- CN104466699A CN104466699A CN201410683332.4A CN201410683332A CN104466699A CN 104466699 A CN104466699 A CN 104466699A CN 201410683332 A CN201410683332 A CN 201410683332A CN 104466699 A CN104466699 A CN 104466699A
- Authority
- CN
- China
- Prior art keywords
- transformer
- switching equipment
- controller switching
- equipment according
- wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/16—Earthing arrangements
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Patch Boards (AREA)
Abstract
本发明提供了一种配电设备,包括变压器和计量箱,变压器与计量箱通过连接电线连接,变压器与计量箱之间的连接电线上设置有地线夹连接部。本发明中的配电设备,在变压器和计量箱之间的连接电线上设置有地线夹连接部,这样,当需更换电流互感器时工作人员便不必再在变压器的低压侧挂地线,进而工作人员不必再登高去接地线了,从而提高了接地效率,减少了操作人员的劳动强度。
The invention provides a power distribution device, which includes a transformer and a metering box. The transformer and the metering box are connected by connecting wires, and the connecting wires between the transformer and the metering box are provided with a ground wire clip connection part. In the power distribution equipment of the present invention, the connecting wire between the transformer and the metering box is provided with a ground clamp connection part, so that when the current transformer needs to be replaced, the staff does not need to hang the ground wire on the low-voltage side of the transformer. Furthermore, the staff no longer need to go up to the grounding wire, thereby improving the grounding efficiency and reducing the labor intensity of the operators.
Description
技术领域technical field
本发明涉及供电领域,具体而言,涉及一种配电设备。The invention relates to the field of power supply, in particular to a power distribution device.
背景技术Background technique
目前,传统的更换计量箱电流互感器的方法需停配电变压器,在配电网变压器低压侧挂地线,来保证操作安全。At present, the traditional method of replacing the current transformer of the metering box needs to stop the distribution transformer and hang the ground wire on the low-voltage side of the transformer in the distribution network to ensure operational safety.
然而,现有技术中的更换电流互感器的方法步骤较为繁琐,且需频繁操作高压侧跌落式保险器,易导致其损坏,同时,增加操作人员的劳动强度,耗时时间较长。However, the method for replacing the current transformer in the prior art is relatively cumbersome, and requires frequent operation of the high-voltage side drop-out fuse, which can easily lead to damage. At the same time, it increases the labor intensity of the operator and takes a long time.
发明内容Contents of the invention
本发明的主要目的在于提供一种配电设备,以解决现有技术中的配电设备更换电流互感器的方法效率较低的问题。The main purpose of the present invention is to provide a power distribution device to solve the problem of low efficiency of the method for replacing a current transformer in the power distribution device in the prior art.
为了实现上述目的,本发明提供了一种配电设备,包括变压器和计量箱,变压器与计量箱通过连接电线连接,变压器与计量箱之间的连接电线上设置有地线夹连接部。In order to achieve the above object, the present invention provides a power distribution equipment, including a transformer and a metering box, the transformer and the metering box are connected by connecting wires, and the connecting wires between the transformer and the metering box are provided with a ground clamp connection part.
进一步地,地线夹连接部为连接电线上的切除绝缘层后的导线裸露部。Further, the connection part of the ground clamp is the exposed part of the wire after the insulation layer is cut off on the connection wire.
进一步地,配电设备还包括防护套,防护套套设在连接电线的地线夹连接部的外侧。Further, the power distribution equipment further includes a protective sleeve, and the protective sleeve is sleeved on the outside of the connecting portion of the ground wire clamp connecting the electric wires.
进一步地,防护套包括包裹部,包裹部为管状,且包裹部上设置有从其一端贯穿到另一端的开口。Further, the protective sheath includes a wrapping part, the wrapping part is tubular, and the wrapping part is provided with an opening penetrating from one end to the other end.
进一步地,防护套还包括把手部,把手部设置在包裹部的一端,且把手部的延伸方向倾斜于包裹部的轴线。Further, the protective cover also includes a handle part, which is arranged at one end of the wrapping part, and the extension direction of the handle part is inclined to the axis of the wrapping part.
进一步地,防护套为绝缘套。Further, the protective sheath is an insulating sheath.
进一步地,防护套为橡胶套。Further, the protective sheath is a rubber sheath.
进一步地,配电设备还包括紧固件,紧固件缠绕在防护套的外侧。Further, the power distribution equipment further includes a fastener, and the fastener is wound on the outer side of the protective cover.
进一步地,计量箱内安装有电流互感器,连接电线的远离变压器的一端的接线头与电流互感器连接。Furthermore, a current transformer is installed in the metering box, and the terminal connecting the end of the wire far away from the transformer is connected to the current transformer.
进一步地,连接电线上的地线夹连接部位于计量箱内。Further, the connection part of the ground clamp on the connecting wire is located in the metering box.
本发明中的配电设备,在变压器和计量箱之间的连接电线上设置有地线夹连接部,这样,当需更换电流互感器时工作人员便不必再在变压器的低压侧挂地线,进而工作人员不必再登高去接地线了,从而提高了接地效率,减少了操作人员的劳动强度。In the power distribution equipment of the present invention, the connection wire between the transformer and the metering box is provided with a ground wire clip connection part, so that when the current transformer needs to be replaced, the staff does not need to hang the ground wire on the low-voltage side of the transformer. Furthermore, the staff no longer need to go up to the grounding wire, thereby improving the grounding efficiency and reducing the labor intensity of the operators.
附图说明Description of drawings
构成本申请的一部分的说明书附图用来提供对本发明的进一步理解,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:The accompanying drawings constituting a part of the present application are used to provide a further understanding of the present invention, and the schematic embodiments and descriptions of the present invention are used to explain the present invention, and do not constitute an improper limitation of the present invention. In the attached picture:
图1示出了本发明的配电设备的结构示意图;Fig. 1 shows the schematic structural diagram of the power distribution equipment of the present invention;
图2示出了防护套的结构示意图;以及Figure 2 shows a schematic structural view of the protective cover; and
图3示出了图2的俯视图。FIG. 3 shows a top view of FIG. 2 .
其中,上述附图包括以下附图标记:Wherein, the above-mentioned accompanying drawings include the following reference signs:
10、变压器;20、计量箱;30、连接电线;31、地线夹连接部;40、防护套;41、包裹部;42、开口;43、把手部;50、电流互感器;60、电杆。10. Transformer; 20. Measuring box; 30. Connecting wire; 31. Ground clamp connection part; 40. Protective sleeve; 41. Wrapping part; 42. Opening; 43. Handle part; 50. Current transformer; 60. Electric pole.
具体实施方式Detailed ways
需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本发明。It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and examples.
本发明提供了一种配电设备,请参考图1至图3,该配电设备包括变压器10和计量箱20,变压器10与计量箱20通过连接电线30连接,变压器10与计量箱20之间的连接电线30上设置有地线夹连接部31。The present invention provides a power distribution equipment, please refer to Figures 1 to 3, the power distribution equipment includes a transformer 10 and a metering box 20, the transformer 10 and the metering box 20 are connected by connecting wires 30, between the transformer 10 and the metering box 20 The connecting wire 30 is provided with a ground clip connection portion 31 .
本发明中的配电设备,在变压器10和计量箱20之间的连接电线30上设置有地线夹连接部31,这样,当需更换电流互感器时工作人员便不必再在变压器10的低压侧挂地线,进而工作人员不必再登高去接地线了,从而提高了接地效率,减少了操作人员的劳动强度。In the power distribution equipment in the present invention, the connection wire 30 between the transformer 10 and the metering box 20 is provided with a ground clamp connection part 31, so that when the current transformer needs to be replaced, the staff does not need to check the low voltage of the transformer 10. The grounding wire is hung on the side, so that the staff no longer have to go up to the grounding wire, thereby improving the grounding efficiency and reducing the labor intensity of the operator.
优选地,地线夹连接部31为连接电线30上的切除绝缘层后的导线裸露部。Preferably, the connection part 31 of the ground clamp is an exposed part of the wire on the connection wire 30 after cutting off the insulating layer.
本发明预先在计量箱20进线电缆与电流互感器50筛网连接分叉处做“破口”,在更换的互感器上方用计量换表专用地线夹在“破口”做接地保护,无需停高压侧保险器,减少了对保险器的频繁操作。In the present invention, a "break" is made in advance at the connection bifurcation of the incoming cable of the metering box 20 and the screen of the current transformer 50, and the special ground wire for metering and meter replacement is clamped on the "break" above the replaced transformer for grounding protection. There is no need to stop the fuse on the high-voltage side, which reduces the frequent operation of the fuse.
优选地,配电设备还包括防护套40,防护套40套设在连接电线30的地线夹连接部31的外侧。本申请通过制作防护套40,并将其套设在连接电线30的地线夹连接部31上,可保证在正常运行时安全供电。Preferably, the power distribution equipment further includes a protective sheath 40 , and the protective sheath 40 is sheathed on the outside of the connection portion 31 of the ground clamp connecting the wire 30 . In the present application, by making the protective sheath 40 and sheathing it on the connection part 31 of the ground wire clip connecting the wire 30, it can ensure safe power supply during normal operation.
优选地,防护套40包括包裹部41,包裹部41为管状,且包裹部41上设置有从其一端贯穿到另一端的开口42。将包裹部41套设在地线夹连接部31上,以包裹住裸露的导线。Preferably, the protective sheath 40 includes a wrapping part 41, which is tubular, and the wrapping part 41 is provided with an opening 42 penetrating from one end to the other end. The wrapping part 41 is sheathed on the connection part 31 of the ground wire clamp to wrap the exposed wire.
优选地,防护套40还包括把手部43,把手部43设置在包裹部41的一端,且把手部43的延伸方向倾斜于包裹部41的轴线。通过设置把手部43,可以比较方便地拆卸下防护套40。Preferably, the protective cover 40 further includes a handle portion 43 disposed at one end of the wrapping portion 41 , and the extending direction of the handle portion 43 is inclined to the axis of the wrapping portion 41 . By providing the handle portion 43, the protective cover 40 can be disassembled more conveniently.
优选地,防护套40为绝缘套。这样,可以比较方便地保护地线夹连接部31,进而保证供电安全。Preferably, the protective sheath 40 is an insulating sheath. In this way, the connection portion 31 of the ground clamp can be protected more conveniently, thereby ensuring the safety of power supply.
优选地,防护套40为橡胶套。Preferably, the protective cover 40 is a rubber cover.
优选地,配电设备还包括紧固件,紧固件缠绕在防护套40的外侧。这样,可以比较方便地紧固该防护套40,使其固定在地线夹连接部31的外侧。Preferably, the power distribution equipment further includes fasteners wound around the outer side of the protective cover 40 . In this way, the protective cover 40 can be fastened more conveniently so that it is fixed on the outside of the connecting portion 31 of the ground wire clip.
优选地,计量箱20内安装有电流互感器50,连接电线30的远离变压器10的一端的接线头与电流互感器50连接。Preferably, a current transformer 50 is installed in the metering box 20 , and the terminal connected to the end of the wire 30 away from the transformer 10 is connected to the current transformer 50 .
优选地,连接电线30上的地线夹连接部31位于计量箱20内。这样,可以保证供电的安全进行。Preferably, the ground clip connection portion 31 on the connecting wire 30 is located in the metering box 20 . In this way, the safe operation of power supply can be guaranteed.
在本申请中,变压器10安装在电杆60上。配电设备包括三根连接电线30,且三根连接电线30上均设置有地线夹连接部31。In this application, the transformer 10 is installed on the pole 60 . The power distribution equipment includes three connecting wires 30 , and each of the three connecting wires 30 is provided with a ground clamp connecting portion 31 .
本申请采取在进线电缆与电流互感器连接分叉处做“破口”实现挂地线方式的改进,从而达到简化操作、减轻工作人员劳动强度的目的。This application adopts the improvement of the way of hanging the ground wire by making a "break" at the bifurcation where the incoming cable and the current transformer are connected, so as to achieve the purpose of simplifying the operation and reducing the labor intensity of the staff.
本申请完成“破口”部位的恢复原件的研究和制作,保证“破口”部位在日常运行时能够保证导线的耐腐蚀性和绝缘性,做到安全、稳定供电。This application completes the research and production of the restored original parts of the "break" part to ensure that the "break" part can ensure the corrosion resistance and insulation of the wires during daily operation, and achieve safe and stable power supply.
从以上的描述中,可以看出,本发明上述的实施例实现了如下技术效果:From the above description, it can be seen that the above-mentioned embodiments of the present invention have achieved the following technical effects:
(1)通过对本项目的方法改进,可在更换低压计量箱20的电流时无需停高压侧保险器,减少了对保险器的频繁操作;(1) By improving the method of this project, it is not necessary to stop the high-voltage side fuse when the current of the low-voltage metering box 20 is replaced, reducing the frequent operation of the fuse;
(2)将挂地线的位置由配电变压器架构上改进至计量箱20内,免去了工作人员上杆的辛苦,较大程度上保证了施工安全;(2) The position of hanging the ground wire is improved from the structure of the distribution transformer to the inside of the metering box 20, which saves the labor of the staff on the pole, and ensures the construction safety to a large extent;
(3)由于低压计量箱在配电环节应用广泛,如果改造成本过高则造成方法不合实际,无法推广;(3) Since low-voltage metering boxes are widely used in power distribution, if the transformation cost is too high, the method will be unrealistic and cannot be promoted;
(4)本项目在不增加日常开支,以较小的改造成本获取了较大的经济效益。(4) This project has obtained greater economic benefits with a relatively small renovation cost without increasing daily expenses.
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410683332.4A CN104466699A (en) | 2014-11-24 | 2014-11-24 | Power distribution equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410683332.4A CN104466699A (en) | 2014-11-24 | 2014-11-24 | Power distribution equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104466699A true CN104466699A (en) | 2015-03-25 |
Family
ID=52912306
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410683332.4A Pending CN104466699A (en) | 2014-11-24 | 2014-11-24 | Power distribution equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104466699A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105388341A (en) * | 2015-11-27 | 2016-03-09 | 国网北京市电力公司 | Metering box |
-
2014
- 2014-11-24 CN CN201410683332.4A patent/CN104466699A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105388341A (en) * | 2015-11-27 | 2016-03-09 | 国网北京市电力公司 | Metering box |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204012038U (en) | A kind of earthing device | |
CN104466783A (en) | Protecting device for alive circuit and insulating protection method | |
CN201075318Y (en) | Insulator string electrical arc discharge apparatus | |
CN203859248U (en) | Short circuit grounding device used for overhead line maintenance | |
CN104466699A (en) | Power distribution equipment | |
CN204905469U (en) | Distribution lines overhauls protective earthing device | |
CN204376210U (en) | Controller switching equipment | |
CN204144790U (en) | Two cross-arm conductor leading supports fixed insulation device | |
CN201576903U (en) | High-voltage flow-leading shield cover for live working | |
CN205828033U (en) | Dew-point-proof transmission line insulation sheath | |
CN103852609B (en) | Metering box, ground wire hitching method of the metering box, and replacement method of current transformer of the metering box | |
CN204332890U (en) | Drop-out fuse with electrometric grounding device | |
CN204302325U (en) | For the High-Voltage Insulation standard trolley of leakage conductor high direct voltage test | |
CN104682311A (en) | Lightning protection overhead line | |
JP5850813B2 (en) | Coaxial cable connection device for feeding | |
CN106848632A (en) | Wire sheath, the method for wiring | |
CN106207530A (en) | The complete thread guide devices in a kind of 10KV transformer platform area | |
CN201629187U (en) | Lightning protection insulators for transmission lines | |
CN205139207U (en) | Metering tank | |
CN205178076U (en) | Connection lug and have its earth connection | |
CN206224029U (en) | Storage rack for redundant optical cable | |
CN204241732U (en) | An optical cable transfer box with a grounding device | |
CN203674560U (en) | a tower | |
CN111293626A (en) | A live replacement method based on lightning protection device | |
CN204720264U (en) | Low-voltage electric attaching insulating sleeve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |