[go: up one dir, main page]

CN104514520A - Plunger gas lift controller and method with remote transmission and remote control function - Google Patents

Plunger gas lift controller and method with remote transmission and remote control function Download PDF

Info

Publication number
CN104514520A
CN104514520A CN201310449514.0A CN201310449514A CN104514520A CN 104514520 A CN104514520 A CN 104514520A CN 201310449514 A CN201310449514 A CN 201310449514A CN 104514520 A CN104514520 A CN 104514520A
Authority
CN
China
Prior art keywords
plunger
controller
pressure
gas
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310449514.0A
Other languages
Chinese (zh)
Inventor
佘朝毅
熊杰
尹强
马辉运
李自强
付永强
朱昆
黄艳
熊雄
李奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201310449514.0A priority Critical patent/CN104514520A/en
Publication of CN104514520A publication Critical patent/CN104514520A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/122Gas lift

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Selective Calling Equipment (AREA)

Abstract

A plunger gas lift controller with remote transmission and control functions and a method belong to the technical field of oil and gas fields. The controller is integrated with the pressure gauge, and the casing gas is directly connected to the pressure sensor through a special gas source pipeline; the aluminum alloy shell combines all the components into a whole; the keyboard consists of four buttons; the front cover is connected with the display and the keyboard; the display is connected with the main board; the junction boxes are directly connected by adopting joints; the rear cover is connected with the battery, and the azimuth angle adjusting screw is connected with the solar panel; the transmission antenna is connected with the computer and the remote transmission system to transmit the plunger operation data; the solar cell panel is installed on the top of the controller. The invention prolongs the production period of the self-injection, reduces the manual operation cost, prolongs the well repair operation period and saves the well repair operation cost; the length of the accumulated liquid segment can be effectively reduced, and the yield of the gas well is improved.

Description

一种具有远传远控功能柱塞气举控制器及方法Plunger gas lift controller and method with remote transmission and remote control function

技术领域technical field

本发明涉及一种具有远传远控功能柱塞气举控制器及方法,属于油气田技术领域。The invention relates to a plunger gas lift controller with remote transmission and remote control functions and a method, belonging to the technical field of oil and gas fields.

背景技术Background technique

近年来,随着西南油气田低渗、低产、低压、泡排、气举、间开等有水气井越来越多,且气井的生产越来越受到前期费用投入、气井环保开采、运行维护难易等因素的制约,柱塞气举作为一种清洁、环保、维修维护管理方便的排水采气工艺技术,在西南油气田20多口井的应用中,为确保老气田井稳产、提高单井采收率方面发挥越来越大的作用,取得了良好技术经济效益和社会效益,已逐渐形成一套针对川渝水气田切实有效的排水采气工艺技术。In recent years, with the Southwest oil and gas fields, there are more and more water-filled gas wells such as low permeability, low production, low pressure, bubble discharge, gas lift, and interleaving, and the production of gas wells is increasingly affected by the initial cost investment, environmental protection of gas wells, and difficult operation and maintenance. Restricted by factors such as ease of use, plunger gas lift, as a clean, environmentally friendly, and convenient maintenance and management drainage gas recovery technology, has been applied in more than 20 wells in Southwest Oil and Gas Fields, in order to ensure stable production of old gas fields and improve single well recovery It has played an increasingly important role in terms of efficiency, achieved good technical, economic and social benefits, and has gradually formed a set of practical and effective drainage and gas recovery technology for Sichuan-Chongqing water and gas fields.

引进柱塞气举工艺在现场应用过程中,存在着柱塞控制器经常出现无故停机、控制屏无显示、生产制度自动变改、采购成本高、采购周期长等问题,导致柱塞控制器出现故障后就导致气井无法正常生产,严重的被迫关井;引进的柱塞控制器还无进行柱塞生产数据的自动记录、传输、远传控制等功能,导致柱塞试运行调试初期必定待在现场一线调试,无法连续跟踪分析柱塞每个周期运行情况,调试效率、周期长;常规压力传感器通过电缆传输至控制器内,受外界环境影响较大,在通过压力模式生产时可能导致气井生产制度不稳定,调试困难等,严重制约排水采气工艺技术推广的应用难题。In the field application process of the introduced plunger gas lift technology, there are problems such as the plunger controller often shutting down for no reason, no display on the control screen, automatic change of the production system, high procurement cost, and long procurement cycle, which lead to the occurrence of plunger controllers. After the failure, the gas well cannot be produced normally, and the well is forced to be shut down in severe cases; the imported plunger controller does not have the functions of automatic recording, transmission, and remote control of the plunger production data, which leads to delays in the initial stage of plunger trial operation and debugging. On-site first-line debugging, unable to continuously track and analyze the operation of each cycle of the plunger, debugging efficiency and long cycle; conventional pressure sensors are transmitted to the controller through cables, which are greatly affected by the external environment, and may cause gas wells to Unstable production system, difficult debugging, etc., seriously restrict the application of drainage and gas recovery technology promotion.

发明内容Contents of the invention

为了克服现有技术的不足,本发明提供一种具有远传远控功能柱塞气举控制器。In order to overcome the deficiencies of the prior art, the present invention provides a plunger gas lift controller with remote transmission and remote control functions.

一种具有远传远控功能的柱塞气举控制器,控制器与压力计一体,控制器与压力计一体,通过专用气源管线将套管气直接连接在压力传感器;铝合金外壳将所有部件组合成为一个整体;键盘由四个按钮组成;前盖连接显示器和键盘;显示器连接主板;接线盒直接采用接头连接;后盖连接电池,方位角调节螺丝连接太阳能板;传输天线与电脑、远传系统连接进行柱塞运行数据的传输;太阳能电池板安装在控制器顶端。A plunger gas lift controller with remote transmission and remote control function. The controller is integrated with the pressure gauge, and the controller is integrated with the pressure gauge. The casing gas is directly connected to the pressure sensor through a special gas source pipeline; the aluminum alloy casing connects all The components are combined into a whole; the keyboard is composed of four buttons; the front cover is connected to the display and the keyboard; the display is connected to the motherboard; The transmission system is connected to transmit the plunger operation data; the solar panel is installed on the top of the controller.

一种具有远传远控功能柱塞气举控制方法,含有以下步骤;A plunger gas lift control method with a remote transmission and remote control function, comprising the following steps;

通过专用气源管线将套管气直接连接压力传感器,压力传感器读取套压;The casing gas is directly connected to the pressure sensor through a dedicated gas source pipeline, and the pressure sensor reads the casing pressure;

现场进行柱塞井基础资料和运行参数的现场设定,显示器实时显示油、套压、开、关井时间、柱塞上行时间及其它柱塞运行参数,主板为控制器的核心部件,数据处理终端,自动计算柱塞每次运行速度、判断是否在设定的运行范围内等,并可根据气井基本情况对优化设计控制器运行程序,提高柱塞控制器的稳定性、可靠性;On-site setting of plunger well basic data and operating parameters, the monitor displays oil, casing pressure, well opening and closing time, plunger up time and other plunger operating parameters in real time, the main board is the core component of the controller, data processing The terminal can automatically calculate the running speed of the plunger each time, judge whether it is within the set operating range, etc., and optimize the design of the controller operating program according to the basic conditions of the gas well to improve the stability and reliability of the plunger controller;

调节太阳能电池板的方向,采用螺纹连接,确保太阳光能长时间对镍氢电池充电;Adjust the direction of the solar panel and use threaded connection to ensure that the sunlight can charge the Ni-MH battery for a long time;

传输天线与电脑、远传系统连接进行柱塞运行数据的传输,并对柱塞控制器进行远程控制及运行参数远程调试等,太阳能电池板安装在控制器顶端,用于接收太阳能,为控制器内的电池充电,确保电池能长时间工作;The transmission antenna is connected with the computer and the remote transmission system to transmit the operation data of the plunger, and perform remote control and remote debugging of the operation parameters of the plunger controller. The internal battery is charged to ensure that the battery can work for a long time;

对柱塞工艺井通过时间、压力等优化模式开关井生产,确保柱塞每次到达井口防喷管内;For the plunger process well, the production is switched on and off in an optimized mode such as time and pressure to ensure that the plunger reaches the wellhead blowout preventer every time;

控制器与压力计一体,通过气源管线直接引压制压力计处,提高套管压力监测的稳定性,减低电缆传输受到的外界影响;The controller is integrated with the pressure gauge, and the pressure gauge is directly guided through the gas source pipeline to improve the stability of the casing pressure monitoring and reduce the external influence on the cable transmission;

通过高压气源管线将套压传输到控制器压力传感器位置,油压、柱塞到达及其它相关参数通过有线传输至接线盒位置,所有的数据进入控制器核心部件主板内,进行数据的分析处理,自动优化并形成该井柱塞运行制度,控制器记录的各项参数通过传输天线进行数据的传输至服务器端,服务器通过不同端口传输数据到客户端,客户端安装配套的远传控制软件,进行柱塞运行制度的调试,使柱塞运行到达最优状态,实现柱塞气举工艺井的稳定运行。The casing pressure is transmitted to the position of the pressure sensor of the controller through the high-pressure air source pipeline, and the oil pressure, the arrival of the plunger and other related parameters are transmitted to the position of the junction box through the cable, and all the data enter the main board of the core component of the controller for data analysis and processing , automatically optimize and form the well plunger operation system, the parameters recorded by the controller are transmitted to the server through the transmission antenna, the server transmits data to the client through different ports, and the client installs the supporting remote control software, Debug the plunger operation system to make the plunger operation reach the optimal state and realize the stable operation of the plunger gas lift process well.

本发明的优点是:The advantages of the present invention are:

柱塞气举排水采气工艺作为气井自喷生产后的接替工艺,对间歇生产井可以延长自喷生产周期,减少人工作业费用,延长修井作业周期,节约修井作业费用;对于具有一定自喷能力的间开井,可有效恢复该井的自喷能力,使气井管理简单化;对于具有连续自喷能力,但井底积液段较长的气井,可以有效降低积液段长度,提高气井产量;对于泡排工艺井,有效减缓井筒积液速度,减少化学药剂的用量,甚至不使用泡排剂,降低化学物质对产层的伤害和减少环境的污染;修井后辅助排液,可以使气井迅速恢复产能,减少修井液对产层的影响,与连续气举技术联合使用,可以有效降低连续气举用气量,提高排液能力。The plunger gas lift drainage gas recovery technology is used as a successor process after the gas wells are produced spontaneously. For intermittent production wells, the self-spraying production period can be extended, the labor cost can be reduced, the workover operation period can be extended, and the workover operation cost can be saved; Interval opening of self-flowing ability can effectively restore the self-flowing ability of the well and simplify gas well management; for gas wells with continuous self-flowing ability but long bottom-hole liquid accumulation section, the length of liquid accumulation section can be effectively reduced, Improve the production of gas wells; for bubble drainage process wells, effectively slow down the liquid accumulation rate in the wellbore, reduce the amount of chemical agents, or even not use foam drainage agents, reduce the damage of chemical substances to the production layer and reduce environmental pollution; assist fluid drainage after workover , can quickly restore production capacity of the gas well, reduce the impact of workover fluid on the production layer, combined with continuous gas lift technology, can effectively reduce the gas consumption of continuous gas lift, and improve the liquid drainage capacity.

附图说明Description of drawings

当结合附图考虑时,通过参照下面的详细描述,能够更完整更好地理解本发明以及容易得知其中许多伴随的优点,但此处所说明的附图用来提供对本发明的进一步理解,构成本发明的一部分,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定,如图其中:A more complete and better understanding of the invention, and many of its attendant advantages, will readily be learned by reference to the following detailed description when considered in conjunction with the accompanying drawings, but the accompanying drawings illustrated herein are intended to provide a further understanding of the invention and constitute A part of the present invention, the exemplary embodiment of the present invention and its description are used to explain the present invention, and do not constitute an improper limitation of the present invention, as shown in the figure:

图1为本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.

下面结合附图和实施例对本发明进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

具体实施方式Detailed ways

显然,本领域技术人员基于本发明的宗旨所做的许多修改和变化属于本发明的保护范围。Obviously, many modifications and changes made by those skilled in the art based on the gist of the present invention belong to the protection scope of the present invention.

实施例1:如图1所示,Embodiment 1: As shown in Figure 1,

一种具有远传远控功能柱塞气举控制器,压力传感器1;铝合金外壳2;键盘3;前盖4;显示器5;主板6;接线盒7;电池8;后盖9;太阳能板方位角调节螺丝10;传输天线11;太阳能电池板12;压力传感器1连接铝合金外壳2,后盖9连接电池8,电池8连接接线盒7,接线盒7连接主板6,主板6连接显示器5,显示器5连接前盖4,键盘3安装在铝合金外壳2内,铝合金外壳2的顶端连接太阳能板方位角调节螺丝10,太阳能板方位角调节螺丝10连接太阳能电池板12,太阳能电池板12连接传输天线11。A plunger gas lift controller with remote transmission and remote control function, pressure sensor 1; aluminum alloy casing 2; keyboard 3; front cover 4; display 5; main board 6; junction box 7; battery 8; rear cover 9; solar panel Azimuth adjustment screw 10; transmission antenna 11; solar panel 12; pressure sensor 1 is connected to aluminum alloy casing 2, rear cover 9 is connected to battery 8, battery 8 is connected to junction box 7, junction box 7 is connected to main board 6, main board 6 is connected to display 5 , the display 5 is connected to the front cover 4, the keyboard 3 is installed in the aluminum alloy casing 2, the top of the aluminum alloy casing 2 is connected to the solar panel azimuth adjustment screw 10, the solar panel azimuth adjustment screw 10 is connected to the solar panel 12, and the solar panel 12 Connect the transmission antenna 11.

通过在控制器内设定柱塞运行参数,确保柱塞稳定运行,使气井达到较好的排水采气效果。By setting the operating parameters of the plunger in the controller, the plunger is guaranteed to run stably, so that the gas well can achieve a better drainage and gas production effect.

压力传感器1通过专用气源管线将套管气直接连接在该处,起读取套压作用,减少了压力传感器通过电缆传输至控制器内,受外界环境影响较大,在通过压力模式开关井生产时可能导致气井生产制度不稳定的可能,压力传感器镶嵌于铝合金外壳下端。The pressure sensor 1 directly connects the casing gas to this place through a special gas source pipeline to read the casing pressure, reducing the transmission of the pressure sensor to the controller through the cable, which is greatly affected by the external environment. The gas well production system may be unstable during production, and the pressure sensor is embedded in the lower end of the aluminum alloy casing.

铝合金外壳2具备一定防爆功能,防止雨水进入控制器内部,并将所有部件组合成为一个整体,内设相应的限位槽,便于其它部件的安装。The aluminum alloy casing 2 has a certain explosion-proof function to prevent rainwater from entering the controller, and all components are combined into a whole, and corresponding limiting grooves are provided inside to facilitate the installation of other components.

键盘3由四个按钮组成,可以现场进行柱塞井基础资料和运行参数的现场设定,通过固定卡槽安装于外壳内。The keyboard 3 is composed of four buttons, which can set the basic data and operating parameters of the plunger well on site, and is installed in the casing through the fixed card slot.

前盖4用于机械保护控制的显示器和键盘,具有防水功能,采用螺纹连接,可以方便自如的通过旋转打开、关闭。The front cover 4 is used for the display and keyboard of mechanical protection control, has waterproof function, adopts threaded connection, and can be opened and closed conveniently and freely by rotation.

显示器5实时显示油、套压、开、关井时间、柱塞上行时间及其它柱塞运行参数,通过固定卡槽安装于外壳内。The display 5 displays oil, casing pressure, well opening and closing time, plunger up time and other plunger operating parameters in real time, and is installed in the casing through a fixed slot.

主板6控制器的核心部件,数据处理终端,自动计算柱塞每次运行速度、判断是否在设定的运行范围内等,并可根据气井基本情况对优化设计控制器运行程序,提高柱塞控制器的稳定性、可靠性等,通过固定卡槽安装于外壳内。The main board 6 is the core component of the controller, and the data processing terminal can automatically calculate the running speed of the plunger each time, judge whether it is within the set operating range, etc., and can optimize the design of the controller's operating program according to the basic conditions of the gas well to improve the plunger control. To ensure the stability and reliability of the device, it is installed in the shell through the fixed card slot.

接线盒7用于连接电池阀、到达传感器、压力及远传传输、远传控制等线路,直接采用特殊接头,连接方便快速,通过固定卡槽安装于外壳内。The junction box 7 is used to connect the battery valve, arrival sensor, pressure and remote transmission, remote control and other lines. It directly adopts a special connector, which is convenient and fast to connect, and is installed in the shell through a fixed card slot.

电池8提供控制工作电量,通过太阳能电池板对该电池充电,通过固定卡槽安装于外壳内。The battery 8 provides control work power, charges the battery through a solar panel, and is installed in the casing through a fixing slot.

后盖9用于机械保护控制电池末端,具有防水功能,采用螺纹连接,通过旋转打开、关闭。Back cover 9 is used for mechanical protection control battery end, has waterproof function, adopts threaded connection, opens and closes by rotation.

太阳能板方位角调节螺丝10调节太阳能电池板的方向,采用螺纹连接,确保太阳光能长时间对镍氢电池充电。The solar panel azimuth adjustment screw 10 adjusts the direction of the solar panel and is threaded to ensure that the sunlight can charge the Ni-MH battery for a long time.

传输天线11可与电脑、远传系统连接进行柱塞运行数据的传输,并对柱塞控制器进行远程控制及运行参数远程调试等,天线置于太阳能电池板的背面。The transmission antenna 11 can be connected with the computer and the remote transmission system to transmit the operation data of the plunger, and perform remote control of the plunger controller and remote debugging of operation parameters, etc. The antenna is placed on the back of the solar panel.

太阳能电池板12,安装在控制器顶端,用于接收太阳能,为控制器内的电池充电,确保电池能长时间工作。The solar panel 12 is installed on the top of the controller for receiving solar energy to charge the battery in the controller to ensure that the battery can work for a long time.

实施例2:如图1所示,Embodiment 2: As shown in Figure 1,

一种具有远传远控功能的新型柱塞气举控制器,A new plunger gas lift controller with remote transmission and remote control function,

图1所示,该具有远传远控功能的新型柱塞气举控制器,安装于井口附近,通过专业技术人员在现场或办公室电脑上对控制器内设置柱塞运行参数,通过时间、压力等模式自动控制柱塞气举工艺井的开关;数据传输天线能实施传输气井的油压、套压及柱塞运行参数等值在办公室电脑上,实现远传监控、远传调试柱塞运行制度;压力传感器与控制器一体确保压力控制模式中生产更稳定;控制系统自主优化功能,能根据气井生产特点自动优化柱塞运行制度,提高柱塞工艺井运行效率。As shown in Figure 1, the new plunger gas lift controller with remote transmission and remote control function is installed near the wellhead, and professional technicians set the plunger operating parameters in the controller on the field or office computer, through time, pressure Automatically control the switch of the plunger gas lift process well in equal mode; the data transmission antenna can transmit the oil pressure, casing pressure and plunger operation parameters of the gas well to the office computer to realize remote monitoring and remote debugging of the plunger operation system ; The pressure sensor and controller are integrated to ensure more stable production in the pressure control mode; the independent optimization function of the control system can automatically optimize the plunger operation system according to the production characteristics of the gas well, and improve the operation efficiency of the plunger process well.

一种具有远传远控功能柱塞气举控制器,由压力传感器1;铝合金外壳2;键盘3;前盖4;显示器5;主板6;接线盒7;电池8;后盖9;太阳能板方位角调节螺丝10;传输天线11;太阳能电池板12组成。A plunger gas lift controller with remote transmission and remote control function, comprising a pressure sensor 1; an aluminum alloy casing 2; a keyboard 3; a front cover 4; a display 5; a main board 6; a junction box 7; a battery 8; Panel azimuth adjustment screw 10; transmission antenna 11; solar panel 12.

压力传感器1,通过专用气源管线将套管气直接连接在该处,起读取套压作用,减少了压力传感器通过电缆传输至控制器内,受外界环境影响较大,在通过压力模式开关井生产时可能导致气井生产制度不稳定的可能,压力传感器镶嵌于铝合金外壳下端。铝合金外壳2,具备一定防爆功能,防止雨水进入控制器内部,并将所有部件组合成为一个整体,内设相应的限位槽。键盘3,由四个按钮组成,可以现场进行柱塞井基础资料和运行参数的现场设定,通过固定卡槽安装与外壳内。前盖4,用于机械保护控制的显示器和键盘,具有防水功能,采用螺纹连接,可以方便自如的通过旋转打开、关闭。显示器5,实时显示油、套压、开、关井时间、柱塞上行时间及其它柱塞运行参数,通过固定卡槽安装与外壳内。主板6,控制器的核心部件,数据处理终端,自动计算柱塞每次运行速度、判断是否在设定的运行范围内等,并可根据气井基本情况对优化设计控制器运行程序,提高柱塞控制器的稳定性、可靠性等,通过固定卡槽安装与外壳内。接线盒7,用于连接电池阀、到达传感器、压力及远传传输、远传控制等线路,直接采用特殊接头,连接方便快速,通过固定卡槽安装与外壳内。电池8,提供控制工作电量,通过太阳能电池板对该电池充电,通过固定卡槽安装与外壳内。后盖9,用于机械保护控制电池末端,具有防水功能,采用螺纹连接,通过旋转打开、关闭。太阳能板方位角调节螺丝10,调节太阳能电池板的方向,采用螺纹连接,确保太阳光能长时间对镍氢电池充电。传输天线11,可与电脑、远传系统连接进行柱塞运行数据的传输,并对柱塞控制器进行远程控制及运行参数远程调试等,天线置于太阳能电池板的背面。太阳能电池板12,安装在控制器顶端,用于接收太阳能,为控制器内的电池充电,确保电池能长时间工作。The pressure sensor 1 is directly connected to the casing gas through a dedicated gas source pipeline to read the casing pressure, which reduces the transmission of the pressure sensor to the controller through the cable, which is greatly affected by the external environment. Through the pressure mode switch The gas well production system may be unstable during well production, and the pressure sensor is embedded in the lower end of the aluminum alloy casing. The aluminum alloy casing 2 has a certain explosion-proof function, prevents rainwater from entering the controller, and combines all components into a whole with corresponding limit slots inside. The keyboard 3 is composed of four buttons, which can set the basic data and operating parameters of the plunger well on site, and is installed in the housing through the fixed card slot. The front cover 4 is used for the display and keyboard of mechanical protection control, has waterproof function, and adopts threaded connection, which can be opened and closed conveniently and freely by rotation. Display 5, real-time display of oil, casing pressure, opening and closing time, plunger up time and other plunger operating parameters, installed in the casing through a fixed slot. Main board 6, the core part of the controller, data processing terminal, automatically calculates the plunger’s running speed each time, judges whether it is within the set operating range, etc., and can optimize the design of the controller’s operating program according to the basic conditions of the gas well to improve the plunger The stability and reliability of the controller are installed in the housing through the fixed card slot. The junction box 7 is used to connect the battery valve, arrival sensor, pressure and remote transmission, remote control and other lines. It directly adopts a special connector, which is convenient and fast to connect, and is installed in the housing through a fixed card slot. The battery 8 provides power for controlling work, charges the battery through a solar panel, and is installed in the housing through a fixed card slot. The back cover 9 is used for mechanical protection to control the end of the battery, has a waterproof function, is threaded, and is opened and closed by rotation. The solar panel azimuth adjustment screw 10 adjusts the direction of the solar panel and is threaded to ensure that the sunlight can charge the Ni-MH battery for a long time. The transmission antenna 11 can be connected with a computer and a remote transmission system to transmit plunger operation data, and perform remote control of the plunger controller and remote debugging of operating parameters, etc. The antenna is placed on the back of the solar panel. The solar panel 12 is installed on the top of the controller for receiving solar energy to charge the battery in the controller to ensure that the battery can work for a long time.

井口附近安装一套具有远传远控功能的柱塞气举控制器,专业技术人员在现场或办公室电脑上对控制器内设置柱塞运行参数,确保柱塞能在井下卡定器缓冲弹簧总成至井口防喷管内稳定周期运行,提高气井携液生产的能力,延长自喷生产周期,减少人工作业费用,延长修井作业周期,节约修井作业费用等,尤其远传远控的应用,大幅降低了专业技术人员舟车劳顿和行车安全风险,节约大量运输成本,实现柱塞气举工艺井的数字化、智能化,能实现气井的清洁、环保开采,提高有水气井单井采收率。A set of plunger gas lift controller with remote transmission and remote control function is installed near the wellhead. Professional technicians set the plunger operating parameters in the controller on the field or office computer to ensure that the plunger can be locked in the downhole clamper buffer spring assembly. It can run stably in the blowout preventer at the wellhead, improve the liquid-carrying production capacity of the gas well, prolong the production cycle of self-spraying, reduce the cost of manual operation, prolong the cycle of workover operation, save the cost of workover operation, etc., especially the application of remote transmission and remote control , greatly reducing the fatigue and driving safety risks of professional technicians, saving a lot of transportation costs, realizing the digitalization and intelligence of plunger gas lift process wells, realizing the clean and environmentally friendly production of gas wells, and improving the single well recovery rate of water gas wells .

该具有远传远控功能的新型柱塞气举控制器,可安装在井口附近,对柱塞工艺井通过时间、压力等优化模式开关井生产,确保柱塞每次到达井口防喷管内,起到较好的排水采气效果。控制器与压力计一体,通过气源管线直接引压制压力计处,可以提高套管压力监测的稳定性,减低电缆传输受到的外界影响;具备自主优化功能,能根据气井生产特点自动优化柱塞运行制度,提高柱塞工艺井运行效率;具备柱塞运行参数自动记录,具有有线、无线数据传输、远程控制及远程参数设定等功能,方便技术人员对柱塞气举工艺井运行情况进行动态跟踪评价,实现了柱塞气举工艺井数字化、智能化,具有更好、更方便的开展柱塞气举工艺井生产制度的优化调试及运行维护工作。该新型柱塞控制器具有工作状态稳定,具备数据存储、记录、传输、远程控制等功能,运行参数调试方便,自动化程度高,维护周期短、效率高等特点。The new type plunger gas lift controller with remote transmission and remote control function can be installed near the wellhead, and the plunger process well will pass the time, pressure and other optimization modes to switch well production, so as to ensure that the plunger reaches the wellhead blowout preventer every time. To better drainage and gas recovery effect. The controller is integrated with the pressure gauge, and the pressure gauge is directly guided through the gas source pipeline, which can improve the stability of casing pressure monitoring and reduce the external influence on cable transmission; it has an independent optimization function, which can automatically optimize the plunger according to the production characteristics of the gas well The operation system improves the operation efficiency of the plunger process well; it has the functions of automatic recording of plunger operation parameters, wired and wireless data transmission, remote control and remote parameter setting, etc., which is convenient for technicians to dynamically monitor the operation status of the plunger gas lift process well. Tracking and evaluation has realized the digitalization and intelligence of the plunger gas lift process well, and it is better and more convenient to carry out the optimization, debugging and operation and maintenance of the production system of the plunger gas lift process well. The new plunger controller has the characteristics of stable working state, data storage, recording, transmission, remote control and other functions, convenient debugging of operating parameters, high degree of automation, short maintenance cycle and high efficiency.

该控制器通过高压气源管线将套压传输到控制器压力传感器位置,油压、柱塞到达及其它相关参数通过有线传输至接线盒位置,所有的数据进入控制器核心部件主板内,进行数据的分析处理,自动优化并形成该井柱塞运行制度,控制器记录的各项参数通过传输天线进行数据的传输至服务器端,服务器通过不同端口传输数据到客户端,客户端安装配套的远传控制软件,可以人为进行柱塞运行制度的调试,使柱塞运行到达最优状态,实现柱塞气举工艺井的稳定运行。The controller transmits the sleeve pressure to the position of the pressure sensor of the controller through the high-pressure air source pipeline, and the oil pressure, plunger arrival and other related parameters are transmitted to the position of the junction box through the cable, and all the data enter the main board of the core part of the controller for data processing. Analysis and processing, automatic optimization and formation of the plunger operation system of the well, various parameters recorded by the controller are transmitted to the server through the transmission antenna, the server transmits data to the client through different ports, and the client installs a supporting remote transmission The control software can manually debug the plunger operation system, so that the plunger operation can reach the optimal state, and realize the stable operation of the plunger gas lift process well.

工具性能指标:Tool performance indicators:

1.压力计工作压力等级35MPa,压力计精度可达2‰FS,还可根据现场需要标定压力计等级;1. The working pressure level of the pressure gauge is 35MPa, the precision of the pressure gauge can reach 2‰FS, and the pressure gauge level can also be calibrated according to the needs of the site;

2.整体工作环境:-25~70℃;2. Overall working environment: -25~70℃;

3.供电系统:2.2Ah/6V镍氢电池+3W太阳能电池板;3. Power supply system: 2.2Ah/6V Ni-MH battery + 3W solar panel;

4.控制界面人性化,可通过控制器自带键盘或与电脑通讯后设定柱塞运行参数;4. The control interface is user-friendly, and the plunger operating parameters can be set through the controller's own keyboard or after communicating with the computer;

5.控制器可以根据气井生产特点自主优化柱塞运行制度;5. The controller can independently optimize the plunger operation system according to the production characteristics of the gas well;

6.柱塞运行数据可通过GPRS传输,能实现柱塞运行数据的远传动态监测,并能进行柱塞气举工艺井的控制及远程参数设定。6. The plunger operation data can be transmitted through GPRS, which can realize the remote transmission dynamic monitoring of the plunger operation data, and can control the plunger gas lift process well and set remote parameters.

如上所述,对本发明的实施例进行了详细地说明,但是只要实质上没有脱离本发明的发明点及效果可以有很多的变形,这对本领域的技术人员来说是显而易见的。因此,这样的变形例也全部包含在本发明的保护范围之内。As mentioned above, although the Example of this invention was demonstrated in detail, it is obvious to those skilled in the art that many modifications can be made as long as the inventive point and effect of this invention are not substantially deviated. Therefore, all such modified examples are also included in the protection scope of the present invention.

Claims (2)

1. have the plunger lift controller that function is far controlled in teletransmission, it is characterized in that: controller and pressure gauge one, controller and pressure gauge one, be connected directly between pressure sensor by special source gas line by casing gas; All component combinations are become as a whole by aluminum alloy casing; Keyboard is made up of four buttons; Protecgulum connects display and keyboard; Display connects mainboard; Junction box directly adopts joint to connect; Bonnet connects battery, and azimuth adjustment screw connects solar panels; Transmit antenna is connected with computer, remote transmitting system the transmission carrying out plunger service data; Solar panel is arranged on controller top.
2. there is teletransmission and far control a function plunger gaslift control method, it is characterized in that containing following steps;
By special source gas line by direct for casing gas Bonding pressure sensor, pressure sensor reads casing pressure;
The scene setting of plunger well basic data and operational factor is carried out at scene, display shows oil, casing pressure, open and close well time, plunger upstream time and other plunger operational factor in real time, mainboard is the core component of controller, data processing terminal, automatic calculating plunger each run speed, judge whether setting range of operation in etc., and according to gas well basic condition to optimal design controller working procedure, stability, the reliability of plunger controller can be improved;
Regulate the direction of solar panel, employing is threaded, and guarantees that solar energy charges to Ni-MH battery for a long time;
Transmit antenna is connected with computer, remote transmitting system the transmission carrying out plunger service data, and Long-distance Control and operational factor remote debugging etc. are carried out to plunger controller, solar panel is arranged on controller top, for receiving solar energy, for the battery charging in controller, guarantee that battery can work long hours;
Plunger process well is produced by the Optimizing Mode such as time, pressure switch well, guarantees that plunger arrives in shaft mouth anti-blowout pipe at every turn;
Controller and pressure gauge one, by source gas line direct impulse pressing pressure meter place, improve the stability of casing pressure monitoring, lower the ectocine that cable transmission is subject to;
By high-pressure air source pipeline, casing pressure is transferred to controller pressure sensor position, oil pressure, plunger arrive and other relevant parameter by wire transmission to junction box position, all data enter in controller core parts mainboard, carry out the analyzing and processing of data, Automatic Optimal also forms this well plunger operation system, what the parameters of controller record carried out data by transmit antenna transfers to server end, server transmits data to client by different port, client installs supporting teletransmission control software design, carry out the debugging that plunger runs system, plunger is run and arrives optimum state, realize the stable operation of plunger lift process well.
CN201310449514.0A 2013-09-27 2013-09-27 Plunger gas lift controller and method with remote transmission and remote control function Pending CN104514520A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310449514.0A CN104514520A (en) 2013-09-27 2013-09-27 Plunger gas lift controller and method with remote transmission and remote control function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310449514.0A CN104514520A (en) 2013-09-27 2013-09-27 Plunger gas lift controller and method with remote transmission and remote control function

Publications (1)

Publication Number Publication Date
CN104514520A true CN104514520A (en) 2015-04-15

Family

ID=52790347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310449514.0A Pending CN104514520A (en) 2013-09-27 2013-09-27 Plunger gas lift controller and method with remote transmission and remote control function

Country Status (1)

Country Link
CN (1) CN104514520A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107605464A (en) * 2017-09-22 2018-01-19 中国石油集团西部钻探工程有限公司 Gas well switch board control system and its control method
CN110617060A (en) * 2019-10-28 2019-12-27 贵州航天凯山石油仪器有限公司 Method for realizing wireless transmission of instrument data in plunger well
CN110847866A (en) * 2019-11-18 2020-02-28 西安思坦仪器股份有限公司 Intelligent plunger system
CN113153224A (en) * 2021-03-25 2021-07-23 中国石油天然气股份有限公司 Diagnosis method and equipment suitable for shale gas well plunger process operation state
CN113338871A (en) * 2021-07-22 2021-09-03 辽宁众联石油天然气有限公司 Gas well control system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5132904A (en) * 1990-03-07 1992-07-21 Lamp Lawrence R Remote well head controller with secure communications port
US6209642B1 (en) * 1998-04-08 2001-04-03 Foy Streetman Apparatus and method for enhancing fluid and gas recovery in a well
CN202338335U (en) * 2011-12-06 2012-07-18 中国石油天然气股份有限公司 Downhole Operation Status Tracking System of Plunger Used in Gas Production
CN102808607A (en) * 2011-06-01 2012-12-05 中国石油天然气股份有限公司 A plunger device for on-line measurement of gas wells and a plunger liquid drainage gas production system
CN203515496U (en) * 2013-09-27 2014-04-02 中国石油天然气股份有限公司 A plunger gas lift controller with remote transmission and remote control function

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5132904A (en) * 1990-03-07 1992-07-21 Lamp Lawrence R Remote well head controller with secure communications port
US6209642B1 (en) * 1998-04-08 2001-04-03 Foy Streetman Apparatus and method for enhancing fluid and gas recovery in a well
CN102808607A (en) * 2011-06-01 2012-12-05 中国石油天然气股份有限公司 A plunger device for on-line measurement of gas wells and a plunger liquid drainage gas production system
CN202338335U (en) * 2011-12-06 2012-07-18 中国石油天然气股份有限公司 Downhole Operation Status Tracking System of Plunger Used in Gas Production
CN203515496U (en) * 2013-09-27 2014-04-02 中国石油天然气股份有限公司 A plunger gas lift controller with remote transmission and remote control function

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107605464A (en) * 2017-09-22 2018-01-19 中国石油集团西部钻探工程有限公司 Gas well switch board control system and its control method
CN110617060A (en) * 2019-10-28 2019-12-27 贵州航天凯山石油仪器有限公司 Method for realizing wireless transmission of instrument data in plunger well
CN110847866A (en) * 2019-11-18 2020-02-28 西安思坦仪器股份有限公司 Intelligent plunger system
CN113153224A (en) * 2021-03-25 2021-07-23 中国石油天然气股份有限公司 Diagnosis method and equipment suitable for shale gas well plunger process operation state
CN113153224B (en) * 2021-03-25 2022-12-09 中国石油天然气股份有限公司 A diagnostic method and equipment suitable for the operating state of the plunger process in shale gas wells
CN113338871A (en) * 2021-07-22 2021-09-03 辽宁众联石油天然气有限公司 Gas well control system
CN113338871B (en) * 2021-07-22 2024-07-23 辽宁众联石油天然气有限公司 Gas well control system

Similar Documents

Publication Publication Date Title
CN104514520A (en) Plunger gas lift controller and method with remote transmission and remote control function
CN203594415U (en) Electric submersible pump production control system based on downhole multi-parameter real-time monitoring
CN108979602B (en) An energy-saving device for an oil recovery machine and a method for estimating a dynamic liquid level model of an oil well
CN201513146U (en) Solar-powered integrated remote measuring and monitoring system
CN203515496U (en) A plunger gas lift controller with remote transmission and remote control function
CN111364941A (en) Shale gas well wellhead pressure control method and control system thereof
CN202789517U (en) Oil production control device of screw pump based on downhole multi-parameter real-time monitoring
CN204899774U (en) Rotatory steerable drilling control system structure
CN205382924U (en) A Ground Control System for Intelligent Intermittent Water Injection Process
Zhang et al. Application of wireline intelligent separate-layer water injection technology in Huabei Oilfield
CN205374437U (en) Hydroelectric power generation formula runoff automatic monitoring device
CN204851222U (en) Gas drilling detritus returns row detection device
CN207437036U (en) A pressure-flow dual-carrier downhole and surface communication device
CN219061598U (en) Natural gas well production control device
CN212054661U (en) Built-in water injection flow monitoring devices in pit
CN205618141U (en) Oil field pressure boost water injection device
CN210636568U (en) Environment-friendly pin-connected panel pump station structure
CN202194185U (en) Constant voltage frequency-converting control automatic water supply device
CN220306803U (en) Integrated electric control sledge for gas collecting station
CN221957566U (en) Track measurement probe while drilling
CN205370560U (en) Supersonic wave drill liquid appearance that leaks hunting based on DSP technique
CN213274367U (en) A sewage discharge monitoring system
CN216813108U (en) Multifunctional control valve for natural gas exploitation and gas production tree
CN204114443U (en) A Time Control Device for Controlling the Temperature of Electric Heating Gathering and Transportation Pipeline
CN206625281U (en) A kind of building construction informationization tap water supply system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150415

RJ01 Rejection of invention patent application after publication