CN104409892A - Special ground clamp for novel overhead bus bar bridge - Google Patents
Special ground clamp for novel overhead bus bar bridge Download PDFInfo
- Publication number
- CN104409892A CN104409892A CN201410661603.6A CN201410661603A CN104409892A CN 104409892 A CN104409892 A CN 104409892A CN 201410661603 A CN201410661603 A CN 201410661603A CN 104409892 A CN104409892 A CN 104409892A
- Authority
- CN
- China
- Prior art keywords
- rod
- insulating bar
- connecting plate
- screw
- grounding wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R11/00—Individual connecting elements providing two or more spaced connecting locations for conductive members which are, or may be, thereby interconnected, e.g. end pieces for wires or cables supported by the wire or cable and having means for facilitating electrical connection to some other wire, terminal, or conductive member, blocks of binding posts
- H01R11/11—End pieces or tapping pieces for wires, supported by the wire and for facilitating electrical connection to some other wire, terminal or conductive member
- H01R11/26—End pieces terminating in a screw clamp, screw or nut
Landscapes
- Electric Cable Installation (AREA)
Abstract
本发明公开了一种新型高位母线桥专用接地线夹,包括可拆卸连接的接地线夹具和绝缘调节杆,接地线夹具包括固定部分和可活动部分,固定部分包括上夹板和母线导电板,母线导电板的末端设有地线固定栓,母线导电板上开设有通孔;可活动部分包括下夹片、螺杆、多边形基座和定位架,定位架包括竖向连接板和横向连接板;横向连接板上由上到下开设有螺孔,螺杆的顶端连接下夹片,螺杆的末端连接多边形基座;绝缘调节杆的上部连接杆包括第一绝缘杆,第一绝缘杆的顶端连接多边形套筒,多边形套筒的形状与多边形基座相匹配,第一绝缘杆末端设有上部连接件;下部延长杆包括第二绝缘杆,第二绝缘杆的顶端与第一绝缘杆末端的连接件相匹配。
The invention discloses a new type of special ground wire clamp for high-position busbar bridges, which includes a detachably connected ground wire clamp and an insulation adjustment rod. The ground wire clamp includes a fixed part and a movable part. The end of the conductive plate is provided with a ground wire fixing bolt, and a through hole is opened on the conductive plate of the bus bar; the movable part includes a lower clip, a screw, a polygonal base and a positioning frame, and the positioning frame includes a vertical connecting plate and a horizontal connecting plate; There are screw holes on the connecting plate from top to bottom, the top of the screw is connected to the lower clip, and the end of the screw is connected to the polygonal base; the upper connecting rod of the insulating adjustment rod includes a first insulating rod, and the top of the first insulating rod is connected to the polygonal sleeve The shape of the polygonal sleeve matches the polygonal base, and the upper connecting piece is provided at the end of the first insulating rod; the lower extending rod includes the second insulating rod, and the top end of the second insulating rod is connected with the connecting piece at the end of the first insulating rod. match.
Description
技术领域 technical field
本发明涉及接地安全技术领域,尤其涉及一种新型高位母线桥专用接地线夹。 The invention relates to the technical field of grounding safety, in particular to a new type of special grounding clamp for high-level bus bridges.
背景技术 Background technique
接地线是接在电气设备外壳等部位及时的将因各种原因产生的不安全的电荷或者漏电电流导出的线路。在输电线路的检修过程中,线路停电之后必须连接地线。在电力设备的检修和维护过程中,需要保证设备可靠接地,通常是将连接有接地线的线夹固定在接地设备的导体部件上。在进行高位母线接地操作时,需要携带攀高工具高处作业,如果操作人员在作业时不慎摔倒或者误操作,导致人员受伤及发生误带电挂接地线的违规事故。 The grounding wire is connected to the electrical equipment casing and other parts in a timely manner to lead out unsafe charges or leakage currents generated due to various reasons. During the maintenance process of the transmission line, the ground wire must be connected after the power failure of the line. During the inspection and maintenance of electric equipment, it is necessary to ensure reliable grounding of the equipment. Usually, the clamp connected with the grounding wire is fixed on the conductor part of the grounding equipment. When carrying out the grounding operation of high-level busbars, it is necessary to carry climbing tools to work at high places. If the operator accidentally falls or misoperates during the operation, it will lead to personal injury and violation accidents such as wrongly electrified and connected to the grounding wire.
发明内容 Contents of the invention
本发明的目的是提供一种新型高位母线桥专用接地线夹,能够根据铝排的不同厚度,人工进行调节转接地线夹具的夹度范围,满足不同要求,既保证运维人员的安全,又有效节约了悬挂接地线的时间。 The purpose of the present invention is to provide a new type of special ground wire clamp for high-level bus bridges, which can manually adjust the clamping range of the ground wire clamp according to the different thicknesses of the aluminum bars, so as to meet different requirements and ensure the safety of operation and maintenance personnel. It also effectively saves the time for hanging the grounding wire.
本发明采用的技术方案为: The technical scheme adopted in the present invention is:
一种新型高位母线桥专用接地线夹,包括可拆卸连接的接地线夹具和绝缘调节杆,所述的接地线夹具包括固定部分和可活动部分,固定部分包括上夹板和母线导电板,上夹板与母线导电板垂直连接,母线导电板的末端设有地线固定栓,母线导电板上由左端面向右端面开设有通孔;可活动部分包括下夹片、螺杆、多边形基座和定位架,定位架包括竖向连接板和横向连接板,横向连接板的右端垂直连接竖向连接板的末端,竖向连接板的右侧壁上连接定位栓,定位栓穿过通孔并通过螺帽固定;横向连接板上由上到下开设有螺孔,螺杆与螺孔螺纹连接,螺杆的顶端连接下夹片,螺杆的末端连接多边形基座;所述的绝缘调节杆包括上部连接杆和下部延长杆,上部连接杆包括第一绝缘杆,第一绝缘杆的顶端连接多边形套筒,多边形套筒的形状与多边形基座相匹配,多边形套筒与多边形基座可拆卸连接,第一绝缘杆末端设有上部连接件;下部延长杆包括第二绝缘杆,第二绝缘杆的顶端与第一绝缘杆末端的连接件相匹配。 A new type of special ground wire clamp for high-level bus bridges, including a detachably connected ground wire clamp and an insulation adjustment rod. The ground wire clamp includes a fixed part and a movable part. The fixed part includes an upper splint and a busbar conductive plate. The upper splint It is vertically connected with the busbar conductive plate, and the end of the busbar conductive plate is provided with a ground wire fixing bolt, and a through hole is opened on the busbar conductive plate from the left end to the right end; the movable part includes the lower clip, the screw, the polygonal base and the positioning frame, The positioning frame includes a vertical connecting plate and a horizontal connecting plate, the right end of the horizontal connecting plate is vertically connected to the end of the vertical connecting plate, the right side wall of the vertical connecting plate is connected with a positioning bolt, and the positioning bolt passes through the through hole and is fixed by a nut ; There are screw holes on the horizontal connecting plate from top to bottom, the screw rod is threadedly connected with the screw hole, the top of the screw rod is connected to the lower clip, and the end of the screw rod is connected to the polygonal base; the insulating adjustment rod includes an upper connecting rod and a lower extension Rod, the upper connecting rod includes a first insulating rod, the top end of the first insulating rod is connected to a polygonal sleeve, the shape of the polygonal sleeve matches the polygonal base, the polygonal sleeve is detachably connected to the polygonal base, and the end of the first insulating rod An upper connecting piece is provided; the lower extending rod includes a second insulating rod, and the top end of the second insulating rod matches the connecting piece at the end of the first insulating rod.
所述的上部连接件为空心的圆柱筒,空心的圆柱体的内部水平设有一根限位杆,空心圆柱筒的上部套设在第一绝缘杆末端。 The upper connecting piece is a hollow cylinder, and a limit rod is arranged horizontally inside the hollow cylinder, and the upper part of the hollow cylinder is sleeved on the end of the first insulating rod.
第二绝缘杆的顶端面上开设有一个卡槽,限位杆设于卡槽内,第二绝缘杆的外直径小于上部连接件的内直径。 A slot is opened on the top surface of the second insulating rod, the limit rod is arranged in the slot, and the outer diameter of the second insulating rod is smaller than the inner diameter of the upper connecting piece.
所述的下部延长杆末端设有与第一绝缘杆末端的上部连接件相同的连接件。 The end of the lower extension rod is provided with the same connecting piece as the upper connecting piece at the end of the first insulating rod.
所述的下部延长杆设有多根。 There are multiple extension rods at the lower part.
上夹板的下端面上设有向上凹的线槽。 An upward concave wire groove is arranged on the lower end surface of the upper splint.
所述的定位栓设有两个。 There are two positioning bolts.
本发明利用固定部分和定位架对接地线夹具进行粗略的调整,使得接地线夹具能够卡住铝排或者母线,再通过绝缘调节杆控制螺杆的上下移动,从而控制下夹片的上下移动,达到对接地线夹具进行精密的调整,最终使得上夹板和下夹片夹夹紧检修的铝排或者母线;进一步地,利用上部连接件连接上部连接杆和下部延长杆,当工作人员操作不当或者部件使用频率高的时候,限位杆有可能会被拧断、卡槽会变形,影响绝缘调节杆的快速安装和方便使用,所以,采用上部连接件可以进行随时的更换。本装置具有灵活性,实用方面、既能保证运维人员的安全、更加有效节约了悬挂接地线的时间。 The invention uses the fixed part and the positioning frame to roughly adjust the grounding wire clamp, so that the grounding wire clamp can clamp the aluminum bar or the bus bar, and then controls the up and down movement of the screw rod through the insulation adjustment rod, thereby controlling the up and down movement of the lower clamping piece to achieve Precisely adjust the grounding wire clamp, and finally make the upper splint and the lower clamp clamp the aluminum bar or busbar for maintenance; further, use the upper connecting piece to connect the upper connecting rod and the lower extension rod, when the staff improperly operate or the parts When the frequency of use is high, the limit rod may be twisted off and the card slot may be deformed, which affects the quick installation and convenient use of the insulation adjustment rod. Therefore, the upper connecting piece can be used for replacement at any time. The device is flexible, and practically, it can not only ensure the safety of the operation and maintenance personnel, but also more effectively save the time for hanging the grounding wire.
附图说明 Description of drawings
图1为本发明的接地线夹具的结构示意主视图; Fig. 1 is the schematic front view of the structure of the ground wire clamp of the present invention;
图2为本发明的接地线夹具的结构示意右视图; Fig. 2 is the schematic right view of the structure of the ground wire clamp of the present invention;
图3为本发明的绝缘调节杆的结构示意图; Fig. 3 is the structural schematic diagram of the insulating adjusting rod of the present invention;
图4为本发明的绝缘调节杆的A部放大结构示意图。 Fig. 4 is a schematic diagram showing the enlarged structure of part A of the insulating adjusting rod of the present invention.
具体实施方式 Detailed ways
如图1、图2、图3和图4所示,本发明包括可拆卸连接的接地线夹具和绝缘调节杆,所述的接地线夹具包括固定部分和可活动部分,固定部分包括上夹板1和母线导电板2,上夹板1与母线导电板2垂直连接,上夹板1的下端面上设有向上凹的线槽20,线槽20用于夹紧母线,防止母线滑落。母线导电板2的末端设有地线固定栓11,母线导电板2上由左端面向右端面开设有通孔8。可活动部分包括下夹片5、螺杆6、多边形基座7和定位架,定位架包括竖向连接板3和横向连接板4,横向连接板4的右端垂直连接竖向连接板3的末端,竖向连接板3的右侧壁上连接两个定位栓9,定位栓9穿过通孔8并通过螺帽10固定;横向连接板4上由上到下开设有螺孔19,螺杆6与螺孔19螺纹连接,螺杆6的顶端连接下夹片5,螺杆6的末端连接多边形基座7。所述的绝缘调节杆包括上部连接杆和下部延长杆,上部连接杆包括第一绝缘杆14,第一绝缘杆14的顶端连接多边形套筒13,多边形套筒13的形状与多边形基座7相匹配,多边形套筒13与多边形基座7可拆卸连接,如卡接。第一绝缘杆14末端设有上部连接件16;上部连接件16为空心的圆柱筒,空心的圆柱体的内部水平设有一根限位杆17,空心圆柱筒的上部套设在第一绝缘杆14末端。下部延长杆包括第二绝缘杆15,第二绝缘杆15的顶端与第一绝缘杆14末端的连接件相匹配连接。第二绝缘杆15的顶端面开设有卡槽18,限位杆17设于卡槽18内,第二绝缘杆15的外直径小于上部连接件16的内直径。下部延长杆末端设有与第一绝缘杆14末端的上部连接件16相同的连接件。所述的下部延长杆设有多根。 As shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, the present invention includes a detachably connected grounding wire clamp and an insulation adjustment rod. The grounding wire clamp includes a fixed part and a movable part, and the fixed part includes an upper splint 1 And the busbar conductive plate 2, the upper splint 1 is vertically connected with the busbar conductive plate 2, and the lower end surface of the upper splint 1 is provided with an upwardly concave wire groove 20, and the wire groove 20 is used to clamp the busbar to prevent the busbar from slipping. The end of the busbar conductive plate 2 is provided with a ground wire fixing bolt 11, and the busbar conductive plate 2 is provided with a through hole 8 from the left end to the right end. The movable part includes a lower clip 5, a screw rod 6, a polygonal base 7 and a positioning frame. The positioning frame includes a vertical connecting plate 3 and a horizontal connecting plate 4. The right end of the horizontal connecting plate 4 is vertically connected to the end of the vertical connecting plate 3. Two positioning pins 9 are connected on the right side wall of vertical connecting plate 3, and positioning pin 9 passes through hole 8 and is fixed by nut 10; Offer screw hole 19 from top to bottom on horizontal connecting plate 4, screw rod 6 and The screw holes 19 are threaded, the top of the screw 6 is connected to the lower clip 5 , and the end of the screw 6 is connected to the polygonal base 7 . The insulating adjusting rod includes an upper connecting rod and a lower extension rod, the upper connecting rod includes a first insulating rod 14, the top end of the first insulating rod 14 is connected to a polygonal sleeve 13, and the shape of the polygonal sleeve 13 is similar to that of the polygonal base 7. Matching, the polygonal sleeve 13 is detachably connected with the polygonal base 7, such as clamping. The end of the first insulating rod 14 is provided with an upper connecting piece 16; the upper connecting piece 16 is a hollow cylinder, and a limit rod 17 is arranged horizontally inside the hollow cylinder, and the upper part of the hollow cylinder is sleeved on the first insulating rod. 14 ends. The lower extension rod includes a second insulating rod 15 , and the top end of the second insulating rod 15 is matched with the connector at the end of the first insulating rod 14 . The top surface of the second insulating rod 15 is provided with a locking groove 18 , and the limiting rod 17 is disposed in the locking groove 18 . The outer diameter of the second insulating rod 15 is smaller than the inner diameter of the upper connecting piece 16 . The end of the lower extension rod is provided with the same connecting piece as the upper connecting piece 16 at the end of the first insulating rod 14 . There are multiple extension rods at the lower part.
下面结合附图具体说明本发明的工作原理: The working principle of the present invention is specifically described below in conjunction with accompanying drawing:
如图1所示,首先,工作人员目测铝排的厚度或者母线的粗细程度,手动首次调整定位,首先松动定位栓9配套的螺帽10,使定位栓9松懈,根据目测的厚度或者粗细大致定位一下定位架的上下位置,再拧紧螺帽10。由于定位架的竖向连接板3右侧壁采用平面结构,母线导电板2的左侧壁也采用平面结构,能够使得竖向连接板3与母线导电板2紧密的贴合在一起,更加牢固的固定住定位架。然后,将接地线通过地线固定栓11固定在接地线夹具上,起到导电的作用,将工作中泄露的电流导向大地,避免工作人员触电,危害生命。其次,再将上部连接杆顶端的多边形套筒13套设在多边形基座7上,此时,工作人员可以轻松地举高接地线夹具,将接地线夹具设于需要检修的设备上。此时,接地线夹具并没有牢固的夹紧检修设备,所以,需要再次精细地调节。在将接地线夹具举高之前,工作人员需要目测检修设备所处的高度,根据高度情况连接下部延长杆。如图4所示,为图3A部的放大图,上部连接杆和下部延长杆通过上部连接件16连接在一起,上部连接件16的内部水平设有一根限位杆17,也叫“一”字形横杆,采用此种结构能够方便、快捷地连接起来,操作方便。限位杆17能够匹配设于第二绝缘杆15的顶部筒壁上相对开设的卡槽18内,由于绝缘调节杆是由工作人员手握支撑整个重量,加上地心引力的作用,限位杆17不会轻易地由卡槽18内脱落,保证使用的有效性。工作人员安装好绝缘调节杆后,需要进行精确调整,由于下夹片5通过螺杆6的作用而上下移动,而螺杆6需要依靠绝缘调节杆的作用而进行转动,所以,此时,工作人员通过手动转动绝缘调节杆,使得螺杆6进行转动,最后能够使得下夹片5进行上下移动,根据实际的情况,向上调节或者向下调节,直至能够加紧检修设备。 As shown in Figure 1, first, the staff visually inspects the thickness of the aluminum row or the thickness of the bus bar, and manually adjusts the positioning for the first time. Locate the upper and lower positions of the spacer, and then tighten the nut 10. Because the right side wall of the vertical connection plate 3 of the positioning frame adopts a planar structure, the left side wall of the busbar conductive plate 2 also adopts a planar structure, which can make the vertical connection plate 3 and the busbar conductive plate 2 closely fit together, making it more firm to fix the positioning bracket. Then, the grounding wire is fixed on the grounding wire clamp by the grounding wire fixing bolt 11, which plays the role of conduction, and the current leaked in the work is guided to the earth, so as to avoid the electric shock of the staff and endanger life. Secondly, the polygonal sleeve 13 at the top of the upper connecting rod is sleeved on the polygonal base 7. At this time, the staff can easily raise the grounding wire clamp and set the grounding wire clamp on the equipment that needs to be overhauled. At this time, the ground wire clamp does not firmly clamp the maintenance equipment, so it needs to be finely adjusted again. Before raising the ground wire clamp, the staff needs to visually check the height of the maintenance equipment, and connect the lower extension rod according to the height. As shown in Figure 4, which is an enlarged view of Figure 3A, the upper connecting rod and the lower extension rod are connected together through the upper connecting piece 16, and a limit rod 17 is arranged horizontally inside the upper connecting piece 16, also called "one". The glyph cross bar can be connected conveniently and quickly by adopting this structure, and the operation is convenient. The limit rod 17 can be matched in the draw-in groove 18 that is arranged on the top cylinder wall of the second insulating rod 15, because the insulation adjusting rod is held by the staff to support the whole weight, and the effect of gravity, the limit The rod 17 will not easily fall off from the slot 18, ensuring the effectiveness of use. After the staff installs the insulation adjusting rod, precise adjustment is required. Because the lower clip 5 moves up and down through the action of the screw 6, and the screw 6 needs to be rotated by the action of the insulation adjusting rod, so at this time, the staff passes Manually turn the insulation adjustment rod to make the screw rod 6 rotate, and finally the lower clip 5 can be moved up and down. According to the actual situation, adjust upward or downward until the maintenance equipment can be tightened.
本发明采用上部连接件16连接上部连接杆和下部延长杆,主要是由于绝缘调节杆在长期的使用过程中,会有损耗,当工作人员操作不当或者部件使用频率高的时候,限位杆17有可能会被拧断、卡槽18会变形,这些都会影响绝缘调节杆的快速安装和方便使用,所以,采用上部连接件16可以进行随时的更换。同时,在实际的现场工作中,需要携带多根绝缘调节杆,以防一根损坏而影响正常检修。 The present invention uses the upper connecting piece 16 to connect the upper connecting rod and the lower extension rod, mainly because the insulation adjusting rod will be worn out during long-term use. It may be twisted off and the card slot 18 will be deformed, which will affect the quick installation and convenient use of the insulating adjustment rod. Therefore, the upper connecting piece 16 can be used for replacement at any time. At the same time, in actual on-site work, it is necessary to carry multiple insulating adjustment rods, in case one is damaged and affects normal maintenance.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410661603.6A CN104409892A (en) | 2014-11-19 | 2014-11-19 | Special ground clamp for novel overhead bus bar bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410661603.6A CN104409892A (en) | 2014-11-19 | 2014-11-19 | Special ground clamp for novel overhead bus bar bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104409892A true CN104409892A (en) | 2015-03-11 |
Family
ID=52647499
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410661603.6A Pending CN104409892A (en) | 2014-11-19 | 2014-11-19 | Special ground clamp for novel overhead bus bar bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104409892A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105406218A (en) * | 2015-11-11 | 2016-03-16 | 国网浙江省电力公司湖州供电公司 | High-voltage grounding wire clamp |
CN106761854A (en) * | 2017-01-09 | 2017-05-31 | 北京新能正源环境科技有限公司 | The installation method of tunnel arch |
CN114374102A (en) * | 2021-12-02 | 2022-04-19 | 华能澜沧江水电股份有限公司 | Ground wire assembling clamp |
CN115051175A (en) * | 2022-07-22 | 2022-09-13 | 广东电网有限责任公司 | Double-end grounding test bolt grounding clamp |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101593942A (en) * | 2009-04-03 | 2009-12-02 | 安徽省电力公司滁州供电公司 | Operating method and special equipment for 10 kV insulated line operating lever type bypass |
JP4382213B2 (en) * | 1999-10-14 | 2009-12-09 | 中国電力株式会社 | Connection clamp device |
CN101726632A (en) * | 2008-10-11 | 2010-06-09 | 江苏省电力公司如皋市供电公司 | Electrical equipment test wire clamp |
CN101982908A (en) * | 2010-09-19 | 2011-03-02 | 江苏省电力公司高邮市供电公司 | Portable inspection ground wire device |
CN102769260A (en) * | 2012-07-03 | 2012-11-07 | 山西省电力公司忻州供电公司 | A live shunt device for preventing high-voltage variable conduction fluid junctions from heating and burning |
CN204304021U (en) * | 2014-11-19 | 2015-04-29 | 国家电网公司 | A kind of Novel high-level bus bridge Special grounding wire clip |
-
2014
- 2014-11-19 CN CN201410661603.6A patent/CN104409892A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4382213B2 (en) * | 1999-10-14 | 2009-12-09 | 中国電力株式会社 | Connection clamp device |
CN101726632A (en) * | 2008-10-11 | 2010-06-09 | 江苏省电力公司如皋市供电公司 | Electrical equipment test wire clamp |
CN101593942A (en) * | 2009-04-03 | 2009-12-02 | 安徽省电力公司滁州供电公司 | Operating method and special equipment for 10 kV insulated line operating lever type bypass |
CN101982908A (en) * | 2010-09-19 | 2011-03-02 | 江苏省电力公司高邮市供电公司 | Portable inspection ground wire device |
CN102769260A (en) * | 2012-07-03 | 2012-11-07 | 山西省电力公司忻州供电公司 | A live shunt device for preventing high-voltage variable conduction fluid junctions from heating and burning |
CN204304021U (en) * | 2014-11-19 | 2015-04-29 | 国家电网公司 | A kind of Novel high-level bus bridge Special grounding wire clip |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105406218A (en) * | 2015-11-11 | 2016-03-16 | 国网浙江省电力公司湖州供电公司 | High-voltage grounding wire clamp |
CN105406218B (en) * | 2015-11-11 | 2018-02-23 | 国网浙江省电力公司湖州供电公司 | A kind of high-voltage grounding wire clamp |
CN106761854A (en) * | 2017-01-09 | 2017-05-31 | 北京新能正源环境科技有限公司 | The installation method of tunnel arch |
CN114374102A (en) * | 2021-12-02 | 2022-04-19 | 华能澜沧江水电股份有限公司 | Ground wire assembling clamp |
CN115051175A (en) * | 2022-07-22 | 2022-09-13 | 广东电网有限责任公司 | Double-end grounding test bolt grounding clamp |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204304021U (en) | A kind of Novel high-level bus bridge Special grounding wire clip | |
CN103066526B (en) | A kind of ground connection line method and separated earthing instrument for ultra-high-tension power transmission line | |
CN104409892A (en) | Special ground clamp for novel overhead bus bar bridge | |
CN104201614B (en) | Far-end operation changes the device of two division circuit two strings of strain insulators | |
CN107171249A (en) | The mounting structure and replacement operation method of a kind of duplex strain insulator string | |
CN103326304B (en) | 10kV charged drainage wire supporting device | |
CN102270817A (en) | Tools for live replacement of tension insulators | |
CN104682262A (en) | Conductor end fixture for replacing first insulator at conductor end of single-link suspension insulator string and application of conductor end fixture | |
CN202206067U (en) | A tool for replacing line tension insulators with power on | |
CN203690798U (en) | Universal tool for replacing suspension angle tower insulator string | |
CN104617515A (en) | 10KV distribution line pole top maintenance supporting rod | |
CN103594964A (en) | Pole tower lead supporting frame | |
CN203277304U (en) | Built-in high voltage fuse bushing installation device | |
CN201981995U (en) | Pole ladder for maintenance of single-column device | |
CN209691988U (en) | Portable combined type short-circuit earthing bar | |
CN103474905A (en) | Auxiliary grounding wire laying device | |
CN204156488U (en) | Lightning arrester installation assembly | |
CN103746317B (en) | A kind of general utility tool changing straight-line angle tower insulator string | |
CN205692990U (en) | One is charged takes fire tool kit | |
CN109731252A (en) | A fixed safety belt suspension device for maintenance of electrical equipment in substations | |
CN205303738U (en) | Electric wire netting earth connection | |
CN203617613U (en) | Pole tower lead supporting frame | |
CN205178388U (en) | Two cluster insulators of straight line are changed and are connected | |
CN204175175U (en) | Circuit tower cable maintenance ladder | |
CN102891451B (en) | A kind of tubular busbar post insulator overhaul platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150311 |