CN104532751A - High and large section bridge deck slab U and V rib joining section assembling method - Google Patents
High and large section bridge deck slab U and V rib joining section assembling method Download PDFInfo
- Publication number
- CN104532751A CN104532751A CN201410803573.8A CN201410803573A CN104532751A CN 104532751 A CN104532751 A CN 104532751A CN 201410803573 A CN201410803573 A CN 201410803573A CN 104532751 A CN104532751 A CN 104532751A
- Authority
- CN
- China
- Prior art keywords
- rib
- bracket
- section
- bridge deck
- steel tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a high and large section bridge deck slab U and V rib joining section assembling method. A tool comprises a bracket where a U and V rib jointing section is placed, opening adjusting bolts, a lead screw jacking system, a vertical rod, a leveling base and other elements. During working, U and V ribs are placed on the bracket, a jacking system nut is rotated to enable the bracket to slowly ascend to the jointing assembly position, then the opening adjusting nuts are utilized for accurately adjusting the jointing section position, spot welding and fixing are carried out after accurate positioning, and the next working procedure is carried out; the leveling base and the vertical rod are connected in an angle-adjustable mode, so that assembly of U and V rib jointing sections at different angle inclined bottom plate positions inside a box body is achieved. The tool is simple in structure, the operation method is simple and fast, the jointing section assembling precision is effectively controlled, and the whole bridge deck slab U and V rib overall straightness is improved, so that the bridge deck slab anti-fatigue performance is improved, and the working efficiency is greatly improved.
Description
Technical field
What the present invention relates to is a kind of high heavy in section bridge deck U, V rib embedding benefit section assembly method, is mainly used in accurate positioning adjustment in steel box girder bridge panel unit U, V rib embedding benefit section assembling process, belongs to bridge steel structure technical field.
Background technology
According to domestic multiple actual case analysis, steel box structure bridge is in lasting dynamic load effect, and under the impact of fatigue failure, bridge deck U, V rib place cracks, and affects the application life of whole bridge.At present, the breach of this difficult point also just broken through by steel box structure bridge circle in joint exploration.
Unit in charge of construction is in bridge location erection, ring joint welding procedure process, often when the embedding benefit section assembling of tall and big section steel box girder bridge deck U, V rib, the method of manually lifting is utilized to assemble, the assembly quality of the embedding benefit section of bridge deck U, V rib cannot meet cross bridge floor board U, V rib quality requirement, to directly affect the anti-fatigue performance of bridge deck, greatly reduce whole bridge application life.So, find a kind of scientific and reasonable and can the frock measure of practical application and construction method be necessary in high heavy in section bridge deck U, V rib embedding benefit section assembling process.The present invention effectively can control embedding benefit section assembly precision, improves full-bridge bridge deck U, V rib integrated straight dimension, thus improves bridge deck anti-fatigue performance, and simple to operation, greatly can improve operating efficiency.
Summary of the invention
The object of the present invention is to provide a kind of structure simple, easy to use one high heavy in section bridge deck U, V rib embedding benefit section assembly method.
This practical technical solution problem provides following scheme:
A kind of high heavy in section bridge deck U, V rib embedding benefit section assembly method, according to U, the U-shaped bracket of V rib profile arrangement, bracket both sides arrange adjustment split bolt, be used for bracket openings of sizes, and utilize pole steel tube to coordinate screw mandrel to carry out jacking to bracket, after jacking to embedding benefit fragment position, bracket opening part bolt carries out accurate adjustment, rotating shaft is regulated to be connected by a fixed rotating shaft with one between leveling base with pole steel tube, be applicable at the enterprising line operate of the inclined bottom plate of any angle, be that axle center is rotated when regulating pole steel tube angle with fixed rotating shaft by pole steel tube, be adjusted to and can tighten adjustment rotating shaft during work angle, rear spot welding in place fixedly completes the assembling of embedding benefit section.
Described a whole set of frock comprises the U-shaped bracket placing U, V rib embedding benefit section, the adjustment split bolt, screw mandrel jack-up system, pole steel tube, the leveling base that regulate upper shed.
Construction tool method of the present invention is made up of elements such as placement U, V rib embedding benefit section bracket, adjustment upper shed bolt, screw mandrel jack-up system, vertical rod, leveling bases.Each element material and specification need be selected according to actual loading situation, meet strength and stability requirement in operation process.
Beneficial effect of the present invention is as follows:
1, each element of this frock all takes the connected mode of bolt or welding to be combined into entirety, and structure is simple; All be bolted between each element, dismounting, easy to assembly, be convenient to carrying.
2, the present invention effectively can control bridge deck U, V rib assembly precision, improves full-bridge bridge deck U, V rib straightness accuracy, thus greatly improves cross bridge floor board anti-fatigue performance.
3, the present invention is simple to operation, greatly reduces operation easier, is conducive to increasing work efficiency.
Accompanying drawing explanation
Fig. 1 is integral construction tool structure schematic diagram of the present invention;
Fig. 2 is for placing U, V rib embedding benefit section bracket and screw mandrel jack-up system overall structure schematic diagram;
Fig. 3 is vertical rod structural representation;
Fig. 4 is leveling base structural representation.
Detailed description of the invention
See accompanying drawing, a kind of high heavy in section bridge deck U, V rib embedding benefit section assembly method, according to U, the U-shaped bracket of V rib profile arrangement, bracket both sides arrange adjustment split bolt, be used for bracket openings of sizes, and utilize pole steel tube to coordinate screw mandrel to carry out jacking to bracket, after jacking to embedding benefit fragment position, bracket opening part bolt carries out accurate adjustment, rotating shaft is regulated to be connected by a fixed rotating shaft with one between leveling base with pole steel tube, be applicable at the enterprising line operate of the inclined bottom plate of any angle, be that axle center is rotated when regulating pole steel tube angle with fixed rotating shaft by pole steel tube, be adjusted to and can tighten adjustment rotating shaft during work angle, rear spot welding in place fixedly completes the assembling of embedding benefit section.A whole set of frock comprises the U-shaped bracket placing U, V rib embedding benefit section, the adjustment split bolt, screw mandrel jack-up system, pole steel tube, the leveling base that regulate upper shed.
The assembly tooling of high heavy in section bridge deck U, V rib of the present invention embedding benefit section, comprises and places U, V rib embedding benefit section bracket 1; Bracket 1 is arranged four adjustment split bolts 2; Bracket 1 bottom welding arranges jacking screw mandrel 3; Jacking screw mandrel 3 is respectively arranged with the original papers such as counter-force spring bearing 4, Limit Bearing 5, jacking nut 6, jacking screw mandrel 3 and counter-force spring bearing 4 relative motion, jacking screw mandrel 3 is relative with Limit Bearing 5 fixing; Jacking screw mandrel 3 interts in vertical rod 7 caliber, arranges junction plate 8 bottom vertical rod 7; Leveling base is made up of one block of leveling base plate, 9, two pieces of limiting plates 10; Vertical rod 7 bottom connecting plate 8 is placed between leveling base two pieces of limiting plates 10, fixed rotating shaft bolt 11 and regulating rotary axle bolt 12 is utilized to connect, being that axle center is rotated when regulating vertical rod angle with fixed rotating shaft by vertical rod, when being adjusted to desired angle, tightening regulating rotary axle bolt.
Claims (2)
1. one kind high heavy in section bridge deck U, V rib embedding benefit section assembly method, it is characterized in that, according to U, the U-shaped bracket of V rib profile arrangement, bracket both sides arrange adjustment split bolt, be used for bracket openings of sizes, and utilize pole steel tube to coordinate screw mandrel to carry out jacking to bracket, after jacking to embedding benefit fragment position, bracket opening part bolt carries out accurate adjustment, rotating shaft is regulated to be connected by a fixed rotating shaft with one between leveling base with pole steel tube, be applicable at the enterprising line operate of the inclined bottom plate of any angle, be that axle center is rotated when regulating pole steel tube angle with fixed rotating shaft by pole steel tube, be adjusted to and can tighten adjustment rotating shaft during work angle, rear spot welding in place fixedly completes the assembling of embedding benefit section.
2. one according to claim 1 high heavy in section bridge deck U, V rib embedding benefit section assembly method, it is characterized in that, described a whole set of frock comprises the U-shaped bracket placing U, V rib embedding benefit section, the adjustment split bolt, screw mandrel jack-up system, pole steel tube, the leveling base that regulate upper shed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410803573.8A CN104532751B (en) | 2014-12-18 | 2014-12-18 | A kind of high heavy in section floorings U, V rib embedding benefit section assembly method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410803573.8A CN104532751B (en) | 2014-12-18 | 2014-12-18 | A kind of high heavy in section floorings U, V rib embedding benefit section assembly method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104532751A true CN104532751A (en) | 2015-04-22 |
CN104532751B CN104532751B (en) | 2016-08-24 |
Family
ID=52848359
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410803573.8A Active CN104532751B (en) | 2014-12-18 | 2014-12-18 | A kind of high heavy in section floorings U, V rib embedding benefit section assembly method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104532751B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104831643A (en) * | 2015-05-27 | 2015-08-12 | 中国葛洲坝集团三峡建设工程有限公司 | Jacking device used for bridge construction |
CN111663453A (en) * | 2020-06-24 | 2020-09-15 | 中铁九桥工程有限公司 | Curved U-shaped rib assembling device and method |
CN111894283A (en) * | 2020-08-07 | 2020-11-06 | 中冶建工集团有限公司 | Installation method of splayed steel concrete composite structure diagonal bracing steel beam |
CN114654171A (en) * | 2022-03-30 | 2022-06-24 | 中铁宝桥(扬州)有限公司 | U-rib embedding section tool and manufacturing and using method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008297706A (en) * | 2007-05-29 | 2008-12-11 | Jfe Engineering Kk | Sealed diaphragm of steel deck slab, installation method thereof, and repair method of existing steel deck |
JP2008308872A (en) * | 2007-06-14 | 2008-12-25 | Metropolitan Expressway Co Ltd | U-rib steel slab |
CN202337948U (en) * | 2011-11-25 | 2012-07-18 | 武汉一冶钢结构有限责任公司 | U rib joining section jacking device for top plate of steel box girder |
CN202528089U (en) * | 2012-03-26 | 2012-11-14 | 无锡华联科技集团有限公司 | Bridge U-shaped rib assembling end part positioning mechanism |
CN203125374U (en) * | 2013-03-19 | 2013-08-14 | 中铁宝桥集团有限公司 | Assembly device for positioning U-shaped decking rib of steel bridge |
-
2014
- 2014-12-18 CN CN201410803573.8A patent/CN104532751B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008297706A (en) * | 2007-05-29 | 2008-12-11 | Jfe Engineering Kk | Sealed diaphragm of steel deck slab, installation method thereof, and repair method of existing steel deck |
JP2008308872A (en) * | 2007-06-14 | 2008-12-25 | Metropolitan Expressway Co Ltd | U-rib steel slab |
CN202337948U (en) * | 2011-11-25 | 2012-07-18 | 武汉一冶钢结构有限责任公司 | U rib joining section jacking device for top plate of steel box girder |
CN202528089U (en) * | 2012-03-26 | 2012-11-14 | 无锡华联科技集团有限公司 | Bridge U-shaped rib assembling end part positioning mechanism |
CN203125374U (en) * | 2013-03-19 | 2013-08-14 | 中铁宝桥集团有限公司 | Assembly device for positioning U-shaped decking rib of steel bridge |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104831643A (en) * | 2015-05-27 | 2015-08-12 | 中国葛洲坝集团三峡建设工程有限公司 | Jacking device used for bridge construction |
CN111663453A (en) * | 2020-06-24 | 2020-09-15 | 中铁九桥工程有限公司 | Curved U-shaped rib assembling device and method |
CN111894283A (en) * | 2020-08-07 | 2020-11-06 | 中冶建工集团有限公司 | Installation method of splayed steel concrete composite structure diagonal bracing steel beam |
CN114654171A (en) * | 2022-03-30 | 2022-06-24 | 中铁宝桥(扬州)有限公司 | U-rib embedding section tool and manufacturing and using method |
CN114654171B (en) * | 2022-03-30 | 2024-07-23 | 中铁宝桥(扬州)有限公司 | U-rib embedded block tool and manufacturing and using method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN104532751B (en) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203640309U (en) | Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame | |
CN104532751A (en) | High and large section bridge deck slab U and V rib joining section assembling method | |
CN201891171U (en) | Integral bolt assembling frame | |
CN202701851U (en) | Angle iron boring mold with adjustable edge distance | |
CN102380643A (en) | Novel guide cover fixed collar drilling tooling of wind driven generator | |
CN204627001U (en) | PC structure floor assembled prefabricated post diagonal brace support system | |
CN101890757B (en) | Assembled adjustable steel bar binding clamping fixture support | |
CN208088524U (en) | A kind of steel construction assembled rigid node structure | |
CN213329466U (en) | Rigid connection node of rectangular steel column | |
CN202023298U (en) | Roof truss-sectioned roof girder structure capable of being hoisted by cross type tower crane | |
CN211219393U (en) | Clamp for welding reinforcing steel bar column | |
CN205979016U (en) | Proximity switch positioner | |
CN106975881A (en) | A kind of welding box beam fixing device | |
CN201722627U (en) | Assembled adjustable support for reinforcing bar binding fixture | |
CN207959501U (en) | A kind of combination column | |
CN202401403U (en) | Heavy-type hinge for installing cable tower of cable bridge | |
CN103592116B (en) | A kind of load cylinder positioning system of shield duct piece testing machine | |
CN212159059U (en) | Universal auxiliary frame tool for test | |
CN206319421U (en) | High-rise steel structure steel column butt joint fixture | |
CN110230352B (en) | Novel inner octagonal bolt frame structure node and construction method | |
CN208543136U (en) | A kind of electricity rotation bracket assembly positioning welding tool | |
CN205587890U (en) | Be used for hydraulic support welded adjustable to prop muscle | |
CN105672524A (en) | No-initial stress adjustable damper embedded part and construction method thereof | |
CN207048351U (en) | A kind of steel structural upright column correction auxiliary tools | |
CN108406211A (en) | A kind of electricity rotation bracket assembly positioning welding tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 230022 China Railway Fourth Bureau Group Steel Structure Co., Ltd. No. 388 Huanhu East Road, Hefei City, Anhui Province Patentee after: Steel structure building Co., Ltd. of the four Bureau of China Railway Address before: 230022 China Railway Fourth Bureau Group Steel Structure Co., Ltd. No. 388 Huanhu East Road, Hefei City, Anhui Province Patentee before: Steel Structure Co., Ltd. of China Tiesiju Civil Engineering Group |
|
CP01 | Change in the name or title of a patent holder |