[go: up one dir, main page]

CN104481549B - Bentonite injection method and system for blocking gushing water and sand - Google Patents

Bentonite injection method and system for blocking gushing water and sand Download PDF

Info

Publication number
CN104481549B
CN104481549B CN201410658969.8A CN201410658969A CN104481549B CN 104481549 B CN104481549 B CN 104481549B CN 201410658969 A CN201410658969 A CN 201410658969A CN 104481549 B CN104481549 B CN 104481549B
Authority
CN
China
Prior art keywords
bentonite
shield
injection
sand
decanting point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410658969.8A
Other languages
Chinese (zh)
Other versions
CN104481549A (en
Inventor
韦丹
范宜
张瑞临
肖羽曼
高伟贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North Heavy Industry Group Co Ltd
Original Assignee
North Heavy Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North Heavy Industry Group Co Ltd filed Critical North Heavy Industry Group Co Ltd
Priority to CN201410658969.8A priority Critical patent/CN104481549B/en
Publication of CN104481549A publication Critical patent/CN104481549A/en
Application granted granted Critical
Publication of CN104481549B publication Critical patent/CN104481549B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Provided is a bentonite injection method and system for blocking gushing water and sand and applied to the technical field of earth pressure balance shield machines. The bentonite slurry is pumped from a first bentonite tank on a rear supporting vehicle to injection points around a shield body of a shield machine through a first quantitative centrifugal pump, the injection points of the shield body are circumferentially and uniformly arranged to provide sufficient and effective propulsion for the tunneling of the shield machine, the bentonite slurry liquid is switched to a foam system by being switched to the same injection opening of a rotary connector and a foam injection system through a control valve to for achieving the independent injection of the bentonite to the outside of a tool plate and completing muck improvement, and the bentonite slurry in an excavation chamber is pumped to a muck vehicle through a second quantitative centrifugal pump. The bentonite injection method and system for blocking gushing water and sand effectively solves the problem that a pressure balance is difficult to establish in the excavation chamber when the shield machine works on a sandy gravel stratum containing abundant moisture so as to effectively avoid road collapse, endangering the personal safety and damaging equipment.

Description

A kind of bentonite method for implanting and system gushing sand for blocking retention of excessive fluid
Technical field
The present invention relates to one of balancing earth-pressure shielding machine technical field is used for blocking the bentonite injection that retention of excessive fluid gushes sand Method and system.
Background technology
At present, when balancing earth-pressure shielding machine meets with sand-pebble layer, aqueous abundant, and permeability of aquifer is stronger, excavates It is difficult to set up earth pressure balance in storehouse, when at this moment easily causing conveying worm casting, retention of excessive fluid gushes the generation of husky event, and causes Road surface subsides, or even work the mischief personal safety and the damage of equipment.Run into rich in water sand cobble in balancing earth-pressure shielding machine During stratum, easily cause the accident of gushing, a kind of bentonite method for implanting gushing sand for blocking retention of excessive fluid that we develop not only can Lubrication shield body, reduces the frictional resistance between shield body and sand, and can effectively block the generation that retention of excessive fluid gushes husky event.Cause This, development is a kind of, and for blocking, retention of excessive fluid gushes the bentonite method for implanting of sand and system is always new problem anxious to be resolved.
Content of the invention
It is an object of the invention to provide a kind of bentonite method for implanting and system gushing sand for blocking retention of excessive fluid, for richness Aqueous sand-pebble layer, shield machine excavates when being difficult to set up earth pressure balance in storehouse, injects bentonite slurry around shield body, stops Subsoil water and fine sand collect and form even surface collapse construction accident of gushing, and inject bentonite slurry in anterior shield pressure-bearing dividing plate, Some centimetres of injection stratum, the gap between embedded cobble is mixed with forming mud film, plays sealing and pressure maintaining effect.
The object of the present invention is achieved like this:A kind of bentonite method for implanting gushing sand for blocking retention of excessive fluid, with shield Structure machine moves ahead, need to by bentonite slurry, the first bentonite tank from rear matching vehicle is pumped to shield machine with the first quantitative centrifugal pump At decanting point around shield body, the volume of the first bentonite tank is 3m3, and the decanting point in shield body is usually the uniform cloth of circumferencial direction Put, such bentonite slurry is mixed with surrounding soil, form thin mud film around shield body, shield body not only can be lubricated, reduce shield Frictional resistance between body and sand, tunneling for shield machine provides more sufficient effective propulsive force, and the thin mud film of formation can hinder Only subsoil water and fine sand collect, and play the effect of sealing, block water and blowout enters in front of shield machine;Another of bentonite system Branch road is the serosity being stirred the second bentonite tank on rear matching vehicle, is pumped into anterior shield pressure-bearing dividing plate with frequency conversion screw Decanting point and the decanting point of foaming system switching, the volume of the second bentonite tank is 7m3;Swelling in the injection of anterior shield pressure-bearing dividing plate Soil paste liquid, can be deep with some centimetres of injection stratum, and the gap between embedded cobble is mixed with forming mud film, plays sealing and pressurize Effect;The bentonite slurry being switched to foaming system is to be switched at swivel joint with foam injection systems altogether by control valve Use identical inlet, realize the independent injection bentonite to outside cutterhead, completing sediment improvement, if meeting with aqueous big stratum, opening Dig the bentonite slurry in storehouse and become sposh shape, it is possible to use the second quantitative centrifugal pump is mixed excavating the bentonite slurry in storehouse with water Compound is retracted on slag-soil truck;A kind of described injected system gushing husky bentonite method for implanting for blocking retention of excessive fluid, including Decanting point around first bentonite tank, the first quantitative centrifugal pump, shield body, the second bentonite tank, frequency conversion screw pump, anterior shield pressure-bearing The decanting point of dividing plate, the decanting point of foaming system switching, the second quantitative centrifugal pump, the first bentonite tank connects via valve, reducing Head and play the expansion joint of adjusting position to the first quantitative centrifugal pump, then by the first quantitative expanded section of centrifugal pump, reducer union, The decanting point to around shield body for the valve, according to the needs of physical location, each connector adopts hard tube or hose connection;Second swelling Native tank via valve, reducer union and expansion joint to frequency conversion screw pump, then by the expanded section of frequency conversion screw pump, 2 reducer unions, Flow transducer, pressure transducer, valve and check valve are to the decanting point of anterior shield pressure-bearing dividing plate, or the note to foaming system switching Access point, each connector adopts hard tube or hose connection;If meeting with aqueous big stratum, the bentonite slurry excavating in storehouse becomes sposh Shape, via valve and expansion joint to the second quantitative centrifugal pump, then being connected in slag-soil truck by expansion joint, hard tube and flexible pipe;Institute A kind of bentonite method for implanting gushing sand for blocking retention of excessive fluid stated, its operation principle is, rich in water sand pebble layer, shield Machine excavates when being difficult to set up earth pressure balance in storehouse, and the decanting point around shield body injects bentonite mud with the first quantitative centrifugal pump Slurry, stops subsoil water and fine sand from collecting and form even surface collapse construction accident of gushing;With frequency conversion screw pump by bentonite mud Slurry is injected into the decanting point of anterior shield pressure-bearing dividing plate, some centimetres of injection stratum, and the gap between embedded cobble is mixed with forming mud Film, plays sealing and pressure maintaining effect, will excavate unnecessary bentonite slurry and aqueous mixtures in storehouse using the second quantitative centrifugal pump It is retracted on slag-soil truck.
The present invention is characterized by its method for implanting and system.Its operation principle is, rich in water sand pebble layer, shield Structure machine excavates when being difficult to set up earth pressure balance in storehouse, and the decanting point around shield body injects bentonite mud with the first quantitative centrifugal pump Slurry, stops subsoil water and fine sand from collecting and form even surface collapse construction accident of gushing;With frequency conversion screw pump by bentonite mud Slurry is injected into the decanting point of anterior shield pressure-bearing dividing plate, some centimetres of injection stratum, and the gap between embedded cobble is mixed with forming mud Film, plays sealing and pressure maintaining effect, will excavate unnecessary bentonite slurry and aqueous mixtures in storehouse using the second quantitative centrifugal pump It is retracted on slag-soil truck.
A kind of for block retention of excessive fluid gush sand bentonite method for implanting and system compared with prior art, have and effectively solve Certainly shield machine meets with sand-pebble layer, aqueous abundant, and permeability of aquifer is stronger, excavates in storehouse and is difficult to set up earth pressure balance, When easily causing conveying worm casting, retention of excessive fluid gushes the generation of husky event, is prevented effectively from road surface and subsides, in addition harm personal safety with And equipment damage the advantages of, will be widely used in balancing earth-pressure shielding machine technical field.
Brief description
Below in conjunction with the accompanying drawings and embodiment the present invention is described in detail.
Fig. 1 is the systematic schematic diagram of the present invention.
Specific embodiment
Referring to the drawings, a kind of bentonite method for implanting gushing sand for blocking retention of excessive fluid, with shield going-forward, need to be with first Quantitative centrifugal pump 2(Power 18.5kW)First bentonite tank 1 from rear matching vehicle for the bentonite slurry is pumped to shield machine shield At decanting point 3 around body, the volume of the first bentonite tank 1 is 3m3, and it is uniform that the decanting point 3 in shield body is usually circumferencial direction Arrangement, such bentonite slurry is mixed with surrounding soil, forms thin mud film around shield body, not only can lubricate shield body, reduces Frictional resistance between shield body and sand, tunneling for shield machine provides more sufficient effective propulsive force, and the thin mud film of formation is permissible Stop subsoil water and fine sand from collecting, play the effect of sealing, block water and blowout enters in front of shield machine;Bentonite system another Bar branch road is the serosity being stirred the second bentonite tank 4 on rear matching vehicle, with frequency conversion screw pump 5(Power 22kW)It is transported to The decanting point 6 of anterior shield pressure-bearing dividing plate and the decanting point 7 of foaming system switching, the volume of the second bentonite tank 4 is 7m3;In anterior shield The bentonite slurry of pressure-bearing dividing plate injection, can be deep with some centimetres of injection stratum, and the gap between embedded cobble is mixed with being formed Mud film, plays sealing and pressure maintaining effect;The bentonite slurry being switched to foaming system is to switch over rotation by control valve to connect Share identical inlet with foam injection systems at head, realize the independent injection bentonite to outside cutterhead, complete sediment improvement, such as Fruit meets with aqueous big stratum, and the bentonite slurry excavating in storehouse becomes sposh shape, it is possible to use the second quantitative centrifugal pump 8(Power 5.5kW)The bentonite slurry excavating in storehouse is retracted on slag-soil truck with aqueous mixtures.
A kind of described injected system gushing husky bentonite method for implanting for blocking retention of excessive fluid, including the first bentonite tank 1(Volume is 3m3), the first quantitative centrifugal pump 2(Power 18.5kW), the decanting point 3 around shield body, the second bentonite tank 4(Volume For 7m3), frequency conversion screw pump 5(Power 22kW), anterior shield pressure-bearing dividing plate decanting point 6, foaming system switching decanting point 7, second Quantitative centrifugal pump 8(Power 5.5kW), the first bentonite tank 1(Volume is 3m3)Via valve, reducer union and an adjusting position Expansion joint is to the first quantitative centrifugal pump 2(Power 18.5kW), then by the first quantitative expanded section of centrifugal pump 2, reducer union, The decanting point 3 to around shield body for the valve, according to the needs of physical location, each connector adopts hard tube or hose connection;Second is swollen Profit native tank 4(Volume is 7m3)Via valve, reducer union and expansion joint to frequency conversion screw pump 5(Power 22kW), then by frequency conversion spiral shell The expanded section of bar pump 5,2 reducer unions, flow transducer, pressure transducer, valve and check valve are to anterior shield pressure-bearing dividing plate Decanting point 6, or the decanting point 7 to foaming system switching, each connector adopts hard tube or hose connection;If meeting with aqueous the earth Layer, the bentonite slurry excavating in storehouse becomes sposh shape, via valve and expansion joint to the second quantitative centrifugal pump 8(Power 5.5kW), Being connected in slag-soil truck by expansion joint, hard tube and flexible pipe again.
A kind of described bentonite method for implanting gushing sand for blocking retention of excessive fluid, its operation principle is, rich in water sand ovum Stone stratum, shield machine excavates in storehouse when being difficult to set up earth pressure balance, the first quantitation centrifugal pump 2 of the decanting point 3 around shield body (Power 18.5kW)Injection bentonite slurry, stops subsoil water and fine sand from collecting and form even surface collapse construction thing of gushing Therefore;With frequency conversion screw pump 5(Power 22kW)Bentonite slurry is injected into the decanting point 6 of anterior shield pressure-bearing dividing plate, if injection stratum Dry centimetre, the gap between embedded cobble is mixed with forming mud film, plays sealing and pressure maintaining effect, using the second quantitative centrifugal pump 8(Power 5.5kW)The unnecessary bentonite slurry excavating in storehouse is retracted on slag-soil truck with aqueous mixtures.

Claims (2)

1. a kind of for block retention of excessive fluid gush sand bentonite method for implanting it is characterised in that:With shield going-forward, need to be with first By bentonite slurry, the first bentonite tank from rear matching vehicle is pumped to the decanting point around shield machine shield body to quantitative centrifugal pump Place, the volume of the first bentonite tank is 3m3, usually circumferencial direction is evenly arranged the decanting point in shield body, such bentonite slurry Liquid is mixed with surrounding soil, forms thin mud film around shield body, not only can lubricate shield body, reduces rubbing between shield body and sand Wipe resistance, tunneling for shield machine provides more sufficient effective propulsive force, the thin mud film of formation can stop subsoil water and fine sand from converging Collection, plays the effect of sealing, blocks water and blowout enters in front of shield machine;Another branch road of bentonite system is by rear matching vehicle On the serosity that is stirred of the second bentonite tank, be pumped into decanting point and the foaming system of anterior shield pressure-bearing dividing plate with frequency conversion screw The decanting point of switching, the volume of the second bentonite tank is 7m3;On the bentonite slurry of anterior shield pressure-bearing dividing plate injection, injection stratum Some centimetres deep, and the gap between embedded cobble is mixed with forming mud film, plays sealing and pressure maintaining effect;It is switched to foaming system Bentonite slurry be by control valve switch at swivel joint with foam injection systems share identical inlet, realize To outside cutterhead, independent injection bentonite, completes sediment improvement, if meeting with aqueous big stratum, the bentonite slurry excavating in storehouse becomes The bentonite slurry excavating in storehouse is retracted on slag-soil truck with aqueous mixtures by sposh shape using the second quantitative centrifugal pump;Described A kind of for blocking the injected system that retention of excessive fluid gushes the bentonite method for implanting of sand, include the first bentonite tank, first quantitatively from Decanting point around heart pump, shield body, the second bentonite tank, frequency conversion screw pump, the decanting point of anterior shield pressure-bearing dividing plate, foaming system are cut The decanting point that changes, the second quantitative centrifugal pump, the first bentonite tank is via valve, reducer union and the expansion joint playing adjusting position To the first quantitative centrifugal pump, then by the decanting point around the first quantitative expanded section of centrifugal pump, reducer union, valve to shield body, According to the needs of physical location, each connector adopts hard tube or hose connection;Second bentonite tank via valve, reducer union and Expansion joint to frequency conversion screw pump, then by the expanded section of frequency conversion screw pump, 2 reducer unions, flow transducer, pressure transducer, Valve and check valve are to the decanting point of anterior shield pressure-bearing dividing plate, or the decanting point to foaming system switching, and each connector adopts hard tube Or it is hose connection;If meeting with aqueous big stratum, the bentonite slurry excavating in storehouse becomes sposh shape, arrives via valve and expansion joint Second quantitative centrifugal pump, then being connected in slag-soil truck by expansion joint, hard tube and flexible pipe.
2. according to claim 1 a kind of for block retention of excessive fluid gush sand bentonite method for implanting it is characterised in that:Its work It is that, rich in water sand pebble layer, shield machine excavates when being difficult to set up earth pressure balance in storehouse, the injection around shield body as principle Point, with the first quantitative centrifugal pump injection bentonite slurry, stops subsoil water and fine sand from collecting and form even surface collapse of gushing and apply Fortification event;With frequency conversion screw pump, bentonite slurry is injected into the decanting point of anterior shield pressure-bearing dividing plate, some centimetres of injection stratum, embedding Enter the gap between cobble to be mixed with forming mud film, play sealing and pressure maintaining effect, storehouse will be excavated using the second quantitative centrifugal pump Interior unnecessary bentonite slurry and aqueous mixtures are retracted on slag-soil truck.
CN201410658969.8A 2014-11-19 2014-11-19 Bentonite injection method and system for blocking gushing water and sand Active CN104481549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410658969.8A CN104481549B (en) 2014-11-19 2014-11-19 Bentonite injection method and system for blocking gushing water and sand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410658969.8A CN104481549B (en) 2014-11-19 2014-11-19 Bentonite injection method and system for blocking gushing water and sand

Publications (2)

Publication Number Publication Date
CN104481549A CN104481549A (en) 2015-04-01
CN104481549B true CN104481549B (en) 2017-02-22

Family

ID=52756141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410658969.8A Active CN104481549B (en) 2014-11-19 2014-11-19 Bentonite injection method and system for blocking gushing water and sand

Country Status (1)

Country Link
CN (1) CN104481549B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593456A (en) * 2016-12-08 2017-04-26 中铁十四局集团隧道工程有限公司 Method for setting shield tunneling machine free in water-rich sand cobble stratum due to stuck cutter
CN108343441A (en) * 2017-12-21 2018-07-31 北方重工装备(沈阳)有限公司 A kind of auxiliary pressurize method for balancing earth-pressure shielding machine
CN109026040A (en) * 2018-08-03 2018-12-18 中国电建集团铁路建设有限公司 A kind of synchronization bi-material layers sediment improvement system for earth pressure balanced shield, EPBS
CN110656656A (en) * 2019-10-21 2020-01-07 吉林大学 Fast and efficient blocking material for groundwater pollution and its application method
CN113153321B (en) * 2021-03-30 2023-03-14 中建八局轨道交通建设有限公司 Muck improvement system for shield construction and construction method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101191417A (en) * 2007-12-21 2008-06-04 沈阳重型机械集团有限责任公司 Bentonite mud water pressurization equilibration shield machine
CN101210494A (en) * 2007-12-24 2008-07-02 沈阳重型机械集团有限责任公司 Gas cushion type mud water pressurization equilibration shield machine
CN101539023B (en) * 2008-03-21 2012-07-04 中铁二局股份有限公司 Shield machine belt pressure chamber opening operation construction method
CN101298837A (en) * 2008-06-23 2008-11-05 沈阳重型机械集团有限责任公司 Apparatus for reducing friction resistance between shield machine shield body and tunneling wall
CN103603670B (en) * 2013-11-21 2019-03-05 上海市基础工程集团有限公司 Ultra-deep earthing shield crossing bad ground construction method

Also Published As

Publication number Publication date
CN104481549A (en) 2015-04-01

Similar Documents

Publication Publication Date Title
CN104481549B (en) Bentonite injection method and system for blocking gushing water and sand
CN104213833B (en) Pipeline Crossing by Horizontal Directional Drilling construction method and rig thereof
JP5163424B2 (en) Groundwater drainage structure and tunnel construction method having the drainage structure
CN107605498B (en) Construction method for horizontal grouting reinforcement structure of end head of shield tunnel in water-rich sandy pebble stratum
CN103899323B (en) A kind of construction method of shield crossing rail yard
CN103362515B (en) Shield structure soil storehouse water under high pressure flushing system
CN105221168B (en) Shield method tunnel construction portal Water sealing method under the conditions of a kind of rich water is buried
CN212223929U (en) Flushing and sucking device for non-drainage sinking construction process of open caisson
CN106320354B (en) The Seepage method on solution cavity development stratum under coating
CN105971614A (en) Shield tunneling machine and shield construction method applied to composite stratum with upper soft portion and lower hard portion
CN109024641A (en) Triple tube double-liquid rotary spray is used for the construction method of deep basal pit leak stopping
CN203924137U (en) Serious seepage block structure of underground continuous wall
CN102230384A (en) Earth pressure balance/ muddy water pressurization continuously-switching shield construction method
CN207194916U (en) A kind of tunneltron curtain steel pipe interlocking structure
CN206246125U (en) A kind of modified earth pressure balanced shield, EPBS hinge seal device
CN108662284A (en) The construction method of small-bore push pipe
CN204940315U (en) A kind of water-stopping system for the large-scale vertical shaft of region of FuShui
CN110259465A (en) A kind of method that list shield double mode TBM pre-grouting reinforces fault belt
CN106437742B (en) Earth pressure balanced shield, EPBS construction is prominent in a kind of rich water country rock gushes prevention device and method
CN208918541U (en) A kind of device for abolishing cutterhead mud cake
CN111042861B (en) A kind of advanced control method for water damage in working face of downhill roadway in coal mine
CN111720130A (en) A shield device and construction method for excavating various sections
KR101867598B1 (en) ahead reaming method of drilling method
CN106285696B (en) Sand-pebble layer rectangular shield top pick earth pressure balance establishes construction method
CN105586978A (en) Construction method of soil replacement stir waterproof curtain based on gravels

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant