司 | Smelting method for realizing ultrahigh purity of bearing steel by controlling alkalinity of furnace slag and combining electromagnetic stirring of tundish |
CN111441003A (en) * | 2020-04-03 | 2020-07-24 | 包头钢铁(集团)有限责任公司 | Rare earth-containing bearing circular tube blank |
CN111663019A (en) * | 2020-05-18 | 2020-09-15 | 包头钢铁(集团)有限责任公司 | Special refining slag for producing bearing steel by medium-sized converter and bearing steel production process thereof |
CN111957919A (en) * | 2020-07-27 | 2020-11-20 | 涟源钢铁集团有限公司 | Preparation method of 9SiCr hot-rolled wide strip steel |
CN112481549A (en) * | 2020-10-21 | 2021-03-12 | 南京钢铁股份有限公司 | Preparation method of GCr15 bearing steel |
CN112662832A (en) * | 2020-12-18 | 2021-04-16 | 芜湖新兴铸管有限责任公司 | Production method of special-section square billet of high-carbon chromium bearing steel |
CN113462961A (en) * | 2021-06-04 | 2021-10-01 | 包头钢铁(集团)有限责任公司 | Production method of rare earth-containing round-link chain wire rod |
CN113957319A (en) * | 2021-09-23 | 2022-01-21 | 包头钢铁(集团)有限责任公司 | Production method for improving 60kg/m steel rail low power and performance by changing blank compression ratio |
CN114000054A (en) * | 2021-10-19 | 2022-02-01 | 河南中原特钢装备制造有限公司 | GCr15SiMn bearing steel continuous casting billet and smelting continuous casting process thereof |
CN114752843A (en) * | 2022-04-01 | 2022-07-15 | 承德建龙特殊钢有限公司 | High-carbon chromium bearing steel and preparation method thereof |
CN114752843B (en) * | 2022-04-01 | 2023-02-21 | 承德建龙特殊钢有限公司 | High-carbon chromium bearing steel and preparation method thereof |
CN114774619A (en) * | 2022-04-29 | 2022-07-22 | 中国铁建重工集团股份有限公司 | Low-nitrogen high-carbon chromium bearing steel and production method thereof |
CN114774619B (en) * | 2022-04-29 | 2023-10-24 | 中国铁建重工集团股份有限公司 | Low-nitrogen high-carbon chromium bearing steel and production method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN104561730B (en) | 2016-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104561730A (en) | Method for producing GCr15 bearing steel billets | |
CN102352469B (en) | Ultrahigh-strength vanadium-titanium composite microalloyed high-carbon steel wire rod and preparation method thereof | |
CN104946972B (en) | Steel disc strip for diode lead and production technology of steel disc strip | |
CN101514423B (en) | Aluminiferous low-carbon cold heading wire rod steel and production method thereof | |
CN104032214B (en) | A kind of non-quenched and tempered steel and its production process | |
CN106947908B (en) | A kind of method of continuous casting electroslag production 4Cr5MoSiV1 die steels | |
CN101967610A (en) | High carbon high silicon martensite stainless steel billet and preparation method thereof | |
CN103882313B (en) | Wire rod for ultrahigh-strength fine cutting steel wire and production method thereof | |
CN102676948B (en) | Preparation method of boron-containing tire cord steel | |
CN101412183A (en) | Method for producing high-carbon chromium bearing steel by double retarded cooling process | |
CN101962734B (en) | Steel for ball mill steel ball and preparation method thereof | |
CN107794451B (en) | A kind of plastic die steel 718 and its production technology | |
CN103103443B (en) | Bearing steel GCr15 production technology capable of preventing plugging of continuous casting water gap | |
CN103320691B (en) | Manufacturing method for Q345 series coil plates | |
CN108004456A (en) | A kind of production method of GCr15 Bearing Steel Billets | |
CN105483557A (en) | Wire rod for 80-grade cord outer winding and manufacturing method thereof | |
CN104233098A (en) | Low-cost 60Si2Mn spring steel and production technology thereof | |
CN104745958A (en) | Steel wire rod for furniture spring and production method of steel wire rod | |
CN106811679B (en) | Method for eliminating irregular vibration marks on surface of high-carbon steel billet | |
CN105537549A (en) | Production method of continuous casting round billet of seamless steel tube steel at low temperature of minus 100 DEG C | |
CN106834612A (en) | A kind of production method of ultra-low silicon peritectic steel | |
CN111299533A (en) | Method for improving castability of ultra-low carbon steel produced by billet continuous casting machine | |
CN102851447A (en) | Outside-furnace refining production method of steel used in carbon steel welding wire | |
CN102899563B (en) | A kind of production method of ultra-high strength steel plate | |
CN116426812B (en) | Manufacturing method of electrolytic aluminum cathode flat steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |