CN104495617A
CN104495617A CN201410786371.7A CN201410786371A CN104495617A CN 104495617 A CN104495617 A CN 104495617A CN 201410786371 A CN201410786371 A CN 201410786371A CN 104495617 A CN104495617 A CN 104495617A
Authority
CN
China
Prior art keywords
crane
grab
signal
boom
grab bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410786371.7A
Other languages
Chinese (zh)
Other versions
CN104495617B (en
Inventor
朱华炳
訾斌
牛康廷
高晨辉
卫道柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei University of Technology
Original Assignee
Hefei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei University of Technology filed Critical Hefei University of Technology
Priority to CN201410786371.7A priority Critical patent/CN104495617B/en
Publication of CN104495617A publication Critical patent/CN104495617A/en
Application granted granted Critical
Publication of CN104495617B publication Critical patent/CN104495617B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C3/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith and intended primarily for transmitting lifting forces to loose materials; Grabs
    • B66C3/12Grabs actuated by two or more ropes
    • B66C3/125Devices for control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C15/00Safety gear
    • B66C15/06Arrangements or use of warning devices
    • B66C15/065Arrangements or use of warning devices electrical
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C3/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith and intended primarily for transmitting lifting forces to loose materials; Grabs
    • B66C3/14Grabs opened or closed by driving motors thereon
    • B66C3/18Grabs opened or closed by driving motors thereon by electric motors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C3/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith and intended primarily for transmitting lifting forces to loose materials; Grabs
    • B66C3/20Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith and intended primarily for transmitting lifting forces to loose materials; Grabs mounted on, or guided by, jibs

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Control And Safety Of Cranes (AREA)

Abstract

针对现有塔式起重机的抓斗在工作过程中始终晃动的技术难题,本发明提供一种用于起重机抓斗的调稳作业系统,由检测装置、信号收发及处理装置、调稳装置三部分构成;所述检测装置安装在起重机上,负责检测起重机的动作参数及环境参数;所述信号收发及处理装置依据接收到的检测数据生成控制信号,并将该控制信号传递至调稳装置执行;本发明还提供一套控制方法,针对不同的作业环境与工作状态进行动态调节,确保起重机工作环境始终处于安全的状态下运行。有益的技术效果:本发明可以使抓斗的调稳过程更加平稳、精确,而且在本发明整个调稳过程中实现了实时监测和反馈控制,提高了抓斗在控制平衡方面的稳定性、可靠性和安全性。

Aiming at the technical problem that the grab bucket of the existing tower crane is always shaking during the working process, the present invention provides a stabilizing operation system for the grab bucket of the crane, which consists of three parts: a detection device, a signal sending and receiving and processing device, and a stabilizing device Composition: the detection device is installed on the crane and is responsible for detecting the motion parameters and environmental parameters of the crane; the signal sending and receiving and processing device generates a control signal according to the received detection data, and transmits the control signal to the stabilization device for execution; The present invention also provides a set of control methods for dynamically adjusting different working environments and working states to ensure that the working environment of the crane is always running in a safe state. Beneficial technical effects: the present invention can make the stabilization process of the grab bucket more stable and accurate, and realize real-time monitoring and feedback control in the entire stabilization process of the present invention, which improves the stability and reliability of the grab bucket in terms of control balance. sex and safety.

Description

用于起重机抓斗的调稳作业系统及调稳方法Stability adjustment operation system and method for crane grab

技术领域 technical field

本发明涉属于起重机设备领域,尤其涉及塔式起重机的抓斗的辅助控制,具体涉及一种用于起重机抓斗的调稳作业系统及调稳方法。 The invention relates to the field of crane equipment, in particular to auxiliary control of a grab bucket of a tower crane, and in particular to a stability adjustment operation system and a stability adjustment method for a crane grab.

背景技术 Background technique

起重机主要应用于建筑、港口、车间、工地等场合,近年来随着制造业的快速发展,重大负载及日益复杂的吊装环境,使得人们对起重吊装设备的安全性、稳定性、可靠性提出了更高的要求。而塔式起重机是高空作业设备,本身比较高,覆盖面积大,吊臂比较长,而且常在港口等环境恶劣的场合工作,加上操作人员和安装人员常常在高空作业,所以其安全性、稳定性要求很高。 Cranes are mainly used in construction, ports, workshops, construction sites and other occasions. In recent years, with the rapid development of the manufacturing industry, heavy loads and increasingly complex hoisting environments have made people raise concerns about the safety, stability, and reliability of hoisting equipment. higher requirements. The tower crane is high-altitude operation equipment. It is relatively high, has a large coverage area, and has a relatively long boom. It often works in harsh environments such as ports. In addition, operators and installers often work at high altitudes, so its safety, Stability requirements are high.

现在塔式起重机的抓斗是用一条钢丝绳来吊挂,由于其作业空间比较高,抓取物料比较重,在港口工作时很容易受到风力影响,导致抓斗在运行过程中不停的晃动。而现在的塔式起重机的抓斗通过抓斗稳定器来稳定。抓斗稳定器只是在抓斗上另加一条绳索,绳索通过吊臂上的配重在轨道上运行,来拉动抓斗,以调节抓斗的平衡,在运动过程中是随意控制,并不能根据实际工况来调节抓斗的平衡。而且抓斗在工作过程中的晃动不仅受到吊臂旋转的影响,还受到风速、风向的影响,抓斗的受力情况在不断的改变,同时也在不停的晃动。对绳索的承载能力,吊臂的稳定性都具有极大的影响。影响着抓取物料,转移物料过程的平稳性和整台机器的安全性。 At present, the grab bucket of the tower crane is hung by a steel wire rope. Due to its relatively high working space and heavy material to be grabbed, it is easily affected by the wind when working in the port, causing the grab bucket to shake continuously during operation. The grab of the current tower crane is stabilized by the grab stabilizer. The grab stabilizer just adds a rope to the grab. The rope runs on the track through the counterweight on the boom to pull the grab to adjust the balance of the grab. It is controlled at will during the movement and cannot be controlled according to Adjust the balance of the grab according to the actual working conditions. Moreover, the shaking of the grab bucket in the working process is not only affected by the rotation of the boom, but also by the wind speed and wind direction. The force situation of the grab bucket is constantly changing, and it is also constantly shaking. It has a great influence on the load-bearing capacity of the rope and the stability of the boom. It affects the stability of grabbing materials, transferring materials and the safety of the whole machine.

发明内容 Contents of the invention

针对现有塔式起重机的抓斗在工作过程中始终晃动的技术难题,以及仅通过配重式的抓斗稳定器对抓斗进行调稳的效果差的问题,本发明提出一种适用于码头等作业空间较大、受风影响较大、环境比较恶劣的场合的一种用于起重机抓斗的调稳作业系统及调稳方法,本发明具有自动化、智能化的技术特点,能提高抓斗作业过程的稳定性和安全性。本发明具体如下: Aiming at the technical problem that the grab bucket of the existing tower crane is always shaking during the working process, and the poor effect of stabilizing the grab bucket only through the counterweight type grab bucket stabilizer, the present invention proposes a An operation system and method for adjusting the stability of a crane grab in the occasions where the working space is large, affected by the wind, and the environment is relatively harsh. The invention has the technical characteristics of automation and intelligence, and can improve the stability of the grab The stability and safety of the operation process. The present invention is specifically as follows:

用于起重机抓斗的调稳作业系统,所述调稳作业系统所适用的起重机包括底座1、转盘2、起重机本体9、吊臂7、第一滚轮6、起重机绳索10和抓斗13;其中,底座1固定在地基上,在底座1的顶部设有转盘2,在转盘2的顶部设有起重机本体9,吊臂7的底端与起重机本体9活动连接,吊臂7的顶端设有第一滚轮6;起重机绳索10的一端与起重机的绳索马达相连接,起重机绳索10的一端绕过第一滚轮6后与抓斗13相连接;起重机本体9相对转盘2沿水平方向的转动,吊臂7相对起重机本体9沿竖直方向抬起或落下,起重机绳索10在绳索马达的转动下将抓斗13吊起或放下; It is used for the stability adjustment operation system of the crane grab, and the crane to which the stability adjustment operation system is applicable includes a base 1, a turntable 2, a crane body 9, a boom 7, a first roller 6, a crane rope 10 and a grab bucket 13; , the base 1 is fixed on the foundation, the top of the base 1 is provided with a turntable 2, the top of the turntable 2 is provided with a crane body 9, the bottom end of the boom 7 is movably connected with the crane body 9, and the top of the boom 7 is provided with a second One roller 6; one end of the crane rope 10 is connected with the rope motor of the crane, and one end of the crane rope 10 is connected with the grab bucket 13 after bypassing the first roller 6; 7 Lift or drop relative to the crane body 9 in the vertical direction, and the crane rope 10 lifts or lowers the grab bucket 13 under the rotation of the rope motor;

本发明所述的调稳作业系统由检测装置、信号收发及处理装置、调稳装置三部分构成; The stabilizing operation system of the present invention consists of three parts: a detection device, a signal sending and receiving and processing device, and a stabilizing device;

所述检测装置安装在起重机上,负责检测起重机的动作参数及环境参数,并将检测到的上述动作参数及环境参数做为检测数据一并反馈至信号收发及处理装置; The detection device is installed on the crane and is responsible for detecting the motion parameters and environmental parameters of the crane, and feeds back the detected motion parameters and environmental parameters as detection data to the signal transceiver and processing device;

所述信号收发及处理装置依据接收到的检测数据生成控制信号,并将该控制信号传递至调稳装置执行; The signal transceiving and processing device generates a control signal according to the received detection data, and transmits the control signal to the stabilization device for execution;

所述调稳装置包括导轨组件和电动调节组件;其中,导轨组件包含一条导轨808;导轨组件安装在起重机的吊臂上;电动调节组件包含一条调稳绳索803和一个调稳电动机809;电动调节组件活动连接在导轨组件的导轨808上,并通过调稳绳索803将电动调节组件与起重机的抓斗连接在一起;调稳电动机809在信号收发及处理装置发出的控制信号的驱动下带动电动调节组件沿导轨808朝起重机本体9一侧或朝抓斗13一侧移动;当抓斗13朝外摆动时,电动调节组件朝起重机本体9一侧移动时,且通过电动调节组件中的调稳绳索803将抓斗13朝重机本体9一侧拉紧,将抓斗13向内拉;反之,当抓斗13朝内摆动时,电动调节组件朝抓斗13一侧移动时,减小调稳绳索803对抓斗13的牵引力,促使抓斗13向外摆; The stabilizer includes a guide rail assembly and an electric adjustment assembly; wherein, the guide rail assembly includes a guide rail 808; the guide rail assembly is installed on the boom of the crane; the electric adjustment assembly includes a stabilized rope 803 and a stabilized motor 809; The component is movably connected to the guide rail 808 of the guide rail component, and the electric adjustment component is connected with the grab bucket of the crane through the stabilizer rope 803; The assembly moves along the guide rail 808 toward the side of the crane body 9 or toward the side of the grab bucket 13; when the grab bucket 13 swings outward, when the electric adjustment assembly moves toward the side of the crane body 9, and through the stabilized rope in the electric adjustment assembly 803 tighten the grab bucket 13 towards the side of the crane body 9, and pull the grab bucket 13 inward; otherwise, when the grab bucket 13 swings inward, when the electric adjustment component moves toward the side of the grab bucket 13, reduce the stability adjustment. The traction force of the rope 803 to the grab bucket 13 impels the grab bucket 13 to swing outwards;

即通过调稳装置,始终向抓斗13施加一个与抓斗13实时摆动方向相反的作用力。 That is, through the stabilizing device, a force opposite to the real-time swing direction of the grab bucket 13 is always applied to the grab bucket 13 .

采用本发明所述的调稳作业系统进行起重机抓斗的调稳方法,按如下步骤进行: Adopt the stabilizing operation system of the present invention to carry out the stabilizing method of the crane grab bucket, carry out as follows:

步骤1、检测装置、信号收发及处理装置、调稳装置初始化: Step 1. Initialization of detection device, signal sending and receiving and processing device, and stabilization device:

开启检测装置、信号收发及处理装置、调稳装置的电源;建立三者之间的通讯连接;人工向信号收发及处理装置输入吊臂7的长度值L; Turn on the power supply of the detection device, the signal transceiver and processing device, and the stabilizing device; establish a communication connection between the three; manually input the length value L of the boom 7 to the signal transceiver and processing device;

步骤2、由检测装置获取起重机实时的动作参数和环境参数,并传递至信号收发及处理装置;其中,起重机的环境参数包括风的速度以及方向的信息,起重机的动作参数包括抓斗13的实时位置信息、吊臂7在垂直面内的摆角信息、吊臂7在水平面内的转角信息、抓斗13的受力信息; Step 2, obtain the real-time action parameters and environmental parameters of the crane by the detection device, and transmit them to the signal transceiver and processing device; wherein, the environmental parameters of the crane include information on the speed and direction of the wind, and the action parameters of the crane include the real-time information of the grab bucket 13. Position information, swing angle information of the boom 7 in the vertical plane, rotation angle information of the boom 7 in the horizontal plane, force information of the grab bucket 13;

步骤3、由信号收发及处理装置以起重机本体9为坐标原点建立OXYZ坐标系;由信号收发及处理装置将接收到的起重机实时的动作参数和环境参数转换成OXYZ坐标系下的:抓斗13周围的风速值V、抓斗13的受力值F、吊臂7的摆角值α,吊臂7的转角值β、以及抓斗13的实时坐标(Xd、Y d、Z d); Step 3, the OXYZ coordinate system is established with the crane body 9 as the coordinate origin by the signal receiving and processing device; the received real-time action parameters and environmental parameters of the crane are converted into the OXYZ coordinate system by the signal receiving and processing device: grab bucket 13 The surrounding wind speed value V, the force value F of the grab 13, the swing angle value α of the boom 7, the rotation angle value β of the boom 7, and the real-time coordinates (X d , Y d , Z d ) of the grab bucket 13;

步骤4、由信号收发及处理装置根据抓斗13的受力值F与抓斗13周围的风速值V进行起重机工作环境是否安全的判断: Step 4. The signal receiving and processing device judges whether the working environment of the crane is safe according to the force value F of the grab bucket 13 and the wind speed value V around the grab bucket 13:

当受力值F>0公斤(Kg)且风速值V≥20米/秒(m/s),信号收发及处理装置报警,提示操作人员关闭起重机,停止作业; When the force value F>0 kilograms (Kg) and the wind speed value V≥20 meters/second (m/s), the signal sending and receiving and processing device will alarm, prompting the operator to shut down the crane and stop the operation;

当受力值F≤0公斤(Kg)且风速值V≥55米/秒(m/s),信号收发及处理装置报警,提示操作人员关闭起重机,停止作业; When the force value F ≤ 0 kilograms (Kg) and the wind speed value V ≥ 55 meters per second (m/s), the signal sending and receiving and processing device alarms, prompting the operator to shut down the crane and stop the operation;

当受力值F>0公斤(Kg)且风速值V<20米/秒(m/s)、或当受力值F≤20公斤(Kg)且风速值V<55米/秒(m/s),进入下一步; When the force value F>0 kilograms (Kg) and the wind speed value V<20 meters/second (m/s), or when the force value F≤20 kilograms (Kg) and the wind speed value V<55 meters/second (m/s) s), go to the next step;

步骤5、由信号收发及处理装置根据吊臂7的摆角值α、吊臂7的转角值β及吊臂7的长度值L测算出靠近第一滚轮6一侧的吊臂7端部的X轴方向的坐标值Xa=L×Cosα×Cosβ,简称为吊臂的X轴向坐标值XaStep 5, measure and calculate the position of the end of the boom 7 near the first roller 6 side according to the swing angle value α of the boom 7, the rotation angle value β of the boom 7 and the length value L of the boom 7 by the signal transceiver and processing device The coordinate value X a in the X-axis direction = L×Cosα×Cosβ, referred to as the X-axis coordinate value X a of the boom:

步骤6、由信号收发及处理装置比较吊臂7的X轴向坐标值Xa与抓斗13的实时X轴向坐标值Xd的大小进行比较: Step 6. The X-axis coordinate value X a of the boom 7 is compared with the real-time X-axis coordinate value X d of the grab bucket 13 by the signal receiving and processing device:

若吊臂7的X轴向坐标值Xa不等于抓斗13的实时X轴向坐标值Xd,,则抓斗13处于不稳定的位置,由信号收发及处理装置向调稳装置下达运行指令; If the X-axis coordinate value X a of the boom 7 is not equal to the real-time X-axis coordinate value X d of the grab bucket 13, the grab bucket 13 is in an unstable position, and the signal sending and receiving and processing device sends an order to the stabilizing device to run instruction;

若吊臂7的X轴向坐标值Xa等于抓斗13的实时X轴向坐标值Xd,则抓斗13处于稳定的位置,由信号收发及处理装置向调稳装置发出停止运行指令; If the X-axis coordinate value X a of the boom 7 is equal to the real-time X-axis coordinate value X d of the grab bucket 13, the grab bucket 13 is in a stable position, and the signal sending and receiving and processing device sends a stop operation instruction to the stabilizing device;

步骤7、当抓斗13完成吊运,关闭检测装置、信号收发及处理装置和调稳装置,关闭起重机,结束操作。 Step 7. When the grab bucket 13 completes the lifting, close the detection device, the signal sending and receiving and processing device and the stabilizing device, close the crane, and end the operation.

有益的技术效果Beneficial technical effect

本发明所述的用于起重机抓斗的调稳作业系统及调稳方法是针对抓斗在运行过程中的不稳定摆动而提出的,将原有的抓斗稳定器改为齿轮齿条机构即本发明中导轨组件和电动调节组件的配合使用,并通过电动调节组件中电机驱动其运动,使原来抓斗稳定器的随机控制改为本发明的自动控制。本发明中的齿轮齿条传动机构可靠性高,工作过程平稳,可以使抓斗的调稳过程更加平稳、精确,而且在本发明整个调稳过程中实现了实时监测和反馈控制,提高了抓斗在控制平衡方面的稳定性、可靠性和安全性。在监测过程中用到了风速风向传感器,可以实时的监测风速,使得起重机抓斗可以更好的适应周围环境的变化。 The stabilizing operation system and stabilizing method for the crane grab described in the present invention are proposed for the unstable swing of the grab during operation, and the original grab stabilizer is changed to a rack and pinion mechanism. In the present invention, the guide rail assembly and the electric adjustment assembly are used together, and the motor in the electric adjustment assembly drives its movement, so that the original random control of the grab stabilizer is changed to the automatic control of the present invention. The rack and pinion transmission mechanism in the present invention has high reliability and a stable working process, which can make the stabilization process of the grab bucket more stable and accurate, and realizes real-time monitoring and feedback control during the entire stabilization process of the present invention, improving the grasping capacity. The stability, reliability and safety of the bucket in controlling the balance. The wind speed and direction sensor is used in the monitoring process, which can monitor the wind speed in real time, so that the crane grab can better adapt to changes in the surrounding environment.

本发明的检测装置用到角位移传感器、压力传感器、位移传感器以及风速风向传感器,可以实现位置、风速风向的实时监控,而且通过无线收发装置将收集到的信号通过信号调理电路以及模数转换电路发送到可编程控制器PLC上,PLC的输出端与工控机接口相连,由于抓斗在空载和满载时对风速的限制不同,在抓斗空载或满载时在风速超过起重机所要求的最大风速的情况下,通过报警装置发出报警信号,操作人员在听到报警信号后,使起重机停止工作。在风速允许的情况下,通过工控机来控制抓斗调稳机构中的电动机运转,从而调整抓斗的位置,使其尽可能稳定、安全的工作,在很大程度上提高了工作过程中的安全性。 The detection device of the present invention uses angular displacement sensors, pressure sensors, displacement sensors and wind speed and wind direction sensors, which can realize real-time monitoring of position, wind speed and wind direction, and pass the collected signals through signal conditioning circuits and analog-to-digital conversion circuits through wireless transceiver devices It is sent to the programmable controller PLC, and the output terminal of the PLC is connected to the interface of the industrial computer. Since the grab has different restrictions on the wind speed when it is empty or full, the wind speed exceeds the maximum required by the crane when the grab is empty or full. In the case of wind speed, an alarm signal is sent through the alarm device, and the operator stops the crane after hearing the alarm signal. When the wind speed permits, the industrial computer is used to control the operation of the motor in the grab stability mechanism, thereby adjusting the position of the grab to make it work as stably and safely as possible, which greatly improves the working process. safety.

附图说明 Description of drawings

图1为本发明所述调稳作业系统的结构框图。 Fig. 1 is a structural block diagram of the stabilization operation system of the present invention.

图2为检测装置及信号收发及处理装置的结构框图。 Fig. 2 is a structural block diagram of the detection device and the signal receiving and processing device.

图3为调稳装置的俯视图。 Figure 3 is a top view of the stabilizing device.

图4为图3的A-A剖视图。 FIG. 4 is a cross-sectional view along line A-A of FIG. 3 .

图5为图3的B处的立体示意图。 FIG. 5 is a schematic perspective view of point B in FIG. 3 .

图6本发明所述用于起重机抓斗的调稳方法流程图。 Fig. 6 is a flow chart of the method for stabilizing a crane grab according to the present invention.

图7本发明所述调稳作业系统的工作示意图。 Fig. 7 is a working diagram of the stabilization operation system of the present invention.

图中的序号为:底座1、转盘2、第一角位移传感器3、第二角位移传感器4、第二控制无线发送装置5、第一滚轮6、吊臂7、起重机本体9、起重机绳索10、风速风向传感器11、位置传感器12、抓斗13、应变片14、第一控制无线发送装置15、齿条801、轴802、调稳绳索803、第二滚轮804、齿轮805、第一挡板806、导轨平台807、导轨808、调稳电动机809、电机支架810、第二挡板811、联轴器812、挡圈813、槽钢814、钢板815、齿条固定板817、第一控制无线接收装置901、第二控制无线接收装置902、信号调理电路903、模数转换电路904、报警装置905、可编程逻辑控制器PLC906、工控机907。 The serial numbers in the figure are: base 1, turntable 2, first angular displacement sensor 3, second angular displacement sensor 4, second control wireless transmission device 5, first roller 6, boom 7, crane body 9, crane rope 10 , wind speed and direction sensor 11, position sensor 12, grab bucket 13, strain gauge 14, first control wireless transmission device 15, rack 801, shaft 802, stabilizing rope 803, second roller 804, gear 805, first baffle 806, guide rail platform 807, guide rail 808, stabilizer motor 809, motor bracket 810, second baffle plate 811, coupling 812, retaining ring 813, channel steel 814, steel plate 815, rack fixing plate 817, first control wireless Receiving device 901 , second control wireless receiving device 902 , signal conditioning circuit 903 , analog-to-digital conversion circuit 904 , alarm device 905 , programmable logic controller PLC 906 , and industrial computer 907 .

具体实施方式 Detailed ways

下面结合附图对本发明的实施做进一步描述: Implementation of the present invention will be further described below in conjunction with accompanying drawing:

用于起重机抓斗的调稳作业系统,其所适用的起重机包括底座1、转盘2、起重机本体9、吊臂7、第一滚轮6、起重机绳索10和抓斗13;其中,底座1固定在地基上,在底座1的顶部设有转盘2,在转盘2的顶部设有起重机本体9,吊臂7的底端与起重机本体9活动连接,吊臂7的顶端设有第一滚轮6;起重机绳索10的一端与起重机的绳索马达相连接,起重机绳索10的一端绕过第一滚轮6后与抓斗13相连接;起重机本体9相对转盘2沿水平方向的转动,吊臂7相对起重机本体9沿竖直方向抬起或落下,起重机绳索10在绳索马达的转动下将抓斗13吊起或放下,如图7所示。 It is used to stabilize the operation system of the crane grab, and the crane it is suitable for includes a base 1, a turntable 2, a crane body 9, a boom 7, a first roller 6, a crane rope 10 and a grab bucket 13; wherein, the base 1 is fixed on On the foundation, a turntable 2 is provided on the top of the base 1, a crane body 9 is arranged on the top of the turntable 2, the bottom end of the boom 7 is movably connected with the crane body 9, and the top of the boom 7 is provided with a first roller 6; One end of the rope 10 is connected with the rope motor of the crane, and one end of the crane rope 10 is connected with the grab bucket 13 after going around the first roller 6; Lifting or falling in the vertical direction, the crane rope 10 lifts or lowers the grab bucket 13 under the rotation of the rope motor, as shown in FIG. 7 .

参见图1,用于起重机抓斗的调稳作业系统,由检测装置、信号收发及处理装置、调稳装置三部分构成; Referring to Figure 1, the stability adjustment system used for crane grabs consists of three parts: a detection device, a signal transceiver and processing device, and a stability adjustment device;

所述检测装置安装在起重机上,负责检测起重机的动作参数及环境参数,并将检测到的上述动作参数及环境参数做为检测数据一并反馈至信号收发及处理装置; The detection device is installed on the crane and is responsible for detecting the motion parameters and environmental parameters of the crane, and feeds back the detected motion parameters and environmental parameters as detection data to the signal transceiver and processing device;

所述信号收发及处理装置依据接收到的检测数据生成控制信号,并将该控制信号传递至调稳装置执行; The signal transceiving and processing device generates a control signal according to the received detection data, and transmits the control signal to the stabilization device for execution;

参见图3,所述调稳装置包括导轨组件和电动调节组件;其中,导轨组件包含一条导轨808;导轨组件安装在起重机的吊臂上;电动调节组件包含一条调稳绳索803和一个调稳电动机809;电动调节组件活动连接在导轨组件的导轨808上,并通过调稳绳索803将电动调节组件与起重机的抓斗连接在一起;调稳电动机809在信号收发及处理装置发出的控制信号的驱动下带动电动调节组件沿导轨808朝起重机本体9一侧或朝抓斗13一侧移动;当抓斗13朝外摆动时,电动调节组件朝起重机本体9一侧移动,且通过电动调节组件中的调稳绳索803将抓斗13朝重机本体9一侧拉紧,即将抓斗13向内拉;反之,当抓斗13朝内摆动时,电动调节组件朝抓斗13一侧移动时,减小调稳绳索803对抓斗13的牵引,促使抓斗13向外摆,详见图7; Referring to Fig. 3, described stabilizing device comprises guide rail assembly and electric adjustment assembly; Wherein, guide rail assembly comprises a guide rail 808; Guide rail assembly is installed on the boom of crane; Electric adjustment assembly comprises a stabilized rope 803 and a stabilized motor 809; the electric adjustment assembly is movably connected on the guide rail 808 of the guide rail assembly, and the electric adjustment assembly is connected with the grab bucket of the crane through the stabilized rope 803; Drive the electric adjustment assembly to move toward the crane body 9 side or the grab bucket 13 side along the guide rail 808; when the grab bucket 13 swings outwards, the electric adjustment assembly moves toward the crane body 9 side, and through the electric adjustment assembly Adjust the rope 803 to tighten the grab bucket 13 towards the side of the crane body 9, that is, to pull the grab bucket 13 inward; Small adjustment stabilizes the traction of the rope 803 to the grab bucket 13, impels the grab bucket 13 to swing outwards, see Fig. 7 for details;

即通过调稳装置,始终向抓斗13施加一个与抓斗13实时摆动方向相反的作用力。 That is, through the stabilizing device, a force opposite to the real-time swing direction of the grab bucket 13 is always applied to the grab bucket 13 .

参见图2,检测装置包括风速风向传感器11,位置传感器12,第一角位移传感器3、第二角位移传感器4和应变片14;其中, Referring to Fig. 2, detection device comprises wind speed wind direction sensor 11, position sensor 12, the first angular displacement sensor 3, the second angular displacement sensor 4 and strain gauge 14; Wherein,

风速风向传感器11安装在靠近抓斗13一侧的起重机绳索10上,用于检测并反馈风的速度以及方向; The wind speed and direction sensor 11 is installed on the crane rope 10 near the grab bucket 13 side for detecting and feeding back the speed and direction of the wind;

位置传感器12安装在抓斗13的顶端,用于测量并反馈抓斗13的实时位置; The position sensor 12 is installed on the top of the grab bucket 13 for measuring and feeding back the real-time position of the grab bucket 13;

第一角位移传感器3以及第二角位移传感器4均安装在靠近转盘2一侧的吊臂7上,第一角位移传感器3用于测量并反馈吊臂7在垂直面内的摆角,第二角位移传感器4用于测量并反馈吊臂7在水平面内的转角; The first angular displacement sensor 3 and the second angular displacement sensor 4 are all installed on the boom 7 near the turntable 2 side, the first angular displacement sensor 3 is used to measure and feed back the swing angle of the boom 7 in the vertical plane, the second Two angular displacement sensors 4 are used to measure and feed back the angle of rotation of the boom 7 in the horizontal plane;

应变片14均布在抓斗13上,检测并反馈抓斗13的受力状况; Strain gauges 14 are evenly distributed on the grab bucket 13 to detect and feed back the force condition of the grab bucket 13;

风的速度以及方向的信息为起重机的环境参数,抓斗13的实时位置信息、吊臂7在垂直面内的摆角信息、吊臂7在水平面内的转角信息、抓斗13的受力信息为起重机的动作参数。 The information on the speed and direction of the wind is the environmental parameters of the crane, the real-time position information of the grab bucket 13, the swing angle information of the boom 7 in the vertical plane, the rotation angle information of the boom 7 in the horizontal plane, and the force information of the grab bucket 13 is the motion parameter of the crane.

参见图2,信号收发及处理装置包括第一控制无线发送装置15、第二控制无线发送装置5和信号接收与处理单元; Referring to Fig. 2, the signal transceiving and processing device includes a first control wireless transmission device 15, a second control wireless transmission device 5 and a signal receiving and processing unit;

其中,第一控制无线发送装置15安装在抓斗13的顶端,第一控制无线发送装置15的信号输入端分别与风速风向传感器11的信号输出端、位置传感器12的信号输出端、应变片14的信号输出端相连接; Wherein, the first control wireless transmission device 15 is installed on the top of the grab bucket 13, and the signal input end of the first control wireless transmission device 15 is respectively connected with the signal output end of the wind speed and direction sensor 11, the signal output end of the position sensor 12, and the strain gauge 14. The signal output terminal is connected;

第二控制无线发送装置5安装在靠近转盘2一侧的吊臂7上,第二控制无线发送装置5的信号输入端分别与第一角位移传感器3的信号输出端、第二角位移传感器4的信号输出端相连接; The second control wireless transmission device 5 is installed on the boom 7 near the turntable 2 side, and the signal input end of the second control wireless transmission device 5 is connected with the signal output end of the first angular displacement sensor 3 and the second angular displacement sensor 4 respectively. The signal output terminal is connected;

第一控制无线发送装置15、第二控制无线发送装置5分别与信号接收与处理单元无线连接并通讯。 The first control wireless sending device 15 and the second control wireless sending device 5 are respectively wirelessly connected and communicated with the signal receiving and processing unit.

参见图2,所述信号接收与处理单元由第一控制无线接收装置901、第二控制无线接收装置902、信号调理电路903、模数转换电路904、报警装置905、可编程逻辑控制器PLC906和工控机907构成; Referring to Fig. 2, the signal receiving and processing unit is composed of a first control wireless receiving device 901, a second control wireless receiving device 902, a signal conditioning circuit 903, an analog-to-digital conversion circuit 904, an alarm device 905, a programmable logic controller PLC906 and Composition of industrial computer 907;

第一控制无线接收装置901的信号输出端、第二控制无线接收装置902的信号输出端分别与信号调理电路903的信号输入端相连接;信号调理电路903的信号输出端经模数转换电路904与可编程逻辑控制器PLC906的信号输入端相连接;可编程逻辑控制器PLC906的信号输出端分别与报警装置905的信号输入端、工控机907的信号输入端相连接;工控机907的信号输出端与调稳装置相连接; The signal output end of the first control wireless receiving device 901, the signal output end of the second control wireless receiving device 902 are respectively connected with the signal input end of the signal conditioning circuit 903; It is connected with the signal input end of the programmable logic controller PLC906; the signal output end of the programmable logic controller PLC906 is respectively connected with the signal input end of the alarm device 905 and the signal input end of the industrial computer 907; the signal output of the industrial computer 907 The terminal is connected with the stabilizing device;

其中,第一控制无线接收装置901与第一控制无线发送装置15无线连接并通信,第二控制无线接收装置902与第二控制无线发送装置5无线连接并通信; Wherein, the first control wireless receiving device 901 is wirelessly connected and communicates with the first control wireless transmitting device 15, and the second control wireless receiving device 902 is wirelessly connected and communicating with the second control wireless transmitting device 5;

信号调理电路903负责将第一控制无线接收装置901和第二控制无线接收装置902接收到的信号进行调理放大并向下一级输出; The signal conditioning circuit 903 is responsible for conditioning and amplifying the signals received by the first control wireless receiving device 901 and the second control wireless receiving device 902 and outputting them to the next stage;

模数转换电路904负责将经信号调理电路903放大调理的模拟信号转换为数字信号; The analog-to-digital conversion circuit 904 is responsible for converting the analog signal amplified and conditioned by the signal conditioning circuit 903 into a digital signal;

可编程逻辑控制器PLC906负责将经模数转换电路904模数转换后的信号进行具体的判断与处理,并产生控制命令; The programmable logic controller PLC906 is responsible for specific judgment and processing of the signals converted by the analog-to-digital conversion circuit 904, and generates control commands;

报警装置905在可编程逻辑控制器PLC906的控制下发出报警信号,提示驾驶员在听到报警信号后,切断电源,使起重机停止工作; The alarm device 905 sends out an alarm signal under the control of the programmable logic controller PLC906, prompting the driver to cut off the power supply and stop the crane after hearing the alarm signal;

工控机907按可编程逻辑控制器PLC906产生的控制命令驱动调稳装置中调稳电动机809运行,同时,由工控机907显示屏显示可编程逻辑控制器PLC906实时执行的程序指令以及调稳电动机809的运转状态。 The industrial computer 907 drives the stabilizing motor 809 in the stabilizing device to run according to the control command generated by the programmable logic controller PLC906. At the same time, the display screen of the industrial computer 907 displays the program instructions executed by the programmable logic controller PLC906 in real time and the stabilizing motor 809. operating status.

参见图3,所述导轨组件还包括齿条801、第一挡板806、导轨平台807、第二挡板811、槽钢814、钢板815和齿条固定板817;其中,导轨平台807固定连接在导轨808的底部;导轨平台807长度方向的一个侧面上连接有槽钢814;通过长条状的钢板815将导轨平台807相连的槽钢814的底部与另一个槽钢814的底边相连接,即2个槽钢814与钢板815所构成的组合体的截面呈U形;在2个槽钢814的内侧共同连接有一个长条状的齿条固定板817;通过螺钉816将齿条801固定在齿条固定板817的顶面;所述导轨平台807、槽钢814、钢板815和齿条固定板817均与导轨808等长的矩形块体;导轨808的长度不小于吊臂7长度的1/2;在朝向起重机本体9一侧的导轨808的端部设有第一挡板806,在在朝向抓斗13一侧的导轨808的端部设有第二挡板811;所述钢板815与吊臂7焊接在一起,详见图4。 Referring to Fig. 3, the guide rail assembly also includes a rack 801, a first baffle plate 806, a guide rail platform 807, a second baffle plate 811, a channel steel 814, a steel plate 815 and a rack fixing plate 817; wherein the guide rail platform 807 is fixedly connected At the bottom of the guide rail 808; one side of the guide rail platform 807 in the length direction is connected with a channel steel 814; the bottom of the channel steel 814 connected to the guide rail platform 807 is connected to the bottom edge of another channel steel 814 by a strip-shaped steel plate 815 , that is, the cross-section of the combination of two channel steels 814 and steel plates 815 is U-shaped; a long strip-shaped rack fixing plate 817 is connected to the inside of the two channel steels 814; the rack 801 is connected by screws 816 Fixed on the top surface of the rack fixing plate 817; the guide rail platform 807, the channel steel 814, the steel plate 815 and the rack fixing plate 817 are all rectangular blocks with the same length as the guide rail 808; the length of the guide rail 808 is not less than the length of the boom 7 1/2; the end of the guide rail 808 towards the crane body 9 side is provided with a first baffle plate 806, and the end of the guide rail 808 towards the grab bucket 13 side is provided with a second baffle plate 811; The steel plate 815 is welded together with the boom 7, see Fig. 4 for details.

参见图4,所述电动调节组件还包括轴802、第二滚轮804、齿轮805、电机支架810、联轴器812、挡圈813组成;所述电机支架810活动连接在导轨平台807上,并可沿导轨808的长度方向移动;在电机支架810的顶部设有调稳电动机809;所述调稳电动机809的转动轴与导轨平台807的长度方向的侧面相垂直,且指向槽钢814一侧;通过联轴器812将调稳电动机809的转动轴与轴802的一端固定连接;通过过盈配合将挡圈813固定在轴802上,用于固定齿轮805的轴向移动);挡圈813另一侧的端面与齿轮805的轴向一端相连接(挡圈813通过过盈配合固定在轴802上,所述挡圈813用于固定/限制齿轮805的轴向移动;所述齿轮805的齿状边缘与齿条801的条纹相互咬合;通过过盈配合的方式将第二滚轮804安装在齿轮805外侧的轴802上);所述调稳绳索803的一端固定连接在第二滚轮804的径向侧壁上,调稳绳索803的另一端与抓斗13相连接,如图5所示。 Referring to Fig. 4, the electric adjustment assembly also includes a shaft 802, a second roller 804, a gear 805, a motor bracket 810, a coupling 812, and a retaining ring 813; the motor bracket 810 is movably connected to the rail platform 807, and Can move along the length direction of guide rail 808; The top of motor support 810 is provided with stabilizer motor 809; ; The rotating shaft of the motor 809 is fixedly connected to one end of the shaft 802 through the coupling 812; the retaining ring 813 is fixed on the shaft 802 through an interference fit for the axial movement of the fixed gear 805); the retaining ring 813 The end face on the other side is connected with one axial end of the gear 805 (the retaining ring 813 is fixed on the shaft 802 by interference fit, and the retaining ring 813 is used to fix/limit the axial movement of the gear 805; the gear 805 The stripes of the toothed edge and the rack 801 interlock; the second roller 804 is installed on the shaft 802 outside the gear 805 by an interference fit); one end of the stable rope 803 is fixedly connected to the second roller 804 On the radial side wall, the other end of the stabilizing rope 803 is connected with the grab bucket 13, as shown in FIG. 5 .

进一步说,当调稳电动机809按信号收发及处理装置的控制指令正转时,带动齿轮805同向正转,在齿轮805的齿状边缘与齿条801之间反作用力下,将电动调节组件沿着导轨808朝第一滚轮6一侧移动;与此同时,与调稳电动机809一同正转的第二滚轮804将调稳绳索803盘绕在第二滚轮804的径向侧壁上,将正在朝起重机本体9一侧摆动的抓斗13向其运动的反方向提拉,阻止与调稳绳索803相连的抓斗13向起重机本体9一侧偏移; Furthermore, when the stabilizer motor 809 rotates forward according to the control instruction of the signal receiving and processing device, the gear 805 is driven to rotate forward in the same direction, and under the reaction force between the toothed edge of the gear 805 and the rack 801, the electric adjustment assembly Move toward the first roller 6 side along the guide rail 808; meanwhile, the second roller 804 that rotates forward together with the motor 809 will stabilize the rope 803 and coil it on the radial side wall of the second roller 804, and will be The grab bucket 13 that swings towards the crane body 9 is pulled in the opposite direction of its movement, preventing the grab bucket 13 connected to the stabilizer rope 803 from shifting to the crane body 9 side;

进一步说,当调稳电动机809按信号收发及处理装置的控制指令反转时,带动齿轮805同向反转,在齿轮805的齿状边缘与齿条801之间反作用力下,将电动调节组件沿着导轨808朝起重机本体9一侧移动;与此同时,与调稳电动机809一同反转的第二滚轮804将盘绕在第二滚轮804径向侧壁上的调稳绳索803松开,将抓斗13朝起重机本体9一侧提拉,阻止与调稳绳索803相连的抓斗13向外摆动; Furthermore, when the stabilizer motor 809 reverses according to the control instruction of the signal sending and receiving and processing device, the gear 805 is driven to reverse in the same direction, and under the reaction force between the toothed edge of the gear 805 and the rack 801, the electric adjustment assembly Move toward the crane body 9 side along the guide rail 808; at the same time, the second roller 804 reversed together with the motor 809 of the stabilizer will loosen the stabilized rope 803 coiled on the radial side wall of the second roller 804, and the The grab bucket 13 is pulled towards the side of the crane body 9 to prevent the grab bucket 13 connected to the stabilizing rope 803 from swinging outward;

即通过电动调节组件在导轨组件上的移动,将缠绕在第二滚轮804径向侧壁上的调稳绳索803绕紧或松开,进而给予抓斗13作用力,最终使得抓斗13在吊臂7的抬起或放下的运动过程中始终垂向地面。 That is, through the movement of the electric adjustment assembly on the guide rail assembly, the stabilizing rope 803 wound on the radial side wall of the second roller 804 will be wound tight or loosened, and then the force will be given to the grab bucket 13, and finally the grab bucket 13 will be in the hanging position. The arm 7 is always vertical to the ground during the lifting or lowering movement.

参见图4,所述电机支架810的底部设有与导轨808相匹配的凹槽;在电机支架810的凹槽侧壁上设有防倒凸块;在导轨808的侧壁上设有相应的防倒凹槽。 Referring to Fig. 4, the bottom of the motor bracket 810 is provided with a groove matching the guide rail 808; Anti-fall grooves.

参见图6,采用本发明所述的调稳作业系统进行起重机抓斗的调稳方法,具体按如下步骤进行: Referring to Fig. 6, the method for stabilizing the grab bucket of a crane is carried out by using the stabilizing operation system of the present invention, specifically as follows:

步骤1、检测装置、信号收发及处理装置、调稳装置初始化: Step 1. Initialization of detection device, signal sending and receiving and processing device, and stabilization device:

开启检测装置、信号收发及处理装置、调稳装置的电源;建立三者之间的通讯连接;人工向信号收发及处理装置输入吊臂7的长度值L; Turn on the power supply of the detection device, the signal transceiver and processing device, and the stabilizing device; establish a communication connection between the three; manually input the length value L of the boom 7 to the signal transceiver and processing device;

步骤2、由检测装置获取起重机实时的动作参数和环境参数,并传递至信号收发及处理装置;其中,起重机的环境参数包括风的速度以及方向的信息,起重机的动作参数包括抓斗13的实时位置信息、吊臂7在垂直面内的摆角信息、吊臂7在水平面内的转角信息、抓斗13的受力信息; Step 2, obtain the real-time action parameters and environmental parameters of the crane by the detection device, and transmit them to the signal transceiver and processing device; wherein, the environmental parameters of the crane include information on the speed and direction of the wind, and the action parameters of the crane include the real-time information of the grab bucket 13. Position information, swing angle information of the boom 7 in the vertical plane, rotation angle information of the boom 7 in the horizontal plane, force information of the grab bucket 13;

步骤3、由信号收发及处理装置以起重机本体9为坐标原点建立OXYZ坐标系;由信号收发及处理装置将接收到的起重机实时的动作参数和环境参数转换成OXYZ坐标系下的:抓斗13周围的风速值V、抓斗13的受力值F、吊臂7的摆角值α,吊臂7的转角值β、以及抓斗13的实时坐标(Xd、Y d、Z d); Step 3, the OXYZ coordinate system is established with the crane body 9 as the coordinate origin by the signal receiving and processing device; the received real-time action parameters and environmental parameters of the crane are converted into the OXYZ coordinate system by the signal receiving and processing device: grab bucket 13 The surrounding wind speed value V, the force value F of the grab 13, the swing angle value α of the boom 7, the rotation angle value β of the boom 7, and the real-time coordinates (X d , Y d , Z d ) of the grab bucket 13;

建立OXYZ坐标系的优选方案是: 以吊臂7与起重机本体9的连接点为原点O,以吊臂7水平时所指方向为X轴向,以吊臂7竖直时所指方向为Z轴向,以穿过圆心O且同时垂直X轴向和Z轴向的直线方向为Y轴向; The optimal scheme for establishing the OXYZ coordinate system is: the connection point between the boom 7 and the crane body 9 is the origin O, the direction pointed to when the boom 7 is horizontal is the X axis, and the direction pointed to when the boom 7 is vertical is Z Axial, the Y-axis is the straight line passing through the center O and perpendicular to the X-axis and the Z-axis at the same time;

步骤4、由信号收发及处理装置根据抓斗13的受力值F与抓斗13周围的风速值V进行起重机工作环境是否安全的判断: Step 4. The signal receiving and processing device judges whether the working environment of the crane is safe according to the force value F of the grab bucket 13 and the wind speed value V around the grab bucket 13:

当受力值F>0公斤(Kg)且风速值V≥20米/秒(m/s),信号收发及处理装置报警,提示操作人员关闭起重机,停止作业; When the force value F>0 kilograms (Kg) and the wind speed value V≥20 meters/second (m/s), the signal sending and receiving and processing device will alarm, prompting the operator to shut down the crane and stop the operation;

当受力值F≤0公斤(Kg)且风速值V≥55米/秒(m/s),信号收发及处理装置报警,提示操作人员关闭起重机,停止作业; When the force value F ≤ 0 kilograms (Kg) and the wind speed value V ≥ 55 meters per second (m/s), the signal sending and receiving and processing device alarms, prompting the operator to shut down the crane and stop the operation;

当受力值F>0公斤(Kg)且风速值V<20米/秒(m/s)、或当受力值F≤20公斤(Kg)且风速值V<55米/秒(m/s),进入下一步; When the force value F>0 kilograms (Kg) and the wind speed value V<20 meters/second (m/s), or when the force value F≤20 kilograms (Kg) and the wind speed value V<55 meters/second (m/s) s), go to the next step;

步骤5、由信号收发及处理装置根据吊臂7的摆角值α、吊臂7的转角值β及吊臂7的长度值L测算出靠近第一滚轮6一侧的吊臂7端部的X轴方向的坐标值Xa=L×Cosα×Cosβ,简称为吊臂的X轴向坐标值XaStep 5, measure and calculate the position of the end of the boom 7 near the first roller 6 side according to the swing angle value α of the boom 7, the rotation angle value β of the boom 7 and the length value L of the boom 7 by the signal transceiver and processing device The coordinate value X a in the X-axis direction = L×Cosα×Cosβ, referred to as the X-axis coordinate value X a of the boom:

步骤6、由信号收发及处理装置比较吊臂7的X轴向坐标值Xa与抓斗13的实时X轴向坐标值Xd的大小进行比较: Step 6. The X-axis coordinate value X a of the boom 7 is compared with the real-time X-axis coordinate value X d of the grab bucket 13 by the signal receiving and processing device:

若吊臂7的X轴向坐标值Xa不等于抓斗13的实时X轴向坐标值Xd,,则抓斗13处于不稳定的位置,由信号收发及处理装置向调稳装置下达运行指令; If the X-axis coordinate value X a of the boom 7 is not equal to the real-time X-axis coordinate value X d of the grab bucket 13, the grab bucket 13 is in an unstable position, and the signal sending and receiving and processing device sends an order to the stabilizing device to run instruction;

若吊臂7的X轴向坐标值Xa等于抓斗13的实时X轴向坐标值Xd,则抓斗13处于稳定的位置,由信号收发及处理装置向调稳装置发出停止运行指令; If the X-axis coordinate value X a of the boom 7 is equal to the real-time X-axis coordinate value X d of the grab bucket 13, the grab bucket 13 is in a stable position, and the signal sending and receiving and processing device sends a stop operation instruction to the stabilizing device;

步骤7、当抓斗13完成吊运,关闭检测装置、信号收发及处理装置和调稳装置,关闭起重机,结束操作。 Step 7. When the grab bucket 13 completes the lifting, close the detection device, the signal sending and receiving and processing device and the stabilizing device, close the crane, and end the operation.

进一步说,若吊臂7的X轴向坐标值Xa<抓斗13的实时X轴向坐标值Xd,则由信号收发及处理装置向调稳装置发出反转的控制指令,令调稳电动机809带动齿轮805反向旋转,且在齿轮805的齿状边缘与齿条801之间反作用力下,使得电动调节组件朝起重机本体9一侧移动;与此同时,令与调稳电动机809一同反转的第二滚轮804将盘绕在第二滚轮804径向侧壁上的调稳绳索803松开,将抓斗13朝起重机本体9一侧提拉,阻止与调稳绳索803相连的抓斗13向外摆动; Furthermore, if the X-axis coordinate value X a of the boom 7 < the real-time X-axis coordinate value X d of the grab bucket 13, the signal receiving and processing device sends a reverse control command to the stabilizing device, so that the stabilizing The motor 809 drives the gear 805 to rotate in reverse, and under the reaction force between the toothed edge of the gear 805 and the rack 801, the electric adjustment assembly is moved toward the side of the crane body 9; The reversed second roller 804 unclamps the stabilizing rope 803 coiled on the radial side wall of the second roller 804, pulls the grab bucket 13 towards the crane body 9 side, and prevents the grab bucket connected to the stabilizing rope 803. 13 swing outward;

若吊臂7的X轴向坐标值Xa>抓斗13的实时X轴向坐标值Xd,则由信号收发及处理装置向调稳装置发出正转的控制指令,令调稳电动机809带动齿轮805正相旋转,在齿轮805的齿状边缘与齿条801之间反作用力下,使得电动调节组件朝第一滚轮6一侧移动;与此同时,令与调稳电动机809一同正转的第二滚轮804将调稳绳索803盘绕在第二滚轮804的径向侧壁上,将正在朝起重机本体9一侧摆动的抓斗13向其运动的反方向提拉,阻止与调稳绳索803相连的抓斗13向起重机本体9一侧运动。 If the X-axis coordinate value X a of the boom 7 > the real-time X-axis coordinate value X d of the grab bucket 13, the signal sending and receiving and processing device sends a forward rotation control command to the stabilizing device, so that the stabilizing motor 809 drives The gear 805 rotates in the normal phase, and under the reaction force between the toothed edge of the gear 805 and the rack 801, the electric adjustment assembly is moved toward the first roller 6 side; The second roller 804 coils the stabilizing rope 803 on the radial side wall of the second roller 804, and pulls the grab bucket 13 swinging towards the crane body 9 in the opposite direction of its movement, preventing and stabilizing the rope 803 The connected grab bucket 13 moves to one side of the crane body 9 .

Claims (9)

1.用于起重机抓斗的调稳作业系统,本调稳作业系统所适用的起重机包括底座(1)、转盘(2)、起重机本体(9)、吊臂(7)、第一滚轮(6)、起重机绳索(10)和抓斗(13);其中,底座(1)固定在地基上,在底座(1)的顶部设有转盘(2),在转盘(2)的顶部设有起重机本体(9),吊臂(7)的底端与起重机本体(9)活动连接,吊臂(7)的顶端设有第一滚轮(6);起重机绳索(10)的一端与起重机的绳索马达相连接,起重机绳索(10)的一端绕过第一滚轮(6)后与抓斗(13)相连接;起重机本体(9)相对转盘(2)沿水平方向的转动,吊臂(7)相对起重机本体(9)沿竖直方向抬起或落下,起重机绳索(10)在绳索马达的转动下将抓斗(13)吊起或放下;其特征在于:由检测装置、信号收发及处理装置、调稳装置三部分构成; 1. It is used for the stabilizing operation system of the crane grab. The crane applicable to the stabilizing operation system includes the base (1), the turntable (2), the crane body (9), the boom (7), the first roller (6 ), a crane rope (10) and a grab bucket (13); wherein, the base (1) is fixed on the foundation, a turntable (2) is arranged on the top of the base (1), and a crane body is arranged on the top of the turntable (2) (9), the bottom end of the boom (7) is movably connected with the crane body (9), and the top of the boom (7) is provided with a first roller (6); one end of the crane rope (10) is connected to the rope motor of the crane connection, one end of the crane rope (10) bypasses the first roller (6) and connects with the grab (13); the crane body (9) rotates in the horizontal direction relative to the turntable (2), and the boom (7) relative to the crane The main body (9) is lifted or lowered vertically, and the crane rope (10) lifts or lowers the grab bucket (13) under the rotation of the rope motor; The stabilizing device consists of three parts; 所述检测装置安装在起重机上,负责检测起重机的动作参数及环境参数,并将检测到的上述动作参数及环境参数做为检测数据一并反馈至信号收发及处理装置; The detection device is installed on the crane and is responsible for detecting the motion parameters and environmental parameters of the crane, and feeds back the detected motion parameters and environmental parameters as detection data to the signal transceiver and processing device; 所述信号收发及处理装置依据接收到的检测数据生成控制信号,并将该控制信号传递至调稳装置执行; The signal transceiving and processing device generates a control signal according to the received detection data, and transmits the control signal to the stabilization device for execution; 所述调稳装置包括导轨组件和电动调节组件;其中,导轨组件包含一条导轨(808);导轨组件安装在起重机的吊臂上;电动调节组件包含一条调稳绳索(803)和一个调稳电动机(809);电动调节组件活动连接在导轨组件的导轨(808)上,并通过调稳绳索(803)将电动调节组件与起重机的抓斗连接在一起;调稳电动机(809)在信号收发及处理装置发出的控制信号的驱动下带动电动调节组件沿导轨(808)朝起重机本体(9)一侧或朝抓斗(13)一侧移动;当抓斗(13)朝外摆动时,电动调节组件朝起重机本体(9)一侧移动,且通过电动调节组件中的调稳绳索(803)将抓斗(13)朝重机本体(9)一侧拉紧,即将抓斗(13)向内拉;反之,当抓斗(13)朝内摆动时,电动调节组件朝抓斗(13)一侧移动时,减小调稳绳索(803)对抓斗(13)的牵引,促使抓斗(13)向外摆;即通过调稳装置,始终向抓斗(13)施加一个与抓斗(13)实时摆动方向相反的作用力。 The stabilization device includes a guide rail assembly and an electric adjustment assembly; wherein, the guide rail assembly includes a guide rail (808); the guide rail assembly is installed on the boom of the crane; the electric adjustment assembly includes a stabilization rope (803) and a stabilization motor (809); the electric adjustment assembly is movably connected on the guide rail (808) of the guide rail assembly, and the electric adjustment assembly is connected with the grab bucket of the crane through the stabilized rope (803); Driven by the control signal sent by the processing device, the electric adjustment assembly is driven to move along the guide rail (808) toward the side of the crane body (9) or toward the side of the grab (13); when the grab (13) swings outward, the electric adjustment The assembly moves toward the side of the crane body (9), and the grab (13) is tightened toward the side of the crane body (9) through the stabilized rope (803) in the electric adjustment assembly, that is, the grab (13) is inward Conversely, when the grab (13) swings inward, when the electric adjustment assembly moves toward the grab (13) side, the traction of the stabilizing rope (803) to the grab (13) is reduced, prompting the grab ( 13) Swing outward; that is, through the stabilizing device, a force opposite to the real-time swing direction of the grab (13) is always applied to the grab (13). 2.如权利要求1所述的用于起重机抓斗的调稳作业系统,其特征在于:检测装置包括风速风向传感器(11),位置传感器(12),第一角位移传感器(3)、第二角位移传感器(4)和应变片(14);其中,风速风向传感器(11)安装在靠近抓斗(13)一侧的起重机绳索(10)上,用于检测并反馈风的速度以及方向;位置传感器(12)安装在抓斗(13)的顶端,用于测量并反馈抓斗(13)的实时位置;第一角位移传感器(3)以及第二角位移传感器(4)均安装在靠近转盘(2)一侧的吊臂(7)上,第一角位移传感器(3)用于测量并反馈吊臂(7)在垂直面内的摆角,第二角位移传感器(4)用于测量并反馈吊臂(7)在水平面内的转角;应变片(14)均布在抓斗(13)上,检测并反馈抓斗(13)的受力状况;风的速度以及方向的信息为起重机的环境参数,抓斗(13)的实时位置信息、吊臂(7)在垂直面内的摆角信息、吊臂(7)在水平面内的转角信息、抓斗(13)的受力信息为起重机的动作参数。 2. The stability adjustment system for crane grabs according to claim 1, characterized in that: the detection device includes a wind speed and direction sensor (11), a position sensor (12), a first angular displacement sensor (3), a second Two angular displacement sensors (4) and strain gauges (14); among them, the wind speed and direction sensor (11) is installed on the crane rope (10) close to the grab (13) side to detect and feed back the speed and direction of the wind ; The position sensor (12) is installed on the top of the grab (13) for measuring and feeding back the real-time position of the grab (13); the first angular displacement sensor (3) and the second angular displacement sensor (4) are installed on On the boom (7) near the turntable (2), the first angular displacement sensor (3) is used to measure and feed back the swing angle of the boom (7) in the vertical plane, and the second angular displacement sensor (4) is used to It is used to measure and feed back the rotation angle of the boom (7) in the horizontal plane; the strain gauges (14) are evenly distributed on the grab bucket (13) to detect and feed back the force status of the grab bucket (13); the wind speed and direction information is the environmental parameters of the crane, the real-time position information of the grab (13), the swing angle information of the boom (7) in the vertical plane, the rotation angle information of the boom (7) in the horizontal plane, and the force of the grab bucket (13) The information is the action parameter of the crane. 3.如权利要求1所述的用于起重机抓斗的调稳作业系统,其特征在于:信号收发及处理装置包括第一控制无线发送装置(15)、第二控制无线发送装置(5)和信号接收与处理单元; 3. The stability adjustment system for crane grabs according to claim 1, characterized in that: the signal transceiver and processing device includes a first control wireless transmission device (15), a second control wireless transmission device (5) and Signal receiving and processing unit; 其中,第一控制无线发送装置(15)安装在抓斗(13)的顶端,第一控制无线发送装置(15)的信号输入端分别与风速风向传感器(11)的信号输出端、位置传感器(12)的信号输出端、应变片(14)的信号输出端相连接; Among them, the first control wireless transmission device (15) is installed on the top of the grab bucket (13), and the signal input end of the first control wireless transmission device (15) is respectively connected with the signal output end of the wind speed and direction sensor (11), the position sensor ( 12) and the signal output end of the strain gauge (14) are connected; 第二控制无线发送装置(5)安装在靠近转盘(2)一侧的吊臂(7)上,第二控制无线发送装置(5)的信号输入端分别与第一角位移传感器(3)的信号输出端、第二角位移传感器(4)的信号输出端相连接; The second control wireless transmission device (5) is installed on the boom (7) close to the side of the turntable (2), and the signal input end of the second control wireless transmission device (5) is connected with the first angular displacement sensor (3) respectively. The signal output terminal is connected to the signal output terminal of the second angular displacement sensor (4); 第一控制无线发送装置(15)、第二控制无线发送装置(5)分别与信号接收与处理单元无线连接并通讯。 The first control wireless sending device (15) and the second control wireless sending device (5) are wirelessly connected and communicated with the signal receiving and processing unit respectively. 4.如权利要求3所述的用于起重机抓斗的调稳作业系统,其特征在于: 4. The stabilizing operation system for a crane grab as claimed in claim 3, characterized in that: 所述信号接收与处理单元由第一控制无线接收装置(901)、第二控制无线接收装置(902)、信号调理电路(903)、模数转换电路(904)、报警装置(905)、可编程逻辑控制器PLC(906)和工控机(907)构成; The signal receiving and processing unit is composed of a first control wireless receiving device (901), a second control wireless receiving device (902), a signal conditioning circuit (903), an analog-to-digital conversion circuit (904), an alarm device (905), and Composition of programming logic controller PLC (906) and industrial computer (907); 第一控制无线接收装置(901)的信号输出端、第二控制无线接收装置(902)的信号输出端分别与信号调理电路(903)的信号输入端相连接;信号调理电路(903)的信号输出端经模数转换电路(904)与可编程逻辑控制器PLC(906)的信号输入端相连接;可编程逻辑控制器PLC(906)的信号输出端分别与报警装置(905)的信号输入端、工控机(907)的信号输入端相连接;工控机(907)的信号输出端与调稳装置相连接;其中,第一控制无线接收装置(901)与第一控制无线发送装置(15)无线连接并通信,第二控制无线接收装置(902)与第二控制无线发送装置(5)无线连接并通信;信号调理电路(903)负责将第一控制无线接收装置(P01)和第二控制无线接收装置(P02)接收到的信号进行调理放大并向下一级输出; The signal output end of the first control wireless receiving device (901) and the signal output end of the second control wireless receiving device (902) are respectively connected to the signal input end of the signal conditioning circuit (903); the signal of the signal conditioning circuit (903) The output terminal is connected to the signal input terminal of the programmable logic controller PLC (906) through the analog-to-digital conversion circuit (904); the signal output terminal of the programmable logic controller PLC (906) is respectively connected to the signal input terminal of the alarm device (905) terminal and the signal input terminal of the industrial computer (907); the signal output terminal of the industrial computer (907) is connected with the stabilizing device; wherein, the first control wireless receiving device (901) and the first control wireless transmitting device (15 ) wireless connection and communication, the second control wireless receiving device (902) wirelessly connects and communicates with the second control wireless transmitting device (5); the signal conditioning circuit (903) is responsible for connecting the first control wireless receiving device (P01) and the second Control the signal received by the wireless receiving device (P02) to condition and amplify it and output it to the next level; 模数转换电路(904)负责将经信号调理电路(903)放大调理的模拟信号转换为数字信号; The analog-to-digital conversion circuit (904) is responsible for converting the analog signal amplified and conditioned by the signal conditioning circuit (903) into a digital signal; 可编程逻辑控制器PLC(906)负责将经模数转换电路(904)模数转换后的信号进行具体的判断与处理,并产生控制命令;报警装置(905)在可编程逻辑控制器PLC(906)的控制下发出报警信号,提示驾驶员在听到报警信号后,切断电源,使起重机停止工作;工控机(907)按可编程逻辑控制器PLC(906)产生的控制命令驱动调稳装置中调稳电动机(809)运行,同时,由工控机(907)显示屏显示可编程逻辑控制器PLC(906)实时执行的程序指令以及调稳电动机(809)的运转状态。 The programmable logic controller PLC (906) is responsible for the specific judgment and processing of the signal converted by the analog-to-digital conversion circuit (904), and generates control commands; the alarm device (905) is connected to the programmable logic controller PLC ( 906) sends out an alarm signal to prompt the driver to cut off the power supply and stop the crane after hearing the alarm signal; the industrial computer (907) drives the stabilizing device according to the control command generated by the programmable logic controller PLC (906) The middle regulator motor (809) runs, and at the same time, the display screen of the industrial computer (907) displays the program instructions executed by the programmable logic controller PLC (906) in real time and the operation status of the regulator motor (809). 5.如权利要求1所述的用于起重机抓斗的调稳作业系统,其特征在于: 5. The stabilizing operation system for a crane grab as claimed in claim 1, characterized in that: 所述导轨组件还包括齿条(801)、第一挡板(806)、导轨平台(807)、第二挡板(811)、槽钢(814)、钢板(815)和齿条固定板(817);其中,导轨平台(807)固定连接在导轨(808)的底部;导轨平台(807)长度方向的一个侧面上连接有槽钢(814);通过长条状的钢板(815)将导轨平台(807)相连的槽钢(814)的底部与另一个槽钢(814)的底边相连接,即2个槽钢(814)与钢板(815)所构成的组合体的截面呈U形;在2个槽钢(814)的内侧共同连接有一个长条状的齿条固定板(817);通过螺钉(816)将齿条(801)固定在齿条固定板(817)的顶面;所述导轨平台(807)、槽钢(814)、钢板(815)和齿条固定板(817)均与导轨(808)等长的矩形块体;导轨(808)的长度不小于吊臂(7)长度的1/2;在朝向起重机本体(9)一侧的导轨(808)的端部设有第一挡板(806),在在朝向抓斗(13)一侧的导轨(808)的端部设有第二挡板(811);所述钢板(815)与吊臂(7)焊接在一起; The rail assembly also includes a rack (801), a first baffle (806), a rail platform (807), a second baffle (811), a channel steel (814), a steel plate (815) and a rack fixing plate ( 817); wherein, the guide rail platform (807) is fixedly connected to the bottom of the guide rail (808); one side of the guide rail platform (807) in the length direction is connected with a channel steel (814); The bottom of the channel steel (814) connected to the platform (807) is connected to the bottom edge of another channel steel (814), that is, the cross section of the combination of two channel steel (814) and the steel plate (815) is U-shaped ; There is a strip-shaped rack fixing plate (817) connected to the inner sides of the two channel steels (814); the rack (801) is fixed on the top surface of the rack fixing plate (817) by screws (816) ; The guide rail platform (807), channel steel (814), steel plate (815) and rack fixing plate (817) are all rectangular blocks with the same length as the guide rail (808); the length of the guide rail (808) is not less than the boom (7) 1/2 of the length; a first baffle (806) is provided at the end of the guide rail (808) facing the side of the crane body (9), and a first baffle (806) is provided at the end of the guide rail (808) facing the grab (13) side ) is provided with a second baffle (811); the steel plate (815) is welded together with the boom (7); 所述电动调节组件还包括轴(802)、第二滚轮(804)、齿轮(805)、电机支架(810)、联轴器(812)、挡圈(813)组成;所述电机支架(810)活动连接在导轨平台(807)上,并可沿导轨(808)的长度方向移动;在电机支架(810)的顶部设有调稳电动机(809);所述调稳电动机(809)的转动轴与导轨平台(807)的长度方向的侧面相垂直,且指向槽钢(814)一侧;通过联轴器(812)将调稳电动机(809)的转动轴与轴(802)的一端固定连接;通过过盈配合将挡圈(813)安装在轴(802)上,所述挡圈(813)用于限制齿轮(805)的轴向移动;所述齿轮(805)的齿状边缘与齿条(801)的条纹相互咬合;通过过盈配合的方式将第二滚轮(804)固定在齿轮(805)外侧的轴(802);所述调稳绳索(803)的一端固定连接在第二滚轮(804)的径向侧壁上,调稳绳索(803)的另一端与抓斗(13)相连接。 The electric adjustment assembly also includes a shaft (802), a second roller (804), a gear (805), a motor bracket (810), a coupling (812), and a retaining ring (813); the motor bracket (810 ) is movably connected to the guide rail platform (807), and can move along the length direction of the guide rail (808); a motor (809) is provided on the top of the motor bracket (810); the rotation of the motor (809) The shaft is perpendicular to the side of the guide rail platform (807) in the length direction and points to the side of the channel steel (814); the rotation shaft of the motor (809) is fixed to one end of the shaft (802) through a coupling (812) connection; the retaining ring (813) is installed on the shaft (802) by interference fit, and the retaining ring (813) is used to limit the axial movement of the gear (805); the toothed edge of the gear (805) and The stripes of the rack (801) are engaged with each other; the second roller (804) is fixed on the shaft (802) outside the gear (805) by means of interference fit; one end of the stabilizer rope (803) is fixedly connected to the On the radial sidewall of the two rollers (804), the other end of the stable rope (803) is connected with the grab bucket (13). 6.如权利要求5所述的用于起重机抓斗的调稳作业系统,其特征在于: 6. The stabilizing operation system for a crane grab as claimed in claim 5, characterized in that: 当调稳电动机(809)按信号收发及处理装置的控制指令正转时,带动齿轮(805)同向正转,在齿轮(805)的齿状边缘与齿条(801)之间反作用力下,将电动调节组件沿着导轨(808)朝第一滚轮(6)一侧移动;与此同时,与调稳电动机(809)一同正转的第二滚轮(804)将调稳绳索(803)盘绕在第二滚轮(804)的径向侧壁上,将正在朝起重机本体(9)一侧摆动的抓斗(13)向其运动的反方向提拉,阻止与调稳绳索(803)相连的抓斗(13)向起重机本体(9)一侧偏移; When the stabilized motor (809) rotates forward according to the control command of the signal receiving and processing device, it drives the gear (805) to rotate forward in the same direction, under the reaction force between the toothed edge of the gear (805) and the rack (801) , move the electric adjustment assembly along the guide rail (808) toward the side of the first roller (6); at the same time, the second roller (804) rotating forward together with the stabilization motor (809) will stabilize the rope (803) Coiled on the radial side wall of the second roller (804), pull the grab bucket (13) that is swinging towards the side of the crane body (9) to the opposite direction of its movement, preventing it from being connected to the stabilizer rope (803) The grab bucket (13) is offset to the side of the crane body (9); 当调稳电动机(809)按信号收发及处理装置的控制指令反转时,带动齿轮(805)同向反转,在齿轮(805)的齿状边缘与齿条(801)之间反作用力下,将电动调节组件沿着导轨(808)朝起重机本体(9)一侧移动;与此同时,与调稳电动机(809)一同反转的第二滚轮(804)将盘绕在第二滚轮(804)径向侧壁上的调稳绳索(803)松开,将抓斗(13)朝起重机本体(9)一侧提拉,阻止与调稳绳索(803)相连的抓斗(13)向外摆动; When the stabilized motor (809) reverses according to the control instruction of the signal receiving and processing device, the gear (805) is driven to reverse in the same direction, and under the reaction force between the toothed edge of the gear (805) and the rack (801), , move the electric adjustment assembly along the guide rail (808) toward the side of the crane body (9); at the same time, the second roller (804) that reverses together with the stabilization motor (809) will coil around the second roller (804 ) loosen the stabilizing rope (803) on the radial side wall, pull the grab (13) toward the side of the crane body (9), and prevent the grab (13) connected to the stabilizing rope (803) from going outward swing; 即通过电动调节组件在导轨组件上的移动,将缠绕在第二滚轮(804)径向侧壁上的调稳绳索(803)绕紧或松开,进而给予抓斗(13)作用力,最终使得抓斗(13)在吊臂(7)的抬起或放下的运动过程中始终垂向地面。 That is, through the movement of the electric adjustment assembly on the guide rail assembly, the stabilizing rope (803) wound on the radial side wall of the second roller (804) is wound tightly or loosened, and then the grab (13) is given a force, and finally Make the grab bucket (13) vertical to the ground all the time during the lifting or lowering motion process of the boom (7). 7.如权利要求5所述的用于起重机抓斗的调稳作业系统,其特征在于:所述电机支架(810)的底部设有与导轨(808)相匹配的凹槽;在电机支架(810)的凹槽侧壁上设有防倒凸块;在导轨(808)的侧壁上设有相应的防倒凹槽。 7. The stability adjustment system for crane grabs according to claim 5, characterized in that: the bottom of the motor bracket (810) is provided with a groove matching the guide rail (808); in the motor bracket ( The side wall of the groove of 810) is provided with an anti-fall projection; the side wall of the guide rail (808) is provided with a corresponding anti-fall groove. 8.采用权利要求1所述的调稳作业系统进行起重机抓斗的调稳方法,其特征在于:按如下步骤进行: 8. The method for stabilizing the crane grab by adopting the stabilizing operation system according to claim 1 is characterized in that: proceed as follows: 步骤1、检测装置、信号收发及处理装置、调稳装置初始化: Step 1. Initialization of detection device, signal sending and receiving and processing device, and stabilization device: 开启检测装置、信号收发及处理装置、调稳装置的电源;建立三者之间的通讯连接;人工向信号收发及处理装置输入吊臂(7)的长度值L; Turn on the power supply of the detection device, the signal transceiver and processing device, and the stabilization device; establish a communication connection between the three; manually input the length value L of the boom (7) to the signal transceiver and processing device; 步骤2、由检测装置获取起重机实时的动作参数和环境参数,并传递至信号收发及处理装置;其中,起重机的环境参数包括风的速度以及方向的信息,起重机的动作参数包括抓斗(13)的实时位置信息、吊臂(7)在垂直面内的摆角信息、吊臂(7)在水平面内的转角信息、抓斗(13)的受力信息; Step 2. Obtain the real-time action parameters and environmental parameters of the crane by the detection device, and transmit them to the signal receiving and processing device; wherein, the environmental parameters of the crane include wind speed and direction information, and the action parameters of the crane include grab (13) The real-time position information of the boom (7), the swing angle information of the boom (7) in the vertical plane, the rotation angle information of the boom (7) in the horizontal plane, and the force information of the grab bucket (13); 步骤3、由信号收发及处理装置以起重机本体(9)为坐标原点建立OXYZ坐标系;由信号收发及处理装置将接收到的起重机实时的动作参数和环境参数转换成OXYZ坐标系下的:抓斗(13)周围的风速值V、抓斗(13)的受力值F、吊臂(7)的摆角值α,吊臂(7)的转角值β、以及抓斗(13)的实时坐标(Xd、Y d、Z d); Step 3: The OXYZ coordinate system is established with the crane body (9) as the coordinate origin by the signal receiving and processing device; the received real-time action parameters and environmental parameters of the crane are converted into the OXYZ coordinate system by the signal receiving and processing device: The wind speed value V around the bucket (13), the force value F of the grab bucket (13), the swing angle value α of the boom (7), the rotation angle value β of the boom arm (7), and the real-time Coordinates(X d , Y d , Z d ); 步骤4、由信号收发及处理装置根据抓斗(13)的受力值F与抓斗(13)周围的风速值V进行起重机工作环境是否安全的判断: Step 4. The signal receiving and processing device judges whether the working environment of the crane is safe according to the force value F of the grab (13) and the wind speed value V around the grab (13): 当受力值F>0公斤(Kg)且风速值V≥20米/秒(m/s),信号收发及处理装置报警,提示操作人员关闭起重机,停止作业; When the force value F>0 kilograms (Kg) and the wind speed value V≥20 meters/second (m/s), the signal sending and receiving and processing device will alarm, prompting the operator to shut down the crane and stop the operation; 当受力值F≤0公斤(Kg)且风速值V≥55米/秒(m/s),信号收发及处理装置报警,提示操作人员关闭起重机,停止作业; When the force value F ≤ 0 kilograms (Kg) and the wind speed value V ≥ 55 meters per second (m/s), the signal sending and receiving and processing device alarms, prompting the operator to shut down the crane and stop the operation; 当受力值F>0公斤(Kg)且风速值V<20米/秒(m/s)、或当受力值F≤20公斤(Kg)且风速值V<55米/秒(m/s),进入下一步; When the force value F>0 kilograms (Kg) and the wind speed value V<20 meters/second (m/s), or when the force value F≤20 kilograms (Kg) and the wind speed value V<55 meters/second (m/s) s), go to the next step; 步骤5、由信号收发及处理装置根据吊臂(7)的摆角值α、吊臂(7)的转角值β及吊臂(7)的长度值L测算出靠近第一滚轮(6)一侧的吊臂(7)端部的X轴方向的坐标值Xa=L×Cosα×Cosβ,简称为吊臂的X轴向坐标值XaStep 5. According to the swing angle value α of the boom (7), the rotation angle value β of the boom (7) and the length value L of the boom (7), calculate a distance close to the first roller (6) by the signal receiving and processing device. The coordinate value X a of the end of the boom (7) on the side in the X-axis direction = L×Cosα×Cosβ, referred to as the X-axis coordinate value X a of the boom: 步骤6、由信号收发及处理装置比较吊臂(7)的X轴向坐标值Xa与抓斗(13)的实时X轴向坐标值Xd的大小进行比较: Step 6. The X-axis coordinate value X a of the boom (7) is compared with the real-time X-axis coordinate value X d of the grab (13) by the signal receiving and processing device: 若吊臂(7)的X轴向坐标值Xa不等于抓斗(13)的实时X轴向坐标值Xd,则抓斗(13)处于不稳定的位置,由信号收发及处理装置向调稳装置下达运行指令; If the X-axis coordinate value X a of the boom (7) is not equal to the real-time X-axis coordinate value X d of the grab bucket (13), the grab bucket (13) is in an unstable position, and the signal sending and receiving and processing device sends The stabilizing device issues operation instructions; 若吊臂(7)的X轴向坐标值Xa等于抓斗(13)的实时X轴向坐标值Xd,则抓斗(13)处于稳定的位置,由信号收发及处理装置向调稳装置发出停止运行指令; If the X-axis coordinate value X a of the boom (7) is equal to the real-time X-axis coordinate value X d of the grab bucket (13), the grab bucket (13) is in a stable position, and the signal sending and receiving and processing device will adjust to the stable position. The device issues a stop command; 步骤7、当抓斗(13)完成吊运,关闭检测装置、信号收发及处理装置和调稳装置,关闭起重机,结束操作。 Step 7. When the grab bucket (13) completes lifting, close the detection device, the signal sending and receiving and processing device and the stabilization device, close the crane, and end the operation. 9.如权利要求8所述的起重机抓斗的调稳方法,其特征在于: 9. The method for stabilizing the grab bucket of a crane as claimed in claim 8, characterized in that: 若吊臂(7)的X轴向坐标值Xa<抓斗(13)的实时X轴向坐标值Xd,则由信号收发及处理装置向调稳装置发出反转的控制指令,令调稳电动机(809)带动齿轮(805)反向旋转,且在齿轮(805)的齿状边缘与齿条(801)之间反作用力下,使得电动调节组件朝起重机本体(9)一侧移动;与此同时,令与调稳电动机(809)一同反转的第二滚轮(804)将盘绕在第二滚轮(804)径向侧壁上的调稳绳索(803)松开,将抓斗(13)朝起重机本体(9)一侧提拉,阻止与调稳绳索(803)相连的抓斗(13)向外摆动; If the X-axis coordinate value X a of the boom (7) < the real-time X-axis coordinate value X d of the grab bucket (13), the signal sending and receiving and processing device sends a reverse control command to the stabilizing device, so that the adjustment The stabilizing motor (809) drives the gear (805) to rotate in reverse, and under the reaction force between the toothed edge of the gear (805) and the rack (801), the electric adjustment component moves toward the side of the crane body (9); At the same time, make the second roller (804) reversed together with the motor (809) to loosen the rope (803) coiled on the radial side wall of the second roller (804), and the grab ( 13) Pull toward the side of the crane body (9) to prevent the grab (13) connected to the stabilizer rope (803) from swinging outward; 若吊臂(7)的X轴向坐标值Xa>抓斗(13)的实时X轴向坐标值Xd,则由信号收发及处理装置向调稳装置发出正转的控制指令,令调稳电动机(809)带动齿轮(805)正相旋转,在齿轮(805)的齿状边缘与齿条(801)之间反作用力下,使得电动调节组件朝第一滚轮(6)一侧移动;与此同时,令与调稳电动机(809)一同正转的第二滚轮(804)将调稳绳索(803)盘绕在第二滚轮(804)的径向侧壁上,将正在朝起重机本体(9)一侧摆动的抓斗(13)向其运动的反方向提拉,阻止与调稳绳索(803)相连的抓斗(13)向起重机本体(9)一侧运动。 If the X-axis coordinate value X a of the boom (7) > the real-time X-axis coordinate value X d of the grab bucket (13), the signal sending and receiving and processing device sends a forward rotation control command to the stabilizing device, so that the adjustment The stabilizing motor (809) drives the gear (805) to rotate in normal phase, and under the reaction force between the toothed edge of the gear (805) and the rack (801), the electric adjustment assembly moves toward the side of the first roller (6); At the same time, the second roller (804) that makes the forward rotation of the motor (809) will be coiled on the radial side wall of the second roller (804) with the stabilizer rope (803), and will be moving toward the crane body ( 9) Pull the grab bucket (13) swinging on one side to the opposite direction of its movement, preventing the grab bucket (13) connected to the stabilizing rope (803) from moving to the side of the crane body (9).
CN201410786371.7A 2014-12-18 2014-12-18 Stability-regulating operating system and stability-regulating method for crane grab Active CN104495617B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410786371.7A CN104495617B (en) 2014-12-18 2014-12-18 Stability-regulating operating system and stability-regulating method for crane grab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410786371.7A CN104495617B (en) 2014-12-18 2014-12-18 Stability-regulating operating system and stability-regulating method for crane grab

Publications (2)

Publication Number Publication Date
CN104495617A true CN104495617A (en) 2015-04-08
CN104495617B CN104495617B (en) 2017-04-19

Family

ID=52937099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410786371.7A Active CN104495617B (en) 2014-12-18 2014-12-18 Stability-regulating operating system and stability-regulating method for crane grab

Country Status (1)

Country Link
CN (1) CN104495617B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105438990A (en) * 2015-12-30 2016-03-30 上海佩纳沙士吉打机械有限公司 Self-detection and safety system and method of hydraulic grab
CN106629400A (en) * 2016-11-16 2017-05-10 北华大学 Intelligent electric anti-swinging control system for container crane
CN107416680A (en) * 2017-06-07 2017-12-01 天津海运职业学院 A kind of box crossbeam crane gear support
CN112758827A (en) * 2021-01-21 2021-05-07 宜昌市创星电子技术发展有限公司 Portal crane remote control system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102701077A (en) * 2012-06-21 2012-10-03 三一重工股份有限公司 System and method for controlling position of lifting hook of crane, as well as crane
CN102849625A (en) * 2012-06-28 2013-01-02 无锡大力起重机械有限公司 Spreader anti-sway controlling method of overhead traveling crane
CN103723629A (en) * 2013-12-31 2014-04-16 珠海三一港口机械有限公司 Crane and anti-swing control method for steel wire rope of crane
CN103879890A (en) * 2013-12-20 2014-06-25 天津市安维康家科技发展有限公司 Tower crane running status monitoring method and system
CN103991801A (en) * 2014-05-12 2014-08-20 中联重科股份有限公司 Tower crane and anti-swing control method, device and system for lifting hook of tower crane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102701077A (en) * 2012-06-21 2012-10-03 三一重工股份有限公司 System and method for controlling position of lifting hook of crane, as well as crane
CN102849625A (en) * 2012-06-28 2013-01-02 无锡大力起重机械有限公司 Spreader anti-sway controlling method of overhead traveling crane
CN103879890A (en) * 2013-12-20 2014-06-25 天津市安维康家科技发展有限公司 Tower crane running status monitoring method and system
CN103723629A (en) * 2013-12-31 2014-04-16 珠海三一港口机械有限公司 Crane and anti-swing control method for steel wire rope of crane
CN103991801A (en) * 2014-05-12 2014-08-20 中联重科股份有限公司 Tower crane and anti-swing control method, device and system for lifting hook of tower crane

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105438990A (en) * 2015-12-30 2016-03-30 上海佩纳沙士吉打机械有限公司 Self-detection and safety system and method of hydraulic grab
CN105438990B (en) * 2015-12-30 2017-07-21 上海佩纳沙士吉打机械有限公司 Hydraulic grab Autonomous test and security system and method
CN106629400A (en) * 2016-11-16 2017-05-10 北华大学 Intelligent electric anti-swinging control system for container crane
CN106629400B (en) * 2016-11-16 2018-07-10 北华大学 A kind of intelligent container lifting electrical-mechanical swing-proof control system
CN107416680A (en) * 2017-06-07 2017-12-01 天津海运职业学院 A kind of box crossbeam crane gear support
CN112758827A (en) * 2021-01-21 2021-05-07 宜昌市创星电子技术发展有限公司 Portal crane remote control system

Also Published As

Publication number Publication date
CN104495617B (en) 2017-04-19

Similar Documents

Publication Publication Date Title
US9481554B2 (en) Monitoring apparatus and control method of crane hoisting vertical deviation angle
EP2753568B1 (en) Crane control
EP2436640B1 (en) Controlling method, system and device for hook deviation
EP1773706B1 (en) Hoisting-cable drive comprising a single bottom-hook block and two winches
CN104495617B (en) Stability-regulating operating system and stability-regulating method for crane grab
CN101948083A (en) Crane control for controlling a crane&#39;s hoisting gear
US20120168397A1 (en) Hoist apparatus and control method thereof
JPWO2005012155A1 (en) Crane and its controller
CN113200451A (en) Anti-swing control method and travelling crane
WO2015113400A1 (en) Apparatus for steel wire rope swing detection, and hoisting machinery
CN108116989A (en) A kind of Crane control method and system
CN203820210U (en) Multi-rope synergic control system of ultra-deep mine hoist
CN105217454A (en) The anti-sway crashproof control system of a kind of revolving crane lift heavy and control method
CN113382946B (en) Control device for lifting off ground and crane
JP2022508449A (en) Oblique suspension prevention monitoring device and crane that display the swing angle of the hook in real time
CN207877125U (en) A kind of control system of wireless remote control tower crane
CN204848060U (en) Cargo handling manipulator
KR20150032406A (en) A winch system
CN108892046A (en) A kind of Crane control method and control system
CN205012396U (en) Two winding system synchro control devices of diaphragm wall hydraulic grab
CN103669447B (en) Automatic bucket lifting control method, system and device for continuous wall trenching machine
CN103318778B (en) Double-suspension-arm swing arm tower crane and control method thereof
CN202744238U (en) Automatic balance control tower type crane
CN114014164B (en) A crane hook vertical control system and control method thereof
JP2024534139A (en) Tower crane, tower crane operation method, control unit, trolley for tower crane, trolley carriage and use thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant