CN1044142A - 桩腿式海洋平台安装中桩腿的安装方法和安装装置 - Google Patents
桩腿式海洋平台安装中桩腿的安装方法和安装装置 Download PDFInfo
- Publication number
- CN1044142A CN1044142A CN90100117A CN90100117A CN1044142A CN 1044142 A CN1044142 A CN 1044142A CN 90100117 A CN90100117 A CN 90100117A CN 90100117 A CN90100117 A CN 90100117A CN 1044142 A CN1044142 A CN 1044142A
- Authority
- CN
- China
- Prior art keywords
- spud leg
- skewed slot
- platform
- conduit
- pile driving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02B17/021—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0039—Methods for placing the offshore structure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/006—Platforms with supporting legs with lattice style supporting legs
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0056—Platforms with supporting legs
- E02B2017/0073—Details of sea bottom engaging footing
- E02B2017/0082—Spudcans, skirts or extended feet
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T403/00—Joints and connections
- Y10T403/45—Flexibly connected rigid members
- Y10T403/455—Elastomer interposed between radially spaced members
- Y10T403/458—Composite bushing with elastomeric component
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Earth Drilling (AREA)
- Foundations (AREA)
- Revetment (AREA)
Abstract
一种采油平台之类桩腿式海洋平台安装中桩腿的安装方法,其中各桩腿是穿过装在平台底座上或作为平台底座一部分的桩腿导管而打入海底。还有一种实施该方法的装置,该装置由一根或一根以上斜槽组成,斜槽的横剖面成C形或U形,该斜槽从桩腿导管的上端部以适当斜度向上倾斜伸展,其上方处于桩腿自由悬吊时桩腿尖头所在位置之下。这样可用普通的钻井平台安装较小型的平台,从而大大节省费用也能节约时间。
Description
本发明涉及采油平台之类桩腿式海洋平台安装中桩腿的安装方法,其中桩腿穿过装在平台底座上的桩腿导管而打入海底。
以往这种类型的海洋平台是用巨型浮吊吊装的,浮吊把由驳船运到钻井位置处的平台慢慢放入水中,再使各底座桩腿插入平台的各导管中,浮吊还把重锤、振动器之类打桩装置吊起,把各桩腿打入海底。但是,这类浮吊在全世界为数不多,而且这类浮吊的租用费极高,此外当装设平台时不得不等待很长时间;对于较小型海洋平台,装设费用尤其昂贵。
本发明的目的是提出一种桩腿安装方法,以使较小型平台能以比过去低得多的费用装设,也不再为等待专用浮吊到来而空耗很多时间。
本发明所提出的桩腿安装方法的特点如下:各桩腿分别由处于钻井位置的钻井平台上的井架上的绞车提升到平台上方适当位置,此时桩腿由绞车的提升缆绳自由悬吊在空中,该桩腿距平台中心轴的距离最好小于距相应的桩腿导管上端的距离;然后放下桩腿,使桩尖头向外、向下倾斜着朝桩腿导管的上端部移动,桩尖头进入桩腿导管的上端部;接着桩腿继续向下移动,进入桩腿导管,触到海底;最后由悬挂在绞车缆索上的打桩装置向海底打入所需的深度;当打桩装置打好后提升时,打桩装置的下端部最好要向内、向上倾斜着出来,直至打桩装置自由地悬挂在绞车缆索上。这样就可以用钻井用的普通钻井平台来安装较小型的平台。一般来说,在钻井位置上或其附近有这种钻井平台可以供使用,因而用它来安装平台比用上述巨型浮吊要便宜得多,可不必等待浮吊的到来,也省去巨型浮吊的租金。
作为本发明的一种最简单易行的方法是:随着桩腿放下,该桩腿的尖头起先向外、向下倾斜着朝桩腿导管的上端部移动,最后桩尖头进入该上端部;其间桩尖头是沿着一根剖面为C形或U形的斜槽滑动的,该斜槽从桩腿导管的上端部以适当斜度向上倾斜着伸展,该斜槽的上方处于桩腿自由悬吊时桩腿尖头所在位置之下。
根据本发明的方法,用来把桩腿打入海底的打桩装置(用不断冲击或振动)也是由井架上的绞车提升到适当位置,该位置大体在所冲打的桩腿顶部的正上方,然后打桩装置下落,与桩顶接触,逐渐把桩腿打进海底下所需深度;打好以后,打桩装置又被提升起来,在提升过程中最好使打桩装置的下端部沿斜槽向上滑动,直到打桩装置自由地悬挂在绞车缆索之下。由于这样,钻井装置就同样也可以用来打桩;而如果不用本发明所提出方法,则打桩装置(或许是一个长16~18米、重300~500吨的重锤)在脱离桩腿顶端时会猛烈並危险地发生摇晃。
本发明还涉及一种实施上述方法的装置。根据本发明,这种装置具有如下特征:它由一根或一根以上斜槽组成,斜槽的横剖面成C形或U形,该斜槽从桩腿导管的上端部以适当斜度向上倾斜着伸展,其上方处于桩腿自由悬吊时桩腿尖头所在位置之下。这种装置十分有效,而且结构简单、造价低,可以在制造平台过程中在陆上一起制造好。
根据本发明,斜槽相对于水平面的倾斜角可以在20°~70°之间选择,但以40°~60°为好,而最好的是在45°~55°之间。在上述倾斜角范围内,桩腿的尖头就可以在自重的作用下自动沿斜槽下滑,直到它与导管的上端部相碰。
根据本发明,斜槽可以固定安装在平台之上,这样,由于当平台放置在海底上时所有斜槽已固定在正确的安装位置上,就不必再花安装费用;但是斜槽也可以在使用时临时装上去,用完后拆下,这样,一根斜槽就可以重复用来安装多根桩腿;最后这根斜槽可以安装到在平台(例如钻井平台),附近的另一个结构上所以本发明的方法也可以应用于並不装有斜槽的平台的安装上。
后面将结合下列附图对本发明作更充分的介绍:
图1~8表示用本发明方法安装平台时各操作步骤;
图9是平台的侧视图,平台上装有斜槽和桩腿导管,在其中之一中插有一底座桩腿;
图10是图9所示的平台的一部分的放大侧视图,斜槽装在加强管上;
图11是图10中沿Ⅺ-Ⅺ线的穿过斜槽和加强管的更大比例的剖面图;
图12是斜槽与桩腿导管之间连接部的顶视图。
图1~8简略表示了平台(用编号1表示)是如何用钻井平台(用编号2表示)成功地安装起来的。钻井平台2通常有三条或四条桩腿,而在图1中只画出两条桩腿,在只表示钻井平台前部结构的图2~8各图中只画出一条桩腿。钻井平台装置有一钻台20,当桩腿上收时钻台能浮在水面上。而当钻井平台工作时,各桩腿10下伸,于是整个钻井平台就支立在海底上,而钻台20处在海面9之上。悬架在钻井位置上方的钻台区段21之上有井架3,该井架以人所共知的方法在钻井位置上钻出一个或多个井。为此,在井架3上装有或连接有绞车4,绞车4上有提升缆索5;绞车具有巨大的提升能力,通过适当的传动可以提升起重量通常远不足1000吨的较小型平台。
图1~8中所示的平台1就是一种能由绞车提升起的较小型平台。在图1中,平台已由驳船11运到井架3之下,並已与提升缆索5固接住。在图2中,驳船11已被拖走,吊挂在缆索5上的平台已下降在海面9以下一段距离。在图3中,平台1已放置在海底10之上,等待安装底座桩腿。
这些桩腿已用同一艘驳船随同平台运到或用另一艘驳船单独运到。图4中的一根桩腿6已固接在提升缆索上,並已向上提升了一段距离。图5中,桩腿已由提升缆索自由地悬吊在平台上方,並准备插入桩腿导管12之中,后者固定在平台底座16之上或成为平台底座16的一部分。钻井平台2的悬伸的钻台区段21水平方向的面积很有限,宽度约8米,悬伸距离约13米;这样大的面积对于井架用来钻井时是足够使井架正确地处于钻井位置之上,但如要把桩腿6垂直地悬吊在桩腿导管12的顶端13的上方就显得不足,因为为了保证稳定性,桩腿在悬吊过程中要远离井架的工作范围之外。
为此,根据本发明,桩尖8被强行引导通过井架的工作范围,最后在桩腿6下降过程中使桩尖头插入导管12的顶端13。参见图6,桩腿倾斜地悬吊着,其桩头7固接在提升缆索5上,处于井架的工作范围之内,而桩尖头8插在处在井架工作范围之外的导管12的顶端13内。
图10、11和12表示用来安装桩腿的装置的一种推荐方案;该装置由若干根斜槽15组成,每根斜槽安装在平台底座16的加强管17之上,斜槽从桩腿导管12的顶端13处向上、向内倾斜,该斜槽处在桩腿开始下降之前桩尖头8所在位置之下适当距离处。
当桩腿6下降时,桩尖头8首先接触斜槽15的底部;如图11所示,斜槽的剖面呈C形,但同样还可以采用U形、V形或其它任何适当的剖面形状,关键是当桩尖与斜槽的底部接触之后桩尖能可靠地沿斜槽横向移动。
如图10所示,斜槽相对于水平面成一适当的倾斜角,该倾斜角可以在20°~70°之间选择,但以40°~60°之间为好,而最好的是在45°~55°之间;在上述倾斜角范围内,桩尖就可以如图10中虚线所示那样下滑,直到它与导管的上端部相碰;导管上端部结构如图10和图12所示;为能更好地容纳桩尖,导管端部是向上扩大的。随着桩腿继续下降,桩腿逐渐插入导管12之中,最后桩腿就碰到海底,此时提升缆索就从桩头上解下来。从图10可以看出,桩腿导管与平台的中心轴线之间有一夹角,该夹角选为6°~12°之间比较适当,这样可以使桩头仍在井架的工作范围之内,而桩腿的导管则超出工作范围之外。
然后,利用悬吊在绞车4的提升缆索上的适当的打桩装置,通过反复冲打或振动,把桩腿打进海底。在图7中,打桩装置14悬吊在平台1之上,並且大体上在桩头7的正上方;而桩头的位置,正如上面所说那样,是在井架3的工作范围之内。当打桩装置14下落时,打桩装置就撞在桩头7上,于是桩腿就在打桩装置14的作用下向海底10打进所需的深度。当桩腿正向下打的时候,打桩装置14被桩头7移到井架的工作范围之外,並倾斜地悬吊在提升缆索5之下(如图8所示)。如果打桩装置在这个位置脱开桩头,它就会猛烈摇晃;考虑到重锤之类打桩装置通常长达16~18米、重达300~500吨,这种摇晃是非常危险和具有破坏性的。
在采用本发明的情况下,当把打桩装置14提升起来时,其下端部起先有引导地向上、向内倾斜着移动,一直到打桩装置自由地悬吊在提升缆索之下並处于自然平衡状态。作为本发明的推荐方法,打桩装置的下端部沿着斜槽15向上滑动,其情况与桩尖头8沿斜槽15滑入桩腿导管12的上端部13时一样,只是方向相反。
在图9中画出的是一座要安装三条桩腿的平台1。这三条桩腿6中的一条已放入处于图右侧的桩腿导管12之中,並差不多已被重锤14向海底10打进所需深度。当完成打桩以后,重锤就脱离桩头7,而当把重锤提升时,重锤的下部就靠在斜槽上,随着提升缆索提升而沿斜槽上滑(如图中虚线所示),最后重锤稳定地自由地垂直悬吊在提升缆索上(图中未表示出)。这样就确保重锤的桩头脱离时不会像大钟摆那样撞到平台上,把平台碰坏。
从上可以看出,在采用本发明的情况下,就可以用钻井平台来完成较小型海洋平台在海底的全部安装工作,通常在钻井位置处有这种钻井平台,这样就能大大节省费用,在时间上往往也能节约。
在图10、11和12所示的推荐方案中,各斜槽15是固定安装在平台的底座上的,为每根桩腿导管都装有一根导槽;所以,在平台放在海底后立即可以开始安装工作。但是,斜槽也可以采用可拆装的方式装到平台的底座上,从而一根斜槽可用来安装多根导管;斜槽也可以安装在平台的其它类型的结构上,从而本发明的方法和装置也可以用于本来没有斜槽的平台的安装。
本发明的各种推荐方案在上面作了叙述,並表示在附图中,但这些方案仅仅是作为例子列举的。许多其它的方案仍在本发明的权利要求范围之内。比如,桩尖和打桩装置的下端部可以用缆索装置来控制和导向,而不是用斜槽。
Claims (8)
1、采油平台之类桩腿式海洋平台安装中桩腿的安装方法,其中各桩腿是穿过装在平台底座上的桩腿导管而打入海底;本方法的特征在于:各桩腿分别由处于钻井位置的钻井平台上的井架上的绞车提升到平台上方适当位置,此时桩腿由绞车的提升缆索自由悬吊在空中,该桩腿距平台中心轴的距离最好小于距相应的桩腿导管上端的距离;然后放下桩腿,使桩尖头向外、向下倾斜着朝桩腿导管的上端部移动,最后桩尖头进入桩腿导管的上端部;接着桩腿继续向下移动,进入桩腿导管,触到海底;最后由悬挂在绞车缆索上的打桩装置打入所需的深度;当打桩装置打好桩后提升时,打桩装置的下端部最好要向内、向上倾斜着出来,直至打桩装置自由地悬吊在绞车缆索上。
2、根据权利要求1中的方法,其特征是:随着桩腿放下,该桩腿的尖头起先向外、向下倾斜着朝桩腿导管的上端部移动,最后桩尖头进入该上端部;其间桩尖头是沿着一根剖面为C形或U形的斜槽滑动的,该斜槽从桩腿导管的上端部以适当斜度向上倾斜着伸展,该斜槽的上方处于桩腿自由悬吊时桩腿尖头所在位置之下。
3、根据权利要求1和2中的方法,其特征是:用来把桩腿打入海底的打桩装置(通过不断冲击或振动)也是由井架上的绞车提升到适当位置,该位置大体在所冲打的桩腿顶部的正上方,然后打桩装置下落,与桩顶接触,逐渐把桩腿打进海底下所需深度;打好以后,打桩装置又被提升起来,在提升过程中最好使打桩装置的下端部沿斜槽向上滑动,直到打桩装置自由地悬吊在绞车缆索之下。
4、一种用来实施权利要求1、2、3所述的方法的装置,其特征是:它由一根或一根以上斜槽组成,斜槽的横剖面成C形或U形,该斜槽从桩腿导管的上端部以适当斜度向上倾斜着伸展,其上方处于桩腿自由悬吊时桩腿尖头所在位置之下。
5、根据权利要求4所述的装置,其特征是:斜槽相对于水平面的倾斜角可以在20°~70°之间选择,但以40°~60°为好,而最好在45°~55°之间。
6、根据权利要求4或5所述的装置,其特点是斜槽固定安装在平台之上。
7、根据权利要求4或5所述的装置,其特点是斜槽可临时装上去、用后可拆下。
8、根据权利要求4或5所述的装置,其特点是斜槽安装在平台(例如钻井平台)附近的另一个结构上。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DK011289A DK164516C (da) | 1989-01-11 | 1989-01-11 | Fremgangsmaade og indretning til at anbringe de til installation af en paelefunderet off-shore platform hoerende paele |
DK0112/89 | 1989-01-11 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1044142A true CN1044142A (zh) | 1990-07-25 |
CN1021660C CN1021660C (zh) | 1993-07-21 |
Family
ID=8089884
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN90100117A Expired - Fee Related CN1021660C (zh) | 1989-01-11 | 1990-01-10 | 安装海洋平台桩腿的方法和装置 |
Country Status (23)
Country | Link |
---|---|
US (1) | US5127767A (zh) |
EP (1) | EP0453487B1 (zh) |
JP (1) | JPH04502655A (zh) |
KR (1) | KR910700382A (zh) |
CN (1) | CN1021660C (zh) |
AR (1) | AR241028A1 (zh) |
AU (1) | AU625282B2 (zh) |
BR (1) | BR9007017A (zh) |
CA (1) | CA2044587A1 (zh) |
DE (1) | DE69004683D1 (zh) |
DK (1) | DK164516C (zh) |
EG (1) | EG19118A (zh) |
GR (1) | GR1000976B (zh) |
IE (1) | IE900021L (zh) |
LT (1) | LTIP1614A (zh) |
LV (1) | LV10321A (zh) |
MX (1) | MX174503B (zh) |
MY (1) | MY105243A (zh) |
OA (1) | OA09380A (zh) |
PT (1) | PT92809A (zh) |
TR (1) | TR25433A (zh) |
WO (1) | WO1990008232A1 (zh) |
YU (1) | YU47552B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102720197A (zh) * | 2012-07-05 | 2012-10-10 | 南通中远船务工程有限公司 | 自升式风电安装船桩腿翻身吊装方法 |
CN104963327A (zh) * | 2015-07-09 | 2015-10-07 | 中国石油天然气集团公司 | 导管架 |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5051037A (en) * | 1990-09-10 | 1991-09-24 | Mcdermott International, Inc. | Tower with folding braces for fixed offshore platform |
NL9300899A (nl) * | 1992-06-02 | 1994-01-03 | Kvaerner Earl & Wright | Offshore constructie. |
US5527136A (en) * | 1994-07-05 | 1996-06-18 | Halliburton Company | Mono-tripod platform |
GB2292405B (en) * | 1994-08-19 | 1998-05-06 | Mcdermott Int Inc | Offshore structures |
US6039507A (en) * | 1998-06-26 | 2000-03-21 | Atlantic Richfield Company | Method and device for assembling cluster platforms |
US6910831B2 (en) * | 2002-03-08 | 2005-06-28 | Exxonmobil Upstream Research Company | Method for installing a pile anchor |
CN100465578C (zh) * | 2007-10-18 | 2009-03-04 | 大连船舶重工集团有限公司 | 大型桁架式桩腿分段数据检测方法 |
GB0902289D0 (en) * | 2009-02-12 | 2009-03-25 | Marine Current Turbines Ltd | Methods for installing pin-piled jacket type structures at sea |
CA2765046C (en) * | 2009-06-10 | 2014-04-08 | Keystone Engineering, Inc. | Offshore support structure and associated method of installing |
GB201106783D0 (en) * | 2011-04-21 | 2011-06-01 | Fast Frames Uk Ltd | Method and apparatus for driving a pile into a substrate |
CN103243732A (zh) * | 2012-02-01 | 2013-08-14 | 天津市海王星海上工程技术有限公司 | 一种海上测风塔基础结构的安装方法 |
US9663916B2 (en) * | 2012-02-03 | 2017-05-30 | Vallourec Deutschland Gmbh | Foundation structure of an offshore plant, in particular an offshore wind turbine, which foundation structure is to be installed at a low noise level, and installation method therefor |
DE102012010205A1 (de) * | 2012-05-10 | 2013-11-14 | Stiftung Alfred-Wegener-Institut Für Polar- Und Meeresforschung | Standstruktur |
CN102777127B (zh) * | 2012-06-20 | 2015-03-25 | 南阳二机石油装备(集团)有限公司 | 液压旋升船型底座 |
CN102728980B (zh) * | 2012-07-05 | 2014-12-10 | 南通中远船务工程有限公司 | 一种八边形桩腿合拢限位定位方法 |
CN103953020B (zh) * | 2014-04-01 | 2017-01-25 | 武汉船用机械有限责任公司 | 一种用于海洋升降平台的插销桩腿 |
CN105084195B (zh) * | 2015-08-27 | 2017-09-01 | 上海外高桥造船有限公司 | 桩腿移位方法 |
CN114620196B (zh) * | 2022-03-31 | 2023-02-21 | 中海石油(中国)有限公司 | 导管架浮筒装置及带有浮筒装置三腿导管架安装方法 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3387460A (en) * | 1966-05-20 | 1968-06-11 | Dorothy N. Morris | Magnetic pile stabbing apparatus and method |
US3483708A (en) * | 1967-12-28 | 1969-12-16 | Shell Oil Co | Method of anchoring marine structures |
US3670507A (en) * | 1970-09-17 | 1972-06-20 | Texaco Inc | Marine drilling structure with curved drill conductor |
US3751930A (en) * | 1971-12-27 | 1973-08-14 | Texaco Inc | Articulated marine structure with prepositioned anchoring piles |
US4033139A (en) * | 1974-02-08 | 1977-07-05 | Frederick Leonard L | Pile driving hammer, apparatus and method |
US3991581A (en) * | 1975-06-02 | 1976-11-16 | Brown & Root, Inc. | Method and apparatus for handling piling and anchoring an offshore tower |
NL160353C (nl) * | 1976-07-05 | 1979-10-15 | Hollandsche Betongroep Nv | Werkwijze en inrichting voor het op de zeebodem vastzetten van een ondersteuning. |
DE3338137A1 (de) * | 1983-10-20 | 1985-05-09 | Hochtief AG, 4300 Essen | Verfahren zur pfahlgruendung von bohr- und/oder produktionsplattformen, sowie vorrichtung zur durchfuehrung desselben |
US4720214A (en) * | 1986-05-21 | 1988-01-19 | Shell Offshore Inc. | Mudmat design |
-
1989
- 1989-01-11 DK DK011289A patent/DK164516C/da not_active IP Right Cessation
- 1989-12-22 GR GR890100857A patent/GR1000976B/el unknown
- 1989-12-25 YU YU244789A patent/YU47552B/sh unknown
-
1990
- 1990-01-03 IE IE900021A patent/IE900021L/xx unknown
- 1990-01-05 MY MYPI90000013A patent/MY105243A/en unknown
- 1990-01-09 PT PT92809A patent/PT92809A/pt not_active Application Discontinuation
- 1990-01-10 KR KR1019900701986A patent/KR910700382A/ko not_active Application Discontinuation
- 1990-01-10 AR AR315919A patent/AR241028A1/es active
- 1990-01-10 BR BR909007017A patent/BR9007017A/pt not_active Application Discontinuation
- 1990-01-10 CA CA002044587A patent/CA2044587A1/en not_active Abandoned
- 1990-01-10 US US07/720,434 patent/US5127767A/en not_active Expired - Fee Related
- 1990-01-10 JP JP2502311A patent/JPH04502655A/ja active Pending
- 1990-01-10 TR TR90/0098A patent/TR25433A/xx unknown
- 1990-01-10 AU AU49529/90A patent/AU625282B2/en not_active Ceased
- 1990-01-10 EP EP90902168A patent/EP0453487B1/en not_active Expired - Lifetime
- 1990-01-10 WO PCT/DK1990/000008 patent/WO1990008232A1/en active IP Right Grant
- 1990-01-10 DE DE90902168T patent/DE69004683D1/de not_active Expired - Lifetime
- 1990-01-10 EG EG1490A patent/EG19118A/xx active
- 1990-01-10 CN CN90100117A patent/CN1021660C/zh not_active Expired - Fee Related
- 1990-01-10 MX MX019071A patent/MX174503B/es unknown
-
1991
- 1991-07-11 OA OA60039A patent/OA09380A/xx unknown
-
1992
- 1992-12-17 LV LV920321A patent/LV10321A/xx unknown
-
1993
- 1993-12-16 LT LTIP1614A patent/LTIP1614A/xx not_active Application Discontinuation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102720197A (zh) * | 2012-07-05 | 2012-10-10 | 南通中远船务工程有限公司 | 自升式风电安装船桩腿翻身吊装方法 |
CN102720197B (zh) * | 2012-07-05 | 2014-07-02 | 南通中远船务工程有限公司 | 自升式风电安装船桩腿翻身吊装方法 |
CN104963327A (zh) * | 2015-07-09 | 2015-10-07 | 中国石油天然气集团公司 | 导管架 |
Also Published As
Publication number | Publication date |
---|---|
EP0453487B1 (en) | 1993-11-18 |
LTIP1614A (en) | 1995-07-25 |
JPH04502655A (ja) | 1992-05-14 |
PT92809A (pt) | 1990-07-31 |
YU47552B (sh) | 1995-10-03 |
MY105243A (en) | 1994-08-30 |
DK11289D0 (da) | 1989-01-11 |
MX174503B (es) | 1994-05-20 |
AR241028A1 (es) | 1991-04-30 |
DE69004683D1 (de) | 1993-12-23 |
YU244789A (sh) | 1994-06-10 |
DK164516C (da) | 1992-11-23 |
DK11289A (da) | 1990-07-12 |
WO1990008232A1 (en) | 1990-07-26 |
EP0453487A1 (en) | 1991-10-30 |
IE900021L (en) | 1990-07-11 |
OA09380A (en) | 1992-09-15 |
GR1000976B (el) | 1993-03-31 |
TR25433A (tr) | 1993-03-01 |
EG19118A (en) | 1994-10-30 |
AR241028A2 (es) | 1991-04-30 |
US5127767A (en) | 1992-07-07 |
CA2044587A1 (en) | 1990-07-12 |
AU4952990A (en) | 1990-08-13 |
AU625282B2 (en) | 1992-07-09 |
CN1021660C (zh) | 1993-07-21 |
DK164516B (da) | 1992-07-06 |
KR910700382A (ko) | 1991-03-15 |
BR9007017A (pt) | 1991-10-08 |
LV10321A (lv) | 1994-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1021660C (zh) | 安装海洋平台桩腿的方法和装置 | |
KR102185234B1 (ko) | 스퍼드캔 기초를 이용한 프리파일링 템플리트 및 이를 이용한 해상 구조물 설치 방법 | |
JP7547369B2 (ja) | 洋上風車を支持するように適合されたパイルを設置するための船および方法 | |
US4705430A (en) | Composite leg platform | |
CN105987850A (zh) | 具有桶式桁架基础的水域十字板剪切试验平台及安装方法 | |
CN101811563A (zh) | 一种海上沉船的打捞方法 | |
CN200971492Y (zh) | 一种吸力桩式海底钻井基盘 | |
NO171102B (no) | System for fortoeyning av marine konstruksjoner | |
CN115787645A (zh) | 海上风电深水先桩法四桩导管架基础沉桩快速施工工艺 | |
CN204780836U (zh) | 一种可调节浮式固定钻孔平台 | |
US4260291A (en) | Installation of an offshore structure | |
US2837897A (en) | Automatic underwater bracing system for a mobile drilling rig | |
CN111980594B (zh) | 临时海底基盘及批量安装深水表层导管的方法 | |
CN213414164U (zh) | 一种船舶定位机构 | |
CN112278156A (zh) | 一种船舶定位机构 | |
CN112575758A (zh) | 一种借助浮箱回收导管架的方法 | |
CN214272025U (zh) | 一种水上打桩机 | |
CN2642836Y (zh) | 砼桩起吊定位插打装置 | |
CN219862799U (zh) | 一种用于辅助钢管桩插桩入位的装置 | |
CN219989454U (zh) | 一种fpso吸力锚桩上的系泊锚链悬挂平台结构 | |
US4288178A (en) | Apparatus for generating a retropulsive force on a body such as a pile | |
JPH0493491A (ja) | 海底鉱物揚鉱装置 | |
JP2521445Y2 (ja) | 杭打船 | |
JPH06159553A (ja) | 水底沈設管布設方法 | |
NO175438B (no) | Fremgangsmåte og anordning for montering av pælene tilknyttet installasjon av en pælfundamentert offshore-plattform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |