CN104552772B - Precise material mixing device for injection molding machine - Google Patents
Precise material mixing device for injection molding machine Download PDFInfo
- Publication number
- CN104552772B CN104552772B CN201410847560.0A CN201410847560A CN104552772B CN 104552772 B CN104552772 B CN 104552772B CN 201410847560 A CN201410847560 A CN 201410847560A CN 104552772 B CN104552772 B CN 104552772B
- Authority
- CN
- China
- Prior art keywords
- hole
- bin
- feeding warehouse
- plate
- old
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C45/00—Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
- B29C45/17—Component parts, details or accessories; Auxiliary operations
- B29C45/18—Feeding the material into the injection moulding apparatus, i.e. feeding the non-plastified material into the injection unit
- B29C45/1808—Feeding measured doses
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Mechanical Engineering (AREA)
- Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)
Abstract
本发明公开了一种注塑机精准混料装置,包括混料仓,混料仓上方设置有进料仓,进料仓包括新料进料仓和旧料进料仓,进料仓顶部设置有新料进料口和旧料进料口,新料进料口上方设置有新料料斗,旧料进料口上方设置有旧料料斗,混料仓和进料仓之间设置有分仓板,分仓板上设置有甲通孔和乙通孔,新料进料仓内活动设置有甲挡料板和甲定量板,甲定量板上设置有甲定量孔,旧料进料仓内活动设置有乙挡料板和乙定量板,乙定量板上设置有乙定量孔。与现有技术相比,本发明结构简单制造成本低,能够在新料中添加定量的回收的废料,最大化的提高资源使用效率,并且新料和废料的比例可调节。
The invention discloses a precision mixing device for an injection molding machine, comprising a mixing bin, a feeding bin is arranged above the mixing bin, the feeding bin includes a new material feeding bin and an old material feeding bin, and the top of the feeding bin is provided with a The new material inlet and the old material inlet, the new material hopper is set above the new material inlet, the old material hopper is installed above the old material inlet, and the bin board is set between the mixing bin and the feeding bin , A through hole and B through hole are set on the compartment board, A baffle plate and A quantitative plate are set in the new material feed bin, A quantitative hole is set on the A quantitative plate, and the old material feed bin moves A second baffle plate and a second quantitative plate are provided, and a second quantitative hole is arranged on the second quantitative plate. Compared with the prior art, the invention has a simple structure and low manufacturing cost, can add a certain amount of recovered waste materials to the virgin materials, maximizes the resource utilization efficiency, and the ratio of the virgin materials and the waste materials can be adjusted.
Description
技术领域technical field
本发明属于注塑机设备领域,尤其涉及一种注塑机精准混料装置。The invention belongs to the field of injection molding machine equipment, and in particular relates to a precision mixing device for an injection molding machine.
背景技术Background technique
注塑机又名注射成型机或注射机。它是将热塑性塑料或热固性塑料利用塑料成型模具制成各种形状的塑料制品的主要成型设备。分为立式、卧式、全电式。注塑机能加热塑料,对熔融塑料施加高压,使其射出而充满模具型腔。Injection molding machine is also known as injection molding machine or injection machine. It is the main molding equipment for making thermoplastics or thermosetting plastics into various shapes of plastic products using plastic molding molds. Divided into vertical, horizontal, all-electric. The injection molding machine heats the plastic, applies high pressure to the molten plastic, and makes it shoot out to fill the mold cavity.
注塑机的工作原理与打针用的注射器相似,它是借助螺杆(或柱塞)的推力,将已塑化好的熔融状态(即粘流态)的塑料注射入闭合好的模腔内,经固化定型后取得制品的工艺过程。The working principle of the injection molding machine is similar to the syringe used for injection. It uses the thrust of the screw (or plunger) to inject the plastic that has been plasticized into the molten state (that is, the viscous flow state) into the closed cavity. The process of obtaining products after curing and setting.
注射成型是一个循环的过程,每一周期主要包括:定量加料—熔融塑化—施压注射—充模冷却—启模取件。取出塑件后又再闭模,进行下一个循环。Injection molding is a cyclic process, and each cycle mainly includes: quantitative feeding—melt plasticization—pressure injection—mold filling and cooling—mold opening and pick-up. After taking out the plastic parts, the mold is closed again, and the next cycle is carried out.
注塑机操作项目:注塑机操作项目包括控制键盘操作、电器控制系统操作和液压系统操作三个方面。分别进行注射过程动作、加料动作、注射压力、注射速度、顶出型式的选择,料筒各段温度的监控,注射压力和背压压力的调节等。Injection molding machine operation items: Injection molding machine operation items include three aspects: control keyboard operation, electrical control system operation and hydraulic system operation. Carry out the injection process action, feeding action, injection pressure, injection speed, selection of ejection type, temperature monitoring of each section of the barrel, adjustment of injection pressure and back pressure, etc.
一般螺杆式注塑机的成型工艺过程是:首先将粒状或粉状塑料加入机筒内,并通过螺杆的旋转和机筒外壁加热使塑料成为熔融状态,然后机器进行合模和注射座前移,使喷嘴贴紧模具的浇口道,接着向注射缸通入压力油,使螺杆向前推进,从而以很高的压力和较快的速度将熔料注入温度较低的闭合模具内,经过一定时间和压力保持(又称保压)、冷却,使其固化成型,便可开模取出制品(保压的目的是防止模腔中熔料的反流、向模腔内补充物料,以及保证制品具有一定的密度和尺寸公差)。注射成型的基本要求是塑化、注射和成型。塑化是实现和保证成型制品质量的前提,而为满足成型的要求,注射必须保证有足够的压力和速度。同时,由于注射压力很高,相应地在模腔中产生很高的压力(模腔内的平均压力一般在20~45MPa之间),因此必须有足够大的合模力。由此可见,注射装置和合模装置是注塑机的关键部件。The molding process of the general screw injection molding machine is: firstly, the granular or powdery plastic is added into the barrel, and the plastic is melted through the rotation of the screw and the outer wall of the barrel is heated, and then the machine is closed and the injection seat is moved forward. Make the nozzle close to the sprue of the mold, and then feed the pressure oil into the injection cylinder to push the screw forward, so that the molten material is injected into the closed mold with a lower temperature at a high pressure and at a faster speed. Keep time and pressure (also known as holding pressure), cool it, make it solidify and form, and then open the mold and take out the product (the purpose of holding pressure is to prevent the backflow of the molten material in the mold cavity, replenish materials into the mold cavity, and ensure that the product with certain density and dimensional tolerances). The basic requirements of injection molding are plasticization, injection and molding. Plasticization is the prerequisite to realize and guarantee the quality of molded products, and in order to meet the requirements of molding, injection must ensure sufficient pressure and speed. At the same time, due to the high injection pressure, a correspondingly high pressure is generated in the mold cavity (the average pressure in the mold cavity is generally between 20~45MPa), so there must be a large enough clamping force. It can be seen that the injection device and the clamping device are the key components of the injection molding machine.
目前国内的企业,响应国家的号召节能减排,为了节约资源和降低成本,均会将回收的废料和已经使用过的塑料加入到新料中,熔化混合之后,当做原料再次利用。这样虽然能够节省原料,但是,这些废料和使用过的塑料,其中会混有一些杂质,这些杂质会严重影响产品的质量,甚至还会损坏注塑机。并且,为了保证产品的质量,这些废料和新料的混合比例是有具体数值要求的,不能够超标,如果超标,则原料不能够达标,这样就会使得产品的质量不过关。At present, domestic enterprises respond to the country's call for energy conservation and emission reduction. In order to save resources and reduce costs, they will add recycled waste and used plastics to new materials. After melting and mixing, they will be reused as raw materials. Although this can save raw materials, these waste materials and used plastics will be mixed with some impurities, which will seriously affect the quality of the product and even damage the injection molding machine. Moreover, in order to ensure the quality of the product, the mixing ratio of these waste materials and new materials has specific numerical requirements and cannot exceed the standard. If it exceeds the standard, the raw materials cannot meet the standard, which will make the quality of the product unqualified.
目前企业解决废料和新料的混合比例,只要是采用称重之后,再混合熔化混合。这种方式,虽然简单,且不需要增加成本,但是操作麻烦,并且,每一次增加原料进注塑机,都需要称重一次,非常的麻烦,时间成本过大。At present, enterprises solve the mixing ratio of waste materials and new materials, as long as they are weighed, then mixed, melted and mixed. Although this method is simple and does not require an increase in cost, it is cumbersome to operate, and it needs to be weighed every time the raw material is added into the injection molding machine, which is very troublesome and time-consuming.
发明内容Contents of the invention
本发明针对现有技术中的不足,提供了一种注塑机精准混料装置,能够在新料中添加定量的回收的废料,最大化的提高资源使用效率,并且新料和废料的比例可调节。Aiming at the deficiencies in the prior art, the present invention provides a precision mixing device for injection molding machines, which can add a certain amount of recovered waste materials to the new materials, maximize the efficiency of resource use, and the ratio of new materials and waste materials can be adjusted .
为了解决上述技术问题,本发明通过下述技术方案得以解决:一种注塑机精准混料装置,包括混料仓,所述混料仓上方设置有进料仓,所述进料仓包括新料进料仓和旧料进料仓,所述进料仓顶部设置有新料进料口和旧料进料口,所述新料进料口上方设置有新料料斗,所述旧料进料口上方设置有旧料料斗,所述混料仓和进料仓之间设置有分仓板,所述分仓板上设置有甲通孔和乙通孔,所述新料进料仓内活动设置有甲挡料板和甲定量板,所述甲定量板上设置有甲定量孔,所述旧料进料仓内活动设置有乙挡料板和乙定量板,所述乙定量板上设置有乙定量孔,所述新料进料口、所述甲定量孔和所述甲通孔将所述新料料斗和所述混料仓相连通,所述旧料进料口、所述乙定量孔和所述乙通孔将所述旧料料斗和所述混料仓相连通。In order to solve the above technical problems, the present invention is solved by the following technical solutions: a precision mixing device for injection molding machines, including a mixing bin, above which a feeding bin is arranged, and the feeding bin includes new materials A feed bin and an old material feed bin, the top of the feed bin is provided with a new material inlet and an old material inlet, a new material hopper is arranged above the new material inlet, and the old material feed There is an old material hopper above the mouth, a sub-bin plate is set between the mixing bin and the feeding bin, and a through-hole and a second through-hole are set on the sub-bin board, and the new material feeds into the bin. A material baffle plate and a quantitative plate are provided, and the A quantitative plate is provided with a quantitative hole, and a second material baffle plate and a second quantitative plate are arranged movablely in the old material feeding bin, and the second quantitative plate is provided with There is a second quantitative hole, the new material inlet, the first quantitative hole and the first through hole communicate with the new material hopper and the mixing bin, the old material inlet, the second The quantitative hole and the second through hole communicate the old material hopper with the mixing bin.
上述技术方案中,优选的,所述甲通孔、所述新料进料口和所述甲定量孔的直径数值依次减小,所述乙通孔、所述旧料进料口和所述乙定量孔的直径数值依次减小。In the above technical solution, preferably, the diameter values of the A through hole, the new material feed port and the A quantitative hole decrease successively, and the B through hole, the old material feed port and the The diameter values of quantitative hole B decrease successively.
上述技术方案中,优选的,所述甲定量板位于所述新料进料仓外部的端部下方设置有甲定量板手柄。In the above technical solution, preferably, a handle of the first quantitative plate is provided under the end of the first quantitative plate located outside the fresh material feeding bin.
上述技术方案中,优选的,所述乙定量板位于所述旧料进料仓外部的端部下方设置有乙定量板手柄。In the above technical solution, preferably, a second quantitative plate handle is provided under the end of the second quantitative plate located outside the used material feed bin.
上述技术方案中,优选的,所述甲挡料板位于所述新料进料仓外部的端部上方设置有甲挡料手柄。In the above technical solution, preferably, a material blocking handle is provided above the end of the A material blocking plate located outside the fresh material feeding bin.
上述技术方案中,优选的,所述乙挡料板位于所述旧料进料仓外部的端部上方设置有乙挡料手柄。In the above technical solution, preferably, the second material blocking plate is provided with a second material blocking handle above the end outside the used material feeding bin.
上述技术方案中,优选的,所述混料仓内转动设置有搅拌杆,所述搅拌杆上设置有若干片搅拌叶,所述混料仓底部设置有混料出口,所述混料出口上转动设置有门板,所述混料仓底部位于所述混料出口两侧设置有两个加热部。In the above technical solution, preferably, a stirring rod is arranged in rotation in the mixing bin, a plurality of stirring blades are arranged on the stirring rod, a mixing outlet is arranged at the bottom of the mixing bin, and a mixing outlet is arranged on the mixing outlet A door panel is provided for rotation, and two heating parts are arranged at the bottom of the mixing bin on both sides of the mixing outlet.
本发明结构简单制造成本低,能够在新料中添加定量的回收的废料,最大化的提高资源使用效率,并且新料和废料的比例可调节。The invention has a simple structure and low manufacturing cost, can add a certain amount of recycled waste materials to the virgin materials, maximizes the resource utilization efficiency, and the ratio of the virgin materials to the waste materials can be adjusted.
附图说明Description of drawings
图1是本发明结构示意图。Fig. 1 is a schematic diagram of the structure of the present invention.
图2是本发明甲活动挡板结构示意图。Fig. 2 is a structural schematic diagram of a movable baffle of the present invention.
图3是本发明乙活动挡板结构示意图。Fig. 3 is the structure diagram of movable baffle plate B of the present invention.
具体实施方式detailed description
下面结合附图与具体实施方式对本发明作进一步详细描述:如图1至图3所示,一种注塑机精准混料装置,包括混料仓1,所述混料仓1上方设置有进料仓,所述进料仓包括新料进料仓和旧料进料仓,所述进料仓顶部设置有新料进料口71和旧料进料口61,所述新料进料口71上方设置有新料料斗7,所述旧料进料口61上方设置有旧料料斗6,所述混料仓1和进料仓之间设置有分仓板15,所述分仓板15上设置有甲通孔151和乙通孔152,所述新料进料仓内活动设置有甲挡料板3和甲定量板5,所述甲定量板5上设置有甲定量孔51,所述旧料进料仓内活动设置有乙挡料板2和乙定量板4,所述乙定量板4上设置有乙定量孔41,所述新料进料口71、所述甲定量孔51和所述甲通孔151将所述新料料斗7和所述混料仓1相连通,所述旧料进料口61、所述乙定量孔41和所述乙通孔152将所述旧料料斗6和所述混料仓1相连通。The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments: As shown in Figures 1 to 3, a precision mixing device for an injection molding machine includes a mixing bin 1, and a feeding material is arranged above the mixing bin 1 The feed bin includes a new feed bin and an old feed bin, the top of the feed bin is provided with a new feed inlet 71 and an old feed inlet 61, and the new feed inlet 71 A new material hopper 7 is arranged on the top, an old material hopper 6 is arranged above the old material inlet 61, a sub-bin plate 15 is arranged between the mixing bin 1 and the feeding bin, and on the sub-bin board 15 A through hole 151 and a second through hole 152 are provided. A material baffle plate 3 and a quantitative plate 5 are movable in the new material feeding bin. The first quantitative plate 5 is provided with a quantitative hole 51. Second material baffle plate 2 and second quantitative plate 4 are arranged movablely in the old material feeding bin, and second quantitative hole 41 is arranged on the second quantitative plate 4, and described new material feed opening 71, described first quantitative hole 51 and The first through hole 151 communicates the new material hopper 7 with the mixing bin 1, and the old material inlet 61, the second quantitative hole 41 and the second through hole 152 connect the old material The hopper 6 communicates with the mixing bin 1 .
所述甲通孔151、所述新料进料口71和所述甲定量孔51的直径数值依次减小,所述乙通孔152、所述旧料进料口61和所述乙定量孔41的直径数值依次减小。这样设置,落入到混料仓1中的新料的数量就完全依靠甲定量孔51来控制;落入到混料仓1中的旧料的数量就完全依靠乙定量孔41来控制。The diameter values of the first through hole 151, the new material feed port 71 and the first quantitative hole 51 decrease successively, and the second through hole 152, the old material feed port 61 and the second quantitative hole The diameter values of 41 decrease successively. Arranged like this, the quantity of the new material that falls in the mixing bin 1 just relies on first quantitative hole 51 to control completely;
所述甲定量板5位于所述新料进料仓外部的端部下方设置有甲定量板手柄52。设置有甲定量板手柄52,是为了方便移动甲定量板5。The first quantitative plate 5 is provided with a first quantitative plate handle 52 below the end of the outside of the new material feed bin. A quantitative plate handle 52 is provided to move the first quantitative plate 5 for convenience.
所述乙定量板4位于所述旧料进料仓外部的端部下方设置有乙定量板手柄42。设置有乙定量板手柄42,是为了方便移动乙定量板4。The second quantitative plate 4 is provided with a second quantitative plate handle 42 below the end of the outside of the old material feed bin. The second quantitative plate handle 42 is provided to move the second quantitative plate 4 for convenience.
所述甲挡料板3位于所述新料进料仓外部的端部上方设置有甲挡料手柄31。设置有甲挡料手柄31,是为了方便移动甲挡料板3。A material blocking handle 31 is arranged above the end of the first material blocking plate 3 located outside the new material feed bin. The first material retaining handle 31 is provided to facilitate the movement of the first material retaining plate 3 .
所述乙挡料板2位于所述旧料进料仓外部的端部上方设置有乙挡料手柄21。设置有乙挡料手柄21,是为了方便移动乙挡料板2。The second material blocking plate 2 is provided with a second material blocking handle 21 above the end of the outside of the old material feed bin. The second material retaining handle 21 is provided to facilitate the movement of the second material retaining plate 2 .
所述混料仓1内转动设置有搅拌杆11,所述搅拌杆11上设置有若干片搅拌叶12,所述混料仓1底部设置有混料出口14,所述混料出口14上转动设置有门板141,所述混料仓1底部位于所述混料出口14两侧设置有两个加热部13。这样设置,就能够将新料和旧料在此处充分的混合,提高原料的质量,从而保证了产品的质量。A stirring rod 11 is arranged to rotate in the mixing bin 1, a plurality of stirring blades 12 are arranged on the stirring rod 11, a mixing outlet 14 is arranged at the bottom of the mixing bin 1, and a mixing outlet 14 is rotated on the mixing outlet 14. A door panel 141 is provided, and two heating parts 13 are provided at the bottom of the mixing bin 1 on both sides of the mixing outlet 14 . With this setting, the new material and the old material can be fully mixed here, and the quality of the raw material can be improved, thus ensuring the quality of the product.
本发明开始工作时,需要将甲定量板5和乙定量板4分别插入到新料进料仓和旧料进料仓中,使得甲定量孔51对准甲通孔151和乙定量孔41对准乙通孔152。然后在新料料斗7中倒入足量的处于熔融状态的新料,在旧料料斗6中倒入足量的处于熔融状态的旧料。此时,同时拉出甲挡料板3和乙挡料板2,这样就打开了新料料斗7和旧料料斗6到混料仓1通道。这样设置,新料和旧料就源源不断的进入混料仓1中了。When the present invention starts to work, it is necessary to insert the first quantitative plate 5 and the second quantitative plate 4 into the new material feeding bin and the old material feeding bin respectively, so that the first quantitative hole 51 is aligned with the first through hole 151 and the second quantitative hole 41 pair quasi-B via hole 152 . Then pour a sufficient amount of new material that is in a molten state in the new material hopper 7, and pour a sufficient amount of old material that is in a molten state in the old material hopper 6. Now, pull out first material baffle plate 3 and second material baffle plate 2 simultaneously, so just opened new material hopper 7 and old material hopper 6 to mixing bin 1 passage. Set up like this, new material and old material just enter in the mixing bin 1 in a steady stream.
因为新料和旧料是同时开始进入到混料仓1中,所以两者在同一之间内流入混料仓1中的比例,就是甲定量孔51和乙定量孔41的直径的比。在不改动甲定量板5和乙定量板4的情况下,这个比例是恒定的,因此在混料仓1中,旧料所占比重是不变的。这样,就最大化利用了旧料,节约资源。Because new material and old material begin to enter in the mixing bin 1 simultaneously, so the ratio of both flowing in the mixing bin 1 in the same period is exactly the ratio of the diameters of first quantitative hole 51 and second quantitative hole 41. Under the situation of not changing first quantitative plate 5 and second quantitative plate 4, this ratio is constant, so in mixing bin 1, the proportion of old material is constant. In this way, the use of old materials is maximized and resources are saved.
如果产品发生变化,对旧料的比例需求改变了。此时,本发明需要暂时停工,调整好比例之后,在重新开工。本发明停工,只需要将甲挡料板3和乙挡料板2重新插入,挡住新料料斗7和旧料料斗6到混料仓1通道。这样,混料仓1中就不会再有原料进入。此时,需要更换乙定量板4,选择设置了所需的乙定量孔41孔径的乙定量板4,将其插入旧料进料仓中参加工作即可。也可以配合更换甲定量板5,这样就能够产生很多种变化,以满足实际生产的需求。If the product changes, the proportional demand for old materials changes. At this time, the present invention needs to temporarily stop working, and after adjusting the ratio, start working again. The present invention shuts down, only needs to reinsert first material baffle plate 3 and second material baffle plate 2, block new material hopper 7 and old material hopper 6 to mixing bin 1 passage. Like this, just can not have raw material to enter again in the mixing bin 1. Now, need to change the second quantitative plate 4, select the second quantitative plate 4 that the required second quantitative hole 41 apertures are set, insert it in the old material feeding bin and get final product. Also can cooperate to change first quantitative plate 5, like this just can produce many kinds of changes, to meet the demand of actual production.
本发明的新料和旧料的比例是可以调节的,根据不同的原料,以及产品的需求,调节旧料在原料中的比例。The ratio of the new material and the old material in the present invention can be adjusted, and the ratio of the old material in the raw material can be adjusted according to different raw materials and product requirements.
本发明结构简单制造成本低,能够在新料中添加定量的回收的废料,最大化的提高资源使用效率,并且新料和废料的比例可调节。The invention has a simple structure and low manufacturing cost, can add a certain amount of recycled waste materials to the virgin materials, maximizes the resource utilization efficiency, and the ratio of the virgin materials to the waste materials can be adjusted.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410847560.0A CN104552772B (en) | 2014-12-29 | 2014-12-29 | Precise material mixing device for injection molding machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410847560.0A CN104552772B (en) | 2014-12-29 | 2014-12-29 | Precise material mixing device for injection molding machine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104552772A CN104552772A (en) | 2015-04-29 |
CN104552772B true CN104552772B (en) | 2017-05-24 |
Family
ID=53070343
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410847560.0A Expired - Fee Related CN104552772B (en) | 2014-12-29 | 2014-12-29 | Precise material mixing device for injection molding machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104552772B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104985752A (en) * | 2015-06-09 | 2015-10-21 | 苏州乔布注塑工业有限公司 | Feeding mechanism for injection molding machine |
CN105128270A (en) * | 2015-09-10 | 2015-12-09 | 芜湖蓝博塑胶有限公司 | Raw material batching device for injection molding materials |
CN107139393A (en) * | 2017-06-16 | 2017-09-08 | 天津宏向塑料制品有限公司 | A kind of rapid mixer device for injection machine |
CN107127930A (en) * | 2017-06-16 | 2017-09-05 | 天津宏向塑料制品有限公司 | A kind of automatic-feeding horizontal injection press |
CN108454053A (en) * | 2018-03-19 | 2018-08-28 | 浙江恒烨新材料科技有限公司 | A kind of feeding transformation device of master batch used for spinning |
CN108748856A (en) * | 2018-05-25 | 2018-11-06 | 王海彬 | A kind of high-efficiency injection molding machine equipment of the plastics-production with cooling effect |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5942258A (en) * | 1995-02-20 | 1999-08-24 | Wilhelm Hedrich Vakuumanlagen Gmbh & Co., Kb | Delivery device for free-flowing materials consisting of at least two mutually reactant components, in particular casting resins |
CN201329623Y (en) * | 2009-01-06 | 2009-10-21 | 佛山市南海稳德福无纺布有限公司 | Plastic machine enabling waste and old plastic and new material to mix after being melted dividually |
CN202169650U (en) * | 2011-08-01 | 2012-03-21 | 天津市新实丰液压机械有限公司 | Movable weighing hopper type three-bin proportioning machine |
CN203510605U (en) * | 2013-11-01 | 2014-04-02 | 宁波创基机械有限公司 | Injection molding machine hopper long in service life |
CN203739171U (en) * | 2014-03-05 | 2014-07-30 | 宁波圣捷喷雾泵有限公司 | Material mixing device for injection molding |
-
2014
- 2014-12-29 CN CN201410847560.0A patent/CN104552772B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5942258A (en) * | 1995-02-20 | 1999-08-24 | Wilhelm Hedrich Vakuumanlagen Gmbh & Co., Kb | Delivery device for free-flowing materials consisting of at least two mutually reactant components, in particular casting resins |
CN201329623Y (en) * | 2009-01-06 | 2009-10-21 | 佛山市南海稳德福无纺布有限公司 | Plastic machine enabling waste and old plastic and new material to mix after being melted dividually |
CN202169650U (en) * | 2011-08-01 | 2012-03-21 | 天津市新实丰液压机械有限公司 | Movable weighing hopper type three-bin proportioning machine |
CN203510605U (en) * | 2013-11-01 | 2014-04-02 | 宁波创基机械有限公司 | Injection molding machine hopper long in service life |
CN203739171U (en) * | 2014-03-05 | 2014-07-30 | 宁波圣捷喷雾泵有限公司 | Material mixing device for injection molding |
Also Published As
Publication number | Publication date |
---|---|
CN104552772A (en) | 2015-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104552772B (en) | Precise material mixing device for injection molding machine | |
CN209999595U (en) | Nozzle of kinds of injection moulding machine | |
CN105729702B (en) | A kind of device and method producing large scale wood-plastic composite panel | |
CN206561570U (en) | A kind of plastic material extrusion device | |
CN204604825U (en) | The injection moulding machine of the recyclable waste material of a kind of anti-clogging | |
CN104589531B (en) | Injection molding machine mixing device | |
CN203665885U (en) | Plastic injection molding machine for starch base | |
CN103057061A (en) | Device and method for efficient mixed microcellular foaming plastic precise injection molding | |
CN203792664U (en) | Novel injection molding machine charging barrel | |
CN104608324B (en) | A kind of injection machine simply accurate mixing device | |
CN206357593U (en) | A kind of anti-clogging screw of injection mechanism | |
CN205614910U (en) | A device for producing large-scale wood-plastic composite panels | |
CN210758817U (en) | Plastic extrusion molding device | |
CN211616398U (en) | Charging barrel mixing mechanism for injection molding machine | |
CN209755946U (en) | injection mold for quickly forming injection molding piece | |
CN209454038U (en) | A kind of plastic cement turnover box MES injection device | |
CN204869541U (en) | Full -automatic injection molding machine of intelligence | |
CN104608272A (en) | Quick and precise mixing device of injection molding machine | |
CN206748976U (en) | A kind of screw rod preformed formula injector | |
CN104552782B (en) | Multi-head nozzle for injection molding machine | |
CN103817848A (en) | Injection system | |
CN209207892U (en) | A kind of charging barrel of injection molding machine | |
CN105835282A (en) | Die pressing device for producing large-size wood-plastic composite board | |
CN205497929U (en) | Novel environmental protection injection molding machine | |
CN205614911U (en) | Molding device of production jumbo size wood -plastic composite panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170524 Termination date: 20171229 |